ML072850059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML072850059
| number = ML072850059
| issue date = 11/13/2006
| issue date = 11/13/2006
| title = 2006/11/13-Oyster Creek September 2007 Evidentiary Hearing - Intervenors Exhibit 47, Issue # 0055718, Exelon Nuclear Issue - Statement of Confirmation, Originator: Kathy Barnes
| title = Oyster Creek September 2007 Evidentiary Hearing - Intervenors Exhibit 47, Issue # 0055718, Exelon Nuclear Issue - Statement of Confirmation, Originator: Kathy Barnes
| author name = Barnes K
| author name = Barnes K
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Citizens Exhibits 47 ,-OS {3 L% --]_Create another New Issue E Create another Issue from '00557180' Print Close window**AS REQUIRED, PRINT ISSUE REPORT AND PROVIDE TO YOUR SUPERVISOR**
{{#Wiki_filter:Citizens Exhibits 47
Note: This is your only notice. You will not have an opportunity to print this confirmation later.Exelon Nuclear Issue -Statement of Confirmation Issue #: 00557180 Originator:
  ,-OS           {3 L
KATHY BARNES Submit Date: November 13,.2006 VAmJ"FELINNR41OMIU Basic Information Affected Facility: Dscv Date: Oyster Creek 11/07/2006 11:00 How Discovered Code: H02 Event Date: 11/07/2006 11:00 Affected Unit: NA bbinwald Nm6ý ILL(&f.by Applicant";
    -- ]_Create another New Issue E         Create another Issue from '00557180'                   Print Close window
.... Z nterveno-r IDBElllw on U'AnelAIM A CiftwTiM on -Pf]ETD WM~DRAWV RepoýlwlCýu*
              **AS REQUIRED, PRINT ISSUE REPORT AND PROVIDE TO YOUR SUPERVISOR**
Affected Sys: Subj ect: COMMITMENTS MADE FOR GL 87-05 ARE NOT IN THE RA DATABASE Required Information Condition  
Note: This is your only notice. You will not have an opportunity to print this confirmation later.
Exelon Nuclear Issue - Statement of Confirmation 13, Issue #: 00557180           Originator: KATHY BARNES                         Submit Date:. November 2006 VAmJ"FELINNR41OMIU Basic Information                                                             bbinwald Nm6ý                                ILL(
Affected Facility:         Oyster Creek Dscv Date:                 11/07/2006 11:00                                               Applicant";.... Znterveno-r
                                                                                            &f.by How Discovered Code:       H02 IDBElllwon          U'AnelAIM Event Date:
Affected Unit:
11/07/2006 11:00 NA ACiftwTiMon -
RepoýlwlCýu*
Pf]ETD            WM~DRAWV Affected Sys:
Subj ect:                   COMMITMENTS MADE FOR GL 87-05 ARE NOT IN THE RA DATABASE Required Information Condition


==
== Description:==
Description:==
Commitments were made as a result of the GL 87-05 as well as other correspondence, meetings, etc. concerning our Drywell Corrosion Monitoring and Water Intrusion mitigation plans. The correspondence covers the time period of 1986 through present. A check of the Lotus Notes database presently used for commitment tracking did not indicate any commitments have been made. Based on limited research an SER was DOCKETED I IlRN 'r.
issued with subsequent correspondence, which committed us to a corrosion monitoring activities and leakage monitoring activities for the Drywell. The October 1,2007 (10:45am)      correspondence was used to formulate what is thought to be the present commitments for leakage monitoring. That information was utilized as an nFpFI.FfF nF.qrRF:TARY input to the outage leakage monitoring activities to determine the steps RULEMAKINGS AND A.II IfIC.ATIONN RTAFF        necessary to meet the present commitments and the License Renewal commitments for leakage monitoring. The documents were annotated with reference to the correspondence for the present commitments and to Passport commitment tracking numbers for the License Renewal commitments.
Subsequent research determined other correspondence exists which indicated we initiated "preventive maintenance to clear the sand bed drains periodically". There were no preventive maintenance activities prior to this outage to clear the sand bed drains. It is not known at this time whether this is a commitment by virtue of it being in our correspondence with the NRC.
IR 547236 documents the existence of debris in the sand bed drains, when performing the first known formalized maintenance activity to inspect the.
drains. Although the debris did not affect the capability to monitor the leakage from the sand bed drains, there is a question of where did the debris came from and when should be the next time we inspect the drains, and on what frequency. An ACIT was issued to address these concerns. No OCLROO015508 iMp(ak~6cy-o.1h'-


