ML061730314: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML061730314
| number = ML061730314
| issue date = 02/27/2006
| issue date = 02/27/2006
| title = 2006/02/27-VYNPS Operating Procedure OP 2180, Revision 39, Circulating Water/Cooling Tower Operation
| title = VYNPS Operating Procedure OP 2180, Revision 39, Circulating Water/Cooling Tower Operation
| author name =  
| author name =  
| author affiliation = Vermont Yankee Nuclear Power Corp
| author affiliation = Vermont Yankee Nuclear Power Corp
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:VERMONT YANKEE NUCLEAR POWER STATION I ~OPERATING PROCEDUIRE 0 (ý-I OP 2180 REVISION 39 CIRCULATING WATER/COOLING TOWER OPERATION USE CLASSIFICATION:
{{#Wiki_filter:VERMONT YANKEE NUCLEAR POWER STATION I           ~OPERATING PROCEDUIRE OP 2180 0 (ý -I REVISION 39 CIRCULATING WATER/COOLING TOWER OPERATION USE CLASSIFICATION: REFERENCE RESPONSIBLE PROCEDURE OWNER: Manager, Operations REQUIRED REVIEWS                     Yes/No E-Plan                           10CFR50.54(cD       No Security                         10CFRS0.54(p)       No Probable Risk Analysis (PRA)                 ,       No Reactivity Management                               No LPC       Effective                                   Affected Pages No.       Date 1     03/08/06   Pg I of 52 2       03/13/06   Pg 47 of 52 3       04/10/06   Pgs 18, 28, 32, & 39 of 52; Appendix B pg 6 of 10; Appendix D pgs 1 & 7 of 12 4       05/09/06   Pgs 30 & 35 of 52 5       05/23/06   Pg 32 of 52 Implementation Statement: N/A
REFERENCE RESPONSIBLE PROCEDURE OWNER: Manager, Operations REQUIRED REVIEWS Yes/No E-Plan 10CFR50.54(cD No Security 10CFRS0.54(p)
(
No Probable Risk Analysis (PRA) , No Reactivity Management No LPC Effective Affected Pages No. Date 1 03/08/06 Pg I of 52 2 03/13/06 Pg 47 of 52 3 04/10/06 Pgs 18, 28, 32, & 39 of 52; Appendix B pg 6 of 10; Appendix D pgs 1 & 7 of 12 4 05/09/06 Pgs 30 & 35 of 52 5 05/23/06 Pg 32 of 52 Implementation Statement:
1 EPfct I Effec-tive Date:       02/27/06 OP 2180 Rev. 39 Page 1 of 52 LPC #1
N/A ( EPfct I 1 Effec-tive Date: 02/27/06 OP 2180 Rev. 39 Page 1 of 52 LPC #1 TABLE OF CONTENTS PURPOSE ..........................................................................................................................................................
 
4 DISCUSSION  
TABLE OF CONTENTS PURPOSE .......................................................................................................................................................... 4 DISCUSSION .................................................................................................................................................... 4 ATI'ACHM ENTS .............................................................................................................................................         7 QA REQUIREM ENTS CROSS REFERENCE .........................................................................................                                         7 REFERENCES AND COM M ITM ENTS ....................................................................................................                                 8 PRECAUTIONS/LIM ITATIONS .....................................................................................................................                     9 PRE RE QUISITES ...........................................................................................................................................       12 PROCEDURE ..................................................................................................................................................       14 A.       Hydraulic Gate Control System - Intake and Discharge Structures (Startup) ..................                                                       14 B.       Intake/Discharge Structure Hydraulic Gate Local Control System ......................... .............. 14 C.     Startup of Circulating Water System ...............................................................................                                 15 D.       Operation of Vacuum Priming System ............................................................................                                     19 E.     Shifting from Open to Hybrid Cycle M ode .....................................................................                                     19 F.     Shifting from Hybrid to Closed Cycle M ode ..................................................................                                       22 G.     Shifting from Closed to Hybrid Cycle M ode ..................................................................                                       24 H.     Shifting from Hybrid to Open Cycle M ode .....................................................................                                     26 I.     Operation of Circ W ater Traveling Screens .....................................................................                                   26 J.       Shutdown of Circ W ater/Cooling Towers ........................................................................                                   26 K.       Circ W ater Sample System .............................................................................................                           27 L.     Initial Tower Wetting .........................................................................................................                     28 M.       Maintaining Cooling Towers Wet ....................................................................................                               33 N.       Subfreezing Operation of Cooling Towers .......................................................................                                   37
....................................................................................................................................................
: 0.     Removing Condenser Water Boxes from Service for Maintenance .................................                                                       39 P.     Loss of River Temperature Recorder Sensing Points (M036 or M037) ..........................                                                         41 OP 2180 Rev. 39 Page 2 of 52
4 ATI'ACHM ENTS .............................................................................................................................................
 
7 QA REQUIREM ENTS CROSS REFERENCE  
Q. Total Loss of River Temperature Indication ....................................................................                             42 R. Hydraulic Gate Control System - Intake and Discharge Structures (Shutdown) .............                                                   42 S. Loss of Hydraulic Gate Control System ............... 1.....;..................................................... 42 T. Use of Hotwell for Condensate Storage ............................................................................                         44 U. Operation with Low Vernon Pond Elevation ..................................................................                                 45 V. Determining and Adjusting Plant Settings .......................................................................                           46 W. Clearing of Debris from Intake Trash Racks .....................................................................                           47 X. Operation of Cooling Tower Lights .................................................................................                         48 Y. Individual Cooling Tower Fan Operation .........................................................................                           48 Z. Initial Tower Balancing Post Maintenance or on System Start-up ...................................                                         49 AA. Circulating Water Traveling Screen Winter Layup .........................................................                                 50 BB. Circulating Water Traveling Screen Winter Layup Restoration ......................................                                         50 FINAL CONDITIONS .................................................................................................................................... 52 OP 2180 Rev. 39 Page 3 of 52
.........................................................................................
 
7 REFERENCES AND COM M ITM ENTS ....................................................................................................
PURPOSE To ensure proper operation of the Circulating Water System and Cooling Towers by Operations Department personnel.
8 PRECAUTIONS/LIM ITATIONS .....................................................................................................................
DISCUSSION The Circulating Water/Cooling Tower Systems provide a flow of water through the main condenser to provide the heat sink needed to condense the steam flowing into the main condenser. Additionally, it is used to control the heat input to the Connecticut River within the prescribed limits to ensure compliance with the NPDES permit thermal limits.
9 PRE RE QUISITES ...........................................................................................................................................
There are three basic modes of operation of the systems:
12 PROCEDURE  
I.     Open Cycle - circulating water from the river passes through condensers directly to the discharge structure and river.
..................................................................................................................................................
: 2.     Hybrid Cycle - circulating water from the river and discharge structure recirc pipe passes through the condenser and is pumped from the discharge structure by the circ water booster pumps through the cooling towers with part or all of the flow being directed to the river.
14 A. Hydraulic Gate Control System -Intake and Discharge Structures (Startup)  
: 3.     Closed Cycle - water cooled by the cooling towers is directed back to the intake structure through the recire pipe. A closed path is established and essentially no heat is rejected to the river.
..................
The cooling towers are pre-wetted prior to normal operation and kept wet to maintain structural integrity'during cooling tower fan operation.
14 B. Intake/Discharge Structure Hydraulic Gate Local Control System .........................  
Under special circumstances, such as maintenance tests or PMTs, it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting.
..............
To ensure the circ water side of the condenser remains full, a minimum of 2 circ water pumps should be running, and the vacuum priming system is placed in service as necessary to remove air from the condenser water box outlets and the discharge line just upstream of the discharge structure.
14 C. Startup of Circulating W ater System ...............................................................................
In the closed cycle mode, blowdown from the circulating water system can be maintained to control water inventory and solids formation by controlling level in the discharge basin.
15 D. Operation of Vacuum Priming System ............................................................................
Past operating experience has demonstrated that optimum plant performance is best achieved when condenser back pressure is maintained at 1.0 inch HgA. During winter months when icing is a consideration, circ water inlet temperature can be maintained greater or equal to 33°F raised by permitting flow from the discharge to the intake structure via the recirc gate.
19 E. Shifting from Open to Hybrid Cycle M ode .....................................................................
OP 2180 Rev. 39 Page 4 of 52
19 F. Shifting from Hybrid to Closed Cycle M ode ..................................................................
 
22 G. Shifting from Closed to Hybrid Cycle M ode ..................................................................
When the Circulating Water System is placed on CLOSED cycle for extended periods, the pH will rise and for this reason, sulfuric acid will be added to maintain pH between 6.5 and 8.5 Standard Units (SU). The heat load on the main condenser will also increase, causing microbiological growth to increase fouling on the condenser tube sheet and tubes. To minimize this biological fouling, the condenser must be periodically treated with algaecide, sodium hypochlorite and sodium bromide, to keep the growth in check. The Chemistry Department is responsible for monitoring and maintaining CW chemistry. The Operations Department is responsible for bulk makeup to the sodium bromide, sodium hypochlorite tank and the sulfuric acid tank. Procedure OP 2181, Service Water/Alternate Cooling Operating Procedure, covers bulk makeup to these tanks.
24 H. Shifting from Hybrid to Open Cycle M ode .....................................................................
[EPU - During the winter permit period, at EPU conditions, when the river flow is less than 1500 cfs, hybrid mode is required. For river temperatures 50*F or less, hybrid mode may be used depending on wet bulb temperature, river flow and temperature as shown in Figures 17 and 18. For river temperatures >50°F, hybrid mode is required, as shown in the summer nomographs. For river temperatures 62°F or higher, closed-cycle mode is required.
26 I. Operation of Circ W ater Traveling Screens .....................................................................
For low river flow conditions (.1500 cfs) with river temperature <50&deg;F the tables within Figure 17 for single tower operation or Figure 18 for two tower operation provide the operator with initial tower settings. The tables are based upon reactor and main generator output at EPU conditions and a 13.4&deg;F river temperature rise. The tables contain the following information:
26 J. Shutdown of Circ W ater/Cooling Towers ........................................................................
* Up River Temperature from M036
26 K. Circ W ater Sample System .............................................................................................
* River Volume Flowrate in FT3 per second
27 L. Initial Tower W etting .........................................................................................................
* Wet Bulb temperature Twb
28 M .M aintaining Cooling Towers W et ....................................................................................
* Thermal Capacity in cfs- 'F (based upon a 13.4 0F -AT)
33 N. Subfreezing Operation of Cooling Towers .......................................................................
S..initial tower settings for hybrid modes for defined conditions The new tables are used as follows:
37 0. Removing Condenser Water Boxes from Service for Maintenance  
* Determine Up River Temperature using M036.
.................................
* Determine river volume flow rate.
39 P. Loss of River Temperature Recorder Sensing Points (M036 or M037) ..........................
* Determine wet bulb temperature.
41 OP 2180 Rev. 39 Page 2 of 52 Q. Total Loss of River Temperature Indication  
Select the table with the appropriate river temperature. If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
....................................................................
Select the appropriate river flow. If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.
42 R. Hydraulic Gate Control System -Intake and Discharge Structures (Shutdown)  
OP 2180 Rev. 39 Page 5 of 52
.............
 
42 S. Loss of Hydraulic Gate Control System ...............
Select the appropriate wet bulb temperature. If the wet bulb temperature is not an exact match for any wet bulb temperature on the table, then proceed as follows:
: 1. .... ; .....................................................
If wet bulb temperature is >30'F, round up to the next highest wet bulb temperature.
42 T. Use of Hotwell for Condensate Storage ............................................................................
44 U. Operation with Low Vernon Pond Elevation  
..................................................................
45 V. Determining and Adjusting Plant Settings .......................................................................
46 W. Clearing of Debris from Intake Trash Racks .....................................................................
47 X. Operation of Cooling Tower Lights .................................................................................
48 Y. Individual Cooling Tower Fan Operation  
.........................................................................
48 Z. Initial Tower Balancing Post Maintenance or on System Start-up ...................................
49 AA. Circulating Water Traveling Screen Winter Layup .........................................................
50 BB. Circulating Water Traveling Screen Winter Layup Restoration  
......................................
50 FINAL CONDITIONS  
....................................................................................................................................
52 OP 2180 Rev. 39 Page 3 of 52 PURPOSE To ensure proper operation of the Circulating Water System and Cooling Towers by Operations Department personnel.
DISCUSSION The Circulating Water/Cooling Tower Systems provide a flow of water through the main condenser to provide the heat sink needed to condense the steam flowing into the main condenser.
Additionally, it is used to control the heat input to the Connecticut River within the prescribed limits to ensure compliance with the NPDES permit thermal limits.There are three basic modes of operation of the systems: I. Open Cycle -circulating water from the river passes through condensers directly to the discharge structure and river.2. Hybrid Cycle -circulating water from the river and discharge structure recirc pipe passes through the condenser and is pumped from the discharge structure by the circ water booster pumps through the cooling towers with part or all of the flow being directed to the river.3. Closed Cycle -water cooled by the cooling towers is directed back to the intake structure through the recire pipe. A closed path is established and essentially no heat is rejected to the river.The cooling towers are pre-wetted prior to normal operation and kept wet to maintain structural integrity'during cooling tower fan operation.
Under special circumstances, such as maintenance tests or PMTs, it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting.To ensure the circ water side of the condenser remains full, a minimum of 2 circ water pumps should be running, and the vacuum priming system is placed in service as necessary to remove air from the condenser water box outlets and the discharge line just upstream of the discharge structure.
In the closed cycle mode, blowdown from the circulating water system can be maintained to control water inventory and solids formation by controlling level in the discharge basin.Past operating experience has demonstrated that optimum plant performance is best achieved when condenser back pressure is maintained at 1.0 inch HgA. During winter months when icing is a consideration, circ water inlet temperature can be maintained greater or equal to 33&deg;F raised by permitting flow from the discharge to the intake structure via the recirc gate.OP 2180 Rev. 39 Page 4 of 52 When the Circulating Water System is placed on CLOSED cycle for extended periods, the pH will rise and for this reason, sulfuric acid will be added to maintain pH between 6.5 and 8.5 Standard Units (SU). The heat load on the main condenser will also increase, causing microbiological growth to increase fouling on the condenser tube sheet and tubes. To minimize this biological fouling, the condenser must be periodically treated with algaecide, sodium hypochlorite and sodium bromide, to keep the growth in check. The Chemistry Department is responsible for monitoring and maintaining CW chemistry.
The Operations Department is responsible for bulk makeup to the sodium bromide, sodium hypochlorite tank and the sulfuric acid tank. Procedure OP 2181, Service Water/Alternate Cooling Operating Procedure, covers bulk makeup to these tanks.[EPU -During the winter permit period, at EPU conditions, when the river flow is less than 1500 cfs, hybrid mode is required.
For river temperatures 50*F or less, hybrid mode may be used depending on wet bulb temperature, river flow and temperature as shown in Figures 17 and 18. For river temperatures  
>50&deg;F, hybrid mode is required, as shown in the summer nomographs.
For river temperatures 62&deg;F or higher, closed-cycle mode is required.For low river flow conditions
(.1500 cfs) with river temperature  
<50&deg;F the tables within Figure 17 for single tower operation or Figure 18 for two tower operation provide the operator with initial tower settings.
The tables are based upon reactor and main generator output at EPU conditions and a 13.4&deg;F river temperature rise. The tables contain the following information:
* Up River Temperature from M036* River Volume Flowrate in FT3 per second* Wet Bulb temperature Twb* Thermal Capacity in cfs- 'F (based upon a 13.4 0 F -AT)S..initial tower settings for hybrid modes for defined conditions The new tables are used as follows:* Determine Up River Temperature using M036.* Determine river volume flow rate.* Determine wet bulb temperature.
Select the table with the appropriate river temperature.
If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
Select the appropriate river flow. If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.OP 2180 Rev. 39 Page 5 of 52 Select the appropriate wet bulb temperature.
If the wet bulb temperature is not an exact match for any wet bulb temperature on the table, then proceed as follows: If wet bulb temperature is >30'F, round up to the next highest wet bulb temperature.
If wet bulb temperature is <30&deg;F, round down to the next lowest wet bulb temperature.
If wet bulb temperature is <30&deg;F, round down to the next lowest wet bulb temperature.
Initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows:* Hyb: This means hybrid mode.FOO: This means fans and the two numbers indicate the number fans required to be running.GOO: This means recire gate and the two numbers indicate recirc gate position.Thus an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.For low river flow condition with river temperature  
Initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows:
>50&deg;F the Summer Operation Nomographs are to be used. The nomographs are revised to reflect a 100% RTP of 1912 MWth. Also included are summer derate nomographs that must be used to prevent high condenser backpressure during summer operations.
* Hyb: This means hybrid mode.
These graphs provide initial power levels for acceptable back pressure based upon river thermal capacity and wet bulb temperature.
FOO:   This means fans and the two numbers indicate the number fans required to be running.
Note that power reduction is only required at very low instantaneous river thermal capacities.]
GOO: This means recire gate and the two numbers indicate recirc gate position.
OP 2180 Rev. 39 Page 6 of 52 ATTACHMENTS I 1. Appendix A 2. Appendix B 3. Appendix C 4. Appendix D 5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.VYOPF 2180.01 VYOPF 2180.02 VYOPF 2180.03 VYOPF 2180.04 VYOPF 2180.05 VYOPF 2180.06 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 Valve Lineup Determining and Adjusting Plant Settings for NPDES Compliance
Thus an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.
[EPU -Between the Dates of May 16 through October 141 Circulating Water Hydraulic Gate Operations With Degraded Position Indication
For low river flow condition with river temperature >50&deg;F the Summer Operation Nomographs are to be used. The nomographs are revised to reflect a 100% RTP of 1912 MWth. Also included are summer derate nomographs that must be used to prevent high condenser backpressure during summer operations. These graphs provide initial power levels for acceptable back pressure based upon river thermal capacity and wet bulb temperature. Note that power reduction is only required at very low instantaneous river thermal capacities.]
[EPU -Determining and Adjusting Plant Settings for NPDES Compliance between the Dates of October 15 through May 151 Deleted Cooling Tower Checklist Deleted Deleted Plant Setting Change Log Deleted Hydraulic Gate Directional Control Valve General Electric Psychometric Chart Wet Bulb Temperature (F) Based on Dry Bulb (F) and Dew Point (F) Temperatures 90% Exceedence Values for Wet Bulb Temperature Extrapolation Plant Setting Nomograph for River Temperatures 50.0-54.91F Plant Setting Nomograph for River Temperatures 55.0-58.9 0 F Plant Setting Nomograph for River Temperatures 59.0-62.9&deg;F Plant Setting Nomograph for River Temperatures 63.0-65.9&deg;F Plant Setting Nomograph for River Temperatures 66.0-69.9&deg;F Plant Setting Nomograph for River Temperatures 70.0-74.9&deg;F Plant Setting Nomograph for River Temperatures 75.0-79.9&deg;F Recirculation Gate Position Intake A Fully Open Recirc Gate 60% Open/Recirc Gate 80% Open Deleted Deleted Deleted[EPU -Circulating Water Plant Settings for Single Cooling Tower Winter Operation]
OP 2180 Rev. 39 Page 6 of 52
[EPU -Circulating Water Plant Settings for Two Cooling Tower Winter Operation]
 
: 28. Figure 18 QA REQUIREMENTS CROSS REFERENCE 1. None OP 2180 Rev. 39 Page 7 of 52 REFERENCES AND COMMITMENTS
ATTACHMENTS
: 1. Technical Specifications and Site Documents a. If, during power operation, an unexpected failure results in a complete loss of the cooling tower system, the Closed Cycle restrictions may be modified for a period of 24 hours to allow an orderly shutdown using the main condenser as a heat sink in the Open Cycle mode (see NPDES Permit).2. Codes, Standards, and Regulations
: 1. Appendix A   Valve Lineup I    2.
: a. NPDES Permit No. 3-1199 b. Vermont AEC Letter, dated Sept. 12, 1978 (NPDES Revision)C. 316 Demonstration Report d. Vermont Water Quality Standard Effective 1/8/87 3. Commitments
3.
: a. UND 9047, Revision of Procedures to Reflect NPDES Permit, issued 12/5/90 b. LER 88-01 c. Condenser Cooling System Facilities Settings Manual (CAR 9406102)d. CAR 9406801, Leaf Accumulation at Intake Structure e. CAR 94061_01, River Temperatures Exceeding NPDES Permit f. SDR 94077, Data Sheets Calculations, Graphs Related to NPDES Temperature Limits Are Not Included in Procedures
Appendix B Appendix C Determining and Adjusting Plant Settings for NPDES Compliance
: g. SOER 84-01, Cooling Water System Degradation Due To Aquatic Life h. ER950486_01, Revise OP 2180 To Include Admin. Limit of<51001F on West Clg Tower; Include Guidance Per Recs. 1 and 2 i. ER96-0538, NPDES Permit Violation During the Month of June j. ER971025_01, Remove Operations Manager Signature Block on App. B to OP 2180 or Modify to Allow for Limited Changes k. ER970019_01, Unexpected Five Foot Reduction in Circulating Water Forebay level. Revise OP 2180 for Routine Use Recirc Gate During Winter as Detailed in Rec.2. (Ice Blockage, Intake, Condenser)
[EPU - Between the Dates of May 16 through October 141 Circulating Water Hydraulic Gate Operations With Degraded Position Indication
: 4. Appendix D    [EPU - Determining and Adjusting Plant Settings for NPDES Compliance between the Dates of October 15 through May 151
: 5. VYOPF 2180.01  Deleted
: 6. VYOPF 2180.02  Cooling Tower Checklist
: 7. VYOPF 2180.03  Deleted
: 8. VYOPF 2180.04  Deleted
: 9. VYOPF 2180.05  Plant Setting Change Log
: 10. VYOPF 2180.06  Deleted
: 11. Figure 1      Hydraulic Gate Directional Control Valve
: 12. Figure 2      General Electric Psychometric Chart
: 13. Figure 3      Wet Bulb Temperature (F) Based on Dry Bulb (F) and Dew Point (F) Temperatures
: 14. Figure 4      90% Exceedence Values for Wet Bulb Temperature Extrapolation
: 15. Figure 5      Plant Setting Nomograph for River Temperatures 50.0-54.91F
: 16. Figure 6      Plant Setting Nomograph for River Temperatures 55.0-58.90 F
: 17. Figure 7      Plant Setting Nomograph for River Temperatures 59.0-62.9&deg;F
: 18. Figure 8      Plant Setting Nomograph for River Temperatures 63.0-65.9&deg;F
: 19. Figure 9      Plant Setting Nomograph for River Temperatures 66.0-69.9&deg;F
: 20. Figure 10    Plant Setting Nomograph for River Temperatures 70.0-74.9&deg;F
: 21. Figure 11    Plant Setting Nomograph for River Temperatures 75.0-79.9&deg;F
: 22. Figure 12    Recirculation Gate Position Intake A Fully Open
: 23. Figure 13    Recirc Gate 60% Open/Recirc Gate 80% Open
: 24. Figure 14    Deleted
: 25. Figure 15    Deleted
: 26. Figure 16    Deleted
: 27. Figure 17    [EPU - Circulating Water Plant Settings for Single Cooling Tower Winter Operation]
: 28. Figure 18    [EPU - Circulating Water Plant Settings for Two Cooling Tower Winter Operation]
QA REQUIREMENTS CROSS REFERENCE
: 1. None OP 2180 Rev. 39 Page 7 of 52
 
REFERENCES AND COMMITMENTS
: 1. Technical Specifications and Site Documents
: a. If, during power operation, an unexpected failure results in a complete loss of the cooling tower system, the Closed Cycle restrictions may be modified for a period of 24 hours to allow an orderly shutdown using the main condenser as a heat sink in the Open Cycle mode (see NPDES Permit).
: 2. Codes, Standards, and Regulations
: a. NPDES Permit No. 3-1199
: b. Vermont AEC Letter, dated Sept. 12, 1978 (NPDES Revision)
C. 316 Demonstration Report
: d. Vermont Water Quality Standard Effective 1/8/87
: 3. Commitments
: a. UND 9047, Revision of Procedures to Reflect NPDES Permit, issued 12/5/90
: b. LER 88-01
: c. Condenser Cooling System Facilities Settings Manual (CAR 9406102)
: d. CAR 9406801, Leaf Accumulation at Intake Structure
: e.     CAR 94061_01, River Temperatures Exceeding NPDES Permit
: f.     SDR 94077, Data Sheets Calculations, Graphs Related to NPDES Temperature Limits Are Not Included in Procedures
: g.     SOER 84-01, Cooling Water System Degradation Due To Aquatic Life
: h. ER950486_01, Revise OP 2180 To Include Admin. Limit of<51001F on West Clg Tower; Include Guidance Per Recs. 1 and 2
: i. ER96-0538, NPDES Permit Violation During the Month of June
: j.     ER971025_01, Remove Operations Manager Signature Block on App. B to OP 2180 or Modify to Allow for Limited Changes
: k.     ER970019_01, Unexpected Five Foot Reduction in Circulating Water Forebay level. Revise OP 2180 for Routine Use Recirc Gate During Winter as Detailed in Rec.2. (Ice Blockage, Intake, Condenser)
: 1. ER97-1567, Environmental Programs/Procedural Inconsistencies
: 1. ER97-1567, Environmental Programs/Procedural Inconsistencies
: m. ER981657_02, Revise OP 2180 to Make It Clear What VYOPF 2180.05 Data Must Be Taken When Circulating Water System is in Operation n. Process Computer Software Change Request 97-50, New Conn. River Flow Calc o. Process Computer Software Change Request 97-51, New Project Save Caics p. ER991077_05, Procedure Changes q. ER2002-1342, Control Switch Left in Close Position r. OE-13646_02, Change to OP 2180 to address OE 13646 s. ER2002-2686_01, Revise OP 2180 -NPDES Backwashing
: m.     ER981657_02, Revise OP 2180 to Make It Clear What VYOPF 2180.05 Data Must Be Taken When Circulating Water System is in Operation
: t. VYC-2403, Circulating Water Plant Settings for OP 2180 u. CR-VTY-2006-00042 CA 00004, Change OP 2180 OP 2180 Rev. 39 Page 8 of 52
: n. Process Computer Software Change Request 97-50, New Conn. River Flow Calc
: o. Process Computer Software Change Request 97-51, New Project Save Caics
: p.     ER991077_05, Procedure Changes
: q. ER2002-1342, Control Switch Left in Close Position
: r.     OE-13646_02, Change to OP 2180 to address OE 13646
: s. ER2002-2686_01, Revise OP 2180 - NPDES Backwashing
: t. VYC-2403, Circulating Water Plant Settings for OP 2180
: u.     CR-VTY-2006-00042 CA 00004, Change OP 2180 OP 2180 Rev. 39 Page 8 of 52
: 4. Supplemental References
: 4. Supplemental References
: a. DWG 191159, Service Water b. DWG 191166, Circulating Water System c. Letter, D.J. Marx to G.A. Johnson, "93&deg;F Temp. Limit for Circ. Water, Deletion of Procedural Restriction for Hybrid/Open Cycle", dated Sept. 26, 1988 d. Memo ESG 98-049, JJ to MP, "Dredging Impact on Critical Cross Section (CW Intake-River)", dated 4/20/98 e. Memo, MEP to EVB, Wetting of Cooling Towers CT-I and CT-2, dated 6/13/97 f. Memo SYSENG 2000-045, SAV to RLR, Cooling Tower Wetting, dated 4/13/2000 g. VYC-2403 Rev. 0, Circulating Water Plant Settings for OP 2180 h. VYC-2403 Rev.0, MCC1, Circulating Water Plant Settings for OP 2180 i. EN-AD-103, Document Control and Records Management Activities
: a.     DWG 191159, Service Water
: j. EN-LI-102, Corrective Action Process k. AP 0010, Situational Reporting Requirements I. AP 0021, Work Orders m. OP 0105, Reactor Operations
: b.       DWG 191166, Circulating Water System
: n. AP 0155, Current System Valve and Breaker Lineup and Identification
: c.     Letter, D.J. Marx to G.A. Johnson, "93&deg;F Temp. Limit for Circ. Water, Deletion of Procedural Restriction for Hybrid/Open Cycle", dated Sept. 26, 1988
: o. AP 0156, Notification of Significant Events p. OP 2106, Oil and Hazardous Materials Spill Prevention and Control q. OP 2160, Turbine Generator Support Systems Operation r. OP 2181, Service Water/Alternate Cooling Operating Procedure s. OT 3120, Condenser High Back Pressure t. ON 3173, Loss of Circulating Water u. OP 4650, Circulating Water System Treatment and Sampling PRECAUTIONS/LIMITATIONS
: d.     Memo ESG 98-049, JJ to MP, "Dredging Impact on Critical Cross Section (CW Intake-River)", dated 4/20/98
: 1. Whenever the CW or SW discharge mode is changed, be aware that the sampling and monitoring valves may have to be realigned to ensure sampling requirements are met.Chemistry must be notified when this occurs. (LER 88-01)2. CW pump "B" should not be shutdown for long periods of time when ambient air temperature is below 32&deg;F to prevent freezing of its cooling water pipes with the ventilation louvers open.3. During subfreezing weather conditions, ice buildup on traveling screens may cause damage/failure when rotated. More frequent screen inspection may be required.
: e.     Memo, MEP to EVB, Wetting of Cooling Towers CT-I and CT-2, dated 6/13/97
Except as required by NPDES permit Part IV, Environmental Monitoring Studies, Connecticut River, operational mode of the screens may need to be altered at the discretion of the Shift Manager due to icing. (ER2002-2686_01)
: f.     Memo SYSENG 2000-045, SAV to RLR, Cooling Tower Wetting, dated 4/13/2000
: 4. During 2"d week of November to I' week in April, check Circ Water de-icing agitators placement per VYOPF 0150.01, AO Round Sheet Outside.5. During chemical addition, operate in closed cycle. Readjust system upon verification by the Chemistry Department that circ water is within the limits of the NPDES permit.OP 2180 Rev. 39 Page 9 of 52
: g.     VYC-2403 Rev. 0, Circulating Water Plant Settings for OP 2180
: h.     VYC-2403 Rev.0, MCC1, Circulating Water Plant Settings for OP 2180
: i.     EN-AD-103, Document Control and Records Management Activities
: j.       EN-LI-102, Corrective Action Process
: k.     AP 0010, Situational Reporting Requirements I.     AP 0021, Work Orders
: m.     OP 0105, Reactor Operations
: n.     AP 0155, Current System Valve and Breaker Lineup and Identification
: o.     AP 0156, Notification of Significant Events
: p.     OP 2106, Oil and Hazardous Materials Spill Prevention and Control
: q.     OP 2160, Turbine Generator Support Systems Operation
: r.     OP 2181, Service Water/Alternate Cooling Operating Procedure
: s.     OT 3120, Condenser High Back Pressure
: t.     ON 3173, Loss of Circulating Water
: u.     OP 4650, Circulating Water System Treatment and Sampling PRECAUTIONS/LIMITATIONS
: 1. Whenever the CW or SW discharge mode is changed, be aware that the sampling and monitoring valves may have to be realigned to ensure sampling requirements are met.
Chemistry must be notified when this occurs. (LER 88-01)
: 2. CW pump "B" should not be shutdown for long periods of time when ambient air temperature is below 32&deg;F to prevent freezing of its cooling water pipes with the ventilation louvers open.
: 3. During subfreezing weather conditions, ice buildup on traveling screens may cause damage/failure when rotated. More frequent screen inspection may be required. Except as required by NPDES permit Part IV, Environmental Monitoring Studies, Connecticut River, operational mode of the screens may need to be altered at the discretion of the Shift Manager due to icing. (ER2002-2686_01)
: 4. During 2 "dweek of November to I' week in April, check Circ Water de-icing agitators placement per VYOPF 0150.01, AO Round Sheet Outside.
: 5. During chemical addition, operate in closed cycle. Readjust system upon verification by the Chemistry Department that circ water is within the limits of the NPDES permit.
OP 2180 Rev. 39 Page 9 of 52
: 6. Be aware that whenever the mode of operation is changed, the system requires at least 1/2 hour to reach temperature equilibrium.
: 6. Be aware that whenever the mode of operation is changed, the system requires at least 1/2 hour to reach temperature equilibrium.
: 7. When in Hybrid or Closed Cycle Mode changes in circulating water header pressure will affect flows to each cell in a tower. When changing Cire Water Booster Pump or tower lineups, cell flow balancing should be verified, and if required, performed.
: 7. When in Hybrid or Closed Cycle Mode changes in circulating water header pressure will affect flows to each cell in a tower. When changing Cire Water Booster Pump or tower lineups, cell flow balancing should be verified, and if required, performed.
: 8. Except for special circumstances, such as maintenance tests or PMTs, for which it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting, do not operate cooling tower fans unless their associated cooling tower is wetted.9. Minimize cycling of CTF 2-1.10. Operation of radios near the hydraulic equipment can cause the gates to drift.11. Do not operate bypass gates in the raise direction with level higher than 235' Forebay level.12. Limit the number of 4KV pump motor starts to three starts in 5 minutes, followed by a 20 minute run or a 45 minute idle period for cooling.13. Cooling Tower fan motor starting limits are: a. no more than 4 starts per hour for the 125 HP fan, CT-2-1.b. no more than 2 starts per hour cold (approximately 1041F or 40 0 C) or I start per hour hot (full load temp) for all the 200 HP fans.c. Pause at least 6.5 minutes in OFF position before changing direction of rotation.14. Maintain the CW intake gates shut during Closed Cycle operation.
: 8. Except for special circumstances, such as maintenance tests or PMTs, for which it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting, do not operate cooling tower fans unless their associated cooling tower is wetted.
Normally, during plant shutdown the intake gates should be closed unless otherwise specified by plant conditions.
: 9. Minimize cycling of CTF 2-1.
During Open or Hybrid Cycle operation, at least one of the intake gates should be 100% open.15. During the period October 15 through May 15 Open or Hybrid operation is allowed provided the following:
: 10. Operation of radios near the hydraulic equipment can cause the gates to drift.
: a. Temperature at Station 3 does not exceed 651F.b. Rate of change of temperature at Station 3 does not exceed 5&deg;F per hour as determined by calculating the difference between consecutive hourly average temperatures. (ER97-1567)
: 11. Do not operate bypass gates in the raise direction with level higher than 235' Forebay level.
C. Plant-induced increase in temperature above ambient at Station 3 does not exceed 13.4 0 F.OP 2180 Rev. 39 Page 10 of 52 NOTE The increase in temperature above ambient at Monitor 3 during steady state open cycle can be calculated using the following formula (which can also be used if ERFIS becomes inoperable from October 15 through May 15). If the formula is used, independent verification of the calculation must be obtained: (ER991077_05)
: 12. Limit the number of 4KV pump motor starts to three starts in 5 minutes, followed by a 20 minute run or a 45 minute idle period for cooling.
: 13. Cooling Tower fan motor starting limits are:
: a.       no more than 4 starts per hour for the 125 HP fan, CT-2-1.
: b.       no more than 2 starts per hour cold (approximately 1041F or 40 0 C) or I start per hour hot (full load temp) for all the 200 HP fans.
: c.       Pause at least 6.5 minutes in OFF position before changing direction of rotation.
: 14. Maintain the CW intake gates shut during Closed Cycle operation. Normally, during plant shutdown the intake gates should be closed unless otherwise specified by plant conditions. During Open or Hybrid Cycle operation, at least one of the intake gates should be 100% open.
: 15. During the period October 15 through May 15 Open or Hybrid operation is allowed provided the following:
: a.     Temperature at Station 3 does not exceed 651F.
: b.       Rate of change of temperature at Station 3 does not exceed 5&deg;F per hour as determined by calculating the difference between consecutive hourly average temperatures. (ER97-1567)
C.       Plant-induced increase in temperature above ambient at Station 3 does not exceed 13.4 0 F.
OP 2180 Rev. 39 Page 10 of 52
 
NOTE The increase in temperature above ambient at Monitor 3 during steady state open cycle can be calculated using the following formula (which can also be used if ERFIS becomes inoperable from October 15 through May 15). If the formula is used, independent verification of the calculation must be obtained: (ER991077_05)
At,= 15.193
At,= 15.193
* C051 (MWt rejected)C275 (River flow in cfs)16. During the period May 16 through October 14 Open or Hybrid operation is allowed provided that: (UND 9047)a. Plant-induced increase in temperature at Station 3 does not exceed: Station 7 Temperature At>63 0 F 2 0 F>59 0 F, <63 0 F 3 0 F>55 0 F, <59 0 F 4 0 F<55&deg;F 5 0 F 17. Ph indication shall be available and maintained to ensure the following limits are adhered to: NPDES Limits Admin Limits 6.5 -8.5 6.7 -8.3 a. If the Admin Limits during Open/Hybrid operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits, up to and including establishing Closed Cycle operation.
* C051 (MWt rejected)
: b. If the Admin Limits during Closed Cycle operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits.18. During Open Cycle operation, it is not necessary to modify the natural Ph of the circ water prior to discharging to the river (letter, State of Vermont to Dr. D.J. Marx, dated 12/4/86).19. Chemistry personnel are notified of CW system mode changes (i.e., Open, Hybrid, or Closed).OP 2180 Rev. 39 Page 11 of 52
C275 (River flow in cfs)
: 20. If any limitation of the NPDES Permit is exceeded, initiate a CR and notify Chemistry supervision to initiate required reports per AP 0010, Notifications and Reports Due. The Chemistry Department will make 24 hour verbal notification to the State, followed by a five day written notification. (LIND 9047)21. During CW operation, Ph monitoring must be operable or grab samples taken by the Chemistry Department.
: 16. During the period May 16 through October 14 Open or Hybrid operation is allowed provided that: (UND 9047)
: 22. Monitor CW performance with BOP Log 7 and the BOP Condenser Performance Display, as well as "Margin to TCRIT" per Appendix B, during all modes of system operation. (SOER 84-01)23. Maintain West Cooling Tower Deep Basin temperature in accordance with OP 2181 Admin. Limits during Hybrid/Closed Cycle operation.
: a.       Plant-induced increase in temperature at Station 3 does not exceed:
Station 7 Temperature             At
                        >630 F                   20 F
                    >59 0 F, <630 F             30 F
                    >55 0 F, <59 0 F             40 F
                        <55&deg;F                   50 F
: 17. Ph indication shall be available and maintained to ensure the following limits are adhered to:
NPDES Limits                   Admin Limits 6.5 - 8.5                   6.7 - 8.3
: a.       If the Admin Limits during Open/Hybrid operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits, up to and including establishing Closed Cycle operation.
: b.       If the Admin Limits during Closed Cycle operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits.
: 18. During Open Cycle operation, it is not necessary to modify the natural Ph of the circ water prior to discharging to the river (letter, State of Vermont to Dr. D.J. Marx, dated 12/4/86).
: 19. Chemistry personnel are notified of CW system mode changes (i.e., Open, Hybrid, or Closed).
OP 2180 Rev. 39 Page 11 of 52
: 20. If any limitation of the NPDES Permit is exceeded, initiate a CR and notify Chemistry supervision to initiate required reports per AP 0010, Notifications and Reports Due. The Chemistry Department will make 24 hour verbal notification to the State, followed by a five day written notification. (LIND 9047)
: 21. During CW operation, Ph monitoring must be operable or grab samples taken by the Chemistry Department.
: 22. Monitor CW performance with BOP Log 7 and the BOP Condenser Performance Display, as well as "Margin to TCRIT" per Appendix B, during all modes of system operation. (SOER 84-01)
: 23. Maintain West Cooling Tower Deep Basin temperature in accordance with OP 2181 Admin. Limits during Hybrid/Closed Cycle operation.
: 24. During cold weather operations, maintain cire water inlet temperature greater than 33 0 F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure using 2 cire water pumps and recire gate. (ER97-0019)
: 24. During cold weather operations, maintain cire water inlet temperature greater than 33 0 F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure using 2 cire water pumps and recire gate. (ER97-0019)
: 25. During warm weather operations, operations of the recire gate for NPDES compliance shall not be performed until the cooling towers are placed in service. Opening the recirc gate first may lead to a rapid increase in condenser backpressure and possible Turbine trip.26. [EPU -Prior to performing any actions related to EPU, confirm the EPU Tech Spec Amendment has been approved.]
: 25. During warm weather operations, operations of the recire gate for NPDES compliance shall not be performed until the cooling towers are placed in service. Opening the recirc gate first may lead to a rapid increase in condenser backpressure and possible Turbine trip.
: 27. During winter operations with wet bulb temperature  
: 26. [EPU - Prior to performing any actions related to EPU, confirm the EPU Tech Spec Amendment has been approved.]
<40&deg;F if cooling towers are used both towers must be in service to prevent ice damage from potential valve leakage.28. During winter operations with wet bulb temperature  
: 27. During winter operations with wet bulb temperature <40&deg;F if cooling towers are used both towers must be in service to prevent ice damage from potential valve leakage.
<40"F if cooling towers are used all cooling tower cells must have flow. Do not isolate flow to an individual cell.PREREQUISITES I. Service Water available to CW pump seals, hypochlorite and acid system, and traveling screens per OP 2181, Service Water/Alternate Cooling Operating Procedure.
: 28. During winter operations with wet bulb temperature <40"F if cooling towers are used all cooling tower cells must have flow. Do not isolate flow to an individual cell.
: 2. Ensure Cooling Tower Checklist is completed before May 1 5 th (VYOPF 2180.02).3. 4160 V Bus 1, 2 and 5 energized.
PREREQUISITES I. Service Water available to CW pump seals, hypochlorite and acid system, and traveling screens per OP 2181, Service Water/Alternate Cooling Operating Procedure.
: 2. Ensure Cooling Tower Checklist is completed before May       1 5th (VYOPF 2180.02).
: 3. 4160 V Bus 1, 2 and 5 energized.
: 4. 480 V MCC 8D, 7C and 7F energized.
: 4. 480 V MCC 8D, 7C and 7F energized.
: 5. Hydraulic gate operators vented, if required, and available for service.6. Appendix A valve lineup completed.
: 5. Hydraulic gate operators vented, if required, and available for service.
: 6. Appendix A valve lineup completed.
OP 2180 Rev. 39 Page 12 of 52
OP 2180 Rev. 39 Page 12 of 52
: 7. Ensure CW Booster pump cooling fans are in AUTO prior to starting the pumps.8. In freezing weather, check for ice or snow accumulation on Cooling Tower fans before starting.9. Ensure discharge basin level is above 223 ft. before starting a CW Booster pump or the pump will trip.10. Ensure intake basin level is above 207 ft. before starting a CW pump or the pump will trip.11. Plant setting change log initiated and appropriate limits set by Operations management.
: 7. Ensure CW Booster pump cooling fans are in AUTO prior to starting the pumps.
: 12. Hotwell level <6' above the bottom of the hotwell prior to operation of the CW system.OP 2180 Rev. 39 Page 13 of 52 PROCEDURE A. Hydraulic Gate Control System -Intake and Discharge Structures (Startup)1. System Startup a. Ensure the following conditions are satisfied:
: 8. In freezing weather, check for ice or snow accumulation on Cooling Tower fans before starting.
: 1) If necessary, Maintenance has primed the pumps and vented the lines.2) Oil reservoir level greater than midline on tank.3) AC power available.
: 9. Ensure discharge basin level is above 223 ft. before starting a CW Booster pump or the pump will trip.
: 4) Valve lineup per Appendix A completed.
: 10. Ensure intake basin level is above 207 ft. before starting a CW pump or the pump will trip.
: b. Turn the two control power breakers on the control panel to ON position.C. Check or place keylock switches for pump #1 and #2 in AUTO.d. Select pump #1 or pump #2 to LEAD.e. Perform the following switch alignment:
: 11. Plant setting change log initiated and appropriate limits set by Operations management.
: 1) Alarm test light switch to OFF.2) CPU ON/OFF switch to ON.3) LOCALIREMOTE switch to REMOTE (for Control Room use).4) RECIRC GATE switch to STOP.B. Intake/Discharge Structure Hydraulic Gate Local Control System 1. Local Operation a. Place the LOCALIREMOTE switch to LOCAL.b. Verifying Intake/Discharge Structure Hydraulic System trouble (6-D-6/7)annunciates as appropriate.
: 12. Hotwell level <6' above the bottom of the hotwell prior to operation of the CW system.
C. Place the 3-position control switch from STOP to the appropriate OPEN/CLOSE position for desired gate movement.d. Place the 3-position control switch to STOP.OP 2180 Rev. 39 Page 14 of 52
OP 2180 Rev. 39 Page 13 of 52
: e. Place the LOCALIREMOTE switch to REMOTE.f. Verify Intake/Discharge Structure Hydraulic System trouble (6-D-6/7)clears as appropriate.
 
C. Startup of Circulating Water System 1. Verify all Prerequisites satisfied.
PROCEDURE A. Hydraulic Gate Control System - Intake and Discharge Structures (Startup)
: 2. Notify the Chemistry Department so that timely plant discharge sampling can be performed for NPDES compliance.
: 1. System Startup
: 3. If during cold weather operations, verify bubblers installed on river side.4. Verify/establish SW supply to CW pump seals and motors at least 10 minutes before starting a CW pump as follows: a. Seals: 10-15 gpm (FI-104-6A/B/C)
: a.     Ensure the following conditions are satisfied:
: b. Motors: >45% (FI-104-8A/B/C)
: 1)     If necessary, Maintenance has primed the pumps and vented the lines.
: 5. Verify/establish the following:
: 2)     Oil reservoir level greater than midline on tank.
: a. CW traveling screens in AUTO (unless CW traveling screens are in winter Iay up).b. Intake gate(s) 100% open.C. CW Ph monitor operable or Chemistry Department notified to perform daily grab sampling of the CW System.d. CW System has been sampled by Chemistry Department to ensure water is within all limits of NPDES Permit.6. Place CW Pump control switch to START (the discharge valve opens to approximately 20% before the pump starts) (CRP 9-6).a. Check any idle circ water pumps, P-5-1A(B,C), for reverse rotation.I) IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)
: 3)     AC power available.
: 4)     Valve lineup per Appendix A completed.
: b.     Turn the two control power breakers on the control panel to ON position.
C.     Check or place keylock switches for pump #1 and #2 in AUTO.
: d.     Select pump #1 or pump #2 to LEAD.
: e.     Perform the following switch alignment:
: 1)     Alarm test light switch to OFF.
: 2)     CPU ON/OFF switch to ON.
: 3)     LOCALIREMOTE switch to REMOTE (for Control Room use).
: 4)     RECIRC GATE switch to STOP.
B. Intake/Discharge Structure Hydraulic Gate Local Control System
: 1. Local Operation
: a. Place the LOCALIREMOTE switch to LOCAL.
: b.     Verifying Intake/Discharge Structure Hydraulic System trouble (6-D-6/7) annunciates as appropriate.
C.     Place the 3-position control switch from STOP to the appropriate OPEN/CLOSE position for desired gate movement.
: d.     Place the 3-position control switch to STOP.
OP 2180 Rev. 39 Page 14 of 52
: e.     Place the LOCALIREMOTE switch to REMOTE.
: f.     Verify Intake/Discharge Structure Hydraulic System trouble (6-D-6/7) clears as appropriate.
C. Startup of Circulating Water System
: 1.     Verify all Prerequisites satisfied.
: 2.     Notify the Chemistry Department so that timely plant discharge sampling can be performed for NPDES compliance.
: 3.     If during cold weather operations, verify bubblers installed on river side.
: 4.     Verify/establish SW supply to CW pump seals and motors at least 10 minutes before starting a CW pump as follows:
: a.     Seals: 10-15 gpm (FI-104-6A/B/C)
: b.     Motors: >45% (FI-104-8A/B/C)
: 5.     Verify/establish the following:
: a.     CW traveling screens in AUTO (unless CW traveling screens are in winter Iay up).
: b.     Intake gate(s) 100% open.
C.     CW Ph monitor operable or Chemistry Department notified to perform daily grab sampling of the CW System.
: d.     CW System has been sampled by Chemistry Department to ensure water is within all limits of NPDES Permit.
: 6.     Place CW Pump control switch to START (the discharge valve opens to approximately 20% before the pump starts) (CRP 9-6).
: a.     Check any idle circ water pumps, P-5-1A(B,C), for reverse rotation.
I)       IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)
OP 2180 Rev. 39 Page 15 of 52
OP 2180 Rev. 39 Page 15 of 52
: 7. Request Chemistry Department verify proper operation of Discharge Basin Rad Monitor (RD- 17-340/PRM-17-359).8. Monitor Discharge Basin Rad Monitor (PRM-17-359) radiation levels for abnormal trends.9. Refer to the Startup of Vacuum Priming System section of this procedure, and place vacuum priming system in service.10. If the Circulating Water System is in operation to support maintaining condenser backpressure, start the second CW pump 11. If condenser backpressure increases to greater than 1.6 inches HgA, with two CW pumps in service, consider starting the third one and operating with three, considering intake level or leaf intrusion problems.NOTE Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers may be lost, thereby short-circuiting the air ejectors.
: 7.     Request Chemistry Department verify proper operation of Discharge Basin Rad Monitor (RD- 17-340/PRM- 17-359).
This results in operational problems with the AOG system.12. If condenser backpressure decreases to less than 1.0 inch HgA, or if there are intake level problems with three CW pumps in service, consider securing one and operating with two.a. Check any idle cire water pumps, P-5-1A(B,C), for reverse rotation.1) IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)
: 8.       Monitor Discharge Basin Rad Monitor (PRM-17-359) radiation levels for abnormal trends.
: 9.       Refer to the Startup of Vacuum Priming System section of this procedure, and place vacuum priming system in service.
: 10.     If the Circulating Water System is in operation to support maintaining condenser backpressure, start the second CW pump
: 11.     If condenser backpressure increases to greater than 1.6 inches HgA, with two CW pumps in service, consider starting the third one and operating with three, considering intake level or leaf intrusion problems.
NOTE Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers may be lost, thereby short-circuiting the air ejectors. This results in operational problems with the AOG system.
: 12.     If condenser backpressure decreases to less than 1.0 inch HgA, or if there are intake level problems with three CW pumps in service, consider securing one and operating with two.
: a.     Check any idle cire water pumps, P-5-1A(B,C), for reverse rotation.
: 1)       IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)
OP 2180 Rev. 39 Page 16 of 52
OP 2180 Rev. 39 Page 16 of 52
: 13. If Plan1 is 6perating during October 15 thiough May 15: a. Monitor the following:
: 13. If Plan1 is 6perating during October 15 thiough May 15:
* Temperature at Station 3 (M037)* Rate of change of temperature at Station 3 (no ERFIS point)* Plant-induced increase in temperature above ambient at Station 3 (C019)b. If it is anticipated that any of the following limits will be exceeded, shift to hybrid IEPU -per Figures 17 or 181 or closed cycle or reduce reactor power to prevent exceeding the limits: 0 Temperature at Station 3 (M037) approaches 65&deg;F 0 Rate of change of temperature at Station 3 (no ERFIS point)approaches 5&deg;F per hour 0 Plant-induced increase in temperature above ambient at Station 3 (C019) approaches 13.4 0 F 0 IF M037 is out of service refer to the Loss of River Temperature Recorder Sensing Points (M036 or M037) section of this procedure.
: a.       Monitor the following:
: 14. If Plant is operating during May 16 through October 14: a. Monitor the following:
* Temperature at Station 3 (M037)
* *Station 7 Temperature (M036)* Plant-induced increase in temperature above ambient at Station 3 (C019)b. If it is anticipated that any of the following limits will be exceeded, shift to hybrid or closed cycle or reduce reactor power to prevent exceeding the limits: Increase in Temperature Above Station 7 Temperature Ambient at Station 3>63 0 F 2 0 F>59 0 F, <63 0 F 3 0 F 2!55 0 F, <59 0 F 4 0 F<55&deg;F 5F OP 2180 Rev. 39 Page 17 of 52 NOTE* -x.. .2 ILFtt~IL JJIWLt F .JIUIUIIW .. " 4.I UI A , 11U U1U U1 UL1UL4 1, J,, I U- L 4 Stti~ngansd aoppigshtobld:bem' iied t~kxsslv6 wer to .....Q-$ t, .....breker contacts, ..... ... ---... -.. ...... .. .. .. .......15. If any of the following ERFIS values are unavailable, perform either of the actions below per Manager Operations approval.S 0 S S S 0 S River Up/Down Temp Rise -C019 Heat Reject to River -C064 Conn River Flow -C275 Margin to TCrit -C276 Instantaneous River Thermal Cap -C277 Condenser Inlet -F052, F053, F054, F055 Condenser Outlet -F056, F057,F058, F059 East Tower Outlet -F078 West Tower Outlet -F079 NOTE This calculation is only valid when the plant is in open cycle.a. Verify river temperature rise is within limits using the following formula, provided the plant is at steady state operation.
* Rate of change of temperature at Station 3 (no ERFIS point)
AT,,= 15.193**(MWt reiected)(River flow in cfs)where: MWt rejected (C051) 1593 [EPU- 19121 *(%RTP)-generator gross MWe River flow in cfs (C275) = Vernon reported flow from Wilder b. "Place Circulating-Water System in hybrid cycle with full recirculation flow (recire gate >85% open), at least 21 cooling tower fans operating, and intake gates open.OP 2180 Rev. 39 Page 18 of 52 LPC #3 D. Operation of Vacuum Priming System NOTE The vacuum priming system should be operated as necessary to prevent the accumulation of non-condensables in the water boxes. The system may be placed in a standby condition when at least two circ water pumps are running.Placing in service: 1. Ensure at least one CW pump is operating.
* Plant-induced increase in temperature above ambient at Station 3 (C019)
: 2. Check Condenser Priming Tank level between empty and 1/4 full.3. Check seal water valve lineup.4. Place A or B Vacuum Priming Pump control switch in RUN.5. Place annunciator 6-B-5, CIRC WTR PRIMING TANK VAC LO, alarm card select switch or jumper in NO (CRP 9-6).Removing from service/Placing in Standby: 1. Place vacuum Priming Pump control switch to OFF.2. Place annunciator 6-B-5, CIRCWTR PRIMING TANK VAC LO, alarm card select switch or jumper in NC (CRP 9-6).E. Shifting from Open to Hybrid Cycle Mode 1. Verify all Prerequisites and Admin. Limits are satisfied.
: b.       If it is anticipated that any of the following limits will be exceeded, shift to hybrid IEPU - per Figures 17 or 181 or closed cycle or reduce reactor power to prevent exceeding the limits:
: 2. If this is the first time of the season hybrid cycle mode is entered, request Chemistry verify proper operation of Discharge Basin Rad Monitor (RD-I 7-340/PRM-1 7-359).3. Confirm normal trends on Discharge Basin Rad Monitor (PRM-17-359).
0         Temperature at Station 3 (M037) approaches 65&deg;F 0         Rate of change of temperature at Station 3 (no ERFIS point) approaches 5&deg;F per hour 0         Plant-induced increase in temperature above ambient at Station 3 (C019) approaches 13.4 0 F 0         IF M037 is out of service refer to the Loss of River Temperature Recorder Sensing Points (M036 or M037) section of this procedure.
OP 2180 Rev. 39 Page 19 of 52 NOTES Each switch operates both tower inlet valves. The red valve position light on CRP 9-6 will energize only when both valves are open.When adjusting plant parameters for NPDES compliance, the recirc gate shall not be repositioned until the cooling towers are placed in service.4. Open/verify open cooling tower inlet #1 (riser) valves CW-6AJB or cooling tower#2 inlet (riser) valves CW-6C/D.5. Close both bypass gates until tower Forebay/discharge basin level is 230-233'(LI-104-10).
: 14. If Plant is operating during May 16 through October 14:
: a.       Monitor the following:
            *       *Station 7 Temperature (M036)
* Plant-induced increase in temperature above ambient at Station 3 (C019)
: b.       If it is anticipated that any of the following limits will be exceeded, shift to hybrid or closed cycle or reduce reactor power to prevent exceeding the limits:
Increase in Temperature Above Station 7 Temperature           Ambient at Station 3
                            >63 0F                          20F 0
                        >59 F, <630F                        30 F 2!55 0 F, <59 0F                    40F
                            <55&deg;F                           5F OP 2180 Rev. 39 Page 17 of 52
 
NOTE IL FJJIWLt . JIUIUIIW         1, 1*A*U1i* .. " 4.I   U'*  UI U- , A 11UU1U U1I  UL1UL4 L  4 J,,
* - x..    .2 Stti~ngansd aoppigshtobld:bem'               iied t,            t~kxsslv6 wer to         . Q-$
breker contacts, -*,-..: . ....             ... ---... - .. ...... .. .. .. . ......
ILFtt~ 15.     If any of the following ERFIS values are unavailable, perform either of the actions below per Manager Operations approval.
S       River Up/Down Temp Rise - C019 Heat Reject to River - C064 0        Conn River Flow - C275 S        Margin to TCrit - C276 S        Instantaneous River Thermal Cap - C277 S        Condenser Inlet - F052, F053, F054, F055 0        Condenser Outlet - F056, F057,F058, F059 East Tower Outlet - F078 S        West Tower Outlet - F079 NOTE This calculation is only valid when the plant is in open cycle.
: a.     Verify river temperature rise is within limits using the following formula, provided the plant is at steady state operation.
AT,,= 15.193**(MWt reiected)
(River flow in cfs) where: MWt rejected (C051)           1593 [EPU- 19121 *(%RTP)-generator gross MWe River flow in cfs (C275) = Vernon reported flow from Wilder
: b.       "Place Circulating-Water System in hybrid cycle with full recirculation flow (recire gate >85% open), at least 21 cooling tower fans operating, and intake gates open.
OP 2180 Rev. 39 Page 18 of 52 LPC #3
 
D. Operation of Vacuum Priming System NOTE The vacuum priming system should be operated as necessary to prevent the accumulation of non-condensables in the water boxes. The system may be placed in a standby condition when at least two circ water pumps are running.
Placing in service:
: 1.     Ensure at least one CW pump is operating.
: 2.     Check Condenser Priming Tank level between empty and 1/4 full.
: 3.     Check seal water valve lineup.
: 4.     Place A or B Vacuum Priming Pump control switch in RUN.
: 5.     Place annunciator 6-B-5, CIRC WTR PRIMING TANK VAC LO, alarm card select switch or jumper in NO (CRP 9-6).
Removing from service/Placing in Standby:
: 1.     Place vacuum Priming Pump control switch to OFF.
: 2.     Place annunciator 6-B-5, CIRCWTR PRIMING TANK VAC LO, alarm card select switch or jumper in NC (CRP 9-6).
E. Shifting from Open to Hybrid Cycle Mode
: 1.     Verify all Prerequisites and Admin. Limits are satisfied.
: 2.     If this is the first time of the season hybrid cycle mode is entered, request Chemistry verify proper operation of Discharge Basin Rad Monitor (RD-I 7-340/PRM-1 7-359).
: 3.     Confirm normal trends on Discharge Basin Rad Monitor (PRM-17-359).
OP 2180 Rev. 39 Page 19 of 52
 
NOTES Each switch operates both tower inlet valves. The red valve position light on CRP 9-6 will energize only when both valves are open.
When adjusting plant parameters for NPDES compliance, the recirc gate shall not be repositioned until the cooling towers are placed in service.
: 4. Open/verify open cooling tower inlet #1 (riser) valves CW-6AJB or cooling tower
  #2 inlet (riser) valves CW-6C/D.
: 5. Close both bypass gates until tower Forebay/discharge basin level is 230-233' (LI-104-10).
: 6. Operate towers and CW Booster pumps in the following combination:
: 6. Operate towers and CW Booster pumps in the following combination:
: a. 1 pump = 1 tower b. 2 pumps = 2 towers c. 3 pumps = 2 towers 7. Ensure cooling fan control switches for circ water booster pumps to be started are in AUTO.8. Start CW Booster pump and allow piping to fill for at least 10 minutes: a. When at least 10 minutes have elapsed, flag CWB pump control switch to START again, to fully open pump discharge valve.b. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: a.       1 pump = 1 tower
: c. Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
: b.     2 pumps = 2 towers
: c.     3 pumps = 2 towers
: 7. Ensure cooling fan control switches for circ water booster pumps to be started are in AUTO.
: 8. Start CW Booster pump and allow piping to fill for at least 10 minutes:
: a.     When at least 10 minutes have elapsed, flag CWB pump control switch to START again, to fully open pump discharge valve.
: b.     Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: c.     Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
: 9. If second CWB pump is required, perform the following:
: 9. If second CWB pump is required, perform the following:
: a. Wait at least 5 minutes after completion of Step D.8.b. Start second CWB pump.c. When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.OP 2180 Rev. 39 Page 20 of 52
: a.     Wait at least 5 minutes after completion of Step D.8.
: d. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: b.       Start second CWB pump.
: e. Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-I 04-67A/B/C).
: c.       When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
OP 2180 Rev. 39 Page 20 of 52
: d.       Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: e.       Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-I 04-67A/B/C).
: 10. If third CWB pump is required, perform the following:
: 10. If third CWB pump is required, perform the following:
: a. Check Tower Forebay/Discharge Basin level has stabilized.
: a.       Check Tower Forebay/Discharge Basin level has stabilized.
: b. Start third CWB pump.c. When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.d. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: b.       Start third CWB pump.
: e. Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
: c.       When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
NOTE Distribution valves close by turning handle clockwise (stem rises).11.12.Fully raise both bypass gates.Check flow through all cells is balanced.a. If required, adjust distribution valves as necessary when all three CWB pumps are running.OP 2180 Rev. 39 Page 21 of 52 NOTES Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers are lost, thereby short-circuiting the air ejectors.
: d.       Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
This results in operational problems with the AOG system.Monitor Bus 5 amperage during fan starts.13. When cooling towers are wetted (per Tower Wetting Section), operate tower fans and then adjust recirc gate as necessary to maintain the following:
: e.       Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
* Condenser backpressure in range of 1.0 to 5.0 inches HgA.* CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.* As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of May 16 through October 14.* As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15.14. If desired, shut Circ Water Intake Gate C (North) to 0% to limit the rise in Service Water inlet temperature.
NOTE Distribution valves close by turning handle clockwise (stem rises).
I F.Shifting from Hybrid to Closed Cycle Mode I. Verify all Prerequisites and Admin Limits satisfied.
: 11. Fully raise both bypass gates.
: 2. Ensure all CW and CWB pumps running.NOTE Monitor Bus 5 amperage during fan starts.3. Operate cooling tower fans as necessary to maintain condenser backpressure in range of 1.0 to 5.0 inches HgA.OP 2180 Rev. 39 Page 22 of 52
: 12. Check flow through all cells is balanced.
: a.       If required, adjust distribution valves as necessary when all three CWB pumps are running.
OP 2180 Rev. 39 Page 21 of 52
 
NOTES Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers are lost, thereby short-circuiting the air ejectors. This results in operational problems with the AOG system.
Monitor Bus 5 amperage during fan starts.
: 13. When cooling towers are wetted (per Tower Wetting Section), operate tower fans and then adjust recirc gate as necessary to maintain the following:
* Condenser backpressure in range of 1.0 to 5.0 inches HgA.
I
* CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.
* As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of May 16 through October 14.
* As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15.
: 14. If desired, shut Circ Water Intake Gate C (North) to 0% to limit the rise in Service Water inlet temperature.
F. Shifting from Hybrid to Closed Cycle Mode I.     Verify all Prerequisites and Admin Limits satisfied.
: 2.     Ensure all CW and CWB pumps running.
NOTE Monitor Bus 5 amperage during fan starts.
: 3.     Operate cooling tower fans as necessary to maintain condenser backpressure in range of 1.0 to 5.0 inches HgA.
OP 2180 Rev. 39 Page 22 of 52
: 4. If system is being placed in closed cycle for purpose of chemical addition/treatment, verify with Chemistry Department if treatment of the service water system will occur simultaneously.
: 4. If system is being placed in closed cycle for purpose of chemical addition/treatment, verify with Chemistry Department if treatment of the service water system will occur simultaneously.
: a. If chemically treating service water simultaneously with circulating water, perform the following:
: a.     If chemically treating service water simultaneously with circulating water, perform the following:
: 1) Refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and secure the service water strainers.
: 1)       Refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and secure the service water strainers.
: 2) Place all control switches for traveling screens to OFF.b. If tower wetting is required within the next day and cooling tower operation is not anticipated, then continue tower operations as needed to meet the 4 hour tower wetting requirements.
: 2)       Place all control switches for traveling screens to OFF.
: b.     If tower wetting is required within the next day and cooling tower operation is not anticipated, then continue tower operations as needed to meet the 4 hour tower wetting requirements.
: 5. Open recirc gate to >85% open and verify afterbay/discharge weir level is <225 fR (LI-104-10-1).
: 5. Open recirc gate to >85% open and verify afterbay/discharge weir level is <225 fR (LI-104-10-1).
: 6. Establish/check established cooling tower blowdown as follows: a. Throttle open Aux. CT Blowdown Throttle Valve, CW-7 as necessary to restrict flow over discharge weir.7. Close all intake gates while monitoring intake level.8. Monitor condenser backpressure.
: 6. Establish/check established cooling tower blowdown as follows:
: a. If required, reduce power as necessary to maintain backpressure  
: a.     Throttle open Aux. CT Blowdown Throttle Valve, CW-7 as necessary to restrict flow over discharge weir.
<5" HgA.OP 2180 Rev. 39 Page 23 of 52 G. Shifting from Closed to Hybrid Cycle Mode 1. While shifting to Hybrid Cycle mode, closely monitor ERFIS points per Appendix B [EPU -or Appendix D] to ensure thermal limits of the NPDES permit are not exceeded.2. Request Chemistry take appropriate samples to ensure limitations of NPDES permit are not exceeded.3. If chemical addition/treatment of service water system is complete, perform the following:
: 7. Close all intake gates while monitoring intake level.
: a. When notified by Chemistry, refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and place service water strainers in service.b. Restore traveling screens per Shift Manager direction.
: 8. Monitor condenser backpressure.
: 4. Open the intake gate(s) to 100%.CAUTION When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B JEPU -or Appendix DI.5. Operate towers and CW Booster pumps in the following combination:
: a.     If required, reduce power as necessary to maintain backpressure <5" HgA.
a.b.C.1 pump = I tower 2 pumps = 2 towers 3 pumps = 2 towers OP 2180 Rev. 39 Page 24 of 52 I 6. Adjust rieilrc gate and cooling tower fans as necessary to maintain the following:
OP 2180 Rev. 39 Page 23 of 52
* Condenser backpressure in range of 1.0 to 5.0 HgA.* CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance
 
[EPU -Between the Dates of May 16 through October 14].As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance
G. Shifting from Closed to Hybrid Cycle Mode
[EPU -Between the Dates of October 15 through May 15].7. If desired to secure one CW Booster pump, THEN a. Open (lower) A(B) CW Bypass Gate to lower Forebay level to 230-233" as read on LI-104-10.
: 1.     While shifting to Hybrid Cycle mode, closely monitor ERFIS points per Appendix B [EPU - or Appendix D] to ensure thermal limits of the NPDES permit are not exceeded.
: b. Secure one CW Booster pump, then OPEN (lower) A(B) CW Bypass Gates, as needed,-to maintain Forebay level 230-233" as read on LI- 104-10.c. Verify limits in Step 5 above are maintained.
: 2.     Request Chemistry take appropriate samples to ensure limitations of NPDES permit are not exceeded.
: 8. If desired to restart the third booster pump, then refer to Section D, Shifting from Open Cycle to Hybrid.OP 2180 Rev. 39 Page 25 of 52 H. Shifting from Hybrid to Open Cycle Mode I. Open/6hedk open intake gate(s) to 100%.2. When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B or Appendix D.3. Fully close the Recirc Gate if plant conditions permit. Place the Recire Gate in the required position for plant conditions considering NPDES requirements and condenser backpressure.
: 3.     If chemical addition/treatment of service water system is complete, perform the following:
: 4. Secure all cooling tower fans.5. Adjust discharge structure Forebay level to 230-233' as indicated on LI-104-10 by opening (lowering)
: a. When notified by Chemistry, refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and place service water strainers in service.
A(B) CW bypass gate.6. Secure a CW booster pump and immediately open (lower) the A(B) bypass gate to maintain Forebay level 230-233'.7. Continue securing CW booster pumps and adjusting Forebay level.8. When all CW booster pumps are secure, fully open (lower) the A(B) bypass gate.9. During cold weather operations, adjust recirc gate as necessary to maintain circ water inlet temperature greater than 33'F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure.
: b. Restore traveling screens per Shift Manager direction.
: 10. Closely monitor Project Save ERFIS points per Appendix B or Appendix D to ensure applicable thermal limits of NPDES Permit are not exceeded.I. Operation of Circ Water Traveling Screens 1. Refer to OP 2181, Service Water/Alternate Cooling Operating Procedure.
: 4.     Open the intake gate(s) to 100%.
J. Shutdown of Circ Water/Cooling Towers I. Request Chemistry Department sample CW discharge and determine if discharge is within limits of NPDES permit.2. If in service, secure cooling tower fans.OP 2180 Rev. 39 Page 26 of 52 NOTE CW Booster pumps will stop immediately upon placing the control switch to stop, but CW pumps will continue to run until respective discharge valve is 20% closed.* 3. Secure one CW Booster pump if running, and one CW pump: a. Monitor basin levels. Maintain discharge structure Forebay level <235' as read on LI-I 04-10.4. When securing all CW pumps ensure pumps are not needed to remove heat from main condenser.
CAUTION When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B JEPU - or Appendix DI.
NOTE The last CW pump stops as soon as its control switch is placed in STOP.5. Secure the other CW Booster pumps if running, and CW pumps in similar manner.6. Notify Chemistry CW System is secured and that the CW Sample Pump must be secured.7. Close all CW intake-gates.-
: 5.     Operate towers and CW Booster pumps in the following combination:
: 8. Open (lower) CW bypass gates.9. During cold weather operations, ensure de-icing agitators are moved into cire water bay.K. Circ Water Sample System 1. The Circ Water Sample System will normally be placed in operation by Chemistry Department personnel.
: a.     1 pump = I tower
OP 2180 Rev. 39 Page 27 of 52 L. Initial Tower Wetting[EPU -If between the'dates of May 16 through October 14, wet the t6iwer(s)  
: b. 2 pumps = 2 towers C. 3 pumps = 2 towers OP 2180 Rev. 39 Page 24 of 52
-as follows:].  
: 6. Adjust rieilrc gate and cooling tower fans as necessary to maintain the following:
-, -: .-l --- .*. r- 0 ..NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,  
* Condenser backpressure in range of 1.0 to 5.0 HgA.
I
* CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.
As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance [EPU - Between the Dates of May 16 through October 14].
As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance [EPU - Between the Dates of October 15 through May 15].
: 7. If desired to secure one CW Booster pump, THEN
: a.       Open (lower) A(B) CW Bypass Gate to lower Forebay level to 230-233" as read on LI-104-10.
: b.       Secure one CW Booster pump, then OPEN (lower) A(B) CW Bypass Gates, as needed,-to maintain Forebay level 230-233" as read on LI- 104-10.
: c.       Verify limits in Step 5 above are maintained.
: 8. If desired to restart the third booster pump, then refer to Section D, Shifting from Open Cycle to Hybrid.
OP 2180 Rev. 39 Page 25 of 52
 
H. Shifting from Hybrid to Open Cycle Mode I.     Open/6hedk open intake gate(s) to 100%.
: 2.     When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B or Appendix D.
: 3.     Fully close the Recirc Gate if plant conditions permit. Place the Recire Gate in the required position for plant conditions considering NPDES requirements and condenser backpressure.
: 4.     Secure all cooling tower fans.
: 5.     Adjust discharge structure Forebay level to 230-233' as indicated on LI-104-10 by opening (lowering) A(B) CW bypass gate.
: 6.     Secure a CW booster pump and immediately open (lower) the A(B) bypass gate to maintain Forebay level 230-233'.
: 7.     Continue securing CW booster pumps and adjusting Forebay level.
: 8.     When all CW booster pumps are secure, fully open (lower) the A(B) bypass gate.
: 9.     During cold weather operations, adjust recirc gate as necessary to maintain circ water inlet temperature greater than 33'F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure.
: 10.     Closely monitor Project Save ERFIS points per Appendix B or Appendix D to ensure applicable thermal limits of NPDES Permit are not exceeded.
I. Operation of Circ Water Traveling Screens
: 1.     Refer to OP 2181, Service Water/Alternate Cooling Operating Procedure.
J. Shutdown of Circ Water/Cooling Towers I.       Request Chemistry Department sample CW discharge and determine if discharge is within limits of NPDES permit.
: 2.       If in service, secure cooling tower fans.
OP 2180 Rev. 39 Page 26 of 52
 
NOTE CW Booster pumps will stop immediately upon placing the control switch to stop, but CW pumps will continue to run until respective discharge valve is 20% closed.
  *3.     Secure one CW Booster pump if running, and one CW pump:
: a. Monitor basin levels. Maintain discharge structure Forebay level <235' as read on LI-I 04-10.
: 4.     When securing all CW pumps ensure pumps are not needed to remove heat from main condenser.
NOTE The last CW pump stops as soon as its control switch is placed in STOP.
: 5.     Secure the other CW Booster pumps if running, and CW pumps in similar manner.
: 6.     Notify Chemistry CW System is secured and that the CW Sample Pump must be secured.
: 7.     Close all CW intake-gates.-
: 8.     Open (lower) CW bypass gates.
: 9.     During cold weather operations, ensure de-icing agitators are moved into cire water bay.
K. Circ Water Sample System
: 1. The Circ Water Sample System will normally be placed in operation by Chemistry Department personnel.
OP 2180 Rev. 39 Page 27 of 52
 
L. Initial Tower Wetting
[EPU - If between the'dates of May 16 through October 14, wet the t6iwer(s)       -
as follows:].
l          -,   -:       .-- --   .     *. 0r- ..
NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,


==Subject:==
==Subject:==
Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
* Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).* Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
* Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).
: a. If towers do not meet the criteria of the above Note, perform the following:
* Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
: 1) Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).2) If required to wet the East Cooling Tower, open Cooling Tower 1 Inlet-(riser)
: a.     If towers do not meet the criteria of the above Note, perform the following:
CW-6A/6B.3) If required to wet the West Cooling Tower, open Cooling Tower 2 Inlet (riser) CW-6C/6D.4) Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/diseharge basin level is 230-233 feet (LI-104-10).
: 1)     Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).
: 5) Ensure cooling fan control switches in AUTO for CW booster pumps to be started.6) Start CW booster pump and allow piping to fill for at least 10 minutes.a) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.OP 2180 Rev. 39 Page 28 of 52 LPC #3 b) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: 2)     If required to wet the East Cooling Tower, open Cooling Tower 1 Inlet-(riser) CW-6A/6B.
c) Ensure selected CW booster pump cooling water flow is approximately 1 gpm (FI-I 04-67A/B/C).
: 3)     If required to wet the West Cooling Tower, open Cooling Tower 2 Inlet (riser) CW-6C/6D.
: 7) If second CW booster pump is required, perform the following:
: 4)     Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/diseharge basin level is 230-233 feet (LI-104-10).
a) Wait at least 5 minutes after start of first CW booster pump.b) Start second CW booster pump.c) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.d) Ensure seal water flow for selected pump is at least 2 gpm (F1- 1 04-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).
: 5)     Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
e) Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
: 6)     Start CW booster pump and allow piping to fill for at least 10 minutes.
: 8) Check flow through all cells is balanced.a) If required, adjust distribution valves as necessary.
a)       When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
b) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow-balancing-shall be verified, and if required, performed.
OP 2180 Rev. 39 Page 28 of 52 LPC #3
: 9) Run each operable cooling tower fan, one at a time, as requested by Maintenance, to allow preventative maintenance activities to occur.10) Continue CW booster pump operation for at least 24 hours.11) When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.
 
b)     Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
c)     Ensure selected CW booster pump cooling water flow is approximately 1 gpm (FI-I 04-67A/B/C).
: 7) If second CW booster pump is required, perform the following:
a)     Wait at least 5 minutes after start of first CW booster pump.
b)     Start second CW booster pump.
c)     When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
d)     Ensure seal water flow for selected pump is at least 2 gpm (F1-104-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).
e)     Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
: 8) Check flow through all cells is balanced.
a)     If required, adjust distribution valves as necessary.
b)     If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow-balancing-shall be verified, and if required, performed.
: 9) Run each operable cooling tower fan, one at a time, as requested by Maintenance, to allow preventative maintenance activities to occur.
: 10) Continue CW booster pump operation for at least 24 hours.
: 11) When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.
OP 2180 Rev. 39 Page 29 of 52
OP 2180 Rev. 39 Page 29 of 52
: 2. [EPU -If between the dates of October 15 through May 15, wet the towers as follows: NOTE Cooling tower(s) may be considered wetted when one of the following conditions has been met (memo, M.E. Pallonis to E.V.Bowman,  
: 2.     [EPU -If   between the dates of October 15 through May 15, wet the towers as follows:
NOTE Cooling tower(s) may be considered wetted when one of the following conditions has been met (memo, M.E. Pallonis to E.V.
Bowman,  


==Subject:==
==Subject:==
Wetting of Cooling Towers CT-1 and CT-2 dated 06/13/97 and Memo SYSENG 2000-045):
Wetting of Cooling Towers CT-1 and CT-2 dated 06/13/97 and Memo SYSENG 2000-045):
Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).Less than or cqual to 7 days have elapsed since 4 continuous hours or more of Cire Water Booster Pump Operation.
Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).
: a. If towers do not meet the criteria of the above Note, perform the following:
Less than or cqual to 7 days have elapsed since 4 continuous hours or more of Cire Water Booster Pump Operation.
: 1) Operate towers and CW Booster pumps in the following combination:
: a.     If towers do not meet the criteria of the above Note, perform the following:
a)b)1 pump = 1 tower 2 pumps -2 towers 2) Initially adjust the recire gate in small increments to obtain a condenser exit temperature (average of F056, F057, F058 and F059) per the table below: Wet Bulb (F)<-5 0 10 20 30.35 Cond Exit Temp (F)>65>60;_.55 250 k45OP 2180 Rev. 39 Page 30 of 52 LPC #4
: 1)     Operate towers and CW Booster pumps in the following combination:
: 3) If required to wet the East Cooling Tower, open/check open Cooling Tower 1 Inlet (riser) CW-6A/6B.4) If required to wet the West Cooling Tower, open/check open Cooling Tower 2 Inlet (riser) CW-6C/6D.5) Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
a)     1 pump = 1 tower b)      2 pumps - 2 towers
: 6) Ensure cooling fan control switches in AUTO for CW booster pumps to be started.7) Start CW booster pump and allow piping to fill for at least 10 minutes.a) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.b) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: 2)     Initially adjust the recire gate in small increments to obtain a condenser exit temperature (average of F056, F057, F058 and F059) per the table below:
c) Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67A/B/C).
Wet Bulb (F)         Cond Exit Temp (F)
                                <-5                      >65 0                      >60 10                    ;_.55 20                    250 30                    k45
                                  .35                    *40*
OP 2180 Rev. 39 Page 30 of 52 LPC #4
: 3)   If required to wet the East Cooling Tower, open/check open Cooling Tower 1 Inlet (riser) CW-6A/6B.
: 4)   If required to wet the West Cooling Tower, open/check open Cooling Tower 2 Inlet (riser) CW-6C/6D.
: 5)   Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
: 6)   Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
: 7)   Start CW booster pump and allow piping to fill for at least 10 minutes.
a)       When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
b)       Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
c)       Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67A/B/C).
8)___Adjust-the North (Gate A) and South (Gate B)_Circ-Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).
8)___Adjust-the North (Gate A) and South (Gate B)_Circ-Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).
: 9) If two towers will be wetted a second CWB pump is required, perform the following:
: 9)   If two towers will be wetted a second CWB pump is required, perform the following:
a) Wait at least 5 minutes after completion of Step 7)a).b) Start second CWB pump.c) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.d) Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
a)       Wait at least 5 minutes after completion of Step 7)a).
e) Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
b)       Start second CWB pump.
c)       When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
d)       Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
e)       Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).
OP 2180 Rev. 39 Page 31 of 52
OP 2180 Rev. 39 Page 31 of 52
: 10) Check that flow through all cells is balanced.a) If required, adjust distribution valves as necessary.
: 10)   Check that flow through all cells is balanced.
b) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
a)     If required, adjust distribution valves as necessary.
c) If exterior leaks are identified, initiate a WOR for repair.11) Periodically adjust the recirc gate to achieve and maintain cooling tower outlet temperature (F078 or F079) greater than: Wet Bulb (F)'<-5 0 10 20 30&#xfd;:35 Cooling Tower Outlet Temp (F)>65>60>55>50>45?:40 12) Continue CW booster pump operation for at least 24 hours.13) When Cooling Tower wetting requirements are satisfied, place-Cir--Water System in mode required by river-or plant-conditions.]
b)     If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
OP 2180 Rev. 39 Page 32 of 52 LPC #5 M. Maintaining Cooling Towers Wet 1. [EPU -If between the dates of May 16 through October 14, maintain the tower(s) wet as follows:]NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,  
c)     If exterior leaks are identified, initiate a WOR for repair.
: 11)   Periodically adjust the recirc gate to achieve and maintain cooling tower outlet temperature (F078 or F079) greater than:
Wet Bulb (F)'       Cooling Tower Outlet Temp (F)
              <-5                      >65 0                    >60 10                  >55 20                    >50 30                    >45
                &#xfd;:35                  ?:40
: 12)   Continue CW booster pump operation for at least 24 hours.
: 13)   When Cooling Tower wetting requirements are satisfied, place
    - Cir--Water System in mode required by river-or plant-conditions.]
OP 2180 Rev. 39 Page 32 of 52 LPC #5
 
M. Maintaining Cooling Towers Wet
: 1.     [EPU - If between the dates of May 16 through October 14, maintain the tower(s) wet as follows:]
NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,


==Subject:==
==Subject:==
Wetting of Cooling Towers CT-I and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
Wetting of Cooling Towers CT-I and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).
: a. Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).b. If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.C. If required to maintain the West Cooling Tower wet, open/check open--Cooling-Tower 2 Inlet (riser) CW-6C/6D.d. Close (raise) North (Gate A) and South (Gate B) Cire Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
: e. Ensure cooling fan control switches in AUTO for CW booster pumps to be started.f. Start CW booster pump and allow piping to fill for at least 10 minutes.1) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.2) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: a.       Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).
: 3) Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-I 04-67A/B/C).
: b.       If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.
OP 2180 Rev. 39 Page 33 of 52 I g. If two towers will be maintained wet a second CW booster pump is required, when at least five minutes have elapsed after placing first CW booster pump in service, perform the following:
C.       If required to maintain the West Cooling Tower wet, open/check open
: 1) Start second CW booster pump.2) When pump amps are steady, flag pump control switch again to fully open pump discharge valve.3) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-I 04-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).
                  --Cooling-Tower 2 Inlet (riser) CW-6C/6D.
: 4) Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-104-67A/B/C).
: d.       Close (raise) North (Gate A) and South (Gate B) Cire Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
: h. Fully close (raise) both bypass gates.i .Check flow through all cells is balanced.I) If required, adjust distribution valves as necessary.
: e.       Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
: 2) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
: f.       Start CW booster pump and allow piping to fill for at least 10 minutes.
: j. Continue CW booster pump operation for at least 4 hours.k. -When-Cooling Tower wetting requirements are satisfied,_place-CircWater System in mode required by river or plant conditions.
: 1)       When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
: 2)       Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: 3)       Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-I 04-67A/B/C).
OP 2180 Rev. 39 Page 33 of 52
 
I g. If two towers will be maintained wet a second CW booster pump is required, when at least five minutes have elapsed after placing first CW booster pump in service, perform the following:
: 1)     Start second CW booster pump.
: 2)     When pump amps are steady, flag pump control switch again to fully open pump discharge valve.
: 3)     Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-I 04-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).
: 4)     Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-104-67A/B/C).
: h. Fully close (raise) both bypass gates.
: i. Check flow through all cells is balanced.
I)     If required, adjust distribution valves as necessary.
: 2)     If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
: j. Continue CW booster pump operation for at least 4 hours.
: k. -When-Cooling Tower wetting requirements are satisfied,_place-CircWater System in mode required by river or plant conditions.
OP 2180 Rev. 39 Page 34 of 52
OP 2180 Rev. 39 Page 34 of 52
: 2. [EPU-If between the dates of October 15 through May 15, maintain the tower(s) wet as follows: NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V.Bowman,  
: 2.     [EPU-If between the dates of October 15 through May 15, maintain the tower(s) wet as follows:
NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V.
Bowman,  


==Subject:==
==Subject:==
Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).
* Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).* Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
* Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours following a long term shutdown (>7 days).
: a. Operate towers and CW Booster pumps in the following combination:
* Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
2 1)2)I pump = 1 tower 2 pumps 2 towers b. Adjust the recirc gate in small increments to obtain a condenser exit temperature (average of F056, F057, FO58 and F059) per the table below: Wet Bulb (F)<-5 0 10 20 30:>35 Cond Exit Temp (F)k:65:60&#xfd;:55:5O k45 k40 c. If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.d. If required to maintain the West Cooling Tower wet, open/check open Cooling Tower 2 Inlet (riser) CW-6CI6D.e. Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
: a.     Operate towers and CW Booster pumps in the following combination:
: f. Ensure cooling fan control switches in AUTO for CW booster pumps to be started.OP 2180 Rev. 39 Page 35 of 52 LPC #4
22)
: g. Start CW booster pump and allow piping to fill for at least 10 minutes.1) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.2) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A1B/C) or 15-30 psig (PI-104-68A/B/C).
: 1)     I pump = 1 tower 2 pumps 2 towers
: 3) Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67AIB/C).
: b.     Adjust the recirc gate in small increments to obtain a condenser exit temperature (average of F056, F057, FO58 and F059) per the table below:
Wet Bulb (F)       Cond Exit Temp (F)
                              <-5                    k:65 0                  :60 10                  &#xfd;:55 20                  :5O 30                  k45
:>35                  k40
: c.     If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.
: d.     If required to maintain the West Cooling Tower wet, open/check open Cooling Tower 2 Inlet (riser) CW-6CI6D.
: e.     Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
: f.     Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
OP 2180 Rev. 39 Page 35 of 52 LPC #4
: g. Start CW booster pump and allow piping to fill for at least 10 minutes.
: 1)     When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
: 2)     Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A1B/C) or 15-30 psig (PI-104-68A/B/C).
: 3)     Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67AIB/C).
: h. Adjust the North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).
: h. Adjust the North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).
: i. If two towers will be maintined wet a second CWB pump is required, perform the following:
: i. If two towers will be maintined wet a second CWB pump is required, perform the following:
: 1) Wait at least 5 minutes after completion of Step g.1.2) Start second CWB pump.3) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.-4) -Ensure seal water flow for selected pump is at-least-2gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: 1)     Wait at least 5 minutes after completion of Step g.1.
: 5) Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
: 2)     Start second CWB pump.
: j. Check that flow through all cells is balanced.1) If required, adjust distribution valves as necessary.
: 3)     When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
: 2) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
  - 4) -   Ensure seal water flow for selected pump is at-least-2gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
: k. Continue CW booster pump operation for at least 4 hours.1. When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.]
: 5)     Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
OP 2180 Rev. 39 Page 36 of 52 N. Subfreezing Operation of Cooling Towers NOTE The basic rule of thumb is to increase cooling tower inlet temperature as high as practicable while keeping operating cells at full water flow.This will allow the warm water to flow across the outer edges of fill to prevent or correct ice formation.
: j. Check that flow through all cells is balanced.
: 1. If possible, secure #1 fan in west tower before all others in an attempt to minimize alternate cooling cell duty.2. For mild icing (1/2" ice on fill and temperatures above 20'F), alternately sequence each fan OFF (at least every 10 minutes every hour).3. For severe icing conditions, adjust the recirc gate or secure fans (maintaining TCrit positive) to maintain cooling tower exit temperature in the range of 70-90 0 F.4. For more severe icing and while maintaining the margin to TCrit positive: a. Allow each fan to coast to a minimum speed for at least 6.5 minutes before reversing direction.
: 1)     If required, adjust distribution valves as necessary.
: b. Place every other fan in REVERSE as needed to control ice formation.
: 2)     If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
: c. -Swap-direction hourly.OP 2180 Rev. 39 Page 37 of 52 NOTE Isolating flow to cells should start at #1 (North End) and progress South to ensure theie are no dead legs in the distribution pipe.5. If heavy icing continues to occur, cooling tower inlet temperature is too low and should be raised by performing 5.a, 5.b or both.a. Incrementally open the recirc gate.b. With the concurrence of the Operations Manager, isolate cells by: 0 Opening the header valve to FULL OPEN position to flush out any debris that may have accumulated on the valve disc and seat.0 Closing the header valve after flushing.0 Closing off cooling cells to keep all operating cells at full flow (water level at the top distribution pan should be 4-6 inches).* Stopping fans on any isolated cell.6. Continue to sequence fans OFF or in REVERSE as necessary.
: k. Continue CW booster pump operation for at least 4 hours.
: 1. When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.]
OP 2180 Rev. 39 Page 36 of 52
 
N. Subfreezing Operation of Cooling Towers NOTE The basic rule of thumb is to increase cooling tower inlet temperature as high as practicable while keeping operating cells at full water flow.
This will allow the warm water to flow across the outer edges of fill to prevent or correct ice formation.
: 1. If possible, secure #1 fan in west tower before all others in an attempt to minimize alternate cooling cell duty.
: 2. For mild icing (1/2" ice on fill and temperatures above 20'F), alternately sequence each fan OFF (at least every 10 minutes every hour).
: 3.     For severe icing conditions, adjust the recirc gate or secure fans (maintaining TCrit positive) to maintain cooling tower exit temperature in the range of 70-90 0 F.
: 4.     For more severe icing and while maintaining the margin to TCrit positive:
: a.     Allow each fan to coast to a minimum speed for at least 6.5 minutes before reversing direction.
: b.       Place every other fan in REVERSE as needed to control ice formation.
: c.   -Swap-direction   hourly.
OP 2180 Rev. 39 Page 37 of 52
 
NOTE Isolating flow to cells should start at #1 (North End) and progress South to ensure theie are no dead legs in the distribution pipe.
: 5.     If heavy icing continues to occur, cooling tower inlet temperature is too low and should be raised by performing 5.a, 5.b or both.
: a.     Incrementally open the recirc gate.
: b.     With the concurrence of the Operations Manager, isolate cells by:
0       Opening the header valve to FULL OPEN position to flush out any debris that may have accumulated on the valve disc and seat.
0       Closing the header valve after flushing.
0       Closing off cooling cells to keep all operating cells at full flow (water level at the top distribution pan should be 4-6 inches).
* Stopping fans on any isolated cell.
: 6.     Continue to sequence fans OFF or in REVERSE as necessary.
I OP 2180 Rev. 39 Page 38 of 52
I OP 2180 Rev. 39 Page 38 of 52
: 0. Removing Condenier Water Boxes from Service for Maintenance
: 0. Removing Condenier Water Boxes from Service for Maintenance
-1. Notify ISO New England of the intention to reduce reactor power.2. .-532% rOP 0105eactor peratons.  
                  -1.
-1.1 C. -2. Reduce reactor power to-<58.32 pe0.00-Ti~tiOertos
Notify ISO New England of the intention to reduce reactor power.
_NOTE The extent of the power reduction should be based on river temperature and condenser cleanliness and the number of water boxes to be removed from service. Trial isolation of a water box can be performed to determine if further power reduction is required prior to completion of the tagging order and draining of the water box.3. Reduce the number of running CW pumps and CW Booster pumps if running, to two each.CAUTIONS Do not isolate both water boxes in one condenser.
: 2. .
Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. See Appendix B[EPU -or Appendix D] for compensatory action as required.(ER 2002-2181)
          -532%                                           rOP 0105eactor peratons.             -
: 4. Isolate and drain the water box(cs) per Step a. or b.: a. If cooling tower operation is required: 1) Close inlet and outlet water box valves:* CW-2A(B,C,D), and* CW-3A(B,C,D), 2) Close water box vacuum system isolation valve CWP-9(l0,I 1,12), 3) Connect hoses from water box drain valves to the TBCCW area sump:* CW-61A(B,C,D), and* CW-62A(B,C,D)
1.1 C.   -2. Reduce reactor power to-<58.32       pe0.00-Ti~tiOertos                   _
NOTE The extent of the power reduction should be based on river temperature and condenser cleanliness and the number of water boxes to be removed from service. Trial isolation of a water box can be performed to determine if further power reduction is required prior to completion of the tagging order and draining of the water box.
: 3.       Reduce the number of running CW pumps and CW Booster pumps if running, to two each.
CAUTIONS Do not isolate both water boxes in one condenser.
Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. See Appendix B
[EPU - or Appendix D] for compensatory action as required.
(ER 2002-2181)
: 4.       Isolate and drain the water box(cs) per Step a. or b.:
: a.     If cooling tower operation is required:
: 1)     Close inlet and outlet water box valves:
* CW-2A(B,C,D), and
* CW-3A(B,C,D),
: 2)     Close water box vacuum system isolation valve CWP-9(l0,I 1,12),
: 3)     Connect hoses from water box drain valves to the TBCCW area sump:
* CW-61A(B,C,D), and
* CW-62A(B,C,D)
OP 2180 Rev. 39 Page 39 of 52 LPC #3
OP 2180 Rev. 39 Page 39 of 52 LPC #3
: 4) Obtain a Discharge Permit, 5) Open the following valves:* Drain valves CW-61A(B,C,D) and CW-62A(B,C,D)
: 4)     Obtain a Discharge Permit,
: 5)     Open the following valves:
* Drain valves CW-61A(B,C,D) and CW-62A(B,C,D)
* Vent valve CW-60A(B,C,D)
* Vent valve CW-60A(B,C,D)
: b. If cooling tower operation is not required: 1) Open bypass gates to full open position, 2) Close inlet and outlet water box valves CW-2A(B,C,D) and CW-3A(B,C,D)
: b. If cooling tower operation is not required:
: 3) Open respective ACBs for the inlet and outlet water box valves closed above, 4) Close water box vacuum system isolation valve CWP-9(10,11,12), 5) Manually open the outlet water box outlet valve, CW-3A(B,C,D) approximately 10%, 6) Open vent valve CW-60A(B,C,D).
: 1)     Open bypass gates to full open position,
: 2)     Close inlet and outlet water box valves CW-2A(B,C,D) and CW-3A(B,C,D)
: 3)     Open respective ACBs for the inlet and outlet water box valves closed above,
: 4)     Close water box vacuum system isolation valve CWP-9(10,11,12),
: 5)     Manually open the outlet water box outlet valve, CW-3A(B,C,D) approximately 10%,
: 6)     Open vent valve CW-60A(B,C,D).
: 5. Monitor the following turbine-generator parameters:
: 5. Monitor the following turbine-generator parameters:
: a. Condenser back pressure on computer points F013 and F014.b. Turbine thrust bearing metal temperature on recorder TR- I 0-/R-1.1) If required, reduce reactor power as necessary to maintain parameters within limits set in OP 2160, Turbine Generator Support Systems Operation.
: a.     Condenser back pressure on computer points F013 and F014.
: 6. When maintenance reports clear: a. Notify Chemistry waterbox is to be returned to service.b. Restore system lineup to normal.7. Increase power per OP 0105, Reactor Operations.
: b. Turbine thrust bearing metal temperature on recorder TR- I 0-/R-1.
OP 2180 Rev. 39 Page 40 of 52 P. Loss of River Temperature Recorder Sensing Points (M036 or M037)(ER-2003-0353_01)
: 1)     If required, reduce reactor power as necessary to maintain parameters within limits set in OP 2160, Turbine Generator Support Systems Operation.
S1. Between the dates May 16 and October 14: a. If M036 is lost, assume TCRIT River Temp Rise Limit (SYS012) is 2&deg;F and adjust plant settings per Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance IEPU -Betveen the Dates of May 16 through October 14].2. [EPU -Between the dates of October 15 and May 15 adjust plant settings per Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance.]
: 6. When maintenance reports clear:
: 3. Anytime of year: a. Loss of valid data indication for either M036 or M037 renders the river monitoring system inoperative and shall be declared "Out of Service".This condition places the Plant in non-compliance with State NPDES Regulations.
: a. Notify Chemistry waterbox is to be returned to service.
: b. Notify Chemistry Management immediately.(CR-VTY-2006-00042 CA 00004)C. Initiate a Work Order Request indicating in the text that the Plant is in Non-Compliance with the NPDES Permit.(CR-VTY-2006-00042 CA 00004)d. Initiate a Condition Report. (CR-VTY-2006-00042 CA 00004)e. Note loss on VYOPF 0150.03A CRO Round, OATC/BOP Turnover Sheet, or VYOPF 0150.04A Shutdown CRO Round, OATC/BOP Turnover Sheet, as applicable. (CR-VTY-2006-00042 CA00004)OP 2180 Rev. 39 Page 41 of 52 Q. Total Loss of River Temperature Indication
: b. Restore system lineup to normal.
: 1. Calculate the degree rise above ambient in open cycle using the following formula: (MWt-MWe(Gross) x 15.193 = IF Rise River Flowrate (cfs)Computer Points (C047-G002) x 15.193 = IF Rise C275 a. Independently verify the calculation. (ER991077_05)
: 7. Increase power per OP 0105, Reactor Operations.
: 2. Service Water pump discharge temperature TI-34 and TI-36 will furnish inlet river temperature.
OP 2180 Rev. 39 Page 40 of 52
 
P. Loss of River Temperature Recorder Sensing Points (M036 or M037)
(ER-2003-0353_01)
S1. Between the dates May 16 and October 14:
: a.     If M036 is lost, assume TCRIT River Temp Rise Limit (SYS012) is 2&deg;F and adjust plant settings per Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance IEPU - Betveen the Dates of May 16 through October 14].
: 2.     [EPU - Between the dates of October 15 and May 15 adjust plant settings per Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance.]
: 3. Anytime of year:
: a.     Loss of valid data indication for either M036 or M037 renders the river monitoring system inoperative and shall be declared "Out of Service".
This condition places the Plant in non-compliance with State NPDES Regulations.
: b.     Notify Chemistry Management immediately.
(CR-VTY-2006-00042 CA 00004)
C.     Initiate a Work Order Request indicating in the text that the Plant is in Non-Compliance with the NPDES Permit.
(CR-VTY-2006-00042 CA 00004)
: d.     Initiate a Condition Report. (CR-VTY-2006-00042 CA 00004)
: e.     Note loss on VYOPF 0150.03A CRO Round, OATC/BOP Turnover Sheet, or VYOPF 0150.04A Shutdown CRO Round, OATC/BOP Turnover Sheet, as applicable. (CR-VTY-2006-00042 CA00004)
OP 2180 Rev. 39 Page 41 of 52
 
Q. Total Loss of River Temperature Indication
: 1. Calculate the degree rise above ambient in open cycle using the following formula:
(MWt-MWe(Gross) x 15.193 = IF Rise River Flowrate (cfs)
Computer Points (C047-G002) x 15.193 = IF Rise C275
: a.     Independently verify the calculation. (ER991077_05)
: 2.     Service Water pump discharge temperature TI-34 and TI-36 will furnish inlet river temperature.
: 3. Downriver temperature can be calculated by adding IF rise and SW pump discharge temperature.
: 3. Downriver temperature can be calculated by adding IF rise and SW pump discharge temperature.
R. Hydraulic Gate Control System -Intake and Discharge Structures (Shutdown)
R. Hydraulic Gate Control System - Intake and Discharge Structures (Shutdown)
I. System Shutdown a. Turn the two control power breakers on the control panel to OFF position.S. Lossof Hydraulic Gate Control System 1. Manual Operations with Supplied Air (Assumes pumps are inoperable)
I. System Shutdown
: a. At the Intake Structure:
: a. Turn the two control power breakers on the control panel to OFF position.
: 1) Connect an air hose to CWHA-2A from SA-107 K or L.2) Open the following valves:* SA-107K or SA-107L* CWHA-2A to Control Air Pump Power OP 2180 Rev. 39 Page 42 of 52
S. Lossof Hydraulic Gate Control System
: 3) Select direction of gate movement on local panel.4) When gate movement is complete, close the following valves:* CWHA-2A* SA-107K or SA-107L b. At the Discharge Structure  
: 1. Manual Operations with Supplied Air (Assumes pumps are inoperable)
-two 8 in. adjustable wrenches required.1) Install quick connect (located in Enclosure B) on IA-993.2) Connect air hose to CWHA-2B from IA-993.3) Open the following:
: a.     At the Intake Structure:
0 IA-993* CWHA-2B to Control Air Pump Power 4) Select direction of gate movement on local panel.5) When gate movement is complete, close the following valves:* CWHA-2B* IA-993 2. Manual Gate Control -Loss of Control Power (See Figure 1).- a.- Verify hydraulic pressure available from either: I) Electric driven hydraulic pump in MANUAL operation.
: 1)     Connect an air hose to CWHA-2A from SA-107 K or L.
: 2) Air driven hydraulic pump operating.
: 2)     Open the following valves:
: b. Position gate by inserting a small Phillips screwdriver, or equivalent, into the appropriate directional control valve block to drive the gate UP and DOWN.OP 2180 Rev. 39 Page 43 of 52 NOTE The following step is used to clear drift alarms from the "A" Bypass Gate while it is tagged out. It will allow operation of the other Bypass gate and the Recirc gate from the Control Room.3. To restore manual operation, perform the following:
* SA-107K or SA-107L
: a. Place both of the control switches for the discharge structure hydraulic system pumps in OFF.b. Place the hydraulic system for the discharge structure gates in LOCAL control.C. Momentarily depress the "A" Bypass gate OPEN pushbutton.
* CWHA-2A to Control Air Pump Power OP 2180 Rev. 39 Page 42 of 52
: d. Reset the alarms.e. Place both of the control switches for the discharge structure hydraulic system pumps in AUTO.f. Place the hydraulic system for the discharge structure gates in REMOTE control.4. See Appendix C for Hydraulic Gate Operations with degraded Position Indication.
: 3)     Select direction of gate movement on local panel.
T. Use of Hotwell for Condensate Storage 1. Open/verify open the North and South Circ Water Booster Bypass Gates.2. Secure all running CW pumps.3. Wait a minimum of 15 minutes prior to performing the next step to ensure the water boxes are drained to the discharge block.4. Close the Condenser Inlet, CW-2A(B,C,D), and Condenser Outlet CW-3A(B,C,D), valves.a. Danger tag the CRP 9-6 Control Switches for CW-2A(B,C,D) and CW-3A(B,C,D) for the Shift Manager OP 2180 Rev. 39 Page 44 of 52
: 4)     When gate movement is complete, close the following valves:
: 5. Uncap and open the Outlet Water Box Drains, CW-62A(B,CD), to provide a vent for the water boxes.a. Danger tag open the Outlet Water Box Drains, CW-62A(B,C,D), for the Shift Manager.6. Monitor condensate conductivity.
* CWHA-2A
: 7. Sample each water box for radioactivity prior to returning it to service.U. Operation with Low Vernon Pond Elevation NOTES* When Vernon Pond elevation is <212 feet, reduction of river flow into the CW intake bay may be necessary, in order to preclude excessive sediment transport into the SW system due to high water velocity (i.e., >1 fps) in the river offshore of the intake structure. (ER 97-1120)The following Step 1 provides guidance to ensure that the CW system is operated such that the inflow into the intake structure from the river is the equivalent of two-thirds or less of full CW system flow. This will ensure that river flow velocity in the vicinity of the intake is less than 1 fps when Vernon Pond elevation is <212 feet.At Vernon Pond elevation  
* SA-107K or SA-107L
<212 ft., SW inlet temperature can be-- affected when operating with the CW intake-gates-open-and with the recirc gate open about 60% or more.1. If it is known that the elevation of Vernon Pond will go <214 ft., perform the following as required: a. If CW system is operating with 2 CW pumps or operating in Closed Cycle mode, then no further action is required.b. If CW system is operating with 3 CW pumps in Open Cycle or Hybrid Cycle mode, perform the following:
: b. At the Discharge Structure - two 8 in. adjustable wrenches required.
: 1)     Install quick connect (located in Enclosure B) on IA-993.
: 2)     Connect air hose to CWHA-2B from IA-993.
: 3)     Open the following:
0       IA-993
* CWHA-2B to Control Air Pump Power
: 4)     Select direction of gate movement on local panel.
: 5)     When gate movement is complete, close the following valves:
* CWHA-2B
* IA-993
: 2. Manual Gate Control - Loss of Control Power (See Figure 1)
.- a.-   Verify hydraulic pressure available from either:
I)     Electric driven hydraulic pump in MANUAL operation.
: 2)     Air driven hydraulic pump operating.
: b. Position gate by inserting a small Phillips screwdriver, or equivalent, into the appropriate directional control valve block to drive the gate UP and DOWN.
OP 2180 Rev. 39 Page 43 of 52
 
NOTE The following step is used to clear drift alarms from the "A" Bypass Gate while it is tagged out. It will allow operation of the other Bypass gate and the Recirc gate from the Control Room.
: 3. To restore manual operation, perform the following:
: a.     Place both of the control switches for the discharge structure hydraulic system pumps in OFF.
: b.     Place the hydraulic system for the discharge structure gates in LOCAL control.
C.     Momentarily depress the "A" Bypass gate OPEN pushbutton.
: d.     Reset the alarms.
: e.     Place both of the control switches for the discharge structure hydraulic system pumps in AUTO.
: f.     Place the hydraulic system for the discharge structure gates in REMOTE control.
: 4.     See Appendix C for Hydraulic Gate Operations with degraded Position Indication.
T. Use of Hotwell for Condensate Storage
: 1.     Open/verify open the North and South Circ Water Booster Bypass Gates.
: 2.     Secure all running CW pumps.
: 3.     Wait a minimum of 15 minutes prior to performing the next step to ensure the water boxes are drained to the discharge block.
: 4.       Close the Condenser Inlet, CW-2A(B,C,D), and Condenser Outlet CW-3A(B,C,D), valves.
: a. Danger tag the CRP 9-6 Control Switches for CW-2A(B,C,D) and CW-3A(B,C,D) for the Shift Manager OP 2180 Rev. 39 Page 44 of 52
: 5. Uncap and open the Outlet Water Box Drains, CW-62A(B,CD), to provide a vent for the water boxes.
: a.       Danger tag open the Outlet Water Box Drains, CW-62A(B,C,D), for the Shift Manager.
: 6. Monitor condensate conductivity.
: 7. Sample each water box for radioactivity prior to returning it to service.
U. Operation with Low Vernon Pond Elevation NOTES
* When Vernon Pond elevation is <212 feet, reduction of river flow into the CW intake bay may be necessary, in order to preclude excessive sediment transport into the SW system due to high water velocity (i.e., >1 fps) in the river offshore of the intake structure. (ER 97-1120)
The following Step 1 provides guidance to ensure that the CW system is operated such that the inflow into the intake structure from the river is the equivalent of two-thirds or less of full CW system flow. This will ensure that river flow velocity in the vicinity of the intake is less than 1 fps when Vernon Pond elevation is <212 feet.
At Vernon Pond elevation <212 ft., SW inlet temperature can be
    --       affected when operating with the CW intake-gates-open-and with the recirc gate open about 60% or more.
: 1. If it is known that the elevation of Vernon Pond will go <214 ft., perform the following as required:
: a.       If CW system is operating with 2 CW pumps or operating in Closed Cycle mode, then no further action is required.
: b.       If CW system is operating with 3 CW pumps in Open Cycle or Hybrid Cycle mode, perform the following:
OP 2180 Rev. 39 Page 45 of 52
OP 2180 Rev. 39 Page 45 of 52
: 1) Open recirc gate to at least 25%.2) If condenser vacuum cannot be maintained below 5 inches HgA, perform either of the following:
: 1)     Open recirc gate to at least 25%.
a) Enter OT 3120, Condenser High Back Pressure.b) Enter ON 3173, Loss of Circulating Water.c) Shift CW system to hybrid or closed cycle per this procedure.
: 2)     If condenser vacuum cannot be maintained below 5 inches HgA, perform either of the following:
: 2. -If it is known that the elevation of Vernon Pond will go below 212 ft., perform the following:
a)     Enter OT 3120, Condenser High Back Pressure.
: 1) Enter OT 3120, Condenser High Back Pressure.2) Enter ON 3173, Loss of Circulating Water.3) Shift CW system to hybrid or closed cycle per this procedure.
b)     Enter ON 3173, Loss of Circulating Water.
: 4) ---Refer to OP 0105, Reactor Operations, and reduce rea-ctor power at<510% CTP/min.V. Determining and Adjusting Plant Settings I1. Refer to Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance.
c)     Shift CW system to hybrid or closed cycle per this procedure.
EPU-Between the Dates of May 16 through October 14], as appropriate.
: 2.   -Ifit is known that the elevation of Vernon Pond will go below 212 ft., perform the following:
: 2. [EPU -Refer to Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15, as appropriate.]
: 1)     Enter OT 3120, Condenser High Back Pressure.
OP 2180 Rev. 39 Page 46 of 52 W. Clearing of Debri&sect; from Intake Trash Racks NOTES" If intake structure level falls to 209 ft., the intake gates will open automatically.
: 2)     Enter ON 3173, Loss of Circulating Water.
They cannot be reclosed until level is above 209 ft." If intake structure level falls to 207 ft., the circ water pumps will trip. The circ water pumps cannot be restarted until intake level is above 207 ft." Operation of the recirc gate at low intake structure water levels will result in reduced flow to the deicing line due to the elevation difference between the recire line (195.25 ft centerline) and the deicing line (217 ft centerline).
: 3)     Shift CW system to hybrid or closed cycle per this procedure.
As a result, the deicing of the SW bay may not occur.I I-If significant ice or trash accumulates at racks or the floating boom, do the following: (CAR 9406801)a. Place the traveling screens in Manual as soon as time permits.b. Dispatch an operator to the discharge structure.
: 4) --- Refer to OP 0105, Reactor Operations, and reduce rea-ctor power at
C. Open the recire gate to 50% until condenser backpressure approaches 3.0" HgAbs.d. Thr6ftlth-e recirc gate to maintain 3.0 to 3.5" HgAbs until ice or trash-hiFs been pushed into mainstream of river, or ceases to move.e. Close the recirc gate.f. When the recirc gate has been closed for at least 30 minutes, place the traveling screens in Auto.g. If leaves or trash are observed moving back toward the trash racks or floating boom, open recire gate to 5%.OP 2180 Rev. 39 Page 47 of 52 LPC #2 X. Operation of Cooling Tower Lights NOTE Cooling tower lights are normally secured and require Operations and Security permission to turn them on.1. Turning On the Cooling Tower Lights a. Obtain permission from the Security Shift Supervisor and the Ops Shift Manager to turn on the tower lights.b. At LP-1X, close CKT 20 (Tower Ltg Photo Cell) and check closed CKT 1 through 7 and CKT 9 to energize west cooling tower lights.C. At LP-lW, close CKT 14 (Tower Ltg Photo Cell) and check closed CKT I through 7 and CKT 9 to energize east cooling tower lights.2. Turning Off the Cooling Tower Lights a. At LP-1X, open CKT 20 to de-energize west cooling tower lights.b. At LP-lW, open CKT 14 to de-energize east cooling tower lights.Y. Individual Cooling Tower Fan Operation NOTES* Tower wetting is not required to perform this surveillance.
                          <510% CTP/min.
* The fan may operate for up to two hours without running water in the towers and without performing prior cooling tower wetting.1. Verify the selected cooling tower fan is clear of obstructions or debris.2. Verify the selected cooling tower fan has normal oil level.3. On panel 9-6, place the selected cooling tower fan control switch to FWD and observe the time.4. Verify the selected cooling tower fan starts.OP 2180 Rev. 39 Page 48 of 52
V. Determining and Adjusting Plant Settings I1. Refer to Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance. EPU-Between the Dates of May 16 through October 14], as appropriate.
: 5. Locally verify no unusual noise or vibration is evident.6. When <2 hours have elapsed from fan start, place the selected cooling tower fan control switch to STP.Z. Initial Tower Balancing Post Maintenance or on System Start-up NOTES The cooling tower distribution valves are reverse threaded and reverse seated. As a result they are operated Clockwise to Close and Counter Clockwise to Open as normal valves.The following steps should be followed for each of the tower distribution valves. The valves may be positioned in any order, but all should be checked before tower operation or after tower maintenance that may have changed the valve positions.
: 2.     [EPU - Refer to Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15, as appropriate.]
: 1. Turn the tower distribution valves clockwise to close.2. Open each valve to the initial position as follows:* Cells 1-5, OPEN each valve 8 turns.* Cells 6-11, OPEN each valve 9 turns.CAUTION If a cell is overflowing badly, significant ground erosion can quickly occur. This situation needs to be promptly addressed.
OP 2180 Rev. 39 Page 46 of 52
: 3. To prevent ground washout, if a cell is overflowing badly, adjust that cell first or secure CWB pumps as needed.4. If needed, rebalance the towers as follows: If a cell is overflowing, evenly close the 4 distribution valves in that cell until overflow stops.-If water depth on the cell distribution platform is less than about 1/2 of the way to the top of the retaining berm, OPEN evenly the 4 cell distribution valves until the water depth is about 1/2 to 3/4 the height of the berm.Adjust cells as necessary until none overflow and water depth is approximately equal in each cell.OP 2180 Rev. 39 Page 49 of 52 AA. Circulating Water Traveling Screen Winter Layup I. Manually wash circ water traveling screen, TS-I-IA(B,C) per the Traveling Screen Operation section of OP 2181, Service Water Alternate Cooling Operating Procedure.
 
: 2. When approximately 20 minutes have elapsed place TS--I-A(B,C) control switch of OFF.3. On MCC-8D at the intake structure open the following breakers:* TSI-IA Circ. Water Traveling Screen A* TS1-1B Circ. Water Traveling Screen B* TSI-IC Circ. Water Traveling Screen C 4. If Service Water traveling screens are washed and ready for winter layup close SW-6, MN Travel Screen Wash.5. If Service Water traveling screens are not ready for winter layup, place the Service Water traveling screens in winter layup per OP 2181, Service Water/Alternate Cooling Operating Procedure.
W. Clearing of Debri&sect; from Intake Trash Racks NOTES
      "     If intake structure level falls to 209 ft., the intake gates will open automatically. They cannot be reclosed until level is above 209 ft.
I
      "     If intake structure level falls to 207 ft., the circ water pumps will trip. The circ water pumps cannot be restarted until intake level is above 207 ft.
      "     Operation of the recirc gate at low intake structure water levels will result in reduced flow to the deicing line due to the elevation I-          difference between the recire line (195.25 ft centerline) and the deicing line (217 ft centerline). As a result, the deicing of the SW bay may not occur.
If significant ice or trash accumulates at racks or the floating boom, do the following: (CAR 9406801)
: a.       Place the traveling screens in Manual as soon as time permits.
: b.       Dispatch an operator to the discharge structure.
C.       Open the recire gate to 50% until condenser backpressure approaches 3.0" HgAbs.
: d.       Thr6ftlth-e recirc gate to maintain 3.0 to 3.5" HgAbs until ice or trash-hiFs been pushed into mainstream of river, or ceases to move.
: e.     Close the recirc gate.
: f.     When the recirc gate has been closed for at least 30 minutes, place the traveling screens in Auto.
: g.     If leaves or trash are observed moving back toward the trash racks or floating boom, open recire gate to 5%.
OP 2180 Rev. 39 Page 47 of 52 LPC #2
 
X. Operation of Cooling Tower Lights NOTE Cooling tower lights are normally secured and require Operations and Security permission to turn them on.
: 1. Turning On the Cooling Tower Lights
: a.     Obtain permission from the Security Shift Supervisor and the Ops Shift Manager to turn on the tower lights.
: b.     At LP-1X, close CKT 20 (Tower Ltg Photo Cell) and check closed CKT 1 through 7 and CKT 9 to energize west cooling tower lights.
C.     At LP-lW, close CKT 14 (Tower Ltg Photo Cell) and check closed CKT I through 7 and CKT 9 to energize east cooling tower lights.
: 2. Turning Off the Cooling Tower Lights
: a.     At LP-1X, open CKT 20 to de-energize west cooling tower lights.
: b.     At LP-lW, open CKT 14 to de-energize east cooling tower lights.
Y. Individual Cooling Tower Fan Operation NOTES
* Tower wetting is not required to perform this surveillance.
* The fan may operate for up to two hours without running water in the towers and without performing prior cooling tower wetting.
: 1. Verify the selected cooling tower fan is clear of obstructions or debris.
: 2. Verify the selected cooling tower fan has normal oil level.
: 3. On panel 9-6, place the selected cooling tower fan control switch to FWD and observe the time.
: 4. Verify the selected cooling tower fan starts.
OP 2180 Rev. 39 Page 48 of 52
: 5.       Locally verify no unusual noise or vibration is evident.
: 6.       When <2 hours have elapsed from fan start, place the selected cooling tower fan control switch to STP.
Z. Initial Tower Balancing Post Maintenance or on System Start-up NOTES The cooling tower distribution valves are reverse threaded and reverse seated. As a result they are operated Clockwise to Close and Counter Clockwise to Open as normal valves.
The following steps should be followed for each of the tower distribution valves. The valves may be positioned in any order, but all should be checked before tower operation or after tower maintenance that may have changed the valve positions.
: 1.     Turn the tower distribution valves clockwise to close.
: 2.       Open each valve to the initial position as follows:
* Cells 1-5, OPEN each valve 8 turns.
* Cells 6-11, OPEN each valve 9 turns.
CAUTION If a cell is overflowing badly, significant ground erosion can quickly occur. This situation needs to be promptly addressed.
: 3.     To prevent ground washout, if a cell is overflowing badly, adjust that cell first or secure CWB pumps as needed.
: 4.     If needed, rebalance the towers as follows:
If a cell is overflowing, evenly close the 4 distribution valves in that cell until overflow stops.
                    -If water depth on the cell distribution platform is less than about 1/2 of the way to the top of the retaining berm, OPEN evenly the 4 cell distribution valves until the water depth is about 1/2 to 3/4 the height of the berm.
Adjust cells as necessary until none overflow and water depth is approximately equal in each cell.
OP 2180 Rev. 39 Page 49 of 52
 
AA. Circulating Water Traveling Screen Winter Layup I.       Manually wash circ water traveling screen, TS-I-IA(B,C) per the Traveling Screen Operation section of OP 2181, Service Water Alternate Cooling Operating Procedure.
: 2.       When approximately 20 minutes have elapsed place TS--I-A(B,C) control switch of OFF.
: 3.       On MCC-8D at the intake structure open the following breakers:
* TSI-IA Circ. Water Traveling Screen A
* TS1-1B Circ. Water Traveling Screen B
* TSI-IC Circ. Water Traveling Screen C
: 4.       If Service Water traveling screens are washed and ready for winter layup close SW-6, MN Travel Screen Wash.
: 5.       If Service Water traveling screens are not ready for winter layup, place the Service Water traveling screens in winter layup per OP 2181, Service Water/Alternate Cooling Operating Procedure.
BB. Circulating Water Traveling Screen Winter Layup Restoration
BB. Circulating Water Traveling Screen Winter Layup Restoration
: 1. Locally verify or place TS-I-1A(B,C) local control switch to OFF.2. Verify or slowlyopen SW-6, MN Travel Screen Wash.3. On MCC-8D at the intake structure close the following breakers: TSI-IA(B,C)
: 1.     Locally verify or place TS-I-1A(B,C) local control switch to OFF.
Circ. Water Traveling Screen A(B,C)NOTE The following steps minimize the potential of carryover of debris into the system.4. Establish communication between an operator at the screen to be returned to service and the Traveling Screen Control Panel.5. Open the Traveling Screen access door to be placed in service to monitor screen condition.
: 2.       Verify or slowlyopen SW-6, MN Travel Screen Wash.
: 6. Place TS-I-IA(B,C) local control switch to MANUAL.OP 2180 Rev. 39 Page 50 of 52
: 3.     On MCC-8D at the intake structure close the following breakers:
: 7. IF debris is observed on the screen above the backwash spray path, THEN notify the operator at the Traveling Screen Control Panel to place the TS--I-A(B,C) to OFF.8. IF notified, the operator at the Traveling Screen Control Panel immediately places the TS-I-IA(B,C) local control switch to OFF.9. If debris removal is required perform the following:
TSI-IA(B,C) Circ. Water Traveling Screen A(B,C)
: a. Obtain appropriate fire hose from spares or Stores.b. Inspect the hose(s) and couplings to be used for the following:
NOTE The following steps minimize the potential of carryover of debris into the system.
: 1) Hose: a) Hose marking (stenciled) includes "Service Test to 250 psi". (If specified pressure is >250 psi it is acceptable.)
: 4.       Establish communication between an operator at the screen to be returned to service and the Traveling Screen Control Panel.
b) Hose has not been vandalized.
: 5.       Open the Traveling Screen access door to be placed in service to monitor screen condition.
c) Free of debris.d) No evidence of mildew or rot.e) No evidence of damage by chemicals, bums, cuts, abrasion, or vermin.2) Couplings:
: 6.       Place TS-I-IA(B,C) local control switch to MANUAL.
a) Damaged threads.b) Corrosion.
OP 2180 Rev. 39 Page 50 of 52
c) Slippage on the hose.d) Out of round.e) Swivel not rotating freely.OP 2180 Rev. 39 Page 51 of 52 f) Missing lugs.g) Other defects that impair operation.
: 7. IF debris is observed on the screen above the backwash spray path, THEN notify the operator at the Traveling Screen Control Panel to place the TS--I-A(B,C) to OFF.
: 3) Replace any degraded hose gaskets.c. Rig a fire hose from a hydrant to the intake structure.
: 8. IF notified, the operator at the Traveling Screen Control Panel immediately places the TS-I-IA(B,C) local control switch to OFF.
: 1) Ensure fire hose(s) are secure to prevent whip prior to pressurizing and operating.
: 9. If debris removal is required perform the following:
: 2) Consider using two persons to man the hose so as to perform operations safely.d. When ready to wash debris, start the Electric Fire Pump in accordance with OP 2186.NOTE Use care not to wash debris into the pump suction side of the traveling screen when performing the next step.e. Wash the debris from the screen through the access door.10. Re-perform Steps 6, 7, 8 and 9.d and 9.e as appropriate until TS-l-I-A(B,C) make at least one full revolution past the backwash header.11. Locally place TS-I-IA(B,C) local control switch to AUTO or MANUAL as directed by the Control Room Supervisor.
: a.     Obtain appropriate fire hose from spares or Stores.
: 12. IF debris removal was required, THEN secure the Electric Fire Pump in accordance with OP 2186.13. Dry and store any fire hose used as follows: a. Dry hoses used by laying them out to dry on the ramp by the intake structure OR use the hanger by the Turbine Building loading bay door OR both.b. Store fire hose(s) used as directed by Operations Shift Management.
: b.       Inspect the hose(s) and couplings to be used for the following:
: 1)     Hose:
a)     Hose marking (stenciled) includes "Service Test to 250 psi". (If specified pressure is >250 psi it is acceptable.)
b)     Hose has not been vandalized.
c)     Free of debris.
d)     No evidence of mildew or rot.
e)     No evidence of damage by chemicals, bums, cuts, abrasion, or vermin.
: 2)     Couplings:
a)     Damaged threads.
b)     Corrosion.
c)     Slippage on the hose.
d)     Out of round.
e)     Swivel not rotating freely.
OP 2180 Rev. 39 Page 51 of 52
 
f)     Missing lugs.
g)     Other defects that impair operation.
: 3)       Replace any degraded hose gaskets.
: c.       Rig a fire hose from a hydrant to the intake structure.
: 1)     Ensure fire hose(s) are secure to prevent whip prior to pressurizing and operating.
: 2)     Consider using two persons to man the hose so as to perform operations safely.
: d.       When ready to wash debris, start the Electric Fire Pump in accordance with OP 2186.
NOTE Use care not to wash debris into the pump suction side of the traveling screen when performing the next step.
: e.       Wash the debris from the screen through the access door.
: 10. Re-perform Steps 6, 7, 8 and 9.d and 9.e as appropriate until TS-l-I-A(B,C) make at least one full revolution past the backwash header.
: 11. Locally place TS-I-IA(B,C) local control switch to AUTO or MANUAL as directed by the Control Room Supervisor.
: 12. IF debris removal was required, THEN secure the Electric Fire Pump in accordance with OP 2186.
: 13. Dry and store any fire hose used as follows:
: a.       Dry hoses used by laying them out to dry on the ramp by the intake structure OR use the hanger by the Turbine Building loading bay door OR both.
: b.       Store fire hose(s) used as directed by Operations Shift Management.
FINAL CONDITIONS
FINAL CONDITIONS
: 1. Required forms completed and returned to Operations office for filing per EN-AD-103 and Retrieval of QA Records, and AP 0155, Current System Valve and Breaker Lineup and Identification.
: 1. Required forms completed and returned to Operations office for filing per EN-AD-103 and Retrieval of QA Records, and AP 0155, Current System Valve and Breaker Lineup and Identification.
OP 2180 Rev. 39 Page 52 of 52 APPENDIX A VALVE LINEUP Valve Number Description Position Initial CRP 9-6 CW-1A Circulating Water Pump I A Disch CW-1B Circulating Water Pump 1B Disch CW-1C Circulating Water Pump IC Disch CW-2A Condenser IA North Inlet CW-2B Condenser 1A South Inlet CW-2C Condenser 1B North Inlet CW-2D Condenser 1 B South Inlet CW-3A Condenser I A North Outlet CW-3B Condenser IA South Outlet CW-3C Condenser lB North Outlet CW-3D Condenser lB South Outlet CW-6A Cooling Tower 1 Inlet CW-6B Cooling Tower I Inlet CW-6C Cooling Tower 2 Inlet CW-6D Cooling Tower 2 Inlet Circ Wtr Intake Gate A Circ Wtr Intake Gate B Circ Wtr Intake Gate C Recirculation Bypass Gate North Circ Water Booster Bypass Gate South Circ Water Booster Bypass Gate CW-5A CWB Pump A Disch CW-5B CWB Pump B Disch CW-5C CWB Pump C Disch AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED AS REQ:OPEN/CLOSED Appendix A OP 2180 Rev. 39 Page 1 of 11 APPENDIX A (Continued)
OP 2180 Rev. 39 Page 52 of 52
Valve Number Description Position Initial CWHO-IA CWHO-2A CWHO-3A CWHO-4A CWHO-30A CWHO-31A CWHO-5A CWHO-6A CWHO-34A CWHO-35A CWHO-7A CWHO-8A CWHO-9A CWHO-10A CWHO-IIA CWHO-12A CWHO-1 6A CWHO-17A CWHO-1 8A CWHO-28A CWHO-29A CWHO-32A CWHO-33A CWHO- 19A CWHO-21A INTAKE STRUCTURE HYDRAULIC SYSTEM Down Drive Isolation  
 
-Intake A Gate Up Drive Isolation
APPENDIX A VALVE LINEUP Valve Number                                 Description                 Position         Initial CRP 9-6 CW-1A                 Circulating Water Pump IA Disch                 AS REQ:OPEN/CLOSED CW-1B                 Circulating Water Pump 1B Disch                 AS REQ:OPEN/CLOSED CW-1C                 Circulating Water Pump IC Disch                 AS REQ:OPEN/CLOSED CW-2A                 Condenser IA North Inlet                                         OPEN CW-2B                 Condenser 1A South Inlet                                         OPEN CW-2C                 Condenser 1B North Inlet                                         OPEN CW-2D                 Condenser 1B South Inlet                                         OPEN CW-3A                 Condenser IA North Outlet                                       OPEN CW-3B                 Condenser IA South Outlet                                       OPEN CW-3C                 Condenser lB North Outlet                                       OPEN CW-3D                 Condenser lB South Outlet                                       OPEN CW-6A                 Cooling Tower 1 Inlet                           AS REQ:OPEN/CLOSED CW-6B                 Cooling Tower I Inlet                           AS REQ:OPEN/CLOSED CW-6C                 Cooling Tower 2 Inlet                           AS REQ:OPEN/CLOSED CW-6D                 Cooling Tower 2 Inlet                           AS REQ:OPEN/CLOSED Circ Wtr Intake Gate A                                               AS REQ:OPEN/CLOSED Circ Wtr Intake Gate B                                               AS REQ:OPEN/CLOSED Circ Wtr Intake Gate C                                               AS REQ:OPEN/CLOSED Recirculation Bypass Gate                                             AS REQ:OPEN/CLOSED North Circ Water Booster Bypass Gate                                 AS REQ:OPEN/CLOSED South Circ Water Booster Bypass Gate                                 AS REQ:OPEN/CLOSED CW-5A                 CWB Pump A Disch                               AS REQ:OPEN/CLOSED CW-5B                 CWB Pump B Disch                               AS REQ:OPEN/CLOSED CW-5C                 CWB Pump C Disch                               AS REQ:OPEN/CLOSED Appendix A OP 2180 Rev. 39 Page 1 of 11
-Intake A Gate Down Drive Isolation  
 
-Intake B Gate Up Drive Isolation  
APPENDIX A (Continued)
-Intake B Gate Intake Gate B Actuator Up Drive Line Vent Intake Gate B Actuator Down Drive Line Vent Down Drive Isolation  
Valve Number                            Description                  Position          Initial INTAKE STRUCTURE HYDRAULIC SYSTEM CWHO-IA        Down Drive Isolation - Intake A Gate                                OPEN CWHO-2A        Up Drive Isolation - Intake A Gate                                  OPEN CWHO-3A        Down Drive Isolation - Intake B Gate                                OPEN CWHO-4A        Up Drive Isolation - Intake B Gate                                  OPEN CWHO-30A      Intake Gate B Actuator Up Drive Line Vent                        CLOSED CWHO-31A      Intake Gate B Actuator Down Drive Line Vent                      CLOSED CWHO-5A        Down Drive Isolation - Intake C Gate                                OPEN CWHO-6A        Up Drive Isolation - Intake C Gate                                  OPEN CWHO-34A      Intake Gate C Actuator Up Drive Line Vent                        CLOSED CWHO-35A      Intake Gate C Actuator Down Drive Line Vent                      CLOSED CWHO-7A        Flow Control Isolation - A Gate                                      OPEN CWHO-8A        Flow Control Isolation - A Gate                                      OPEN CWHO-9A        Flow Control Isolation - B Gate                                      OPEN CWHO-10A      Flow Control -Isolation - B Gate                                    OPEN CWHO-IIA        Flow Control Isolation - C Gate                                      OPEN CWHO-12A        Flow control Isolation - C Gate                                      OPEN CWHO-1 6A      4A Lube Oil Filter Pump Suction Isolation                            OPEN CWHO-17A        Intake Gate A Actuator High Point Vent                          CLOSED CWHO-1 8A      Intake Gate A Actuator Low Point Drain                          CLOSED CWHO-28A        Intake Gate B Actuator High Point Vent                          CLOSED CWHO-29A      Intake Gate B Actuator Low Point Drain                          CLOSED CWHO-32A      Intake Gate C Actuator High Point Vent                          CLOSED CWHO-33A      Intake Gate C Actuator Low Point Vent                            CLOSED CWHO- 19A      Reservoir Drain                                                  CLOSED CWHO-21A      PI-104-134A Isolation                                THROTTLED AS REQ Appendix A OP 2180 Rev. 39 Page 2 of I1
-Intake C Gate Up Drive Isolation
 
-Intake C Gate Intake Gate C Actuator Up Drive Line Vent Intake Gate C Actuator Down Drive Line Vent Flow Control Isolation
APPENDIX A (Continued)
-A Gate Flow Control Isolation
Valve Number                          Description                    Position          Initial CWHO-22A      PI-104-135A Isolation                                THROTTLED AS REQ CWIIO-23A      PI-104-132A Isolation                                THROTTLED AS REQ CWHO-24A      PI-104-133A Isolation                                THROTTLED AS REQ CWHO-25A      PI-91A Isolation                                     THROTTLED AS REQ CWHO-26A      PI-104-130A Isolation                                 THROTTLED AS REQ CWHO-27A      PI-104-136A Isolation                                THROTTLED AS REQ CWHA-IA        Air Pump Isolation                                                   OPEN CWHA-2A        Service Air Isolation                                             CLOSED CWHA-3A        Depressurizing Valve                                              CLOSED OFFICE BUILDING NORTH OUTSIDE CW-42A        CW Pumps Discharge Intake Pipe Vent                                CLOSED CW-42B        CW Pumps Discharge Intake Pipe Vent                               CLOSED INTAKE STRUCTURE CW-54A        PI-6A Circ Water Pump A Disch                                        OPEN CW-54B          PI-6B Circ-Water Pump B Disch                                        OPEN CW-54C          PI-6C Circ Water Pump C Disch                                        OPEN CWD-55A        PI-60A Dilution Pump A Disch                                        OPEN CWD-55B        PI-60B Dilution Pump B Disch                                        OPEN CWD-56A        FE-71 and 72 Dilution Pumps Disch                                CLOSED CWD-56B        FE-71 and 72 Dilution Pumps Disch                                CLOSED CWD-7A        Dilution Pump A Disch                                            CLOSED CWD-7B        Dilution Pump B Disch                                            CLOSED CWI-GATE-      Service Water De-Icing Gate                        *AS REQ:OPEN/CLOSED DEICE Appendix A OP 2180 Rev. 39 Page 3 of 11
-A Gate Flow Control Isolation
 
-B Gate Flow Control -Isolation
APPENDIX A (Continued)
-B Gate Flow Control Isolation
Valve Number                         Description                    Position          Initial TURBINE BUILDING CW-50A        Dpi-65A-2 Condenser A East                                          OPEN CW-50B        Dpi-65A-2 Condenser A West                                          OPEN CW-50C        Dpi-65A-1 Condenser A East                                            OPEN CW-50D        Dpi-65A-1 Condenser A West                                            OPEN CW-51A        Dpi-65B-2 Condenser B East                                            OPEN CW-51B        Dpi-65B-2 Condenser B West                                            OPEN CW-51C        Dpi-65 B-I Condenser B East                                          OPEN CW-51D        Dpi-65B-I Condenser B West                                            OPEN Hypochlorite Panel Drain                            *AS REQ:OPEN/CLOSED CW-37 CW-38          Ph Sensor Supply                                    *AS REQ:OPEN/CLOSED
-C Gate Flow control Isolation
                                                                  *AS REQ:OPEN/CLOSED CW-1OA        Condenser A North Cl and Ph Sample CW-1OC        Condenser A South CI and Ph Sample                  *AS REQ:OPEN/CLOSED
-C Gate 4A Lube Oil Filter Pump Suction Isolation Intake Gate A Actuator High Point Vent Intake Gate A Actuator Low Point Drain Intake Gate B Actuator High Point Vent Intake Gate B Actuator Low Point Drain Intake Gate C Actuator High Point Vent Intake Gate C Actuator Low Point Vent Reservoir Drain PI-104-134A Isolation OPEN OPEN OPEN OPEN CLOSED CLOSED OPEN OPEN CLOSED CLOSED OPEN OPEN OPEN OPEN OPEN OPEN OPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED THROTTLED AS REQ Appendix A OP 2180 Rev. 39 Page 2 of I1 APPENDIX A (Continued)
                                                                  *AS REQ:OPEN/CLOSED CW-IOB        Condenser B North CI and Ph Sample Condenser B South Ci and Ph Sample                  *AS REQ:OPEN/CLOSED CW- 10D CW-52A        PX-58A-I Condenser A North Outlet                                  CLOSED CW-52B          PX-58A-2 Condenser A South Outlet                                CLOSED CW-52C        PX-59B-2 Condenser B North Outlet                                CLOSED CW-52D        PX-58B-I Condenser B South Outlet                                CLOSED CW-62A        Condenser A North Outlet Water Box Drain                          CLOSED CW-62B        Condenser A South Outlet Water Box Drain                          CLOSED CW-62C        Condenser B North Outlet Water Box Drain                          CLOSED CW-62D        Condenser B South Outlet Water Box Drain                          CLOSED CW-61A        Condenser A North Inlet Water Box Drain                          CLOSED CW-61B        Condenser A South Inlet Water Box Drain                          CLOSED Appendix A OP 2180 Rev. 39 Page 4 of 11
Valve Number CWHO-22A CWIIO-23A CWHO-24A CWHO-25A CWHO-26A CWHO-27A CWHA-IA CWHA-2A CWHA-3A Description PI-104-135A Isolation PI-104-132A Isolation PI-104-133A Isolation PI-91A Isolation PI-104-130A Isolation PI-104-136A Isolation Air Pump Isolation Service Air Isolation Depressurizing Valve Position THROTTLED AS REQ THROTTLED AS REQ THROTTLED AS REQ THROTTLED AS REQ THROTTLED AS REQ THROTTLED AS REQ OPEN CLOSED CLOSED Initial CW-42A CW-42B OFFICE BUILDING NORTH OUTSIDE CW Pumps Discharge Intake Pipe Vent CW Pumps Discharge Intake Pipe Vent INTAKE STRUCTURE CLOSED CLOSED CW-54A CW-54B CW-54C CWD-55A CWD-55B CWD-56A CWD-56B CWD-7A CWD-7B CWI-GATE-DEICE PI-6A Circ Water Pump A Disch PI-6B Circ-Water Pump B Disch PI-6C Circ Water Pump C Disch PI-60A Dilution Pump A Disch PI-60B Dilution Pump B Disch FE-71 and 72 Dilution Pumps Disch FE-71 and 72 Dilution Pumps Disch Dilution Pump A Disch Dilution Pump B Disch Service Water De-Icing Gate OPEN OPEN OPEN OPEN OPEN CLOSED CLOSED CLOSED CLOSED*AS REQ:OPEN/CLOSED Appendix A OP 2180 Rev. 39 Page 3 of 11 APPENDIX A (Continued)
 
Valve Number Description TURBINE BUILDING Position Initial CW-50A CW-50B CW-50C CW-50D CW-51A CW-51B CW-51C CW-51D CW-37 CW-38 CW-1OA CW-1OC CW-IOB CW- 10D CW-52A CW-52B CW-52C CW-52D CW-62A CW-62B CW-62C CW-62D CW-61A CW-61B Dpi-65A-2 Condenser A East Dpi-65A-2 Condenser A West Dpi-65A-1 Condenser A East Dpi-65A-1 Condenser A West Dpi-65B-2 Condenser B East Dpi-65B-2 Condenser B West Dpi-65 B-I Condenser B East Dpi-65B-I Condenser B West Hypochlorite Panel Drain Ph Sensor Supply Condenser A North Cl and Ph Sample Condenser A South CI and Ph Sample Condenser B North CI and Ph Sample Condenser B South Ci and Ph Sample PX-58A-I Condenser A North Outlet PX-58A-2 Condenser A South Outlet PX-59B-2 Condenser B North Outlet PX-58B-I Condenser B South Outlet Condenser A North Outlet Water Box Drain Condenser A South Outlet Water Box Drain Condenser B North Outlet Water Box Drain Condenser B South Outlet Water Box Drain Condenser A North Inlet Water Box Drain Condenser A South Inlet Water Box Drain OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN*AS REQ:OPEN/CLOSED
APPENDIX A (Continued)
*AS REQ:OPEN/CLOSED
Valve Number                         Description                   Position         Initial CW-61C        Condenser B North Inlet Water Box Drain                        CLOSED CW-61D        Condenser B South Inlet Water Box Drain                        CLOSED CW-53A        A North Inlet Sample                                            CLOSED CW-53B        A South Inlet Sample                                            CLOSED CW-53C        B North Inlet Sample                                            CLOSED CW-53D        B South Inlet Sample                                            CLOSED CWP-14A      Priming Pump A SW Inlet                                            OPEN CWP-22A      Priming Pump A Strainer Drain                                  CLOSED CWP-1 8A      Priming Pump A SW Solenoid Bypass                              CLOSED CWP-SN-74-IA  Priming Pump A Cooling Water Throttle Valve        THROTTLED AS REQ CWP-14B      Priming Pump B SW Inlet                                            OPEN CWP-22B      Priming Pump B Strainer Drain                                  CLOSED CWP-18B      Priming Pump B SW Solenoid Bypass                              CLOSED CWP-SN-74-1B  Priming Pump B Cooling Water Throttle Valve        THROTTLED AS REQ CWP-19A      Priming Pump A-Solenoid Inlet                                      OPEN CWP-19B      Priming Pump B Solenoid Inlet                                      OPEN CWP-20A      Priming Pump A Solenoid Outlet                                    OPEN CWP-20B      Priming Pump B solenoid Outlet                                    OPEN CWP-21A      Priming Pump A PI-56-A Isolation                                  OPEN CWP-21B      Priming Pump B PI-56-B Isolation                                  OPEN CWP-3A        Priming Pump A Drain                                            CLOSED CWP-3B        Priming Pump B Drain                                            CLOSED CWP-22        P52-IB Suction Drain and Tank Vent                              CLOSED CWP-23A      Sight Glass Priming Tank Hi                                        OPEN CWP-23B      Sight Glass Priming Tank Lo                                        OPEN CWP-24        Priming Tank Drain                                              CLOSED Appendix A OP 2180 Rev. 39 Page 5 of 11
*AS REQ:OPEN/CLOSED
 
*AS REQ:OPEN/CLOSED
APPENDIX A (Continued)
*AS REQ:OPEN/CLOSED
Valve Number                        Description                      Position        Initial CWP-17        Priming Tank Instrumentation                                        OPEN CWP-2A        Priming Pump A Suction                                              OPEN CWP-2B        Priming Pump B Suction                                              OPEN CWP-4        Condenser A North Suction                                            OPEN CWP-5        Condenser A South Suction                                            OPEN CWP-6        Condenser B North Suction                                            OPEN CWP-7        Condenser B South Suction                                            OPEN CWP-8        Discharge Block Suction                            AS REQ:OPEN/CLOSED CWP-9        Condenser A North Suction                                            OPEN CWP-10        Condenser A South Suction                                            OPEN CWP-l I      Condenser B North Suction                                            OPEN CWP-12        Condenser B South Suction                                            OPEN CWP-13        Discharge Block Suction                            AS REQ:OPEN/CLOSED CW-60A        Waterbox Manual Vent                                              CLOSED CW-60B        -Waterbox-Manual Vent                                            CLOSED CW-60C        Waterbox Manual Vent                                              CLOSED CW-60D        Waterbox Manual Vent                                              CLOSED Appendix A OP 2180 Rev. 39 Page 6 of 11
*AS REQ:OPEN/CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED Appendix A OP 2180 Rev. 39 Page 4 of 11 APPENDIX A (Continued)
 
Valve Number CW-61C CW-61D CW-53A CW-53B CW-53C CW-53D CWP-14A CWP-22A CWP-1 8A CWP-SN-74-IA CWP-14B CWP-22B CWP-18B CWP-SN-74-1B CWP-19A CWP-19B CWP-20A CWP-20B CWP-21A CWP-21B CWP-3A CWP-3B CWP-22 CWP-23A CWP-23B CWP-24 Description Condenser B North Inlet Water Box Drain Condenser B South Inlet Water Box Drain A North Inlet Sample A South Inlet Sample B North Inlet Sample B South Inlet Sample Priming Pump A SW Inlet Priming Pump A Strainer Drain Priming Pump A SW Solenoid Bypass Priming Pump A Cooling Water Throttle Valve Priming Pump B SW Inlet Priming Pump B Strainer Drain Priming Pump B SW Solenoid Bypass Priming Pump B Cooling Water Throttle Valve Priming Pump A-Solenoid Inlet Priming Pump B Solenoid Inlet Priming Pump A Solenoid Outlet Priming Pump B solenoid Outlet Priming Pump A PI-56-A Isolation Priming Pump B PI-56-B Isolation Priming Pump A Drain Priming Pump B Drain P52-IB Suction Drain and Tank Vent Sight Glass Priming Tank Hi Sight Glass Priming Tank Lo Priming Tank Drain Position CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED OPEN CLOSED CLOSED THROTTLED AS REQ OPEN CLOSED CLOSED THROTTLED AS REQ OPEN OPEN OPEN OPEN OPEN OPEN CLOSED CLOSED CLOSED OPEN OPEN CLOSED Initial Appendix A OP 2180 Rev. 39 Page 5 of 11 APPENDIX A (Continued)
APPENDIX A (Continued)
Valve Number CWP-17 CWP-2A CWP-2B CWP-4 CWP-5 CWP-6 CWP-7 CWP-8 CWP-9 CWP-10 CWP-l I CWP-12 CWP-13 CW-60A CW-60B CW-60C CW-60D Description Priming Tank Instrumentation Priming Pump A Suction Priming Pump B Suction Condenser A North Suction Condenser A South Suction Condenser B North Suction Condenser B South Suction Discharge Block Suction Condenser A North Suction Condenser A South Suction Condenser B North Suction Condenser B South Suction Discharge Block Suction Waterbox Manual Vent-Waterbox-Manual Vent Waterbox Manual Vent Waterbox Manual Vent Position OPEN OPEN OPEN OPEN OPEN OPEN OPEN AS REQ:OPEN/CLOSED OPEN OPEN OPEN OPEN AS REQ:OPEN/CLOSED CLOSED CLOSED CLOSED CLOSED Initial Appendix A OP 2180 Rev. 39 Page 6 of 11 APPENDIX A (Continued)
Valve Number                             Description                    Position        Initial DISCHARGE STRUCTURE HYDRAULIC SYSTEM CWHO-I1B        Down Drive Isolation - Recirc Gate                                  OPEN CWHO-2B        Up Drive Isolation - Recirc Gate                                    OPEN CWHO-3B        Down Drive Isolation - Bypass Gate B                                OPEN CWHO-4B        Up Drive Isolation - Bypass Gate B                                  OPEN CWHO-5B        Down Drive Isolation - Bypass Gate A                                OPEN CWHO-6B        Up Drive Isolation - Bypass Gate A                                  OPEN CWHO-7B        Flow Control Isolation - Recirc Gate                                OPEN CWHO-8B        Flow Control Isolation - Recirc Gate                                OPEN CWHO-9B        Flow Control Isolation - Bypass Gate B                              OPEN CWHO-10B        Flow Control Isolation - Bypass Gate B                              OPEN CWHO-I IB      Flow Control Isolation - Bypass Gate A                              OPEN CWHO-12B        Flow Control Isolation - Bypass Gate A                              OPEN CWHO-1 6B      4B Lube Oil Filter Pump Suction Isolation                            OPEN CWHO-17B      -Reciro  Gate Actuator High Point Vent                              CLOSED CWHO-1 8B      Recire Gate Actuator Low Point Drain                              CLOSED CWHO-19B        Reservoir Drain                                                   CLOSED CWHO-21B        PI-104-134B Isolation                                THROTTLED AS REQ CWHO-22B        PI-104-135B Isolation                                THROTTLED AS REQ CWHO-23B        PI-104-132B Isolation                                THROTI'LED AS REQ CWHO-24B        PI-104-133B Isolation                                THROTTLED AS REQ CWHO-25B        PI-104-130B Isolation                                 THROTTLED AS REQ CWHO-26B        PI-104-131B Isolation                                THROTTLED AS REQ CWHO-27B        PI-104-136B Isolation                                 THROTTLED AS REQ CWHO-28B        Bypass Gate A High Point Vent                                    CLOSED CWHO-29B        Bypass Gate A Low Point Drain                                     CLOSED Appendix A OP 2180 Rev. 39 Page 7 of 11
Valve Number Description Position Initial CWHO-I1B CWHO-2B CWHO-3B CWHO-4B CWHO-5B CWHO-6B CWHO-7B CWHO-8B CWHO-9B CWHO-10B CWHO-I IB CWHO-12B CWHO-1 6B CWHO-17B CWHO-1 8B CWHO-19B CWHO-21B CWHO-22B CWHO-23B CWHO-24B CWHO-25B CWHO-26B CWHO-27B CWHO-28B CWHO-29B DISCHARGE STRUCTURE HYDRAULIC SYSTEM Down Drive Isolation  
 
