05000528/FIN-2004014-03: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Perform Written Safety Evaluation in Accordance with 10 CFR 50.59 Requirements | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
| inspection report = IR 05000528/2004014 | | inspection report = IR 05000528/2004014 |
Revision as of 18:44, 20 February 2018
Site: | Palo Verde |
---|---|
Report | IR 05000528/2004014 Section 4OA5 |
Date counted | Dec 31, 2004 (2004Q4) |
Type: | TEV: Severity level IV |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 93812 |
Inspectors (proximate) | A Howell G Miller J Shea M Hay |
Violation of: | 10 CFR 50.59 |
INPO aspect | |
' | |