IR 05000335/2012403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES ber 17, 2012 | ||
SUBJECT: ERRATA - SAINT LUCIE NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000335/2012403 AND 05000389/2012403 | ==SUBJECT:== | ||
ERRATA - SAINT LUCIE NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000335/2012403 AND 05000389/2012403 | |||
==Dear Mr. Nazar:== | ==Dear Mr. Nazar:== | ||
On May 4, 2012, the United States Nuclear Regulatory Commission (NRC) issued the subject Saint Lucie Nuclear Plant - NRC Physical Security Inspection Report 05000335/2012403 and 05000389/2012403, ADAMs accession numbers ML12125A378 (non-public version), and ML12125A391 (publicly available version). In reviewing this report it was noted that the report number should have been 05000335/2012404 and 05000389/2012404. Accordingly, we are providing a revised version of the cover letters and the corrected version of the subsequent pages of the report that now reflect the correct report number. We request that you replace pages 1, 2, and 7 of the report, as well as page 1 of the Attachment to the report with the enclosure to this letter. | On May 4, 2012, the United States Nuclear Regulatory Commission (NRC) issued the subject Saint Lucie Nuclear Plant - NRC Physical Security Inspection Report 05000335/2012403 and 05000389/2012403, ADAMs accession numbers ML12125A378 (non-public version), and ML12125A391 (publicly available version). In reviewing this report it was noted that the report number should have been 05000335/2012404 and 05000389/2012404. Accordingly, we are providing a revised version of the cover letters and the corrected version of the subsequent pages of the report that now reflect the correct report number. We request that you replace pages 1, 2, and 7 of the report, as well as page 1 of the Attachment to the report with the enclosure to this letter. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | ||
Sincerely, | |||
/RA/ | |||
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Enclosure: | |||
As stated cc: (See page 2) ML13095A254 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/BD For IH RA/BD RA/DR NAME IHALL B. DESAI D. RICH DATE 09/17/2012 09/17/2012 09/13/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/encl: | |||
Joseph Jensen Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 Eric Katzman Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957-2000 UNITED STATES May 4, 2012 | |||
==SUBJECT:== | |||
SAINT LUCIE NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000335/2012404 AND 05000389/2012404 | |||
== | |||
==Dear Mr. Nazar:== | ==Dear Mr. Nazar:== | ||
On April 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the | On April 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. B. Hughes and other members of your staff. | ||
This inspection examined activities conducted under your license as they relate to security and compliance with the | This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection, no findings were identified. | Based on the results of this inspection, no findings were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. | ||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s Enclosure document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related | |||
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely,/RA/ | Sincerely, | ||
Binoy Desai, Chief | /RA/ | ||
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No: 50-335, 50-389 License No: DPR-67, NPF-16 Enclosure: | |||
Plant Support Branch 2 | |||
Division of Reactor Safety Docket No: 50-335, 50-389 License No: DPR-67, NPF-16 | |||
NRC Security Inspection Report 05000335/2012404 and 05000389/2012404 W/Att: Supplemental Information (OUO) | NRC Security Inspection Report 05000335/2012404 and 05000389/2012404 W/Att: Supplemental Information (OUO) | ||
cc w/encl.: (See page 3) | cc w/encl.: (See page 3) ML12125A391 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/IH RA/JW RA/BD RA/GM For DR NAME I. Hall J. Wallo B. Desai D. Rich DATE 05/02/2012 05/03/2012 05/04/2012 05/02/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/encl: | ||
Joseph Jensen Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 Eric Katzman Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957-2000 | |||
Joseph Jensen Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 | |||
Eric Katzman Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957-2000 | |||
}} | }} |
Latest revision as of 06:44, 20 March 2020
ML13095A254 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 09/17/2012 |
From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
To: | Nazar M Florida Power & Light Co |
K. Farrell or D. Burley | |
References | |
IR-12-403 | |
Download: ML13095A254 (7) | |
Text
UNITED STATES ber 17, 2012
SUBJECT:
ERRATA - SAINT LUCIE NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000335/2012403 AND 05000389/2012403
Dear Mr. Nazar:
On May 4, 2012, the United States Nuclear Regulatory Commission (NRC) issued the subject Saint Lucie Nuclear Plant - NRC Physical Security Inspection Report 05000335/2012403 and 05000389/2012403, ADAMs accession numbers ML12125A378 (non-public version), and ML12125A391 (publicly available version). In reviewing this report it was noted that the report number should have been 05000335/2012404 and 05000389/2012404. Accordingly, we are providing a revised version of the cover letters and the corrected version of the subsequent pages of the report that now reflect the correct report number. We request that you replace pages 1, 2, and 7 of the report, as well as page 1 of the Attachment to the report with the enclosure to this letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Enclosure:
As stated cc: (See page 2) ML13095A254 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/BD For IH RA/BD RA/DR NAME IHALL B. DESAI D. RICH DATE 09/17/2012 09/17/2012 09/13/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/encl:
Joseph Jensen Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 Eric Katzman Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957-2000 UNITED STATES May 4, 2012
SUBJECT:
SAINT LUCIE NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000335/2012404 AND 05000389/2012404
Dear Mr. Nazar:
On April 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. B. Hughes and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s Enclosure document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No: 50-335, 50-389 License No: DPR-67, NPF-16 Enclosure:
NRC Security Inspection Report 05000335/2012404 and 05000389/2012404 W/Att: Supplemental Information (OUO)
cc w/encl.: (See page 3) ML12125A391 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/IH RA/JW RA/BD RA/GM For DR NAME I. Hall J. Wallo B. Desai D. Rich DATE 05/02/2012 05/03/2012 05/04/2012 05/02/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/encl:
Joseph Jensen Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 Eric Katzman Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, FL 34957-2000