-Recirc Gate OPEN Up Drive Isolation
APPENDIX A (Continued)
-Recirc Gate OPEN Down Drive Isolation
Valve Number                           Description                              Position            Initial CWHO-30B          Bypass Gate B High Point Vent                                              CLOSED CWHO-31B          Bypass Gate B Low Point Drain                                              CLOSED CWHA-IB          Air Pump Isolation                                                            OPEN CWHA-2B           Service Air Isolation                                                      CLOSED CWHA-3B          Depressurizing Valve                                                      CLOSED CW-8A            CWB Pump A Seal Water Filter A Inlet                One filter on line with each pump inlet and outlet valves CW-8D            CWB Pump A Seal Water Filter B Inlet                open. Other filter inlet and outlet valves closed with filter CW-9A            CWB Pump A Seal Water Filter A Outlet              in repair or standby condition.
-Bypass Gate B OPEN Up Drive Isolation
These valves routinely CW-9D            CWB Pump A Seal Water Filter B Outlet              operated by operators and mechanics to change filters.
-Bypass Gate B OPEN Down Drive Isolation
CW-8B            CWB Pump B Seal Water Filter A Inlet CW-8E            CWB Pump B Seal Water Filter B Inlet CW-9B            CWB Pump B Seal Water Filter A Outlet CW-9E            CWB Pump B Seal Water Filter B Outlet CW-8C            CWB Pump C Seal Water Filter A Inlet CW-8F          -CWB    Pump C Seal Water Filter B Inlet CW-9C            CWB Pump C Seal Water Filter A Outlet CW-9F            CWB Pump C Seal Water Filter B Outlet CW-59A            CWBP A Seal Water Cooling Loop Drain Valve                       CLOSEDICAPPED CW-59B            CWBP B Seal Water Cooling Loop Drain Valve                      CLOSED/CAPPED CW-59C            CWBP C Seal Water Cooling Loop Drain Valve                      CLOSED/CAPPED CW-1              CWBP A Seal Press PI-68A                                                      OPEN CW-2              CWBP B Seal Press PI-68B                                                      OPEN CW-3              CWBP C Seal Press PI-68C                                                      OPEN CW-4              CWBP A SealPThrust Brg. Cooling Water Supply                                  OPEN CW-7A            CWBP A Thrust Brg. Cooling Water Disch.                    THROTTLED AS REQ CW-58A            CWBP A Discharge Pressure Gauge Isolation Valve                              OPEN Appendix A OP 2180 Rev. 39 Page 8 of 11
-Bypass Gate A OPEN Up Drive Isolation  
 
-Bypass Gate A OPEN Flow Control Isolation
APPENDIX A (Continued)
-Recirc Gate OPEN Flow Control Isolation
Valve Number                            Description                    Position        Initial CW-5              CWBP B Seal/Thrust Brg. Cooling Water Supply                        OPEN CW-7B            CWBP B Thrust Brg. Cooling Water Disch.              THROTTLED AS REQ CW-58B            CWBP B Discharge Pressure Gauge Isolation Valve                    OPEN CW-6              CWBP C Seal/lTrust Brg. Cooling Water Supply                        OPEN CW-7C            CWBP C Thrust Brg. Cooling Water Disch.              THROTITLED AS REQ CW-58C            CWBP C Discharge Pressure Gauge Isolation Valve                    OPEN CW-7              Aux. CT Blowdown Throttle Valve                      THROTTLED AS REQ CW-8              Aux. CT Blowdown Valve                                              OPEN CW SAMPLE SYSTEM CW-29            Disch Bay Suction                                                  OPEN CW-30            Pump.B Suction                                                      OPEN CW-31            Pump B Disch Solenoid Manual Isolation             *THROTTLED AS REQ CW-68-2          Pump B Solenoid Disch Operates With Pump CW-46            Pump A and B Min Flow                                              OPEN CW-32          -- Sample Pump Disch Cross Connect                                  CLOSED CW-27            Sample Pump Disch Cross Connect                                  CLOSED CW-21            Sample Tank B Drain                                             *CLOSED CW-23            Sample Tank B Sample                                            *CLOSED CW-48            River Suction                                                      *OPEN CW-47            Radwaste Dilution Sample                                        *CLOSED CW-I I            Drain                                                            CLOSED CW-24            River/Dilution Pipe Suction                                        OPEN CW-25            Pump A Suction                                                      OPEN CW-26            Pump A Disch Solenoid Manual Isolation             *THROTTLED AS REQ CW-68-1          Pump A Disch Solenoid Operates With Pump CW-20            Sample Tank A Drain                                              *CLOSED Appendix A OP 2180 Rev. 39 Page 9 of 11
-Recirc Gate OPEN Flow Control Isolation
 
-Bypass Gate B OPEN Flow Control Isolation
APPENDIX A (Continued)
-Bypass Gate B OPEN Flow Control Isolation  
Valve Number                             Description                Position          Initial CW-22            Sample Tank A Sample                                          *CLOSED CW-28            Pump Suction Cross Connect                                    CLOSED CW-11A            River Suction Line Flush                                      *CLOSED COOLING TOWERS CW-57E            East Tower East Inlet Hdr Vent/Drain                          CLOSED CW-57A            Sample Cooling Tower No. I Inlet (East)                      *CLOSED CW-57F            East Tower Inlet Header Vent/Drain                            CLOSED CW-57B            Sample Cooling Twr No. I Inlet (West)                        *CLOSED CW-57G            West Tower Inlet Header Vent/Drain                            CLOSED CW-57C            Sample Cooling Twr No. 2 Inlet (East)                        *CLOSED CW-57D            West Tower Inlet Header Vent/Drain                            CLOSED SPRAY POND/TOWER WETTING SYSTEM BS-2              Blowdown Spray Pump Priming Header                            CLOSED BS-3A            Blowdown Spray Pump A Priming                                  **OPEN BS-3B        --- Blowdown Spray Pump B Priming                                  **OPEN BS-3C            Blowdown Spray Pump C Priming                                  **OPEN Deleted Deleted Deleted BS-14A            Blowdown Spray Pump A Casing Vent                              CLOSED BS-14B            Blowdown Spray Pump B Casing Vent                             CLOSED BS-14C            Blowdown Spray Pump C Casing Vent                              CLOSED Deleted BS-12            Tower Header Drain (at pit)                                    **OPEN BS-13            Tower Header Drain (at pit)                                    **OPEN Appendix A OP 2180 Rev. 39 Page 10 of II
-Bypass Gate A OPEN Flow Control Isolation
 
-Bypass Gate A OPEN 4B Lube Oil Filter Pump Suction Isolation OPEN-Reciro Gate Actuator High Point Vent CLOSED Recire Gate Actuator Low Point Drain CLOSED Reservoir Drain CLOSED PI-104-134B Isolation THROTTLED AS REQ PI-104-135B Isolation THROTTLED AS REQ PI-104-132B Isolation THROTI'LED AS REQ PI-104-133B Isolation THROTTLED AS REQ PI-104-130B Isolation THROTTLED AS REQ PI-104-131B Isolation THROTTLED AS REQ PI-104-136B Isolation THROTTLED AS REQ Bypass Gate A High Point Vent CLOSED Bypass Gate A Low Point Drain CLOSED Appendix A OP 2180 Rev. 39 Page 7 of 11 APPENDIX A (Continued)
APPENDIX A (Continued)
Valve Number CWHO-30B CWHO-31B CWHA-IB CWHA-2B CWHA-3B CW-8A CW-8D CW-9A CW-9D CW-8B CW-8E CW-9B CW-9E CW-8C CW-8F CW-9C CW-9F CW-59A CW-59B CW-59C CW-1 CW-2 CW-3 CW-4 CW-7A CW-58A Description Bypass Gate B High Point Vent Bypass Gate B Low Point Drain Air Pump Isolation Service Air Isolation Depressurizing Valve CWB Pump A Seal Water Filter A Inlet CWB Pump A Seal Water Filter B Inlet CWB Pump A Seal Water Filter A Outlet CWB Pump A Seal Water Filter B Outlet CWB Pump B Seal Water Filter A Inlet CWB Pump B Seal Water Filter B Inlet CWB Pump B Seal Water Filter A Outlet CWB Pump B Seal Water Filter B Outlet CWB Pump C Seal Water Filter A Inlet-CWB Pump C Seal Water Filter B Inlet CWB Pump C Seal Water Filter A Outlet CWB Pump C Seal Water Filter B Outlet CWBP A Seal Water Cooling Loop Drain Valve CWBP B Seal Water Cooling Loop Drain Valve CWBP C Seal Water Cooling Loop Drain Valve CWBP A Seal Press PI-68A CWBP B Seal Press PI-68B CWBP C Seal Press PI-68C CWBP A SealPThrust Brg. Cooling Water Supply CWBP A Thrust Brg. Cooling Water Disch.CWBP A Discharge Pressure Gauge Isolation Valve Position Initial CLOSED CLOSED OPEN CLOSED CLOSED One filter on line with each pump inlet and outlet valves open. Other filter inlet and outlet valves closed with filter in repair or standby condition.
* These valves normally operated by Chemistry Technician for chemical addition/sampling but should be in the position show.
These valves routinely operated by operators and mechanics to change filters.CLOSEDICAPPED CLOSED/CAPPED CLOSED/CAPPED OPEN OPEN OPEN OPEN THROTTLED AS REQ OPEN Appendix A OP 2180 Rev. 39 Page 8 of 11 APPENDIX A (Continued)
**      Open to provide winter freezing protection. Tower Wetting System and Blowdown Spray Pond are retired in place.
Valve Number CW-5 CW-7B CW-58B CW-6 CW-7C CW-58C CW-7 CW-8 Description CWBP B Seal/Thrust Brg. Cooling Water Supply CWBP B Thrust Brg. Cooling Water Disch.CWBP B Discharge Pressure Gauge Isolation Valve CWBP C Seal/lTrust Brg. Cooling Water Supply CWBP C Thrust Brg. Cooling Water Disch.CWBP C Discharge Pressure Gauge Isolation Valve Aux. CT Blowdown Throttle Valve Aux. CT Blowdown Valve Position OPEN THROTTLED AS REQ OPEN OPEN THROTITLED AS REQ OPEN THROTTLED AS REQ OPEN Initial CW SAMPLE SYSTEM CW-29 CW-30 CW-31 CW-68-2 CW-46 CW-32 CW-27 CW-21 CW-23 CW-48 CW-47 CW-I I CW-24 CW-25 CW-26 CW-68-1 CW-20 Disch Bay Suction Pump.B Suction Pump B Disch Solenoid Manual Isolation Pump B Solenoid Disch Operates With Pump Pump A and B Min Flow--Sample Pump Disch Cross Connect Sample Pump Disch Cross Connect Sample Tank B Drain Sample Tank B Sample River Suction Radwaste Dilution Sample Drain River/Dilution Pipe Suction Pump A Suction Pump A Disch Solenoid Manual Isolation Pump A Disch Solenoid Operates With Pump Sample Tank A Drain OPEN OPEN*THROTTLED AS REQ OPEN CLOSED CLOSED*CLOSED*CLOSED*OPEN*CLOSED CLOSED OPEN OPEN*THROTTLED AS REQ*CLOSED Appendix A OP 2180 Rev. 39 Page 9 of 11 APPENDIX A (Continued)
REMARKS:
Valve Number CW-22 CW-28 CW-11A Description Sample Tank A Sample Pump Suction Cross Connect River Suction Line Flush Position Initial*CLOSED CLOSED*CLOSED COOLING TOWERS CW-57E CW-57A CW-57F CW-57B CW-57G CW-57C CW-57D BS-2 BS-3A BS-3B BS-3C Deleted Deleted Deleted BS-14A BS-14B BS-14C Deleted BS-12 BS-13 East Tower East Inlet Hdr Vent/Drain Sample Cooling Tower No. I Inlet (East)East Tower Inlet Header Vent/Drain Sample Cooling Twr No. I Inlet (West)West Tower Inlet Header Vent/Drain Sample Cooling Twr No. 2 Inlet (East)West Tower Inlet Header Vent/Drain SPRAY POND/TOWER WETTING SYSTEM Blowdown Spray Pump Priming Header Blowdown Spray Pump A Priming---Blowdown Spray Pump B Priming Blowdown Spray Pump C Priming Blowdown Spray Pump A Casing Vent Blowdown Spray Pump B Casing Vent Blowdown Spray Pump C Casing Vent Tower Header Drain (at pit)Tower Header Drain (at pit)CLOSED*CLOSED CLOSED*CLOSED CLOSED*CLOSED CLOSED CLOSED**OPEN**OPEN**OPEN CLOSED CLOSED CLOSED**OPEN**OPEN Appendix A OP 2180 Rev. 39 Page 10 of II APPENDIX A (Continued)
Reviewed By.                                                                                                /
* These valves normally operated by Chemistry Technician for chemical addition/sampling but should be in the position show.** Open to provide winter freezing protection.
Shift Manager (Print/Sign)                                                Date Appendix A OP 2180 Rev. 39 Page 11 of 11
Tower Wetting System and Blowdown Spray Pond are retired in place.REMARKS: Reviewed By./Shift Manager (Print/Sign)
 
Date Appendix A OP 2180 Rev. 39 Page 11 of 11 APPENDIX B I DETERMINING AND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE IEPU -BETWEEN THE DATES OF MAY 16 THROUGH OCTOBER 141 (SDR 94077)NOTES Operations Management may implement changes to the "TCRIT Delta T Margin" or "TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.
APPENDIX B DETERMINING AND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE I    IEPU - BETWEEN THE DATES OF MAY 16 THROUGH OCTOBER 141 (SDR 94077)
NOTES Operations Management may implement changes to the "TCRIT Delta T Margin" or "TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.
In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.
In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.
CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. (ER 2002-2181)
CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. (ER 2002-2181)
Monitoring the plant settings is accomplished by using the following trends on ERFIS: a. Trend 70 contains a graph of(1) Margin to TCRIT -C276, (2) Instantaneous River Thermal Capacity -C277, and (3) Heat Rejected To River -C064.b. Trend 71 contains a graph of(1) Up River Temp -M036, (2) USGEN River Flow -C278, and (3) River Temperature Rise -C019.C. Trend 72 contains a graph of Margin to TCRIT -C276, set on a 1 hour scale to enhance definition.
Monitoring the plant settings is accomplished by using the following trends on ERFIS:
Appendix B OP 2180 Rev. 39 Page 1 of 10 APPENDIX B (Continued)
: a. Trend 70 contains a graph of(1) Margin to TCRIT - C276, (2) Instantaneous River Thermal Capacity - C277, and (3) Heat Rejected To River - C064.
: 2. To determine plant settings: a. Obtain a value for: 1) C277 "INST RIVER THERMAL CAPACITY" 2) C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
: b. Trend 71 contains a graph of(1) Up River Temp - M036, (2) USGEN River Flow - C278, and (3) River Temperature Rise - C019.
: 3) M036 "UP RIVER TEMPERATURE" 4) River Temperature Correction Factor, as specified by Operations Management
C. Trend 72 contains a graph of Margin to TCRIT - C276, set on a 1 hour scale to enhance definition.
: b. Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.C. To make changes to plant settings refer to the appropriate section of the operating procedure.
Appendix B OP 2180 Rev. 39 Page 1of 10
: 3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows: a. Determine Instantaneous River Thermal Capacity as follows:-IRTC = River Flow * (SYSOl2 -SYSol3)Where: SYS012 = TCRIT River Temp Rise Limit SYSO13 = TCRIT Delta T Margin b. Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.C. Record on plant setting change log changes in: 1) CW/CWB Pumps 2) Number of cooling tower fans 3) Gate positions Appendix B OP 2180 Rev. 39 Page 2 of 10 APPENDIX B (Continued)
 
CAUTION 2. Monitoring of up river temperature is critical to the proper operation of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing.3. When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.a. Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below"0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.b. Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity.
APPENDIX B (Continued)
This will ensure that the plant does not exceed the river capacity.c. The River Up/Down Temp. Rise should be maintained below the allowable temperature
: 2. To determine plant settings:
-'rise from the Precautions/Limitations based oncurrent-up river temperature.
: a.     Obtain a value for:
Appendix B OP 2180 Rev. 39 Page 3 of 10 APPENDIX B (Continued)
: 1)     C277 "INST RIVER THERMAL CAPACITY"
: d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012')
: 2)     C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
is a manually inputted point that is updated by the operator.
: 3)     M036 "UP RIVER TEMPERATURE"
As up river temperature increases, SYS012 should be changed Y2 degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed 1/2/2 degree after reaching the next temperature range. To change the value refer to the table below: NOTE If M036 is not available on ERFIS assume up river temperature  
: 4)     River Temperature Correction Factor, as specified by Operations Management
= 631F.M036 + River Temperature Correction Factor>63 0 F>59 0 F, <63 0 F>55 0 F <590F<55&deg;F At, 2 0 F 30F 4 0 F 50F I Write a Condition Report for any condition that violates or challenges NPDES limits.e. The "TCRIT Delta T Margin" (point ID 'SYSO13')
: b.     Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.
is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.Appendix B OP 2180 Rev. 39 Page 4 of 10 APPENDIX B (Continued)
C.     To make changes to plant settings refer to the appropriate section of the operating procedure.
NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105).
: 3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows:
If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).
: a.     Determine Instantaneous River Thermal Capacity as follows:
          -IRTC = River Flow * (SYSOl2 - SYSol3)
Where:         SYS012 = TCRIT River Temp Rise Limit SYSO13 = TCRIT Delta T Margin
: b.     Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.
C.     Record on plant setting change log changes in:
: 1)     CW/CWB Pumps
: 2)     Number of cooling tower fans
: 3)     Gate positions Appendix B OP 2180 Rev. 39 Page 2 of 10
 
APPENDIX B (Continued)
CAUTION
: 2. Monitoring of up river temperature is critical to the proper operation of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing.
: 3. When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.
: 4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.
: a.     Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below "0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.
: b.       Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity. This will ensure that the plant does not exceed the river capacity.
: c.     The River Up/Down Temp. Rise should be maintained below the allowable temperature
    -     'rise from the Precautions/Limitations based oncurrent-up river temperature.
Appendix B OP 2180 Rev. 39 Page 3 of 10
 
APPENDIX B (Continued)
: d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012') is a manually inputted point that is updated by the operator. As up river temperature increases, SYS012 should be changed Y2 degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed 1/2/2 degree after reaching the next temperature range. To change the value refer to the table below:
NOTE If M036 is not available on ERFIS assume up river temperature = 631F.
M036 + River Temperature Correction Factor                 At,
                              >63 0F                      20F
                          >59 0 F, <63 0 F               30F
                          >55 0F <590F                   40F
                              <55&deg;F                       50F I
Write a Condition Report for any condition that violates or challenges NPDES limits.
: e. The "TCRIT Delta T Margin" (point ID 'SYSO13') is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.
Appendix B OP 2180 Rev. 39 Page 4 of 10
 
APPENDIX B (Continued)
NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105). If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).
: 5. To change the value of the manually inputted points above perform the following:
: 5. To change the value of the manually inputted points above perform the following:
: a. On the ERFIS computer keyboard, press the 'CAV' button.b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.C.Using the cursor, click on the PTID field.d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.e. Verify PTID updated to appropriate Point ID on 'CAV' screen.f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.g. Verify computer point updated using CRO alarm typer.h. Record ERFIS point ID, original, and final values on plant setting change log.i. Update appropriate block on plant setting change log.j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.Appendix B OP 2180 Rev. 39 Page 5 of 10 APPENDIX B (Continued)
: a. On the ERFIS computer keyboard, press the 'CAV' button.
*--. IA-.*,*.4** i.It'Wt#.* ~ V*...'4'AC NOTE If plant conditior 24 -se;thef-a shi6ul utilized." Startgad stopping shoiuld bo iiiiiimized fo prevent x"cessive wear to.breaker --ntacts-.77: 6.C-41I-Fr-B If any of the following ERFIS values are unavailable, perform either of theactions below per Operations Manager approval.0 0 S 0 S S S S S USGEN River Flow -C278 River Up/Down Temp Rise -C019 Heat Reject to River -C064 Conn. River Flow -C275 Margin to TCRIT -C276 Instantaneous River Thermal Cap. -C277 Condenser Inlet -F052, F053, F054, F055 Condenser Outlet -F056, F057, F058, F059 East Tower Outlet -F078 West Tower Outlet -F079 I a. Verify river temperature rise is within ATr limits using the following formula, provided the 1lant is at steady state operation.
: b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.
NOTE This calculation is only valid when the circulating water system is in open cycle.ATr= 15.193*(MWt rejected)(River flow in cfs)where: MWt rejected (COS) =River flow in ets =I1-90-1912*(%CTP)-generator gross MW USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder 1) Independently verify the calculation. (ER991077.05)
C. Using the cursor, click on the PTID field.
Appendix B OP 2180 Rev. 39 Page 6 of 10 LPC #3 APPENDIX B (Continued)
: d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.
: b. Place Circulating Water System in hybrid cycle with full recirculation flow (recirc gate>85% open), at least 21 cooling tower fans operating, and intake gates open.C. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.NOTE Plant Setting Change Log must be completed daily. (ER981657 02)7. Maintain Plant Setting Change Log as follows: a. Daily, at 0000, record the following:
: e. Verify PTID updated to appropriate Point ID on 'CAV' screen.
0 River Temperature Correction Factor (supplied by Operations management)
: f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.
: g. Verify computer point updated using CRO alarm typer.
: h. Record ERFIS point ID, original, and final values on plant setting change log.
: i. Update appropriate block on plant setting change log.
: j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.
Appendix B OP 2180 Rev. 39 Page 5 of 10
 
APPENDIX B (Continued)
NOTE
              *--.       IA-.
              *,*.4** i.
If plant conditior is`quiie*T*F 24  - se;thef-a shi6ul b** utilized."r*
It'Wt#.* ~             V*...'4 'AC Startgad stopping shoiuld bo           iiiiiimized fo prevent x"cessive wear to.         77:
breaker -- ntacts-.
If any of the following ERFIS values are unavailable, perform either of theactions below per C-41I-Fr-B 6.
Operations Manager approval.
USGEN River Flow - C278 0        River Up/Down Temp Rise - C019 0        Heat Reject to River - C064 S      Conn. River Flow - C275 0      Margin to TCRIT - C276 S      Instantaneous River Thermal Cap. - C277 S      Condenser Inlet - F052, F053, F054, F055 S      Condenser Outlet - F056, F057, F058, F059 S      East Tower Outlet - F078 S      West Tower Outlet - F079 I             a.     Verify river temperature rise is within ATr limits using the following formula, provided the 1lant is at steady state operation.
NOTE This calculation is only valid when the circulating water system is in open cycle.
ATr= 15.193*(MWt rejected)
(River flow in cfs)
I1                  where:       MWt rejected (COS) =             1912*(%CTP)-generator gross MW River flow in ets =              USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder
: 1)     Independently verify the calculation. (ER991077.05)
Appendix B OP 2180 Rev. 39 Page 6 of 10 LPC #3
 
APPENDIX B (Continued)
: b. Place Circulating Water System in hybrid cycle with full recirculation flow (recirc gate
        >85% open), at least 21 cooling tower fans operating, and intake gates open.
C. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.
NOTE Plant Setting Change Log must be completed daily. (ER981657 02)
: 7. Maintain Plant Setting Change Log as follows:
: a. Daily, at 0000, record the following:
0       River Temperature Correction Factor (supplied by Operations management)
* M036 ("UPRIVER TEMPERATURE")
* M036 ("UPRIVER TEMPERATURE")
* SYS010 ("USGEN RIVER FLOW C278," CFS),* SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and* SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management)
* SYS010 ("USGEN RIVER FLOW C278," CFS),
* C275 (CONN RIVER FLOW)* C278 (USGEN RIVER FLOW)b. Log any of the following:
* SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and
* SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management)
* C275 (CONN RIVER FLOW)
* C278 (USGEN RIVER FLOW)
: b. Log any of the following:
* Major changes to Plant settings (system mode, number of operating fans, recirc gate position).
* Major changes to Plant settings (system mode, number of operating fans, recirc gate position).
* Plant settings based on anticipated Vernon Dam load changes per Step 3.* Unannounced Vernon schedule changes.* Other information pertinent to plant settings.* Changes in manually inputted data per Step 5 above.* When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.Appendix B OP 2180 Rev. 39 Page 7 of 10 APPENDIX B (Continudd)
* Plant settings based on anticipated Vernon Dam load changes per Step 3.
* Unannounced Vernon schedule changes.
* Other information pertinent to plant settings.
* Changes in manually inputted data per Step 5 above.
* When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.
Appendix B OP 2180 Rev. 39 Page 7 of 10
 
APPENDIX B (Continudd)
C. If plant conditions exist that cause concern about Margin to TCrit for any given hour, perform the following:
C. If plant conditions exist that cause concern about Margin to TCrit for any given hour, perform the following:
: 1) Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).2) Attach graph to log.d. At midnight each day, perform the following:
: 1)       Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).
: 1) Calculate the number of hours the cooling towers were operated that day, to the nearest whole hour.a) Log the number as part of the last log entry for that day "total for the day." 2) Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day.. The "running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.).143 "running total for the month"..&#xf7;16 "total for the day" 159 "running total for the month" entry at 2400 &next day entry at 0000 3) Turn over the log. SM/CRS approve -the-log.
: 2)       Attach graph to log.
Print an official copy of the log.4) Print a copy of the following and attach to previous day's log: 0 S Trend 70 Trend 71 5) Forward previous day's log and trend graphs to Operations Administrative Assistant.
: d. At midnight each day, perform the following:
Appendix B OP 2180 Rev. 39 Page 8 of 10 APPENDIX B (Continued)
: 1)       Calculate the number of hours the cooling towers were operated that day, to the nearest whole hour.
: 8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings.
a)     Log the number as part of the last log entry for that day "total for the day."
Changes to plant settings shall be documented on PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.a. If the network/software becomes unavailable, perform the following:
: 2)       Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day.. The "running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.)
: 1) Maintain the log on VYOPF 2180.05.2) Submit a Condition Report.3) When the log software has been restored, enter the log in the software in a timely manner.Appendix B OP 2180 Rev. 39 Page 9 of 10 APPENDIX B (Continued)
                                            .143 "running total for the month"
: 9. Listing of Project Save ERFIS Computer Points POINT ID DESCRIPTION UNITS C019 RIVER DOWN/UP TEMP RISE F C051 COND HEAT REJECTION MW C064 HEAT REJECT TO RIVER CFSF C102 NUMBER OF CIRC WATER PUMPS ON C103 NUMBER OF CIRC BOOST PUMPS ON C275 CONN RIVER FLOW CFS C276 MARGIN TCRIT DEGF C277 INST RIVER THERMAL CAPACITY CFSF C278 USGEN RIVER FLOW CFS F052 CONDENSER 1A CIRC WATER INLET DEG F F053 CONDENSER 2A CIRC WATER INLET DEG F F054 CONDENSER 1B CIRC WATER INLET DEG F F055 CONDENSER 2B CIRC WATER INLET DEG F F056 CONDENSER 1A CIRC WATER OUTLET DEG F F057 CONDENSER 2A CIRC WATER OUTLET DEG F F058 CONDENSER 1B CIRC WATER OUTLET DEG F F059 CONDENSER 2B CIRC WATER OUTLET DEG F F078 CIRC WATER OUT COOLING TOWER A DEG F F079 CIRC WATER OUT COOLING TOWER B DEG F F084 CW INTAKE GATE A.POSITION_
                                          ..&#xf7;16 "total for the day" entry at 2400 &
F089 CW INTAKE GATE B POSITION F090 CW INTAKE GATE C POSITION F085 CW RECIRC GATE POSITION M036 UP RIVER TEMPERATURE DEG F M037 DOWN RIVER TEMPERATURE DEG F SYSO0O* USGEN RIVER FLOW C278 CFS SYS012* TCRIT RIVER TEMP RISE LIMIT DEGF SYS013* TCRIT DELTAT MARGIN DEGF* Manually entered per Operations Management's Direction Appendix B OP 2180 Rev. 39 Page 10 of 10 APPENDIX C CIRCULATING WATER HYDRAULIC GATE OPERATIONS WITH DEGRADED POSITION INDICATION
next day entry at 0000           159 "running total for the month"
: 3)       Turn over the log. SM/CRS approve -the-log. Print an official copy of the log.
: 4)       Print a copy of the following and attach to previous day's log:
0       Trend 70 S      Trend 71
: 5)       Forward previous day's log and trend graphs to Operations Administrative Assistant.
Appendix B OP 2180 Rev. 39 Page 8 of 10
 
APPENDIX B (Continued)
: 8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings. Changes to plant settings shall be documented on PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.
: a.     If the network/software becomes unavailable, perform the following:
: 1)     Maintain the log on VYOPF 2180.05.
: 2)     Submit a Condition Report.
: 3)     When the log software has been restored, enter the log in the software in a timely manner.
Appendix B OP 2180 Rev. 39 Page 9 of 10
 
APPENDIX B (Continued)
: 9. Listing of Project Save ERFIS Computer Points POINT ID                 DESCRIPTION                     UNITS C019         RIVER DOWN/UP TEMP RISE                         F C051         COND HEAT REJECTION                           MW C064         HEAT REJECT TO RIVER                           CFSF C102         NUMBER OF CIRC WATER PUMPS ON C103         NUMBER OF CIRC BOOST PUMPS ON C275         CONN RIVER FLOW                                 CFS C276         MARGIN TCRIT                                 DEGF C277         INST RIVER THERMAL CAPACITY                   CFSF C278         USGEN RIVER FLOW                               CFS F052         CONDENSER 1A CIRC WATER INLET                 DEG F F053         CONDENSER 2A CIRC WATER INLET                 DEG F F054         CONDENSER 1B CIRC WATER INLET               DEG F F055         CONDENSER 2B CIRC WATER INLET                 DEG F F056         CONDENSER 1A CIRC WATER OUTLET               DEG F F057         CONDENSER 2A CIRC WATER OUTLET               DEG F F058         CONDENSER 1B CIRC WATER OUTLET               DEG F F059         CONDENSER 2B CIRC WATER OUTLET               DEG F F078         CIRC WATER OUT COOLING TOWER A               DEG F F079         CIRC WATER OUT COOLING TOWER B               DEG F F084         CW INTAKE GATE A.POSITION_
F089         CW INTAKE GATE B POSITION F090         CW INTAKE GATE C POSITION F085         CW RECIRC GATE POSITION M036         UP RIVER TEMPERATURE                         DEG F M037         DOWN RIVER TEMPERATURE                       DEG F SYSO0O*       USGEN RIVER FLOW C278                         CFS SYS012*     TCRIT RIVER TEMP RISE LIMIT                   DEGF SYS013*     TCRIT DELTAT MARGIN                           DEGF
* Manually entered per Operations Management's Direction Appendix B OP 2180 Rev. 39 Page 10 of 10
 
APPENDIX C CIRCULATING WATER HYDRAULIC GATE OPERATIONS WITH DEGRADED POSITION INDICATION
: 1. Send an operator to the discharge structure.
: 1. Send an operator to the discharge structure.
: 2. Verify or place both hydraulic pumps in AUTO.3. Place one pump in OFF.4. Notify the Control Room to position the gate(s) to the desired position(s).
: 2. Verify or place both hydraulic pumps in AUTO.
: 5. When directed by the Control Room turn off the operating pump.6. When a gate needs to be re-positioned:
: 3. Place one pump in OFF.
: 4. Notify the Control Room to position the gate(s) to the desired position(s).
: 5. When directed by the Control Room turn off the operating pump.
: 6. When a gate needs to be re-positioned:
6.1. Send an operator to the discharge structure.
6.1. Send an operator to the discharge structure.
6.2. Start one hydraulic pump and notify the control room to position the gate(s) as desired.6.3. When directed by the Control Room turn off the operating pump.7. When the degraded position indication has been repaired, place both hydraulic pumps back in AUTO.Appendix C OP 2180 Rev. 39 Page 1 of I
6.2. Start one hydraulic pump and notify the control room to position the gate(s) as desired.
[EPU -APPENDIX D..........
6.3. When directed by the Control Room turn off the operating pump.
DETERMININGAND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE 4"; ,- ;-'_'- :"-.-.:BETWEENFT.HE:DATES OFOCTOBERiS-THROUGH MA-Y15. .-..S*~-i~T~1SDR9477)]
: 7. When the degraded position indication has been repaired, place both hydraulic pumps back in AUTO.
PU. ....S.NOTES Operations Management may implement changes to the'*TCRIT Delta T Margin" or "*TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.
Appendix C OP 2180 Rev. 39 Page 1 of I
 
[EPU - APPENDIX D
        ..........DETERMININGAND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE 4"; ,- ;-'_'- ;_T,,jt* :"-.-.:BETWEENFT.HE:DATES OFOCTOBERiS-THROUGH MA-Y15.                               . - ..
S*~-i~T~1SDR9477)]
PU.                                               .   ... S.
NOTES Operations Management may implement changes to the
                                        '*TCRIT Delta T Margin" or "*TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.
In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.
In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.
If a manual calculation is performed, document the calculation and results on the VYOPF 2180.05 form to maintain a copy of the calculation.
If a manual calculation is performed, document the calculation and results on the VYOPF 2180.05 form to maintain a copy of the calculation.
CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. (ER 2002-2181)
CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in I                        exceeding the NPDES permit. (ER 2002-2181)
I Monitoring the plant settings is accomplished by using the following trends on ERFIS: a. Trend 70 contains a graph of (1) Margin to TCRIT -C276, (2) Instantaneous River Thermal Capacity -C277, and (3) Heat Rejected To River -C064.b. Trend 71 contains a graph of (1) Up River Temp -M036, (2) USGEN River Flow -C278, and (3) River Temperature Rise -C019.c. Trend 72 contains a graph of Margin to TCRIT -C276, set on a I hour scale to enhance definition.
Monitoring the plant settings is accomplished by using the following trends on ERFIS:
Appendix D OP 2180 Rev. 39 Page I of 12.LPC #3 APPENDIX D (Continued)
: a.       Trend 70 contains a graph of (1) Margin to TCRIT - C276, (2) Instantaneous River Thermal Capacity - C277, and (3) Heat Rejected To River - C064.
: 2. To determine plant settings: a. Obtain a value for: 1) C277 "INST RIVER THERMAL CAPACITY" 2) C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
: b.       Trend 71 contains a graph of (1) Up River Temp - M036, (2) USGEN River Flow -
: 3) M036 "UP RIVER TEMPERATURE" 4) River Temperature Correction Factor, as specified by Operations Management
C278, and (3) River Temperature Rise - C019.
: 5) C275 "CONN RIVER FLOW" b. Apply the obtained values as follows to obtain estimated settings: 1) IF UP RIVER TEMPERATURE IS <50OF, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows: a) Apply Up River Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.b) IF the obtained readings are not exact matches for the values on the tables, round the -values as follows:* If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
: c.       Trend 72 contains a graph of Margin to TCRIT - C276, set on a I hour scale to enhance definition.
* If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.* If wet bulb temperature is >30 0 F, round up to the next highest wet bulb temperature.
Appendix D OP 2180 Rev. 39 Page I of 12
                                                                                              .LPC #3
 
APPENDIX D (Continued)
: 2. To determine plant settings:
: a. Obtain a value for:
: 1)   C277 "INST RIVER THERMAL CAPACITY"
: 2)   C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
: 3)   M036 "UP RIVER TEMPERATURE"
: 4)     River Temperature Correction Factor, as specified by Operations Management
: 5)     C275 "CONN RIVER FLOW"
: b. Apply the obtained values as follows to obtain estimated settings:
: 1)     IF UP RIVER TEMPERATURE IS <50OF, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows:
a)     Apply Up River Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.
b)     IF the obtained readings are not exact matches for the values on the tables, round the -values as follows:
* If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
* If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.
* If wet bulb temperature is >300 F, round up to the next highest wet bulb temperature.
* If wet bulb temperature is <30'F, round down to the next lowest wet bulb temperature.
* If wet bulb temperature is <30'F, round down to the next lowest wet bulb temperature.
c) Initial tower settings are at the intersection of the wet bulb temperature column and river flow.Appendix D OP 2180 Rev. 39 Page 2 of 12 APPENDIX D (Continued)
c)     Initial tower settings are at the intersection of the wet bulb temperature column and river flow.
: 2) IF UP RIVER TEMPERATURE IS >50&deg;F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.
Appendix D OP 2180 Rev. 39 Page 2 of 12
 
APPENDIX D (Continued)
: 2)     IF UP RIVER TEMPERATURE IS >50&deg;F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.
: c. To make changes to plant settings refer to the appropriate section of the operating procedure.
: c. To make changes to plant settings refer to the appropriate section of the operating procedure.
: 3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows: a. Determine Instantaneous River Thermal Capacity as follows: IRTC = River Flow * (SYS012 -SYS013)Where: SYS012 = TCRIT River Temp Rise Limit SYS013 = TCRIT Delta T Margin b. Apply the obtained values as follows to obtain estimated settings: 1) IF UP RIVER TEMPERATURE IS <50&deg;F, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows: a) Apply UpRiver-Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.b) IF the obtained readings are not exact matches for the values on the tables, round the values as follows: 0 If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
: 3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows:
& If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.0 If wet bulb temperature is >30%F, round up to the next highest wet bulb temperature.
: a. Determine Instantaneous River Thermal Capacity as follows:
IRTC = River Flow * (SYS012 - SYS013)
Where:         SYS012 = TCRIT River Temp Rise Limit SYS013 = TCRIT Delta T Margin
: b. Apply the obtained values as follows to obtain estimated settings:
: 1)     IF UP RIVER TEMPERATURE IS <50&deg;F, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows:
a)     Apply UpRiver-Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.
b)     IF the obtained readings are not exact matches for the values on the tables, round the values as follows:
0       If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
                        &       If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.
0       If wet bulb temperature is >30%F, round up to the next highest wet bulb temperature.
* If wet bulb temperature is <30 0 F, round down to the next lowest wet bulb temperature.
* If wet bulb temperature is <30 0 F, round down to the next lowest wet bulb temperature.
Appendix D OP 2180 Rev. 39 Page 3 of 12 APPENDIX D (Continued) c) Initial tower settings are at the intersection of the wet bulb temperature column and river flow.2) IF UP RIVER TEMPERATURE IS >50&deg;F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.
Appendix D OP 2180 Rev. 39 Page 3 of 12
C. Record on plant setting change log changes in: 1) CW/CWB Pumps 2) Number of cooling tower fans 3) Gate positions CAUTIONS" Monitoring of up river temperature is critical to the proper peration of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing." When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.* During winter operations the recire gate is routinely positioned to prevent intake structure freezing.
 
However, when adjusting plant parameters for NPDES compliance, the recirc gate should not be repositioned until the cooling towers are placed in service.4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.a. Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below "0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.Appendix D OP 2180 Rev. 39 Page 4 of 12 APPENDIX D (Continued)
APPENDIX D (Continued) c)     Initial tower settings are at the intersection of the wet bulb temperature column and river flow.
: b. Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity.
: 2)       IF UP RIVER TEMPERATURE IS >50&deg;F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.
This will ensure that the plant does not exceed the river capacity.c. The River Up/Down Temp. Rise should be maintained below the allowable temperature rise from the Precautions/Limitations based on current up river temperature.
C.     Record on plant setting change log changes in:
: d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012')
: 1)     CW/CWB Pumps
is a manually inputted point that is updated by the operator.
: 2)     Number of cooling tower fans
As up river temperature increases, SYS012 should be changed %/ degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed % degree after reaching the next temperature range. For the period October 15 to May 15 TCRIT Temp. Rise Limit is equal to 65F-M036 not to exceed 13.4 AT.e. Write a Condition Report for any condition that violates or challenges NPDES limits.f. The "TCRIT Delta T Margin" (point ID 'SYS013')
: 3)     Gate positions CAUTIONS
is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.Appendix D OP 2180 Rev. 39 Page 5 of 12 APPENDIX D (Continued)
              "     Monitoring of up river temperature is critical to the proper peration of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing.
NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105).
              "     When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.
If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).
* During winter operations the recire gate is routinely positioned to prevent intake structure freezing. However, when adjusting plant parameters for NPDES compliance, the recirc gate should not be repositioned until the cooling towers are placed in service.
: 4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.
: a.     Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below "0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.
Appendix D OP 2180 Rev. 39 Page 4 of 12
 
APPENDIX D (Continued)
: b. Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity. This will ensure that the plant does not exceed the river capacity.
: c. The River Up/Down Temp. Rise should be maintained below the allowable temperature rise from the Precautions/Limitations based on current up river temperature.
: d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012') is a manually inputted point that is updated by the operator. As up river temperature increases, SYS012 should be changed %/degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed %degree after reaching the next temperature range. For the period October 15 to May 15 TCRIT Temp. Rise Limit is equal to 65F-M036 not to exceed 13.4 AT.
: e. Write a Condition Report for any condition that violates or challenges NPDES limits.
: f. The "TCRIT Delta T Margin" (point ID 'SYS013') is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.
Appendix D OP 2180 Rev. 39 Page 5 of 12
 
APPENDIX D (Continued)
NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105). If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).
: 5. To change the value of the manually inputted points above perform the following:
: 5. To change the value of the manually inputted points above perform the following:
NOTE Changing the value of manually inputted points may impact the margin to TCRIT.a. On the ERFIS computer keyboard, press the 'CAV' button.b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.c. Using the cursor, click on the PTID field.d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.e. Verify PTID updated to appropriate Point ID on 'CAV' screen.f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.g. Verify computer point updated using CRO alarm typer.h. Record ERFIS point ID, original, and final values on plant setting change log.i. Update appropriate block on plant setting change log.j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.Appendix D OP 2180 Rev. 39 Page 6 of 12 APPENDIX D (Continued) t.~i.?. .~.NOTE* If~pla ~t TVon oYf th-e fan sholdl lie utilized:  
NOTE Changing the value of manually inputted points may impact the margin to TCRIT.
" Startingndstopp Tshbiiildbc,ninimized to, revwc.t-excegsive.-.  
: a. On the ERFIS computer keyboard, press the 'CAV' button.
&#xa3;.wear to breakefcontacts.
: b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.
6.IF any of the following ERFIS values are unavailable and upstream river temperature is greater than 51.6*F, OR upstream temperature is <51.6*F and river flow is <1500 cfs, THEN perform either of the actions below per .Operations Manager approval.* USGEN River Flow -C278* River Up/Down Temp Rise -C019 Heat Reject to River -C064* Conn. River Flow -C275* Margin to TCRIT -C276* Instantaneous River Thermal Cap. -C277* Condenser Inlet -F052, F053, F054, F055* Condenser Outlet -F056, F057, F058, F059* East Tower Outlet -F078"* West Tower Outlet -F079 a. IF the plant is at steady state operation and ihe circulating water system is in the open cycle, THEN verify river temperature rise is within limits using the following formula: ATr = 15.193*(MWt rejected)*(River flow in -efs) -Ft~where: MWt rejected (CO51)River flow in cfs =1912*(%CTP)-generator gross MW USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder 1) Independently verify the calculation. (ER991077_05)
: c. Using the cursor, click on the PTID field.
Appendix D OP 2180 Rev. 39 Page 7 of 12 LPC #3 APPENDIX D (Continued)
: d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.
: b. IF the result is not within the ATr limit OR the calculation cannot be performed, THEN place the circulating water system in a hybrid cycle based upon the following assumptions, per Figure 17 for single cooling tower operation or Figure 18 for two cooling tower operation if river temperature is <50&deg;F, or nomographs (Figures 5 through 11) if river temperature is >50&deg;F.1250 cfs river flow* Use last wet bulb temperature, IF within four hours of taking the reading.IF >4 hours have elapsed since taking the reading, THEN obtain actual wet bulb temperature using I&C M&TE equipment or ERFIS point C174, if available.
: e. Verify PTID updated to appropriate Point ID on 'CAV' screen.
0 Obtain river temperature.
: f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.
Use methods in OP 2181, Local Sample Service Water Temperature Monitoring, if normal river temperature indication is not available.
: g. Verify computer point updated using CRO alarm typer.
0 Calculate Instantaneous River Thermal Capacity as follows. For winter operations limit IRTC to <16750 cfs- "F.IRTC = 1250 cfs * (65"F -River Temperature)
: h. Record ERFIS point ID, original, and final values on plant setting change log.
: c. Adjust tower settings per the appropriate Table. Interpolate as follows: 1) Select the table with the appropriate river temperature.
: i. Update appropriate block on plant setting change log.
If the river temperature is not an exact match to any figure, round down to the next lowest rivertemperature.
: j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.
: 2) Select the appropriate river flow. If the river flow is not an exact match to any river flow on the figure, then round down to the next lowest river flow if Figures 17 or 18 are used.3) Select the appropriate IRTC if Figure(s) 5 through 11 are used.4) Select the appropriate wet bulb temperature.
Appendix D OP 2180 Rev. 39 Page 6 of 12
If the wet bulb temperature is not an exact match for any wet bulb temperature on Figure 17 or 18, then proceed as follows: If wet bulb temperature is >30 0 F, round up to the next highest wet bulb temperature.
 
