{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17, 2009 Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SUB~IECT: SOUTH TEXAS PRO~IECT, UNITS 1 AND 2 - CORRECTION TO CORRECTION LETTER DATED DECEMBER 2,2008, REGARDING AMENDMENTS 188 AND 175 TO RELOCATE SURVEILLANCE TEST INTERVALS TO LICENSEE-CONTROLLED SURVEILLANCE FREQUENCY CONTROL PROGRAM (RISK-INFORMED INITIATIVE 5-b), ISSUED ON OCTOBER 31,2008 (TAC NOS. MD7058 AND MD7059)
Dear Mr. Halpin:
On October 31, 2008, the Nuclear Regulatory Commission (NRC) issued Amendment No. 188 to Facility Operating License No. NPF-76 and Amendment No. 175 to Facility Operating License No. NPF-80 for South Texas Project (STP), Units 1 and 2, respectively, in response to your application dated October 23,2007. That document was e-mailed to you on October 31,2008, and declared in the NRC Agencywide Documents Access and Management System (ADAMS) at ADAMS Accession No. ML082830172. The amendments revised the Technical Specifications (TS) by relocating the surveillance frequencies of most of the surveillance tests from the TS to a licensee-controlled surveillance frequency control program. The distribution of the amendments was performed by the then newly developed electronic distribution (Listserv) process. The distribution was accomplished by scanning the document in ADAMS, and e-mailing it to recipients on the STP Listserv e-mail distribution list (plant mailing list). A scanning error was rectified in the correction letter dated November 17, 2008 (ADAMS Accession No. ML083170477); however, that correction letter inadvertently omitted TS page 3/42-2 from the TS pages issued as an enclosure to the November 17, 2008, correction letter. That error was corrected by letter dated December 2, 2008, by restoring the TS page 3/4 2-2 which was inadvertently omitted from the November 17, 2008, letter. On February 4, 2009, STP Nuclear Operating Company (STPNOC) informed the NRC staff that TS pages 3/4 3-44,3/43-49,3/45-1, 3/45-4, and 3/4 8-13a, sent to the NRC staff, were not updated to reflect the changes on those pages approved in the intervening amendments, because those amendments had not been implemented at the time when STPNOC forwarded them to NRC. This administrative error affected only TS pages 3/4 3-44, 3/43-49, 3/45-1, 3/4 5-4, and 3/4 8-13a of Amendment Nos. 188 and 175, dated October 31, 2008, and does not change the staff's conclusions regarding Amendment Nos. 188 and 175. Enclosed are
E. Halpin - 2 corrected pages 3/4 3-44, 3/4 3-49, 3/45-1, 3/45-4, and 3/4 8-13a for Amendment Nos. 188 and 175; please replace them in the amendment issued on October 31,2008. Sincerely, bO\\-'w~ 'L&,~~ ---Pv Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
As stated cc: Distribution via Listserv
ENCLOSURE South Texas Project. Units 1 and 2 License Amendment Nos. 188 and 175. Issued October 31. 2008 Corrected Technical Specification Pages 3/43-44 3/43-49 3/45-1 3/4 5-4 3/48-13a
(j) o TABLE 4.3-2 (Continued) c -{ I ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION -{ m SURVEILLANCE REQUIREMENTS X >> DIGITAL OR TRIP ACTUATING MODES (j), ANALOG CHANNEL DEVICE MASTER SLAVE FOR WHICH CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE C Z FUNCTIONAL UNIT CHECK/9} CALI BRATION/9} TEST(7)(9} -'-'TE=:S"-T'--'/.>!..9}L-- LOGIC TEST/g) TEST/9} TEST/9} IS REQUIRED -{ (j)
- 3. Containment Isolation (Continued)
Qo
- 3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
I\\.)
- 4) RCB Purge N.A.
