ML20064K055: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:}}
f
        \%
BOSTON EDf 50N COMPANY 800 50VLETON STREET BOSTON. MABBACHUBETTE 02199 WILLIAM O. HARRINGTON u.... .... ........,
        """""                                                                  January 14, 1983 BECo. Ltr. #83-19 Proposed Change #83-1 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor' Regulation U.S. Nuclear Regulatory Commission Washington, D. C.            20555 License No. DPR '15 Docket No. 50-293 PNPS Proposed Technical Specification Changes
 
==Dear Sir:==
Pursuant to 10 CFR 50.90, Boston Edison Company hereby proposes the following modifications to Facility Operating License No. DPR-35, Appendix A. The desired changes are described in Attachments A-C to this letter. In accordance with 10 CFR 170.22, " Schedule of Fees for Facility License Amendments", a check for the amount of $7,600will be submitted in the near future.
It should be noted that the Technical Specification Change shown in Attachment A is the result of comitments made in response to an IE Inspection Report Notice
                                                                    ~
of Violation. Specifically, the submittal of Attachment A to the NRC addresses INC 82-22-04.
I Should you have any questions concerning this submittal, please do not hesitate to contact us.
t Attachments:          A,B,C 3 signed originals and 37 copies Commonwealth of Massachusetts) l .c$$      County of Suffolk                    )
' oo 05'    Then personally appeared before me William D. Harrington, who, being duly sworn, SS      did state that he is Senior Vice President - Nuclear of Boston Edison Company, O      the applicant herein, and that he is duly authorized to execute and file the
'$x        submittal contained herein in the name and on behalf of Boston Edison Company
'So        and that the statements in said submittal are true to the best of his knowledge h@      and belief.
8      My Commission expires: Y -/4/- PJ                  h      w    d''  N Notary Public
                                                                                            - r'
, e n.'                                                      ,
 
s Attachm:nt A 6
Proposed Technical Specification Change Propcsed Chenge                                                          '
Reference is made to Pilgrim Nuclear Power Station, Unit #1 Technical Specification, Appendix A, Section 3.7. A, " Primary Containment", Item 3.7. A.4.a(3).
Remove the following:    3.7.A.4.a(3)
            "The position alann... opening exceeds 3/32".
Add the following: 3.7.A.4.a(3)
            "Neither of the two position alarm systems which annunciate on Panel C-7 and Panel 905 when any vacuum breaker opening exceeds 3/32", are in alarm."
Remove the following:    Item 4.7.A.4.a(3)
    "Until such time...shall be performed."
      -Remove the following: Bases 3.7.A and 4.7.A "Each dry-well suppression... longer be applicable."
Add the following: Bases 3.7.A and 4.7.A Each drywell suppression chamber vacuum breaker is equipped with three switches. One provides full open indication only. Another provides closed indication and an alarm on Panel C-7 should any vacuum breaker come off its closed seat by greater than 3/32". The last provides a separate and redundant alarm on Panel 905 should any vacuum breaker come off its closed seat by greater than 3/32". The two alarms above are those referred to in Section 3.7. A.4.a(3) and 3.7. A.4.d.
Reason for Change A change to Item 3.7.A.4.a(3) will clarify the ambiguous language that now exists. Specifically the words "when installed" are deleted and the proposed change details the applicable Drywell to Torus Vacuum Breaker alarms.          ,
i Item 4.7.A.4.a(3) is no longer needed because the position indicators with alarm in the control room are installed on the drywell-pressure suppression chamber vacuum breakers.
Safety Considerations
:    This change does not oresent an unreviewed safety question as defined in 10 CFR 50.59(c). It has been reviewed and approved by the Operations Review Committee and reviewed by the Nuclear Safety Review and Audit Committee.
Schedule of Change This change will be put into effect upon receipt of approval by NRC.
Fee Determination Pursuant to 10 CFR 170.22 Boston Edison Company proposes this change as Class II.
!}}

Revision as of 15:03, 31 March 2020

Application for Amend to License DPR-35,consisting of Proposed Tech Spec Change 83-1,changing Tech Specs 3.7.A.4.a(3) & 4.7.A.4.a(3) Re Primary Containment
ML20064K055
Person / Time
Site: Pilgrim
Issue date: 01/14/1983
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20064K058 List:
References
83-19, NUDOCS 8301180286
Download: ML20064K055 (2)


Text