| Q | CCA | Title |
---|
05000454/FIN-2010002-01 | 2010Q1 | | Fire Barrier with Unsealed Penetration Between Unit 1 AF Pump Rooms |
05000454/FIN-2010003-04 | 2010Q2 | H.4 H.5 | Loose Debris Inside of Unit 2 Containment at the Start of the Refueling Outage |
05000454/FIN-2010003-02 | 2010Q2 | | Inadequate Evaluation of Shim Pack for the Upper Steam Generator Lateral Supports |
05000454/FIN-2010003-06 | 2010Q2 | P.2 | Failure to Report an Automatic RPS and Auxiliary Feedwater Actuation While Shut Down |
05000454/FIN-2010003-05 | 2010Q2 | H.14 | Failure to Appropriately Analyse the Degraded Voltage Timer Settings |
05000454/FIN-2010003-03 | 2010Q2 | P.3 | Water Instrusion Leads to Loss of AnnunciatOrs |
05000454/FIN-2010003-01 | 2010Q2 | P.2 | 0B Fire Pump Discharge Valve Discovered Closed |
05000454/FIN-2010007-01 | 2010Q3 | | Inadequate Procedures for Implementing FSAR Required Annulus Cooling |
05000454/FIN-2010004-02 | 2010Q3 | | Relying on the Use of Friction as a Restraining Force when the HI-TRAC is Placed on top of the HI-STORM |
05000454/FIN-2010007-03 | 2010Q3 | | Licensee ISFSI Annulus Cooling System Important to Safety Classification |
05000454/FIN-2010007-02 | 2010Q3 | | Non-Inert Atmosphere May Challenge Fuel Integrity |
05000454/FIN-2010007-04 | 2010Q3 | | Thermal Models in FSAR Design Basis Analysis May Not be Conservative |
05000454/FIN-2010004-01 | 2010Q3 | H.7 | Failure to Perform Adequate Evaluation for Crane Upgrade |
05000454/FIN-2010006-02 | 2010Q4 | | Failure to Provide Adequate Guidance in Safe-Shutdown Procedures |
05000454/FIN-2010005-01 | 2010Q4 | | Inadequate Instructions for the Inspection of the River Screen House and Essential Service Water Cooling Tower |
05000454/FIN-2010006-03 | 2010Q4 | | Failure to Periodically Test 125 Vdc Molded Case Circuit Breakers |
05000454/FIN-2010006-01 | 2010Q4 | | Manual Actions Not Explicitly Approved |
05000454/FIN-2010005-03 | 2010Q4 | | Inadequate Procedural Guidance for Heavy Loads Operations |
05000454/FIN-2010005-02 | 2010Q4 | | Inadequate Procedures for Implementing FSAR Required Annulus Cooling |