{{#Wiki_filter:September 26, 2008  
{{#Wiki_filter:September 26, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
 
Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RE: REQUEST FOR TEMPORARY EXEMPTION FROM 10 CFR 50.46 AND 10 CFR 50, APPENDIX K, FOR LEAD FUEL ASSEMBLIES (TAC NO. MD8330)  
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 -
ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RE: REQUEST FOR TEMPORARY EXEMPTION FROM 10 CFR 50.46 AND 10 CFR 50, APPENDIX K, FOR LEAD FUEL ASSEMBLIES (TAC NO. MD8330)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to the Arizona Public Service Company request for temporary exemption dated March 8, 2008, as supplemented by letter dated September 10, 2008, that would allow up to eight lead fuel assemblies manufactured by AREVA NP with fuel rods clad with M5 to be inserted into the Palo Verde Nuclear Generating Station, Unit 1 reactor core during operating Cycles 15, 16, and 17.
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to the Arizona Public Service Company request for temporary exemption dated March 8, 2008, as supplemented by letter dated September 10, 2008, that would allow up to eight lead fuel assemblies manufactured by AREVA NP with fuel rods clad with M5 to be inserted into the Palo Verde Nuclear Generating Station, Unit 1 reactor core during operating Cycles 15, 16, and 17.
The assessment is being forwarded to the Office of the Federal Register for publication.
The assessment is being forwarded to the Office of the Federal Register for publication.
If you have any questions, please contact me at 301-415-3016.
If you have any questions, please contact me at 301-415-3016.
Sincerely,  
Sincerely,
  /RA/   Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-528  
                                                  /RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-528


==Enclosure:==
==Enclosure:==


Environmental Assessment cc w/encl: See next page  
Environmental Assessment cc w/encl: See next page
 
Pkg ML082540499, Letter (NRR-106) ML082550004, EA (NRR-042) ML082540472 OFFICE DORL/LPL4/PM DORL/LPL4/LA NRR/DLR/RERB/BC OGC DORL/LPL4/BC DORL/LPL4/PM NAME BSingal JBurkhardt BPham RHolmes MMarkley BSingal DATE 9/12/08 9/11/08 9/12/08 9/24/08 9/26/08 9/26/08 Palo Verde Nuclear Generating Station      7/2/2008 cc: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ  85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA  91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ  85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX  76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ  85040 Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. John C. Taylor Director, Nuclear Generation  El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ  85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy., Bldg. D21 San Clemente, CA  92672
 
Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ  85251


Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326 Ms. Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003}}
Pkg ML082540499, Letter (NRR-106) ML082550004, EA (NRR-042) ML082540472 OFFICE  DORL/LPL4/PM    DORL/LPL4/LA      NRR/DLR/RERB/BC  OGC            DORL/LPL4/BC    DORL/LPL4/PM NAME    BSingal        JBurkhardt        BPham            RHolmes        MMarkley        BSingal DATE    9/12/08        9/11/08          9/12/08          9/24/08        9/26/08        9/26/08 Palo Verde Nuclear Generating Station                                  7/2/2008 cc:
Mr. Steve Olea                          Mr. John C. Taylor Arizona Corporation Commission          Director, Nuclear Generation 1200 W. Washington Street                El Paso Electric Company Phoenix, AZ 85007                        340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel                          Mr. James Ray Southern California Edison Company      Public Service Company of New Mexico Law Department, Generation Resources    2401 Aztec NE, MS Z110 P.O. Box 800                            Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector                Southern California Edison Company U.S. Nuclear Regulatory Commission      5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40                              San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV        Salt River Project U.S. Nuclear Regulatory Commission      6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400            Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman                                Assistant General Counsel Maricopa County Board of Supervisors    El Paso Electric Company 301 W. Jefferson, 10th Floor            Mail Location 167 Phoenix, AZ 85003                        123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency      Mr. Eric Tharp 4814 S. 40th Street                      Los Angeles Department of Water & Power Phoenix, AZ 85040                        Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director                Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station    Mr. Brian Almon Mail Station 7636                        Public Utility Commission P.O. Box 52034                          William B. Travis Building Phoenix, AZ 85072-2034                  P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President      Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station    Ms. Karen O'Regan Mail Station 7605                        Environmental Program Manager P.O. Box 52034                          City of Phoenix Phoenix, AZ 85072-2034                  Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003}}

Latest revision as of 21:10, 12 March 2020

Transmittal Letter, Environmental Assessment & Finding of No Significant Impact Request for Temporary Exemption from 10 CFR 50.46 and Appendix K to 10 CFR Part 50 for Lead Fuel Assemblies
ML082550004
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/26/2008
From: Balwant Singal
Plant Licensing Branch IV
To: Edington R
Arizona Public Service Co
Singal, Balwant, 415-3016, NRR/DORL/LPL4
Shared Package
ML082540499 List:
References
TAC MD8330
Download: ML082550004 (3)


Text

September 26, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 -

ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RE: REQUEST FOR TEMPORARY EXEMPTION FROM 10 CFR 50.46 AND 10 CFR 50, APPENDIX K, FOR LEAD FUEL ASSEMBLIES (TAC NO. MD8330)

Dear Mr. Edington:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to the Arizona Public Service Company request for temporary exemption dated March 8, 2008, as supplemented by letter dated September 10, 2008, that would allow up to eight lead fuel assemblies manufactured by AREVA NP with fuel rods clad with M5 to be inserted into the Palo Verde Nuclear Generating Station, Unit 1 reactor core during operating Cycles 15, 16, and 17.

The assessment is being forwarded to the Office of the Federal Register for publication.

If you have any questions, please contact me at 301-415-3016.

Sincerely,

/RA/

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-528

Enclosure:

Environmental Assessment cc w/encl: See next page

Pkg ML082540499, Letter (NRR-106) ML082550004, EA (NRR-042) ML082540472 OFFICE DORL/LPL4/PM DORL/LPL4/LA NRR/DLR/RERB/BC OGC DORL/LPL4/BC DORL/LPL4/PM NAME BSingal JBurkhardt BPham RHolmes MMarkley BSingal DATE 9/12/08 9/11/08 9/12/08 9/24/08 9/26/08 9/26/08 Palo Verde Nuclear Generating Station 7/2/2008 cc:

Mr. Steve Olea Mr. John C. Taylor Arizona Corporation Commission Director, Nuclear Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel Mr. James Ray Southern California Edison Company Public Service Company of New Mexico Law Department, Generation Resources 2401 Aztec NE, MS Z110 P.O. Box 800 Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector Southern California Edison Company U.S. Nuclear Regulatory Commission 5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40 San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV Salt River Project U.S. Nuclear Regulatory Commission 6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400 Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman Assistant General Counsel Maricopa County Board of Supervisors El Paso Electric Company 301 W. Jefferson, 10th Floor Mail Location 167 Phoenix, AZ 85003 123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Mr. Eric Tharp 4814 S. 40th Street Los Angeles Department of Water & Power Phoenix, AZ 85040 Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station Mr. Brian Almon Mail Station 7636 Public Utility Commission P.O. Box 52034 William B. Travis Building Phoenix, AZ 85072-2034 P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Ms. Karen O'Regan Mail Station 7605 Environmental Program Manager P.O. Box 52034 City of Phoenix Phoenix, AZ 85072-2034 Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003