05000454/FIN-2011013-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 9: | Line 9: | ||
| significance = Severity level IV | | significance = Severity level IV | ||
| cornerstone = Mitigating Systems | | cornerstone = Mitigating Systems | ||
| violation of = | | violation of = | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = | | Inspection procedure = | ||
| Inspector = | | Inspector = C Thompson, D Jones, E Duncan, J Cassidy, J Laughlin, J Mcghee, J Robbins, M Holmberg, M Jones, N Feliz Adorno, R Ng, S Sheldon, B Bartlett, B Palagia, Stonej Coroju Sandina, Garmoeb Bartlett, B Jose, C Thompson, E Duncan, E Sanchez Santiago, J Cassidy, J Dalzell, J Robbins, R Ng | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
Latest revision as of 19:44, 20 February 2018
| Site: | Byron |
|---|---|
| Report | IR 05000454/2011013 Section 4OA5 |
| Date counted | Jun 30, 2011 (2011Q2) |
| Type: | TEV: Severity level IV |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | |
| Inspectors (proximate) | C Thompson D Jones E Duncan J Cassidy J Laughlin J Mcghee J Robbins M Holmberg M Jones N Feliz Adorno R Ng S Sheldon B Bartlett B Palagia Stonej Coroju Sandina Garmoeb Bartlett B Jose C Thompson E Duncan E Sanchez Santiago J Cassidy J Dalzell J Robbins R Ng |
| INPO aspect | |
| ' | |