| issue date = 06/30/2011
| issue date = 06/30/2011
| title = 2011 DAEC Initial License Examination Proposed JPMs
| title = 2011 DAEC Initial License Examination Proposed JPMs
| author name = Zoia C D
| author name = Zoia C
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC 2011 RO ADMIN JPM a.docx  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO1
{{#Wiki_filter:DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO1 NRC 2011 RO ADMIN JPM a.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 RO ADMIN JPM a.docx Page 2 of 11  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   PERFORMANCE OF ATTACHMENT 10, VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE, OF STP 3.0.0-01, INSTRUMENT CHECKS JPM NUMBER:                 NRC 2011 RO C0001                   REV.        0 DAEC BANK #2.1.7-05 TASK NUMBER(S) /             1.07 (REACTOR OPERATOR)
JPM TITLE:
TASK TITLE(S):
PERFORMANCE OF ATTACHMENT 10, VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE, OF STP 3.0.0
K/A NUMBERS:                 2.1.7 (4.4)                     K/A VALUE:
-01, INSTRUMENT CHECKS JPM NUMBER:
NRC 2011 RO C0001 DAEC BANK #2.1.7
-05 REV. 0  TASK NUMBER(S) / TASK TITLE(S):
1.07 (REACTOR OPERATOR)
K/A NUMBERS:
2.1.7 (4.4)
K/A VALUE:
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:               Perform:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
EVALUATION LOCATION:             In-Plant:                             Control Room:
Simulate/Walkthrough:
Simulator:                   X       Other:
Perform:   EVALUATION LOCATION:
Lab:
In-Plant:   Control Room:
Time for Completion:           20     Minutes       Time Critical:       Yes         No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
Simulator:
Instructor                                   Date Validated by:
X Other:           Lab:       Time for Completion:
Validation Instructor                             Date Reviewed by:
20 Minutes Time Critical:
Plant Reviewer                                 Date Approved by:
Yes No     Alternate Path [NRC]:
Training Supervisor                               Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Yes No   Alternate Path [INPO]:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Yes No     Developed by:
Retention: Life of policy + 10yrs.                                              Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM a.docx                          Page 2 of 11
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM a.docx Page 3 of 11 TURNOVER SHEET INITIAL CONDITIONS:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant is operating at 100% electrical output.
* The plant is operating at 100% electrical output.
It's a very hot and humid day.
* Its a very hot and humid day.
The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre
* The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre-job Brief.
-job Brief.
o     SPDS point SPDS006 has gone bad.
o SPDS point SPDS006 has gone bad.
o     Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.
o Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):  
* Complete Attachment 10 of STP 3.0.0-01, Instrument Checks.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM a.docx                    Page 3 of 11


Complete Attachment 10 of STP 3.0.0
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-01, Instrument Checks.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
 
QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 4 of 11  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfie
: d. DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant is operating at 100% electrical output.
* The plant is operating at 100% electrical output.
It's a very hot and humid day.
* Its a very hot and humid day.
The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre-job Brief.
* The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre-job Brief.
o SPDS point SPDS006 has gone bad.
o     SPDS point SPDS006 has gone bad.
o Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.
o     Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Complete Attachment 10 of STP 3.0.0
* Complete Attachment 10 of STP 3.0.0-01, Instrument Checks.
-01, Instrument Checks.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM a.docx                            Page 4 of 11


QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 5 of 11  JPM PERFORMANCE INFORMATION Start Time:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication). NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:             Takes the reading from TR-4383A Pen 1 (R) and multiplies it by the Critical N (SEQ-)            Volume Fraction:
Performance Step:
188.38 X 0.1067 Standard:                     Multiplies 188.38 X 0.1067 and gets 20.1.
Critical  N (SEQ-) Takes the reading from TR
-4383A Pen 1 (R) and multiplies it by the Volume Fraction:
188.38 X 0.1067 Standard: Multiplies 188.38 X 0.1067 and gets 20.1.
Then records this number in the PRODUCT (3.0) column.
Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
Evaluator Note:               It is acceptable to round off the reading.
It is acceptable to round off the reading.
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
Performance:
Performance Step:             Takes the reading from TR-4383A Pen 2 (G) and multiplies it by the Critical N (SEQ-)            Volume Fraction:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
* 166.98 X 0.1244.
Critical N (SEQ-) Takes the reading from TR
Standard:                     Multiplies 166.98 X 0.1244 and gets 20.77.
-4383A Pen 2 (G) and multiplies it by the Volume Fraction:
166.98 X 0.1244.
Standard: Multiplies 166.98 X 0.1244 and gets 20.77.
Then records this number in the PRODUCT (3.0) column.
Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
Evaluator Note:               It is acceptable to round off the reading.
It is acceptable to round off the reading.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
NRC 2011 RO ADMIN JPM a.docx                    Page 5 of 11
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step:         Takes the reading from TR-4383A Pen 3 (B) and multiplies it by the Critical N (SEQ-)          Volume Fraction:
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
* 122.97 X 0.1737.
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 6 of 11  Performance Step:
Standard:                 Multiplies 122.97 X 0.1737 and gets 21.36 Then records this number in the PRODUCT (3.0) column.
Critical N (SEQ-) Takes the reading from TR
Evaluator Note:           It is acceptable to round off the reading.
-4383A Pen 3 (B) and multiplies it by the Volume Fraction:
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
122.97 X 0.1737.
Performance Step:         Takes the reading from TR-4383B Pen 1 (R) and multiplies it by the Critical N (SEQ-)          Volume Fraction:
Standard: Multiplies 122.97 X 0.1737 and gets 21.36 Then records this number in the PRODUCT (3.0) column.
* 167.34 X 0.1244.
Evaluator Note:
Standard:                 Multiplies 167.34 X 0.1244 and gets 20.82 Then records this number in the PRODUCT (3.0) column.
It is acceptable to round off the reading.
Evaluator Note:           It is acceptable to round off the reading.
Performance:
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
NRC 2011 RO ADMIN JPM a.docx                  Page 6 of 11
Critical N (SEQ-) Takes the reading from TR
 
-4383B Pen 1 (R) and multiplies it by the Volume Fraction:
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step:         Takes the reading from TR-4383B Pen 2 (G) and multiplies it by the Critical N (SEQ-)          Volume Fraction:
167.34 X 0.1244.
* 134.88 X 0.1737.
Standard: Multiplies 167.34 X 0.1244 and gets 20.82 Then records this number in the PRODUCT (3.0) column.
Standard:                 Multiplies 134.88 X 0.1737 and gets 23.43 Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
Evaluator Note:           It is acceptable to round off the reading.
It is acceptable to round off the reading.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
Performance:
Performance Step:         Takes the reading from TR-4383B Pen 3 (B) and multiplies it by the Critical Y (SEQ-)          Volume Fraction:
SATISFACTORY UNSATISFACTORY Comments:
* 114.99 X 0.1259.
QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
Standard:                 Multiplies 114.99 X 0.1259 and gets 14.48.
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 7 of 11 Performance Step:
Critical N (SEQ-) Takes the reading from TR
-4383B Pen 2 (G) and multiplies it by the Volume Fraction:
134.88 X 0.1737.
Standard: Multiplies 134.88 X 0.1737 and gets 23.43 Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
It is acceptable to round off the reading. Performance:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
Critical Y (SEQ-) Takes the reading from TR
-4383B Pen 3 (B) and multiplies it by the Volume Fraction:
114.99 X 0.1259.
Standard: Multiplies 114.99 X 0.1259 and gets 14.48.
Then records this number in the PRODUCT (3.0) column.
Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
Evaluator Note:           It is acceptable to round off the reading.
It is acceptable to round off the reading.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
Performance:
NRC 2011 RO ADMIN JPM a.docx                  Page 7 of 11
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step:         Takes the reading from TR-4383C Pen 1 (R) and multiplies it by the Critical N (SEQ-)          Volume Fraction:
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
* 122.75 X 0.1259.
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 8 of 11 Performance Step:
Standard:                 Multiplies 122.75 X 0.1259 and gets 15.45.
Critical N (SEQ-) Takes the reading from TR
-4383C Pen 1 (R) and multiplies it by the Volume Fraction:
122.75 X 0.1259.
Standard: Multiplies 122.75 X 0.1259 and gets 15.45.
Then records this number in the PRODUCT (3.0) column.
Then records this number in the PRODUCT (3.0) column.
Evaluator Note:
Evaluator Note:           It is acceptable to round off the reading.
It is acceptable to round off the reading.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
Performance:
Performance Step:         Takes the reading from TR-4383C Pen 2 (G) and multiplies it by the Critical N (SEQ-)          Volume Fraction:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
* 113.83 X 0.0453.
Critical N (SEQ-) Takes the reading from TR
Standard:                 Multiplies 113.83 X 0.0453 and gets 5.16 Then records this number in the PRODUCT (3.0) column.
-4383C Pen 2 (G) and multiplies it by the Volume Fraction:
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
113.83 X 0.0453.
NRC 2011 RO ADMIN JPM a.docx                  Page 8 of 11
Standard: Multiplies 113.83 X 0.0453 and gets 5.16 Then records this number in the PRODUCT (3.0) column.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    


QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step:         Adds up column PRODUCT (3.0).
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
Critical Y (SEQ-)
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 9 of 11 Performance Step:
20.1 20.77 21.36 20.82 23.43 14.48 15.45 5.16 141.57 Standard:                 Adds up the volume fractions for each drywell temperatures and gets a value of 141.57.
Critical Y (SEQ-) Adds up column PRODUCT (3.0).
Evaluator Note:           The number does not have to be exactly the same as above, it will depend on how he rounded off the Volume Fraction calculations.
20.1   20.77   21.36   20.82   23.43   14.48   15.45 141.57     5.16  Standard: Adds up the volume fractions for each drywell temperatures and gets a value of 141.57.
Evaluator Note:
The number does not have to be exactly the same as above, it will depend on how he rounded off the Volume Fraction calculations.
The critical portion is that the calculation be above 135 degrees.
The critical portion is that the calculation be above 135 degrees.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
Performance Step:         Instrument Checks Acceptance Criteria for Volume Weighted Drywell Critical Y (SEQ-)          Average Air Temperature is less than or equal to 135 degrees F.
Critical Y (SEQ-) Instrument Checks Acceptance Criteria for Volume Weighted Drywell Average Air Temperature is less than or equal to 135 degrees F.
Standard:                 Determines that the Attachment 10 value determined in previous step is above the Acceptance Criteria for the STP, and reports the findings to the CRS/SM.
Standard: Determines that the Attachment 10 value determined in previous step is above the Acceptance Criteria for the STP, and reports the findings to the CRS/SM. Evaluator Note:
Evaluator Note:           If the candidate does not recognize that this reading is above the T.S.
If the candidate does not recognize that this reading is above the T.S. acceptance criteria it should be noted as a competency.
acceptance criteria it should be noted as a competency.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 RO ADMIN JPM a.docx                  Page 9 of 11
QF-1030-11 Rev. 7 NRC 2011 RO C001 , DAEC Bank # 2.1.7
 
-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0
QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Terminating Cues:     When the Candidate informs the CRS/SM that they do not meet the acceptance criteria for Drywell average air temperatures, the JPM is complete.
-01, Instrument Checks, Rev. 0 NRC 2011 RO ADMIN JPM a.docx Page 10 of 11 Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
When the Candidate informs the CRS/SM that they do not meet the acceptance criteria for Drywell average air temperatures, the JPM is complete. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
Stop Time:  
NRC 2011 RO ADMIN JPM a.docx                  Page 10 of 11


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM a.docx Page 11 of 11 Page 1 of 1 ATTACHMENT 10 VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE NOTE ________ Attachment 10 is to be performed whenever Computer Point SPDS006 is unavailable or inaccurate. Four different options are available for obtaining alternate temperature readings for each Drywell location and all readings do not have to be from the same option. The 1C29 temperatures used in Step 2.1 and the computer points used in Step 2.2 are sensed from the same temperature elements which input to SPDS006 but the computer points used in Step 2.3 and the 1C142 readings used in Step 2.4 are sensed from different temperature elements. If readings are obtained per Step 2.3 or 2.4, the calculated value may be different than what SPDS006 indicates and the System Engineer should be notified for further evaluation if the change is significant or exceeds the Tech Spec limit of 135F. Any one of the four options is acceptable to use, but the Step 2.1 or Step 2.2 options should be used if available for better accuracy. Assistance from an I&C Tech will be needed for using Step 2.4 option.
QF-1030-11 Rev. 7 Page 1 of 1                                                             ATTACHMENT 10 VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE NOTE                                                                         ________
: 1. Determine which individual instruments are available, circle and initial the instrument chosen in each row.
Attachment 10 is to be performed whenever Computer Point SPDS006 is unavailable or inaccurate. Four different options are available for obtaining alternate temperature readings for each Drywell location and all readings do not have to be from the same option. The 1C29 temperatures used in Step 2.1 and the computer points used in Step 2.2 are sensed from the same temperature elements which input to SPDS006 but the computer points used in Step 2.3 and the 1C142 readings used in Step 2.4 are sensed from different temperature elements. If readings are obtained per Step 2.3 or 2.4, the calculated value may be different than what SPDS006 indicates and the System Engineer should be notified for further evaluation if the change is significant or exceeds the Tech Spec limit of 135&deg;F. Any one of the four options is acceptable to use, but the Step 2.1 or Step 2.2 options should be used if available for better accuracy. Assistance from an I&C Tech will be needed for using Step 2.4 option.
: 2. Obtain the readings per the following as appropriate:
: 1.       Determine which individual instruments are available, circle and initial the instrument chosen in each row.
: 2.       Obtain the readings per the following as appropriate:
2.1 At 1C29, record the recorder reading in the table.
2.1 At 1C29, record the recorder reading in the table.
2.2 Using the Plant Process Computer, record the computer point reading in the table.
2.3 Using the Plant Process Computer, record the computer point reading plus the correction in the table.
2.4 At 1C142, select the ILRT position on switch HSS-4354 and use an L&N Temperature Calibrator to record the temperature reading plus the correction in the table. Refer to NG-96-1963 (Temperature Conversion Reference Tables) Tab 7 for converting resistance readings to temperatures.
: 3.        Multiply each reading by its volume fraction and record the product in the table.
: 4.        Determine the Volume Weighted Drywell Average Air Temperature by adding the eight products.
INSTRUMENT (1.0)                                            READING (2.0)          VOLUME          PRODUCT (3.0) 1C29 (2.1)              Comp. Pt. (2.2)      Comp. Pt. (2.3)        1C142 (2.4)                              FRACTION TR-4383A Channel 1 (R)              B147            B095 + 4.0          TE-4328L + 4.0                                X 0.1067 TR-4383A Channel 2 (G)              B145            B093 + 10.0        TE-4328J + 10.0                                X 0.1244 TR-4383A Channel 3 (B)              B143            B091 + 4.0          TE-4328G + 4.0                                X 0.1737 TR-4383B Channel 1 (R)              B146            B094 + 10.0        TE-4328K + 10.0                                X 0.1244 TR-4383B Channel 2 (G)              B144            B092 + 4.0          TE-4328H + 4.0                                X 0.1737 TR-4383B Channel 3 (B)              B141            B089 + 4.0          TE-4328E + 4.0                                X 0.1259 TR-4383C Channel 1 (R)              B142            B090 + 4.0          TE-4328F + 4.0                                X 0.1259 TR-4383C Channel 2 (G)              B149            B096 + 4.0          TE-4328M + 4.0                                X 0.0453 Volume Weighted Drywell Average Air Temperature (4.0)
NRC 2011 RO ADMIN JPM a.docx                              Page 11 of 11


===2.2 Using===
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO2 NRC 2011 RO ADMIN JPM C002.docx
the Plant Process Computer, record the computer point reading in the table.