N.A. N.A. N.A. 1,2,3,4 Radioactivity-High
- 5) Containment Spray -
See Item 2. above for Containment Spray manual initiation Surveillance Requirements. Manual Initiation
- 6) Phase "A" Isolation See Item 3. a. above for Phase "A" Isolation manual initiation Surveillance Requirements.
w Manual Initiation ~
- c. Phase "B" Isolation t
w
- 1) Automatic Actuation N.A.
N.A. N.A. N.A. (1 ) N.A. N.A. 1,2,3,4 Logic
- 2) Actuation Relays N.A.
N.A. N.A. N.A. N.A. (6) (8) 1,2,3,4 cc
- 3) Containment N.A.
N.A. N.A. N.A. 1,2,3 ~. ~. Pressure--High-3 1\\.)..... I
- 4) Containment Spray See Item 2. above for Containment Spray manual initiation SurVeillance Requirements.
Manual Initiation 3 3 CD CD
- d. RCP Seal Injection
- J
- J
- a. a.
Isolation 3 3 CD CD
- 1) Automatic Actuation N.A.
N.A. N.A. N.A. N.A. (8) 1,2,3,4 ~3. Logic and Actuatiol")
- i zz o 0 Relays
- 2) Charging Header N.A.
N.A. N.A. N.A. 1,2,3,4 Pressure - Low 'Coincident with. See Item 3.a.above for Phase "A" surveillance requirements. Phase "A" Isolation ~- ~I -...j (}l..... co co
(j) o C -l J: TABLE 4.3-2 (Continued) -l m ~ ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (j), SURVEILLANCE REQUIREMENTS c* z =i (j) TABLE NOTATION Qo tv (1) Each train shall be tested at the frequency specified in the Surveillance Frequency Control Program. (2) Deleted (3) Deleted (4) Deleted c..v (5) Deleted ~ c..v (6) Each actuation train shall be tested at a frequency in accordance with the Surveillance Frequency Control Program. Testing of each ~ <0 actua~ion train shall include master relay testing of both logic trains. If an ESFAS instrumentationchannel is inoperable due to failure of the Actuation Logic Test and/or Master Relay Test, increase the surveillance frequency such that each train is tested at the frequency specified in the Surveillance Frequency Control Program unless the failure can be determined by performance of an engineering CC evaluation to be a single random failure.
- J ::J
- ~
N-" (7) For channels with bypass test instrumentation, input relays are tested at a frequency in accordance with the Surveillance Frequency I I Control Program. }>}>
- 3 :3 (8) The test interval is R for Potter & Brumfield MDR Series slave relays.
CD CD
- J ::J
- a. a.
(9) Frequencies are specified in the Surveillance Frequency Control Program unless otherwise noted in the table.
- 3 :3 CD CD
- J ::J zz p p
~i t" -~ ~~ --J OJ (Jl OJ
3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each Safety Injection System accumulator shall be OPERABLE APPLICABILITY: MODES 1 and 2 MODE 3 with pressurizer pressure> 1000 psig ACTION:
- a.
With one accumulator inoperable, except as a result of boron concentration outside the required limits, within 24 hours restore the inoperable accumulator to OPERABLE status or apply the requirements of the CRMP, or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure' to less than 1000 psig within the following 6 hours.
- b.
With more than one accumulator inoperable, except as a result boron concentration outside the required limits, within 1 hour restore at least two accumulators to OPERABLE status or apply the requirements of the CRMP, or be in at least HOT STANDBY within the next 6 hours and reduce pre'ssurizer pressure to less than 1000 psig within the following 6 hours.
- c.
With the.boron concentration of one accumulator outside the required limit, within 72 hours restore the boron concentration to within the required limits or apply the requirements of the CRMP, or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure to less than 1000 psig within the following 6 hours.
- d.
With the boron concentrations of more than one accumulator outside the required limit, within 1 hour restore the boron concentration of at least two accumulators to within the required limits or apply the requirements of the CRMP, or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure to less than 1000 psig within the following 6 hours. SURVEILLANCE REQUIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE:
- a.
