ML20078P565: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20078P565
| number = ML20078P565
| issue date = 12/31/1994
| issue date = 12/31/1994
| title = Annual Operating Rept for Period of Jan-Dec 1994,including Data Associated W/Personnel man-rem by Work & Job Function.
| title = Annual Operating Rept for Period of Jan-Dec 1994,including Data Associated W/Personnel man-rem by Work & Job Function
| author name = Phares J
| author name = Phares J
| author affiliation = ILLINOIS POWER CO.
| author affiliation = ILLINOIS POWER CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,e **
Ilknots Power Company Chnton Power Station P O Box 678 Chnton. IL 61727 Tel 217 935-8881 P&WER                                                                    m 24i5 L30-95(02 - 13 )LP 1A.120 February 13, 1995 Docket No. 50-461                                                            10CFR50.36 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
62tn.nLQp3 rating Repm1
 
==Dear Sir:==
 
In accordance with Section 5.6.1 of the Clinton Power Station Technical Specifications, Illinois Power is submitting the Annual Operating Report for the period of January 1,1995 through December 31,1994 for Clinton Power Station. Attachment I provides the data associated with Personnel Man-Rem by Work and Job Function.
Sincerely yours,
                                                        .h.        f/
Richard F. Pha es, Director, Licensing SFB/csm Attachment cc:    NRC Region III, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Director, Oflice of Nuclear Regulatory Research Illinois Department of Nuclear Safety 1[b(O-$                                                                        g 9502170136 941231 PDR    ADOCK 05000461                                                          !!
R                        PDR                                                      [
 
ILLINOIS POWER COMPANY                                        lt8Cbment 1
              *
* CLINTON POCER STATION.                                                  to U-( 02415 P. O. sox 67e                                                    Page 1 of 2 Clinton, IL 61727 Reg. Ouide 1.16 Report Riportirig Years 94 e
                                                                                          # PERSONNEL (>100 MREM)                                                            TOTAL MAN-REM WORK & JOB FUNCTION                                        STATION                  UTILITY              CONTRA O                          STATION            UTILITY            COffrRACT Routine Operations and surveillance C&intenance and Construction                                                  54                        1                    7                            0.401                0.011            0.059 Oparations                                                                  16                        1                    0                            0.282                0.041            0.000 His1th Physics and Lab                                                        25                        0                    1                            0.282                0.000            0.005 Supervisory and Office staff                                                  5                        0                    1                            0.100              0.000              0.004 Engineering Staff                                                            3                        0                    0                            0.029                0.000            0.000
    +..................................................................................................................................+
Routine Plant Maintenance Maintenance and construction                                                  27                        0                    2                            0.264                0.000            0.016 Opsrations                                                                    4                        0                    u                            0.039                0.000            0.000 Hzsith Physics and Lab                                                        13                        0                    0                            0.114                0.000            0.000 Eupervisory and Office staff                                                  2                        0                    1                            0.005              0.000              0.009 Engineering Staff                                                            3                        0                    0                            0.057                0.000            0.000
    +..................................................................................................................................+
Inservice Inspection M2intenance and Const ruction                                                  1                        0                    0                            0.025                0.000            0.000 Oparations                                                                    0                        0                    0                            0.000                0.000            0.000 Hamith Physics and Lab                                                        3                        0                    0                            0.028                0.000            0.000 Supervisory and Of fice staf f                                                0                        0                    0                            0.000                0.000            0.000 Bngineering Staff                                                            0                        0                    0                            0.000              0.000              0.000
    +............................. ....................................................................................................+
Kpecial Plant Maintenance M2intenance and Construction                                                101                        1                    23                          24.962                0.324            5.023 Opsrations                                                                    25                        2                    2                            5.351                0.305            0.14e Haalth Physics and Lab                                                        45                        0                    2                          12.672                0.000            0.058 Supsrvisory and Office Staff                                                  6                        0                    2                            1.465                0.000            0.324
* 0                    0                            0.955                0.000            0.000 Engineering staff                                                              5
    +..................................................................................................................................+                                                                                            .
Westa Processing Maintenance and construction                                                  11                        0                    2                            0.130                0.000            0.368 Opsrations                                                                      0                      0                    0                            0.000                0.000            0.000 H2alth Physics and Lab                                                        19                        0                    0                            0.313                0.000            0.000 Supsrvisory and Office staf f                                                  1                      0                    0                            0.005                0.000            0.000 Engineering Staf f                                                            0                      0                    0                            0.000                0.000            0.000
    +.................................................................................................................. ...............+
R2fu211ng Operations M2intenance and construction                                                15                        0                    2                            0.345                0.000            0.085 Operations                                                                    1                        0                    0                            0.005                0.000            0.000 Hsalth Physics and Lab                                                      15                        0                    0                            0.154                0.000            0.000 supervisory and Office staff                                                  C                        0                    0                            0.000                0.000            0.000 Engineering Staff                                                              0                        0                    0                            0.000                0.000            0.000
    +..................................................................................................................................+
WOIK & JOB FUNCTION TUTALS:                                                  400                          5                  45                          48.000                0.681            6.099
    +..................................................................................................................................+
                                                                                          # PERSONNEL (>100 MREM)                                                            TOTAL MAN-REM WORK & JOB FUNCTION                                        STATION                  VTILITY              CONTRACT                          STATION            UTILITY            CONTRACT GRAND TOTA 1As                                                                180                          3                  28                          48.003                0.481            6.099
 