0 If wet bulb temperature is <30%F, round down to the next lowest wet bulb temperature.
APPENDIX D (Continued)
Appendix D OP 2180 Rev. 39 Page 8 of 12 APPENDIX D (Continued)
NOTE
: 5) For Figure 17 or 18 initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows: 0 Ilyb: This means hybrid mode.0 FOO: This means fans and the two numbers indicate the number fans required to be running.S G000: This means recirc gate and the two numbers indicate recirc gate position.* For example on Figure 17 or 18, an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.6) For Figure 5 through 11 make initial tower settings per the nomograph.
* If~pla ~toYf                      th-e fan sholdl lie utilized: "
: d. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.NOTE Plant Setting Change Log must be completed daily. (ER981657 02)7. Maintain Plant Setting Change Log as follows: a. Daily, at 0000, record the following:
TVon Ueu*&#xfd;'uSe; t.~i.?. .~.
Startingndstopp Tshbiiildbc,ninimized to, revwc.t-excegsive.-. &#xa3;.
wear to breakefcontacts.
: 6. IF any of the following ERFIS values are unavailable and upstream river temperature is greater than 51.6*F, OR upstream temperature is <51.6*F and river flow is <1500 cfs, THEN perform either of the actions below per .Operations Manager approval.
* USGEN River Flow - C278
* River Up/Down Temp Rise - C019 Heat Reject to River - C064
* Conn. River Flow - C275
* Margin to TCRIT - C276
* Instantaneous River Thermal Cap. - C277
* Condenser Inlet - F052, F053, F054, F055
* Condenser Outlet - F056, F057, F058, F059
* East Tower Outlet - F078"
* West Tower Outlet - F079
: a. IF the plant is at steady state operation and ihe circulating water system is in the open cycle, THEN verify river temperature rise is within limits using the following formula:
ATr = 15.193*(MWt rejected)
                                        *(Riverflow in -efs)-
Ft~       where:     MWt rejected (CO51)         1912*(%CTP)-generator gross MW River flow in cfs =        USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder
: 1)     Independently verify the calculation. (ER991077_05)
Appendix D OP 2180 Rev. 39 Page 7 of 12 LPC #3
 
APPENDIX D (Continued)
: b. IF the result is not within the ATr limit OR the calculation cannot be performed, THEN place the circulating water system in a hybrid cycle based upon the following assumptions, per Figure 17 for single cooling tower operation or Figure 18 for two cooling tower operation if river temperature is <50&deg;F, or nomographs (Figures 5 through 11) if river temperature is >50&deg;F.
1250 cfs river flow
* Use last wet bulb temperature, IF within four hours of taking the reading.
IF >4 hours have elapsed since taking the reading, THEN obtain actual wet bulb temperature using I&C M&TE equipment or ERFIS point C174, if available.
0       Obtain river temperature. Use methods in OP 2181, Local Sample Service Water Temperature Monitoring, if normal river temperature indication is not available.
0       Calculate Instantaneous River Thermal Capacity as follows. For winter operations limit IRTC to <16750 cfs- "F.
IRTC = 1250 cfs * (65"F - River Temperature)
: c. Adjust tower settings per the appropriate Table. Interpolate as follows:
: 1)     Select the table with the appropriate river temperature. If the river temperature is not an exact match to any figure, round down to the next lowest rivertemperature.
: 2)     Select the appropriate river flow. If the river flow is not an exact match to any river flow on the figure, then round down to the next lowest river flow if Figures 17 or 18 are used.
: 3)     Select the appropriate IRTC if Figure(s) 5 through 11 are used.
: 4)     Select the appropriate wet bulb temperature. If the wet bulb temperature is not an exact match for any wet bulb temperature on Figure 17 or 18, then proceed as follows:
If wet bulb temperature is >30 0 F, round up to the next highest wet bulb temperature.
0       If wet bulb temperature is <30%F, round down to the next lowest wet bulb temperature.
Appendix D OP 2180 Rev. 39 Page 8 of 12
 
APPENDIX D (Continued)
: 5)     For Figure 17 or 18 initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows:
0       Ilyb: This means hybrid mode.
0       FOO: This means fans and the two numbers indicate the number fans required to be running.
S     G000: This means recirc gate and the two numbers indicate recirc gate position.
* For example on Figure 17 or 18, an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.
: 6)       For Figure 5 through 11 make initial tower settings per the nomograph.
: d. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.
NOTE Plant Setting Change Log must be completed daily. (ER981657 02)
: 7. Maintain Plant Setting Change Log as follows:
: a. Daily, at 0000, record the following:
* River Temperature Correction Factor (supplied by Operations management)
* River Temperature Correction Factor (supplied by Operations management)
* M036 ("UPRIVER TEMPERATURE")
* M036 ("UPRIVER TEMPERATURE")
0 SYS010 ('"USGEN RIVER FLOW C278," CFS), 0 SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and* SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management) 0 C275 (CONN RIVER FLOW)0 C278 (USGEN RIVER FLOW)Appendix D OP 2180 Rev. 39 Page 9 of 12 APPENDIX D (Continued)
0       SYS010 ('"USGEN RIVER FLOW C278," CFS),
0       SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and
* SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management) 0       C275 (CONN RIVER FLOW) 0       C278 (USGEN RIVER FLOW)
Appendix D OP 2180 Rev. 39 Page 9 of 12
 
APPENDIX D (Continued)
: b. Log any of the following:
: b. Log any of the following:
0 Major changes to Plant settings (system mode, number of operating fans, recirc gate position).
0     Major changes to Plant settings (system mode, number of operating fans, recirc gate position).
0 Plant settings based on anticipated Vernon Dam load changes per Step 3.0 Unannounced Vernon schedule changes.0 Other information pertinent to plant settings.0 Changes in manually inputted data per Step 5 above.0 When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.c. If plantconditions exist that cause concern about Margin to TCrit for any given hour, perform the following:
0     Plant settings based on anticipated Vernon Dam load changes per Step 3.
: 1) Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).2) Attach graph to log.d. At midnight each day, perform the following:
0     Unannounced Vernon schedule changes.
: 1) Calculate-the.number-of hours the cooling towers were operated-that-day, to the nearest whole hour.a) Log the number as part of the last log entry for that day"total for the day." 2) Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day. The"running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.)143 "running total for the month"+ 16 "total for the day" entry at 2400 &next day entry at 0000 159 "running total for the month" Appendix D OP 2180 Rev. 39 Page 10 of 12 APPENDIX D (Continued)
0     Other information pertinent to plant settings.
: 3) Turn over the log. SM/CRS approve the log. Print an official copy of the log.4) Print a copy of the following and attach to previous day's log:* Trend 70* Trend 71 5) Forward previous day's log and trend graphs to Operations Administrative Assistant.
0     Changes in manually inputted data per Step 5 above.
: 8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings.
0     When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.
Changes to plant settings shall be documented on VYOPF 2180.05, PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.a. If the network/software becomes unavailable, perform the following:
: c. If plantconditions exist that cause concern about Margin to TCrit for any given hour, perform the following:
: 1) Maintain the log on VYOPF 2180.05.2) Submit a Condition Report.3) When the log software has been restored, enfer the log in the software in a timely manner.Appendix D OP 2180 Rev. 39 Page 11 of 12 APPENDIX D (Continued)
: 1)     Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).
: 9. Listing of Project Save ERFIS Computer Points POINT ID DESCRIPTION UNITS C019 RIVER DOWN/UP TEMP RISE F C051 COND HEAT REJECTION MW C064 HEAT REJECT TO RIVER CFSF C102 NUMBER OF CIRC:WATER PUMPS ON C103 NUMBER OF CIRC BOOST PUMPS ON C275 CONN RIVER FLOW CFS C276 MARGIN TCRIT DEG F C277 INST RIVER THERMAL CAPACITY CFSF C278 USGEN RIVER FLOW CFS F052 CONDENSER 1A CIRC WATER INLET DEG F F053 CONDENSER 2A CIRC WATER INLET DEG F F054 CONDENSER 1B CIRC WATER INLET DEG F F055 CONDENSER 2B CIRC WATER INLET DEG F F056 CONDENSER 1A CIRC WATER OUTLET DEG F F057 CONDENSER 2A CIRC WATER OUTLET DEG F F058 CONDENSER 1B CIRC WATER OUTLET DEG F F059 CONDENSER 2B CIRC WATER OUTLET DEG F F078 CIRC WATER OUT COOLING TOWER A DEG F F079 CIRC WATER OUT COOLING TOWER B DEG F F084 CW INTAKE GATE A POSITION F089 CW INTAKE GATE B POSITION I I F090 CW INTAKE GATE C POSITION F085 CW RECIRC GATE POSITION M036 UP RIVER TEMPERATURE DEG F M037 DOWN RIVER TEMPERATURE DEG F SYS010* USGEN RIVER FLOW C278 CFS SYS012* TCRIT RIVER TEMP RISE LIMIT DEG F SYS013* TCRIT DELTA T MARGIN DEG F* Manually entered per Operations Management's Direction]
: 2)     Attach graph to log.
Appendix D OP 2180 Rev. 39 Page 12 of 12 COOLING TOWER CHECKLIST I. Construction work on cooling towers complete.2. Maintenance on CWB pumps complete; pumps are operable.3. Maintenance on CWB pump ACBs complete.4. New seal water filters installed for CWB pumps, spare filters available.
: d. At midnight each day, perform the following:
: 5. Intake, recirc and bypass gates are operable.6. Preventive maintenance on cooling tower fans scheduled for completion during initial tower wetting (oil samples, vibration readings and amp readings).
: 1)     Calculate-the.number-of hours the cooling towers were operated-that-day, to the nearest whole hour.
: 7. Instrumentation calibrated and operable to support cooling tower operations.
a)     Log the number as part of the last log entry for that day "total for the day."
: 8. Hypochlorite and acid systems available for pH control and chlorination.
: 2)     Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day. The "running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.)
: 9. CW system WRs and tagging orders reviewed for impact.10. Fan Balancing completed if required; fans are operable.11. Initial tower wetting performed prior to normal cooling tower operation.
143 "running total for the month"
INITIAL/DATE
                                        + 16 "total for the day" entry at 2400 &
//////////Comments/Exceptions:
next day entry at 0000       159 "running total for the month" Appendix D OP 2180 Rev. 39 Page 10 of 12
 
APPENDIX D (Continued)
: 3)       Turn over the log. SM/CRS approve the log. Print an official copy of the log.
: 4)     Print a copy of the following and attach to previous day's log:
* Trend 70
* Trend 71
: 5)     Forward previous day's log and trend graphs to Operations Administrative Assistant.
: 8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings. Changes to plant settings shall be documented on VYOPF 2180.05, PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.
: a.     If the network/software becomes unavailable, perform the following:
: 1)     Maintain the log on VYOPF 2180.05.
: 2)     Submit a Condition Report.
: 3)     When the log software has been restored, enfer the log in the software in a timely manner.
Appendix D OP 2180 Rev. 39 Page 11 of 12
 
APPENDIX D (Continued)
: 9. Listing of Project Save ERFIS Computer Points POINT ID                 DESCRIPTION                   UNITS C019         RIVER DOWN/UP TEMP RISE                     F C051         COND HEAT REJECTION                       MW C064         HEAT REJECT TO RIVER                       CFSF C102         NUMBER OF CIRC:WATER PUMPS ON C103         NUMBER OF CIRC BOOST PUMPS ON C275         CONN RIVER FLOW                             CFS C276         MARGIN TCRIT                             DEG F C277         INST RIVER THERMAL CAPACITY               CFSF C278         USGEN RIVER FLOW                           CFS F052         CONDENSER 1A CIRC WATER INLET             DEG F F053         CONDENSER 2A CIRC WATER INLET           DEG F F054         CONDENSER 1B CIRC WATER INLET             DEG F F055       CONDENSER 2B CIRC WATER INLET             DEG F F056         CONDENSER 1A CIRC WATER OUTLET           DEG F F057         CONDENSER 2A CIRC WATER OUTLET           DEG F F058         CONDENSER 1B CIRC WATER OUTLET           DEG F F059         CONDENSER 2B CIRC WATER OUTLET           DEG F F078         CIRC WATER OUT COOLING TOWER A           DEG F F079         CIRC WATER OUT COOLING TOWER B           DEG F F084         CW INTAKE GATE A POSITION F089         CW INTAKE GATE B POSITION             I           I F090         CW INTAKE GATE C POSITION F085         CW RECIRC GATE POSITION M036         UP RIVER TEMPERATURE                     DEG F M037         DOWN RIVER TEMPERATURE                   DEG F SYS010*     USGEN RIVER FLOW C278                     CFS SYS012*     TCRIT RIVER TEMP RISE LIMIT               DEG F SYS013*     TCRIT DELTA T MARGIN                     DEG F
* Manually entered per Operations Management's Direction]
Appendix D OP 2180 Rev. 39 Page 12 of 12
 
COOLING TOWER CHECKLIST INITIAL/DATE
                                                                              /
I. Construction work on cooling towers complete.
                                                                              /
: 2. Maintenance on CWB pumps complete; pumps are operable.
                                                                              /
: 3. Maintenance on CWB pump ACBs complete.
: 4. New seal water filters installed for CWB pumps, spare filters         /
available.
                                                                              /
: 5. Intake, recirc and bypass gates are operable.
: 6. Preventive maintenance on cooling tower fans scheduled for completion during initial tower wetting (oil samples, vibration         /
readings and amp readings).
: 7. Instrumentation calibrated and operable to support cooling tower       /
operations.
: 8. Hypochlorite and acid systems available for pH control and             /
chlorination.
                                                                              /
: 9. CW system WRs and tagging orders reviewed for impact.
                                                                                /
: 10. Fan Balancing completed if required; fans are operable.
: 11. Initial tower wetting performed prior to normal cooling tower operation.
Comments/Exceptions:
Checklist Completed:
Checklist Completed:
Print/Sign Date VYOPF 2180.02 OP 2180 Rev. 39 Page 1 of 1 PLANT SETTING CHANGE LOG Date: C275 CONN SYS013 TCRIT DELTAT MARGIN RIVER FLOW C278 USGEN M036 UP RIVER TEMPERATURE RIVER FLOW SYS010 (C278 USGEN RIVER TEMPERATURE RIVER FLOW) CORRECTION FACTOR SYS012 TCRIT RIVER M036 + RIVER TEMPERATURE TEMP RISE LIMIT CORRECTION FACTOR RIVER TEMPERATURE (CIRCLE ONE) INCREASING STEADY DECREASING TIME ENTRY INITIALS 0500 RO 1700 RO (Print/Sign)
Print/Sign                          Date VYOPF 2180.02 OP 2180 Rev. 39 Page 1 of 1
CRS (Print/Sign)
 
SM (Print/Sign)
PLANT SETTING CHANGE LOG Date:
SM (Print/Sign)
C275 CONN                              SYS013 TCRIT DELTAT MARGIN RIVER FLOW C278 USGEN                              M036 UP RIVER TEMPERATURE RIVER FLOW SYS010 (C278 USGEN                      RIVER TEMPERATURE RIVER FLOW)                            CORRECTION FACTOR SYS012 TCRIT RIVER                      M036 + RIVER TEMPERATURE TEMP RISE LIMIT                        CORRECTION FACTOR RIVER TEMPERATURE (CIRCLE ONE)      INCREASING        STEADY  DECREASING TIME                              ENTRY                                  INITIALS 0500 RO                        CRS                          SM (Print/Sign)                (Print/Sign)              (Print/Sign) 1700 RO                        CRS                          SM (Print/Sign)              (Print/Sign)              (Print/Sign)
CRS (Print/Sign)(Print/Sign)
VYOPF 2180.05 OP 2180 Rev. 39 Page 1 of I
VYOPF 2180.05 OP 2180 Rev. 39 Page 1 of I FIGURE 1 HYDRAULIC GATE DIRECTIONAL CONTROL VALVE INSERT PHILLIPS SCREWDRIVER INTO THE APPROPRIATE DIRECTIONAL CONTROL VALVE TO RE-POSITION GATE: Figure 1 OP 2180 Rev. 39 Page 1 of I FIGURE 2 GENERAL ELECTRIC PSYCHROMETRIC CHART 1-1 GENERAL* ELECTRIC PSYCHROMETRIC CHART*1*Barometric Pressure 29.92" Hg.Dow Potint 85 CUP: Figure 2 OP 2180 Rev. 39 Page 1 of I FIGURE 3 WET BULB TEMPERATURE (F) BASED ON DRY BULB (F) AND DEW POINT (F) TEMPERATURES Dry Dew Point bulb 10 20 25 30 35 40 45 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 95 10 10 20 18 25 21 2 30 24 27 28 30 35 27 30 31 33 35 40 30 33 34 36 38 40 45 33 35 37 38 40 43 45 50 36 38 39 41 43 45 47 50 52 38 39 41 42 44 461 4 8 52 54 39 40 42 43 45 47 49 52 53 54 56 40 42 431 44 46 48150 52 54 55 56 58 41 43 44 45 47 48 51 53 54 5657 58 60 42 44 45 46 48 49 52 54 55 56 58 59 60 62 44 45 46 47 49 50 52 55 56 57 58 59 6t 62 64 45 46 47 48 50 51 53 56 57. 58 59 60 616 64 66 46 47 48 49 51 52 54 56 57 58 60 61 62 63 65 66 68 47 48 491 50 52 53 55 "57 58 59 60 61 63 64 65 67 68 70 48 50 50 52 53 54 56 58 59, 60 61 62 63 64 66 67 69 70 72 50 51 52 53 54 55 57 59 60 61 621 63 64 65 66 68 69 71 74 51 52 53 54 55 56 58 60 61 61 62 63 65 66 67 68 70 71 73 74 76 52 531 541 55 56 57 59 61 61, 6
 
FIGURE 1 HYDRAULIC GATE DIRECTIONAL CONTROL VALVE INSERT PHILLIPS SCREWDRIVER INTO THE APPROPRIATE DIRECTIONAL CONTROL VALVE TO RE-POSITION GATE:
Figure 1 OP 2180 Rev. 39 Page 1 of I
 
FIGURE 2 GENERAL ELECTRIC PSYCHROMETRIC CHART 1-1 GENERAL*                ELECTRIC
                                                  *1*
PSYCHROMETRIC CHART Barometric Pressure 29.92" Hg.
Dow Potint 85 CUP:
Figure 2 OP 2180 Rev. 39 Page 1 of I
 
FIGURE 3 WET BULB TEMPERATURE (F) BASED ON DRY BULB (F) AND DEW POINT (F) TEMPERATURES Dry                                                              Dew Point bulb    10  20  25    30  35  40  45  50  52  54  56  58  60 62 64    66  68  70  72  74  76  78  80  82    84  86    88 90 95 10    10 20    18 25    21        2 30    24  27  28    30 35    27
FIGURE 7 (Continued)
FIGURE 7 (Continued)
[EPU -Summer Operation Nomograph River Temperature 59'F -62.9 *F (1912 MWth, 200 hp Fans) ]OpenCycle r -! G.I ans:,00 circ...
[EPU - Summer Derate Nomograph River Temperature 59&deg;F - 62.9 'F (1912 MWth, 200 hp Fans)I 1915 1910 1905 1900 1895
! ..#Fahs: 00 .. 4. I ..........
) 1890 1885 0 1880 1875 1870 1865 1860 00" it,       61            40 q'v          'q?          q~            ~  &
I ...... ... ..........  
O 000 00,0  000  000 000  0-9o      000  0"0  000 "00 000    000    0o  "000 River Thermal Capacity (cfr-F)
.......N Recic. 4ate &deg;*siti-n -41 Fa 7s on#Fans: 02 -- ..........................................  
Figure 7 OP 2180 Rev. 39 Page 3 of 3
...... ..............
 
".. .......'' ". .... .....#Fan s: 04 1 ........." .........
FIGURE 8 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 63.0-65.9 0 F Summer Operation Nomograph River Ten erature                                        63F - 65.97&#xfd; (1593 MWth. 200 hp Fans) ope22cycle                                                neCLVC.
2..........  
                *Vanus    00_..4...                                                         Gate oaf                        d          I                  I~                      T                  1 .                     ..
.........  
        #Pan-            00      %!R~cr4. .         .....       . Gftt Position  I .........       . .......F*-
..... .........  
                                                                                                                -'Alt~          ...       on!  ...........           ........         ; ...     ..........                   *]                                    .'<
.i... ..... I ......... ."..... .I"Y 0. ..... ..... .........#Fans: 6 4 ..... .. ...................  
        #Pan:*        :02                ...........                         ...........                           ..........     ........... ...........                               .                                     ............                         ....         ....... J.
.........  
t1ans,            04                                  ..........                     .......
..........  
                                                                                                    ....... ..         -..             4........                     ....                                                                                                     ..
......................  
3"."...................             "                ;              *-.
-4 .".-'. 4.4- / ... ..../. ........"Fa": 16 " ":..... ! ... "..-'...."......
      #Pans:             o0  --- t .......                   ....                 ...........       ..........     ...........             ....             ........
0F , s -.............  
o0          "                    *. .             . ........                                           ......                                                                       ...                           .........       .             . ..
...... ....................  
      *F;nm:14                -    -.-........... ";........ --......
... .................  
                                                                                                                                                                                                          . ........ ........                             *            #/"..............
..... ..... .....-....  
        .*Fans: 06                                                                  ......... t-                                                                                                                                        .                                               . ............
....#Fans: lo 4 .........  
      "b                11..                                                                                                                                                                                                                                                                 ...........
..........  
      #Fans: 122-                --- .                        ........                                                                                                                                                                                                                   . ..".-.......
..........  
  %i    e og          ~10 .         .         J          .           J      .....
..........  
4    .     .       .4..f                                                                                  ..                                               ..........
; .........  
      #    .     t, z 14                                                                                                                                                                                                                                3 .... -      ...   ...... .---    ...........
........ 4. .... ........ .... -... ..... ... ........ ..........
      #Fans:          501.                                           ............                 .                                                                                       ....................                                                 .....
WFans: 22 20 At -."...............  
1
..........  
  %G#atePo: 60 fen s        2 0      .
.... .....- --- ....... ..... C ...... " ........ ...... ... ..............  
4...
...10 , i .4.-' * ." " -" :: /_ __ __," s: ......................  
                                                                                                                                                                                                                      ... 1 4 .....4 ... .............
...#Fas 14 .. ...- ., :...... .... ...., 70.. .......................  
  %GatePost 20                  "            .ji                                                                                                                                                                                        ............... ".....................
.. ..........  
lGatllepow:          40                                                                                                            ..       i        ......_.. .......                                     ..................
.. ........ ...........
boat~epoe:            50                                . ......*.... ......                     .......... ,- .......... ........... 4 ..... ..... }.......... 4..                         . ...             ...... .......... . .    ......... ........... ;........... ;...........     ... .3...
#Pans: 0 ..#Fan s: 18 -.........  
I V
.... ..... e... .. .---:'"........  
  %GatePox:            70    - 4....     ......... ........             -- . ..... ......     t                                                                                                        ......                                           ........           ...................
.. ... .. ... .-.......  
              %Gstp 0        - 1................ ,. . .......... ..... .                                                 ...-      ...       ....!.......... ........... ...           -- ...--..................... .......... ........ ... ......... >............
&#xf7; ..... ... ..-......  
  %Gat.eposi 90              ..       ........... ,.. .......                 :...............           v-..
... ........*.. ... -.. .........
:....           ....t....             *.... ......-      ........ ...i.......... *.......... -........... ............
......... ........-...
3000                  4000              5000              6000              7000          8000          9000            10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal                              Capacity (cfa-F)
:..........-H#Fan s: 20 .' .-...-'." .........  
Figure 8 OP 2180 Rev. 39 Pagel1 of3
..................  
 
....-. ...... ..... .......%Gte ~ ~ .... ... .............
FIGURE 8 (Continued)
#Fa ns:e 22 ...... ... .............  
[EPU -. Summer        I                            Operation Nomograph River Temperature 63*F - 65.9 'F (1912 MWth, 200 hp Fans) ]
...... ... .... ..........
OpenCycle                FCs 1                                    Gate                                                                                          :                'o*ed*
% atepos: ......-0 I ... ... ... ..........
      #Pans: 00          ....... ...... f........... )........... I........... F........... ........... ........... ........... ........... ........... ; .......... 4 ........... *.* _                                                                              * .
...... ....... ... .... ... ..% G a t e ~ o 3 0 _ .T .... ..". .. .......Closee ." 1 ..... ... .. ...OP 21. Rev..39 GatePos 40 ..... ............  
      #Fans: 02                ........................at4 Po,,i~on
..........  
                        *,:Reelr.                                                  .... -::Al                  Fvna, on:                                                                ..........                      ..          "..*ET.-'.''f '-..-
..........  
          *Fann:04                  ..... .........-...                                      . .............                                                                                                                  .
..........
      #FansB:06-i                      4                                                                ....      .....................                            ~.! ................                          .                                ,
....... .........
      #Fans: 06          ....".......          ........... t........... .......... ".......... "........... t                              ...........                                                                                                                .........
..........
Fans:    0                      .......          .. ........... , .......... ............ ...........                                        ..
i ..........  
                                                                                                                                                      .                                                                        ...... . .... ..-.. i...........        ......
..........  
      #Fans: 10      ...........                        ...........
.........  
                                                                .. . .......                                  ..... "          -- .... ... .... .                  .44. ......                        -.
.........  
1.- .
..........
18 .
P.........
      #Fans. 1Fan:2        F                :                        .g.....'".....................                                  .f".
.........  
:. !                  iWet-tulb -'20F                    ...................  .0        U......                                                      O                        - 70F.                                    8iDv/
...........  
      #Fans- 16 -. *........... ....
... .. .V .. .... ...........
      #Fans, 14                ....
                                                                                                                                                      ...      .... ....                                &#xfd;. . .......              .                Y ......
*:  ~ ~#Fans- 18                            ".....                                                    ...... .-.'--          ...........      ... -*".. ". .... .... ......... -," ...... ... ........... .--..                          ...... .......... *.....
10                                              .      ....  :.-.      ...                                                                                                                                                                        .'...-......
      #Fans: 20                                                                                                                    ..          I                                    ....                              .      .    ...                .        ..        ....
Os                22  ..........                                        ..    ".......                                              ......            ...".. ----                                                .......-.......                          ...-'
  %GatePo:s 10      -.                                                                                          ....            .        .....                  '                                                                                                        .....
  %GatePou: 20                                                                                              ..        ......          .-          . ........                    .        ...............
    %G tePos: 30      ---          .- *-" .. ,- "                    ......                              ..                                        . ....            :.............              ....-              .......... ........... -.      .......... ............
  %Gatt  osI 40 60 ...%Oa~~~~~e.......
70.........~ 2                              14.......
2                  -........-- .........      ".........
  %Gates        80....
  %Gat:ePos: s0o ...                  ....... .......... ........... *.......... ............ *............. ............ .. ......... ........ ... .                                    ........ ............. *..........-t............*..............            ...........
          %Gate~~ou:..                                    .... .............                                                                                                                                                                        I      .
Wa        , .os 0 ... ........... .......... .              ......... ........... ........... ............ *.......... ...... .................*........ . ........... ........... ........... .......... ............
tGatepos.      90 ..      ........... ..... ..... ........... i........... .....                                ........... i ......... .. ......... .......... * ........ ............ ........... : ........... ........... ; ..........
ClosedCycle                                                                                                    I        -jI I                I                I                I                I            .                              IiI 00                        %                                          0%              0              %
0,                                                0"          r                        0                  00              0 0 % 0                            0                          0o        '1 0%
River Thermal Capacity (cfs-F)
Figure 8 OP 2180 Rev. 39 Page 2 of 3
 
FIGURE 8 (Continued)
[EPU *'Summer Derate Nomograph River Temperature 63&deg;F - 65.9 *F (1912 MWth, 200 hp Fans) ]
1920                          T                                              .
1910              .... "...........
T                  ..
1900      -.. '- .        .                        .-.
            -757                    0                              5j.WtF~
1880 -4........                                                            .............                          .            .--.......    . .......... ;.            ....    =.-...... ............. 4-.....              ............ ..........
1870 i*....          ...    ....      . ....          ..            .                                            .2.... ....
180                                  .....    .'-.                      ..          ...                :.:.:....
1830 ............ ....
1860          --                    ..
                                                  ------..                      - . .. ........... ........... ,.... * .... .i. . . .,...... ............ ?- - -......... .... ........
1...        ..                                  .........
179                                                                              ........                                          ...... .                  *                  ;              I........ .....
178le0 1 8 10.
                    -/-.......      2 ------------.....                I I T....      : "        ...                .....:.. ......... i"..... ....          -- .:2 -........- .... ... . +.                          :.          .........
1770                ......-        4 ........ -              ----......                                                                                                    ....            .......        --        --.....
176            .*            .........        .---  .-            ...        .....        $................    :........        .*  -*.-._                ...............
                                  .,1                                2 1750                    .......:l:2 .......              ..    ..--.            .
                                                                                                            . .-              ............ l ..      .. 4 ......      *:**
01*                                                          00                                                          0.
17810                                                                  b--.                                                                                            ti 2OP                                                                                                                                                        218      Rv        39.
1740      .... &#xf7;.........                                                                                                    1                                -- '------: .........                            ....."'              Page 3....
                                                                                                  + iOP    *o                                                                                                                          Pae 2180.Rev. 3
 
FIGURE 9 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 66.0-69.9 0 F Sunmmer Operation Nomograph River Temperature 66F - 69.9F (1593 MWth, 200 hp Fans) opencycle          #!an                4    Recac. Gate Cl.4ed
      #Fans: 00        -...                    !.................
      #Fans: 02                  .... ....... t.... .................. ........... .....                    .        ...      ..    ..........                      .      ...          ......    ......                    .'            ...........
      #Fanst 04                                                                                    ......................
      #Fans: 06        .....:........... I........... ...... . ........ .......... ; ..                                                                                                                ......    .......... .--  ........ ...........
      ,Fan o,lO0i
      #Fanst 08                                .............    ....
                        . ........... .-. ................ . ..... .........        __..  "......              ---....                    ....  .... /..                    :........."      ............  ...............
                                      #Fans 12 10...................                          .. ..........&#xfd;:                                            .            ...... .-
          #Fans:.......
      #Fans:    24 12                          "                                  ......... .....              .....
i ;A.....:.....                          ............                                    .........
      #Fanst 14 tm    #*Fans 186..
                          # m n 20.... . ..........                                                                            . -........................        -.... . ....... ....... . ............. ....... .. ........... ............
      #Fans      2.              .                  .........
20 2~ns                                                                                                ...    ........
W  ~tea
    %Ga          320 a: 2 10..          .........................
  ,.atePoss      40                          K.                        .  "."......                                      .....                      .                          .-                ..........                              .....
  %GatePos 30
  %GatePos:        0  ..........                                                          .......
                                                                                                                                      ........... .......... ........... ........... .. ...3.......... ...                            . 3.............
                          %Ca.......70..                                                                    :........                              :
  %kGatePos- 70                          -4 ........... ........... ........... ........... ........... ........... , ...........  -----                ...........        ........
  %GatePos:
  %GatePos: 860    0            ........... ...... ..... ........... ........... ;........... ........... ;............ ........... ;...........    ----- ;........ ... ........... ........... ........... ...........      ...            ....
        %Gate~os= 90 90      .....*........... :...........
                                              .atePo..          . ......... . ........... :............. ........... }............* ........... ............ "............ .......... ............ ........... ............                  ...........
ClosedCycle              l                                l            I            I              I ,                      L            1              .1            .1 3000            4000            5000            6000        7000            8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfs-F)
Figure 9 OP 2180 Rev. 39 Page 1 of 3
 
FIGURE 9 (Continued)
[EPU - Summer Operation Nomograph River' Temperature 66&deg;F - 69.9 *F (1912 MWth, 200 hp Fans) ]
I OpenCycle          #:                                                                                  .                      .                .                  .              .                  .                .
    #,ans        0  ..                    . ........... ......... . e c..........        .............      ..          ......... ...........                    ....................            ...........              .........
iFann0  o&deg;&deg;......o........                                                                ................                    ............                  &deg;........
          #Fns 02    -                                                                                                                                                                                      ...      ..          :::
    #Fans: 04
    *Fans: 06        .                    *
    #Fans: 08            ...........            I........... t..........                      .......        .......            .......                                                                                                                ...........                .
    #Fan : 08. ..        .... ....    ........... .            ..........
                                                    .10  ....-............                                                                                                                              LFns                                                .......
Pann        0            .... ...........              .12..........                  ...
                                                                                                                                                                                                                                              .......      I....                ..........
    #Fans:      15                                                                              ,.                                                                                                            .    .      .      ....        e.. .........
    #Fans: 14                .............." . :"'.....      . .....-.                                                                  ........              . ....... ,.................                              ............      "...............                  .... . ...
aFans: 10                                                                                                                                  ...                                              ....... .......            ........                                  .....      '......
    #Fa ns: 10                                                                                                                                    ..                                                                                                                              .. ..... ..
%Ga.ePos 4.0 ....
70.-..
q....... . .... ....!.....i.........
%Hateaos: 20
%GatePos:      10                                                                                                                                                                                          ...                                                .....
        %Gateft s: 30                                                                ..        .      .,...            ..              o.    ......                      *.o..o            .*    ,    .. ......
                                                                                                                                                                                                          . ... ............ *....o..        ...... .o.. .        ... .      ...,.........
%GatePos:
%GatePos:
6o -t ........-.
%Ga te os: so  90 . ...  .i.......... *........... .........................
..........
                                                              ........... . ........... i........... ..      ........... i...........            J........... .
.......... , .........
                                                                                                                                          ...........                    ........... i........... i.......... !..........."...........    ............ .:.......... ............
.........
%Ga t oe,o:    60 . i .......... ....4.......... I........... ............. i........... i.......... :... ........ i........
..........
.......... .........
:........
......... ......... .............
..........
..........
.-.........
:..........
..........
%GatePos:
70 i ..........
..........
.........
...... .........
..........
..........
.........
........ ..........
..........
.........
..........
..........
..........
..........
%GatePo ,s o 80 .....- .....r .. ....... ..... ... .........
.....i.. ... ." ....... .. ...... ..........
..........
i..........
i.........".:
..... ... T.........
i...........i
.........." %Gatepos:
go .. ....... ..........
-- .........-
.........
-4 .........
I ..........
..........
,..........
.........
..........
..........
i..........
.........
i..........
,..........
ClosedCyule
! I I I, River Thermal Capacity (cfa-F)Figure 7 OP 2180 Rev. 39 Page 2 of 3 FIGURE 7 (Continued)
[EPU -Summer Derate Nomograph River Temperature 59&deg;F -62.9 'F (1912 MWth, 200 hp Fans)I 1915 1910 1905 1900 1895) 1890 1885 0 1880 1875 1870 1865 1860 it, 00" O 61 40 'q? q'v q~ & ~000 00,0 000 000 000 0-9o 000 0"0 000 "00 000 000 0o "000 River Thermal Capacity (cfr-F)Figure 7 OP 2180 Rev. 39 Page 3 of 3 FIGURE 8 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 63.0-65.9 0 F Summer Operation Nomograph River Ten erature 63F -65

Latest revision as of 03:29, 14 March 2020

VYNPS Operating Procedure OP 2180, Revision 39, Circulating Water/Cooling Tower Operation
ML061730314
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/27/2006
From:
Vermont Yankee
To:
Office of Nuclear Reactor Regulation
References
%dam200610 OP 2180, Rev 39
Download: ML061730314 (117)


Text

VERMONT YANKEE NUCLEAR POWER STATION I ~OPERATING PROCEDUIRE OP 2180 0 (ý -I REVISION 39 CIRCULATING WATER/COOLING TOWER OPERATION USE CLASSIFICATION: REFERENCE RESPONSIBLE PROCEDURE OWNER: Manager, Operations REQUIRED REVIEWS Yes/No E-Plan 10CFR50.54(cD No Security 10CFRS0.54(p) No Probable Risk Analysis (PRA) , No Reactivity Management No LPC Effective Affected Pages No. Date 1 03/08/06 Pg I of 52 2 03/13/06 Pg 47 of 52 3 04/10/06 Pgs 18, 28, 32, & 39 of 52; Appendix B pg 6 of 10; Appendix D pgs 1 & 7 of 12 4 05/09/06 Pgs 30 & 35 of 52 5 05/23/06 Pg 32 of 52 Implementation Statement: N/A

(

1 EPfct I Effec-tive Date: 02/27/06 OP 2180 Rev. 39 Page 1 of 52 LPC #1

TABLE OF CONTENTS PURPOSE .......................................................................................................................................................... 4 DISCUSSION .................................................................................................................................................... 4 ATI'ACHM ENTS ............................................................................................................................................. 7 QA REQUIREM ENTS CROSS REFERENCE ......................................................................................... 7 REFERENCES AND COM M ITM ENTS .................................................................................................... 8 PRECAUTIONS/LIM ITATIONS ..................................................................................................................... 9 PRE RE QUISITES ........................................................................................................................................... 12 PROCEDURE .................................................................................................................................................. 14 A. Hydraulic Gate Control System - Intake and Discharge Structures (Startup) .................. 14 B. Intake/Discharge Structure Hydraulic Gate Local Control System ......................... .............. 14 C. Startup of Circulating Water System ............................................................................... 15 D. Operation of Vacuum Priming System ............................................................................ 19 E. Shifting from Open to Hybrid Cycle M ode ..................................................................... 19 F. Shifting from Hybrid to Closed Cycle M ode .................................................................. 22 G. Shifting from Closed to Hybrid Cycle M ode .................................................................. 24 H. Shifting from Hybrid to Open Cycle M ode ..................................................................... 26 I. Operation of Circ W ater Traveling Screens ..................................................................... 26 J. Shutdown of Circ W ater/Cooling Towers ........................................................................ 26 K. Circ W ater Sample System ............................................................................................. 27 L. Initial Tower Wetting ......................................................................................................... 28 M. Maintaining Cooling Towers Wet .................................................................................... 33 N. Subfreezing Operation of Cooling Towers ....................................................................... 37

0. Removing Condenser Water Boxes from Service for Maintenance ................................. 39 P. Loss of River Temperature Recorder Sensing Points (M036 or M037) .......................... 41 OP 2180 Rev. 39 Page 2 of 52

Q. Total Loss of River Temperature Indication .................................................................... 42 R. Hydraulic Gate Control System - Intake and Discharge Structures (Shutdown) ............. 42 S. Loss of Hydraulic Gate Control System ............... 1.....;..................................................... 42 T. Use of Hotwell for Condensate Storage ............................................................................ 44 U. Operation with Low Vernon Pond Elevation .................................................................. 45 V. Determining and Adjusting Plant Settings ....................................................................... 46 W. Clearing of Debris from Intake Trash Racks ..................................................................... 47 X. Operation of Cooling Tower Lights ................................................................................. 48 Y. Individual Cooling Tower Fan Operation ......................................................................... 48 Z. Initial Tower Balancing Post Maintenance or on System Start-up ................................... 49 AA. Circulating Water Traveling Screen Winter Layup ......................................................... 50 BB. Circulating Water Traveling Screen Winter Layup Restoration ...................................... 50 FINAL CONDITIONS .................................................................................................................................... 52 OP 2180 Rev. 39 Page 3 of 52

PURPOSE To ensure proper operation of the Circulating Water System and Cooling Towers by Operations Department personnel.

DISCUSSION The Circulating Water/Cooling Tower Systems provide a flow of water through the main condenser to provide the heat sink needed to condense the steam flowing into the main condenser. Additionally, it is used to control the heat input to the Connecticut River within the prescribed limits to ensure compliance with the NPDES permit thermal limits.

There are three basic modes of operation of the systems:

I. Open Cycle - circulating water from the river passes through condensers directly to the discharge structure and river.

2. Hybrid Cycle - circulating water from the river and discharge structure recirc pipe passes through the condenser and is pumped from the discharge structure by the circ water booster pumps through the cooling towers with part or all of the flow being directed to the river.
3. Closed Cycle - water cooled by the cooling towers is directed back to the intake structure through the recire pipe. A closed path is established and essentially no heat is rejected to the river.

The cooling towers are pre-wetted prior to normal operation and kept wet to maintain structural integrity'during cooling tower fan operation.

Under special circumstances, such as maintenance tests or PMTs, it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting.

To ensure the circ water side of the condenser remains full, a minimum of 2 circ water pumps should be running, and the vacuum priming system is placed in service as necessary to remove air from the condenser water box outlets and the discharge line just upstream of the discharge structure.

In the closed cycle mode, blowdown from the circulating water system can be maintained to control water inventory and solids formation by controlling level in the discharge basin.

Past operating experience has demonstrated that optimum plant performance is best achieved when condenser back pressure is maintained at 1.0 inch HgA. During winter months when icing is a consideration, circ water inlet temperature can be maintained greater or equal to 33°F raised by permitting flow from the discharge to the intake structure via the recirc gate.

OP 2180 Rev. 39 Page 4 of 52

When the Circulating Water System is placed on CLOSED cycle for extended periods, the pH will rise and for this reason, sulfuric acid will be added to maintain pH between 6.5 and 8.5 Standard Units (SU). The heat load on the main condenser will also increase, causing microbiological growth to increase fouling on the condenser tube sheet and tubes. To minimize this biological fouling, the condenser must be periodically treated with algaecide, sodium hypochlorite and sodium bromide, to keep the growth in check. The Chemistry Department is responsible for monitoring and maintaining CW chemistry. The Operations Department is responsible for bulk makeup to the sodium bromide, sodium hypochlorite tank and the sulfuric acid tank. Procedure OP 2181, Service Water/Alternate Cooling Operating Procedure, covers bulk makeup to these tanks.

[EPU - During the winter permit period, at EPU conditions, when the river flow is less than 1500 cfs, hybrid mode is required. For river temperatures 50*F or less, hybrid mode may be used depending on wet bulb temperature, river flow and temperature as shown in Figures 17 and 18. For river temperatures >50°F, hybrid mode is required, as shown in the summer nomographs. For river temperatures 62°F or higher, closed-cycle mode is required.

For low river flow conditions (.1500 cfs) with river temperature <50°F the tables within Figure 17 for single tower operation or Figure 18 for two tower operation provide the operator with initial tower settings. The tables are based upon reactor and main generator output at EPU conditions and a 13.4°F river temperature rise. The tables contain the following information:

  • Up River Temperature from M036
  • River Volume Flowrate in FT3 per second
  • Wet Bulb temperature Twb
  • Thermal Capacity in cfs- 'F (based upon a 13.4 0F -AT)

S..initial tower settings for hybrid modes for defined conditions The new tables are used as follows:

  • Determine Up River Temperature using M036.
  • Determine river volume flow rate.
  • Determine wet bulb temperature.

Select the table with the appropriate river temperature. If the river temperature is not an exact match to any table, round down to the next lowest river temperature.

Select the appropriate river flow. If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.

OP 2180 Rev. 39 Page 5 of 52

Select the appropriate wet bulb temperature. If the wet bulb temperature is not an exact match for any wet bulb temperature on the table, then proceed as follows:

If wet bulb temperature is >30'F, round up to the next highest wet bulb temperature.

If wet bulb temperature is <30°F, round down to the next lowest wet bulb temperature.

Initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows:

  • Hyb: This means hybrid mode.

FOO: This means fans and the two numbers indicate the number fans required to be running.

GOO: This means recire gate and the two numbers indicate recirc gate position.

Thus an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.

For low river flow condition with river temperature >50°F the Summer Operation Nomographs are to be used. The nomographs are revised to reflect a 100% RTP of 1912 MWth. Also included are summer derate nomographs that must be used to prevent high condenser backpressure during summer operations. These graphs provide initial power levels for acceptable back pressure based upon river thermal capacity and wet bulb temperature. Note that power reduction is only required at very low instantaneous river thermal capacities.]

OP 2180 Rev. 39 Page 6 of 52

ATTACHMENTS

1. Appendix A Valve Lineup I 2.

3.

Appendix B Appendix C Determining and Adjusting Plant Settings for NPDES Compliance

[EPU - Between the Dates of May 16 through October 141 Circulating Water Hydraulic Gate Operations With Degraded Position Indication

4. Appendix D [EPU - Determining and Adjusting Plant Settings for NPDES Compliance between the Dates of October 15 through May 151
5. VYOPF 2180.01 Deleted
6. VYOPF 2180.02 Cooling Tower Checklist
7. VYOPF 2180.03 Deleted
8. VYOPF 2180.04 Deleted
9. VYOPF 2180.05 Plant Setting Change Log
10. VYOPF 2180.06 Deleted
11. Figure 1 Hydraulic Gate Directional Control Valve
12. Figure 2 General Electric Psychometric Chart
13. Figure 3 Wet Bulb Temperature (F) Based on Dry Bulb (F) and Dew Point (F) Temperatures
14. Figure 4 90% Exceedence Values for Wet Bulb Temperature Extrapolation
15. Figure 5 Plant Setting Nomograph for River Temperatures 50.0-54.91F
16. Figure 6 Plant Setting Nomograph for River Temperatures 55.0-58.90 F
17. Figure 7 Plant Setting Nomograph for River Temperatures 59.0-62.9°F
18. Figure 8 Plant Setting Nomograph for River Temperatures 63.0-65.9°F
19. Figure 9 Plant Setting Nomograph for River Temperatures 66.0-69.9°F
20. Figure 10 Plant Setting Nomograph for River Temperatures 70.0-74.9°F
21. Figure 11 Plant Setting Nomograph for River Temperatures 75.0-79.9°F
22. Figure 12 Recirculation Gate Position Intake A Fully Open
23. Figure 13 Recirc Gate 60% Open/Recirc Gate 80% Open
24. Figure 14 Deleted
25. Figure 15 Deleted
26. Figure 16 Deleted
27. Figure 17 [EPU - Circulating Water Plant Settings for Single Cooling Tower Winter Operation]
28. Figure 18 [EPU - Circulating Water Plant Settings for Two Cooling Tower Winter Operation]

QA REQUIREMENTS CROSS REFERENCE

1. None OP 2180 Rev. 39 Page 7 of 52

REFERENCES AND COMMITMENTS

1. Technical Specifications and Site Documents
a. If, during power operation, an unexpected failure results in a complete loss of the cooling tower system, the Closed Cycle restrictions may be modified for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to allow an orderly shutdown using the main condenser as a heat sink in the Open Cycle mode (see NPDES Permit).
2. Codes, Standards, and Regulations
a. NPDES Permit No. 3-1199
b. Vermont AEC Letter, dated Sept. 12, 1978 (NPDES Revision)

C. 316 Demonstration Report

d. Vermont Water Quality Standard Effective 1/8/87
3. Commitments
a. UND 9047, Revision of Procedures to Reflect NPDES Permit, issued 12/5/90
b. LER 88-01
c. Condenser Cooling System Facilities Settings Manual (CAR 9406102)
d. CAR 9406801, Leaf Accumulation at Intake Structure
e. CAR 94061_01, River Temperatures Exceeding NPDES Permit
f. SDR 94077, Data Sheets Calculations, Graphs Related to NPDES Temperature Limits Are Not Included in Procedures
g. SOER 84-01, Cooling Water System Degradation Due To Aquatic Life
h. ER950486_01, Revise OP 2180 To Include Admin. Limit of<51001F on West Clg Tower; Include Guidance Per Recs. 1 and 2
i. ER96-0538, NPDES Permit Violation During the Month of June
j. ER971025_01, Remove Operations Manager Signature Block on App. B to OP 2180 or Modify to Allow for Limited Changes
k. ER970019_01, Unexpected Five Foot Reduction in Circulating Water Forebay level. Revise OP 2180 for Routine Use Recirc Gate During Winter as Detailed in Rec.2. (Ice Blockage, Intake, Condenser)
1. ER97-1567, Environmental Programs/Procedural Inconsistencies
m. ER981657_02, Revise OP 2180 to Make It Clear What VYOPF 2180.05 Data Must Be Taken When Circulating Water System is in Operation
n. Process Computer Software Change Request 97-50, New Conn. River Flow Calc
o. Process Computer Software Change Request 97-51, New Project Save Caics
p. ER991077_05, Procedure Changes
q. ER2002-1342, Control Switch Left in Close Position
r. OE-13646_02, Change to OP 2180 to address OE 13646
s. ER2002-2686_01, Revise OP 2180 - NPDES Backwashing
t. VYC-2403, Circulating Water Plant Settings for OP 2180
u. CR-VTY-2006-00042 CA 00004, Change OP 2180 OP 2180 Rev. 39 Page 8 of 52
4. Supplemental References
a. DWG 191159, Service Water
b. DWG 191166, Circulating Water System
c. Letter, D.J. Marx to G.A. Johnson, "93°F Temp. Limit for Circ. Water, Deletion of Procedural Restriction for Hybrid/Open Cycle", dated Sept. 26, 1988
d. Memo ESG 98-049, JJ to MP, "Dredging Impact on Critical Cross Section (CW Intake-River)", dated 4/20/98
e. Memo, MEP to EVB, Wetting of Cooling Towers CT-I and CT-2, dated 6/13/97
f. Memo SYSENG 2000-045, SAV to RLR, Cooling Tower Wetting, dated 4/13/2000
g. VYC-2403 Rev. 0, Circulating Water Plant Settings for OP 2180
h. VYC-2403 Rev.0, MCC1, Circulating Water Plant Settings for OP 2180
i. EN-AD-103, Document Control and Records Management Activities
j. EN-LI-102, Corrective Action Process
k. AP 0010, Situational Reporting Requirements I. AP 0021, Work Orders
m. OP 0105, Reactor Operations
n. AP 0155, Current System Valve and Breaker Lineup and Identification
o. AP 0156, Notification of Significant Events
p. OP 2106, Oil and Hazardous Materials Spill Prevention and Control
q. OP 2160, Turbine Generator Support Systems Operation
r. OP 2181, Service Water/Alternate Cooling Operating Procedure
s. OT 3120, Condenser High Back Pressure
t. ON 3173, Loss of Circulating Water
u. OP 4650, Circulating Water System Treatment and Sampling PRECAUTIONS/LIMITATIONS
1. Whenever the CW or SW discharge mode is changed, be aware that the sampling and monitoring valves may have to be realigned to ensure sampling requirements are met.

Chemistry must be notified when this occurs. (LER 88-01)

2. CW pump "B" should not be shutdown for long periods of time when ambient air temperature is below 32°F to prevent freezing of its cooling water pipes with the ventilation louvers open.
3. During subfreezing weather conditions, ice buildup on traveling screens may cause damage/failure when rotated. More frequent screen inspection may be required. Except as required by NPDES permit Part IV, Environmental Monitoring Studies, Connecticut River, operational mode of the screens may need to be altered at the discretion of the Shift Manager due to icing. (ER2002-2686_01)
4. During 2 "dweek of November to I' week in April, check Circ Water de-icing agitators placement per VYOPF 0150.01, AO Round Sheet Outside.
5. During chemical addition, operate in closed cycle. Readjust system upon verification by the Chemistry Department that circ water is within the limits of the NPDES permit.

OP 2180 Rev. 39 Page 9 of 52

6. Be aware that whenever the mode of operation is changed, the system requires at least 1/2 hour to reach temperature equilibrium.
7. When in Hybrid or Closed Cycle Mode changes in circulating water header pressure will affect flows to each cell in a tower. When changing Cire Water Booster Pump or tower lineups, cell flow balancing should be verified, and if required, performed.
8. Except for special circumstances, such as maintenance tests or PMTs, for which it is acceptable to run one cooling tower fan at a time for up to two hours without running water in the towers and without performing prior cooling tower wetting, do not operate cooling tower fans unless their associated cooling tower is wetted.
9. Minimize cycling of CTF 2-1.
10. Operation of radios near the hydraulic equipment can cause the gates to drift.
11. Do not operate bypass gates in the raise direction with level higher than 235' Forebay level.
12. Limit the number of 4KV pump motor starts to three starts in 5 minutes, followed by a 20 minute run or a 45 minute idle period for cooling.
13. Cooling Tower fan motor starting limits are:
a. no more than 4 starts per hour for the 125 HP fan, CT-2-1.
b. no more than 2 starts per hour cold (approximately 1041F or 40 0 C) or I start per hour hot (full load temp) for all the 200 HP fans.
c. Pause at least 6.5 minutes in OFF position before changing direction of rotation.
14. Maintain the CW intake gates shut during Closed Cycle operation. Normally, during plant shutdown the intake gates should be closed unless otherwise specified by plant conditions. During Open or Hybrid Cycle operation, at least one of the intake gates should be 100% open.
15. During the period October 15 through May 15 Open or Hybrid operation is allowed provided the following:
a. Temperature at Station 3 does not exceed 651F.
b. Rate of change of temperature at Station 3 does not exceed 5°F per hour as determined by calculating the difference between consecutive hourly average temperatures. (ER97-1567)

C. Plant-induced increase in temperature above ambient at Station 3 does not exceed 13.4 0 F.

OP 2180 Rev. 39 Page 10 of 52

NOTE The increase in temperature above ambient at Monitor 3 during steady state open cycle can be calculated using the following formula (which can also be used if ERFIS becomes inoperable from October 15 through May 15). If the formula is used, independent verification of the calculation must be obtained: (ER991077_05)

At,= 15.193

  • C051 (MWt rejected)

C275 (River flow in cfs)

16. During the period May 16 through October 14 Open or Hybrid operation is allowed provided that: (UND 9047)
a. Plant-induced increase in temperature at Station 3 does not exceed:

Station 7 Temperature At

>630 F 20 F

>59 0 F, <630 F 30 F

>55 0 F, <59 0 F 40 F

<55°F 50 F

17. Ph indication shall be available and maintained to ensure the following limits are adhered to:

NPDES Limits Admin Limits 6.5 - 8.5 6.7 - 8.3

a. If the Admin Limits during Open/Hybrid operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits, up to and including establishing Closed Cycle operation.
b. If the Admin Limits during Closed Cycle operation cannot be maintained, immediate action shall be taken to prevent violation of the NPDES Limits.
18. During Open Cycle operation, it is not necessary to modify the natural Ph of the circ water prior to discharging to the river (letter, State of Vermont to Dr. D.J. Marx, dated 12/4/86).
19. Chemistry personnel are notified of CW system mode changes (i.e., Open, Hybrid, or Closed).