===2.3 Using===
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
the Plant Process Computer, record the computer point reading plus the correction in the table.
JPM TITLE:                   VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER:                   NRC 2011 RO C0002                 REV.         0 TASK NUMBER(S) /             2.1.4 (3.3/3.8)
2.4 At 1C142, select the ILRT position on switch HSS
TASK TITLE(S):
-4354 and use an L&N Temperature Calibrator to record the temperature reading plus the correction in the table. Refer to NG 1963 (Temperature Conversion Reference Tables) Tab 7 for converting resistance readings to temperatures.
Knowledge of individual licensed operator responsibilities related to shift K/A NUMBERS:                 N/A                             K/A VALUE:       staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.
: 3. Multiply each reading by its volume fraction and record the product in the table.
: 4. Determine the Volume Weighted Drywell Average Air Temperature by adding the eight products.
INSTRUMENT (1.0)
READING (2.0)
VOLUME  PRODUCT (3.0) 1C29 (2.1)
Comp. Pt. (2.2)
Comp. Pt. (2.3) 1C142 (2.4)
FRACTION  TR-4383A Channel 1 (R)
B147 B095 + 4.0 TE-4328L + 4.0 X 0.1067  TR-4383A Channel 2 (G)
B145 B093 + 10.0 TE-4328J + 10.0 X 0.1244  TR-4383A Channel 3 (B)
B143 B091 + 4.0 TE-4328G + 4.0 X 0.1737  TR-4383B Channel 1 (R)
B146 B094 + 10.0 TE-4328K + 10.0 X 0.1244  TR-4383B Channel 2 (G)
B144 B092 + 4.0 TE-4328H + 4.0 X 0.1737  TR-4383B Channel 3 (B)
B141 B089 + 4.0 TE-4328E + 4.0 X 0.1259  TR-4383C Channel 1 (R)
B142 B090 + 4.0 TE-4328F + 4.0 X 0.1259  TR-4383C Channel 2 (G)
B149 B096 + 4.0 TE-4328M + 4.0 X 0.0453  Volume Weighted Drywell Average Air Temperature (4.0)
 
NRC 2011 RO ADMIN JPM C002.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO2
 
QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 RO ADMIN JPM C002.docx Page 2 of 11  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:
VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER:
NRC 2011 RO C0002 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2.1.4 (3.3/3.8)
K/A NUMBERS:
N/A K/A VALUE:
Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no-solo" operation, maintenance of active license status, 10CFR55, etc.
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO     SRO         STA       NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:                   Perform:     X EVALUATION LOCATION:             In-Plant:                             Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:                           Other:
Simulate/Walkthrough:
Lab:                                 Classroom                 X Time for Completion:           20       Minutes     Time Critical:           Yes         No Alternate Path [NRC]:           Yes         No Alternate Path [INPO]:         Yes         No Developed by:
Perform: X   EVALUATION LOCATION:
Instructor                                     Date Validated by:
In-Plant:   Control Room:
Validation Instructor                               Date Reviewed by:
Simulator:
Plant Reviewer                                   Date Approved by:
Other:           Lab:   Classroom X   Time for Completion:
Training Supervisor                                 Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
20 Minutes Time Critical:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Yes No     Alternate Path [NRC]:
Retention: Life of policy + 10yrs.                                                Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM C002.docx                      Page 2 of 11
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 NRC 2011 RO ADMIN JPM C002.docx Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 248: Line 174:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. RE-VALIDATION SIGNATURE JPMs must be re
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 NRC 2011 RO ADMIN JPM C002.docx Page 4 of 11 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Simulator Setup Instructions:
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
None SIMULATOR MALFUNCTIONS:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 RO ADMIN JPM C002.docx                              Page 3 of 11
None SIMULATOR OVERRIDES:
 
None SIMULATOR REMOTE FUNCTIONS:
QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
None Required Materials:
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements General  
10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20  
-Respiratory Protection NP-912-Respiratory Qualification Requirements General  


==References:==
==References:==
10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements Task Standards:            Identifies which personnel are available to assume the watch and the reaon(s) other(s) are not.
NRC 2011 RO ADMIN JPM C002.docx                  Page 4 of 11
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
* The plant is operating at 100% power.
* Today is July 4, 2011.
* You are the RO.
* You must leave shift.
* Three replacement operators are available.
INITIATING CUES (IF APPLICABLE):
* Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
* Record your findings on Handout #2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM C002.docx                  Page 5 of 11
QF-1030-11 Rev. 7 PERFORMANCE:
EXAMINER NOTE: Provide candidate with Handout #1 START TIME:
: 1. Procedure Step:  Operator reviews the handout and applicable sections of the procedures.
Standard  Determines eligibility of the operators in accordance with the below key Comments Results SAT                          UNSAT Terminating Cue:          ONCE candidate discusses their findings the JPM can be terminated Answer Key If No, what requirement is not Qualified for Relief? (Yes/No) being met.
Does not have a medical exam within the past 2 years RO #1                                NO Does not have the annual fit test Does not meet the required number of hours performing RO #2                                NO                  duties as a licensed operator for the last quarter (Work Control hours do NOT count)
RO #3                              YES                  N/A NRC 2011 RO ADMIN JPM C002.docx                Page 6 of 11


10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20
QF-1030-11 Rev. 7 HANDOUT #1 RO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - ANSOE 4/17/11 - 0700 - 1900 - NSOE 4/25/11 - 0700 - 1900 - ANSOE 5/5/11 - 0700 - 1900 - Work Control Tagout Coordinator 5/6/11 - 0700 - 1900 - ANSOE 5/7/11 - 0700 - 1900 - NSOE 6/4/11 - 0700 - 1900 - NSOE 6/5/11 - 0700 - 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam - 4/10/2009 Latest Mask Fit Test - 12/28/2009 RO#2 Hours Performing Operator Duties in Last Quarter 5/21/11:  0700 - 1900 - Work Control Tagout Coordinator 5/30/11:  0700 - 1900 - ANSOE 6/14/11:  0700 - 1900 - NSOE 6/15/11:  0700 - 1900 - Work Control Tagout Coordinator 6/24/11:  0700 - 1900 - NSOE 6/25/11:  0700 - 1900 - NSOE 6/26/11:  0700 - 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam - 10/14/2009 Latest Mask Fit Test - 11/16/2010 RO#3 Hours Performing Operator Duties in Last Quarter 4/6/11 0700 - 1900 - ANSOE 5/8/11: 0700 - 1900 - ANSOE 5/9/11: 0700 - 1900 - NSOE 5/15/11: 0700 - 1900 - Work Control Tagout Coordinator 6/1/11: 0700 - 1900 - NSOE 6/21/11: 0700 - 1900 - ANSOE Date of Most Recent Medical Exam - 7/15/2010 Latest Mask Fit Test - 6/10/2010 NRC 2011 RO ADMIN JPM C002.docx              Page 7 of 11
-Respiratory Protection NP-912-Respiratory Qualification Requirements Task Standards:
Identifies which personnel are available to assume the watch and the reaon(s) other(s) are not.


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM C002.docx Page 5 of 11 TURNOVER SHEET INITIAL CONDITIONS:
QF-1030-11 Rev. 7 HANDOUT #2 If No, what requirement(s)
The plant is operating at 100% power.
Qualified for Relief? (Yes/No) is/are not being met.
Today is July 4, 2011.
RO #1 RO #2 RO #3 NRC 2011 RO ADMIN JPM C002.docx         Page 8 of 11
You are the RO.
You must leave shift.
Three replacement operators are available.
INITIATING CUES (IF APPLICABLE):
Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
Record your findings on Handout #2.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM C002.docx Page 6 of 11 PERFORMANCE
QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
:  EXAMINER NOTE: Provide candidate with Handout #1 START TIME:
: 1. Procedure Step:
Operator reviews the handout and applicable sections of the procedures.
Standard Determines eligibility of the operators in accordance with the below key Comments  Results  SAT      UNSAT  Terminating Cue:
ONCE candidate discusses their findings the JPM can be terminated Answer Key Qualified for Relief? (Yes/No)
If No, what requirement is not being met.
RO #1  NO  Does not have a medical exam within the past 2 years Does not have the annual fit test  RO #2  NO  Does not meet the required number of hours performing duties as a licensed operator for the last quarter (Work Control hours do NOT count)  RO #3  YES  N/A QF-1030-11  Rev. 7 NRC 2011 RO ADMIN JPM C002.docx Page 7 of 11 HANDOUT #1 RO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - ANSOE  4/17/11 - 0700 - 1900 - NSOE 4/25/11 - 0700 - 1900 - ANSOE 5/5/11 - 0700 - 1900 - Work Control Tagout Coordinator 5/6/11 - 0700 - 1900 - ANSOE 5/7/11 - 0700 - 1900 - NSOE 6/4/11 - 0700 - 1900 - NSOE 6/5/11 - 0700 - 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam
- 4/10/2009 Latest Mask Fit Test
- 12/28/2009 RO#2 Hours Performing Operator Duties in Last Quarter 5/21/11:  0700
- 1900 - Work Control Tagout Coordinator 5/30/11:  0700
- 1900 - ANSOE    6/14/11:  0700
- 1900 - NSOE 6/15/11:  0700
- 1900 - Work Control Tagout Coordinator 6/24/11:  0700
- 1900 - NSOE  6/25/11:  0700
- 1900 - NSOE 6/26/11:  0700
- 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam
- 10/14/2009 Latest Mask Fit Test
- 11/16/2010 RO#3 Hours Performing Operator Duties in Last Quarter 4/6/11  0700
- 1900 - ANSOE  5/8/11:  0700
- 1900 - ANSOE  5/9/11:  0700
- 1900 - NSOE 5/15/11:  0700
- 1900 - Work Control Tagout Coordinator 6/1/11:  0700
- 1900 - NSOE  6/21/11:  0700
- 1900 - ANSOE Date of Most Recent Medical Exam 
- 7/15/2010 Latest Mask Fit Test
- 6/10/2010 QF-1030-11  Rev. 7 NRC 2011 RO ADMIN JPM C002.docx Page 8 of 11 HANDOUT #2 Qualified for Relief? (Yes/No)
If No, what requirement(s) is/are not being met.
RO #1      RO #2      RO #3 QF-1030-11  Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 NRC 2011 RO ADMIN JPM C002.docx Page 9 of 11  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 100% power.
* The plant is operating at 100% power.
Today is July 4, 2011.
* Today is July 4, 2011.
You are the RO.
* You are the RO.
You must leave shift.
* You must leave shift.
Three replacement operators are available.
* Three replacement operators are available.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
* Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
Record your findings on Handout #2.
* Record your findings on Handout #2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM C002.docx                        Page 9 of 11


QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 NRC 2011 RO ADMIN JPM C002.docx Page 10 of 11  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step:
Critical   Standard:     Performance:
Critical Standard:
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Terminating Cues:     ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  
Stop Time:
NRC 2011 RO ADMIN JPM C002.docx                  Page 10 of 11


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM C002.docx Page 11 of 11 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 Examinee: Evaluator:
QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 Examinee:                                             Evaluator:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
RO     SRO     STA       NSPEO       SRO CERT               Date:
SAT: UNSAT:   Remediation required:
ILT RO       ILT SRO PERFORMANCE RESULTS:                       SAT:                         UNSAT:
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Remediation required:           YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 RO ADMIN JPM C002.docx              Page 11 of 11


NRC 2011 RO ADMIN JPM EC.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM EC
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM EC NRC 2011 RO ADMIN JPM EC.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 RO ADMIN JPM EC.docx Page 2 of 10  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   DETERMINE CLEARANCE POINTS FOR RBCCW "B" PUMP REPLACEMENT JPM NUMBER:                 NRC 2011 EC                         REV.       0 TASK NUMBER(S) /
JPM TITLE:
TASK TITLE(S):
DETERMINE CLEARANCE POINTS FOR RBCCW "B" PUMP REPLACEMENT JPM NUMBER:
Knowledge of tagging and K/A NUMBERS:                 2.2.13 (4.1)                     K/A VALUE:
NRC 2011 EC REV. 0   TASK NUMBER(S) / TASK TITLE(S):
clearance procedures.
K/A NUMBERS:
2.2.13 (4.1)
K/A VALUE:
Knowledge of tagging and clearance procedures.
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:                 Perform:     X EVALUATION LOCATION:             In-Plant:                             Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:                   X       Other:
Simulate/Walkthrough:
Lab:                                 Classroom                 X Time for Completion:           20     Minutes       Time Critical:         Yes         No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
Perform: X   EVALUATION LOCATION:
Instructor                                     Date Validated by:
In-Plant:   Control Room:
Validation Instructor                               Date Reviewed by:
Simulator:
Plant Reviewer                                   Date Approved by:
X Other:           Lab:   Classroom X   Time for Completion:
Training Supervisor                                 Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
20 Minutes Time Critical:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Yes No     Alternate Path [NRC]:
Retention: Life of policy + 10yrs.                                                Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM EC.docx                        Page 2 of 10
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 380: Line 281:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?   13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
      / Time Critical) appropriately?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 13. Are all references identified, current, accurate, and available to the trainee?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
RE-VALIDATION SIGNATURE JPMs must be re
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 4 of 10 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Simulator Setup Instructions:
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
None SIMULATOR MALFUNCTIONS:
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
None SIMULATOR OVERRIDES:   None SIMULATOR REMOTE FUNCTIONS:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 RO ADMIN JPM EC.docx                                Page 3 of 10
None Required Materials:
 
BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 General  
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 General  


==References:==
==References:==
BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 Clearance 1400-1P081B: CYCLE-23 Task Standards:            Identifies the isolation points, tag type, component position and tag sequence for a B RBCCW clearance NRC 2011 RO ADMIN JPM EC.docx                      Page 4 of 10


BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 Clearance 1400
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-1P081B: CYCLE
* The plant is operating at 100% power.
-23 Task Standards:
* eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
Identifies the isolation points, tag type, component position and tag sequence for a "B" RBCCW clearance
* Identify the components required to isolate the B RBCCW Pump for pump replacement.
 
* Record the required components, tag type, component positions and tagging sequence on the handout provided.
QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM EC.docx Page 5 of 10 TURNOVER SHEET INITIAL CONDITIONS:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
The plant is operating at 100% power.
NRC 2011 RO ADMIN JPM EC.docx                    Page 5 of 10
eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
Identify the components required to isolate the "B" RBCCW Pump for pump replacement.
Record the required components, tag type, component positions and tagging sequen ce on the handout provided. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}


QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 6 of 10  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 100% power.
* The plant is operating at 100% power.
eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
* eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
Identify the components required to isolate the "B" RBCCW Pump for pump replacement.
* Identify the components required to isolate the B RBCCW Pump for pump replacement.
Record the required components, tag type, component positions and tagging sequence on the handout provided. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* Record the required components, tag type, component positions and tagging sequence on the handout provided.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM EC.docx                          Page 6 of 10
 
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:            Obtain references, as required:
Critical N (SEQ-)
* P&ID BECH-M-112 & BECH-E111<0007>
Standard:                    Obtains references P&ID BECH-M- 112 & BECH-E111<0007 Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:            Records the isolation points Critical Y (SEQ-)
Standard:                    See Key Below Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Terminating Cues:      ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 RO ADMIN JPM EC.docx                    Page 7 of 10
 
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 KEY Component              Tag Type            Sequence**              Component Description                                                  Position/Configuration Handswitch          Maintenance in        Anytime              Tag on Handswitch HS4833              Progress OR Caution OR Info Breaker 1B4320      Danger                1                    OFF Discharge          Danger                2                    Closed Valve V12-0007 Suction Valve      Danger                2                    Closed V12-0005 Drain Valve        Caution                3                    Operate As Needed To V12-0125                                                        Drain OR Open Pressure Point      Caution                3                    Operate as needed to Drain V12-0125                                                        OR Open Pressure Point      Caution                3                    Operate as needed to Drain V12-0126                                                        OR Open
**Examiner      Note:
The sequence must be electrical first (control switch, fuses, breaker),
valve isolations second (suction, discharge) and drains third.
The Pressure Points and Sequence Info for the Handswitch are NOT CRITICAL and in a smaller font size Critical Portions are BOLD, identified in RED and in a LARGER Font size NRC 2011 RO ADMIN JPM EC.docx              Page 8 of 10


QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 7 of 10  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 HANDOUT #1 Component            Tag Type              Sequence            Component Description                                              Position/Configuration 1.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
2.
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
3.
Performance Step:
4.
Critical  N (SEQ-) Obtain references, as required:
5.
P&ID BECH-M-112 & BECH
6.
-E111<0007>
7.
Standard: Obtains references P&ID BECH-M- 112 & BECH
8.
-E111<0007    Performance:
9.
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
10.
Critical Y (SEQ-) Records the isolation points Standard: See Key Below Performance:
11.
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
12.
ONCE candidate discusses their findings the JPM can be terminated NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
13.
Stop Time:
NRC 2011 RO ADMIN JPM EC.docx              Page 9 of 10


QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 8 of 10  KEY  Component Description Tag Type Sequence**
QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 Examinee:                                             Evaluator:
Component Position/Configuration Handswitch HS4833 Maintenance in Progress OR Caution OR Info  Anytime Tag on Handswitch Breaker 1B4320 Danger 1 OFF Discharge Valve V12-0007 Danger 2 Closed Suction Valve V12-0005 Danger 2 Closed Drain Valve V12-0125 Caution  3 Operate As Needed To Drain OR Open Pressure Point V12-0125 Caution 3 Operate as needed to Drain OR Open Pressure Point V12-0126 Caution 3 Operate as needed to Drain OR Open  **Examiner Note:
RO     SRO     STA       NSPEO       SRO CERT               Date:
The sequence must be electrical first (control switch, fuses, breaker), valve isolations second (suction, discharge) and drains third.
ILT RO       ILT SRO PERFORMANCE RESULTS:                     SAT:                         UNSAT:
The Pressure Points and Sequence Info for the Handswitch are NOT CRITICAL and in a smaller font size  Critical Portions are BOLD,  identified in RED and in a LARGER Font size QF-1030-11  Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 NRC 2011 RO ADMIN JPM EC.docx Page 9 of 10 HANDOUT #1 Component Description Tag Type Sequence Component Position/Configuration
Remediation required:         YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
: 1.      2.      3.      4.      5.      6.      7.      8.      9.      10.      11.      12.      13.
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
QF-1030-11  Rev. 7 NRC 2011 RO ADMIN JPM EC.docx Page 10 of 10 NRC 2011 EC, Determine Clearance Points for RBCCW "B" Pump Replacement, Rev. 0 Examinee: Evaluator:
EVALUATORS SIGNATURE:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
SAT: UNSAT:   Remediation required:
NRC 2011 RO ADMIN JPM EC.docx                Page 10 of 10
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 RO ADMIN JPM RC.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM RC
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM RC NRC 2011 RO ADMIN JPM RC.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 RO ADMIN JPM RC.docx Page 2 of 9  JOB PERFORMANCE MEAS URE (JPM)   JPM TITLE:
JPM TITLE:                   DETERMINE PERSONNEL AVAILABILITY TO PERFORM RADIATION AREA TASK JPM NUMBER:                 NRC 2011 RO ADMIN JPM             REV.         0 RC TASK NUMBER(S) /             96.05 TASK TITLE(S):               CONDUCT PLNAT OPERATIONS IN ACCORDANCE WITH ADMINISTRATIVE PROCEDURES K/A NUMBERS:                 2.3.12                           K/A VALUE:
DETERMINE PERSONNEL AVAILABILITY TO PERFORM RADIATION AREA TASK   JPM NUMBER:
NRC 2011 RO ADMIN JPM RC REV. 0   TASK NUMBER(S) / TASK TITLE(S):
96.05 CONDUCT PLNAT OPERATIONS IN ACCORDANCE WITH ADMINISTRATIVE PROCEDURES K/A NUMBERS:
2.3.12 K/A VALUE:
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                             Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:                           Other:                 X Lab:
Simulate/Walkthrough:
Time for Completion:           10     Minutes       Time Critical:       Yes         No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
Perform: X   EVALUATION LOCATION:
Instructor                                   Date Validated by:
In-Plant:   Control Room:
Validation Instructor                             Date Reviewed by:
Simulator:
Plant Reviewer                                 Date Approved by:
Other: X         Lab:       Time for Completion:
Training Supervisor                               Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
10 Minutes Time Critical:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Yes No     Alternate Path [NRC]:
Retention: Life of policy + 10yrs.                                              Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM RC.docx                          Page 2 of 9
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 NRC 2011 RO ADMIN JPM RC.docx Page 3 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 481: Line 387:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
RE-VALIDATION SIGNATURE JPMs must be re
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 NRC 2011 RO ADMIN JPM RC.docx Page 4 of 9 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
Simulator Setup Instructions:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 RO ADMIN JPM RC.docx                                  Page 3 of 9
None SIMULATOR MALFUNCTIONS:
 
TIME MALFUNCTION #
QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.                                                                                                                                                                                     SIMULATOR OVERRIDES:
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS:
TIME OVERRIDE ID OVERRIDE DESCRIPTION ET DELAY VALUE RAMP                                                                                                                                                                         SIMULATOR REMOTE FUNCTIONS:
TIME       MALFUNCTION #       MALFUNCTION         ET   DELAY       F. SEV. RAMP       I. SEV.
TIME REMOTE FUNCTION #
TITLE SIMULATOR OVERRIDES:
REMOTE FUNCTION TITLE VALUE RAMP                                                                                             Required Materials:
TIME       OVERRIDE ID       OVERRIDE               ET       DELAY       VALUE       RAMP DESCRIPTION SIMULATOR REMOTE FUNCTIONS:
Calculator Candidate may refer to ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES (Level of Usage is "Information Use"). If stated they would refer to the ACP, provide a copy.
TIME             REMOTE             REMOTE FUNCTION TITLE               VALUE       RAMP FUNCTION #
Required Materials:       Calculator Candidate may refer to ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES (Level of Usage is Information Use). If stated they would refer to the ACP, provide a copy.
General  
General  


==References:==
==References:==
ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES, Revision 21 Task Standards:            Determines the expected exposure for the task Selects the operator who can perform the task without exceeding DAEC limits NRC 2011 RO ADMIN JPM RC.docx                    Page 4 of 9


ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES, Revision 21 Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
Determines the expected exposure for the task Selects the operator who can perform the task without exceeding DAEC limits
* Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWCU.
 
* DAEC Management has decided that an operator will make the required area entry.
QF-103 0-11 Rev. 7 NRC 2011 RO ADMIN JPM RC.docx Page 5 of 9 TURNOVER SHEET INITIAL CONDITIONS:
* Time to complete the task for an experienced operator will be 24 minutes.
Entry to the reactor building is required to manually close MO
* Time to complete the task for a new operator will be 30 minutes
-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWC U. DAEC Management has decided that an operator will make the required area entry.
* Radiation levels at the valve are as high as 1500 mR/hr.
Time to complete the task for an experienced operator will be 24 minutes.
* Four (4) individuals are available to perform the task.
Time to complete the task for a new operator will be 30 minutes Radiation levels at the valve are as high as 1500 mR/hr.
A. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employee # - 00001, SSN: 111-11-1111).
Four (4) individuals are available to perform the task.
B. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).
A. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employe e # - 00001, SSN: 111 1111). B. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee #  
C. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).
- 00002, SSN: 222 2222). C. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333 3333). D. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444 4444).
D. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444-44-4444).
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Determine the following using the maximum dose rate expected and information above:
* Determine the following using the maximum dose rate expected and information above:
The individual(s) available to close MO
* The individual(s) available to close MO-2701 without exceeding DAEC Administrative Limits
-2701 without exceeding DAEC Administrative Limits The radiation exposure the individuals would receive if they performed the task The reason a particular worker would not be chosen for the task
* The radiation exposure the individuals would receive if they performed the task
 
* The reason a particular worker would not be chosen for the task NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM RC.docx                         Page 5 of 9
 
QF-1030-11  Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev.
NRC 2011 RO ADMIN JPM RC.docx Page 6 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Entry to the reactor building is required to manually close MO
* Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWCU.
-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWCU.
* DAEC Management has decided that an operator will make the required area entry.
DAEC Management has decided that an operator will make the required area entry.
* Time to complete the task for an experienced operator will be 24 minutes.
Time to complete the task for an experienced operator will be 24 minutes.
* Time to complete the task for a new operator will be 30 minutes
Time to complete the task for a new operator will be 30 minutes Radiation levels at the valve are as high as 1500 mR/hr.
* Radiation levels at the valve are as high as 1500 mR/hr.
Four (4) individuals are available to perform the task.
* Four (4) individuals are available to perform the task.
E. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employee #  
E. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employee # - 00001, SSN: 111-11-1111).
- 00001, SSN: 111 1111). F. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared  
F. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).
G. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).
H. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444-44-4444).
INITIATING CUES (IF APPLICABLE):
* Determine the following using the maximum dose rate expected and information above:
* The individual(s) available to close MO-2701 without exceeding DAEC Administrative Limits
* The radiation exposure the individuals would receive if they performed the task
* The reason a particular worker would not be chosen for the task NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 RO ADMIN JPM RC.docx                            Page 6 of 9


pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee #
QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
- 00002, SSN: 222 2222). G. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333 3333). H. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444 4444). INITIATING CUES (IF APPLICABLE):
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Determine the following using the maximum dose rate expected and information above:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
The individual(s) available to close MO
Performance Step:            Determine the expected exposure for the task for both a new and experienced Critical Y (SEQ-)            operator Standard:                    For an experienced operator - Calculates that a 24 minute exposure in a 1500 mR/hr field will cause a dose of 600 mR.
-2701 without exceeding DAEC Administrative Limits The radiation exposure the individuals would receive if they performed the task The reason a particular worker would not be chosen for the task NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
For a new operator - Calculates that a 30 minute exposure in a 1500 mR/hr field will cause a dose of 750 mR.
Performance:                 SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 RO ADMIN JPM RC.docx                      Page 7 of 9


QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev.
QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 Performance Step:           Determine which, if any, of the individuals is available to close MO-2701 without Critical Y (SEQ-)          exceeding his annual DAEC Administrative Limit.
0 NRC 2011 RO ADMIN JPM RC.docx Page 7 of 9  JPM PERFORMANCE INFORMATION Start Time:
Standard:                   Determines operator C is the only operator available to close MO-2701 without exceeding DAEC Administrative Limits:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
* Operator A has previously received a planned special exposure.
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Critical  Y (SEQ-) Determine the expected exposure for the task for both a new and experienced operator  Standard: For an experienced operator
- Calculates that a 24 minute exposure in a 1500 mR/hr field will cause a dose of 600 mR.
For a new operator
- Calculates that a 30 minute exposure in a 1500 mR/hr field will cause a dose of 750 mR.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev.
0  NRC 2011 RO ADMIN JPM RC.docx Page 8 of 9 Performance Step:
Critical Y (SEQ-) Determine which, if any, of the individuals is available to close MO
-2701 without exceeding his annual DAEC Administrative Limit.
Standard: Determines operator C is the only operator available to close MO
-2701 without exceeding DAEC Administrative Limits:
Operator A has previously received a planned special exposure.
600 mR would cause him/her to exceed 5 R TEDE.
600 mR would cause him/her to exceed 5 R TEDE.
Operator B is a declared pregnant worker. 600 mR would cause her to exceed 450mR.
* Operator B is a declared pregnant worker. 600 mR would cause her to exceed 450mR.
Operator C is a new Licensed Reactor Operator. 750 mR will cause him/her to have a total of 1350 mR.
* Operator C is a new Licensed Reactor Operator. 750 mR will cause him/her to have a total of 1350 mR.
Operator D is an experienced Licensed Reactor Operator. 600 mR will cause him to exceed 2000 mR.
* Operator D is an experienced Licensed Reactor Operator. 600 mR will cause him to exceed 2000 mR.
Performance:
Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
Terminating Cues:   When the candidate has stated the expected dose for the task and states which operator(s), if any, are available for the task without exceeding DAEC Administrative limits, inform him that the JPM is complete.
When the candidate has stated the expected dose for the task and states which operator(s), if any, are available for the task without exceeding DAEC Administrative limits, inform him that the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
Stop Time:  
NRC 2011 RO ADMIN JPM RC.docx                    Page 8 of 9


QF-1030-11 Rev. 7 NRC 2011 RO ADMIN JPM RC.docx Page 9 of 9 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 Examinee: Evaluator:
QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 Examinee:                                             Evaluator:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
RO     SRO     STA       NSPEO       SRO CERT               Date:
SAT: UNSAT:   Remediation required:
ILT RO       ILT SRO PERFORMANCE RESULTS:                       SAT:                         UNSAT:
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Remediation required:             YES                       NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 RO ADMIN JPM RC.docx                  Page 9 of 9


NRC 2011 SRO ADMIN JPM C001.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO1
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO1 NRC 2011 SRO ADMIN JPM C001.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 SRO ADMIN JPM C001.docx Page 2 of 14  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   PERFORM STP 3.0.0-01, ATT. 11 - CORE THERMAL LIMITS CHECK JPM NUMBER:                 NRC 2011 ADMIN JPM             REV.       0 SRO C001 TASK NUMBER(S) /             82.00 TASK TITLE(S):               Monitor the Rod Block Monitoring System Ability to evaluate plant performance and make operational K/A NUMBERS:                 2.1.7 (4.7)2.1.7 (4.7)       K/A VALUE:       judgments based on operating characteristics, reactor behavior, and instrument interpretation.
JPM TITLE:
PERFORM STP 3.0.0
-01, ATT. 11  
- CORE THERMAL LIMITS CHECK JPM NUMBER:
NRC 2011 ADMIN JPM SRO C001 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
82.00 Monitor the Rod Block Monitoring System K/A NUMBERS:
2.1.7 (4.7)2.1.7 (4.7)
K/A VALUE:
Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO       STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                   Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                         Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:               X       Other:
Simulate/Walkthrough:
Lab:                             Classroom                 X Time for Completion:           15     Minutes   Time Critical:           Yes         No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Perform: X   EVALUATION LOCATION:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
In-Plant:   Control Room:
Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM C001.docx                                                Page 2 of 14
Simulator:
X Other:           Lab:   Classroom X   Time for Completion:
15 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No   Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0
QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
-01, Att. 11  
REVIEW STATEMENTS                                                                         YES NO   N/A
- Core Thermal Limits Check, Rev. 0 NRC 2011 SRO ADMIN JPM C001.docx Page 3 of 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
: 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 617: Line 502:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?   13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
      / Time Critical) appropriately?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 13. Are all references identified, current, accurate, and available to the trainee?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
RE-VALIDATION SIGNATURE JPMs must be re
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
-01, Att. 11  
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
- Core Thermal Limits Check, Rev. 0 NRC 2011 SRO ADMIN JPM C001.docx Page 4 of 14 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
Simulator Setup Instructions:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 SRO ADMIN JPM C001.docx                              Page 3 of 14
None SIMULATOR MALFUNCTIONS:
 
None SIMULATOR OVERRIDES:
QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
None SIMULATOR REMOTE FUNCTIONS:
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       ARP 1C05B (A-6) (B-6)
None Required Materials:
Plant process computer Technical Specifications Copy of Official 3D Case with MFLCPR and Load Line OOS Power to Flow Map COLR General  
ARP 1C05B (A
-6) (B-6) Plant process computer Technical Specifications Copy of Official 3D Case with MFLCPR and Load Line OOS Power to Flow Map COLR General  


==References:==
==References:==
ARP 1C05B (A-6) (B-6), Rev 74 Technical Specifications, LCO 3.2.2, Amendment 243 Power to Flow Map Task Standards:            Identify Tech Spec Safety Limit violation (MCPR)
Identify Load Line and MFLCPR limits are exceeded NRC 2011 SRO ADMIN JPM C001.docx                  Page 4 of 14


ARP 1C05B (A
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-6) (B-6), Rev 74 Technical Specifications, LCO 3.2.2, Amendment 243 Power to Flow Map Task Standards:
* The plant is at rated power INITIATING CUES (IF APPLICABLE):
Identify Tech Spec Safety Limit violation (MCPR)
* Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0-01, and determine actions required, if any.
Identify Load Line and MFLCPR limits are exceeded
 
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM C001.docx Page 5 of 14 TURNOVER SHEET INITIAL CONDITIONS:
The plant is at rated power
 
INITIATING CUES (IF APPLICABLE):
Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0
-01, and determine actions required, if any.
EVALUATOR CUE:
EVALUATOR CUE:
Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
NRC 2011 SRO ADMIN JPM C001.docx               Page 5 of 14
QF-1030-11  Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0
-01, Att. 11
- Core Thermal Limits Check, Rev. 0 NRC 2011 SRO ADMIN JPM C001.docx Page 6 of 14 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is at rated power INITIATING CUES (IF APPLICABLE):
* The plant is at rated power INITIATING CUES (IF APPLICABLE):
Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0
* Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0-01, and determine actions required, if any.
-01, and determine actions required, if any.
EVALUATOR CUE:
EVALUATOR CUE:
Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM C001.docx                        Page 6 of 14


QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0
QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-01, Att. 11  
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
- Core Thermal Limits Check, Rev. 0 NRC 2011 SRO ADMIN JPM C001.docx Page 7 of 14  JPM PERFORMANCE INFORMATION Start Time:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step:             Takes initial data including Load Line.
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Critical Y (SEQ-)
Performance Step
Standard:                     Identifies that the load line is greater than the allowable value and is also greater than the MELLA Limit. Recommends that load line be reduced to below MELLA immediately (IAW Power to Flow Map note)
: Critical  Y (SEQ-) Takes initial data including Load Line.
Enters AOP 255.2 at Step 7. for actions Performance:                 SATISFACTORY                     UNSATISFACTORY Comments:
Standard: Identifies that the load line is greater than the allowable value and is also greater than the MELLA Limit. Recommends that load line be reduced to below MELLA immediately (IAW Power to Flow Map note)
Performance Step:             Continues review and notes MCPR and MFLCPR limit is OOS Critical Y (SEQ-)
Enters AOP 255.2 at Step 7. for actions Performance:
Standard:                     Determines MCPR is OOS and enters Technical Specification 3.2.2 Condition A which requires the plant to reduce MCPR to within limits in 2 hours.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Evaluator Note:               May reference COLR Evaluator Note:               Provide a copy of Power to Flow Map if requested Performance:                 SATISFACTORY                     UNSATISFACTORY Comments:
Critical Y (SEQ-) Continues review and notes MCPR and MFLCPR limit is OOS Standard: Determines MCPR is OOS and enters Technical Specification 3.2.2 Condition A which requires the plant to reduce MCPR to within limits in 2 hours.
Terminating Cues:     When the candidate identifies entry into TS 3.2.2 Condition A and that the MELLA limit has been exceeded and immediate action is required, the JPM is complete.
Evaluator Note:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
May reference COLR Evaluator Note:
Stop Time:
Provide a copy of Power to Flow Map if requested Performance:
NRC 2011 SRO ADMIN JPM C001.docx                    Page 7 of 14
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
When the candidate identifies entry into TS 3.2.2 Condition A and that the MELLA limit has been exceeded and immediate action is required, the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  


NRC 2011 SRO ADMIN JPM C001.docx Page 8 of 14 Page 1 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT (Note: Not required in Mode 4
Page 1 of 3                                   ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT (Note: Not required in Mode 4 )
NOTE ___crs___ If the reactor is operating in Single Loop (SLO), then "N/A" Attachment 11 and perform the Combined Single Loop Surveillance Procedure STP
NOTE                                               ___crs___
-3.4.1-02. APRM Gain Adjustment shall be accomplished once per day when in MODE 1 while greater than or equal to () 21.7% RTP and within 12 hours after greater than or equal to () 21.7% RTP on startup. Attachment 11 may be marked N/A if operating at less than () 21.7% RTP for an extended period of time.
If the reactor is operating in Single Loop (SLO), then N/A Attachment 11 and perform the Combined Single Loop Surveillance Procedure STP-3.4.1-02. APRM Gain Adjustment shall be accomplished once per day when in MODE 1 while greater than or equal to () 21.7% RTP and within 12 hours after greater than or equal to () 21.7% RTP on startup. Attachment 11 may be marked N/A if operating at less than (<) 21.7% RTP for an extended period of time.
1.0 APRM GAIN ADJUSTMENT (TWO LOOP OPERATION ONLY)
1.0         APRM GAIN ADJUSTMENT (TWO LOOP OPERATION ONLY) 1.1        Record CORE POWER and indicate source below:                                          ___crs___
(X) From PERIODIC LOG
( ) From POWER and FLOW LOG
( ) From Computer Point C133
( ) From heat balance conducted by Reactor Engineer CORE POWER = ___99.9___ % Power.
1.2        Determine desired APRM setting. APRM setting shall be greater than or equal to ()    ___crs___
CORE POWER minus 2% from Step 1.1 and less than or equal to () CORE POWER plus 2%.
Desired APRM setting:  _97.9___% Power and  _101.9___% Power A      B        C        D        E          F 1.3        Record as found      100      100      101      100      101      101            ___crs___
indicated APRM power % @ 1C37 1.4        If APRM requires adjustment, perform Steps a through f, otherwise N/A Steps a through f.
a)  Bypass, and                _____ _____      _____    _____    _____    _____      ___N/A___
adjust desired APRM setting if necessary.
b)  Confirm bypass            _____    _____    _____    _____    _____    _____      ___N/A___
light on Panel 1C05 c)  Confirm bypass            _____    _____    _____    _____    _____    _____      ___N/A___
light on Panel 1C37 d)  Confirm computer            _____  _____    _____    _____    _____    _____      ___N/A___
alarm message                A548    A549    A550      A551    A552      A553 e)  Confirm all                _____  _____    _____    _____    _____    _____      ___N/A___
alarms are reset f)  Record as left            _100_ _100_        _101_    100_    _101_    _101_      ___N/A___
indicated APRM power, % @ 1C37 NRC 2011 SRO ADMIN JPM C001.docx                      Page 8 of 14


===1.1 Record===
Page 2 of 3                                ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT 1.5      Confirm APRM Computer Points (B000-B005) values are approximately the same          ___crs___
CORE POWER and indicate source below:
as the As-Left values on 1C37. If not, notify the Reactor Engineer and appropriate System Engineer.
(X) From  PERIODIC LOG
2.0      CORE THERMAL LIMITS 2.1      If the process computer is not available, responsibility for Attachment 11 has been    N/A _
(  )  From POWER and FLOW LOG
turned over to a Reactor Engineer. (N/A this step if process computer is available.)
( ) From Computer Point C133
2.2      Check the method or methods used to determine the core parameters.                  ___crs___
( )  From  heat balance conducted by Reactor Engineer CORE POWER =  ___99.9___ % Power.
Periodic Log: _______X_______ Power and Flow Log: _____________
___crs___ 1.2 Determine desired APRM setting. APRM setting shall be greater than or equal to () CORE POWER minus 2% from Step 1.1 and less than or equal to () CORE POWER plus 2%. Desired APRM setting:  _97.9___% Power and  _101.9___% Power
Heat Balance by RE: __________________
___crs___
2.3      Record the following core parameters.
A B
2.3.1    Core Megawatt Thermal (POWER MWT) _____1909_______ Mwt                              ___crs___
C D
2.3.2    Percent Reactor Pwr (CORE POWER) _____99.9_______ %                                 ___crs___
E F  1.3 Record as found 100    100      101      100      101      101  indicated APRM power % @ 1C37
2.3.3    Percent Load Line (LOAD LINE) _____100.68_________%                                 ___crs___
___crs___ 1.4 If APRM requires adjustment, perform Steps "a" through "f", otherwise "N/A" Steps "a" through "f".
a) If Load Line is greater than (>) 100.4%, immediately notify the CRS. Otherwise,      ___crs___
a) Bypass, and                    _____    _____      _____
mark this step N/A.
_____      _____      _____
2.3.4   Core flow (FLOW) _____48.760________ Mlb/hr                                          ___crs___
adjust desired APRM setting if necessary.
a) If Core flow is greater than (>) 51.3 Mlb/hr, immediately notify the CRS. Otherwise,   N/A _
___N/A___ b) Confirm bypass              _____    _____      _____    _____      _____      _____
mark this step N/A.
light on Panel 1C05
2.3.5    Percent Core Flow (CORE FLOW) ____99.5________%                                      ___crs___
___N/A___ c) Confirm bypass              _____    _____      _____    _____      _____      _____
2.3.6    Most Limiting Maximum Fraction of Limiting Critical Power Ratio                      ___crs___
light on Panel 1C37
(MFLCPR) __1.002________
___N/A___ d) Confirm computer            _____    _____      _____    _____      _____      _____
a) If Most Limiting MFLCPR is  0.99, N/A Steps 2.3.6.b and c and proceed to              N/A _
alarm message                  A548      A549      A550      A551      A552 A553 ___N/A___ e) Confirm all                      _____     _____      _____    _____      _____      _____
Step 2.3.7.
alarms are reset
b) If Most Limiting MFLCPR is > 0.99 but 1.00, notify the CRS, N/A Step 2.3.6.c and     N/A _
___N/A___ f) Record as left                  _
proceed to Step 2.3.7.
100_    _100_      _101_    100_      _101_      _101_ indicated APRM power, % @ 1C37
c) If Most Limiting MFLCPR is > 1.00, observe General Instructions 4.3 through 4.5. ___crs___
___N/A___
NRC 2011 SRO ADMIN JPM C001.docx                     Page 9 of 14
NRC 2011 SRO ADMIN JPM C001.docx Page 9 of 14 Page 2 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT


===1.5 Confirm===
Page 3 of 3                              ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT 2.3.7    Most Limiting Max Fraction of Limiting Power Density                              ___crs___
APRM Computer Points (B000
(MFLPD) ___0.848________
-B005) values are approximately the same as the As-Left values on 1C37. If not, notify the Reactor Engineer and appropriate System Engineer.
a) If Most Limiting MFLPD is  0.99, N/A Steps 2.3.7.b and c and proceed to          ___crs___
___crs___ 2.0 CORE THERMAL LIMITS 2.1 If the process computer is not available, responsibility for Attachment 11 has been turned over to a Reactor Engineer. (N/A this step if process computer is available.)
Step 2.3.8.
N/A _ 2.2 Check the method or methods used to determine the core parameters.
b) If Most Limiting MFLPD is > 0.99 but  1.0, notify the CRS, N/A Step 2.3.7.c and   N/A _
Periodic Log: _______
proceed to Step 2.3.8.
X_______ Power and Flow Log:  _____________
c) If MFLPD is > 1.0, observe General Instructions 4.3 through 4.5.                   N/A _
___crs___  Heat Balance by RE:  __________________
2.3.8    Most Limiting Maximum Average Planar Linear Heat Generation Rate Ratio            ___crs___
(MAPRAT) ____0.717______
a) If the Most Limiting MAPRAT is  0.99, N/A Steps 2.3.8.b and c.                   ___crs___
b) If Most Limiting MAPRAT is > 0.99 but 1.0, notify the CRS and N/A Step 2.3.8.c. N/A _
c) If Most Limiting MAPRAT is > 1.0, observe General Instructions 4.3 through 4.5. N/A _
NRC 2011 SRO ADMIN JPM C001.docx                  Page 10 of 14


===2.3 Record===
HANDOUT #1 PAGE 1
the following core parameters.
                              >>>> SIMULATOR <<<<               SEQUENCE NO 2 CORE PARAMETERS                     3DM/P11                     TODAY 5 MINUTES AGO CALCULATED POWER   MWT           1909.       PERIODIC LOG                 TODAY 5 MINUTES AGO     PRINTED POWER   MWE             646.       USER REQUEST                 CASE ID     FMLD1090730012821 FLOW     MLB/HR       48.760       CALC RESULTS                 RESTART     FMLD1090730012821 FPAPDR                 0.833                                     LPRM SHAPE         - FULL CORE SUBC     BTU/LB       22.91       Keff               1.0037 PR       PSIa         1038.5       XE WORTH     %   -2.34     LOAD LINE  
2.3.1 Core Megawatt Thermal (POWER MWT) _____
1909_______ Mwt
___crs___ 2.3.2 Percent Reactor Pwr (CORE POWER) _____99.9_______ % ___crs___ 2.3.3 Percent Load Line (LOAD LINE) _____100.68_________%
___crs___ a) If Load Line is greater than (>) 100.4%, immediately notify the CRS. Otherwise, mark this step N/A.
___crs___ 2.3.4 Core flow (FLOW) _____48.760________ Mlb/hr
___crs___ a) If Core flow is greater than (>) 51.3 Mlb/hr, immediately notify the CRS. Otherwise, mark this step N/A.
N/A  _ 2.3.5 Percent Core Flow (CORE FLOW) ____99.5________% ___crs___ 2.3.6 Most Limiting Maximum Fraction of Limiting Critical Power Ratio (MFLCPR) __1.002________ ___crs___ a) If Most Limiting MFLCPR is  0.99, N/A Steps 2.3.6.b and c and proceed to Step 2.3.7. N/A  _ b) If Most Limiting MFLCPR is > 0.99 but  1.00, notify the CRS, N/A Step 2.3.6.c and proceed to Step 2.3.7.
N/A  _ c) If Most Limiting MFLCPR is > 1.00, observe General Instructions 4.3 through 4.5.
___crs___
NRC 2011 SRO ADMIN JPM C001.docx Page 10 of 14 Page 3 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT 2.3.7 Most Limiting Max Fraction of Limiting Power Density (MFLPD) ___0.848________ ___crs___ a) If Most Limiting MFLPD is  0.99, N/A Steps 2.3.7.b and c and proceed to Step 2.3.8. ___crs___ b) If Most Limiting MFLPD is >
0.99 but  1.0, notify the CRS, N/A Step 2.3.7.c and proceed to Step 2.3.8.
N/A  _ c) If MFLPD is > 1.0, observe General Instructions 4.3 through 4.5.
N/A  _ 2.3.8 Most Limiting Maximum Average Planar Linear Heat Generation Rate Ratio (MAPRAT) ____0.717______ ___crs___ a) If the Most Limiting MAPRAT is  0.99, N/A Steps 2.3.8.b and c.
___crs___ b) If Most Limiting MAPRAT is > 0.99 but  1.0, notify the CRS and N/A Step 2.3.8.c.
N/A  _ c) If Most Limiting MAPRAT is > 1.0, observe General Instructions 4.3 through 4.5.
N/A  _
NRC 2011 SRO ADMIN JPM C001.docx Page 11 of 14 HANDOUT #1 PAGE 1 >>>> SIMULATOR <<<<
SEQUENCE NO 2 CORE PARAMETERS 3DM/P11 TODAY 5 MINUTES AGO CALCULATED POWER MWT 1909. PERIODIC LOG TODAY 5 MINUTES AGO PRINTED POWER MWE 646. USER REQUEST CASE ID FMLD1090730012821 FLOW MLB/HR 48.760 CALC RESULTS RESTART FMLD1090730012821 FPAPDR 0.833 LPRM SHAPE
- FULL CORE SUBC BTU/LB 22.91 Keff 1.0037 PR PSIa 1038.5 XE WORTH   %
-2.34 LOAD LINE  


==SUMMARY==
==SUMMARY==


CORE MWD/sT 21469.0 XE/RATED 1.01 CORE POWER 99.9% CYCLE MWD/sT 7900.6 AVE VF 0.494 CORE FLOW 99.5% MCPR 1.337   LOAD LINE 100.68% CORRECTION FACTOR:
CORE     MWD/sT     21469.0         XE/RATED           1.01     CORE POWER                 99.9%
MFLCPR=   1.008 MFLPD=   1.000 MAPRAT=   1.000 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM=   1.34 MOST LIMITING LOCATIONS (NON
CYCLE   MWD/sT       7900.6       AVE VF             0.494     CORE FLOW                 99.5%
-SYMMETRIC)
MCPR                   1.337                                     LOAD LINE               100.68%
MFLCPR LOC MFLPD L OC MAPRAT LOC PCRAT LOC 1.002   25-28 0.848 9 6 0.717 9 6 0.783 35 6 1.000 25-18 0.846 35 6 0.716 9 6 0.781 9 6 0.998 19-28 0.845 9 6 0.714 35 6 0.779 35 6 0.996 19-18 0.843 35 6 0.690 15 5 0.767 9 6 0.993 25-36 0.816 15 5 0.689 29 5 0.752 29 5 0.991 25-10 0.814 29 5 0.687 29 5 0.750 15 5 0.989 19-36 0.812 29 5 0.685 15 5 0.749 15 5 0.987 23-20 0.811 15 6 0.682 7 6 0.747 29 5 0.984 21-26 0.808 37 6 0.681 37-2 8- 6 0.745 7 6 0.982 23-26 0.807 7 6 0.679 37 6 0.743 37 6 SEQ. A-l C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL NOTCH REL PW LOC 0.263 25             00 0.527 24             02 0.651 23 43           04 0.776 22   L           06 0.836 21 39           08 0.895 20             10 0.925 19 35           12 0.954 18   L           14 1.006 17 31   38 22 38 P   16 1.059 16             18 1.070 15 27       C     20 1.082 14   L           22 1.108 13 23   22   8 22   24 1.134 12             26 1.162 11 19           28 1.189 10   L           30 1.234 09 15
CORRECTION FACTOR:           MFLCPR=     1.008     MFLPD=     1.000     MAPRAT=   1.000 OPTION: ARTS                 2 LOOPS ON           MANUAL FLOW         MCPRLIM=   1.34 MOST LIMITING LOCATIONS (NON-SYMMETRIC)
* 38 22 38   32 1.278 08             34 1.310 07 11           36 1.342 06   L           38 1.266 05 07           40 1.190 04             42 0.882 03 03           44 0.573 02     L     L     L     L     L 46 0.287 01   02 06 10 14 18 22 26 30 34 38 42 CORE AVERAGE RADIAL POWER DISTRIBUTION
MFLCPR     LOC       MFLPD           LOC        MAPRAT       LOC         PCRAT     LOC 1.002     25-28     0.848         9 6       0.717       9 6     0.783   35   6 1.000     25-18     0.846       35 6       0.716       9 6     0.781     9   6 0.998   19-28     0.845         9 6       0.714     35 6       0.779   35   6 0.996   19-18     0.843       35 6       0.690     15 5       0.767     9   6 0.993   25-36     0.816       15 5       0.689     29 5       0.752   29   5 0.991   25-10     0.814       29 5       0.687     29 5       0.750   15   5 0.989     19-36     0.812       29 5       0.685     15 5       0.749   15   5 0.987     23-20     0.811       15 6       0.682       7 6     0.747   29   5 0.984     21-26     0.808       37 6       0.681     37 6       0.745     7   6 0.982   23-26     0.807         7 6       0.679     37 6       0.743   37   6 SEQ. A-l   C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE             CORE AVE AXIAL NOTCH REL PW   LOC 0.263   25 00     0.527   24 02     0.651   23 43                                                                     04     0.776   22 L                                                                   06     0.836   21 39                                                                     08     0.895   20 10     0.925   19 35                                                                     12     0.954   18 L                                                                   14     1.006   17 31                 38           22         38   P                     16     1.059   16 18     1.070   15 27                                 C                                   20     1.082   14 L                                                                   22     1.108   13 23                 22           8         22                         24     1.134   12 26     1.162   11 19                                                                     28     1.189   10 L                                                                   30     1.234   09 15
* 38           22         38                         32     1.278   08 34     1.310   07 11                                                                     36     1.342   06 L                                                                   38     1.266   05 07                                                                     40     1.190   04 42     0.882   03 03                                                                     44     0.573   02 L         L           L         L         L             46     0.287   01 02 06   10 14     18   22   26   30   34   38   42 CORE AVERAGE RADIAL POWER DISTRIBUTION NRC 2011 SRO ADMIN JPM C001.docx              Page 11 of 14
 
RING #    1    2        3        4      5        6 REL PW  0.849 1.227    1.191    1.203  1.154    0.629 NRC 2011 SRO ADMIN JPM C001.docx      Page 12 of 14


NRC 2011 SRO ADMIN JPM C001.docx Page 12 of 14 RING # 1 2 3 4 5 6 REL PW 0.849 1.227 1.191 1.203 1.154 0.629 NRC 2011 SRO ADMIN JPM C001.docx Page 13 of 14 HANDOUT #1 PAGE 2 >>>> SIMULATOR <<<<
HANDOUT #1 PAGE 2
INSTRUMENT READINGS/STATUS SEQUENCE NO 2 RAW LPRM READINGS TODAY 5 MINUTES AGO CALCULATED TODAY 5 MINUTES AGO PRINTED 41D 18.8 24.0 CASE ID FMLD1090730012821 C 26.2 33.9 LPRM SHAPE  
>>>> SIMULATOR <<<< INSTRUMENT READINGS/STATUS SEQUENCE NO 2 RAW LPRM READINGS             TODAY 5 MINUTES AGO CALCULATED TODAY 5 MINUTES AGO PRINTED 41D           18.8 24.0                         CASE ID FMLD1090730012821 C             26.2 33.9                         LPRM SHAPE - FULL CORE B             33.5 41.1 A             34.3 41.5                             # OF TIPS NOT SCANNED: 1
- FULL CORE B 33.5 41.1 A 34.3 41.5 # OF TIPS NOT SCANNED: 1
                                                          # OF TIPS REJECTED: 1 33D 24.8     34.6   37.1C 30.9 C     36.1 49.9 53.7 45.5                         FAILED SENSORS:
  # OF TIPS REJECTED: 1 33D 24.8 34.6 37.1C 30.9 C 36.1 49.9 53.7 45.5 FAILED SENSORS:
B     44.8 57.1 50.4 55.6                         LPRM ( 0 SIGNAL FAILED)
B 44.8 57.1 50.4 55.6 LPRM ( 0 SIGNAL FAILED)
A     47.8 53.2 49.1 49.5P                         LPRM ( 0 PANACEA-REJECTED)
A 47.8 53.2 49.1 49.5P LPRM ( 0 PANACEA
OTHER SENSORS ( 0 TOTAL) 25D   31.9 42.2 41.0 37.4 24.3                     SUB RODS C     45.9 61.8 50.3 57.6 34.8                       NONE B     52.3 52.6 49.3 50.7 42.3 A     54.7 44.4 42.3 45.4 37.8                     T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D   29.0 39.2 41.6 34.6 19.1                     M = MAPRAT LOCATION C     43.0 58.6 61.7 54.5 26.2                     D = MFLPD LOCATION B     51.8 62.4 52.3 61.5 33.7                     P = PCRAT LOCATION A     54.3* 44.8 45.5 47.7 30.5                   # = MULTIPLE LIMIT O9D   17.7   28.4   31.2 24.5 C     23.5   42.3   45.4 36.4 B     30.7   51.1   56.8 45.2 A     26.1   63.4   61.8 53.7 08     16     24     32   40 CORE  
-REJECTED) OTHER SENSORS ( 0 TOTAL) 25D 31.9 42.2 41.0 37.4 24.3 SUB RODS C 45.9 61.8 50.3 5 7.6 34.8   NONE B 52.3 52.6 49.3 50.7 42.3 A 54.7 44.4 42.3 45.4 37.8 T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D 29.0 39.2 41.6 34.6 19.1 M = MAPRAT LOCATION C 43.0 58.6 61.7 54.5 26.2 D = MFLPD LOCATION B 51.8 62.4 52.3 61.5 33.7 P = PCRAT LOCATION   A 54.3* 44.8 45.5 47.7 30.5 # = MULTIPLE LIMIT O9D 17.7 28.4 31.2 24.5 C 23.5 42.3 45.4 36.4 B 30.7 51.1 56.8 45.2 A 26.1 63.4 61.8 53.7 08 16 24 32 40   CORE  


==SUMMARY==
==SUMMARY==


INER         1.121 CORE POWER 99.9%
INER         1.121 CORE POWER 99.9%       CALC SUB FLOW     101.7%       DP MEAS PSI             23.88 CORE FLOW   99.5%     OPER SUB FLOW       -2.0%     DP CALC PSI             27.87 LOAD LINE 100.68%       FLOW BASIS         MEAS       FEEDWTR FLOW MLB/HR     8.26 APRM CALIBRATION A       B       C     D       E       F READING       98.7   98.5   100.8   98.9     98.5     98.3 AGAF           1.016 1.018     0.995 1.015     1.017   1.018 APRM - %CTP   -1.6   -1.8     0.5   -1.5     -1.7     -2.0 TIP RUNS RECOMMENDED STRINGS:       NONE NRC 2011 SRO ADMIN JPM C001.docx            Page 13 of 14
CALC SUB FLOW 101.7% DP MEAS PSI 23.88 CORE FLOW   99.5%
OPER SUB FLOW
  -2.0% DP CALC PSI 27.87 LOAD LINE 100.68%
FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 8.26 APRM CALIBRATION A B C D E F READING 98.7 98.5 100.8 98.9 98.5 98.3 AGAF 1.016 1.018   0.995 1.015 1.017 1.018 APRM - %CTP -1.6 -1.8   0.5 -1.5 -1.7 -2.0 TIP RUNS RECOMMENDED STRINGS:       NONE


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM C001.docx Page 14 of 14 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0
QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 Examinee:                                             Evaluator:
-01, Att. 11  
RO     SRO     STA       NSPEO       SRO CERT               Date:
- Core Thermal Limits Check, Rev. 0 Examinee: Evaluator:
ILT RO       ILT SRO PERFORMANCE RESULTS:                       SAT:                         UNSAT:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
Remediation required:           YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
SAT: UNSAT:   Remediation required:
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
EVALUATOR'S SIGNATURE:
NRC 2011 SRO ADMIN JPM C001.docx              Page 14 of 14
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 SRO ADMIN JPM C002.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO2
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO2 NRC 2011 SRO ADMIN JPM C002.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 SRO ADMIN JPM C002.docx Page 2 of 11  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER:                 NRC 2011 SRO ADMIN           REV.       0 JPM C002 TASK NUMBER(S) /
JPM TITLE:
TASK TITLE(S):
VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER:
Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical K/A NUMBERS:                 2.1.4 (3.3/3.8)           K/A VALUE:
NRC 2011 SRO ADMIN JPM C002 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.
K/A NUMBERS:
2.1.4 (3.3/3.8)
K/A VALUE:
Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no
-solo" operation, maintenance of active license status, 10CFR55, etc.
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:                 Perform:   X EVALUATION LOCATION:             In-Plant:                       Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:                     Other:
Simulate/Walkthrough:
Lab:                           Classroom                 X Time for Completion:           20   Minutes   Time Critical:           Yes       No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Perform: X   EVALUATION LOCATION:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
In-Plant:   Control Room:
Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM C002.docx                  Page 2 of 11
Simulator:
Other:           Lab:   Classroom X   Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 818: Line 674:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?   13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
      / Time Critical) appropriately?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 13. Are all references identified, current, accurate, and available to the trainee?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
RE-VALIDATION SIGNATURE JPMs must be re
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 4 of 11 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Simulator Setup Instructions:
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
None SIMULATOR MALFUNCTIONS:
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
None SIMULATOR OVERRIDES:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 SRO ADMIN JPM C002.docx                              Page 3 of 11
None SIMULATOR REMOTE FUNCTIONS:
 
None Required Materials:
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20  
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 General  
-Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 General  


==References:==
==References:==
10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 Task Standards:            Identifies which personnel are available to assume the watch and the reason(s) other(s) are not.
NRC 2011 SRO ADMIN JPM C002.docx                  Page 4 of 11


10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 Task Standards:
* The plant is operating at 100% power.
Identifies which personnel are available to assume the watch and the reason(s) other(s) are not.
* Today is July 4, 2011.
 
* You are the CRS.
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM C002.docx Page 5 of 11 TURNOVER SHEET INITIAL CONDITIONS:
* You must leave shift.
The plant is operating at 100% power.
* Three other Control Room Supervisors are available.
Today is July 4, 2011.
You are the CRS.
You must leave shift.
Three other Control Room Supervisors are available.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
* Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
Record your findings on Handout #2.
* Record your findings on Handout #2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
NRC 2011 SRO ADMIN JPM C002.docx                   Page 5 of 11
QF-1030-11  Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 6 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 100% power.
* The plant is operating at 100% power.
Today is July 4, 2011.
* Today is July 4, 2011.
You are the CRS.
* You are the CRS.
You must leave shift.
* You must leave shift.
Three other Control Room Supervisors are available.
* Three other Control Room Supervisors are available.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
* Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
Record your findings on Handout #2.
* Record your findings on Handout #2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM C002.docx                        Page 6 of 11
 
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:            Operator reviews the handout and applicable sections of the procedures.
Critical Standard:                    Determines eligibility of the operators in accordance with the below key Evaluator Note:              Provide candidate with Handout #1 Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Terminating Cues:      ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 SRO ADMIN JPM C002.docx                  Page 7 of 11


QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 7 of 11  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 Answer Key If No, what requirement is not Qualified for Relief? (Yes/No) being met.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Does not have a medical exam within the past 2 years SRO #1                          NO Does have the annual fit test Does not meet the required number of hours performing SRO #2                          NO                  duties as a licensed operator for the last quarter (Work Control Supervisor hours do NOT count)
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
SRO #3                        YES                  N/A NRC 2011 SRO ADMIN JPM C002.docx          Page 8 of 11
Performance Step:
Critical Operator reviews the handout and applicable sections of the procedures.
Standard: Determines eligibility of the operators in accordance with the below key Evaluator Note:
Provide candidate with Handout #1 Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
ONCE candidate discusses their findings the JPM can be terminated


NOTEEnsure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 HANDOUT #1 SRO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - CRS 4/17/11 - 0700 - 1900 - CRS 4/25/11 - 0700 - 1900 - CRS 5/5/11 - 0700 - 1900 - Work Control Supervisor 5/6/11 - 0700 - 1900 - CRS 5/7/11 - 0700 - 1900 - CRS 6/4/11 - 0700 - 1900 - CRS 6/5/11 - 0700 - 1900 - Work Control Supervisor Date of Most Recent Medical Exam - 4/10/2009 Latest Mask Fit Test - 12/28/2009 SRO#2 Hours Performing Operator Duties in Last Quarter 5/21/11:  0700 - 1900 - Work Control Supervisor 5/30/11:  0700 - 1900 - CRS 6/14/11:  0700 - 1900 - CRS 6/15/11:  0700 - 1900 - Work Control Supervisor 6/24/11:  0700 - 1900 - CRS 6/25/110700 - 1900 - CRS 6/26/11: 0700 - 1900 - Work Control Supervisor Date of Most Recent Medical Exam - 10/14/2009 Latest Mask Fit Test - 11/16/2010 SRO#3 Hours Performing Operator Duties in Last Quarter 4/6/11 0700 - 1900 - CRS 5/8/11: 0700 - 1900 - CRS 5/9/11: 0700 - 1900 - CRS 5/15/11: 0700 - 1900 - Work Control Supervisor 6/1/11: 0700 - 1900 - CRS 6/21/11: 0700 - 1900 - CRS Date of Most Recent Medical Exam - 7/15/2010 Latest Mask Fit Test - 6/10/2010 NRC 2011 SRO ADMIN JPM C002.docx              Page 9 of 11
Stop Time:


QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 8 of 11 Answer Key Qualified for Relief? (Yes/No)
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 HANDOUT #2 If No, what requirement(s)
If No, what requirement is not being met.
Qualified for Relief? (Yes/No) is/are not being met.
SRO #1  NO  Does not have a medical exam within the past 2 years Does have the annual fit test SRO #2  NO  Does not meet the required number of hours performing duties as a licensed operator for the last quarter (Work Control Supervisor hours do NOT count)
SRO #1 SRO #2 SRO #3 NRC 2011 SRO ADMIN JPM C002.docx         Page 10 of 11
SRO #3  YES  N/A QF-1030-11  Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 9 of 11 HANDOUT #1 SRO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - CRS  4/17/11 - 0700 - 1900 - CRS 4/25/11 - 0700 - 1900 - CRS 5/5/11 - 0700 - 1900 - Work Control Supervisor 5/6/11 - 0700 - 1900 - CRS 5/7/11 - 0700 - 1900 - CRS 6/4/11 - 0700 - 1900 - CRS 6/5/11 - 0700 - 1900 - Work Control Supervisor Date of Most Recent Medical Exam
- 4/10/2009 Latest Mask Fit Test
- 12/28/2009 SRO#2 Hours Performing Operator Duties in Last Quarter 5/21/11:  0700
- 1900 - Work Control Supervisor 5/30/11:  0700
- 1900 - CRS 6/14/11:  0700
- 1900 - CRS 6/15/11:  0700
- 1900 - Work Control Supervisor 6/24/11:  0700
- 1900 - CRS 6/25/11:  0700
- 1900 - CRS 6/26/11:  0700
- 1900 - Work Control Supervisor Date of Most Recent Medical Exam
- 10/14/2009 Latest Mask Fit Test
- 11/16/2010 SRO#3 Hours Performing Operator Duties in Last Quarter 4/6/11  0700
- 1900 - CRS  5/8/11:  0700
- 1900 - CRS 5/9/11:  0700
- 1900 - CRS 5/15/11:  0700
- 1900 - Work Control Supervisor 6/1/11:  0700
- 1900 - CRS 6/21/11:  0700
- 1900 - CRS Date of Most Recent Medical Exam  - 7/15/2010 Latest Mask Fit Test
- 6/10/2010 QF-1030-11  Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 NRC 2011 SRO ADMIN JPM C002.docx Page 10 of 11 HANDOUT #2 Qualified for Relief? (Yes/No)
If No, what requirement(s) is/are not being met.
SRO #1       SRO #2       SRO #3 QF-1030-11  Rev. 7 NRC 2011 SRO ADMIN JPM C002.docx Page 11 of 11 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 Examinee:  Evaluator:
RO    SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
SAT:  UNSAT:  Remediation required:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:  ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 SRO ADMIN JPM EC.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 Examinee:                                            Evaluator:
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 SRO ADMIN JPM C002.docx             Page 11 of 11


