APR 11 19W MEMORANDUM FOR:
'M. Miller, Vogtle Project Manager, PWR Project Directorate #4 Division of PWR Licensing-A 6
FROM:
C. E. Rossi, Assistant Director Division of PWR Licensing-A SU53 JECT:
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO R.G. 1.97, REV. 2 Plant Name:
Vogtle Electric Generating Plant, Unit Nos. 1 and P l
Utility:
Georgia Power Company j
Docket No.:
50-424/425 1
Licensing Status:
NTOL l
e Responsible Branch:
PD #4/DPA-1 Project Manager:
M. Miller Review Branch:
EICSB/DPA hview Status:
Complete 1
We are transmitting herewith our subject safety evaluation with its attachment',
EG&G Idaho, Inc., Technical Evaluation Report (TER) dated April 1986..We find the instrumentation provided by the Georgia Power Company for meeting the recommendations of Regulatory Guide 1.97 acceptable, except for the. variable containment sump water temperature.
i Our safety evaluation'is based on our review of EG4G's TER EGG-EA-6806. This j
completes EICSB's action on this item.
The EICSB evaluation of licensee performance (SALP input) is also enclosed.
S C. E. Rossi, Assistant Director Division of PWR Licensing-A Distribution:
Document Control 016 EICSB Rdg.
cc:<(w/enev):
d: 4 trtl9 M et M )(ti D. Crutchfield J. E. Knight
,G. Lainas F. Rosa j
'B. J. Youngblood C. E. Rossi l
'H. Walker Vogtle S/F F. Witt A. Udy (EG&G) l J. Joyce 4
1 Contact-i J. Lazevnick, EICSB/DPA X24864 EICSB/DPA SL/EICSB/DPA BC/EICSB/DPA AtdPA JLazevn c :ct
.JEKnightt/M FRosa g C lossi 4 8/ to /86 (ft/ /o /86 48/ / 0 /86 4 8/ (( /86 OFFICIAL RECORD COP 4
/
,