  .    .-                . . - . . .                .- ..-..            .- ._=.          --        - ...    .-
,.  **                                                                            Atttchment 1                        :
to U-602415 Page 2 of 2
                    .                                                                                                s
* k R3 port of Personn_cl and Man-Rem by Work an_si Job Function This report is a tabulation on an annual basis of tl - number of station, utility and other personnel (including contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and job function.
i The work and job function totals for personnel greater than 100 mrem /yr are different than grand totals because an individual may perform work under .nore than one work and job function during the year.                                                                                  -
The total man-rem is based on a ratio of the official TLD results.
I I
I i
i k
s e
f
                                                                                                    -      - ,    ._}}

Revision as of 23:47, 19 May 2020

Annual Operating Rept for Period of Jan-Dec 1994,including Data Associated W/Personnel man-rem by Work & Job Function
ML20078P565
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/31/1994
From: Phares J
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602415, NUDOCS 9502170136
Download: ML20078P565 (3)


Text

,e **

Ilknots Power Company Chnton Power Station P O Box 678 Chnton. IL 61727 Tel 217 935-8881 P&WER m 24i5 L30-95(02 - 13 )LP 1A.120 February 13, 1995 Docket No. 50-461 10CFR50.36 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

62tn.nLQp3 rating Repm1

Dear Sir:

In accordance with Section 5.6.1 of the Clinton Power Station Technical Specifications, Illinois Power is submitting the Annual Operating Report for the period of January 1,1995 through December 31,1994 for Clinton Power Station. Attachment I provides the data associated with Personnel Man-Rem by Work and Job Function.

Sincerely yours,

.h. f/

Richard F. Pha es, Director, Licensing SFB/csm Attachment cc: NRC Region III, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Director, Oflice of Nuclear Regulatory Research Illinois Department of Nuclear Safety 1[b(O-$ g 9502170136 941231 PDR ADOCK 05000461  !!

R PDR [

ILLINOIS POWER COMPANY lt8Cbment 1

  • CLINTON POCER STATION. to U-( 02415 P. O. sox 67e Page 1 of 2 Clinton, IL 61727 Reg. Ouide 1.16 Report Riportirig Years 94 e
  1. PERSONNEL (>100 MREM) TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRA O STATION UTILITY COffrRACT Routine Operations and surveillance C&intenance and Construction 54 1 7 0.401 0.011 0.059 Oparations 16 1 0 0.282 0.041 0.000 His1th Physics and Lab 25 0 1 0.282 0.000 0.005 Supervisory and Office staff 5 0 1 0.100 0.000 0.004 Engineering Staff 3 0 0 0.029 0.000 0.000

+..................................................................................................................................+

Routine Plant Maintenance Maintenance and construction 27 0 2 0.264 0.000 0.016 Opsrations 4 0 u 0.039 0.000 0.000 Hzsith Physics and Lab 13 0 0 0.114 0.000 0.000 Eupervisory and Office staff 2 0 1 0.005 0.000 0.009 Engineering Staff 3 0 0 0.057 0.000 0.000

+..................................................................................................................................+

Inservice Inspection M2intenance and Const ruction 1 0 0 0.025 0.000 0.000 Oparations 0 0 0 0.000 0.000 0.000 Hamith Physics and Lab 3 0 0 0.028 0.000 0.000 Supervisory and Of fice staf f 0 0 0 0.000 0.000 0.000 Bngineering Staff 0 0 0 0.000 0.000 0.000

+............................. ....................................................................................................+

Kpecial Plant Maintenance M2intenance and Construction 101 1 23 24.962 0.324 5.023 Opsrations 25 2 2 5.351 0.305 0.14e Haalth Physics and Lab 45 0 2 12.672 0.000 0.058 Supsrvisory and Office Staff 6 0 2 1.465 0.000 0.324

  • 0 0 0.955 0.000 0.000 Engineering staff 5

+..................................................................................................................................+ .

Westa Processing Maintenance and construction 11 0 2 0.130 0.000 0.368 Opsrations 0 0 0 0.000 0.000 0.000 H2alth Physics and Lab 19 0 0 0.313 0.000 0.000 Supsrvisory and Office staf f 1 0 0 0.005 0.000 0.000 Engineering Staf f 0 0 0 0.000 0.000 0.000

+.................................................................................................................. ...............+

R2fu211ng Operations M2intenance and construction 15 0 2 0.345 0.000 0.085 Operations 1 0 0 0.005 0.000 0.000 Hsalth Physics and Lab 15 0 0 0.154 0.000 0.000 supervisory and Office staff C 0 0 0.000 0.000 0.000 Engineering Staff 0 0 0 0.000 0.000 0.000

+..................................................................................................................................+

WOIK & JOB FUNCTION TUTALS: 400 5 45 48.000 0.681 6.099

+..................................................................................................................................+

  1. PERSONNEL (>100 MREM) TOTAL MAN-REM WORK & JOB FUNCTION STATION VTILITY CONTRACT STATION UTILITY CONTRACT GRAND TOTA 1As 180 3 28 48.003 0.481 6.099

. .- . . - . . . .- ..-.. .- ._=. -- - ... .-

,. ** Atttchment 1  :

to U-602415 Page 2 of 2

. s

  • k R3 port of Personn_cl and Man-Rem by Work an_si Job Function This report is a tabulation on an annual basis of tl - number of station, utility and other personnel (including contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and job function.

i The work and job function totals for personnel greater than 100 mrem /yr are different than grand totals because an individual may perform work under .nore than one work and job function during the year. -

The total man-rem is based on a ratio of the official TLD results.

I I

I i

i k

s e

f

- - , ._