| title = ER 05000327-11-301 and 05000328-11-301, April 12 -13, 2011; Sequoyah Nuclear Plant; Operator License Examinations
| title = Er 05000327-11-301 and 05000328-11-301, April 12 -13, 2011; Sequoyah Nuclear Plant; Operator License Examinations
| author name = Franke M E
| author name = Franke M E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS

Latest revision as of 00:46, 19 February 2018

Er 05000327-11-301 and 05000328-11-301, April 12 -13, 2011; Sequoyah Nuclear Plant; Operator License Examinations
ML111300565
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/10/2011
From: Franke M E
Division of Reactor Safety II
To: Krich R M
Tennessee Valley Authority
References
50-237/11-301, 50-238/11-301 50-237/11-301, 50-238/11-301
Download: ML111300565 (8)


See also: IR 05000327/2011301

Text

May 10, 2011

Mr. R. Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT NOS.: 05000327/2011301 AND 05000328/2011301

Dear Mr. Krich:

During the period April 12 - 13, 2011, the Nuclear Regulatory Commission (NRC) administered a retake walk-through operating test to an employee of your company who had applied for a license to operate the Sequoyah Nuclear Plant. At the conclusion of the test, the examiner discussed preliminary findings related to the operating test with those members of your staff identified in the enclosed report. The Senior Reactor Operator (SRO) applicant passed the operating test. A waiver was granted for the written examination. There were no post-examination comments.

The initial examination submittal was within the range of acceptability expected for the proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

TVA 2 If you have any questions concerning this letter, please contact me at (404) 997-4436.

Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-327, 50-328 License Nos: DPR 77, DPR 79

Enclosure:

Report Details cc w/encl.: (See page 3)

TVA 2 If you have any questions concerning this letter, please contact me at (404) 997-4436.

Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-327, 50-328 License Nos: DPR 77, DPR 79

Enclosure:

Report Details cc w/encl.: (See page 3)

Distribution w/encl: C. Evans, RII EICS (Part 72 Only) L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC R. Pascarelli, NRR (Regulatory Conferences Only) RidsNrrPMSequoyah Resource X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML111300565 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRS RII: DRP SIGNATURE RA RA RA NAME E. LEA M. FRANKE E. GUTHRIE DATE 05/06/2011 05/06/2011 05/09/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: O:\SEQUOYAH EXAMINATIONS\INITIAL EXAM RETAKE 2011-01\POST EXAM INFO\SEQUOYAH RETAKE EXAM REPORT 2011 REV1.DOCX TVA 3 cc w/encl: M. D. Skaggs Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution G. M. Cook Manager Licensing Sequoyah Nuclear Plant Electronic Mail Distribution R. M. Cook Manager, Corp. Nuclear Licensing - SQN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel County Mayor Hamilton County Hamilton County Courthouse 208 Courthouse 625 Georgia Avenue Chattanooga, TN 37402-2801 Tennessee Department of Environment & Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Ann Harris 341 Swing Loop Rockwood, TN 37854 Tennessee Valle Authority Electronic Mail Distribution Tennessee Valley Authority ATTN: Ms. Coleen Ware Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Report Nos.: 05000327/2011301, 05000328/2011301 Licensee: Tennessee Valley Authority (TVA) Facility: Sequoyah Nuclear Plant, Units 1 & 2 Location: Soddy-Daisy, TN 37379 Dates: Operating Test - April 12 - 13, 2011 Examiners: Edwin Lea, Jr., Chief Examiner, Operations Engineer Approved by: Mark E. Franke, Chief Operations Branch Division of Reactor Safety Enclosure SUMMARY OF FINDINGS ER 05000327/2011301 and 05000328/2011301, April 12 -13, 2011; Sequoyah Nuclear Plant; Operator License Examinations. A Nuclear Regulatory Commission (NRC) examiner conducted an initial retake examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable. Members of the Sequoyah Nuclear Plant training staff developed the operating test.

The NRC administered the operating test during the period April 12 - 13, 2011. A waiver of the written examination was granted. The Senior Reactor Operator (SRO) applicant passed the operating test. The applicant was issued a license commensurate with the level of the examination administered.

Enclosure REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope Members of the Sequoyah Nuclear Plant staff developed the operating test. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials. The NRC reviewed the licensee's examination security measures while preparing and administering the examination in order to ensure compliance with 10 CFR §55.49,

"Integrity of examinations and tests." The NRC examiner evaluated one Senior Reactor Operator (SRO) retake applicant using the guidelines contained in NUREG-1021. The examiner administered the operating test during the period April 12 -13, 2011. Evaluation of the applicant and review of associated documentation were performed to determine if the applicant, who applied for a license to operate the Sequoyah Nuclear Plant, met the requirements specified in 10 CFR Part 55, "Operators' Licenses." b. Findings No findings were identified. The NRC determined, using NUREG-1021, that the licensee's initial examination submittal was within the range of acceptability expected for the proposed examination.

The applicant passed the operating test and was granted a waiver for the written examination. The applicant was issued a license. A copy of the individual examination report was sent to the facility Training Manager for evaluation. The licensee did not submit any post-examination comments. 4OA6 Exit Meeting Summary On April 13, 2011, the NRC examiner discussed preliminary findings related to the operating test with Mr. Ken Langdon, Plant Manager, and members of the Sequoyah Nuclear Plant staff identified in the enclosed report. The examiner asked the licensee if any of the examination material was proprietary. No proprietary information was identified.

Enclosure KEY POINTS OF CONTACT Licensee personnel A. Bergeron, Operations Training Manager M. Buckner, Exam Developer T. Conner, Unit Supervisor S. Connors, Operations Manager G. Cook, Licensing Manager D. Hawes, Initial Licensing Training Supervisor K. Langdon, Plant Manager R. Proffitt, Licensing Program Manager O. Triolo, Exam Developer N. Thomas, Licensing Engineer C. Ware, Training Manager J. Wilkes, Operations Support Superintendent