ML083170477: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML083170477
| number = ML083170477
| issue date = 11/17/2008
| issue date = 11/17/2008
| title = Project, Units 1 and 2 - Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b) (TAC Nos. MD7058 and MD7059)
| title = Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b)
| author name = Thadani M C
| author name = Thadani M
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 17, 2008 Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 SOUTH TEXAS PROJECT, UNITS 1 AND 2 -CORRECTIONS TO AMENDMENTS 188 AND 175 TO RELOCATE SURVEILLANCE TEST INTERVALS TO LICENSEE-CONTROLLED SURVEILLANCE FREQUENCY CONTROL PROGRAM (RISK-INFORMED INITIATIVE 5-b) (TAC NOS. MD7058 AND MD7059)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 17, 2008 Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
 
==SUBJECT:==
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - CORRECTIONS TO AMENDMENTS 188 AND 175 TO RELOCATE SURVEILLANCE TEST INTERVALS TO LICENSEE-CONTROLLED SURVEILLANCE FREQUENCY CONTROL PROGRAM (RISK-INFORMED INITIATIVE 5-b) (TAC NOS. MD7058 AND MD7059)


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
On October 31, 2008, the Nuclear Regulatory Commission (NRC) staff issued Amendment No. 188 to Facility Operating License No. NPF-76 and Amendment No. 175 to Facility Operating License No. NPF-80 for South Texas Project (STP), Units 1 and 2, respectively.
On October 31, 2008, the Nuclear Regulatory Commission (NRC) staff issued Amendment No. 188 to Facility Operating License No. NPF-76 and Amendment No. 175 to Facility Operating License No. NPF-80 for South Texas Project (STP), Units 1 and 2, respectively.
The amendments revised the Technical Specifications (TS) by relocating the surveillance frequencies of most of the surveillance tests from the TS to a licensee-controlled surveillance frequency control program. The distribution of the amendments was performed by the newly developed electronic distribution (Listserv) process which is accomplished by scanning the document in the Agencywide Documents Access and Management System (ADAMS) and emailing it to recipients of the STP Listserv distribution (plant mailing list). An error was introduced in the TS pages during the document scanning process. The error consisted of deletion of some of the revision bars in the TS pages. The NRC staff has corrected the scanning process and revised the Amendment Nos.188 and 175 document to show the revision bars on the TS pages. The corrected amendment document has been replaced in ADAMS under the original ADAMS Accession No. ML082830172.
The amendments revised the Technical Specifications (TS) by relocating the surveillance frequencies of most of the surveillance tests from the TS to a licensee-controlled surveillance frequency control program.
The corrections do not change the NRC staffs conclusions in the NRC letter dated October 31, 2008, approving the requested amendments.
The distribution of the amendments was performed by the newly developed electronic distribution (Listserv) process which is accomplished by scanning the document in the Agencywide Documents Access and Management System (ADAMS) and emailing it to recipients of the STP Listserv distribution (plant mailing list). An error was introduced in the TS pages during the document scanning process. The error consisted of deletion of some of the revision bars in the TS pages.
Please replace the amendment document emailed to you on October 31,2008, with the enclosed revised amendment document.
The NRC staff has corrected the scanning process and revised the Amendment Nos.188 and 175 document to show the revision bars on the TS pages. The corrected amendment document has been replaced in ADAMS under the original ADAMS Accession No. ML082830172.
E. Halpin -2 We regret any inconvenience caused by this error. Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499  
The corrections do not change the NRC staffs conclusions in the NRC letter dated October 31, 2008, approving the requested amendments. Please replace the amendment document emailed to you on October 31,2008, with the enclosed revised amendment document.
 
E. Halpin                                   -2 We regret any inconvenience caused by this error.
Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499


==Enclosure:==
==Enclosure:==


As stated cc w/encl: See next page South Texas Project, Units 1 and 2 (9-19-2008) cc: INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Additional Distribution via Listserv November 17, 2008 E. Halpin -2 We regret any inconvenience caused by this error. Sincerely, IRAI Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499  
As stated cc w/encl: See next page
 
South Texas Project, Units 1 and 2   (9-19-2008) cc:
INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Additional Distribution via Listserv
 
November 17, 2008 E. Halpin                                       -2 We regret any inconvenience caused by this error.
Sincerely, IRAI Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499


