|
|
(5 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| #REDIRECT [[Press Release-III-12-002, NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant]]
| | {{Adams |
| | | number = ML120050290 |
| | | issue date = 01/05/2012 |
| | | title = Press Release-III-12-002: NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant |
| | | author name = |
| | | author affiliation = NRC/OPA/RGN-II/FO |
| | | addressee name = |
| | | addressee affiliation = |
| | | docket = 05000255 |
| | | license number = |
| | | contact person = |
| | | document report number = Press Release-III-12-002 |
| | | document type = Press Release |
| | | page count = 2 |
| | }} |
| | See also: [[see also:Press Release-III-12-002]] |
| | |
| | =Text= |
| | {{#Wiki_filter:NRC NEWS |
| | U.S. NUCLEAR REGULATORY COMMISSION |
| | Office of Public Affairs Region III |
| | 2443 Warrenville Road |
| | Lisle IL 60532 |
| | Site: www.nrc.gov |
| | Blog: http://public-blog.nrc-gateway.gov |
| | No. III-12-002 January, 5 2012 |
| | Contact: Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3.RegionIII@nrc.gov |
| | Prema Chandrathil (630) 829-9663 |
| | NRC TO HOLD TWO REGULATORY CONFERENCES ON JANUARY 11 TO |
| | DISCUSS PRELIMINARY WHITE AND PRELIMINARY YELLOW FINDINGS AT |
| | PALISADES NUCLEAR PLANT |
| | The Nuclear Regulatory Commission will hold two regulatory conferences with Entergy |
| | Nuclear Operations on Wednesday, Jan. 11, to discuss two preliminary inspection findings |
| | issued to the plant. The plant is located in Covert, Mich., approximately 50 miles west of |
| | Kalamazoo. |
| | The first meeting for the preliminary white finding is scheduled to begin at 9 a.m. and |
| | the second for the preliminary yellow finding will begin at 1:30 p.m. Both meetings will take |
| | place at the NRCs Region III office, 2443 Warrenville Rd. Suite 210, in Lisle, Ill. The public is |
| | invited to observe and will have an opportunity to talk with NRC officials after the business |
| | portion of the meetings. |
| | The preliminary white finding of low-to-moderate safety significance is related to the |
| | service water system. |
| | The system is comprised of three motor-driven pumps that are used to provide cooling to |
| | safety-related equipment, such as containment air coolers and diesel generators. Last August, one |
| | of the service water pumps failed due to cracking in one of the couplings. This was a repeat of a |
| | previous event in 2009. The NRC conducted a Special Inspection and preliminarily concluded |
| | the utility failed to prevent a recurrence of the cracking condition and failed to completely |
| | consider the properties of the steel material used in the coupling. |
| | The preliminary yellow finding of substantial significance to safety is related to an |
| | electrical fault caused by personnel at the site. The electrical fault resulted in a reactor trip and |
| | the loss of half of the control room indicators, and activation of safety systems not warranted by |
| | actual plant conditions. This made the reactor trip more challenging for the operators and |
| | increased the risk of a serious event occurring. The NRC conducted a Special Inspection and |
| | preliminarily determined the actions and work preparation for the electrical panel work were not |
| | done correctly. |
| | |
| | The two regulatory conferences are being held to discuss the preliminary findings and |
| | their safety significance, and to assist the NRC in making a final enforcement decision. No |
| | decisions will be made at these conferences. After the conferences, the NRC will review the |
| | information received and make a final determination on the safety significance of both findings. |
| | The NRCs inspection reports detailing the findings are available online at: |
| | http://www.nrc.gov/reading-rm/adams.html. The number to access the preliminary white report |
| | is ML113330819. The number to access the preliminary yellow report is ML113330802. |
| | ### |
| | News releases are available through a free listserv subscription at the following Web address: |
| | http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE |
| | link. E-mail notifications are sent to subscribers when news releases are posted to NRC's website. |
| | }} |
|
---|
Category:Press Release
MONTHYEARML24249A1782024-08-0707 August 2024 News Release-24-064: NRC Announces Opportunities to Request Hearings for Palisades Restart License Amendments, License Transfer ML24214A2322024-07-25025 July 2024 News Release-III-24-021: NRC Will Hold Public Meeting August 1 to Discuss Potential Restart of Palisades Nuclear Plant ML24184B8562024-06-27027 June 2024 News Release-24-052: NRC Seeks Input on Environmental Review Topics for Palisades Nuclear Plant Restart Application ML24113A1992024-04-10010 April 2024 News Release-III-24-005: NRC Will Hold Public Meeting April 17 to Discuss Potential Restart of Palisades Nuclear Plant ML24052A3242023-12-0808 December 2023 News Release-23-077: NRC Approves Changes to Palisades Nuclear Plant’S Emergency Planning Requirements ML22255A0862022-09-0909 September 2022 News Release-22-037: NRC to Hold Decommissioning Plan Public Meeting for Palisades Nuclear Power Plant in Michigan ML22112A0212022-04-19019 April 2022 News Release-III-22-005: NRC to Conduct Open House to Discuss 2021 Performance of Palisades Nuclear Plant Press Release-21-053, NRC Approves License Transfer for Palisades and Big Rock Point Nuclear Power Plants2021-12-13013 December 2021 Press Release-21-053: NRC Approves License Transfer for Palisades and Big Rock Point Nuclear Power Plants Press Release-III-21-015, NRC to Hold Virtual Meeting to Discuss Palisades Nuclear Power Plant 2020 Performance2021-06-24024 June 2021 Press Release-III-21-015: NRC to Hold Virtual Meeting to Discuss Palisades Nuclear Power Plant 2020 Performance ML21209A4962021-02-0303 February 2021 News Release-21-006: NRC to Seek Comment on Environmental Review Topics for Point Beach Subsequent License Renewal Press Release-III-20-004, NRC Names New Resident Inspector at Palisades Nuclear Power Plant2020-05-29029 May 2020 Press Release-III-20-004: NRC Names New Resident Inspector at Palisades Nuclear Power Plant Press Release-19-039, NRC Announces Public Meetings Dates and Venues for Community Advisory Boards Near Decommissioning Nuclear Power Plants2019-08-21021 August 2019 Press Release-19-039: NRC Announces Public Meetings Dates and Venues for Community Advisory Boards Near Decommissioning Nuclear Power Plants Press Release-III-19-009, NRC to Hold Open House to Discuss 2018 Performance of Palisades Nuclear Plant2019-04-30030 April 2019 Press Release-III-19-009: NRC to Hold Open House to Discuss 2018 Performance of Palisades Nuclear Plant Press Release-III-18-026, NRC Names New Senior Resident Inspector at Palisades Nuclear Power Station2018-07-27027 July 2018 Press Release-III-18-026: NRC Names New Senior Resident Inspector at Palisades Nuclear Power Station Press Release-III-18-010, NRC to Conduct Open House to Discuss 2017 Performance of Palisades Nuclear Power Plant2018-04-0202 April 2018 Press Release-III-18-010: NRC to Conduct Open House to Discuss 2017 Performance of Palisades Nuclear Power Plant Press Release-IV-18-002, NRC Issues Confirmatory Order to Entergy2018-03-14014 March 2018 Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy Press Release-III-17-022, NRC to Conduct Open House to Discuss 2016 Performance of Palisades Nuclear Plant2017-07-17017 July 2017 Press Release-III-17-022: NRC to Conduct Open House to Discuss 2016 Performance of Palisades Nuclear Plant Press Release-III-16-015, NRC Schedules a Town Hall Meeting June 23 to Discuss Palisades Nuclear Plant2016-06-14014 June 2016 Press Release-III-16-015: NRC Schedules a Town Hall Meeting June 23 to Discuss Palisades Nuclear Plant Press Release-III-16-010, NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant2016-05-16016 May 2016 Press Release-III-16-010: NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant Press Release-15-068, NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors2015-10-27027 October 2015 Press Release-15-068: NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors Press Release-III-15-023, NRC Names New Resident Inspector at Palisades Nuclear Plant2015-10-0505 October 2015 Press Release-III-15-023: NRC Names New Resident Inspector at Palisades Nuclear Plant Press Release-15-054, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2015-09-0303 September 2015 Press Release-15-054: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-III-15-008, NRC Schedules Public Meeting Apr. 9 to Discuss Performance of Palisades Nuclear Power Station2015-04-0303 April 2015 Press Release-III-15-008: NRC Schedules Public Meeting Apr. 9 to Discuss Performance of Palisades Nuclear Power Station Press Release-III-15-003, NRC Has Increased Oversight of Palisades Nuclear Power Plant2015-02-27027 February 2015 Press Release-III-15-003: NRC Has Increased Oversight of Palisades Nuclear Power Plant Press Release-III-15-001, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Palisades Nuclear Plant2015-01-0707 January 2015 Press Release-III-15-001: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Palisades Nuclear Plant Press Release-III-14-031, NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant2014-07-24024 July 2014 Press Release-III-14-031: NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant ML14204A2102014-07-22022 July 2014 Press Release-III-14-031: NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant Press Release-III-14-023, NRC Schedules Public Meeting June 26 to Discuss Performance of Palisades Nuclear Power Station2014-06-23023 June 2014 Press Release-III-14-023: NRC Schedules Public Meeting June 26 to Discuss Performance of Palisades Nuclear Power Station Press Release-III-14-008, NRC Names New Senior Resident Inspector at Palisades Nuclear Station2014-03-20020 March 2014 Press Release-III-14-008: NRC Names New Senior Resident Inspector at Palisades Nuclear Station Press Release-III-13-035, NRC Names Cynthia D. Pederson as Region III Administrator2013-08-13013 August 2013 Press Release-III-13-035: NRC Names Cynthia D. Pederson as Region III Administrator Press Release-III-13-027, NRC Regional Office Webinar to Discuss Agency Steps on Palisades Water Tank2013-07-0909 July 2013 Press Release-III-13-027: NRC Regional Office Webinar to Discuss Agency Steps on Palisades Water Tank Press Release-III-13-007, NRC Schedules Public Meeting April 2, 2013, to Discuss Performance of Palisades Nuclear Power Station2013-03-25025 March 2013 Press Release-III-13-007: NRC Schedules Public Meeting April 2, 2013, to Discuss Performance of Palisades Nuclear Power Station Press Release-III-13-006, NRC to Discuss Pressurized Thermal Shock Basics for Palisades; Webinar to Be Held March 192013-03-0707 March 2013 Press Release-III-13-006: NRC to Discuss Pressurized Thermal Shock Basics for Palisades; Webinar to Be Held March 19 Press Release-III-13-001, NRC to Discuss Recent Through-Wall Leaks at Palisades; Webinar to Be Held January 122013-01-0808 January 2013 Press Release-III-13-001: NRC to Discuss Recent Through-Wall Leaks at Palisades; Webinar to Be Held January 12 Press Release-III-12-042, NRC Schedules Public Meeting for December 11 to Discuss Palisades Corrective Actions and NRC Oversight2012-12-0404 December 2012 Press Release-III-12-042: NRC Schedules Public Meeting for December 11 to Discuss Palisades Corrective Actions and NRC Oversight Press Release-III-12-041, NRC Says Palisades Performance Has Improved But Still Needs Heightened Oversight2012-11-0909 November 2012 Press Release-III-12-041: NRC Says Palisades Performance Has Improved But Still Needs Heightened Oversight Press Release-III-12-038, NRC to Discuss Preliminary Special Inspection Results; Webinar to Be Held October 12012-09-26026 September 2012 Press Release-III-12-038: NRC to Discuss Preliminary Special Inspection Results; Webinar to Be Held October 1 Press Release-III-12-036, NRC to Hold Public Meeting to Discuss Palisades Safety Culture Assessment Results2012-09-0707 September 2012 Press Release-III-12-036: NRC to Hold Public Meeting to Discuss Palisades Safety Culture Assessment Results Press Release-III-12-035, NRC Begins Special Inspection at Palisades Nuclear Plant2012-08-15015 August 2012 Press Release-III-12-035: NRC Begins Special Inspection at Palisades Nuclear Plant Press Release-III-12-030, NRC Issues Confirmatory Action Letter to Palisades Nuclear Power Plant2012-07-17017 July 2012 Press Release-III-12-030: NRC Issues Confirmatory Action Letter to Palisades Nuclear Power Plant Press Release-III-12-015, NRC Names New Resident Inspector at Palisades Nuclear Power Plant2012-04-25025 April 2012 Press Release-III-12-015: NRC Names New Resident Inspector at Palisades Nuclear Power Plant Press Release-III-12-009, NRC Schedules Open House and Public Meeting for March 21 to Discuss Palisades Nuclear Power Plant Performance in 20112012-03-15015 March 2012 Press Release-III-12-009: NRC Schedules Open House and Public Meeting for March 21 to Discuss Palisades Nuclear Power Plant Performance in 2011 Press Release-III-12-006, NRC Cites Palisades for Three Violations; Public Meeting Scheduled2012-02-14014 February 2012 Press Release-III-12-006: NRC Cites Palisades for Three Violations; Public Meeting Scheduled Press Release-III-12-003, NRC Issues Confirmatory Orders to Palisades Plant Owner Entergy and Plant Operator2012-01-26026 January 2012 Press Release-III-12-003: NRC Issues Confirmatory Orders to Palisades Plant Owner Entergy and Plant Operator ML1200502902012-01-0505 January 