DOCKETED I IlRN 'r.October 1,2007 (10:45am)nFpFI.F fF nF.qrRF:TARY RULEMAKINGS AND A.II IfIC.ATIONN RTAFF Commitments were made as a result of the GL 87-05 as well as other correspondence, meetings, etc. concerning our Drywell Corrosion Monitoring and Water Intrusion mitigation plans. The correspondence covers the time period of 1986 through present. A check of the Lotus Notes database presently used for commitment tracking did not indicate any commitments have been made. Based on limited research an SER was issued with subsequent correspondence, which committed us to a corrosion monitoring activities and leakage monitoring activities for the Drywell. The correspondence was used to formulate what is thought to be the present commitments for leakage monitoring.
frequency is presented in the previous correspondence found, but there may be other correspondence, which did make commitments to a frequency, or removed this activity. Without having a commitment tracking system for these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.
That information was utilized as an input to the outage leakage monitoring activities to determine the steps necessary to meet the present commitments and the License Renewal commitments for leakage monitoring.
Immediate actions taken:        License renewal assembled a partial list of documents retrieved from the correspondence database that had been assembled to support the License Renewal Project. Correspondence was discovered relevant to the water intrusion measures including the monitoring of the sand bed drains.
The documents were annotated with reference to the correspondence for the present commitments and to Passport commitment tracking numbers for the License Renewal commitments.
Regulatory Assurance was notified of the finding.
Subsequent research determined other correspondence exists which indicated we initiated "preventive maintenance to clear the sand bed drains periodically".
This IR was submitted.
There were no preventive maintenance activities prior to this outage to clear the sand bed drains. It is not known at this time whether this is a commitment by virtue of it being in our correspondence with the NRC.IR 547236 documents the existence of debris in the sand bed drains, when performing the first known formalized maintenance activity to inspect the.drains. Although the debris did not affect the capability to monitor the leakage from the sand bed drains, there is a question of where did the debris came from and when should be the next time we inspect the drains, and on what frequency.
Recommendation for action:       1. Perforn a complete review of all correspondence relative to the GL 87-05, and the drywell corrosion monitoring and water intrusion mitigation plan for legitimate commitments. Review these commitments for confirmation of implementation. For commitments that are determined to no longer be appropriate, disposition those commitments in accordance with the corporate commitment management procedures.
An ACIT was issued to address these concerns.
Assure documents are annotated properly for commitments, which will be retained. Enter those commitments into the commitment tracking system with cross-references to the implementing documents for retrieval purposes.
No OCLROO015508 iMp(ak~6cy-o.1h'-
This is required to answer an existing question for the NRC Inspection 2006-13 Report, which is ongoing.
Immediate actions taken: frequency is presented in the previous correspondence found, but there may be other correspondence, which did make commitments to a frequency, or removed this activity.
: 2. Considering the risks associated with missing commitments (examples being: failure to perform leakage monitoring for the sand bed drains, potentially failure to perform periodic clearing of the sand bed drains, etc.)
Without having a commitment tracking system for these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.
evaluate the need to initiate efforts to retrieve historical commitments, and confirm formal implementation mechanisms exist for those items determined to be legitimate commitments, and that they are being tracked and annotated in accordance with corporate commitment tracking requirements. This would be a significant manpower effort and probably require outside support.
License renewal assembled a partial list of documents retrieved from the correspondence database that had been assembled to support the License Renewal Project. Correspondence was discovered relevant to the water intrusion measures including the monitoring of the sand bed drains.Regulatory Assurance was notified of the finding.This IR was submitted.
: 3. Develop and expand the correspondence data base similar to the one which was provided to regulatory assurance from the license renewal project for easy retrieval of the basis documents which provide an input to our Current License Basis (CLB). This would also be beneficial for those performing 50.59 evaluations, which rely on the determination of our CLB.
: 1. Perforn a complete review of all correspondence relative to the GL 87-05, and the drywell corrosion monitoring and water intrusion mitigation plan for legitimate commitments.
Supervisor Verbally Contacted J. Kandasamy Optional Additional Information What activities, processes, or procedures were involved? During 1R21, NRC Inspections of the drywell water intrusion activities prompted a more extensive search for related correspondence.
Review these commitments for confirmation of implementation.
Why did the condition happen?                               The age of OC has resulted in an enormous volume of regulatory correspondence that had not OCLROO015509
For commitments that are determined to no longer be appropriate, disposition those commitments in accordance with the corporate commitment management procedures.
 
