|
|
Line 2: |
Line 2: |
| | number = ML17284A126 | | | number = ML17284A126 |
| | issue date = 09/06/2017 | | | issue date = 09/06/2017 |
| | title = Foia/Pa-2017-0675, Request for Pilgrim Nuclear Power Station, The Problem Identification and Resolution Sample Inspection Report 05000293/2017405. | | | title = FOIA/PA-2017-0675, Request for Pilgrim Nuclear Power Station, The Problem Identification and Resolution Sample Inspection Report 05000293/2017405. |
| | author name = Legere C | | | author name = Legere C |
| | author affiliation = Cape Cod Times | | | author affiliation = Cape Cod Times |
Revision as of 19:23, 15 February 2018
|
---|
Category:FOIA/Privacy Act Request
MONTHYEARML23125A0542023-03-20020 March 2023 FOIA-2023-000081, Request for Copies of Any and All Complaints, Investigate Reports, Witness Statements, Memoranda, Correspondence, Records, And/Or Other Documents Which Refer or Relate to an Incident Located at 600 Rocky Hill Road, Plymout ML23125A0592023-03-16016 March 2023 FOIA-2023-000079, Request for Documentation Received by the NRC from Holtec Dated 2021 to the Present (March 16, 2023) on Discussions with the Plymouth Police Department (Ppd) on the Memorandum of Agreement (Moa) for an Enhanced Emergency R ML17254A0182017-09-0606 September 2017 FOIA/PA-2017-0676, Request for List of the 22 Instances of Cross-Cutting Issues Referenced in the Pilgrim Station Quarterly Assessment, Report 05000293/2017005 (ML17237A163) ML17284A1262017-09-0606 September 2017 FOIA/PA-2017-0675, Request for Pilgrim Nuclear Power Station, the Problem Identification and Resolution Sample Inspection Report 05000293/2017405. ML17284A1252017-09-0606 September 2017 FOIA/PA-2017-0674 - Request for Pilgrim Nuclear Power Station, the Problem Identification and Resolution Sample Inspection Report 05000293/2017405. NRC-2017-0004, NRC-2017-000485, Request for Evaluations or Documentation Associated with 72.212 Between the NRC and Entergy'S Pilgrim Nuclear Power Station2017-04-20020 April 2017 NRC-2017-000485, Request for Evaluations or Documentation Associated with 72.212 Between the NRC and Entergy'S Pilgrim Nuclear Power Station ML17135A0092017-03-22022 March 2017 FOIA/PA-2017-0494, Request for the United States Atomic Energy Commission Summary of Application, in the Matter of Boston Edison Company for Pilgrim Nuclear Power Station, Dated August 6, 1971, Docket No. 50-293 ML17034A2182016-10-0606 October 2016 FOIA/PA-2017-0031, Request for All Records, Including Communications, Related to the Specified Contention in the Environmental Protection Agency'S Draft Permit for Pilgrim Nuclear Power Station ML16109A0052016-04-15015 April 2016 FOIA/PA-2016-0433 - All Information Related to Any and All Valves Manufactured by Marotta Controls, Inc., Marotta Scientific Controls, Inc., Marotta Engineering, or Marotta Controls at the Pilgrim Nuclear Generating Station, Prior to 1/1/19 2023-03-20
[Table view] |
Text
From: To: Legere. Christine FOIA Resource CASE NO: 2017-0675 DATE REC'D: 09/06/2017 Subject: [External_Sender] Pilgrim Nuclear Power Station -Problem Identification and resolution sample inspection report: 05000293/2017405 Date: Wednesday, September 06, 2017 9:35:36 AM Letter to Brian Sullivan, Pilgrim VP dated Sept. 5, 2017 I request under the Freedom oflnformation Act documents related to the above-listed report, dealing with security-related problem identification and resolution inspection on Aug. 23, 2017 Christine Legere Cape Cod Times 508-916-0422 This message may contain confidential and/or privileged information. If you are not the intended recipient or authorized to receive this for the intended recipient, you must not use, copy, disclose or take any action based on this message or any information herein. If you have received this message in error, please advise the sender immediately by sending a reply e-mail and delete this message. Thank you for your cooperation. *