==Enclosure:==
==Enclosure:==


As stated cc w/encl: See next page DISTRIBUTION:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDirsltsb Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrDraApla Resource RidsNrrPMMThadani Resource RidsNrrLAJBurkhardt Resource RidsOgcRp Resource RidsRgn4MailCenter Resource AHowe, NRRlDRAlAPLA GHiII, OIS (4) ADAMS Accession No. ML083170477;  
PUBLIC                         RidsNrrDorlLpl4 Resource              RidsRgn4MailCenter Resource LPLIV Reading                   RidsNrrDraApla Resource               AHowe, NRRlDRAlAPLA RidsAcrsAcnw_MailCTR Resource  RidsNrrPMMThadani Resource            GHiII, OIS (4)
RidsNrrDirsltsb Resource        RidsNrrLAJBurkhardt Resource RidsNrrDorlDpr Resource        RidsOgcRp Resource ADAMS Accession No. ML083170477;  


==Enclosure:==
==Enclosure:==
 
ML082830172 OFFICE       NRRlLPL4/PM   IV NRRlLPL4/LA             NRRlLPL4/BC               NRRlLPL4/PM !"'j NAME         MThadani     lW   .IBurkhardt *via e-mail MMarkley       ~,.z:-.      MThadani     /)1u, DATE           II!J3/og'     11/13/08                     (, ((-r, () '6         111/1- /)...06) IS OFFICIAL RECORD COpy}}
ML082830172 OFFICE NRRlLPL4/PM IV NRRlLPL4/LA NRRlLPL4/BC NRRlLPL4/PM  
!"'j NAME MThadani lW .IBurkhardt  
*via e-mail MMarkley MThadani /)1u, DATE II!J3/og' 11/13/08 (, ((-r, () '6 111/1-/)...06) IS OFFICIAL RECORD COpy}}

Latest revision as of 06:20, 22 March 2020

Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b)
ML083170477
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/17/2008
From: Thadani M
Plant Licensing Branch IV
To: Halpin E
South Texas
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC MD7058, TAC MD7059
Download: ML083170477 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 17, 2008 Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - CORRECTIONS TO AMENDMENTS 188 AND 175 TO RELOCATE SURVEILLANCE TEST INTERVALS TO LICENSEE-CONTROLLED SURVEILLANCE FREQUENCY CONTROL PROGRAM (RISK-INFORMED INITIATIVE 5-b) (TAC NOS. MD7058 AND MD7059)

Dear Mr. Halpin:

On October 31, 2008, the Nuclear Regulatory Commission (NRC) staff issued Amendment No. 188 to Facility Operating License No. NPF-76 and Amendment No. 175 to Facility Operating License No. NPF-80 for South Texas Project (STP), Units 1 and 2, respectively.

The amendments revised the Technical Specifications (TS) by relocating the surveillance frequencies of most of the surveillance tests from the TS to a licensee-controlled surveillance frequency control program.

The distribution of the amendments was performed by the newly developed electronic distribution (Listserv) process which is accomplished by scanning the document in the Agencywide Documents Access and Management System (ADAMS) and emailing it to recipients of the STP Listserv distribution (plant mailing list). An error was introduced in the TS pages during the document scanning process. The error consisted of deletion of some of the revision bars in the TS pages.

The NRC staff has corrected the scanning process and revised the Amendment Nos.188 and 175 document to show the revision bars on the TS pages. The corrected amendment document has been replaced in ADAMS under the original ADAMS Accession No. ML082830172.

The corrections do not change the NRC staffs conclusions in the NRC letter dated October 31, 2008, approving the requested amendments. Please replace the amendment document emailed to you on October 31,2008, with the enclosed revised amendment document.

E. Halpin -2 We regret any inconvenience caused by this error.

Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/encl: See next page

South Texas Project, Units 1 and 2 (9-19-2008) cc:

INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Additional Distribution via Listserv

November 17, 2008 E. Halpin -2 We regret any inconvenience caused by this error.

Sincerely, IRAI Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPLIV Reading RidsNrrDraApla Resource AHowe, NRRlDRAlAPLA RidsAcrsAcnw_MailCTR Resource RidsNrrPMMThadani Resource GHiII, OIS (4)

RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource RidsNrrDorlDpr Resource RidsOgcRp Resource ADAMS Accession No. ML083170477;

Enclosure:

ML082830172 OFFICE NRRlLPL4/PM IV NRRlLPL4/LA NRRlLPL4/BC NRRlLPL4/PM !"'j NAME MThadani lW .IBurkhardt *via e-mail MMarkley ~,.z:-. MThadani /)1u, DATE II!J3/og' 11/13/08 (, ((-r, () '6 111/1- /)...06) IS OFFICIAL RECORD COpy