Recommendation for action: Assure documents are annotated properly for commitments, which will be retained.
been reviewed in searching for prior commitments. Commitments were not tracked in a database for all teh years of OC operation.
Enter those commitments into the commitment tracking system with cross-references to the implementing documents for retrieval purposes.This is required to answer an existing question for the NRC Inspection 2006-13 Report, which is ongoing.2. Considering the risks associated with missing commitments (examples being: failure to perform leakage monitoring for the sand bed drains, potentially failure to perform periodic clearing of the sand bed drains, etc.)evaluate the need to initiate efforts to retrieve historical commitments, and confirm formal implementation mechanisms exist for those items determined to be legitimate commitments, and that they are being tracked and annotated in accordance with corporate commitment tracking requirements.
Changes of ownership and changes in definition of what constitutes a commitment has resulted in inadequate understanding of what this older correspondence requires.
This would be a significant manpower effort and probably require outside support.3. Develop and expand the correspondence data base similar to the one which was provided to regulatory assurance from the license renewal project for easy retrieval of the basis documents which provide an input to our Current License Basis (CLB). This would also be beneficial for those performing 50.59 evaluations, which rely on the determination of our CLB.Supervisor Verbally Contacted J. Kandasamy Optional Additional Information What activities, processes, or procedures were involved?
What are the consequences?                Without having a commitment tracking system or proper disposition of these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.
During 1R21, NRC Inspections of the drywell water intrusion activities prompted a more extensive search for related correspondence.
Any procedural requirements impacted?    LS-AA-1 10 provides requirements for managing commitments in current regulatory correspondence. This issue report is related to historical commitments made by GPUN.
Why did the condition happen?The age of OC has resulted in an enormous volume of regulatory correspondence that had not OCLROO015509 What are the consequences?
Identify any adverse physical conditions: There was no PM established to periodically clear the sand bed drains of clogs.
Any procedural requirements impacted?Identify any adverse physical conditions:
List of Knowledgeable individuals:        T.Quintenz, H.Ray, P.Tamburro, J.Huffnagel, J.Kandasamy, D.Helker Is this a repeat or similar condition?    Yes. There have been other recent examples of missed commitments from "old" correspondence that had not been captured in the OC commitment tracking database. IR 348545 (Tell-tale Drains -
List of Knowledgeable individuals:
Poly bottles not having a PM to monitor DW leakage)
Is this a repeat or similar condition?
Routing Owed To Group:                                    ACAPALL Routed to Group:                                  CR-OSC OCLROO01 5510}}
Routing Owed To Group: Routed to Group: been reviewed in searching for prior commitments.
Commitments were not tracked in a database for all teh years of OC operation.
Changes of ownership and changes in definition of what constitutes a commitment has resulted in inadequate understanding of what this older correspondence requires.Without having a commitment tracking system or proper disposition of these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.
LS-AA-1 10 provides requirements for managing commitments in current regulatory correspondence.
This issue report is related to historical commitments made by GPUN.There was no PM established to periodically clear the sand bed drains of clogs.T.Quintenz, H.Ray, P.Tamburro, J.Huffnagel, J.Kandasamy, D.Helker Yes. There have been other recent examples of missed commitments from "old" correspondence that had not been captured in the OC commitment tracking database.
IR 348545 (Tell-tale Drains -Poly bottles not having a PM to monitor DW leakage)ACAPALL CR-OSC OCLROO01 5510}}

Latest revision as of 10:38, 13 March 2020

Oyster Creek September 2007 Evidentiary Hearing - Intervenors Exhibit 47, Issue # 0055718, Exelon Nuclear Issue - Statement of Confirmation, Originator: Kathy Barnes
ML072850059
Person / Time
Site: Oyster Creek
Issue date: 11/13/2006
From: Barnes K
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
SECY RAS
References
50-219-LR, AmerGen-Intervenor-47, RAS 14364
Download: ML072850059 (3)


Text

Citizens Exhibits 47

,-OS {3 L

-- ]_Create another New Issue E Create another Issue from '00557180' Print Close window

    • AS REQUIRED, PRINT ISSUE REPORT AND PROVIDE TO YOUR SUPERVISOR**

Note: This is your only notice. You will not have an opportunity to print this confirmation later.

Exelon Nuclear Issue - Statement of Confirmation 13, Issue #: 00557180 Originator: KATHY BARNES Submit Date:. November 2006 VAmJ"FELINNR41OMIU Basic Information bbinwald Nm6ý ILL(

Affected Facility: Oyster Creek Dscv Date: 11/07/2006 11:00 Applicant";.... Znterveno-r

&f.by How Discovered Code: H02 IDBElllwon U'AnelAIM Event Date:

Affected Unit:

11/07/2006 11:00 NA ACiftwTiMon -

RepoýlwlCýu*

Pf]ETD WM~DRAWV Affected Sys:

Subj ect: COMMITMENTS MADE FOR GL 87-05 ARE NOT IN THE RA DATABASE Required Information Condition

Description:

