Press Release-III-12-002, NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant

From kanterella
Jump to navigation Jump to search
Press Release-III-12-002: NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant
ML16141B160
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/05/2012
From:
Office of Public Affairs Region II
To:
Category:Press Release
References
Press Release-III-12-002
Download: ML16141B160 (1)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region III 2443 Warrenville Road Lisle IL 60532 Site: www.nrc.gov Blog: http://public-blog.nrc-gateway.gov No. III-12-002 January, 5 2012

Contact:

Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3.RegionIII@nrc.gov Prema Chandrathil (630) 829-9663 NRC TO HOLD TWO REGULATORY CONFERENCES ON JANUARY 11 TO DISCUSS PRELIMINARY WHITE AND PRELIMINARY YELLOW FINDINGS AT PALISADES NUCLEAR PLANT The Nuclear Regulatory Commission will hold two regulatory conferences with Entergy Nuclear Operations on Wednesday, Jan. 11, to discuss two preliminary inspection findings issued to the plant. The plant is located in Covert, Mich., approximately 50 miles west of Kalamazoo.

The first meeting for the preliminary white finding is scheduled to begin at 9 a.m. and the second for the preliminary yellow finding will begin at 1:30 p.m. Both meetings will take place at the NRCs Region III office, 2443 Warrenville Rd. Suite 210, in Lisle, Ill. The public is invited to observe and will have an opportunity to talk with NRC officials after the business portion of the meetings.

The preliminary white finding of low-to-moderate safety significance is related to the service water system.

The system is comprised of three motor-driven pumps that are used to provide cooling to safety-related equipment, such as containment air coolers and diesel generators. Last August, one of the service water pumps failed due to cracking in one of the couplings. This was a repeat of a previous event in 2009. The NRC conducted a Special Inspection and preliminarily concluded the utility failed to prevent a recurrence of the cracking condition and failed to completely consider the properties of the steel material used in the coupling.

The preliminary yellow finding of substantial significance to safety is related to an electrical fault caused by personnel at the site. The electrical fault resulted in a reactor trip and the loss of half of the control room indicators, and activation of safety systems not warranted by actual plant conditions. This made the reactor trip more challenging for the operators and increased the risk of a serious event occurring. The NRC conducted a Special Inspection and preliminarily determined the actions and work preparation for the electrical panel work were not done correctly.

The two regulatory conferences are being held to discuss the preliminary findings and their safety significance, and to assist the NRC in making a final enforcement decision. No decisions will be made at these conferences. After the conferences, the NRC will review the information received and make a final determination on the safety significance of both findings.

The NRCs inspection reports detailing the findings are available online at:

http://www.nrc.gov/reading-rm/adams.html. The number to access the preliminary white report is ML113330819. The number to access the preliminary yellow report is ML113330802.

News releases are available through a free listserv subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's website.

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region III 2443 Warrenville Road Lisle IL 60532 Site: www.nrc.gov Blog: http://public-blog.nrc-gateway.gov No. III-12-002 January, 5 2012

Contact:

Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3.RegionIII@nrc.gov Prema Chandrathil (630) 829-9663 NRC TO HOLD TWO REGULATORY CONFERENCES ON JANUARY 11 TO DISCUSS PRELIMINARY WHITE AND PRELIMINARY YELLOW FINDINGS AT PALISADES NUCLEAR PLANT The Nuclear Regulatory Commission will hold two regulatory conferences with Entergy Nuclear Operations on Wednesday, Jan. 11, to discuss two preliminary inspection findings issued to the plant. The plant is located in Covert, Mich., approximately 50 miles west of Kalamazoo.

The first meeting for the preliminary white finding is scheduled to begin at 9 a.m. and the second for the preliminary yellow finding will begin at 1:30 p.m. Both meetings will take place at the NRCs Region III office, 2443 Warrenville Rd. Suite 210, in Lisle, Ill. The public is invited to observe and will have an opportunity to talk with NRC officials after the business portion of the meetings.

The preliminary white finding of low-to-moderate safety significance is related to the service water system.

The system is comprised of three motor-driven pumps that are used to provide cooling to safety-related equipment, such as containment air coolers and diesel generators. Last August, one of the service water pumps failed due to cracking in one of the couplings. This was a repeat of a previous event in 2009. The NRC conducted a Special Inspection and preliminarily concluded the utility failed to prevent a recurrence of the cracking condition and failed to completely consider the properties of the steel material used in the coupling.

The preliminary yellow finding of substantial significance to safety is related to an electrical fault caused by personnel at the site. The electrical fault resulted in a reactor trip and the loss of half of the control room indicators, and activation of safety systems not warranted by actual plant conditions. This made the reactor trip more challenging for the operators and increased the risk of a serious event occurring. The NRC conducted a Special Inspection and preliminarily determined the actions and work preparation for the electrical panel work were not done correctly.

The two regulatory conferences are being held to discuss the preliminary findings and their safety significance, and to assist the NRC in making a final enforcement decision. No decisions will be made at these conferences. After the conferences, the NRC will review the information received and make a final determination on the safety significance of both findings.

The NRCs inspection reports detailing the findings are available online at:

http://www.nrc.gov/reading-rm/adams.html. The number to access the preliminary white report is ML113330819. The number to access the preliminary yellow report is ML113330802.

News releases are available through a free listserv subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's website.