05000416/FIN-2008006-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Fire Brigade Members Assigned Responsibilities That Conflicted | | title = Fire Brigade Members Assigned Responsibilities That Conflicted with Fire Brigade Responsibilities | ||
| docket = 05000416 | | docket = 05000416 | ||
Line 13: | Line 13: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71111.05 | | Inspection procedure = IP 71111.05 | ||
| Inspector = N O,' | | Inspector = N O, 'Keefek Sullivan, S Alferink, R Bywater, R Mullikin, P Qualls | ||
| CCA = H.5 | | CCA = H.5 | ||
| INPO aspect = WP.1 | | INPO aspect = WP.1 |
Revision as of 19:36, 20 February 2018
Site: | Grand Gulf |
---|---|
Report | IR 05000416/2008006 Section 1R05 |
Date counted | Sep 30, 2008 (2008Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | N O 'Keefek Sullivan S Alferink R Bywater R Mullikin P Qualls |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |