ML15350A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML15350A360
| number = ML15350A360
| issue date = 12/16/2015
| issue date = 12/16/2015
| title = IR 05000354/2015403, 05000272/2015403 and 05000311/2015403, November 6, 2015, Hope Creek Generating Station, and Salem Nuclear Generating Station, Units 1 and 2 - NRC Security Inspection
| title = Ir 05000354/2015403, 05000272/2015403 and 05000311/2015403, November 6, 2015, Hope Creek Generating Station, and Salem Nuclear Generating Station, Units 1 and 2 - NRC Security Inspection
| author name = McKinley R R
| author name = McKinley R R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1

Revision as of 02:03, 13 February 2018

Ir 05000354/2015403, 05000272/2015403 and 05000311/2015403, November 6, 2015, Hope Creek Generating Station, and Salem Nuclear Generating Station, Units 1 and 2 - NRC Security Inspection
ML15350A360
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 12/16/2015
From: Raymond McKinley
Plant Support Branch 1
To: Braun R
Public Service Enterprise Group
References
IR 2015403
Download: ML15350A360 (4)


See also: IR 05000272/2015403

Text

December 16, 2015

Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT: HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000354/2015403, 05000272/2015403 AND 05000311/2015403

Dear Mr. Braun:

On November 6, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2. The NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented one finding of very low security significance (Green) in this report. The finding does not involve a violation of NRC requirements. One cross-cutting aspect was assigned to the finding in the area of Human Performance Procedure Adherence, for the failure to follow processes, procedures, and work instructions. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; and the NRC resident inspectors at Hope Creek Generating Station and Salem Generating Station, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/

Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-354, 50-272, and 50-311 License Nos. NPF-57, DPR-70, and DPR-75 Nonpublic

Enclosure:

Inspection Report 05000354/2015403, 05000272/2015403, and 05000311/2015403

w/Attachment:

Supplemental Information (OUO-SRI) cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI: P. Davison, Vice President Hope Creek J. Perry, Vice President, Salem J. Peacock, Director Security (Acting) P. Baldauf, Director, NJ Radiation Protection Programs F. Fisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health