ML11242A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUCLEAR ORGANIZATION UNITS 2 AND 3 SURVEILLANCE OPERATING INSTRUCTION REVISION 15 ATTACHMENT I , S023-3-3.27.2 PAGE 9 OF 27 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses: YEY/NO/NA e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE , [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned.SR 3.8.9.1 AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.[2] BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30)
{{#Wiki_filter:,
[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6)STEP PERFORMED BY (INITIALS):
NUCLEAR ORGANIZATION               SURVEILLANCE OPERATING INSTRUCTION                   S023-3-3.27.2 UNITS 2 AND 3                      REVISION 15                                          PAGE 9 OF 27 ATTACHMENT I 2.0     ACCEPTANCE CRITERIA         (Continued) 2.7   Vital DC Buses:
COMMENTS: 3-h-- '~Surveillance completed and log entry made.DATE TIME PERFORMED BY: REVIEWED BY: (b)(6)/ D~ -TM.................
YEY/NO/NA       e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE
i=.FILE DISPOSITION:
                    , [3]             and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1             associated breakers are properly aligned.
File per $0123-0-A3.
SR 3.8.9.1       AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.
REVIEWED BY ATTACHMENT I PAGE 6 OF 6 MAR 1 9 2008 S023-3-3.27.2
[2]   BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus.                     (ECP 001000280-30)
[3]   If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9.                       If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.
LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers).                                                                         (b)(6)
STEP PERFORMED BY (INITIALS):
COMMENTS:
Surveillance completed      3-h--                     '~             and log entry made.
DATE             TIME PERFORMED BY:
REVIEWED BY:
(b)(6) i=.
                                                                                      /D~ -TM FILE DISPOSITION:     File per $0123-0-A3.
ATTACHMENT I       PAGE 6 OF 6 REVIEWED BY MAR 1 9 2008 S023-3-3.27.2
____---i-i}}
____---i-i}}

Latest revision as of 16:21, 10 March 2020

Surveillance Operating Instruction, Revision 15
ML11242A073
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/17/2008
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML11242A073 (1)


Text

,

NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 9 OF 27 ATTACHMENT I 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses:

YEY/NO/NA e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE

, [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned.

SR 3.8.9.1 AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.

[2] BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30)

[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.

LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6)

STEP PERFORMED BY (INITIALS):

COMMENTS:

Surveillance completed 3-h-- '~ and log entry made.

DATE TIME PERFORMED BY:

REVIEWED BY:

(b)(6) i=.

/D~ -TM FILE DISPOSITION: File per $0123-0-A3.

ATTACHMENT I PAGE 6 OF 6 REVIEWED BY MAR 1 9 2008 S023-3-3.27.2