IR 05000151/2012005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML12307A330
| number = ML12307A330
| issue date = 10/31/2012
| issue date = 10/31/2012
| title = IR 05000151-12-005 (DNMS), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor
| title = IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor
| author name = Lipa C A
| author name = Lipa C A
| author affiliation = NRC/RGN-III/DNMS/MCID
| author affiliation = NRC/RGN-III/DNMS/MCID

Revision as of 10:13, 14 February 2018

IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor
ML12307A330
Person / Time
Site: University of Illinois
Issue date: 10/31/2012
From: Lipa C A
NRC/RGN-III/DNMS/MCID
To: Holm R L
University of Illinois
Rodriguez L N
References
IR-12-005
Download: ML12307A330 (12)


Text

October 31, 2012

Mr. Richard Reactor Administrator 216 Talbot Laboratory 104 South Wright St.

Urbana, IL 61801

SUBJECT: NRC INSPECTION REPORT 05000151/12005(DNMS) UNIVERSITY OF ILLINOIS NUCLEAR REACTOR

Dear Mr. Holm:

On October 15, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the permanently shut down University of Illinois Advanced Teaching Research Isotope General Atomic (TRIGA) Nuclear Research Reactor, Urbana, Illinois. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on July 23, 2012, and subsequent in-office review through October 15, 2012, the inspectors conducted independent confirmatory radiation surveys and sampling, and evaluated your contractor's decommissioning performance. At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with your decommissioning contractor. At the conclusion of the in-office review, a final telephone exit meeting was conducted with you on October 15, 2012.

This inspection consisted of an examination of decommissioning activities at the site as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included the performance of confirmatory surveys and a selective examination of decommissioning documents.

Based on the results of this inspection, no violations were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.

Sincerely,/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115

Enclosure:

NRC Inspection Report No. 05000151/12005(DNMS) cc w/encl: J. Klinger, Illinois Emergency Management Agency (IEMA)

K. Horn, IEMA C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois