ENS 53817: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 21: | Line 21: | ||
All primary and secondary containment isolation valves, with the exception of the 2T41F003A, Refueling Floor Inboard Vent Supply Isolation valve, functioned successfully. The refuel floor inboard vent supply isolation valve failed to travel fully closed on the secondary containment isolation signal and was therefore declared inoperable. The 2T41F003B refuel floor outboard vent supply isolation valve was verified to go fully closed and therefore isolation of that associated penetration line was successful. After assistance from maintenance, the valve was verified to be fully closed. | All primary and secondary containment isolation valves, with the exception of the 2T41F003A, Refueling Floor Inboard Vent Supply Isolation valve, functioned successfully. The refuel floor inboard vent supply isolation valve failed to travel fully closed on the secondary containment isolation signal and was therefore declared inoperable. The 2T41F003B refuel floor outboard vent supply isolation valve was verified to go fully closed and therefore isolation of that associated penetration line was successful. After assistance from maintenance, the valve was verified to be fully closed. | ||
All SBGT systems functioned successfully. The associated fuse and relay were replaced, and secondary containment was returned to normal service. | All SBGT systems functioned successfully. The associated fuse and relay were replaced, and secondary containment was returned to normal service. | ||
The licensee notified the NRC Resident Inspector. | The licensee notified the NRC Resident Inspector. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190109en.html#en53817 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190109en.html#en53817 | ||
}}{{unit info | }}{{unit info |
Latest revision as of 23:56, 23 February 2020
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1371.2 h57.133 days <br />8.162 weeks <br />1.878 months <br />) | |
Opened: | Nicholas Hightower 08:12 Jan 8, 2019 |
NRC Officer: | Jeffrey Whited |
Last Updated: | Jan 8, 2019 |
53817 - NRC Website
| |