2012 Press Release-III-12-002: NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant Press Release-III-12-002, NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant2012-01-0505 January 2012 Press Release-III-12-002: NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant Press Release-III-11-034, NRC Begins Special Inspection at Palisades Nuclear Plant2011-09-29029 September 2011 Press Release-III-11-034: NRC Begins Special Inspection at Palisades Nuclear Plant Press Release-IV-11-038, NRC Issues Confirmatory Order to Entergy with Actions to Improve Quality Control and Employee Concerns Programs2011-08-25025 August 2011 Press Release-IV-11-038: NRC Issues Confirmatory Order to Entergy with Actions to Improve Quality Control and Employee Concerns Programs Press Release-III-11-029, NRC Begins Special Inspection at Palisades Nuclear Power Plant2011-08-15015 August 2011 Press Release-III-11-029: NRC Begins Special Inspection at Palisades Nuclear Power Plant Press Release-III-11-011, NRC Schedules Public Meeting for May 5 to Discuss Palisades Nuclear Power Plant Performance and NRC Oversight2011-04-21021 April 2011 Press Release-III-11-011: NRC Schedules Public Meeting for May 5 to Discuss Palisades Nuclear Power Plant Performance and NRC Oversight 2024-08-07
[Table view] |
See also: see also:Press Release-III-12-002
Text
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs Region III
2443 Warrenville Road
Lisle IL 60532
Site: www.nrc.gov
Blog: http://public-blog.nrc-gateway.gov
No. III-12-002 January, 5 2012
Contact: Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3.RegionIII@nrc.gov
Prema Chandrathil (630) 829-9663
NRC TO HOLD TWO REGULATORY CONFERENCES ON JANUARY 11 TO
DISCUSS PRELIMINARY WHITE AND PRELIMINARY YELLOW FINDINGS AT
PALISADES NUCLEAR PLANT
The Nuclear Regulatory Commission will hold two regulatory conferences with Entergy
Nuclear Operations on Wednesday, Jan. 11, to discuss two preliminary inspection findings
issued to the plant. The plant is located in Covert, Mich., approximately 50 miles west of
Kalamazoo.
The first meeting for the preliminary white finding is scheduled to begin at 9 a.m. and
the second for the preliminary yellow finding will begin at 1:30 p.m. Both meetings will take
place at the NRCs Region III office, 2443 Warrenville Rd. Suite 210, in Lisle, Ill. The public is
invited to observe and will have an opportunity to talk with NRC officials after the business
portion of the meetings.
The preliminary white finding of low-to-moderate safety significance is related to the
service water system.
The system is comprised of three motor-driven pumps that are used to provide cooling to
safety-related equipment, such as containment air coolers and diesel generators. Last August, one
of the service water pumps failed due to cracking in one of the couplings. This was a repeat of a
previous event in 2009. The NRC conducted a Special Inspection and preliminarily concluded
the utility failed to prevent a recurrence of the cracking condition and failed to completely
consider the properties of the steel material used in the coupling.
The preliminary yellow finding of substantial significance to safety is related to an
electrical fault caused by personnel at the site. The electrical fault resulted in a reactor trip and
the loss of half of the control room indicators, and activation of safety systems not warranted by
actual plant conditions. This made the reactor trip more challenging for the operators and
increased the risk of a serious event occurring. The NRC conducted a Special Inspection and
preliminarily determined the actions and work preparation for the electrical panel work were not
done correctly.
The two regulatory conferences are being held to discuss the preliminary findings and
their safety significance, and to assist the NRC in making a final enforcement decision. No
decisions will be made at these conferences. After the conferences, the NRC will review the
information received and make a final determination on the safety significance of both findings.
The NRCs inspection reports detailing the findings are available online at:
http://www.nrc.gov/reading-rm/adams.html. The number to access the preliminary white report
is ML113330819. The number to access the preliminary yellow report is ML113330802.
News releases are available through a free listserv subscription at the following Web address:
http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE
link. E-mail notifications are sent to subscribers when news releases are posted to NRC's website.