OP 2180 Rev. 39 Page 11 of 52

20. If any limitation of the NPDES Permit is exceeded, initiate a CR and notify Chemistry supervision to initiate required reports per AP 0010, Notifications and Reports Due. The Chemistry Department will make 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> verbal notification to the State, followed by a five day written notification. (LIND 9047)
21. During CW operation, Ph monitoring must be operable or grab samples taken by the Chemistry Department.
22. Monitor CW performance with BOP Log 7 and the BOP Condenser Performance Display, as well as "Margin to TCRIT" per Appendix B, during all modes of system operation. (SOER 84-01)
23. Maintain West Cooling Tower Deep Basin temperature in accordance with OP 2181 Admin. Limits during Hybrid/Closed Cycle operation.
24. During cold weather operations, maintain cire water inlet temperature greater than 33 0 F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure using 2 cire water pumps and recire gate. (ER97-0019)
25. During warm weather operations, operations of the recire gate for NPDES compliance shall not be performed until the cooling towers are placed in service. Opening the recirc gate first may lead to a rapid increase in condenser backpressure and possible Turbine trip.
26. [EPU - Prior to performing any actions related to EPU, confirm the EPU Tech Spec Amendment has been approved.]
27. During winter operations with wet bulb temperature <40°F if cooling towers are used both towers must be in service to prevent ice damage from potential valve leakage.
28. During winter operations with wet bulb temperature <40"F if cooling towers are used all cooling tower cells must have flow. Do not isolate flow to an individual cell.

PREREQUISITES I. Service Water available to CW pump seals, hypochlorite and acid system, and traveling screens per OP 2181, Service Water/Alternate Cooling Operating Procedure.

2. Ensure Cooling Tower Checklist is completed before May 1 5th (VYOPF 2180.02).
3. 4160 V Bus 1, 2 and 5 energized.
4. 480 V MCC 8D, 7C and 7F energized.
5. Hydraulic gate operators vented, if required, and available for service.
6. Appendix A valve lineup completed.

OP 2180 Rev. 39 Page 12 of 52

7. Ensure CW Booster pump cooling fans are in AUTO prior to starting the pumps.
8. In freezing weather, check for ice or snow accumulation on Cooling Tower fans before starting.
9. Ensure discharge basin level is above 223 ft. before starting a CW Booster pump or the pump will trip.
10. Ensure intake basin level is above 207 ft. before starting a CW pump or the pump will trip.
11. Plant setting change log initiated and appropriate limits set by Operations management.
12. Hotwell level <6' above the bottom of the hotwell prior to operation of the CW system.

OP 2180 Rev. 39 Page 13 of 52

PROCEDURE A. Hydraulic Gate Control System - Intake and Discharge Structures (Startup)

1. System Startup
a. Ensure the following conditions are satisfied:
1) If necessary, Maintenance has primed the pumps and vented the lines.
2) Oil reservoir level greater than midline on tank.
3) AC power available.
4) Valve lineup per Appendix A completed.
b. Turn the two control power breakers on the control panel to ON position.

C. Check or place keylock switches for pump #1 and #2 in AUTO.

d. Select pump #1 or pump #2 to LEAD.
e. Perform the following switch alignment:
1) Alarm test light switch to OFF.
2) CPU ON/OFF switch to ON.
3) LOCALIREMOTE switch to REMOTE (for Control Room use).
4) RECIRC GATE switch to STOP.

B. Intake/Discharge Structure Hydraulic Gate Local Control System

1. Local Operation
a. Place the LOCALIREMOTE switch to LOCAL.
b. Verifying Intake/Discharge Structure Hydraulic System trouble (6-D-6/7) annunciates as appropriate.

C. Place the 3-position control switch from STOP to the appropriate OPEN/CLOSE position for desired gate movement.

d. Place the 3-position control switch to STOP.

OP 2180 Rev. 39 Page 14 of 52

e. Place the LOCALIREMOTE switch to REMOTE.
f. Verify Intake/Discharge Structure Hydraulic System trouble (6-D-6/7) clears as appropriate.

C. Startup of Circulating Water System

1. Verify all Prerequisites satisfied.
2. Notify the Chemistry Department so that timely plant discharge sampling can be performed for NPDES compliance.
3. If during cold weather operations, verify bubblers installed on river side.
4. Verify/establish SW supply to CW pump seals and motors at least 10 minutes before starting a CW pump as follows:
a. Seals: 10-15 gpm (FI-104-6A/B/C)
b. Motors: >45% (FI-104-8A/B/C)
5. Verify/establish the following:
a. CW traveling screens in AUTO (unless CW traveling screens are in winter Iay up).
b. Intake gate(s) 100% open.

C. CW Ph monitor operable or Chemistry Department notified to perform daily grab sampling of the CW System.

d. CW System has been sampled by Chemistry Department to ensure water is within all limits of NPDES Permit.
6. Place CW Pump control switch to START (the discharge valve opens to approximately 20% before the pump starts) (CRP 9-6).
a. Check any idle circ water pumps, P-5-1A(B,C), for reverse rotation.

I) IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)

OP 2180 Rev. 39 Page 15 of 52

7. Request Chemistry Department verify proper operation of Discharge Basin Rad Monitor (RD- 17-340/PRM- 17-359).
8. Monitor Discharge Basin Rad Monitor (PRM-17-359) radiation levels for abnormal trends.
9. Refer to the Startup of Vacuum Priming System section of this procedure, and place vacuum priming system in service.
10. If the Circulating Water System is in operation to support maintaining condenser backpressure, start the second CW pump
11. If condenser backpressure increases to greater than 1.6 inches HgA, with two CW pumps in service, consider starting the third one and operating with three, considering intake level or leaf intrusion problems.

NOTE Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers may be lost, thereby short-circuiting the air ejectors. This results in operational problems with the AOG system.

12. If condenser backpressure decreases to less than 1.0 inch HgA, or if there are intake level problems with three CW pumps in service, consider securing one and operating with two.
a. Check any idle cire water pumps, P-5-1A(B,C), for reverse rotation.
1) IF reverse rotation is observed, THEN notify the Shift Manager and System Engineering for evaluation. (OE-13646_02)

OP 2180 Rev. 39 Page 16 of 52

13. If Plan1 is 6perating during October 15 thiough May 15:
a. Monitor the following:
  • Temperature at Station 3 (M037)
  • Rate of change of temperature at Station 3 (no ERFIS point)
  • Plant-induced increase in temperature above ambient at Station 3 (C019)
b. If it is anticipated that any of the following limits will be exceeded, shift to hybrid IEPU - per Figures 17 or 181 or closed cycle or reduce reactor power to prevent exceeding the limits:

0 Temperature at Station 3 (M037) approaches 65°F 0 Rate of change of temperature at Station 3 (no ERFIS point) approaches 5°F per hour 0 Plant-induced increase in temperature above ambient at Station 3 (C019) approaches 13.4 0 F 0 IF M037 is out of service refer to the Loss of River Temperature Recorder Sensing Points (M036 or M037) section of this procedure.

14. If Plant is operating during May 16 through October 14:
a. Monitor the following:
  • *Station 7 Temperature (M036)
  • Plant-induced increase in temperature above ambient at Station 3 (C019)
b. If it is anticipated that any of the following limits will be exceeded, shift to hybrid or closed cycle or reduce reactor power to prevent exceeding the limits:

Increase in Temperature Above Station 7 Temperature Ambient at Station 3

>63 0F 20F 0

>59 F, <630F 30 F 2!55 0 F, <59 0F 40F

<55°F 5F OP 2180 Rev. 39 Page 17 of 52

NOTE IL FJJIWLt . JIUIUIIW 1, 1*A*U1i* .. " 4.I U'* UI U- , A 11UU1U U1I UL1UL4 L 4 J,,

  • - x.. .2 Stti~ngansd aoppigshtobld:bem' iied t, t~kxsslv6 wer to . Q-$

breker contacts, -*,-..: . .... ... ---... - .. ...... .. .. .. . ......

ILFtt~ 15. If any of the following ERFIS values are unavailable, perform either of the actions below per Manager Operations approval.

S River Up/Down Temp Rise - C019 Heat Reject to River - C064 0 Conn River Flow - C275 S Margin to TCrit - C276 S Instantaneous River Thermal Cap - C277 S Condenser Inlet - F052, F053, F054, F055 0 Condenser Outlet - F056, F057,F058, F059 East Tower Outlet - F078 S West Tower Outlet - F079 NOTE This calculation is only valid when the plant is in open cycle.

a. Verify river temperature rise is within limits using the following formula, provided the plant is at steady state operation.

AT,,= 15.193**(MWt reiected)

(River flow in cfs) where: MWt rejected (C051) 1593 [EPU- 19121 *(%RTP)-generator gross MWe River flow in cfs (C275) = Vernon reported flow from Wilder

b. "Place Circulating-Water System in hybrid cycle with full recirculation flow (recire gate >85% open), at least 21 cooling tower fans operating, and intake gates open.

OP 2180 Rev. 39 Page 18 of 52 LPC #3

D. Operation of Vacuum Priming System NOTE The vacuum priming system should be operated as necessary to prevent the accumulation of non-condensables in the water boxes. The system may be placed in a standby condition when at least two circ water pumps are running.

Placing in service:

1. Ensure at least one CW pump is operating.
2. Check Condenser Priming Tank level between empty and 1/4 full.
3. Check seal water valve lineup.
4. Place A or B Vacuum Priming Pump control switch in RUN.
5. Place annunciator 6-B-5, CIRC WTR PRIMING TANK VAC LO, alarm card select switch or jumper in NO (CRP 9-6).

Removing from service/Placing in Standby:

1. Place vacuum Priming Pump control switch to OFF.
2. Place annunciator 6-B-5, CIRCWTR PRIMING TANK VAC LO, alarm card select switch or jumper in NC (CRP 9-6).

E. Shifting from Open to Hybrid Cycle Mode

1. Verify all Prerequisites and Admin. Limits are satisfied.
2. If this is the first time of the season hybrid cycle mode is entered, request Chemistry verify proper operation of Discharge Basin Rad Monitor (RD-I 7-340/PRM-1 7-359).
3. Confirm normal trends on Discharge Basin Rad Monitor (PRM-17-359).

OP 2180 Rev. 39 Page 19 of 52

NOTES Each switch operates both tower inlet valves. The red valve position light on CRP 9-6 will energize only when both valves are open.

When adjusting plant parameters for NPDES compliance, the recirc gate shall not be repositioned until the cooling towers are placed in service.

4. Open/verify open cooling tower inlet #1 (riser) valves CW-6AJB or cooling tower
  1. 2 inlet (riser) valves CW-6C/D.
5. Close both bypass gates until tower Forebay/discharge basin level is 230-233' (LI-104-10).
6. Operate towers and CW Booster pumps in the following combination:
a. 1 pump = 1 tower
b. 2 pumps = 2 towers
c. 3 pumps = 2 towers
7. Ensure cooling fan control switches for circ water booster pumps to be started are in AUTO.
8. Start CW Booster pump and allow piping to fill for at least 10 minutes:
a. When at least 10 minutes have elapsed, flag CWB pump control switch to START again, to fully open pump discharge valve.
b. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
c. Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
9. If second CWB pump is required, perform the following:
a. Wait at least 5 minutes after completion of Step D.8.
b. Start second CWB pump.
c. When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.

OP 2180 Rev. 39 Page 20 of 52

d. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
e. Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-I 04-67A/B/C).
10. If third CWB pump is required, perform the following:
a. Check Tower Forebay/Discharge Basin level has stabilized.
b. Start third CWB pump.
c. When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.
d. Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
e. Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).

NOTE Distribution valves close by turning handle clockwise (stem rises).

11. Fully raise both bypass gates.
12. Check flow through all cells is balanced.
a. If required, adjust distribution valves as necessary when all three CWB pumps are running.

OP 2180 Rev. 39 Page 21 of 52

NOTES Experience has shown that when condenser backpressure is less than 1.0 inch HgA, the loop seals on the SJAE inter condensers are lost, thereby short-circuiting the air ejectors. This results in operational problems with the AOG system.

Monitor Bus 5 amperage during fan starts.

13. When cooling towers are wetted (per Tower Wetting Section), operate tower fans and then adjust recirc gate as necessary to maintain the following:
  • Condenser backpressure in range of 1.0 to 5.0 inches HgA.

I

  • CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.
  • As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of May 16 through October 14.
  • As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15.
14. If desired, shut Circ Water Intake Gate C (North) to 0% to limit the rise in Service Water inlet temperature.

F. Shifting from Hybrid to Closed Cycle Mode I. Verify all Prerequisites and Admin Limits satisfied.

2. Ensure all CW and CWB pumps running.

NOTE Monitor Bus 5 amperage during fan starts.

3. Operate cooling tower fans as necessary to maintain condenser backpressure in range of 1.0 to 5.0 inches HgA.

OP 2180 Rev. 39 Page 22 of 52

4. If system is being placed in closed cycle for purpose of chemical addition/treatment, verify with Chemistry Department if treatment of the service water system will occur simultaneously.
a. If chemically treating service water simultaneously with circulating water, perform the following:
1) Refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and secure the service water strainers.
2) Place all control switches for traveling screens to OFF.
b. If tower wetting is required within the next day and cooling tower operation is not anticipated, then continue tower operations as needed to meet the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> tower wetting requirements.
5. Open recirc gate to >85% open and verify afterbay/discharge weir level is <225 fR (LI-104-10-1).
6. Establish/check established cooling tower blowdown as follows:
a. Throttle open Aux. CT Blowdown Throttle Valve, CW-7 as necessary to restrict flow over discharge weir.
7. Close all intake gates while monitoring intake level.
8. Monitor condenser backpressure.
a. If required, reduce power as necessary to maintain backpressure <5" HgA.

OP 2180 Rev. 39 Page 23 of 52

G. Shifting from Closed to Hybrid Cycle Mode

1. While shifting to Hybrid Cycle mode, closely monitor ERFIS points per Appendix B [EPU - or Appendix D] to ensure thermal limits of the NPDES permit are not exceeded.
2. Request Chemistry take appropriate samples to ensure limitations of NPDES permit are not exceeded.
3. If chemical addition/treatment of service water system is complete, perform the following:
a. When notified by Chemistry, refer to OP 2181, Service Water/Alternate Cooling Water Operating Procedure, and place service water strainers in service.
b. Restore traveling screens per Shift Manager direction.
4. Open the intake gate(s) to 100%.

CAUTION When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B JEPU - or Appendix DI.

5. Operate towers and CW Booster pumps in the following combination:
a. 1 pump = I tower
b. 2 pumps = 2 towers C. 3 pumps = 2 towers OP 2180 Rev. 39 Page 24 of 52
6. Adjust rieilrc gate and cooling tower fans as necessary to maintain the following:
  • Condenser backpressure in range of 1.0 to 5.0 HgA.

I

  • CT-2-1 Deep Basin Temp (ERFIS point F074) in accordance with OP 2181 Admin. Limits.

As required by Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance [EPU - Between the Dates of May 16 through October 14].

As required by Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance [EPU - Between the Dates of October 15 through May 15].

7. If desired to secure one CW Booster pump, THEN
a. Open (lower) A(B) CW Bypass Gate to lower Forebay level to 230-233" as read on LI-104-10.
b. Secure one CW Booster pump, then OPEN (lower) A(B) CW Bypass Gates, as needed,-to maintain Forebay level 230-233" as read on LI- 104-10.
c. Verify limits in Step 5 above are maintained.
8. If desired to restart the third booster pump, then refer to Section D, Shifting from Open Cycle to Hybrid.

OP 2180 Rev. 39 Page 25 of 52

H. Shifting from Hybrid to Open Cycle Mode I. Open/6hedk open intake gate(s) to 100%.

2. When operating the recirc gate in the Closed direction, operate the gate such that the thermal limits of the NPDES permit are not exceeded by monitoring ERFIS points per Appendix B or Appendix D.
3. Fully close the Recirc Gate if plant conditions permit. Place the Recire Gate in the required position for plant conditions considering NPDES requirements and condenser backpressure.
4. Secure all cooling tower fans.
5. Adjust discharge structure Forebay level to 230-233' as indicated on LI-104-10 by opening (lowering) A(B) CW bypass gate.
6. Secure a CW booster pump and immediately open (lower) the A(B) bypass gate to maintain Forebay level 230-233'.
7. Continue securing CW booster pumps and adjusting Forebay level.
8. When all CW booster pumps are secure, fully open (lower) the A(B) bypass gate.
9. During cold weather operations, adjust recirc gate as necessary to maintain circ water inlet temperature greater than 33'F while maintaining condenser backpressure between 1.0 and 1.6 in Hg backpressure.
10. Closely monitor Project Save ERFIS points per Appendix B or Appendix D to ensure applicable thermal limits of NPDES Permit are not exceeded.

I. Operation of Circ Water Traveling Screens

1. Refer to OP 2181, Service Water/Alternate Cooling Operating Procedure.

J. Shutdown of Circ Water/Cooling Towers I. Request Chemistry Department sample CW discharge and determine if discharge is within limits of NPDES permit.

2. If in service, secure cooling tower fans.

OP 2180 Rev. 39 Page 26 of 52

NOTE CW Booster pumps will stop immediately upon placing the control switch to stop, but CW pumps will continue to run until respective discharge valve is 20% closed.

  • 3. Secure one CW Booster pump if running, and one CW pump:
a. Monitor basin levels. Maintain discharge structure Forebay level <235' as read on LI-I 04-10.
4. When securing all CW pumps ensure pumps are not needed to remove heat from main condenser.

NOTE The last CW pump stops as soon as its control switch is placed in STOP.

5. Secure the other CW Booster pumps if running, and CW pumps in similar manner.
6. Notify Chemistry CW System is secured and that the CW Sample Pump must be secured.
7. Close all CW intake-gates.-
8. Open (lower) CW bypass gates.
9. During cold weather operations, ensure de-icing agitators are moved into cire water bay.

K. Circ Water Sample System

1. The Circ Water Sample System will normally be placed in operation by Chemistry Department personnel.

OP 2180 Rev. 39 Page 27 of 52

L. Initial Tower Wetting

[EPU - If between the'dates of May 16 through October 14, wet the t6iwer(s) -

as follows:].

l -, -: .-- -- . *. 0r- ..

NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,

Subject:

Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).

  • Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following a long term shutdown (>7 days).
  • Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
a. If towers do not meet the criteria of the above Note, perform the following:
1) Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).
2) If required to wet the East Cooling Tower, open Cooling Tower 1 Inlet-(riser) CW-6A/6B.
3) If required to wet the West Cooling Tower, open Cooling Tower 2 Inlet (riser) CW-6C/6D.
4) Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/diseharge basin level is 230-233 feet (LI-104-10).
5) Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
6) Start CW booster pump and allow piping to fill for at least 10 minutes.

a) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.

OP 2180 Rev. 39 Page 28 of 52 LPC #3

b) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).

c) Ensure selected CW booster pump cooling water flow is approximately 1 gpm (FI-I 04-67A/B/C).

7) If second CW booster pump is required, perform the following:

a) Wait at least 5 minutes after start of first CW booster pump.

b) Start second CW booster pump.

c) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.

d) Ensure seal water flow for selected pump is at least 2 gpm (F1-104-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).

e) Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).

8) Check flow through all cells is balanced.

a) If required, adjust distribution valves as necessary.

b) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow-balancing-shall be verified, and if required, performed.

9) Run each operable cooling tower fan, one at a time, as requested by Maintenance, to allow preventative maintenance activities to occur.
10) Continue CW booster pump operation for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
11) When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.

OP 2180 Rev. 39 Page 29 of 52

2. [EPU -If between the dates of October 15 through May 15, wet the towers as follows:

NOTE Cooling tower(s) may be considered wetted when one of the following conditions has been met (memo, M.E. Pallonis to E.V.

Bowman,

Subject:

Wetting of Cooling Towers CT-1 and CT-2 dated 06/13/97 and Memo SYSENG 2000-045):

Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following a long term shutdown (>7 days).

Less than or cqual to 7 days have elapsed since 4 continuous hours or more of Cire Water Booster Pump Operation.

a. If towers do not meet the criteria of the above Note, perform the following:
1) Operate towers and CW Booster pumps in the following combination:

a) 1 pump = 1 tower b) 2 pumps - 2 towers

2) Initially adjust the recire gate in small increments to obtain a condenser exit temperature (average of F056, F057, F058 and F059) per the table below:

Wet Bulb (F) Cond Exit Temp (F)

<-5 >65 0 >60 10 ;_.55 20 250 30 k45

.35 *40*

OP 2180 Rev. 39 Page 30 of 52 LPC #4

3) If required to wet the East Cooling Tower, open/check open Cooling Tower 1 Inlet (riser) CW-6A/6B.
4) If required to wet the West Cooling Tower, open/check open Cooling Tower 2 Inlet (riser) CW-6C/6D.
5) Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
6) Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
7) Start CW booster pump and allow piping to fill for at least 10 minutes.

a) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.

b) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).

c) Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67A/B/C).

8)___Adjust-the North (Gate A) and South (Gate B)_Circ-Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).

9) If two towers will be wetted a second CWB pump is required, perform the following:

a) Wait at least 5 minutes after completion of Step 7)a).

b) Start second CWB pump.

c) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.

d) Ensure seal water flow for selected pump is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).

e) Ensure cooling water flow for the selected pump is approximately 1 gpm (FI-104-67A/B/C).

OP 2180 Rev. 39 Page 31 of 52

10) Check that flow through all cells is balanced.

a) If required, adjust distribution valves as necessary.

b) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.

c) If exterior leaks are identified, initiate a WOR for repair.

11) Periodically adjust the recirc gate to achieve and maintain cooling tower outlet temperature (F078 or F079) greater than:

Wet Bulb (F)' Cooling Tower Outlet Temp (F)

<-5 >65 0 >60 10 >55 20 >50 30 >45

ý:35  ?:40

12) Continue CW booster pump operation for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
13) When Cooling Tower wetting requirements are satisfied, place

- Cir--Water System in mode required by river-or plant-conditions.]

OP 2180 Rev. 39 Page 32 of 52 LPC #5

M. Maintaining Cooling Towers Wet

1. [EPU - If between the dates of May 16 through October 14, maintain the tower(s) wet as follows:]

NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V. Bowman,

Subject:

Wetting of Cooling Towers CT-I and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).

Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following a long term shutdown (>7 days).

Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.

a. Ensure sufficient number of CW booster pumps operable (one required to wet down one tower, two required to wet down both towers).
b. If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.

C. If required to maintain the West Cooling Tower wet, open/check open

--Cooling-Tower 2 Inlet (riser) CW-6C/6D.

d. Close (raise) North (Gate A) and South (Gate B) Cire Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
e. Ensure cooling fan control switches in AUTO for CW booster pumps to be started.
f. Start CW booster pump and allow piping to fill for at least 10 minutes.
1) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
2) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).
3) Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-I 04-67A/B/C).

OP 2180 Rev. 39 Page 33 of 52

I g. If two towers will be maintained wet a second CW booster pump is required, when at least five minutes have elapsed after placing first CW booster pump in service, perform the following:

1) Start second CW booster pump.
2) When pump amps are steady, flag pump control switch again to fully open pump discharge valve.
3) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-I 04-69A/B/C) or 15-30 psig (PI-1 04-68A/B/C).
4) Ensure selected CW booster pump cooling water flow is approximately I gpm (FI-104-67A/B/C).
h. Fully close (raise) both bypass gates.
i. Check flow through all cells is balanced.

I) If required, adjust distribution valves as necessary.

2) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
j. Continue CW booster pump operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
k. -When-Cooling Tower wetting requirements are satisfied,_place-CircWater System in mode required by river or plant conditions.

OP 2180 Rev. 39 Page 34 of 52

2. [EPU-If between the dates of October 15 through May 15, maintain the tower(s) wet as follows:

NOTE Cooling tower(s) may be considered wetted when one of the following conditions have been met (memo, M.E. Palionis to E.V.

Bowman,

Subject:

Wetting of Cooling Towers CT-1 and CT-2 dated 6/13/97 and Memo SYSENG 2000-045).

  • Circ Water Booster Pump(s) have been pumping water to a tower(s) for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following a long term shutdown (>7 days).
  • Less than or equal to 7 days have elapsed since 4 continuous hours or more of Circ Water Booster Pump Operation.
a. Operate towers and CW Booster pumps in the following combination:

22)

1) I pump = 1 tower 2 pumps 2 towers
b. Adjust the recirc gate in small increments to obtain a condenser exit temperature (average of F056, F057, FO58 and F059) per the table below:

Wet Bulb (F) Cond Exit Temp (F)

<-5 k:65 0 :60 10 ý:55 20 :5O 30 k45

>35 k40
c. If required to maintain the East Cooling Tower wet, open/check open Cooling Tower I Inlet (riser) CW-6A/6B.
d. If required to maintain the West Cooling Tower wet, open/check open Cooling Tower 2 Inlet (riser) CW-6CI6D.
e. Close (raise) North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates until tower Forebay/discharge basin level is 230-233 feet (LI-104-10).
f. Ensure cooling fan control switches in AUTO for CW booster pumps to be started.

OP 2180 Rev. 39 Page 35 of 52 LPC #4

g. Start CW booster pump and allow piping to fill for at least 10 minutes.
1) When at least 10 minutes have elapsed, flag pump control switch to START again, to fully open discharge valve.
2) Ensure selected CW booster pump seal water flow is at least 2 gpm (FI-104-69A1B/C) or 15-30 psig (PI-104-68A/B/C).
3) Ensure selected CW booster pump cooling water flow is approximately lgpm (FI-104-67AIB/C).
h. Adjust the North (Gate A) and South (Gate B) Circ Water Booster Bypass Gates to maintain tower Forebay/discharge basin level at 230-233 feet (LI-104-10).
i. If two towers will be maintined wet a second CWB pump is required, perform the following:
1) Wait at least 5 minutes after completion of Step g.1.
2) Start second CWB pump.
3) When pump amps are steady, flag pump control switch to START again, to fully open pump discharge valve.

- 4) - Ensure seal water flow for selected pump is at-least-2gpm (FI-104-69A/B/C) or 15-30 psig (PI-104-68A/B/C).

5) Ensure cooling water flow for the selected pump is approximately I gpm (FI-104-67A/B/C).
j. Check that flow through all cells is balanced.
1) If required, adjust distribution valves as necessary.
2) If changes to Circ Water booster pump or tower lineups are made during tower wetting operation, cell flow balancing shall be verified, and if required, performed.
k. Continue CW booster pump operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
1. When Cooling Tower wetting requirements are satisfied, place Circ Water System in mode required by river or plant conditions.]

OP 2180 Rev. 39 Page 36 of 52

N. Subfreezing Operation of Cooling Towers NOTE The basic rule of thumb is to increase cooling tower inlet temperature as high as practicable while keeping operating cells at full water flow.

This will allow the warm water to flow across the outer edges of fill to prevent or correct ice formation.

1. If possible, secure #1 fan in west tower before all others in an attempt to minimize alternate cooling cell duty.
2. For mild icing (1/2" ice on fill and temperatures above 20'F), alternately sequence each fan OFF (at least every 10 minutes every hour).
3. For severe icing conditions, adjust the recirc gate or secure fans (maintaining TCrit positive) to maintain cooling tower exit temperature in the range of 70-90 0 F.
4. For more severe icing and while maintaining the margin to TCrit positive:
a. Allow each fan to coast to a minimum speed for at least 6.5 minutes before reversing direction.
b. Place every other fan in REVERSE as needed to control ice formation.
c. -Swap-direction hourly.

OP 2180 Rev. 39 Page 37 of 52

NOTE Isolating flow to cells should start at #1 (North End) and progress South to ensure theie are no dead legs in the distribution pipe.

5. If heavy icing continues to occur, cooling tower inlet temperature is too low and should be raised by performing 5.a, 5.b or both.
a. Incrementally open the recirc gate.
b. With the concurrence of the Operations Manager, isolate cells by:

0 Opening the header valve to FULL OPEN position to flush out any debris that may have accumulated on the valve disc and seat.

0 Closing the header valve after flushing.

0 Closing off cooling cells to keep all operating cells at full flow (water level at the top distribution pan should be 4-6 inches).

  • Stopping fans on any isolated cell.
6. Continue to sequence fans OFF or in REVERSE as necessary.

I OP 2180 Rev. 39 Page 38 of 52

0. Removing Condenier Water Boxes from Service for Maintenance

-1.

Notify ISO New England of the intention to reduce reactor power.

2. .

-532% rOP 0105eactor peratons. -

1.1 C. -2. Reduce reactor power to-<58.32 pe0.00-Ti~tiOertos _

NOTE The extent of the power reduction should be based on river temperature and condenser cleanliness and the number of water boxes to be removed from service. Trial isolation of a water box can be performed to determine if further power reduction is required prior to completion of the tagging order and draining of the water box.

3. Reduce the number of running CW pumps and CW Booster pumps if running, to two each.

CAUTIONS Do not isolate both water boxes in one condenser.

Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. See Appendix B

[EPU - or Appendix D] for compensatory action as required.

(ER 2002-2181)

4. Isolate and drain the water box(cs) per Step a. or b.:
a. If cooling tower operation is required:
1) Close inlet and outlet water box valves:
  • CW-2A(B,C,D), and
  • CW-3A(B,C,D),
2) Close water box vacuum system isolation valve CWP-9(l0,I 1,12),
3) Connect hoses from water box drain valves to the TBCCW area sump:
  • CW-61A(B,C,D), and
  • CW-62A(B,C,D)

OP 2180 Rev. 39 Page 39 of 52 LPC #3

4) Obtain a Discharge Permit,
5) Open the following valves:
  • Drain valves CW-61A(B,C,D) and CW-62A(B,C,D)
  • Vent valve CW-60A(B,C,D)
b. If cooling tower operation is not required:
1) Open bypass gates to full open position,
2) Close inlet and outlet water box valves CW-2A(B,C,D) and CW-3A(B,C,D)
3) Open respective ACBs for the inlet and outlet water box valves closed above,
4) Close water box vacuum system isolation valve CWP-9(10,11,12),
5) Manually open the outlet water box outlet valve, CW-3A(B,C,D) approximately 10%,
6) Open vent valve CW-60A(B,C,D).
5. Monitor the following turbine-generator parameters:
a. Condenser back pressure on computer points F013 and F014.
b. Turbine thrust bearing metal temperature on recorder TR- I 0-/R-1.
1) If required, reduce reactor power as necessary to maintain parameters within limits set in OP 2160, Turbine Generator Support Systems Operation.
6. When maintenance reports clear:
a. Notify Chemistry waterbox is to be returned to service.
b. Restore system lineup to normal.
7. Increase power per OP 0105, Reactor Operations.

OP 2180 Rev. 39 Page 40 of 52

P. Loss of River Temperature Recorder Sensing Points (M036 or M037)

(ER-2003-0353_01)

S1. Between the dates May 16 and October 14:

a. If M036 is lost, assume TCRIT River Temp Rise Limit (SYS012) is 2°F and adjust plant settings per Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance IEPU - Betveen the Dates of May 16 through October 14].
2. [EPU - Between the dates of October 15 and May 15 adjust plant settings per Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance.]
3. Anytime of year:
a. Loss of valid data indication for either M036 or M037 renders the river monitoring system inoperative and shall be declared "Out of Service".

This condition places the Plant in non-compliance with State NPDES Regulations.

b. Notify Chemistry Management immediately.

(CR-VTY-2006-00042 CA 00004)

C. Initiate a Work Order Request indicating in the text that the Plant is in Non-Compliance with the NPDES Permit.

(CR-VTY-2006-00042 CA 00004)

d. Initiate a Condition Report. (CR-VTY-2006-00042 CA 00004)
e. Note loss on VYOPF 0150.03A CRO Round, OATC/BOP Turnover Sheet, or VYOPF 0150.04A Shutdown CRO Round, OATC/BOP Turnover Sheet, as applicable. (CR-VTY-2006-00042 CA00004)

OP 2180 Rev. 39 Page 41 of 52

Q. Total Loss of River Temperature Indication

1. Calculate the degree rise above ambient in open cycle using the following formula:

(MWt-MWe(Gross) x 15.193 = IF Rise River Flowrate (cfs)

Computer Points (C047-G002) x 15.193 = IF Rise C275

a. Independently verify the calculation. (ER991077_05)
2. Service Water pump discharge temperature TI-34 and TI-36 will furnish inlet river temperature.
3. Downriver temperature can be calculated by adding IF rise and SW pump discharge temperature.

R. Hydraulic Gate Control System - Intake and Discharge Structures (Shutdown)

I. System Shutdown

a. Turn the two control power breakers on the control panel to OFF position.

S. Lossof Hydraulic Gate Control System

1. Manual Operations with Supplied Air (Assumes pumps are inoperable)
a. At the Intake Structure:
1) Connect an air hose to CWHA-2A from SA-107 K or L.
2) Open the following valves:
  • SA-107K or SA-107L
  • CWHA-2A to Control Air Pump Power OP 2180 Rev. 39 Page 42 of 52
3) Select direction of gate movement on local panel.
4) When gate movement is complete, close the following valves:
  • CWHA-2A
  • SA-107K or SA-107L
b. At the Discharge Structure - two 8 in. adjustable wrenches required.
1) Install quick connect (located in Enclosure B) on IA-993.
2) Connect air hose to CWHA-2B from IA-993.
3) Open the following:

0 IA-993

  • CWHA-2B to Control Air Pump Power
4) Select direction of gate movement on local panel.
5) When gate movement is complete, close the following valves:
  • CWHA-2B
  • IA-993
2. Manual Gate Control - Loss of Control Power (See Figure 1)

.- a.- Verify hydraulic pressure available from either:

I) Electric driven hydraulic pump in MANUAL operation.

2) Air driven hydraulic pump operating.
b. Position gate by inserting a small Phillips screwdriver, or equivalent, into the appropriate directional control valve block to drive the gate UP and DOWN.

OP 2180 Rev. 39 Page 43 of 52

NOTE The following step is used to clear drift alarms from the "A" Bypass Gate while it is tagged out. It will allow operation of the other Bypass gate and the Recirc gate from the Control Room.

3. To restore manual operation, perform the following:
a. Place both of the control switches for the discharge structure hydraulic system pumps in OFF.
b. Place the hydraulic system for the discharge structure gates in LOCAL control.

C. Momentarily depress the "A" Bypass gate OPEN pushbutton.

d. Reset the alarms.
e. Place both of the control switches for the discharge structure hydraulic system pumps in AUTO.
f. Place the hydraulic system for the discharge structure gates in REMOTE control.
4. See Appendix C for Hydraulic Gate Operations with degraded Position Indication.

T. Use of Hotwell for Condensate Storage

1. Open/verify open the North and South Circ Water Booster Bypass Gates.
2. Secure all running CW pumps.
3. Wait a minimum of 15 minutes prior to performing the next step to ensure the water boxes are drained to the discharge block.
4. Close the Condenser Inlet, CW-2A(B,C,D), and Condenser Outlet CW-3A(B,C,D), valves.
a. Danger tag the CRP 9-6 Control Switches for CW-2A(B,C,D) and CW-3A(B,C,D) for the Shift Manager OP 2180 Rev. 39 Page 44 of 52
5. Uncap and open the Outlet Water Box Drains, CW-62A(B,CD), to provide a vent for the water boxes.
a. Danger tag open the Outlet Water Box Drains, CW-62A(B,C,D), for the Shift Manager.
6. Monitor condensate conductivity.
7. Sample each water box for radioactivity prior to returning it to service.

U. Operation with Low Vernon Pond Elevation NOTES

  • When Vernon Pond elevation is <212 feet, reduction of river flow into the CW intake bay may be necessary, in order to preclude excessive sediment transport into the SW system due to high water velocity (i.e., >1 fps) in the river offshore of the intake structure. (ER 97-1120)

The following Step 1 provides guidance to ensure that the CW system is operated such that the inflow into the intake structure from the river is the equivalent of two-thirds or less of full CW system flow. This will ensure that river flow velocity in the vicinity of the intake is less than 1 fps when Vernon Pond elevation is <212 feet.

At Vernon Pond elevation <212 ft., SW inlet temperature can be

-- affected when operating with the CW intake-gates-open-and with the recirc gate open about 60% or more.

1. If it is known that the elevation of Vernon Pond will go <214 ft., perform the following as required:
a. If CW system is operating with 2 CW pumps or operating in Closed Cycle mode, then no further action is required.
b. If CW system is operating with 3 CW pumps in Open Cycle or Hybrid Cycle mode, perform the following:

OP 2180 Rev. 39 Page 45 of 52

1) Open recirc gate to at least 25%.
2) If condenser vacuum cannot be maintained below 5 inches HgA, perform either of the following:

a) Enter OT 3120, Condenser High Back Pressure.

b) Enter ON 3173, Loss of Circulating Water.

c) Shift CW system to hybrid or closed cycle per this procedure.

2. -Ifit is known that the elevation of Vernon Pond will go below 212 ft., perform the following:
1) Enter OT 3120, Condenser High Back Pressure.
2) Enter ON 3173, Loss of Circulating Water.
3) Shift CW system to hybrid or closed cycle per this procedure.
4) --- Refer to OP 0105, Reactor Operations, and reduce rea-ctor power at

<510% CTP/min.

V. Determining and Adjusting Plant Settings I1. Refer to Appendix B, Determining and Adjusting Plant Settings for NPDES Compliance. EPU-Between the Dates of May 16 through October 14], as appropriate.

2. [EPU - Refer to Appendix D, Determining and Adjusting Plant Settings for NPDES Compliance Between the Dates of October 15 through May 15, as appropriate.]

OP 2180 Rev. 39 Page 46 of 52

W. Clearing of Debri§ from Intake Trash Racks NOTES

" If intake structure level falls to 209 ft., the intake gates will open automatically. They cannot be reclosed until level is above 209 ft.

I

" If intake structure level falls to 207 ft., the circ water pumps will trip. The circ water pumps cannot be restarted until intake level is above 207 ft.

" Operation of the recirc gate at low intake structure water levels will result in reduced flow to the deicing line due to the elevation I- difference between the recire line (195.25 ft centerline) and the deicing line (217 ft centerline). As a result, the deicing of the SW bay may not occur.

If significant ice or trash accumulates at racks or the floating boom, do the following: (CAR 9406801)

a. Place the traveling screens in Manual as soon as time permits.
b. Dispatch an operator to the discharge structure.

C. Open the recire gate to 50% until condenser backpressure approaches 3.0" HgAbs.

d. Thr6ftlth-e recirc gate to maintain 3.0 to 3.5" HgAbs until ice or trash-hiFs been pushed into mainstream of river, or ceases to move.
e. Close the recirc gate.
f. When the recirc gate has been closed for at least 30 minutes, place the traveling screens in Auto.
g. If leaves or trash are observed moving back toward the trash racks or floating boom, open recire gate to 5%.

OP 2180 Rev. 39 Page 47 of 52 LPC #2

X. Operation of Cooling Tower Lights NOTE Cooling tower lights are normally secured and require Operations and Security permission to turn them on.

1. Turning On the Cooling Tower Lights
a. Obtain permission from the Security Shift Supervisor and the Ops Shift Manager to turn on the tower lights.
b. At LP-1X, close CKT 20 (Tower Ltg Photo Cell) and check closed CKT 1 through 7 and CKT 9 to energize west cooling tower lights.

C. At LP-lW, close CKT 14 (Tower Ltg Photo Cell) and check closed CKT I through 7 and CKT 9 to energize east cooling tower lights.

2. Turning Off the Cooling Tower Lights
a. At LP-1X, open CKT 20 to de-energize west cooling tower lights.
b. At LP-lW, open CKT 14 to de-energize east cooling tower lights.

Y. Individual Cooling Tower Fan Operation NOTES

  • Tower wetting is not required to perform this surveillance.
  • The fan may operate for up to two hours without running water in the towers and without performing prior cooling tower wetting.
1. Verify the selected cooling tower fan is clear of obstructions or debris.
2. Verify the selected cooling tower fan has normal oil level.
3. On panel 9-6, place the selected cooling tower fan control switch to FWD and observe the time.
4. Verify the selected cooling tower fan starts.

OP 2180 Rev. 39 Page 48 of 52

5. Locally verify no unusual noise or vibration is evident.
6. When <2 hours have elapsed from fan start, place the selected cooling tower fan control switch to STP.

Z. Initial Tower Balancing Post Maintenance or on System Start-up NOTES The cooling tower distribution valves are reverse threaded and reverse seated. As a result they are operated Clockwise to Close and Counter Clockwise to Open as normal valves.

The following steps should be followed for each of the tower distribution valves. The valves may be positioned in any order, but all should be checked before tower operation or after tower maintenance that may have changed the valve positions.

1. Turn the tower distribution valves clockwise to close.
2. Open each valve to the initial position as follows:
  • Cells 1-5, OPEN each valve 8 turns.
  • Cells 6-11, OPEN each valve 9 turns.

CAUTION If a cell is overflowing badly, significant ground erosion can quickly occur. This situation needs to be promptly addressed.

3. To prevent ground washout, if a cell is overflowing badly, adjust that cell first or secure CWB pumps as needed.
4. If needed, rebalance the towers as follows:

If a cell is overflowing, evenly close the 4 distribution valves in that cell until overflow stops.

-If water depth on the cell distribution platform is less than about 1/2 of the way to the top of the retaining berm, OPEN evenly the 4 cell distribution valves until the water depth is about 1/2 to 3/4 the height of the berm.

Adjust cells as necessary until none overflow and water depth is approximately equal in each cell.

OP 2180 Rev. 39 Page 49 of 52

AA. Circulating Water Traveling Screen Winter Layup I. Manually wash circ water traveling screen, TS-I-IA(B,C) per the Traveling Screen Operation section of OP 2181, Service Water Alternate Cooling Operating Procedure.

2. When approximately 20 minutes have elapsed place TS--I-A(B,C) control switch of OFF.
3. On MCC-8D at the intake structure open the following breakers:
  • TSI-IA Circ. Water Traveling Screen A
  • TS1-1B Circ. Water Traveling Screen B
  • TSI-IC Circ. Water Traveling Screen C
4. If Service Water traveling screens are washed and ready for winter layup close SW-6, MN Travel Screen Wash.
5. If Service Water traveling screens are not ready for winter layup, place the Service Water traveling screens in winter layup per OP 2181, Service Water/Alternate Cooling Operating Procedure.

BB. Circulating Water Traveling Screen Winter Layup Restoration

1. Locally verify or place TS-I-1A(B,C) local control switch to OFF.
2. Verify or slowlyopen SW-6, MN Travel Screen Wash.
3. On MCC-8D at the intake structure close the following breakers:

TSI-IA(B,C) Circ. Water Traveling Screen A(B,C)

NOTE The following steps minimize the potential of carryover of debris into the system.

4. Establish communication between an operator at the screen to be returned to service and the Traveling Screen Control Panel.
5. Open the Traveling Screen access door to be placed in service to monitor screen condition.
6. Place TS-I-IA(B,C) local control switch to MANUAL.

OP 2180 Rev. 39 Page 50 of 52

7. IF debris is observed on the screen above the backwash spray path, THEN notify the operator at the Traveling Screen Control Panel to place the TS--I-A(B,C) to OFF.
8. IF notified, the operator at the Traveling Screen Control Panel immediately places the TS-I-IA(B,C) local control switch to OFF.
9. If debris removal is required perform the following:
a. Obtain appropriate fire hose from spares or Stores.
b. Inspect the hose(s) and couplings to be used for the following:
1) Hose:

a) Hose marking (stenciled) includes "Service Test to 250 psi". (If specified pressure is >250 psi it is acceptable.)

b) Hose has not been vandalized.

c) Free of debris.

d) No evidence of mildew or rot.

e) No evidence of damage by chemicals, bums, cuts, abrasion, or vermin.

2) Couplings:

a) Damaged threads.

b) Corrosion.

c) Slippage on the hose.

d) Out of round.

e) Swivel not rotating freely.

OP 2180 Rev. 39 Page 51 of 52

f) Missing lugs.

g) Other defects that impair operation.

3) Replace any degraded hose gaskets.
c. Rig a fire hose from a hydrant to the intake structure.
1) Ensure fire hose(s) are secure to prevent whip prior to pressurizing and operating.
2) Consider using two persons to man the hose so as to perform operations safely.
d. When ready to wash debris, start the Electric Fire Pump in accordance with OP 2186.

NOTE Use care not to wash debris into the pump suction side of the traveling screen when performing the next step.

e. Wash the debris from the screen through the access door.
10. Re-perform Steps 6, 7, 8 and 9.d and 9.e as appropriate until TS-l-I-A(B,C) make at least one full revolution past the backwash header.
11. Locally place TS-I-IA(B,C) local control switch to AUTO or MANUAL as directed by the Control Room Supervisor.
12. IF debris removal was required, THEN secure the Electric Fire Pump in accordance with OP 2186.
13. Dry and store any fire hose used as follows:
a. Dry hoses used by laying them out to dry on the ramp by the intake structure OR use the hanger by the Turbine Building loading bay door OR both.
b. Store fire hose(s) used as directed by Operations Shift Management.

FINAL CONDITIONS

1. Required forms completed and returned to Operations office for filing per EN-AD-103 and Retrieval of QA Records, and AP 0155, Current System Valve and Breaker Lineup and Identification.

