ML20214H056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-87-213, Forwards SER on Licensee Conformance to Rev 3 of Reg Guide 1.97 on Emergency Response Capability.Technical Evaluation Rept for May 1986 Encl Re Licensee Submittal,Per Generic Ltr 82-33.W/SALP Input]]
{{Adams
| number = ML20214H056
| issue date = 06/11/1986
| title = Forwards SER on Licensee Conformance to Rev 3 of Reg Guide 1.97 on Emergency Response Capability.Technical Evaluation Rept for May 1986 Encl Re Licensee Submittal,Per Generic Ltr 82-33.W/SALP Input
| author name = Rossi C
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Nerses V
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000000, 05000443, 05000444
| license number =
| contact person =
| case reference number = FOIA-87-213, RTR-REGGD-01.097, RTR-REGGD-1.097
| document report number = GL-82-33, NUDOCS 8606160035
| package number = ML20213F414
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:-
Docket No.:    50-443/444                                                      Jgg 111986        l MEMORANDUM FOR:        Victor Nerses, Seabrook Project Manager PWR Project Directorate #5 Division of PWR Licensinp-A FROM:                  C. E.-Rossi, Assistant Director Division of PWR Licensing-A
 
==SUBJECT:==
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO R.G. 1.97, REV.'3 Plant Name:            Seabrook Station, Unit Nos. I and 2            -
Docket Nos.:          50-443/444
                                                                                *1 *
    ' Utility:              Public Service of New Hampshire Licensing Status:      OL                                            ,4't-Project Manager:      V. Nerses                                            ''
Review Branch:        EICSB/DPA Review Status:          Complete for Core Load We are transmitting herewith our subject safety evaluation with its-attachment, EG8G Idaho, Inc. Technical Evaluation- Report (TER) dated May 1986. Our safety j
evaluation is based on our review of EG8G's TER EGG-NTA-7256. We find the instrumentation provided by Public Service of New Hampshire for meeting the recomendations of Regulatory Guide 1.97 acceptable, except for the. variables accumulator tank level and pressure, containment sump water temperature, and quench tank temperature.
The applicant has committed to upgrade the accumulator tank level or pressure and containment sump water temperature instrumentation in accordance with Regu-latory Guide 1.97 prior to startup from the first refueling outage.. 'This is acceptable. For quench tank temperature the applicant should provide additional-information on the existing range of the instrument or provide an expanded range prior to startup from the first refueling outage.
Enclosure 2 is the SALP input for this review.
Original aignedby Charles E. Rossi, Assistant Director Division of PWR Licensing-A
 
==Enclosures:==
Distribution:
As stated                                    Docket File No. 50-443/444 EICSB Rdg                                            4 cc: See attached list                        WWLgavnkb(PFH2h J. E. Kriight q
 
==Contact:==
-                                    F. Rosa.                                              '
J. Lazevnick, EICSB/DPA                      C. E. Rossi                                          j X24864                                      Seabrook S/F                                            i i
E!CSB/DPA          SL/EICSB/DPA        BC/EICS)1LDEA                                            -
JLa      ick:ct    JE ni                FRosa g 4'              ERossi                          j a'.
6/i    86          6/ /D' 6            6 fit;/86 '              / //86;                      .
1
                                                                    /
OFFICIAL RECORD COPY
                                                    / f80                      '
h)                /
                                                                                                $/f 1
 
7-V. Nerses            2-cc:  T. Novak V. Noonan            j H. Walker            '
J. Wing J. Joyce            i A. Udy (EG8G) i I
1 J
1 i
i j
a s                              ,
4}}

Latest revision as of 05:16, 6 August 2021

Forwards SER on Licensee Conformance to Rev 3 of Reg Guide 1.97 on Emergency Response Capability.Technical Evaluation Rept for May 1986 Encl Re Licensee Submittal,Per Generic Ltr 82-33.W/SALP Input
ML20214H056
Person / Time
Site: Seabrook, 05000000
Issue date: 06/11/1986
From: Rossi C
Office of Nuclear Reactor Regulation
To: Nerses V
Office of Nuclear Reactor Regulation
Shared Package
ML20213F414 List:
References
FOIA-87-213, RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 8606160035
Download: ML20214H056 (2)


Text

-

Docket No.: 50-443/444 Jgg 111986 l MEMORANDUM FOR: Victor Nerses, Seabrook Project Manager PWR Project Directorate #5 Division of PWR Licensinp-A FROM: C. E.-Rossi, Assistant Director Division of PWR Licensing-A

SUBJECT:

EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO R.G. 1.97, REV.'3 Plant Name: Seabrook Station, Unit Nos. I and 2 -

Docket Nos.: 50-443/444

  • 1 *

' Utility: Public Service of New Hampshire Licensing Status: OL ,4't-Project Manager: V. Nerses

Review Branch: EICSB/DPA Review Status: Complete for Core Load We are transmitting herewith our subject safety evaluation with its-attachment, EG8G Idaho, Inc. Technical Evaluation- Report (TER) dated May 1986. Our safety j

evaluation is based on our review of EG8G's TER EGG-NTA-7256. We find the instrumentation provided by Public Service of New Hampshire for meeting the recomendations of Regulatory Guide 1.97 acceptable, except for the. variables accumulator tank level and pressure, containment sump water temperature, and quench tank temperature.

The applicant has committed to upgrade the accumulator tank level or pressure and containment sump water temperature instrumentation in accordance with Regu-latory Guide 1.97 prior to startup from the first refueling outage.. 'This is acceptable. For quench tank temperature the applicant should provide additional-information on the existing range of the instrument or provide an expanded range prior to startup from the first refueling outage.

Enclosure 2 is the SALP input for this review.

Original aignedby Charles E. Rossi, Assistant Director Division of PWR Licensing-A

Enclosures:

Distribution:

As stated Docket File No. 50-443/444 EICSB Rdg 4 cc: See attached list WWLgavnkb(PFH2h J. E. Kriight q

Contact:

- F. Rosa. '

J. Lazevnick, EICSB/DPA C. E. Rossi j X24864 Seabrook S/F i i

E!CSB/DPA SL/EICSB/DPA BC/EICS)1LDEA -

JLa ick:ct JE ni FRosa g 4' ERossi j a'.

6/i 86 6/ /D' 6 6 fit;/86 ' / //86; .

1

/

OFFICIAL RECORD COPY

/ f80 '

h) /

$/f 1

7-V. Nerses 2-cc: T. Novak V. Noonan j H. Walker '

J. Wing J. Joyce i A. Udy (EG8G) i I

1 J

1 i

i j

a s ,

4