ML103280107: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML103280107
| number = ML103280107
| issue date = 11/24/2010
| issue date = 11/24/2010
| title = Senior Reactor Operator Written Retake Examination
| title = Senior Reactor Operator Written Retake Examination
| author name = Hansell S L
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Joyce T P
| addressee name = Joyce T
| addressee affiliation = Public Service Electric & Gas Co
| addressee affiliation = Public Service Electric & Gas Co
| docket = 05000354
| docket = 05000354
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P. O. Box 236 Hancocks Bridge, NJ 08038 REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 November 24, 2010
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 November    24, 2010 Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P. O. Box 236 Hancocks Bridge, NJ 08038


==SUBJECT:==
==SUBJECT:==
SENIOR REACTOR OPERATOR WRITTEN RETAKE HOPE CREEK GENERATING STATION, UNIT 1  
SENIOR REACTOR OPERATOR WRITTEN RETAKE EXAMINATION-HOPE CREEK GENERATING STATION, UNIT 1


==Dear Mr. Joyce:==
==Dear Mr. Joyce:==
In a telephone conversation on September 10, 2010, between Mr. Robert Boesch, Supervisor, Operations Training, and Mr. Samuel Hansell, Chief, Operations Branch, NRC, arrangements were made for the administration of a written retake licensing examination at Hope Creek on February 3, 2011. As agreed during the telephone conversation, your staff will prepare the written examination based on the guidelines in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement  
 
: 1. The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.
In a telephone conversation on September 10, 2010, between Mr. Robert Boesch, Supervisor, Operations Training, and Mr. Samuel Hansell, Chief, Operations Branch, NRC, arrangements were made for the administration of a written retake licensing examination at Hope Creek on February 3, 2011.
To meet the above schedule, it will be necessary for your staff to furnish the written examination outline, the written examination, and the supporting reference materials by the dates discussed with Mr. Boesch. Pursuant to Title 10, Section 10 CFR 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval.
As agreed during the telephone conversation, your staff will prepare the written examination based on the guidelines in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.
All materials should be complete and ready-to-use.
To meet the above schedule, it will be necessary for your staff to furnish the written examination outline, the written examination, and the supporting reference materials by the dates discussed with Mr. Boesch. Pursuant to Title 10, Section 10 CFR 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.
In order to conduct the requested written examination, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402.
In order to conduct the requested written examination, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and any waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. Because your applicant for this NRC written retake examination previously passed the operating test, administered the week of August 23, 2010, you may request a waiver of that portion. If the application is not received at least 30 days before the examination date, a postponement may be necessary.
To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and any waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. Because your applicant for this NRC written retake examination previously passed the operating test, administered the week of August 23, 2010, you may request a waiver of that portion. If the application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.
The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.
 
T.Joyce 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections.
T.Joyce                                           2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The public reporting burden for this collection of information is estimated to average 250 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.
Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.
Docket No: License No. 50-354 NPF-57 cc: Distribution via ListServ Sincerely, 1 C c
Sincerely,     1 ~
---=----"" ...... Samuel L. nsell, Jr., Chief Operations Branch Division of Reactor Safety T. Joyce 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections.
cC -==~-~~    Samuel L.
The public reporting burden for this collection of information is estimated to average 250 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
                                                                ---=----""
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.
nsell, Jr., Chief Operations Branch Division of Reactor Safety Docket No:      50-354 License No. NPF-57 cc: Distribution via ListServ
 
T. Joyce                                                           2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.
Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.
Docket No: License No. 50-354 NPF-57 cc: Distribution via ListServ SUNSI Review Complete:
Sincerely, IRA!
SLH (Reviewer's Initials)
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No:         50-354 License No.       NPF-57 cc: Distribution via ListServ SUNSI Review Complete: SLH (Reviewer's Initials)
Sincerely, IRA! Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety ADAMS PKG: ML 103200290 ADAMS ACCESSION NO.: ML 103280107 DOCUMENTNAME:G:\DRS\Operations Branch\FISH\Exam 11-HC Rtk Feb 11 (U01840)\HC-120 Day ExamRetakeltr.docx After declaring this document "An Official Agency Record" it will be released to the Public. T' f thO d t . d' . h b "C" C . h h "C' h tJ o receive a copy 0 IS ocumen, In Icate In t e ox: = oP'i Wit out attac mentJenc osure "E = OPYWlt attach men enclosure "N"= No copy OFFICE RI/DRS/OB I RI/DRS/OB I I l I NAME THFishl SLHanseli1 DATE 11/24/10 11/24/2010 OFFICIAL RECORD COPY T. Joyce Distribution w/encl: W. Dean, RA (R10RAMAIL Resource)
ADAMS PKG: ML103200290                                            ADAMS ACCESSION NO.: ML103280107 DOCUMENTNAME:G:\DRS\Operations Branch\FISH\Exam 11-HC Rtk Feb 11 (U01840)\HC-120 Day ExamRetakeltr.docx After declaring this document "An Official Agency Record" it will be released to the Public.
To receive
      ' a copy 0 f thOIS documen,t .Ind'Icate .In the b ox: "C" = CoP'i Wit. hout attachmentJenc osure "E"=C  ' h attach mentJenclosure "N"= No copy OPYWlt OFFICE                 RI/DRS/OB           I RI/DRS/OB                 I                         I                     l                         I NAME                   THFishl                   SLHanseli1 DATE                   11/24/10                   11/24/2010 OFFICIAL RECORD COPY
 