OP 2180 Rev. 39 Page 52 of 52

APPENDIX A VALVE LINEUP Valve Number Description Position Initial CRP 9-6 CW-1A Circulating Water Pump IA Disch AS REQ:OPEN/CLOSED CW-1B Circulating Water Pump 1B Disch AS REQ:OPEN/CLOSED CW-1C Circulating Water Pump IC Disch AS REQ:OPEN/CLOSED CW-2A Condenser IA North Inlet OPEN CW-2B Condenser 1A South Inlet OPEN CW-2C Condenser 1B North Inlet OPEN CW-2D Condenser 1B South Inlet OPEN CW-3A Condenser IA North Outlet OPEN CW-3B Condenser IA South Outlet OPEN CW-3C Condenser lB North Outlet OPEN CW-3D Condenser lB South Outlet OPEN CW-6A Cooling Tower 1 Inlet AS REQ:OPEN/CLOSED CW-6B Cooling Tower I Inlet AS REQ:OPEN/CLOSED CW-6C Cooling Tower 2 Inlet AS REQ:OPEN/CLOSED CW-6D Cooling Tower 2 Inlet AS REQ:OPEN/CLOSED Circ Wtr Intake Gate A AS REQ:OPEN/CLOSED Circ Wtr Intake Gate B AS REQ:OPEN/CLOSED Circ Wtr Intake Gate C AS REQ:OPEN/CLOSED Recirculation Bypass Gate AS REQ:OPEN/CLOSED North Circ Water Booster Bypass Gate AS REQ:OPEN/CLOSED South Circ Water Booster Bypass Gate AS REQ:OPEN/CLOSED CW-5A CWB Pump A Disch AS REQ:OPEN/CLOSED CW-5B CWB Pump B Disch AS REQ:OPEN/CLOSED CW-5C CWB Pump C Disch AS REQ:OPEN/CLOSED Appendix A OP 2180 Rev. 39 Page 1 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial INTAKE STRUCTURE HYDRAULIC SYSTEM CWHO-IA Down Drive Isolation - Intake A Gate OPEN CWHO-2A Up Drive Isolation - Intake A Gate OPEN CWHO-3A Down Drive Isolation - Intake B Gate OPEN CWHO-4A Up Drive Isolation - Intake B Gate OPEN CWHO-30A Intake Gate B Actuator Up Drive Line Vent CLOSED CWHO-31A Intake Gate B Actuator Down Drive Line Vent CLOSED CWHO-5A Down Drive Isolation - Intake C Gate OPEN CWHO-6A Up Drive Isolation - Intake C Gate OPEN CWHO-34A Intake Gate C Actuator Up Drive Line Vent CLOSED CWHO-35A Intake Gate C Actuator Down Drive Line Vent CLOSED CWHO-7A Flow Control Isolation - A Gate OPEN CWHO-8A Flow Control Isolation - A Gate OPEN CWHO-9A Flow Control Isolation - B Gate OPEN CWHO-10A Flow Control -Isolation - B Gate OPEN CWHO-IIA Flow Control Isolation - C Gate OPEN CWHO-12A Flow control Isolation - C Gate OPEN CWHO-1 6A 4A Lube Oil Filter Pump Suction Isolation OPEN CWHO-17A Intake Gate A Actuator High Point Vent CLOSED CWHO-1 8A Intake Gate A Actuator Low Point Drain CLOSED CWHO-28A Intake Gate B Actuator High Point Vent CLOSED CWHO-29A Intake Gate B Actuator Low Point Drain CLOSED CWHO-32A Intake Gate C Actuator High Point Vent CLOSED CWHO-33A Intake Gate C Actuator Low Point Vent CLOSED CWHO- 19A Reservoir Drain CLOSED CWHO-21A PI-104-134A Isolation THROTTLED AS REQ Appendix A OP 2180 Rev. 39 Page 2 of I1

APPENDIX A (Continued)

Valve Number Description Position Initial CWHO-22A PI-104-135A Isolation THROTTLED AS REQ CWIIO-23A PI-104-132A Isolation THROTTLED AS REQ CWHO-24A PI-104-133A Isolation THROTTLED AS REQ CWHO-25A PI-91A Isolation THROTTLED AS REQ CWHO-26A PI-104-130A Isolation THROTTLED AS REQ CWHO-27A PI-104-136A Isolation THROTTLED AS REQ CWHA-IA Air Pump Isolation OPEN CWHA-2A Service Air Isolation CLOSED CWHA-3A Depressurizing Valve CLOSED OFFICE BUILDING NORTH OUTSIDE CW-42A CW Pumps Discharge Intake Pipe Vent CLOSED CW-42B CW Pumps Discharge Intake Pipe Vent CLOSED INTAKE STRUCTURE CW-54A PI-6A Circ Water Pump A Disch OPEN CW-54B PI-6B Circ-Water Pump B Disch OPEN CW-54C PI-6C Circ Water Pump C Disch OPEN CWD-55A PI-60A Dilution Pump A Disch OPEN CWD-55B PI-60B Dilution Pump B Disch OPEN CWD-56A FE-71 and 72 Dilution Pumps Disch CLOSED CWD-56B FE-71 and 72 Dilution Pumps Disch CLOSED CWD-7A Dilution Pump A Disch CLOSED CWD-7B Dilution Pump B Disch CLOSED CWI-GATE- Service Water De-Icing Gate *AS REQ:OPEN/CLOSED DEICE Appendix A OP 2180 Rev. 39 Page 3 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial TURBINE BUILDING CW-50A Dpi-65A-2 Condenser A East OPEN CW-50B Dpi-65A-2 Condenser A West OPEN CW-50C Dpi-65A-1 Condenser A East OPEN CW-50D Dpi-65A-1 Condenser A West OPEN CW-51A Dpi-65B-2 Condenser B East OPEN CW-51B Dpi-65B-2 Condenser B West OPEN CW-51C Dpi-65 B-I Condenser B East OPEN CW-51D Dpi-65B-I Condenser B West OPEN Hypochlorite Panel Drain *AS REQ:OPEN/CLOSED CW-37 CW-38 Ph Sensor Supply *AS REQ:OPEN/CLOSED

  • AS REQ:OPEN/CLOSED CW-1OA Condenser A North Cl and Ph Sample CW-1OC Condenser A South CI and Ph Sample *AS REQ:OPEN/CLOSED
  • AS REQ:OPEN/CLOSED CW-IOB Condenser B North CI and Ph Sample Condenser B South Ci and Ph Sample *AS REQ:OPEN/CLOSED CW- 10D CW-52A PX-58A-I Condenser A North Outlet CLOSED CW-52B PX-58A-2 Condenser A South Outlet CLOSED CW-52C PX-59B-2 Condenser B North Outlet CLOSED CW-52D PX-58B-I Condenser B South Outlet CLOSED CW-62A Condenser A North Outlet Water Box Drain CLOSED CW-62B Condenser A South Outlet Water Box Drain CLOSED CW-62C Condenser B North Outlet Water Box Drain CLOSED CW-62D Condenser B South Outlet Water Box Drain CLOSED CW-61A Condenser A North Inlet Water Box Drain CLOSED CW-61B Condenser A South Inlet Water Box Drain CLOSED Appendix A OP 2180 Rev. 39 Page 4 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial CW-61C Condenser B North Inlet Water Box Drain CLOSED CW-61D Condenser B South Inlet Water Box Drain CLOSED CW-53A A North Inlet Sample CLOSED CW-53B A South Inlet Sample CLOSED CW-53C B North Inlet Sample CLOSED CW-53D B South Inlet Sample CLOSED CWP-14A Priming Pump A SW Inlet OPEN CWP-22A Priming Pump A Strainer Drain CLOSED CWP-1 8A Priming Pump A SW Solenoid Bypass CLOSED CWP-SN-74-IA Priming Pump A Cooling Water Throttle Valve THROTTLED AS REQ CWP-14B Priming Pump B SW Inlet OPEN CWP-22B Priming Pump B Strainer Drain CLOSED CWP-18B Priming Pump B SW Solenoid Bypass CLOSED CWP-SN-74-1B Priming Pump B Cooling Water Throttle Valve THROTTLED AS REQ CWP-19A Priming Pump A-Solenoid Inlet OPEN CWP-19B Priming Pump B Solenoid Inlet OPEN CWP-20A Priming Pump A Solenoid Outlet OPEN CWP-20B Priming Pump B solenoid Outlet OPEN CWP-21A Priming Pump A PI-56-A Isolation OPEN CWP-21B Priming Pump B PI-56-B Isolation OPEN CWP-3A Priming Pump A Drain CLOSED CWP-3B Priming Pump B Drain CLOSED CWP-22 P52-IB Suction Drain and Tank Vent CLOSED CWP-23A Sight Glass Priming Tank Hi OPEN CWP-23B Sight Glass Priming Tank Lo OPEN CWP-24 Priming Tank Drain CLOSED Appendix A OP 2180 Rev. 39 Page 5 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial CWP-17 Priming Tank Instrumentation OPEN CWP-2A Priming Pump A Suction OPEN CWP-2B Priming Pump B Suction OPEN CWP-4 Condenser A North Suction OPEN CWP-5 Condenser A South Suction OPEN CWP-6 Condenser B North Suction OPEN CWP-7 Condenser B South Suction OPEN CWP-8 Discharge Block Suction AS REQ:OPEN/CLOSED CWP-9 Condenser A North Suction OPEN CWP-10 Condenser A South Suction OPEN CWP-l I Condenser B North Suction OPEN CWP-12 Condenser B South Suction OPEN CWP-13 Discharge Block Suction AS REQ:OPEN/CLOSED CW-60A Waterbox Manual Vent CLOSED CW-60B -Waterbox-Manual Vent CLOSED CW-60C Waterbox Manual Vent CLOSED CW-60D Waterbox Manual Vent CLOSED Appendix A OP 2180 Rev. 39 Page 6 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial DISCHARGE STRUCTURE HYDRAULIC SYSTEM CWHO-I1B Down Drive Isolation - Recirc Gate OPEN CWHO-2B Up Drive Isolation - Recirc Gate OPEN CWHO-3B Down Drive Isolation - Bypass Gate B OPEN CWHO-4B Up Drive Isolation - Bypass Gate B OPEN CWHO-5B Down Drive Isolation - Bypass Gate A OPEN CWHO-6B Up Drive Isolation - Bypass Gate A OPEN CWHO-7B Flow Control Isolation - Recirc Gate OPEN CWHO-8B Flow Control Isolation - Recirc Gate OPEN CWHO-9B Flow Control Isolation - Bypass Gate B OPEN CWHO-10B Flow Control Isolation - Bypass Gate B OPEN CWHO-I IB Flow Control Isolation - Bypass Gate A OPEN CWHO-12B Flow Control Isolation - Bypass Gate A OPEN CWHO-1 6B 4B Lube Oil Filter Pump Suction Isolation OPEN CWHO-17B -Reciro Gate Actuator High Point Vent CLOSED CWHO-1 8B Recire Gate Actuator Low Point Drain CLOSED CWHO-19B Reservoir Drain CLOSED CWHO-21B PI-104-134B Isolation THROTTLED AS REQ CWHO-22B PI-104-135B Isolation THROTTLED AS REQ CWHO-23B PI-104-132B Isolation THROTI'LED AS REQ CWHO-24B PI-104-133B Isolation THROTTLED AS REQ CWHO-25B PI-104-130B Isolation THROTTLED AS REQ CWHO-26B PI-104-131B Isolation THROTTLED AS REQ CWHO-27B PI-104-136B Isolation THROTTLED AS REQ CWHO-28B Bypass Gate A High Point Vent CLOSED CWHO-29B Bypass Gate A Low Point Drain CLOSED Appendix A OP 2180 Rev. 39 Page 7 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial CWHO-30B Bypass Gate B High Point Vent CLOSED CWHO-31B Bypass Gate B Low Point Drain CLOSED CWHA-IB Air Pump Isolation OPEN CWHA-2B Service Air Isolation CLOSED CWHA-3B Depressurizing Valve CLOSED CW-8A CWB Pump A Seal Water Filter A Inlet One filter on line with each pump inlet and outlet valves CW-8D CWB Pump A Seal Water Filter B Inlet open. Other filter inlet and outlet valves closed with filter CW-9A CWB Pump A Seal Water Filter A Outlet in repair or standby condition.

These valves routinely CW-9D CWB Pump A Seal Water Filter B Outlet operated by operators and mechanics to change filters.

CW-8B CWB Pump B Seal Water Filter A Inlet CW-8E CWB Pump B Seal Water Filter B Inlet CW-9B CWB Pump B Seal Water Filter A Outlet CW-9E CWB Pump B Seal Water Filter B Outlet CW-8C CWB Pump C Seal Water Filter A Inlet CW-8F -CWB Pump C Seal Water Filter B Inlet CW-9C CWB Pump C Seal Water Filter A Outlet CW-9F CWB Pump C Seal Water Filter B Outlet CW-59A CWBP A Seal Water Cooling Loop Drain Valve CLOSEDICAPPED CW-59B CWBP B Seal Water Cooling Loop Drain Valve CLOSED/CAPPED CW-59C CWBP C Seal Water Cooling Loop Drain Valve CLOSED/CAPPED CW-1 CWBP A Seal Press PI-68A OPEN CW-2 CWBP B Seal Press PI-68B OPEN CW-3 CWBP C Seal Press PI-68C OPEN CW-4 CWBP A SealPThrust Brg. Cooling Water Supply OPEN CW-7A CWBP A Thrust Brg. Cooling Water Disch. THROTTLED AS REQ CW-58A CWBP A Discharge Pressure Gauge Isolation Valve OPEN Appendix A OP 2180 Rev. 39 Page 8 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial CW-5 CWBP B Seal/Thrust Brg. Cooling Water Supply OPEN CW-7B CWBP B Thrust Brg. Cooling Water Disch. THROTTLED AS REQ CW-58B CWBP B Discharge Pressure Gauge Isolation Valve OPEN CW-6 CWBP C Seal/lTrust Brg. Cooling Water Supply OPEN CW-7C CWBP C Thrust Brg. Cooling Water Disch. THROTITLED AS REQ CW-58C CWBP C Discharge Pressure Gauge Isolation Valve OPEN CW-7 Aux. CT Blowdown Throttle Valve THROTTLED AS REQ CW-8 Aux. CT Blowdown Valve OPEN CW SAMPLE SYSTEM CW-29 Disch Bay Suction OPEN CW-30 Pump.B Suction OPEN CW-31 Pump B Disch Solenoid Manual Isolation *THROTTLED AS REQ CW-68-2 Pump B Solenoid Disch Operates With Pump CW-46 Pump A and B Min Flow OPEN CW-32 -- Sample Pump Disch Cross Connect CLOSED CW-27 Sample Pump Disch Cross Connect CLOSED CW-21 Sample Tank B Drain *CLOSED CW-23 Sample Tank B Sample *CLOSED CW-48 River Suction *OPEN CW-47 Radwaste Dilution Sample *CLOSED CW-I I Drain CLOSED CW-24 River/Dilution Pipe Suction OPEN CW-25 Pump A Suction OPEN CW-26 Pump A Disch Solenoid Manual Isolation *THROTTLED AS REQ CW-68-1 Pump A Disch Solenoid Operates With Pump CW-20 Sample Tank A Drain *CLOSED Appendix A OP 2180 Rev. 39 Page 9 of 11

APPENDIX A (Continued)

Valve Number Description Position Initial CW-22 Sample Tank A Sample *CLOSED CW-28 Pump Suction Cross Connect CLOSED CW-11A River Suction Line Flush *CLOSED COOLING TOWERS CW-57E East Tower East Inlet Hdr Vent/Drain CLOSED CW-57A Sample Cooling Tower No. I Inlet (East) *CLOSED CW-57F East Tower Inlet Header Vent/Drain CLOSED CW-57B Sample Cooling Twr No. I Inlet (West) *CLOSED CW-57G West Tower Inlet Header Vent/Drain CLOSED CW-57C Sample Cooling Twr No. 2 Inlet (East) *CLOSED CW-57D West Tower Inlet Header Vent/Drain CLOSED SPRAY POND/TOWER WETTING SYSTEM BS-2 Blowdown Spray Pump Priming Header CLOSED BS-3A Blowdown Spray Pump A Priming **OPEN BS-3B --- Blowdown Spray Pump B Priming **OPEN BS-3C Blowdown Spray Pump C Priming **OPEN Deleted Deleted Deleted BS-14A Blowdown Spray Pump A Casing Vent CLOSED BS-14B Blowdown Spray Pump B Casing Vent CLOSED BS-14C Blowdown Spray Pump C Casing Vent CLOSED Deleted BS-12 Tower Header Drain (at pit) **OPEN BS-13 Tower Header Drain (at pit) **OPEN Appendix A OP 2180 Rev. 39 Page 10 of II

APPENDIX A (Continued)

  • These valves normally operated by Chemistry Technician for chemical addition/sampling but should be in the position show.
    • Open to provide winter freezing protection. Tower Wetting System and Blowdown Spray Pond are retired in place.

REMARKS:

Reviewed By. /

Shift Manager (Print/Sign) Date Appendix A OP 2180 Rev. 39 Page 11 of 11

APPENDIX B DETERMINING AND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE I IEPU - BETWEEN THE DATES OF MAY 16 THROUGH OCTOBER 141 (SDR 94077)

NOTES Operations Management may implement changes to the "TCRIT Delta T Margin" or "TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.

In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.

CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in exceeding the NPDES permit. (ER 2002-2181)

Monitoring the plant settings is accomplished by using the following trends on ERFIS:

a. Trend 70 contains a graph of(1) Margin to TCRIT - C276, (2) Instantaneous River Thermal Capacity - C277, and (3) Heat Rejected To River - C064.
b. Trend 71 contains a graph of(1) Up River Temp - M036, (2) USGEN River Flow - C278, and (3) River Temperature Rise - C019.

C. Trend 72 contains a graph of Margin to TCRIT - C276, set on a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> scale to enhance definition.

Appendix B OP 2180 Rev. 39 Page 1of 10

APPENDIX B (Continued)

2. To determine plant settings:
a. Obtain a value for:
1) C277 "INST RIVER THERMAL CAPACITY"
2) C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
3) M036 "UP RIVER TEMPERATURE"
4) River Temperature Correction Factor, as specified by Operations Management
b. Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.

C. To make changes to plant settings refer to the appropriate section of the operating procedure.

3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows:
a. Determine Instantaneous River Thermal Capacity as follows:

-IRTC = River Flow * (SYSOl2 - SYSol3)

Where: SYS012 = TCRIT River Temp Rise Limit SYSO13 = TCRIT Delta T Margin

b. Apply to the nomographs (Figures 5 through 11) for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity, to arrive at the estimated plant setting.

C. Record on plant setting change log changes in:

1) CW/CWB Pumps
2) Number of cooling tower fans
3) Gate positions Appendix B OP 2180 Rev. 39 Page 2 of 10

APPENDIX B (Continued)

CAUTION

2. Monitoring of up river temperature is critical to the proper operation of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing.
3. When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.
4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.
a. Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below "0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.
b. Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity. This will ensure that the plant does not exceed the river capacity.
c. The River Up/Down Temp. Rise should be maintained below the allowable temperature

- 'rise from the Precautions/Limitations based oncurrent-up river temperature.

Appendix B OP 2180 Rev. 39 Page 3 of 10

APPENDIX B (Continued)

d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012') is a manually inputted point that is updated by the operator. As up river temperature increases, SYS012 should be changed Y2 degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed 1/2/2 degree after reaching the next temperature range. To change the value refer to the table below:

NOTE If M036 is not available on ERFIS assume up river temperature = 631F.

M036 + River Temperature Correction Factor At,

>63 0F 20F

>59 0 F, <63 0 F 30F

>55 0F <590F 40F

<55°F 50F I

Write a Condition Report for any condition that violates or challenges NPDES limits.

e. The "TCRIT Delta T Margin" (point ID 'SYSO13') is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.

Appendix B OP 2180 Rev. 39 Page 4 of 10

APPENDIX B (Continued)

NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105). If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).

5. To change the value of the manually inputted points above perform the following:
a. On the ERFIS computer keyboard, press the 'CAV' button.
b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.

C. Using the cursor, click on the PTID field.

d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.
e. Verify PTID updated to appropriate Point ID on 'CAV' screen.
f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.
g. Verify computer point updated using CRO alarm typer.
h. Record ERFIS point ID, original, and final values on plant setting change log.
i. Update appropriate block on plant setting change log.
j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.

Appendix B OP 2180 Rev. 39 Page 5 of 10

APPENDIX B (Continued)

NOTE

  • --. IA-.
  • ,*.4** i.

If plant conditior is`quiie*T*F 24 - se;thef-a shi6ul b** utilized."r*

It'Wt#.* ~ V*...'4 'AC Startgad stopping shoiuld bo iiiiiimized fo prevent x"cessive wear to. 77:

breaker -- ntacts-.

If any of the following ERFIS values are unavailable, perform either of theactions below per C-41I-Fr-B 6.

Operations Manager approval.

USGEN River Flow - C278 0 River Up/Down Temp Rise - C019 0 Heat Reject to River - C064 S Conn. River Flow - C275 0 Margin to TCRIT - C276 S Instantaneous River Thermal Cap. - C277 S Condenser Inlet - F052, F053, F054, F055 S Condenser Outlet - F056, F057, F058, F059 S East Tower Outlet - F078 S West Tower Outlet - F079 I a. Verify river temperature rise is within ATr limits using the following formula, provided the 1lant is at steady state operation.

NOTE This calculation is only valid when the circulating water system is in open cycle.

ATr= 15.193*(MWt rejected)

(River flow in cfs)

I1 where: MWt rejected (COS) = 1912*(%CTP)-generator gross MW River flow in ets = USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder

1) Independently verify the calculation. (ER991077.05)

Appendix B OP 2180 Rev. 39 Page 6 of 10 LPC #3

APPENDIX B (Continued)

b. Place Circulating Water System in hybrid cycle with full recirculation flow (recirc gate

>85% open), at least 21 cooling tower fans operating, and intake gates open.

C. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.

NOTE Plant Setting Change Log must be completed daily. (ER981657 02)

7. Maintain Plant Setting Change Log as follows:
a. Daily, at 0000, record the following:

0 River Temperature Correction Factor (supplied by Operations management)

  • M036 ("UPRIVER TEMPERATURE")
  • SYS010 ("USGEN RIVER FLOW C278," CFS),
  • SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and
  • SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management)
  • C275 (CONN RIVER FLOW)
  • C278 (USGEN RIVER FLOW)
b. Log any of the following:
  • Major changes to Plant settings (system mode, number of operating fans, recirc gate position).
  • Plant settings based on anticipated Vernon Dam load changes per Step 3.
  • Unannounced Vernon schedule changes.
  • Other information pertinent to plant settings.
  • Changes in manually inputted data per Step 5 above.
  • When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.

Appendix B OP 2180 Rev. 39 Page 7 of 10

APPENDIX B (Continudd)

C. If plant conditions exist that cause concern about Margin to TCrit for any given hour, perform the following:

1) Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).
2) Attach graph to log.
d. At midnight each day, perform the following:
1) Calculate the number of hours the cooling towers were operated that day, to the nearest whole hour.

a) Log the number as part of the last log entry for that day "total for the day."

2) Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day.. The "running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.)

.143 "running total for the month"

..÷16 "total for the day" entry at 2400 &

next day entry at 0000 159 "running total for the month"

3) Turn over the log. SM/CRS approve -the-log. Print an official copy of the log.
4) Print a copy of the following and attach to previous day's log:

0 Trend 70 S Trend 71

5) Forward previous day's log and trend graphs to Operations Administrative Assistant.

Appendix B OP 2180 Rev. 39 Page 8 of 10

APPENDIX B (Continued)

8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings. Changes to plant settings shall be documented on PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.
a. If the network/software becomes unavailable, perform the following:
1) Maintain the log on VYOPF 2180.05.
2) Submit a Condition Report.
3) When the log software has been restored, enter the log in the software in a timely manner.

Appendix B OP 2180 Rev. 39 Page 9 of 10

APPENDIX B (Continued)

9. Listing of Project Save ERFIS Computer Points POINT ID DESCRIPTION UNITS C019 RIVER DOWN/UP TEMP RISE F C051 COND HEAT REJECTION MW C064 HEAT REJECT TO RIVER CFSF C102 NUMBER OF CIRC WATER PUMPS ON C103 NUMBER OF CIRC BOOST PUMPS ON C275 CONN RIVER FLOW CFS C276 MARGIN TCRIT DEGF C277 INST RIVER THERMAL CAPACITY CFSF C278 USGEN RIVER FLOW CFS F052 CONDENSER 1A CIRC WATER INLET DEG F F053 CONDENSER 2A CIRC WATER INLET DEG F F054 CONDENSER 1B CIRC WATER INLET DEG F F055 CONDENSER 2B CIRC WATER INLET DEG F F056 CONDENSER 1A CIRC WATER OUTLET DEG F F057 CONDENSER 2A CIRC WATER OUTLET DEG F F058 CONDENSER 1B CIRC WATER OUTLET DEG F F059 CONDENSER 2B CIRC WATER OUTLET DEG F F078 CIRC WATER OUT COOLING TOWER A DEG F F079 CIRC WATER OUT COOLING TOWER B DEG F F084 CW INTAKE GATE A.POSITION_

F089 CW INTAKE GATE B POSITION F090 CW INTAKE GATE C POSITION F085 CW RECIRC GATE POSITION M036 UP RIVER TEMPERATURE DEG F M037 DOWN RIVER TEMPERATURE DEG F SYSO0O* USGEN RIVER FLOW C278 CFS SYS012* TCRIT RIVER TEMP RISE LIMIT DEGF SYS013* TCRIT DELTAT MARGIN DEGF

  • Manually entered per Operations Management's Direction Appendix B OP 2180 Rev. 39 Page 10 of 10

APPENDIX C CIRCULATING WATER HYDRAULIC GATE OPERATIONS WITH DEGRADED POSITION INDICATION

1. Send an operator to the discharge structure.
2. Verify or place both hydraulic pumps in AUTO.
3. Place one pump in OFF.
4. Notify the Control Room to position the gate(s) to the desired position(s).
5. When directed by the Control Room turn off the operating pump.
6. When a gate needs to be re-positioned:

6.1. Send an operator to the discharge structure.

6.2. Start one hydraulic pump and notify the control room to position the gate(s) as desired.

6.3. When directed by the Control Room turn off the operating pump.

7. When the degraded position indication has been repaired, place both hydraulic pumps back in AUTO.

Appendix C OP 2180 Rev. 39 Page 1 of I

[EPU - APPENDIX D

..........DETERMININGAND ADJUSTING PLANT SETTINGS FOR NPDES COMPLIANCE 4"; ,- ;-'_'- ;_T,,jt* :"-.-.:BETWEENFT.HE:DATES OFOCTOBERiS-THROUGH MA-Y15. . - ..

S*~-i~T~1SDR9477)]

PU. . ... S.

NOTES Operations Management may implement changes to the

'*TCRIT Delta T Margin" or "*TCRIT River Temp Rise Limit" based on instrument inaccuracy or a need to modify our limits based on previous performance.

In addition to the normal phone service, Wilder Station (Trans Canada) can also be contacted at 1-888-291-8221, 1-800-291-8105, and 1-800-291-8000.

If a manual calculation is performed, document the calculation and results on the VYOPF 2180.05 form to maintain a copy of the calculation.

CAUTION Removing a water box from service will cause the applicable ERFIS points, F052 to F059, to become inaccurate and may result in I exceeding the NPDES permit. (ER 2002-2181)

Monitoring the plant settings is accomplished by using the following trends on ERFIS:

a. Trend 70 contains a graph of (1) Margin to TCRIT - C276, (2) Instantaneous River Thermal Capacity - C277, and (3) Heat Rejected To River - C064.
b. Trend 71 contains a graph of (1) Up River Temp - M036, (2) USGEN River Flow -

C278, and (3) River Temperature Rise - C019.

c. Trend 72 contains a graph of Margin to TCRIT - C276, set on a I hour scale to enhance definition.

Appendix D OP 2180 Rev. 39 Page I of 12

.LPC #3

APPENDIX D (Continued)

2. To determine plant settings:
a. Obtain a value for:
1) C277 "INST RIVER THERMAL CAPACITY"
2) C174 "OUTDOOR WET BULB TEMPERATURE" or equivalent wet bulb temperature
3) M036 "UP RIVER TEMPERATURE"
4) River Temperature Correction Factor, as specified by Operations Management
5) C275 "CONN RIVER FLOW"
b. Apply the obtained values as follows to obtain estimated settings:
1) IF UP RIVER TEMPERATURE IS <50OF, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows:

a) Apply Up River Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.

b) IF the obtained readings are not exact matches for the values on the tables, round the -values as follows:

  • If the river temperature is not an exact match to any table, round down to the next lowest river temperature.
  • If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.
  • If wet bulb temperature is >300 F, round up to the next highest wet bulb temperature.
  • If wet bulb temperature is <30'F, round down to the next lowest wet bulb temperature.

c) Initial tower settings are at the intersection of the wet bulb temperature column and river flow.

Appendix D OP 2180 Rev. 39 Page 2 of 12

APPENDIX D (Continued)

2) IF UP RIVER TEMPERATURE IS >50°F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.
c. To make changes to plant settings refer to the appropriate section of the operating procedure.
3. When the schedule for Vernon Hydro will result in a reduction in river flow, the adjustments should be made at least 30 minutes prior to the scheduled Vernon Hydro change, for increases in river flow adjustments should be made after the Vernon Hydro change is complete as follows:
a. Determine Instantaneous River Thermal Capacity as follows:

IRTC = River Flow * (SYS012 - SYS013)

Where: SYS012 = TCRIT River Temp Rise Limit SYS013 = TCRIT Delta T Margin

b. Apply the obtained values as follows to obtain estimated settings:
1) IF UP RIVER TEMPERATURE IS <50°F, THEN refer to Figure 17 for single cooling tower operation or Figure 18 two tower operation as follows:

a) Apply UpRiver-Temperature, the River Temperature Correction Factor, the Wet Bulb Temperature, and River Flow to arrive at the estimated plant setting.

b) IF the obtained readings are not exact matches for the values on the tables, round the values as follows:

0 If the river temperature is not an exact match to any table, round down to the next lowest river temperature.

& If the river flow is not an exact match to any river flow on the table, then round down to the next lowest river flow.

0 If wet bulb temperature is >30%F, round up to the next highest wet bulb temperature.

  • If wet bulb temperature is <30 0 F, round down to the next lowest wet bulb temperature.

Appendix D OP 2180 Rev. 39 Page 3 of 12

APPENDIX D (Continued) c) Initial tower settings are at the intersection of the wet bulb temperature column and river flow.

2) IF UP RIVER TEMPERATURE IS >50°F, THEN refer to the nomographs, Figure 5 through 11, for the present River Temperature plus the River Temperature Correction Factor, Wet Bulb Temperature, and Instantaneous River Thermal Capacity to arrive at the estimated plant setting. These settings are expected to be very conservative.

C. Record on plant setting change log changes in:

1) CW/CWB Pumps
2) Number of cooling tower fans
3) Gate positions CAUTIONS

" Monitoring of up river temperature is critical to the proper peration of the Project Save, due to the manually inputted numbers for river temperature when river temperature is changing.

" When adjusting plant parameters for NPDES compliance, the recirc gate shall not be opened until the cooling towers are placed in service.

  • During winter operations the recire gate is routinely positioned to prevent intake structure freezing. However, when adjusting plant parameters for NPDES compliance, the recirc gate should not be repositioned until the cooling towers are placed in service.
4. By frequently monitoring the ERFIS trends, adjustments to plant settings can be fine tuned to attain the most desirable output. 30 minutes is required to attain steady state conditions after adjustments are made.
a. Margin to TCRIT should be maintained above "0", but because of variances in inputs it may drop below "0" momentarily (ERFIS alarm). Verify that the area of the curve below "0" will be less than the area of the curve above "0" for each hour (HROO to HR59). Take steps to reduce thermal discharge as necessary to provide sufficient margin to ensure compliance for the hourly Margin to TCRIT.

Appendix D OP 2180 Rev. 39 Page 4 of 12

APPENDIX D (Continued)

b. Heat Rejected to the River should be maintained below the Instantaneous River Thermal Capacity. This will ensure that the plant does not exceed the river capacity.
c. The River Up/Down Temp. Rise should be maintained below the allowable temperature rise from the Precautions/Limitations based on current up river temperature.
d. The "TCRIT River Temp. Rise Limit" (point ID 'SYS012') is a manually inputted point that is updated by the operator. As up river temperature increases, SYS012 should be changed %/degree before reaching the next temperature range. As up river temperature decreases, SYS012 should be changed %degree after reaching the next temperature range. For the period October 15 to May 15 TCRIT Temp. Rise Limit is equal to 65F-M036 not to exceed 13.4 AT.
e. Write a Condition Report for any condition that violates or challenges NPDES limits.
f. The "TCRIT Delta T Margin" (point ID 'SYS013') is a manually inputted point that is updated by the operator on direction from Operations Management per Step 5.

Appendix D OP 2180 Rev. 39 Page 5 of 12

APPENDIX D (Continued)

NOTE If the C278 USGEN RIVER FLOW signal becomes invalid, then a fixed value (SYS010) of 1,250 CFS will be fed into C275 CONN RIVER FLOW. The flow value of SYS010 may be adjusted by Control Room personnel once they are able to obtain the correct river flow from Wilder Dam personnel (802-291-8105). If a microwave signal problem is indicated, additional information regarding the microwave signal problem may be obtained from National Grid (508-389-2441) or Northeast Utilities (860-665-6000).

5. To change the value of the manually inputted points above perform the following:

NOTE Changing the value of manually inputted points may impact the margin to TCRIT.

a. On the ERFIS computer keyboard, press the 'CAV' button.
b. Log in to the User Security Password screen by typing the appropriate password and pressing the Enter key.
c. Using the cursor, click on the PTID field.
d. At Data Point Selection window, type in appropriate point ID in the Point Search/Text space and then hit 'Find'.
e. Verify PTID updated to appropriate Point ID on 'CAV' screen.
f. Move cursor to VALUE field and enter new Point ID value. Press enter on the ERFIS computer keyboard.
g. Verify computer point updated using CRO alarm typer.
h. Record ERFIS point ID, original, and final values on plant setting change log.
i. Update appropriate block on plant setting change log.
j. Have a second operator verify the as left value of the computer point being changed and make a note on plant setting change log.

Appendix D OP 2180 Rev. 39 Page 6 of 12

APPENDIX D (Continued)

NOTE

  • If~pla ~toYf th-e fan sholdl lie utilized: "

TVon Ueu*ý'uSe; t.~i.?. .~.

Startingndstopp Tshbiiildbc,ninimized to, revwc.t-excegsive.-. £.

wear to breakefcontacts.

6. IF any of the following ERFIS values are unavailable and upstream river temperature is greater than 51.6*F, OR upstream temperature is <51.6*F and river flow is <1500 cfs, THEN perform either of the actions below per .Operations Manager approval.
  • USGEN River Flow - C278
  • River Up/Down Temp Rise - C019 Heat Reject to River - C064
  • Conn. River Flow - C275
  • Margin to TCRIT - C276
  • Instantaneous River Thermal Cap. - C277
  • Condenser Inlet - F052, F053, F054, F055
  • Condenser Outlet - F056, F057, F058, F059
  • East Tower Outlet - F078"
  • West Tower Outlet - F079
a. IF the plant is at steady state operation and ihe circulating water system is in the open cycle, THEN verify river temperature rise is within limits using the following formula:

ATr = 15.193*(MWt rejected)

  • (Riverflow in -efs)-

Ft~ where: MWt rejected (CO51) 1912*(%CTP)-generator gross MW River flow in cfs = USGEN River Flow C278 OR Conn River Flow C275 OR Vernon reported flow from Wilder

1) Independently verify the calculation. (ER991077_05)

Appendix D OP 2180 Rev. 39 Page 7 of 12 LPC #3

APPENDIX D (Continued)

b. IF the result is not within the ATr limit OR the calculation cannot be performed, THEN place the circulating water system in a hybrid cycle based upon the following assumptions, per Figure 17 for single cooling tower operation or Figure 18 for two cooling tower operation if river temperature is <50°F, or nomographs (Figures 5 through 11) if river temperature is >50°F.

1250 cfs river flow

  • Use last wet bulb temperature, IF within four hours of taking the reading.

IF >4 hours have elapsed since taking the reading, THEN obtain actual wet bulb temperature using I&C M&TE equipment or ERFIS point C174, if available.

0 Obtain river temperature. Use methods in OP 2181, Local Sample Service Water Temperature Monitoring, if normal river temperature indication is not available.

0 Calculate Instantaneous River Thermal Capacity as follows. For winter operations limit IRTC to <16750 cfs- "F.

IRTC = 1250 cfs * (65"F - River Temperature)

c. Adjust tower settings per the appropriate Table. Interpolate as follows:
1) Select the table with the appropriate river temperature. If the river temperature is not an exact match to any figure, round down to the next lowest rivertemperature.
2) Select the appropriate river flow. If the river flow is not an exact match to any river flow on the figure, then round down to the next lowest river flow if Figures 17 or 18 are used.
3) Select the appropriate IRTC if Figure(s) 5 through 11 are used.
4) Select the appropriate wet bulb temperature. If the wet bulb temperature is not an exact match for any wet bulb temperature on Figure 17 or 18, then proceed as follows:

If wet bulb temperature is >30 0 F, round up to the next highest wet bulb temperature.

0 If wet bulb temperature is <30%F, round down to the next lowest wet bulb temperature.

Appendix D OP 2180 Rev. 39 Page 8 of 12

APPENDIX D (Continued)

5) For Figure 17 or 18 initial tower settings are at the intersection of the wet bulb temperature column and river flow. The information provided is defined as follows:

0 Ilyb: This means hybrid mode.

0 FOO: This means fans and the two numbers indicate the number fans required to be running.

S G000: This means recirc gate and the two numbers indicate recirc gate position.

  • For example on Figure 17 or 18, an initial setting of Hyb:F22:G03 means circ water in hybrid mode, 22 fans in service, and the recirc gate set to 3% open.
6) For Figure 5 through 11 make initial tower settings per the nomograph.
d. Document calculation and results on plant setting change log form VYOPF 2180.05, to maintain a copy of the calculation for review by the Environmental Engineer at a later date.

NOTE Plant Setting Change Log must be completed daily. (ER981657 02)

7. Maintain Plant Setting Change Log as follows:
a. Daily, at 0000, record the following:
  • River Temperature Correction Factor (supplied by Operations management)
  • M036 ("UPRIVER TEMPERATURE")

0 SYS010 ('"USGEN RIVER FLOW C278," CFS),

0 SYS012 ("TCRIT RIVER TEMP RISE LIMIT," DEGF), and

  • SYS013 ("TCRIT DELTAT MARGIN," DEGF) (supplied by Operations Management) 0 C275 (CONN RIVER FLOW) 0 C278 (USGEN RIVER FLOW)

Appendix D OP 2180 Rev. 39 Page 9 of 12

APPENDIX D (Continued)

b. Log any of the following:

0 Major changes to Plant settings (system mode, number of operating fans, recirc gate position).

0 Plant settings based on anticipated Vernon Dam load changes per Step 3.

0 Unannounced Vernon schedule changes.

0 Other information pertinent to plant settings.

0 Changes in manually inputted data per Step 5 above.

0 When the OATC is relieved, the oncoming OATC signs into the log using the current shift position turnover icon.

c. If plantconditions exist that cause concern about Margin to TCrit for any given hour, perform the following:
1) Print Trend 72 graph as close to the hour as possible to include the entire hour in question (HR 00 to HR 59).
2) Attach graph to log.
d. At midnight each day, perform the following:
1) Calculate-the.number-of hours the cooling towers were operated-that-day, to the nearest whole hour.

a) Log the number as part of the last log entry for that day "total for the day."

2) Calculate "running total for the month" by adding "total for the day" at 2400 to the 0000 "running total for the month" and log this number in the last entry for that day as well as the first entry for the next day. The "running total for the month" will be returned to zero at 0000 on the first day of each month. (See example below.)

143 "running total for the month"

+ 16 "total for the day" entry at 2400 &

next day entry at 0000 159 "running total for the month" Appendix D OP 2180 Rev. 39 Page 10 of 12

APPENDIX D (Continued)

3) Turn over the log. SM/CRS approve the log. Print an official copy of the log.
4) Print a copy of the following and attach to previous day's log:
  • Trend 70
  • Trend 71
5) Forward previous day's log and trend graphs to Operations Administrative Assistant.
8. The control room operator will fill out form VYOPF 0150.03A, CRO Round Turnover Sheet, to document component failures of equipment associated with Project Save that cause actions to be taken to change plant settings. Changes to plant settings shall be documented on VYOPF 2180.05, PLANT SETTING CHANGE LOG. Out of service components shall be maintained on VYOPF 0150.03A until component is returned to service.
a. If the network/software becomes unavailable, perform the following:
1) Maintain the log on VYOPF 2180.05.
2) Submit a Condition Report.
3) When the log software has been restored, enfer the log in the software in a timely manner.

Appendix D OP 2180 Rev. 39 Page 11 of 12

APPENDIX D (Continued)

9. Listing of Project Save ERFIS Computer Points POINT ID DESCRIPTION UNITS C019 RIVER DOWN/UP TEMP RISE F C051 COND HEAT REJECTION MW C064 HEAT REJECT TO RIVER CFSF C102 NUMBER OF CIRC:WATER PUMPS ON C103 NUMBER OF CIRC BOOST PUMPS ON C275 CONN RIVER FLOW CFS C276 MARGIN TCRIT DEG F C277 INST RIVER THERMAL CAPACITY CFSF C278 USGEN RIVER FLOW CFS F052 CONDENSER 1A CIRC WATER INLET DEG F F053 CONDENSER 2A CIRC WATER INLET DEG F F054 CONDENSER 1B CIRC WATER INLET DEG F F055 CONDENSER 2B CIRC WATER INLET DEG F F056 CONDENSER 1A CIRC WATER OUTLET DEG F F057 CONDENSER 2A CIRC WATER OUTLET DEG F F058 CONDENSER 1B CIRC WATER OUTLET DEG F F059 CONDENSER 2B CIRC WATER OUTLET DEG F F078 CIRC WATER OUT COOLING TOWER A DEG F F079 CIRC WATER OUT COOLING TOWER B DEG F F084 CW INTAKE GATE A POSITION F089 CW INTAKE GATE B POSITION I I F090 CW INTAKE GATE C POSITION F085 CW RECIRC GATE POSITION M036 UP RIVER TEMPERATURE DEG F M037 DOWN RIVER TEMPERATURE DEG F SYS010* USGEN RIVER FLOW C278 CFS SYS012* TCRIT RIVER TEMP RISE LIMIT DEG F SYS013* TCRIT DELTA T MARGIN DEG F
  • Manually entered per Operations Management's Direction]

Appendix D OP 2180 Rev. 39 Page 12 of 12

COOLING TOWER CHECKLIST INITIAL/DATE

/

I. Construction work on cooling towers complete.

/

2. Maintenance on CWB pumps complete; pumps are operable.

/

3. Maintenance on CWB pump ACBs complete.
4. New seal water filters installed for CWB pumps, spare filters /

available.

/

5. Intake, recirc and bypass gates are operable.
6. Preventive maintenance on cooling tower fans scheduled for completion during initial tower wetting (oil samples, vibration /

readings and amp readings).

7. Instrumentation calibrated and operable to support cooling tower /

operations.

8. Hypochlorite and acid systems available for pH control and /

chlorination.

/

9. CW system WRs and tagging orders reviewed for impact.

/

10. Fan Balancing completed if required; fans are operable.
11. Initial tower wetting performed prior to normal cooling tower operation.

Comments/Exceptions:

Checklist Completed:

Print/Sign Date VYOPF 2180.02 OP 2180 Rev. 39 Page 1 of 1

PLANT SETTING CHANGE LOG Date:

C275 CONN SYS013 TCRIT DELTAT MARGIN RIVER FLOW C278 USGEN M036 UP RIVER TEMPERATURE RIVER FLOW SYS010 (C278 USGEN RIVER TEMPERATURE RIVER FLOW) CORRECTION FACTOR SYS012 TCRIT RIVER M036 + RIVER TEMPERATURE TEMP RISE LIMIT CORRECTION FACTOR RIVER TEMPERATURE (CIRCLE ONE) INCREASING STEADY DECREASING TIME ENTRY INITIALS 0500 RO CRS SM (Print/Sign) (Print/Sign) (Print/Sign) 1700 RO CRS SM (Print/Sign) (Print/Sign) (Print/Sign)

VYOPF 2180.05 OP 2180 Rev. 39 Page 1 of I

FIGURE 1 HYDRAULIC GATE DIRECTIONAL CONTROL VALVE INSERT PHILLIPS SCREWDRIVER INTO THE APPROPRIATE DIRECTIONAL CONTROL VALVE TO RE-POSITION GATE:

Figure 1 OP 2180 Rev. 39 Page 1 of I

FIGURE 2 GENERAL ELECTRIC PSYCHROMETRIC CHART 1-1 GENERAL* ELECTRIC

  • 1*

PSYCHROMETRIC CHART Barometric Pressure 29.92" Hg.

Dow Potint 85 CUP:

Figure 2 OP 2180 Rev. 39 Page 1 of I

FIGURE 3 WET BULB TEMPERATURE (F) BASED ON DRY BULB (F) AND DEW POINT (F) TEMPERATURES Dry Dew Point bulb 10 20 25 30 35 40 45 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 95 10 10 20 18 25 21 2 30 24 27 28 30 35 27 30 31 33 35 40 30 33 34 36 38 40 45 33 35 37 38 40 43 45 50 36 38 39 41 43 45 47 50 52 38 39 41 42 44 461 4 8 52 54 39 40 42 43 45 47 49 52 53 54 56 40 42 431 44 46 48150 52 54 55 56 58 41 43 44 45 47 48 51 53 54 5657 58 60 42 44 45 46 48 49 52 54 55 56 58 59 60 62 44 45 46 47 49 50 52 55 56 57 58 59 6t 62 64 45 46 47 48 50 51 53 56 57. 58 59 60 616 64 66 46 47 48 49 51 52 54 56 57 58 60 61 62 63 65 66 68 47 48 491 50 52 53 55 "57 58 59 60 61 63 64 65 67 68 70 48 50 50 52 53 54 56 58 59, 60 61 62 63 64 66 67 69 70 72 50 51 52 53 54 55 57 59 60 61 621 63 64 65 66 68 69 71 74 51 52 53 54 55 56 58 60 61 61 62 63 65 66 67 68 70 71 73 74 76 52 531 541 55 56 57 59 61 61, 6'2 631 64 65 66 661 69 70 72. 731 75 76 78 53 54 55 56 57 58 60 61 62 63 '64 65 66 67 68 69 71 72 73 75 77 78 80 54 56 56 57 58 59 61 62 63 64 65:66 67 68 69 70 71 72 74 75 7779 80 82 56 57 57 58 59 60 62 63 64 65 66 66 67 68 69 71 72 73 74 76 77 79 81 82 84 57 58 59 59 60 61 63 64 65 66 66 67 .68 69 70 71 72 74 75 76 78 79 81 83 84 86 58 59 60 60 61 62 64 65 .66 67 67 68 69 70 71 72 73 74 75 77 78 80 81 83 85 86 88 59 60 61 62 62 63 65 66 67 67 68:6970 71 72 73 74 75 76 77 79 80 81 83 85 87 88 90 61 61 62 63 64 65 66 67 68 68 69 70 71 71 72 73 74 75 77 78 79 80 82 83 85 87189 90 95 64 65 65 66 66 67 68 70 70 . 71 71 72 7373 74 7576 77 78 79 80 82 83 84 86 87 89 91 95 100 67 68 68 69 6970 71 72 7 3 -73=4 7 76 778 791 80181 82 83 84 51 8 17I 901 91 88 96 Note: Above values based on following equation from EPA Repo #16130FDQ by Thackston, E.L. and F.L. Parker of Vanderbilt University in Nashville, TN entitled "Effect of Geographical Location on Cooling Pond Requirements and Performance," published March 1971.

Wet Bulb = Dry Bulb x (0.655 + 0.36 x exp[9500.8 x ([1/(460+Dry Bulb)]-[1/(460+Dew Point)])])

Figure 3 OP 2180 Rev. 39 Page 1 of I

FIGURE 4 90% EXCEEDENCE VALUES FOR WET BULB TEMPERATURE EXTRAPOLATION FIGURE 4 90% EXCEEDENCE VALUES FOR WET BULB TEMPERATURE EXTRAPOLATION Lead Tlu.

0 1 2 3 4 5. 7 8 9 1r 11 12 13: 14 15 16 20 21 22 23 17 18 19" 2.0 2.2 2 .4 247 3.0 3.3 3.6 3.8 3.9 40 4.0 3.9 3.8 3A6 3.3 3.0 2.7 2.4 2.2 1.8 1.8 1.8 1.8 2 2.1 2.6 3 -.1 3.7 2.0 3 .7 4.6 4.3 4.8 5.3 ' 5.6 a5.8 5.8

. 5.6 '5.3 4.8" 4.3 3.7 3.1 1.6 2.1 1.6 1.5 1.5 125 1.8 2.2 2.9 5.4 6.2 6.8 7.1 7.4 7,4 .7.2 6.81 6.2 13 2.6 3.6 4 .*7 .9 6,9 7i 8.5 8.9 9.0 8.3 8".5 7.8 6.9 5.4 4.6 3.7 5.9' 4,7 3.6 2.9 2.1 1.5 1.1 0.9 0.9 1.8 1.5 2.6 1,7 1.0 0.6 0.4 0.6 1.0 1.7 5 3.3 4.6 .,0 7.3 8.5 9.4.10.1 10.3 0.1 10.3 10,1 9.4 8.5 7.3 6.0 4.6 3.3 2.1 11 0.5 .0.1 0.1 0.5 1.1 2.1 6 4.2 5.8 '.3 8.8 10.1 11,0 11.6 11.6 11,6 l11. 10.1 8A8 7.3 5.8 .4.2 2.7 1.5 0. --0.1 -0.3 0.5 1.5 2.7 7 5.3 7.0 18, 10.3 11.6 12.5 12,9 8

12.9 12.5 11,6 0. .8,3 7,0 5.3 3.5 2.0 ;0.7 -0.1 -0.6 -0.6 - -0.1 0.7 2.0 5.5 6.5 8.4 1.7 11.8 13.0 14 1.2 13.1 13.7"14.0 13.7 13.0U11.8 o-. 8.4 6.5 4.6 2.8 1.2" 0.1 -0.7 -0.9 -0.7 0.1 1.2 2.8 4.6 9 7.9 9.9 14.2 14.7 14.7 14.1 13.1 1lh7 t9.9 7.9 3.8 3.8 .2.0"0.3 -0.5 -1.0 11 -1.0 -0,.5 0.5 2.0 3.8 S.8 10 9.3 11.3 1.0 14.3 13.1 IS4 15.1. 14.3 13.0 11.3 9.3 7.1 5.0 .3.0 1.2 -0.1 -0.9 -1.2 -0.9 -0.1 1.2 3.0 5.0 7.1 21 10.6 12.5 h.1 1532 15.8 15.8 13.2 14,1 12.5 10.6 8 6.2 4.1 *2.2 .0.6 -0.5 -1.1 -1.1 -0.3 0.6 2.2 4.1 6.2 8.5 12 11.8 13.6 1:1.0 13.9 16.1 15.9 15.0 13.6 11,8 9.8 o75 5.3 3.2 1.5 0.1 -0.8 -1.1 -0.8 0.1 1.5 3.2 3.3 9.8 13 12.9 14.5 12, 13.7 15.0 1:$.6 16.1 16.1 13.6 14,5 12.9 11.0 8.8 6.6 4.4 2o5 0.9 -.. 2.-0.S -0.8 -0.2 0.9 2.5 11.4 6.6 8.8 11.0 5.8 16.1 15.8 15,0 13.7 12.0 10.0 7.8 357. 3.7 1.9 0.6 -0.2 -0.5 -0.2 0.6 1.9 3.7 5.7 10.0 12.0 23 14.1 15.2 5.8 15.8 13.2 14,2 12.7 16 14.4 13.1 1.4 15.1 14.4 10.9 .,9 6.9 4.8 3.1 1.6 0, 0.0 0.0 0.5 1.6 3,1 4.8 6.9 8.9 10.9 12.7 15.2 11.7 9.9 7.9 6.0 4.2 2.7 1.5 0.7 0.5 0.7 1.5 2.7 4.2 6.0 7.9 9., 11.7 13.2 17 14.3 14.8 1.8 14.1 13.4 12.1 10.6 13.9 14.1 3.9 13.3 12.3 8.9 7.1 5.4 3.8 2.6. 1.7 1.2 1.2 la7 2.6 3.8 5.4 7.1 4.9 10.6 12.1 13.4 29 11.1 9.6 8.0- 6.5 5.0 3.7 2U8 2.2 2.0 2.2 2.8' 3.7 5.0 6.3 8.0 9.6 11.1 12.3 13.3 13.3 13.3 2.9 12.2 11.3 10.1 8.8 7.4 6.14..9 3.0 3.3" 2.9 20 2.9 3.3 3.9 4.9 6.1 7.4 8.8 10.1 11.3 12.2 12.9 12.4 12.3 It 1.9 11.2 10.3 21 11.5 11.3 9*3 8.1 7.0 6.0 Se.1 4.4 4.0 3.6 4.0" 4.4 .3.1 0.0 7.0 8.1 9.3 10.3 11.2 11.9 12.3 22 10.4. 10.2 1I0.8 10.2 9.8 9.4 9.3 8.6 7.8 7.0 6.2 5.6. 5.2 4.9 4.9 352- V;6 6.2 7.0 7.8 8.6 9.5 30.2 10.8 11.31 11.5 28 1I 8.8 8.3 7.7 7,2 6.7 6.3 6.1. 6.0 6.1 6.3 6.7 7.2. 7.7 .8.3 8.8 9.4 9.8 10.2 10.5 10.5 23 9.41 9.3 P.O 8.8 8.5 8.2 7.9. 7.7 7.5 7.3 7.2 7.2 7.3 7.5 7.7 7.9 8.2 8,.5 8.8 9.0 9.3 9.4 9.5 9.5 24 8.5 8.5 8.5 8.5 8.5 8,5 8.5 8,5 8.5 8.3 .8.5. 8.5 8.5 8.5 8.5 25 8.5 8.5' 8o5 8j 8.5 8.5 8.5 8.5 8.5 7.8 8.0 5.A 8.5 1.8 S.1 9.3 9.5 9.7 9.8. 9.8 9o7 9.3 7.3. 7.6 26 9.3 9.1 8.8 8.5 8.2 8.0 7.8 7.6 7.3 7.3 7.5 a.3 8.g 9.4 10.0 10., 10.8 11.0 11.1 11.0 10.8 10.4 6.7 6.6 6.7 6.9 27 7.1 10.0 9.4 8.9 8.3 7.8 7.3 6.9 2a 7.8 8.7 9.5 10.3 11.1 11.7 12.1 t2.4 12.4. 121o.11.7 11.1 10.3 9.3 8.7 7.8. 7.1 6.3 6.0 5.8 3.8 6.0 6.5 7.2 8.2 9.3 10.4 11.3 12.4 13.1 13.5 13.6 13.5 13.1 12.4 11.3 29 10.4 9.3 8.2 7,2 6.3 356 5.2 5.0 5.2 6.3 20 7.5 8.8 0.2 11.5 12.7 13.7 14.3 14.7 14,7 14.3 13.4 12,7 11.5 10.1 8.5 7.5 6.3. 5.3 4*7 4.3 4.3 4,7 5.,3 5.3 8.1 9.7 1.3 12.8 14.0 13,0 15.6 1.,8 15.6 15,0 14s0 12.8 11.3.

