Line 2: Line 2:
| number = ML080140425
| number = ML080140425
| issue date = 01/28/2008
| issue date = 01/28/2008
| title = Prairie Island, Units 1 & 2 - Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs
| title = Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ECCS -Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)3.5.3 ECCS -Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.-NOTES -----------------------------------------
{{#Wiki_filter:ECCS - Shutdown 3.5.3 3.5     EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3         One ECCS train shall be OPERABLE.
NOTES
: 1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
: 1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
: 2. An SI train may be considered OPERABLE when the pump is capable of being manually started from the control room.APPLICABILITY:
: 2. An SI train may be considered OPERABLE when the pump is capable of being manually started from the control room.
MODE 4 when both RCS cold leg temperatures are > SI pump disable temperature specified in PTLR.ACTIONS.NOTE LCO 3.0.4.b is not applicable to ECCS safety injection (SI) subsystem.
APPLICABILITY:         MODE 4 when both RCS cold leg temperatures are > SI pump disable temperature specified in PTLR.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A. 1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable, subsystem to OPERABLE status.B. Required ECCS safety B.1 Restore required ECCS SI 1 hour injection (SI) subsystem subsystem to OPERABLE inoperable, status.Prairie Island Units I and 2 Unit 1 -Amendment No. 4-58 4-67 183 Unit 2 -Amendment No. 449 447 173 3.5.3-1}}
ACTIONS
                                          .NOTE LCO 3.0.4.b is not applicable to ECCS safety injection (SI) subsystem.
CONDITION                       REQUIRED ACTION                       COMPLETION TIME A. Required ECCS residual       A. 1 Initiate action to restore           Immediately heat removal (RHR)                 required ECCS RHR subsystem inoperable,               subsystem to OPERABLE status.
B. Required ECCS safety         B.1   Restore required ECCS SI             1 hour injection (SI) subsystem           subsystem to OPERABLE inoperable,                         status.
Prairie Island                                             Unit 1 - Amendment No. 4-58 4-67 183 Units I and 2                              3.5.3-1        Unit 2 - Amendment No. 449 447 173}}

Latest revision as of 08:07, 13 March 2020

Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs
ML080140425
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/28/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Chawla M, NRR/DORL/LPL3-1, 301-415-8371
Shared Package
ML080100073 List:
References
TAC MD4209, TAC MD4210
Download: ML080140425 (1)


Text

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.

NOTES

1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
2. An SI train may be considered OPERABLE when the pump is capable of being manually started from the control room.

APPLICABILITY: MODE 4 when both RCS cold leg temperatures are > SI pump disable temperature specified in PTLR.

ACTIONS

.NOTE LCO 3.0.4.b is not applicable to ECCS safety injection (SI) subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A. 1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable, subsystem to OPERABLE status.

B. Required ECCS safety B.1 Restore required ECCS SI 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> injection (SI) subsystem subsystem to OPERABLE inoperable, status.

Prairie Island Unit 1 - Amendment No. 4-58 4-67 183 Units I and 2 3.5.3-1 Unit 2 - Amendment No. 449 447 173