At a frequency in accordance with the Surveillance Frequency Control Program by:
- 1)
Verifying the contained borated water volume is <: 8800 gallons and::; 9100 gallons and nitrogen cover-pressure is <: 590 psig and :s 670 psig, and
- 2)
Verifying that each accumulator isolation valve is open.
- b.
At a frequency in accordance with the Surveillance Frequency Control Program and within 6 hours* after each solution volume increase of greater than or equal to 1% of tank volume that is not the result of addition from the RWST by verifying the boron concentration of the accumUlator solution is <: 2700 ppm and::; 3000 ppm, and
- c.
At a frequency in accordance with the Surveillance Frequency Control Program when the RCS pressure is above 1000 psig by verifying that power to the isolation valve operator is removed.
- The 6 hr. SR is only required to be performed for affected accumulators.
SOUTH TEXAS - UNITS 1 & 2 3/45-1 Unit 1 Amendment No. 51,5",,59,135.:j..1g 188 Unit 2 Amendment No. 40.43.47,124 +ee 175
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.2 .Each ECCS subsystem shall be demonstrated OPERABLE:
- a.
At a frequency in accordance with the Surveillance Frequency Control Program by verifying that the following valves are in the indicated positions with power to the valve operators removed: Valve Number Valve Function Valve Position XSIOOO8 A,B,C H,igh Head Hot Leg Closed Recirculation Isolation XRHOO19 A, B,C Low Head Hot Leg Closed Recirculation Isolation
- b.
At a frequency in accordance with the Surveillance Frequency Control Program by:
- 1)
. Verifying that the ECCS piping is full of water by venting the ECCS pump casings and accessible discharge piping high points, and
- 2)
Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
- c.
Bya visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during I,.OCA cOf')ditions. This visual inspection shall be performed:
- 1)
For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and
- 2)
Of the areas affected within containment at the completion of each containment entry when CONTAINMENT INTEGRITY is established.
- d.
At a frequency in accordance with the Surveillance Frequency Control Program by a visual inspection of the containment sump and verifying that the sUbsystem suction inlets are not restricted by debris and that the sump components show no evidence of structural distress or abnormal corrosion. SOUTH TEXAS - UNITS 1 & 2 3/4 5-4 Unit 1 - Amendment No. ~ 188 Unit 2 - Amendment No. 4+Q 175
ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (continued) Suspend all operations involving CORE ALTERATIONS, operations involving positive reactivity additions that could result in loss of required SHUTDOWN MARGIN or required boron concentration, AND Initiate corrective action to restore the required DC electrical power subsystems to OPERABLE status as soon as possible. SURVEILLANCE REQUIREMENTS 4.8.2.2 Each 125-volt battery bank shall be demonstrated OPERABLE:
- a.
At a frequency in accordance with the Surveillance Frequency Control Program by verifying that the total battery terminal voltage is greater than or equal to the minimum .established float voltage.
- b.
At a frequency in accordance with the Surveillance Frequency Control Program by verifying that the battery charger can supply at least 300 amperes at greater than or equal to the minimum established float voltage for at least 8 hours. OR: Verify each battery charger can recharge the battery to the fully charged state within 12 hours while supplying the largest combined demands of the various continuous steady state loads following a battery discharge to the bounding design-basis event discharge state.
- c.
NOTE:
- 1. The modified performance discharge test in SR 4.8.2.3.f may be performed in lieu of Surveillance Requirement 4.8.2.2.c.
- 2. Credit may be taken for unplanned events that satisfy this surveillance requirement.
At a frequency in accordance with the Surveillance Frequency Control Program by verifying that the battery capacity is adequate to supply and maintain inOPERABLE status all of the actual or simulated ESF loads for the design duty cycle when the battery is subjeCted to a battery service test. SOUTH TEXAS - UNITS 1& 2 3/48-13a Unit 1 - Amendment No. 180, 182, 184 188 Unit 2 - Amendment No. 167, 169, 171 175
ML092260475 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME MThadani JBurkhardt MMarkley MThadani for MThadani BSingal for DATE 8/17/09 8/17/09 8/17/09 8/17/09}}