36 1A.8 16.6 8.0 18.8 9.7 8.1 6.7 5.4 4.5 3.8 3.6 3.8 4.5 6.7 48 19.1 1,8 1.0 16.6 14,8 1217 10,5 8.3 6.2 4,4 3.1 2.2 1.9 2.1 3.1 4.4 6.2 6.3 10.5 12.7 10.7 10.7 0.7 10,7 10.7 10.70.7 10.7 10.7 10.710.7 10.7.10.7 10.7 10.7 10.7 10.7 10.7 104-7 10.7 10.7 10.? 10.7 LO.

EXAMPLE:

Problem -t Estimation of maximum wet bulb needed for time period from 1100 to 2100 Present Conditions -f Time, 1000; Wet Bulb, 57.3*F Figure 4 OP 2180 Rev. 39 Predictions -t Maximum correction from 1 to 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> from present time is 10.3°F Page 1 of 1 Wet bulb not exceeded 90% of the time from 1100 to 2100 is 67.6'F

FIGURE 5 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 50.0-54.9 0 F Summer Operation Nomograph River Temperature SOP - 54.9F (1593 MWtb, 200 hp Fans)

OpenCycle

  • raý!ns - necfirc. oat a Clole4 . ........ ..... *
  1. Fans: 00 .............. ..............

6 ..... ....

Or Reicirc. 04te Ponitqion - !A41 Fansn..

  1. Fans: 02 ............... ." ............ ............... .........
  1. Pansz 04 . .............. t... .............. ............... . .
  1. Fans: 06 3.. ..... ........... ....  :"'-. ...... ... ............
  1. Fans: 08 S............
  1. Fans: 10
  1. Fans: 12
  1. Fans: 14
  1. Panst 16
  1. Fans: 18 2:0.--::::., o ::::::.4 :::S--.. ::::::

"".............4.......................... so*....... "

/...o

. . . / .1-....o.".:.c . ... .

  • Fans: 20 1........~.......  :~ ..... -e........--......................

434 #Fans: 22 ...... ....... ........ . . . .......... .............. e. ........ .... .......... ..... ........ ..... ............... ...... ........ ............ ................

%Gatepos: 10 .......

{..... ...... ............... r............... . ......... .. ............ {. ...... ..................

. .... ............. L . .......... .......

%GatePos: 20 .. .. .... .. .. .. . . .. . .

%GatePos: 30 ~ ~~

.......... ~ ~ ~ ~ ................-........

~ ~ ~ ~t.........

........ ~ ~~~- {..... .. ...................... :.......... *............ .......i ....... "...............

%GatePos: 40

%GatePos: 50 ...... "..

.. .. . i..........................{ ......... ....:.............. I'....:........... T..... ........ t"........ . ..t._ .... ........... !... _............

I... ........

%GatePost 60 t ~ ~ ~~ ~ ~ __ ~

_I_ _ __ ~ _~ _ __ ~ _ _ __~ ~

_ _ __ ~ _ _.....

%Gatepos: 70

%Gatepos: 80 " .... ... .. .. .......

%Gatepos: 90 ClosedCycle 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfc-F)

Figure 5 OP 2180 Rev. 39 Page 1 of 3

FIGURE 5 (Continued)

[EPU - Summer Operation Nomograph River Temperature 500 F - 54.9 *F (1912 MWth, 200 hp Fans) ]

openeycle, # F6n3 - rcirc. 6ate C1osed . i! , , '"' , ., i

  1. Fans: 00 . ....... i............ .-Pate

%R~circ. I............ .Al

............Pdeition .-...........?nnOn............ . ............ ............ 4............. I....... ....... ... - .-..... . ....

a 02 .. ........ t.s....... .

  • Fans:00 .......  :...... ......  :......":..........  :... 2...........',*;.....

".......I... *- *:.. -..... "-

  1. Fan l 04 ...... ......... ..... ............. ............ . .====.=====. . ...........................

.===.

06 .....

4Fans: 08 ....... 6. "

...... ....... ...- ......... ....' ...... .. .#F.:s . ..-. 4. ".......

10 . ..................... .. . .. ........-. ..... .... ......... ..

  1. F n : I *Fas:12Wet-bulb-

.... :............. ............ ...... 2dF oi

....... *EF6F . ...O....... ....... 7 Q7 80F:

  1. Pans:. 12161
  1. Fans: 1.8... ........ :Fann:

........ / ...... ...........................

  • ,.i. . .........
  1. Fans: 22 ........ ...... y G......:

40 . . .................. ...... !...... ...... .... ......

I' #Pan---s:

  1. Fas:...... ..... .......... ...... ........

te*o.: 10*

%GatePos: 70....."

......... .. ............ 44 ........ ............ ............. ....... .........

%GGatePos: 90 .................. ............ ..........................

%GatePos: 40 -.......... ............ ............ ............ ............ ............ ............. ............ ....... ............ ............ ............ .............

%Gate,

%GatePos: s son -.......

.0 i............ .............. i............ .-............."............ .

80....... ............ "............-."............ ............ ............... "........... .............. ".............

  • ,:o o,: 0 ..... ..... ... ..."............ i........... 4.. .....i............ "....... i............ i............

i ............ i............. i ......... i.............

%Gate~o,. 70 . ....... !............. :............ !............ ?. .. ....!........... ............ !............. ............. I............. ............. ............. ?............ -------------.

W* t~eot : 80o ........ i............ ._........... i........... J.......... i............ ............. ............ ............. !............ ............... i............ .............. i.............

%GatePos: 90 .....t. .......... ............ i............ - ..... !............. ............ i ........... . ............ ............. ............ ............. ............ .............

%GOP 218 Rev..39 River Thermal Capacity (cfs-F)

Figure 5 OP 2180 Rev. 39 Page 2 of 3

FIGURE 5 (Continued)

Summer Derate Nomograph River Temperature 50°F - 54.9 'F (1912 MWth, 200 hp Fans) ]

NO DERATE REQUIRED Figure 5 OP 2180 Rev. 39 Page 3 of 3

FIGURE 6 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 55.0-58.9 0 F Summer Operation Nomograph River Temperature 5SF - 58.9F (1593 Mwth, 200 bp Fans) 00 ""! ............. - ................. .---...... ............

Rerc. CGate Pozit*ion 3ll Fan. On A

M f ao

.02 04 S:

. ........... ! ............. I ............ ............. ;..............* .........

.. /..... .."! .-...........

. ........- ...-. -.-.. ..... .. ...----- . . . .I- - ........ ..

  1. Fan st 06 . .......... ............. . .................. ...... ,............ . ........  ; .. : . ... *........ ....... . ._ ........ .---. .............
  1. Fans,:an 108 0 ---:......... ....... ...... ....... ...... .... ......

. .:'-'-".....-,..-.......:.......2-... ,. '.........:.................

.. i ........ ....--.-..........

OFans 1 10 . .......... : ......... * -. :*".................... ...... - ..................

. ...... ......-ans .. .....-- t ..... . . .......

  • Fa....12W.t-b,41b-.-....

.r=,

..... ... ::*Fanu...... ...14 ... ...

-j.40~.

................... .~ 0P ,. 70F 8O

  1. Fans ....... . ........ . ............. .. . ............
  1. Panris 2. 16 -- ...... . .- . .. ..-. ... '.. ........ ......... ..

-. . . / ..... ... ........ ... .. ...

  1. Fa n- t 2. .. .... . .. . . .. ..

%-A. . 0. -f .......... 4.............

%O o at 4  : . . . . . . . . ... .4 ..... ..... ..... ..... , ............ .......... .............

%.atePo t10.......... ......... ..... I ............

l-Gateros: 30 ....... 1....::.-". -----........- ...... ............ ............. .............. ..........

%QatePost260..... .,...... . ..-.- I.~ . .. . ....... L.....

%Gat~ePou:.............

%GatePost s: 40 60 ............... ....... i............ :-........... -................

3..............

.+............

. t .............

............ I-- ...-.........

%Gatepost 80 . ........... i....... ...... ............. *.......... ............... ........ . ........... ............... * ... ..... ........ ..... , ............. ,.... ........ : .............

%Gatepost 90 .. . ___..... ...

5000 6000 7000 8000 .9000 1.0000 11000 12000 13000 14000 15000 16000 17000 19000 Rlver Thermal Capacity (cf*-*"

Figure 6 OP 2180 Rev. 39 Page of3

FIGURE 6 (Continued)

[EPU - Summer Operation Nomograph River Temperature 55°F - 58.9 *F (1912 MWth, 200 hp Fans) ]

Ope~fcye # Fails - R~cAirc- hate Cl.osed

  1. Fans: 00 . . ......... - ........ ....................... . . I ........... 4 ........... .........

_%!Re~irc. qlate Pcsition:- An:: Fans O~n

  1. Fans:
  1. ranm % 04006 ........... *..... ... ........ .:.......... --....- '" ........... :............ ............. . ":..........."
  • .' . ........'"["i*

........ ::.........J-t

  • . * ,0...............
  1. Fans: 0 -.... . ........... . ............... ...... ....
  • Fns 08.............. ...  ;.1 ..... *.... ... .. . . .
  • FAn- : 10 ..........

- .......... ........... ....... 4.... . .... .......... ..... .-.... .. .:4....--0 ....... ...... ......

:1:2wet b-lb - OF s6 .. C6 ... . I.. .. . .br . 7F
  • ....... .- ...... 60F. 0.....

..........1 ........... ............................ . ......

  1. F*ns: 14 ..........

/ .......... .... ..................

  1. Fan, 116 ......... ............

18- 4 ... ....... ........... . . .......... . ......... .........

  1. Fans:
  1. Fan: 20 0 .-........... .......... -...

...... 4.. .. .....

...... .. ..... . ........ I ......

Id .- . - , ... . ..... ... . . . . . . . ... ... . ...-.. ... .......-... .:...:. ....

  1. Fans- 22 .. .. ..... ........e.. .... .. . . . .

.*4 ...........

tvate..."120 .... ,...

%GatePos:

%GatePost 30-.:-

20 ......... *....

%GatePos: 0...........

...... ..... ......... .. .. .I "

% at ePo s:..0 . .............. i........... ......----- ............ ........... 4...........

%,GatePos: 50 . ......

It .-.......... ........... ........... 7 ........... I............

I- ........... . .................

s %Gate.....80.....

6o .......*~t ...... ------- ...... . ..... ....... ...... ......

Wa.tefos: 70 . ......... .-........... ".......... f......... . ..... ".......... ".......... ........... I............ :........ ... ........... ........... ........... "........... "...........

%6GatePos: 80 . ......... :............7 . ........... ...... -... .....:..........* ........... ............ :........... .-.......... ............ :........... ............ :........... ............

%Matepos: 90 ..... ,........... $ ,i ........ I

..........  ;.. ......I,;............ * ... .. .i

........... . ........... 1............ I ........... L........... I I*-- ......

0o0 i0 i" 0i i0 i00 i i 0 0i 0 0i 0, 0000 00~ 00" o 00 '0 ~ .00 000 000 River Thermal Capacity (cfs-F)

Figure 6 OP 2180 Rev. 39 Page 2 of 3

FIGURE 6 (Continued)

[EPU - Summer Derate Nomograph River Temperature 55°F - 58.9 *F (1912 MWth, 200 hp Fans)]

1915 I . .:,! . 2 *

Bul I

! 'lp I

3 ....

i I

-we 1910 J8Pe~i 2 1 s 1905 S............... .... ...... ..-.. ........... .... .............. . .... ........ 4... ........ -..-..........

  • -. . ....... .2 ... ......

1900

... .** ......... . . . . . . ." .. . . ".. . . . . .. . . . . . . . . . ". . . . .i. . . . .....**

..... ... ....... .. I. ............ . .. .... .. . . ..........

1895 ....... ....

.... 4, ...

2.i . .2 .............

. . I, -.

14 1890 .! 2 2 2 0

1885 12  : 2 -. 2- 2 1880 s above

.2 '

2 i

! i: 2 2 2 *

÷- -+.....I...i......... .-

=4 ..... -2.. ... .,. .. ...,.......-. ... i ......... ,.4......-"t..j... .. 2... .......-. 4......... . ..........

1875 ... "....

1 -------- "t2 ' . ... I


...... ..... I . 2 ----- -------.......... .

. ,i,

  • 2* I .

1870 1865 S i 1 i,  ! 1I. .. 2

  • ,2:* wu rit~e po* ul.e~s specified abo~ve t j " t

______________________________________ 1 ....

1860

-00 0 00 . * .

0010 00 00 0 00a L10, Riier Thermal Capacity (cfai-FJ Figure 6 OP 2180 Rev. 39 Page 3 of 3

FIGURE 7 0

PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 59.0-62.9 F Summer Operation Nomograph River Temperature 59F - 62.9F (1593 NWth, 200 hp Fans) openCycle

  • Fann: 0 *...I-.Rei4. ... I -***-...6,.
  • Fan._
  1. Fang 10002 ........

-i .4.-...... i . . ........ . .... ..

I....4.. ......


.-........ .......... Z............. . . ......... . . ...................

4

  1. ?afl s 04 - -...... o,, . ....-. . ............ ............ ........... .. .........

..... 16.... ...... ...... ...

Fans: 02 - ............. . .. ............ ..... . . .. ..... .. ......... .......

, 40........................

... #Fans: 14 . . ..... ...... .. ..."........4.'.-....

......y .o....... .............. o....o.-o.........

12ans, - . ...........

............L...... ..

........4......

  1. Fafns 018 --------t..

.4 I- --- ---..

  • ?a4.2 ... .....- ---4 -:-"

,'~~..

.. f -- .

..........". .... , .:* ÷., :........ .......

. i......... . . . . . .

22 .. .......... .. . ... ... ..... . .. ......

  • -7 ......

ta ,eo*,s1 10 ..i .............-.-............ . .... ............... .... ........ .......... . ........... *.............

  1. Fans s 20 9.................. ..... ...... ..........

tOatePO 2050...............,*............,.

.,.  : 0..."

I I "

I n

.......... .:.÷., .......... 0*R.i............

,ae.,s .,....O 20 4.,

,.i:".... .......

---.... +.*

S..... --

A.. . .. .................

% .÷."

  • '.g

.. ,.* ............ 33............

Wso.......

a ep ss ........ '". .

....... .... 4........ ...... 4 ..... ...........

%GatePoxs 0 ........--........ - ------......... ---.................

4J WGatefot  : 70o ......... ...... ..................

e

.. .......... ~ oo...... ...? ..........-.

%*at~epos: 8 0 -,....... . .... .............. ....

. ... ............ ".  ;. ......... ........... . ...... .....- .......... *.!. .......... . .......... ............. ! ............ 4 ..... ...... "

%GatePost g0o - ........... i........... i.. .... .......... . 4 ................ . ...... ............. ............ I ........... r......... . ............ ............ . ..........

olsi*

i i .- ii i] .

%Gate~o4000......... 5000 70........800.......00.....100...... .... 1.. .. 0 ....1.......0 ... 000...

....... 1 ... ............ 0 1........ 0 1........

l I R ive Thra Caait " c  ! *

~~~~~~Fgr
!i , ' 7

%G*.e ~sl 8.......*-i.....l..............

.. !........  :........ .-....... *.......': .. ... .e....... *..... . .218....... R...............

iIagel , , o..

FIGURE 7 (Continued)

[EPU - Summer Operation Nomograph River Temperature 59'F - 62.9 *F (1912 MWth, 200 hp Fans) ]

OpenCycleans:,00 r.I - circ... ate~Clos*dG  ! . .  !

  1. Fahs: 00 .. 4. I.......... I . ..... ... .......... .......

N Recic. 4ate °*siti-n -41 Fa on 7s

  1. Fans: 02 -- .......................................... ...... .............. ".. ". .... ............
  1. Fan s: 1 04 ......... "......... 2..........

......... ..... ......... . . i... .... . . . I"Y I".....

........ 0...... ..... .........

  1. Fans: 46 ..... ... .................. ......... ..........

. ..................... -4 4.4-

.".-'. /... .... /. ........

16 "Fa": " ":.....  ! ... "..-'...."......

, s 0F -. ............ . ..... ....................... . ................ . .... ..... .....-.... ....

4#Fans: lo .......... .......... .......... ; ......... ........

......... 4. .... . ....... .... -.... .... ... ........ ..........

22 WFans: 20-. ".... At

.....- . C.. ...... ...

s: #Fas 14 ......................

, 70.. ......................... ... .......... .. ........ . ..........

  1. Pans: 0 . .
  1. Fan s: 18 10 - ......... ......... , i e... .. . ... .. ... .4.-'

.. .-............÷* . *::.. . ..-.. ......... .........

/_ __........-...

-H#Fan s: 20 .'.-...- ......... .................. '." ....-. ...... ..... *-:*--

%Gte ~ ~

  1. Fa ns:e 22 ...... ... ............. . . ....... .... ..........

% atepos: 0 G a tI e

%......- ~. o .. 3 0 _ .T ... ... .......... . . .... ....... ... . .. ..

Closee . 1" ..... . .. .. .

GatePos 40 ......... . .......... ...... .. ......... .......... .......... .......... ....... ... .........

...V..........

...... i...........

.......... .......... ......... ......... P......... ..........

%GatePos: 6o -t ........-. .......... .......... ,......... ......... .......... .......... *......... :........ . ........ . ..................... .......... .......... .-.........:.......... ..........

%GatePos: 70 -*......... i .......... .......... ......... . ..... ......... .......... .......... ......... ........ .......... .......... ......... . ......... . ......... .......... ..........

%GatePo ,s 80o r.....-. ..... ....... .. ......... ..... .. ..... i.. ... . " ....... ........ .......... .......... i.......... i.........".: ..... ...T......... i...........i ..........

" %Gatepos: go ......... .......... -- .........-......... -4 ......... I .......... .......... ,.......... ......... *......... . ......... .......... i.......... ......... *-......... i.......... ,..........

ClosedCyule  ! I I I,

.. OP 21. Rev..39 River Thermal Capacity (cfa-F)

Figure 7 OP 2180 Rev. 39 Page 2 of 3

FIGURE 7 (Continued)

[EPU - Summer Derate Nomograph River Temperature 59°F - 62.9 'F (1912 MWth, 200 hp Fans)I 1915 1910 1905 1900 1895

) 1890 1885 0 1880 1875 1870 1865 1860 00" it, 61 40 q'v 'q? q~ ~ &

O 000 00,0 000 000 000 0-9o 000 0"0 000 "00 000 000 0o "000 River Thermal Capacity (cfr-F)

Figure 7 OP 2180 Rev. 39 Page 3 of 3

FIGURE 8 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 63.0-65.9 0 F Summer Operation Nomograph River Ten erature 63F - 65.97ý (1593 MWth. 200 hp Fans) ope22cycle neCLVC.

  • Vanus 00_..4... Gate oaf d I I~ T 1 . ..
  1. Pan- 00  %!R~cr4. . ..... . Gftt Position I ......... . .......F*-

-'Alt~ ... on! ........... ........  ; ... .......... *] .'<

  1. Pan:* :02 ........... ........... .......... ........... ........... . ............ .... ....... J.

t1ans, 04 .......... .......

....... .. -.. 4........ .... ..

3"."................... "  ; *-.

  1. Pans: o0 --- t ....... .... ........... .......... ........... .... ........

o0 " *. . . ........ ...... ... ......... . . ..

  • F;nm:14 - -.-........... ";........ --......

. ........ ........ * #/"..............

.*Fans: 06 ......... t- . . ............

"b 11.. ...........

  1. Fans: 122- --- . ........ . ..".-.......

%i e og ~10 . . J . J .....

4 . . .4..f .. ..........

  1. . t, z 14 3 .... - ... ...... .--- ...........
  1. Fans: 501. ............ . .................... .....

1

%G#atePo: 60 fen s 2 0 .

4...

... 1 4 .....4 ... .............

%GatePost 20 " .ji ............... ".....................

lGatllepow: 40 .. i ......_.. ....... ..................

boat~epoe: 50 . ......*.... ...... .......... ,- .......... ........... 4 ..... ..... }.......... 4.. . ... ...... .......... . . ......... ........... ;........... ;........... ... .3...

I V

%GatePox: 70 - 4.... ......... ........ -- . ..... ...... t ...... ........ ...................

%Gstp 0 - 1................ ,. . .......... ..... . ...- ... ....!.......... ........... ... -- ...--..................... .......... ........ ... ......... >............

%Gat.eposi 90 .. ........... ,.. .......  :............... v-..

.... ....t.... *.... ......- ........ ...i.......... *.......... -........... ............

3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfa-F)

Figure 8 OP 2180 Rev. 39 Pagel1 of3

FIGURE 8 (Continued)

[EPU -. Summer I Operation Nomograph River Temperature 63*F - 65.9 'F (1912 MWth, 200 hp Fans) ]

OpenCycle FCs 1 Gate  : 'o*ed*

  1. Pans: 00 ....... ...... f........... )........... I........... F........... ........... ........... ........... ........... ........... ; .......... 4 ........... *.* _ * .
  1. Fans: 02 ........................at4 Po,,i~on
  • ,:Reelr. .... -::Al Fvna, on: .......... .. "..*ET.-'.f '-..-
  • Fann:04 ..... .........-... . ............. .
  1. FansB:06-i 4 .... ..................... ~.! ................ . ,
  1. Fans: 06 ...."....... ........... t........... .......... ".......... "........... t ........... .........

Fans: 0 ....... .. ........... , .......... ............ ........... ..

. ...... . .... ..-.. i........... ......

  1. Fans: 10 ........... ...........

.. . ....... ..... " -- .... ... .... . .44. ...... -.

1.- .

18 .

  1. Fans. 1Fan:2 F  : .g.....'"..................... .f".
. ! iWet-tulb -'20F ................... .0 U...... O - 70F. 8iDv/
  1. Fans- 16 -. *........... ....
  1. Fans, 14 ....

... .... .... ý. . ....... . Y ......

  • ~ ~#Fans- 18 "..... ...... .-.'-- ........... ... -*".. ". .... .... ......... -," ...... ... ........... .--.. ...... .......... *.....

10 . ....  :.-. ... .'...-......

  1. Fans: 20 .. I .... . . ... . .. ....

Os 22 .......... .. "....... ...... ...".. ---- .......-....... ...-'

%GatePo:s 10 -. .... . ..... ' .....

%GatePou: 20 .. ...... .- . ........ . ...............

%G tePos: 30 --- .- *-" .. ,- " ...... .. . ....  :............. ....- .......... ........... -. .......... ............

%Gatt osI 40 60 ...%Oa~~~~~e.......

70.........~ 2 14.......

2 -........-- ......... ".........

%Gates 80....

%Gat:ePos: s0o ... ....... .......... ........... *.......... ............ *............. ............ .. ......... ........ ... . ........ ............. *..........-t............*.............. ...........

%Gate~~ou:.. .... ............. I .

Wa , .os 0 ... ........... .......... . ......... ........... ........... ............ *.......... ...... .................*........ . ........... ........... ........... .......... ............

tGatepos. 90 .. ........... ..... ..... ........... i........... ..... ........... i ......... .. ......... .......... * ........ ............ ........... : ........... ........... ; ..........

ClosedCycle I -jI I I I I I . IiI 00  % 0% 0  %

0, 0" r 0 00 0 0 % 0 0 0o '1 0%

River Thermal Capacity (cfs-F)

Figure 8 OP 2180 Rev. 39 Page 2 of 3

FIGURE 8 (Continued)

[EPU *'Summer Derate Nomograph River Temperature 63°F - 65.9 *F (1912 MWth, 200 hp Fans) ]

1920 T .

1910 .... "...........

T ..

1900 -.. '- . . .-.

-757 0 5j.WtF~

1880 -4........ ............. . .--....... . .......... ;. .... =.-...... ............. 4-..... ............ ..........

1870 i*.... ... .... . .... .. . .2.... ....

180 ..... .'-. .. ...  :.:.:....

1830 ............ ....

1860 -- ..


.. - . .. ........... ........... ,.... * .... .i. . . .,...... ............ ?- - -......... .... ........

1... .. .........

179 ........ ...... . *  ; I........ .....

178le0 1 8 10.

-/-....... 2 ------------..... I I T....  : " ... .....:.. ......... i"..... .... -- .:2 -........- .... ... . +.  :. .........

1770 ......- 4 ........ - ----...... .... ....... -- --.....

176 .* ......... .--- .- ... ..... $................  :........ .* -*.-._ ...............

.,1 2 1750 .......:l:2 ....... .. ..--. .

. .- ............ l .. .. 4 ...... *:**

01* 00 0.

17810 b--. ti 2OP 218 Rv 39.

1740 .... ÷......... 1 -- '------: ......... ....."' Page 3....

+ iOP *o Pae 2180.Rev. 3

FIGURE 9 PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 66.0-69.9 0 F Sunmmer Operation Nomograph River Temperature 66F - 69.9F (1593 MWth, 200 hp Fans) opencycle #!an 4 Recac. Gate Cl.4ed

  1. Fans: 00 -...  !.................
  1. Fans: 02 .... ....... t.... .................. ........... ..... . ... .. .......... . ... ...... ...... .' ...........
  1. Fanst 04 ......................
  1. Fans: 06 .....:........... I........... ...... . ........ .......... ; .. ...... .......... .-- ........ ...........

,Fan o,lO0i

  1. Fanst 08 ............. ....

. ........... .-. ................ . ..... ......... __.. "...... ---.... .... .... /..  :........." ............ ...............

  1. Fans 12 10................... .. ..........ý: . ...... .-
  1. Fans:.......
  1. Fans: 24 12 " ......... ..... .....

i ;A.....:..... ............ .........

  1. Fanst 14 tm #*Fans 186..
  1. m n 20.... . .......... . -........................ -.... . ....... ....... . ............. ....... .. ........... ............
  1. Fans 2. . .........

20 2~ns ... ........

W ~tea

%Ga 320 a: 2 10.. .........................

,.atePoss 40 K. . "."...... ..... . .- .......... .....

%GatePos 30

%GatePos: 0 .......... .......

........... .......... ........... ........... .. ...3.......... ... . 3.............

%Ca.......70..  :........  :

%kGatePos- 70 -4 ........... ........... ........... ........... ........... ........... , ........... ----- ........... ........

%GatePos:

%GatePos: 860 0 ........... ...... ..... ........... ........... ;........... ........... ;............ ........... ;........... ----- ;........ ... ........... ........... ........... ........... ... ....

%Gate~os= 90 90 .....*........... :...........

.atePo.. . ......... . ........... :............. ........... }............* ........... ............ "............ .......... ............ ........... ............ ...........

ClosedCycle l l I I I , L 1 .1 .1 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfs-F)

Figure 9 OP 2180 Rev. 39 Page 1 of 3

FIGURE 9 (Continued)

[EPU - Summer Operation Nomograph River' Temperature 66°F - 69.9 *F (1912 MWth, 200 hp Fans) ]

I OpenCycle #: . . . . . . .

  1. ,ans 0 .. . ........... ......... . e c.......... ............. .. ......... ........... .................... ........... .........

iFann0 o°°......o........ ................ ............ °........

  1. Fns 02 - ... ..  :::
  1. Fans: 04
  • Fans: 06 . *
  1. Fans: 08 ........... I........... t.......... ....... ....... ....... ........... .
  1. Fan : 08. .. .... .... ........... . ..........

.10 ....-............ LFns .......

Pann 0 .... ........... .12.......... ...

....... I.... ..........

  1. Fans: 15 ,. . . . .... e.. .........
  1. Fans: 14 .............." . :"'..... . .....-. ........ . ....... ,................. ............ "............... .... . ...

aFans: 10 ... ....... ....... ........ ..... '......

  1. Fa ns: 10 .. .. ..... ..

%Ga.ePos 4.0 ....

70.-..

q....... . .... ....!.....i.........

%Hateaos: 20

%GatePos: 10 ... .....

%Gateft s: 30 .. . .,... .. o. ...... *.o..o .* , .. ......

. ... ............ *....o.. ...... .o.. . ... . ...,.........

%GatePos:

%Ga te os: so 90 . ... .i.......... *........... .........................

........... . ........... i........... .. ........... i........... J........... .

........... ........... i........... i.......... !..........."........... ............ .:.......... ............

%Ga t oe,o: 60 . i .......... ....4.......... I........... ............. i........... i.......... :... ........ i........... ........... ........... .......... .' .......... ............ "...........

%Ga tefos: 70 -4.; .................4... ........ ...... . ...... ; .. ... .............. ;........... ;........... ;........... .. ......... ........... , ........... i........... i...........

ClonedCycle I

-10o 00 VO 0000000

-to, Ir' 0, 0000000 110 0

40 0000000000 4 4 ýP Ile 000000 0 0 00 0 00 00 0 00 0 River Thermal Capacity (cfs-F)

Figure 9 OP 2180 Rev. 39 Page 2 of 3

FIGURE 9 (Continued)

[EPU- Summer Derate Nomograph River Temperature 66°F - 69.9 *F (1912 MWth, 200 hp Fans) I 1920 * .i r T-'" i I l 9* 0.. ........ .... . . . . ......... .......

19100 .. ;5......- -$.t-.:.

  • ' 80oi .. .....-

y:

-. B*),. .....

4* ....

-W4tBulb -................

2........ '2 ......... ... ............ .......

1890 ......... . ..... ....... . . .........

1870 1880 ... ........... -- -- ".14..

.. , .. ..+......... .....

. ..... io- -. ......

t.... .

18 1860 o ... "... -.-... ----

. j-............ ...........- : ..............- .. .....*: ......... :--.... .. . .................

1840 ...... . .. ....:...... . . "....... -...... . ........ . .. ........ ................ ......

1830 ....... ........  : ... IL ------

1820 ..... ------ ......... .. .*. ..

2 I I "  !:

1800 -..----.......-.--......

.:  ;/ .......  : 2 . ...-- --- - --.....

180 179 ... ------ . .. . - -- . ......

1810 . ............ ... ...... .. (------- --....... ....... .......... ..........

1.760 -------.-... .... . .......... .............

,4 1770 *... -.....2.......t. ...... i.. .. + --.- I

2-................ I...

.................... ... i.... ...... - .......--.......... ..... S......

2
  • 2 . 2 2 .* 2 , 2 1760 JO ro =-10 ro 0: =19 90

."..*/...... ...:.: . .

1 7 40 ... 1 .w... . . . .1 ... I lfp 00 0

River Thezrta1 Capacity (cfe-F)

Figure 9 OP 2180 Rev. 39 Page 3 of 3

FIGURE 10 PLANT SETTING NOMOGRAPH I FOR RIVER TEMPERATURES 70.0-74.9 0 F Summuer oper~ation Ncxzwxra~ip River Terrrerature 70P - 74.9F (1593 X~th, 200 bp Pana)

OpenCycle

  1. Fansz 00 I J
  • 1 ana .1 vnecirv. Gat+ Position R~tc14c. ......

Clojed e ..... .

All :.Fq13" on, I.

I !

1__

... o.*.. .

A

. .. ........ 0..

  1. Fans: 02 ....................... J,........... ........... ... 3..... . . . .........

.Fans t 04 ....... ....... ........... '"".. .. - ... i.... ....... ........... ............

  1. Fans: 06 . .. ....

. ........ S........ ........

  1. Fangs: 08

.... i !20..............

... i : '*'!......* ....

.... ....l  :-i".......

  • Fann: 10
  • Fans z 12 . . . ............. - "... ....................
  1. Fans : 14 ~~~~~.. ......... .. ..... ., .........
  • FAn : 16
  • VaflE i18 I
  1. Fang: 20 .

-14 .

A ..... ......... .. ....

  1. Fans : 22 ..". .*...........

..... *..........4* ... ....... 3...........

tOatePos: 10 .. .

%,GatePost 20  :....... .............

........... 3 .......... . ...........

. ...... / . . . -.............. .

%GatePos: 30 .... .......................... ... ......

%GatePost 40

3. ......... ........... , ......... .,.......... l.... .. .l............. -- .. ----- - .-..........

............ 4 ........... i.-----------

WGatePo", 50 ................. ....... ...... ....... ......... 3s .. .

,.3 ..... . 3.....I......

%Gatepol2 60 -_4 .............

%GatePos: 70 ....I":

! ........i i ...........

i ...... ... ...........

... ........... -,...i..... . .......i..........

%Gatepost 80 ...... ...... -------

%Gateroa: 90 ClosedCycle 3000 .4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfe-F)

Figure 10 OP 2180 Rev. 39 Page 1 of 3

FIGURE 10 (Continued)

[EPU - Summer Operation Nomograph River Temperature 70°F - 74.9 °F (1912 MWth, 200 hp Fans) ]

OpenCycle #: . . .

  1. Fans: 00 .. ........ f........... I ) ........... ................................... ..........

%!Recir. Gat+ Position -IA02 F~ns on:

  1. Fans: 02 ...."......................... ... . .. .......
  1. Fan* : 04 . . ............................................ ....... " ...... . ............" .
  1. Pans: 06 ....*.......... I........... I--........--........... ,........... ;........... ,.......... .... ...... .. . ...
  1. Fans:08 . ...i'. ...........* ..............................- ...........". .......... .... ...-. ........'- ... ..
  1. Fang: 10 ........... ......... . ........... ....-.... . ...........

. 1 .... ... .. .. ..... ..... ....

  1. Fans: 2 ........................ .. ............ . _..... ....... ..............

iFans: 14 .........

  1. Pans: 18 .. ... .... ..... ...

... ~....-........

  1. Fans: 16 ... .. ..... ........ .......................

%Cate.o: .. ... .................... ............. ...... ..........

  1. Fans: 70 ..... ........... .. i.. .'....... .......

o::.............. 9. -'... 2. ...... "......

I...... ........... ...........

  1. oPane: 2o .

%Qa..ru ~ 20.... 7.".-..

. . ... I.. ....... . .......I . ..-. .......... ......... 1........... ............

t*te o,= 10 *........ .....

%Gte:oa:

........ 5

%Gatelos: 20  ! ...%Oatepon......

."...'* 60............ ...... ........ ......."...........' ........... ".......... "..... ..... 3............. ........

%Cate oa: 40 ..................... .. ......... ........... . ................................ ...................... i ........... ........... .......... P.......... ........... f3

%dGatePos: 50 ....*....................... :....................... ........... ............ ........... "........... .:.......... :........................ ......... ............. I........... ...........

%OatePos= 60 ....* ....... ...." ....... ....* ..........."..........." ........... ........... "........... ........... "... . ........... "........... ".......... .......... ".......... ...........

%GatePoe: 70 .. ........... , ......... i...... . . .......... ..... }..... ........... ...........  ; ........... ...........

f s 80 ...... :Gt ...... . ..... *. .. ".."..."..

80 .... : ......... ~~........................

%Gatel~~s: " ............... ........... . V...... .....- .

%Gatepos:. 90 .. ........... , ........... * .......... 4 ........... , ........... , ........... 4 ........... i ........... ........... . .......... ;. ....... --.........-........... ........... ............

Clonedpycle Joo ooo oo oogooo%%%%% .... ~O .... .. 218 Rev 9 River Thermal Capacity (ors-F)

Figure 10 OP 2180 Rev. 39 Page 2 of 3

FIGURE 10 (Continued)

[EPU - Summer Derate Nomograph River Temperature 70'F - 74.9 'F (1912 MWth, 200 hp Fans) J 1920 1900 4 ':

L91 18

__ 0..

- ---------- 2

... "I.1s70, 18 ..."0 ...... ------ ul ----,' ....... ........ ......

.. - .---.;--- "- "i"-

1880 . .... .. . . ........

1830 .....

1860 . . ....--

4i........... ...... ....

18-0 ---........ ....--

1860 .... .......

2I . ."

= I.  : , - l....................

.: ......
  • 2  !. . -

2-.

1770 1820.. . ....4 . " .......

.i/

2 2 * * . , 1 1740 --. --- . t .. -... - 4---......

174  : *..... *2

  • 2 , i * , ,r i l. , ,Iie~

2

  • 2* ' *l 2
  • 2* 2"
  • 2

.0 ," 0 _ V V 0

, , 00.0 0 1Fgr 10,,

Rie OF 2b~lcpfct OP 2180 Rev. 39 Page 3 of 3

FIGURE II PLANT SETTING NOMOGRAPH FOR RIVER TEMPERATURES 75.0-79.97F Summer Operation Nomograph River Temparature 75F - 79.9F (1593 MWth, 200 hp Fans) 0p~Cyoe *'inu 4 ecid. Gat, Ci.14edi I I 00 .Fan.....- ............ t ...... .........

Fans: 02 -... .... , ... .......... ..... . ......... .................... ....... ... .................. . .... .......

  1. Fangs 0 .....

- ÷........ .............. .. "'-.:'i.....

  1. Fangs 06 .... . - ...............................................
  1. Pans: 10 . .. ... . ...... -.... .............. . .... . . . .

a.ns: 10 ... ........... ............ .......................

I a : 0..3 . ......... .................. .......... ..........- ...........

  1. Ians: 14 .. . ...

Fante 16 . .......... ....... . ........ ....... .. .......... . ........... .......... ...........

  1. Iat..: 20 . .. . .... *.1

. .... ..... i. i

  1. Fans: 20 . . . . ...... .. ....... .... ........ ............. . ......... ...........

a n: 40 .......... ...................

IGtp ""...

u ..... . ...........

  • .s:

60 *~ . . . . 3.. .... 3... ...... . . ".....-.... .....

...... . 4 .......... ....... . .............

%.atepoa8. 0 .... 4............ ..........

%GatePo: 90 .....

l*tp 60 s ........ ..... . ".....

tOatepoa, 70 %Gaef......

.. ss7 e. ......

....1 . .......

. .... 3

........... t........... ........

....... t...

.......i... ....... -i.. ........

. .... . . .... .....4...........

.......a

%lGa tep os t S 0O ........ .........

......... .... --- ----...... ....... ----- ...... ......4 ...... ......,.....

%Gat~ePos 90 ........... -- .......... i ..... . i.......

............ ...... ... .......... t.... ...............

  • 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 River Thermal Capacity (cfs-F)

Figure I11 OP 2180 Rev. 39 Page I of 3

FIGURE 11 (Continued)

[EPU - Summer Operation Nomograph River Temperature 75°F - 79.9 *F (1912 MWth, 200 hp Fans) ]

Opencycle * . a "

  1. Fans- OD ............ I.......3... ýi.......... i.......4. . -- 2 . .*............

On.. .

  1. Fans: 02 s 04 ....0 :*...........

Recin

. cat+

Posi-ion -::Al iFns on*.....

......4*... ....... I........... *... ........ *........... *........... ;......

  1. Fans: 06 . [................... .............

. ....... ......... t........

  1. Fans: 08 ............

... wet .........20? 3 0 ...... . --....

  1. Fans: 10 .... .. ............ . ........

IT P. .3....*.- ..

s 12 ... Ia * ...... .....

  1. .0... 1..4.........-- ....... . . .... ..... " .... ..... . . ....... .......
  1. Fans3:
  1. Fans: 126 .. ..:......i

.. :...., .... .... ".......A ..........

. . 41 ........... ......... ...........

  1. P n. . .... .. .p e ... ........-.... ... ..o...

18...

1. ....... .....
  1. Fans: 20 -.--- ...... . ....

".-4... ... . ............- ...... . ........ .- .. ...

........... .........._4 .........

0....... ... .......... . ...... ......... ....

n 20 ,4#a .

o-.......... 0...... . .... ..... ......

400 ~

%G %Gat~~~~~pos:~

.tefos: .: ,.[.....

%G t:s6 .. 2 I.-"........... .  : ..

% Fatenos: 0  ; ". "....-. -----. z... .................

%OatePos: s 800 ,~tp - - ....

...... .....i . .. .. .--.-..........

tGatepos: 70 %Gate*os

.. ............ 0... -...-3 ...........

. I........... ,...........; ........... ; ........... 4 ........... ; ......... ........... ;...........* . ........... ...........

  • .--3................ ........... .........

........... t........... ...........

%Gatefos: 60 . ... ........... ........... ... .. .....*........... ........... .;...........*..........." ........... * ......... ............ " .......... "........... ........... .......... "...........

%Gteo no  : 90 -.............. !........ ...... ........... ........... *.......... ........... ........... *......... ............ ------ ........... ...........

ClosedCycle -I-! I I I  !.  !  ! I I I 00 0 000 0 00 0% 0 000 o 00000000 00 00 0000 River Thermal Capacity (cfs-F)

Figure 1 OP 2180 Rev. 39 Page 2 of 3

FIGURE 11 (Continued)

[EPU - Summer Derate Nomograph River Temperature 75°F - 79.9 'F (1912 MWth, 200 hp Fans) ]

1920 jI **

1 910 7..

. 8.....

.. .... . . .....=:.. ". - -.

1880 1--"..0 --........ -... ".

e. ..-- --..........

t.....-- .. .. ....--....

.:/ t I: 3 3 188 0 --- .-.... " :.. .. ... .."1 "" 0. *... .. "...... -. " " "...... . ... " ...: . .... .. "...... * ... ... .... .........

1890 *-- ---- - .... ..... -*.-2-*....-. * . .I-**..* . ... )......

1878 ... 1.... 0

..8 .-2Y.....................

i 2 / I 3 186 /  :-L!.. .... .- /

.....  :.2 "* * *.......:........  :........ .

........ f- .... ..-:.  :*  :

  • 3 3 3 l::.... .....

lR f 1 8 0 --- --- -- - .. . ... ... .".. 3 . ... . . ....... .. ---

2 . . ...

" 8*40 1 *.--- - ..... ... .......... .... . ...... . ....... . . ...

.- ... -.... ......I 1850 1790 9

  • 2 *
  • 2 [ 1
  • 2

" 1 0 -

17810 -.. ... .... ........................ .. ........... ....... .3

.. 3 1760 - .-. ..-----

I....... - ~.......... .......... - -----......

17 0 4 $ 2  : .- $*4  : .. .. .:  :..

17 177 00 -"..- V I I .-.. ...st ' . .: 2 -. 2 ... I ..

1730 1 +/-

  • 1 1 1 ' 1 . **

S* -0... 0 0. I . .00 0

%000 0000V0ol0 00 00 00 V 0 0 00 000 00  ;

nivýer Thermal Capacity (cfa-F)

Figure I1I OP 2180 Rev. 39 Page 3 of 3

FIGURE 12 RECIRCULATION GATE POSITION INTAKE A FULLY OPEN

.1valopo: fro 198849 data 0

-aJ

-:---7 ti CL w

U V. .

1 2S....... ' . .' ' ,17. ".... 1100 Recirculatlon Cate Positron, Percent Open

'(Intake A Fully Open)

Tabulation of above figure Reclrc Gate Recirc Gate Reclrc Gate Recirc Gate Flow,% Pos., wFo %- Pos., -V Flow, % Pos., % Flow, % Pos., %

9 0 31 17 53 27 75 35 10 1 32 18 54 27 76 35 11 2 33 18 55 27 77 36 12 4 34 19 56 28 78 37 13 5 35 19 57 28 79 37 14 6 36 20 58 28 80 38 15 7 37 20 59 29 81 38 16 7 38 21 60 29 82 39 17 8 39 21 61 29 83 40 18 9 40 22 62 30 84 41 19 10 41 22 63 30 85 42 20 10 42 22 64 30 86 43 21 11 43 23 65 31 87 45 22 12 44 23 66 31 88 46 23 12 45 23 67 31 89 48 24 13 46 24 68 32 90 50 25 14 47 24 69 32 91 52 26 15 48 25 70 32 92 55 27 15 49 25 71 33 93 61 28 16 50 25 72 33 94 70 29 16 51 26 73 34 95 85 30 17 52 26 74 34 96 100 Figure 12 OP 2180 Rev. 39 Page I of I

FIGURE 13 RECIRC GATE 60% OPEN/RECIRC GATE 80% OPEN Recirc Gate 60 Percent Open " Recirc Gate 80 Percent Open C:

0 *0 C; 0 7)

.0 CC aL.

Intake A Position, Percent Open Intake A Position, Percent Open Developed From 1988-89 Data Figure 13 OP 2180 Rev. 39 Page I of I

7--;C. *.E,,r J

j. L&41A'5w COOL ItG TowTOWr WTAKE BLOCK

,STRLLc ThV1G

'-'9; (OJVDE//SEI? c 0 0C-Ns -I

.0~

  • £ aD Cooi- ING TOwElq

'DISCHARGE .BL k PIPC I

k~.

S4 I is94 I 91 I, II L I*,ee I9 r* r'**

a =

7 - 6 ligl*

1 1iI is

-IgIISI **.?... * ,

, -. -_g -- .--------- 1 a . 9. ,.

,... .... f ....

o0 II allfill Lcx% =: it o a00*

Ii' .* V'*

= - .II**-

'~",aY 1-" -- -- '

', , 1-.-

  • . ' - I..-- .. . . . . "

_999 - -* -- . . . . .. J

. , ,l I r.. . IFb .. it-IL.* *-

-- - -* '-- 1'" . . ...  ;

I 1olIIo T F - -~

!o .........

  • l il*'--

-- *  ;;  ! J

  • .*,*.,N I ".

-m ...M.... -

6Fiet~di £ U. -P . ,

.... 4 '--.,

  • - L _ _.*..

-" -* YaI' MCU 6AI9G WA~t:U b-fP9.aCL &'bM.Ma6"

.... vu-C .--

L -

C6TICW c PIA

  • i,,,*,,.,I:,1, I,-,

,T*.;=,*.. -,.,-

HYPOCC LO F4TES.U1D ONWETu'*4; f1*WW¶rU3 byLYV.i 10 m .. . 14 9 il dp.ww -

Is ,l-I,

~-urt A.~ SO"!

llll*

,id..

, m---I IZ -

4,-F illl!

l l*i, lb.,

-' - -. 9 16 9... 9. T,* ~ p.

p1 IIC 1 0. 69 1 0. a '--S

>,i-
"
  • l II.