ML11242A073: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NUCLEAR ORGANIZATION | {{#Wiki_filter:, | ||
[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6)STEP PERFORMED BY (INITIALS): | NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 9 OF 27 ATTACHMENT I 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses: | ||
COMMENTS: 3-h-- '~ | YEY/NO/NA e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE | ||
, [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned. | |||
File per $0123-0-A3. | SR 3.8.9.1 AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned. | ||
[2] BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30) | |||
[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec. | |||
LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6) | |||
STEP PERFORMED BY (INITIALS): | |||
COMMENTS: | |||
Surveillance completed 3-h-- '~ and log entry made. | |||
DATE TIME PERFORMED BY: | |||
REVIEWED BY: | |||
(b)(6) i=. | |||
/D~ -TM FILE DISPOSITION: File per $0123-0-A3. | |||
ATTACHMENT I PAGE 6 OF 6 REVIEWED BY MAR 1 9 2008 S023-3-3.27.2 | |||
____---i-i}} | ____---i-i}} |
Latest revision as of 16:21, 10 March 2020
ML11242A073 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 03/17/2008 |
From: | - No Known Affiliation |
To: | Office of Information Services |
References | |
FOIA/PA-2011-0157 | |
Download: ML11242A073 (1) | |
Text
,
NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 9 OF 27 ATTACHMENT I 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses:
YEY/NO/NA e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE
, [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned.
SR 3.8.9.1 AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.
[2] BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30)
[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.
LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6)
STEP PERFORMED BY (INITIALS):
COMMENTS:
Surveillance completed 3-h-- '~ and log entry made.
DATE TIME PERFORMED BY:
REVIEWED BY:
(b)(6) i=.
/D~ -TM FILE DISPOSITION: File per $0123-0-A3.
ATTACHMENT I PAGE 6 OF 6 REVIEWED BY MAR 1 9 2008 S023-3-3.27.2