Commitments were made as a result of the GL 87-05 as well as other correspondence, meetings, etc. concerning our Drywell Corrosion Monitoring and Water Intrusion mitigation plans. The correspondence covers the time period of 1986 through present. A check of the Lotus Notes database presently used for commitment tracking did not indicate any commitments have been made. Based on limited research an SER was DOCKETED I IlRN 'r.

issued with subsequent correspondence, which committed us to a corrosion monitoring activities and leakage monitoring activities for the Drywell. The October 1,2007 (10:45am) correspondence was used to formulate what is thought to be the present commitments for leakage monitoring. That information was utilized as an nFpFI.FfF nF.qrRF:TARY input to the outage leakage monitoring activities to determine the steps RULEMAKINGS AND A.II IfIC.ATIONN RTAFF necessary to meet the present commitments and the License Renewal commitments for leakage monitoring. The documents were annotated with reference to the correspondence for the present commitments and to Passport commitment tracking numbers for the License Renewal commitments.

Subsequent research determined other correspondence exists which indicated we initiated "preventive maintenance to clear the sand bed drains periodically". There were no preventive maintenance activities prior to this outage to clear the sand bed drains. It is not known at this time whether this is a commitment by virtue of it being in our correspondence with the NRC.

IR 547236 documents the existence of debris in the sand bed drains, when performing the first known formalized maintenance activity to inspect the.

drains. Although the debris did not affect the capability to monitor the leakage from the sand bed drains, there is a question of where did the debris came from and when should be the next time we inspect the drains, and on what frequency. An ACIT was issued to address these concerns. No OCLROO015508 iMp(ak~6cy-o.1h'-

frequency is presented in the previous correspondence found, but there may be other correspondence, which did make commitments to a frequency, or removed this activity. Without having a commitment tracking system for these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.

Immediate actions taken: License renewal assembled a partial list of documents retrieved from the correspondence database that had been assembled to support the License Renewal Project. Correspondence was discovered relevant to the water intrusion measures including the monitoring of the sand bed drains.

Regulatory Assurance was notified of the finding.

This IR was submitted.

Recommendation for action: 1. Perforn a complete review of all correspondence relative to the GL 87-05, and the drywell corrosion monitoring and water intrusion mitigation plan for legitimate commitments. Review these commitments for confirmation of implementation. For commitments that are determined to no longer be appropriate, disposition those commitments in accordance with the corporate commitment management procedures.

Assure documents are annotated properly for commitments, which will be retained. Enter those commitments into the commitment tracking system with cross-references to the implementing documents for retrieval purposes.

This is required to answer an existing question for the NRC Inspection 2006-13 Report, which is ongoing.

2. Considering the risks associated with missing commitments (examples being: failure to perform leakage monitoring for the sand bed drains, potentially failure to perform periodic clearing of the sand bed drains, etc.)

evaluate the need to initiate efforts to retrieve historical commitments, and confirm formal implementation mechanisms exist for those items determined to be legitimate commitments, and that they are being tracked and annotated in accordance with corporate commitment tracking requirements. This would be a significant manpower effort and probably require outside support.

3. Develop and expand the correspondence data base similar to the one which was provided to regulatory assurance from the license renewal project for easy retrieval of the basis documents which provide an input to our Current License Basis (CLB). This would also be beneficial for those performing 50.59 evaluations, which rely on the determination of our CLB.

Supervisor Verbally Contacted J. Kandasamy Optional Additional Information What activities, processes, or procedures were involved? During 1R21, NRC Inspections of the drywell water intrusion activities prompted a more extensive search for related correspondence.

Why did the condition happen? The age of OC has resulted in an enormous volume of regulatory correspondence that had not OCLROO015509

been reviewed in searching for prior commitments. Commitments were not tracked in a database for all teh years of OC operation.

Changes of ownership and changes in definition of what constitutes a commitment has resulted in inadequate understanding of what this older correspondence requires.

What are the consequences? Without having a commitment tracking system or proper disposition of these historical commitments renders the site to potential repeat occurrences of missed commitments from a current license basis perspective.

Any procedural requirements impacted? LS-AA-1 10 provides requirements for managing commitments in current regulatory correspondence. This issue report is related to historical commitments made by GPUN.

Identify any adverse physical conditions: There was no PM established to periodically clear the sand bed drains of clogs.

List of Knowledgeable individuals: T.Quintenz, H.Ray, P.Tamburro, J.Huffnagel, J.Kandasamy, D.Helker Is this a repeat or similar condition? Yes. There have been other recent examples of missed commitments from "old" correspondence that had not been captured in the OC commitment tracking database. IR 348545 (Tell-tale Drains -

Poly bottles not having a PM to monitor DW leakage)

Routing Owed To Group: ACAPALL Routed to Group: CR-OSC OCLROO01 5510