T. Joyce                                     3 Distribution w/encl:
W. Dean, RA       (R10RAMAIL Resource)
M. Dapas, DRA (R10RAMAIL Resource)
M. Dapas, DRA (R10RAMAIL Resource)
D. Lew, DRP (R1DRPMAIL Resource)
D. Lew, DRP       (R1DRPMAIL Resource)
J. Clifford, DRP (R1 DRPMAIL Resource)
J. Clifford, DRP (R1 DRPMAIL Resource)
D. Roberts, DRS (R1DRSMaii Resource)
D. Roberts, DRS (R1DRSMaii Resource)
P. Wilson, DRS (R1DRSMaii Resource)
P. Wilson, DRS (R1DRSMaii Resource)
A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP B. Welling, DRP, SRI A. Patel, DRP, RI K. McKenzie, Resident OA G. Miller, RI OEDO D. Bearde, DRS RidsNRRPMHopeCreek Resource RidsNrrDorlLpl1-2Resource ROPreportsResource@nrc.gov 3 DRS Master Exam File (C. Bixler) (w/concurrences)
A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP B. Welling, DRP, SRI A. Patel, DRP, RI K. McKenzie, Resident OA G. Miller, RI OEDO D. Bearde, DRS RidsNRRPMHopeCreek Resource RidsNrrDorlLpl1-2Resource ROPreportsResource@nrc.gov DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File}}
DRS File}}

Latest revision as of 10:32, 11 March 2020

Senior Reactor Operator Written Retake Examination
ML103280107
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/24/2010
From: Hansell S
Operations Branch I
To: Joyce T
Public Service Electric & Gas Co
Shared Package
ML103200290 List:
References
U01840
Download: ML103280107 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 November 24, 2010 Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SENIOR REACTOR OPERATOR WRITTEN RETAKE EXAMINATION-HOPE CREEK GENERATING STATION, UNIT 1

Dear Mr. Joyce:

In a telephone conversation on September 10, 2010, between Mr. Robert Boesch, Supervisor, Operations Training, and Mr. Samuel Hansell, Chief, Operations Branch, NRC, arrangements were made for the administration of a written retake licensing examination at Hope Creek on February 3, 2011.

As agreed during the telephone conversation, your staff will prepare the written examination based on the guidelines in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.

To meet the above schedule, it will be necessary for your staff to furnish the written examination outline, the written examination, and the supporting reference materials by the dates discussed with Mr. Boesch. Pursuant to Title 10, Section 10 CFR 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.

In order to conduct the requested written examination, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and any waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. Because your applicant for this NRC written retake examination previously passed the operating test, administered the week of August 23, 2010, you may request a waiver of that portion. If the application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.

T.Joyce 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.

Sincerely, 1 ~

cC -==~-~~ Samuel L.

---=----""

nsell, Jr., Chief Operations Branch Division of Reactor Safety Docket No: 50-354 License No. NPF-57 cc: Distribution via ListServ

T. Joyce 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Doucments Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRC's public website at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Boesch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact your Chief Examiner, Mr. Todd Fish at (610) 337-5369, or me at (610) 337-5046.

Sincerely, IRA!

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No: 50-354 License No. NPF-57 cc: Distribution via ListServ SUNSI Review Complete: SLH (Reviewer's Initials)

ADAMS PKG: ML103200290 ADAMS ACCESSION NO.: ML103280107 DOCUMENTNAME:G:\DRS\Operations Branch\FISH\Exam 11-HC Rtk Feb 11 (U01840)\HC-120 Day ExamRetakeltr.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive

' a copy 0 f thOIS documen,t .Ind'Icate .In the b ox: "C" = CoP'i Wit. hout attachmentJenc osure "E"=C ' h attach mentJenclosure "N"= No copy OPYWlt OFFICE RI/DRS/OB I RI/DRS/OB I I l I NAME THFishl SLHanseli1 DATE 11/24/10 11/24/2010 OFFICIAL RECORD COPY

T. Joyce 3 Distribution w/encl:

W. Dean, RA (R10RAMAIL Resource)

M. Dapas, DRA (R10RAMAIL Resource)

D. Lew, DRP (R1DRPMAIL Resource)

J. Clifford, DRP (R1 DRPMAIL Resource)

D. Roberts, DRS (R1DRSMaii Resource)

P. Wilson, DRS (R1DRSMaii Resource)

A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP B. Welling, DRP, SRI A. Patel, DRP, RI K. McKenzie, Resident OA G. Miller, RI OEDO D. Bearde, DRS RidsNRRPMHopeCreek Resource RidsNrrDorlLpl1-2Resource ROPreportsResource@nrc.gov DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File