NRC 2011 SRO ADMIN JPM EC
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM EC NRC 2011 SRO ADMIN JPM EC.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 SRO ADMIN JPM EC.docx Page 2 of 9  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   REVIEW THE ISOLATION POINTS FOR RWS BAY A DIVER INSPECTION &
JPM TITLE:
A CORE SPRAY PUMP MOTOR INSPECTION BY ELECTRICAL MAINTENANCE JPM NUMBER:                 NRC 2011 SRO ADMIN           REV.       0 JPM EC TASK NUMBER(S) /
REVIEW THE ISOLATION POINTS FOR RWS BAY "A" DIVER INSPECTION & "A" CORE SPRAY PUMP MOTOR INSPECTION BY ELECTRICAL MAINTENANCE JPM NUMBER:
TASK TITLE(S):
NRC 2011 SRO ADMIN JPM EC REV. 0   TASK NUMBER(S) / TASK TITLE(S):
K/A NUMBERS:
2.2.13 (4.3)
2.2.13 (4.3)
KNOWLEDGE OF TAGGING AND CLEARANCE PROCEDURES K/A VALUE:
KNOWLEDGE OF K/A NUMBERS:                TAGGING AND               K/A VALUE:
Justification (FOR K/A VALUES <3.0):
CLEARANCE PROCEDURES Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:             Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:             X       Other:
Simulate/Walkthrough:
Lab:                           Classroom               X Time for Completion:           25   Minutes   Time Critical:       Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Perform: X   EVALUATION LOCATION:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
In-Plant:   Control Room:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM EC.docx                    Page 2 of 9
Simulator:
X Other:           Lab:   Classroom X   Time for Completion:
25 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 NRC 2011 SRO ADMIN JPM EC.docx Page 3 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 948: Line 774:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?   13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
      / Time Critical) appropriately?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 13. Are all references identified, current, accurate, and available to the trainee?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
RE-VALIDATION SIGNATURE JPMs must be re
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
Re-Validation Personnel Date Re-Validation Personnel Date       Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 NRC 2011 SRO ADMIN JPM EC.docx Page 4 of 9 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Simulator Setup Instructions:
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
None SIMULATOR MALFUNCTIONS:
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
None SIMULATOR OVERRIDES:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 SRO ADMIN JPM EC.docx                                Page 3 of 9
None SIMULATOR REMOTE FUNCTIONS:
 
None   Required Materials:
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Clearances for the "A" Intake Structure Pit and the "A" Core Spray Pump Tech Specs General  
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:             Clearances for the A Intake Structure Pit and the A Core Spray Pump Tech Specs General  


==References:==
==References:==
 
Clearances for the A Intake Structure Pit and the A Core Spray Pump Tech Specs Task Standards:                 Determines 2 incorrect blocking points and their correct replacements.
Clearances for the "A" Intake Structure Pit and the "A" Core Spray Pump Tech Specs Task Standards:
Determines 2 incorrect blocking points and their correct replacements.
Determines applicable TS.
Determines applicable TS.
Clearance for CSClearance for RWS
Clearance for CS Clearance for RWS NRC 2011 SRO ADMIN JPM EC.docx                          Page 4 of 9


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EC.docx Page 5 of 9 TURNOVER SHEET INITIAL CONDITIONS:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
The plant is operating at rated power.
* The plant is operating at rated power.
All TS LCOs are currently met Divers will be inspecting the "A" RWS intake structure pit Electricians will be performing an inspection of the "A" Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
* All TS LCOs are currently met
Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.
* Divers will be inspecting the A RWS intake structure pit
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* Electricians will be performing an inspection of the A Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
* Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM EC.docx                      Page 5 of 9


QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 NRC 2011 SRO ADMIN JPM EC.docx Page 6 of 9  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at rated power.
* The plant is operating at rated power.
All TS LCOs are currently met Divers will be inspecting the "A" RWS intake structure pit Electricians will be performing an inspection of the "A" Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
* All TS LCOs are currently met
Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.
* Divers will be inspecting the A RWS intake structure pit
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* Electricians will be performing an inspection of the A Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
* Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM EC.docx                          Page 6 of 9
 
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
EXAMINER NOTE: Provide candidate with the clearances for the A Intake Structure Pit and the A Core Spray Pump NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:            Obtain and reviews clearances.
Critical Y (SEQ-)
Standard:                    Determines the following clearance points are incorrect and then provides the correct blocking points:
: 1. The heater breaker for Core Spray Pump 1P-211A-M is identified as the heater breaker for B Core Spray Pump and should be 1L80-25 (Danger Tag 932).
: 2. The A Bay Screen Wash Nozzle Shutoff valve breaker is identified as 1B2112 and should be 1B9112 (Danger Tag 966)
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:            Identifies the required TS entries Critical Y (SEQ-)
Standard:                    Determines that the following TS apply
: 1. RWS - TS 3.7.2 Condition A. - 7 day
: 2. Core Spray - TS 3.5.1 Condition B. - 7 days Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 SRO ADMIN JPM EC.docx                      Page 7 of 9


QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 NRC 2011 SRO ADMIN JPM EC.docx Page 7 of 9  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 Terminating Cues:    ONCE candidate discusses their findings the JPM can be terminated.
EXAMINER NOTE: Provide candidate with the clearances for the "A" Intake Structure Pit and the "A" Core Spray Pump NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Stop Time:
Performance Step:
NRC 2011 SRO ADMIN JPM EC.docx              Page 8 of 9
Critical  Y (SEQ-) Obtain and reviews clearances
. Standard: Determines the following clearance points are incorrect and then provides the correct blocking points:
: 1. The heater breaker for Core Spray Pump 1P
-211A-M is identified as the heater breaker for "B" Core Spray Pump and should be 1L80
-25  (Danger Tag 932).
: 2. The "A" Bay Screen Wash Nozzle Shutoff valve breaker is identified as 1B2112 and should be 1B9112 (Danger Tag 966)
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Identifies the required TS entries Standard: Determines that the following TS apply
: 1. RWS - TS 3.7.2 Condition A.
- 7 day  2. Core Spray
- TS 3.5.1 Condition B.
- 7 days   Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0  NRC 2011 SRO ADMIN JPM EC.docx Page 8 of 9 Terminating Cues:
ONCE candidate discusses their findings the JPM can be terminated.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EC.docx Page 9 of 9 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay "A" Diver Inspection & "A" Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 Examinee: Evaluator:
QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 Examinee:                                             Evaluator:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
RO     SRO     STA       NSPEO       SRO CERT               Date:
SAT: UNSAT:   Remediation required:
ILT RO       ILT SRO PERFORMANCE RESULTS:                       SAT:                         UNSAT:
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Remediation required:             YES                       NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 SRO ADMIN JPM EC.docx                  Page 9 of 9


NRC 2011 SRO ADMIN JPM RC.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 ADMIN SRO JPM RC
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 ADMIN SRO JPM RC NRC 2011 SRO ADMIN JPM RC.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 SRO ADMIN JPM RC.docx Page 2 of 11  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   SURVEY MAP REVIEW AND DOSE CALCULATIONS TO DETERMINE THE ADEQUACY OF THE RWP DOSE SETTING AND DETERMINE IF A DOSE EXTENSION IS REQUIRED JPM NUMBER:                 NRC 2011 ADMIN SRO           REV.       1 JPM RC TASK NUMBER(S) /             1.11 (SENIOR REACTOR OPERATOR)
JPM TITLE:
TASK TITLE(S):
SURVEY MAP REVIEW AND DOSE CALCU LATIONS TO DETERMINE THE AD EQUACY OF THE RWP DOSE SETTING AND DETERMINE IF A DOSE EXTENSION IS REQUIRED JPM NUMBER:
Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, K/A NUMBERS:                2.3.13 (3.8)      K/A VALUE:        containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
NRC 2011 ADMIN SRO JPM RC REV. 1   TASK NUMBER(S) / TASK TITLE(S):
1.11 (SENIOR REACTOR OPERATOR)
K/A NUMBERS:
2.3.13 (3.8)
K/A VALUE:
Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high
-radiation areas, aligning filters, etc.
Justification (FOR K/A VALUES <3.0):
Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:                 Perform:       X EVALUATION LOCATION:             In-Plant:                       Control Room:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulator:             X         Other:
Simulate/Walkthrough:
Lab:                             Classroom                 X Time for Completion:           20   Minutes   Time Critical:             Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Perform: X   EVALUATION LOCATION:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
In-Plant:   Control Room:
Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM RC.docx                    Page 2 of 11
Simulator:
X Other:           Lab:   Classroom X   Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Ad equacy o f the RWP Dose Setting and Determine if a Dose Extension is Required
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
, Rev. 1 NRC 2011 SRO ADMIN JPM RC.docx Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS                                                                         YES NO   N/A
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 1,055: Line 868:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
RE-VALIDATION SIGNATURE JPMs must be re
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 SRO ADMIN JPM RC.docx                                Page 3 of 11
Re-Validation Personnel Date Re-Validation Personnel Date       Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Ad equacy o f the RWP Dose Setting and Determine if a Dose Extension is Required
 
, Rev. 1 NRC 2011 SRO ADMIN JPM RC.docx Page 4 of 11 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       1. Survey map of the Heater Bay at 61% power.
None SIMULATOR MALFUNCTIONS:
None SIMULATOR OVERRIDES:
None SIMULATOR REMOTE FUNCTIONS:
None   Required Materials:
: 1. Survey map of the Heater Bay at 61% power.
: 2. Copy of ACP 1411.17 to write on.
: 2. Copy of ACP 1411.17 to write on.
: 3. Copy of NG
: 3. Copy of NG-165K when requested General  
-165K when requested General  


==References:==
==References:==
ACP 1411.17 NG-165K Task Standards:
* Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.
* Determine that the worker will need a dose extension and completes Section 1 and 2 of NG-165K.
NRC 2011 SRO ADMIN JPM RC.docx                  Page 4 of 11


ACP 1411.17 NG-165K Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.
* The plant is operating at about 60% power.
Determine that the worker will need a dose extension and completes Section 1 and 2 of NG
* The date is currently 6/23/11. You are the CRS.
-165K.
* The piping supporting Level Transmitter LT-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E-05A heater, has failed.
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM RC.docx Page 5 of 11 TURNOVER SHEET INITIAL CONDITIONS:
* The old piping and LT have been removed. The New piping and LT are ready for installation.
The plant is operating at about 60% power
* Brad Pit is the only qualified welder who can perform the job. SSN # 123-45-6789, TLD 9999
. The date is currently 6/23/11. You are the CRS.
* Brad Pits supervisor, Mike Heffley, has performed a pre-job brief.
The piping supporting Level Transmitter LT
* A welder apprentice has run all of the required material to the job site.
-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E
* The following are the estimated times required for the job:
-05A heater, has failed.
* 10 minutes to prep the welds.
The old piping and LT have been removed. The New piping and LT are ready for installation.
* 20 minutes to secure the new LT and pipes in place.
Brad Pit is the only qualified welder who can perform the job. SSN # 123 6789, TLD 9999 Brad Pit's supervisor, Mike Heffley, has performed a pre
* 15 minutes to actually weld the pipes.
-job brief.
* Brad has received 1855 mrem for the year.
A welder apprentice has run all of the required material to the job site.
* Scaffolding for the job has been erected at location 5 on the survey map.
The following are the estimated times required for the job:
10 minutes to prep the welds.
20 minutes to secure the new LT and pipes in place.
15 minutes to actually weld the pipes.
Brad has received 1855 mrem for the year.
Scaffolding for the job has been erected at location 5 on the survey map.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
* Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
Show all work assumptions on the survey map.
* Show all work assumptions on the survey map.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM RC.docx                    Page 5 of 11


QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 NRC 2011 SRO ADMIN JPM RC.docx Page 6 of 11  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at about 60% power
* The plant is operating at about 60% power.
. The date is currently 6/23/11. You are the CRS.
* The date is currently 6/23/11. You are the CRS.
The piping supporting Level Transmitter LT
* The piping supporting Level Transmitter LT-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E-05A heater, has failed.
-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E
* The old piping and LT have been removed. The New piping and LT are ready for installation.
-05A heater, has failed.
* Brad Pit is the only qualified welder who can perform the job. SSN # 123-45-6789, TLD 9999
The old piping and LT have been removed. The New piping and LT are ready for installation. Brad Pit is the only qualified welder who can perform the job. SSN # 123 6789, TLD 9999 Brad Pit's supervisor, Mike Heffley, has performed a pre
* Brad Pits supervisor, Mike Heffley, has performed a pre-job brief.
-job brief.
* A welder apprentice has run all of the required material to the job site.
A welder apprentice has run all of the required material to the job site.
* The following are the estimated times required for the job:
The following are the estimated times required for the job:
* 10 minutes to prep the welds.
10 minutes to prep the welds.
* 20 minutes to secure the new LT and pipes in place.
20 minutes to secure the new LT and pipes in place.
* 15 minutes to actually weld the pipes.
15 minutes to actually weld the pipes.
* Brad has received 1855 mrem for the year.
Brad has received 1855 mrem for the year.
* Scaffolding for the job has been erected at location 5 on the survey map.
Scaffolding for the job has been erected at location 5 on the survey map.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
* Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
Show all work assumptions on the survey map.
* Show all work assumptions on the survey map.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 SRO ADMIN JPM RC.docx                          Page 6 of 11
 
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:            Determine the dose needed for the job.
Critical Y (SEQ-)
Standard:                    Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.
Evaluator Note:              The Candidate may add some additional dose for the trip to and from the job. This will not affect the fact that Brad will need a dose extension for the job.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:            Determine if the worker will need a dose extension.
Critical Y (SEQ-)
Standard:                    Determine that the worker will need a dose extension and completes Sections 1 and 2 of NG-165K.
Evaluator Cue:                Prompt to begin the paperwork required for the extension. When the candidate obtains the document, provide a copy and tell them to fill out sections 1 and 2 only.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 SRO ADMIN JPM RC.docx                    Page 7 of 11


QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 NRC 2011 SRO ADMIN JPM RC.docx Page 7 of 11  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 Performance Step:           Per ACP 1411.17, the workers first line supervisor may extend the individuals Critical Y (SEQ-)          dose.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Standard:                   Determine that Brads supervisor or higher will have to extend his dose to greater than 2000 mrem. Completes section 1 and 2 of NG-165K, Increased Administrative Dose Limit Request Evaluator Note:             Provide Copy of NG-165K when requested.
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step:
Terminating Cues:     The JPM is complete when the candidate has determined the dose for the weld job, determined that a dose extension is required and completes section 1 and 2 of NG-165K.
Critical  Y (SEQ-) Determine the dose needed for the job.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Standard: Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.
Stop Time:
Evaluator Note:
NRC 2011 SRO ADMIN JPM RC.docx                  Page 8 of 11
The Candidate may add some additional dose for the trip to and from the job. This will not affect the fact that Brad will need a dose extension for the job. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Determine if the worker will need a dose extension.
Standard: Determine that the worker will need a dose extension and completes Sections 1 and 2 of NG
-165K. Evaluator Cue:
Prompt to begin the paperwork required for the extension. When the candidate obtains the document, provide a copy and tell them to fill out sections 1 and 2 only.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1  NRC 2011 SRO ADMIN JPM RC.docx Page 8 of 11 Performance Step:
Critical Y (SEQ-) Per ACP 1411.17, the workers first line supervisor may extend the individuals dose. Standard: Determine that Brad's supervisor or higher will have to extend his dose to greater than 2000 mrem. Completes section 1 and 2 of NG-165K, Increased Administrative Dose Limit Request Evaluator Note:
Provide Copy of NG
-165K when requested.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
The JPM is complete when the candidate has determined the dose for the weld job, determined that a dose extension is required and completes section 1 and 2 of NG-165K. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  


NRC 2011 SRO ADMIN JPM RC.docx Page 9 of 11 NG-165K, ADMINISTRATIVE DOSE LIMIT REQUEST Worker Name:
NG-165K, ADMINISTRATIVE DOSE LIMIT REQUEST Worker Name:                                         TLD Number:                   SSN:
TLD Number:
Employed by:                                           Supervisor:
SSN:   Employed by:
: 1. Type of Extension Beyond 2,000 millirem per Year TEDE         Beyond 4,000 millirem per Year TEDE Beyond 3,000 millirem per Year TEDE         Beyond 4,500 millirem per Year TEDE
Supervisor:
: 2. TEDE Review & Upgrade Request Workers current yearly TEDE: _____________ millirem Extend to yearly limit of: __________________ millirem Detailed Reason for extension (Required for all extensions): _____________________________
: 1. Type of Extension Beyond 2,000 millirem per Year TEDE Beyond 4,000 millirem per Year TEDE Beyond 3,000 millirem per Year TEDE   Beyond 4,500 millirem per Year TEDE
: 3. Dosimetry Review Dosimetry to verify: documented evidence of current year dose is on file with no personal estimate for current year; and SDE and LDE not limiting.
: 2. TEDE Review & Upgrade Request Worker's current yearly TEDE: _____________ millirem Extend to yearly limit of: __________________ millirem Detailed Reason for extension (Required for all extensions): _____________________________
Approved                     Disapproved, reason:
______________________________________________________________________________
______________________________________________________________________________
: 3. Dosimetry Review Dosimetry to verify: documented evidence of current year dose is on file with no personal estimate for current year; and SDE and LDE not limiting.
Approved Disapproved, reason:
Dosimetry / Date
Dosimetry / Date
: 4. Approval signatures                     Circle One Beyond 2,000 millirem/yr TEDE:
: 4. Approval signatures               Circle One Beyond 2,000 millirem/yr TEDE:               Y/N Radiation Protection Manager / Date Beyond 3,000 millirem/yr TEDE:               Y/N Radiation Protection Manager / Date Y /N Plant General Manager / Date Beyond 4 ,000 millirem//yr TEDE:             Y /N Radiation Protection Manager / Date Y /N Plant General. Manager / Date Beyond 4,500 millirem/yr TEDE:               Y/N Site Vice President/ Date
Y / N   Radiation Protection Manager / Date Beyond 3,000 millirem/yr TEDE:
: 5. Workers Acknowledgment (Required for any increase)     Worker / Date NRC 2011 SRO ADMIN JPM RC.docx                      Page 9 of 11
Y / N   Radiation Protection Manager / Date Y / N   Plant General Manager / Date Beyond 4 ,000 millirem//yr TEDE:
Y / N   Radiation Protection Manager / Date Y / N   Plant General. Manager / Date Beyond 4,500 millirem/yr TEDE:
Y / N   Site Vice President/ Date
: 5. Worker's Acknowledgment (Required for any increase) Worker / Date


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM RC.docx Page 10 of 11 QF-1030-11  Rev. 7 NRC 2011 SRO ADMIN JPM RC.docx Page 11 of 11 NRC 2011 ADMIN SRO JPM RC
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM RC.docx Page 10 of 11
, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 Examinee:  Evaluator:
RO    SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
SAT:  UNSAT:  Remediation required:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:  ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 1 of 11 Usage Level Information Use Approved for
QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 Examinee:                                            Evaluator:
'Point-of-Use' printing IF NO Temporary Changes are in effect for this procedure.  
RO      SRO    STA      NSPEO      SRO CERT              Date:
(on designated printers) Record the following: Date / Time: _____________ / _________ Initials: ____
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 SRO ADMIN JPM RC.docx                Page 11 of 11
 
ADMINISTRATIVE CONTROL PROCEDURE                                         ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                           Rev. 22 Page 1 of 11 Usage Level Information Use Approved for Point-of-Use printing IF NO Temporary Changes are in effect for this procedure.
(on designated printers)
Record the following: Date / Time: _____________ / _________ Initials: ____
NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours if active document use exceeds a 24 hour period as determined from the date and time recorded above.
NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours if active document use exceeds a 24 hour period as determined from the date and time recorded above.
Prepared By:
Prepared By:                               /                                             Date:
/ Date:   Print Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)
Print                               Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)
Reviewed By:
Reviewed By:                               /                                             Date:
/ Date:   Print Signature Reviewed By:
Print                               Signature Reviewed By:                               /                                             Date:
/ Date:   Print Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By  
Print                               Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By                               /                                             Date:
/ Date:   Print Signature  
Print                               Signature
 
ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 2 of 11 Table of Contents Page 1.0  PURPOSE.............................................................................................................................3 2.0  DEFINITIONS........................................................................................................................3 3.0  INSTRUCTIONS....................................................................................................................4 3.1 INSTRUCTIONAL DETAILS....................................................................................4
 
===3.2 FEDERAL===
REGULATORY DOSE LIMITS...............................................................5 3.3 DAEC ADMINISTRATIVE DOSE LIMITS FOR ROUTINE OPERATIONS..............6
 
===3.4 EXPOSURE===
HISTORY............................................................................................7
 
===3.5 INCREASED===
EXPOSURE REQUESTS..................................................................8 3.5.1 PREREQUISITES........................................................................................8
 
====3.5.2 UPGRADING====
ADMINISTRATIVE LIMITS....................................................8
 
===3.6 EXPOSURE===
TO A DEVELOPING EMBRYO AND FETUS.....................................9
 
===3.7 NEXTERA===
ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC.........................10 3.8 DAEC DOSE GUIDANCE FOR EMERGENCIES.................................................10 4.0  RECORDS...........................................................................................................................10


==5.0 REFERENCES==
ADMINISTRATIVE CONTROL PROCEDURE                                                              ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                                                Rev. 22 Page 2 of 11 Table of Contents Page 1.0 PURPOSE ............................................................................................................................. 3 2.0 DEFINITIONS ........................................................................................................................ 3 3.0 INSTRUCTIONS .................................................................................................................... 4 3.1  INSTRUCTIONAL DETAILS.................................................................................... 4 3.2  FEDERAL REGULATORY DOSE LIMITS............................................................... 5 3.3  DAEC ADMINISTRATIVE DOSE LIMITS FOR ROUTINE OPERATIONS.............. 6 3.4  EXPOSURE HISTORY............................................................................................ 7 3.5 INCREASED EXPOSURE REQUESTS .................................................................. 8 3.5.1  PREREQUISITES ........................................................................................ 8 3.5.2  UPGRADING ADMINISTRATIVE LIMITS.................................................... 8 3.6 EXPOSURE TO A DEVELOPING EMBRYO AND FETUS ..................................... 9 3.7  NEXTERA ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC ......................... 10 3.8  DAEC DOSE GUIDANCE FOR EMERGENCIES ................................................. 10 4.0 RECORDS ........................................................................................................................... 10
....................................................................................................................10 ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 3 of 11


==1.0 PURPOSE==
==5.0 REFERENCES==
This procedure provides guidance for ensuring that DAEC personnel do not exceed Federal exposure limits and instructions for increasing DAEC administrative dose limits and applies to all personnel entering the restricted area at DAEC as Radiation Workers or Visitors. The DAEC shall attempt to obtain the records of cumulative occupational dose of workers in accordance with 10 CFR 20.2104. A Workers "Declaration of Exposure" for prior years may be used to meet the requirements of 10 CFR 20.2104.
.................................................................................................................... 10
NOTE Personnel receiving treatment with medical isotopes should not enter the restricted area unless approved by the Health Physics Supervisor or Radiation Protection Manager. Contact Dosimetry for further guidance.  


==2.0 DEFINITIONS==
ADMINISTRATIVE CONTROL PROCEDURE                              ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                  Rev. 22 Page 3 of 11 1.0 PURPOSE This procedure provides guidance for ensuring that DAEC personnel do not exceed Federal exposure limits and instructions for increasing DAEC administrative dose limits and applies to all personnel entering the restricted area at DAEC as Radiation Workers or Visitors.
Administrative Dose Limit - Specified doses established to require review prior to exceeding.
The DAEC shall attempt to obtain the records of cumulative occupational dose of workers in accordance with 10 CFR 20.2104. A Workers Declaration of Exposure for prior years may be used to meet the requirements of 10 CFR 20.2104.
NOTE Personnel receiving treatment with medical isotopes should not enter the restricted area unless approved by the Health Physics Supervisor or Radiation Protection Manager.
Contact Dosimetry for further guidance.
2.0 DEFINITIONS Administrative Dose Limit - Specified doses established to require review prior to exceeding.
Committed Dose Equivalent (CDE) - Dose to organs that will be received from an intake of radioactive material during the 50 year period following the intake.
Committed Dose Equivalent (CDE) - Dose to organs that will be received from an intake of radioactive material during the 50 year period following the intake.
Committed Effective Dose Equivalent (CEDE) - Sum of the products of the weighing factors applicable to each of the organs irradiated and the CDE.
Committed Effective Dose Equivalent (CEDE) - Sum of the products of the weighing factors applicable to each of the organs irradiated and the CDE.
Deep Dose Equivalent (DDE) - Dose resulting from external exposure of the whole body at a depth of 1 centimeter (1000 mg/cm2).
Deep Dose Equivalent (DDE) - Dose resulting from external exposure of the whole body at a depth of 1 centimeter (1000 mg/cm2).
Escorted Radiation Worker (ERW) - A visitor who may receive occupational exposure and, therefore, is monitored while on site with a Thermoluminescent Dosimeter (TLD) and assigned
Escorted Radiation Worker (ERW) - A visitor who may receive occupational exposure and, therefore, is monitored while on site with a Thermoluminescent Dosimeter (TLD) and assigned exposure limits.
Extremity - Hand, elbow, arm below elbow, foot, knee, leg below the knee.
Form NRC Nuclear Regulatory Commission form entitled Occupational External Radiation Exposure History or equivalent.
Lens Dose Equivalent (LDE) - Applies to the external exposure of the lens of the eye and is taken as the dose equivalent at a tissue depth of 0.3 centimeters (300 mg/cm2).


exposure limits. Extremity - Hand, elbow, arm below elbow, foot, knee, leg below the knee. Form NRC Nuclear Regulatory Commission form entitled "Occupational External Radiation Exposure History" or equivalent.
ADMINISTRATIVE CONTROL PROCEDURE                                   ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                       Rev. 22 Page 4 of 11 Member of the Public - Member of the public means an individual in a controlled or unrestricted area. However, an individual is not a member of the public during any period in which the individual receives occupational exposure.
Lens Dose Equivalent (LDE) - Applies to the external exposure of the lens of the eye and is taken as the dose equivalent at a tissue depth of 0.3 centimeters (300 mg/cm 2).
ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 4 of 11 Member of the Public - Member of the public means an individual in a controlled or unrestricted area. However, an individual is not a member of the public during any period in which the individual receives occupational exposure.
Minor - Minor means an individual less than 18 years of age.
Minor - Minor means an individual less than 18 years of age.
Radiation Worker - Trained individuals, commensurate with risk, working in or frequenting any portion of the restricted area or RCA who are considered to receive occupational dose (their "assigned duties" involve exposure to radiation and radioactive materials). Restricted Area or Radiologically Controlled Area (RCA) - Any area which is controlled on site for the purposes of protection of individuals from exposure to radiation and radioactive materials. For DAEC, the Restricted Area is the area within the security fence. Shallow Dose Equivalent (SDE) - Dose resulting from external exposure of the skin or extremity, at a depth of 0.007 centimeters (7 mg/cm2) averaged over an area of one square centimeter.
Radiation Worker - Trained individuals, commensurate with risk, working in or frequenting any portion of the restricted area or RCA who are considered to receive occupational dose (their assigned duties involve exposure to radiation and radioactive materials).
Total Effective Dose Equivalent (TEDE) - Sum of the deep dose equivalent and committed effective dose equivalent. Total Organ Dose Equivalent (TODE) - Sum of the deep dose equivalent and committed dose equivalent.
Restricted Area or Radiologically Controlled Area (RCA) - Any area which is controlled on site for the purposes of protection of individuals from exposure to radiation and radioactive materials. For DAEC, the Restricted Area is the area within the security fence.
Visitors - Individual that is not trained in radiation protection as required by 10CFR19. This individual can be a worker (Federal dose limits for an occupationally exposed worker apply) or the individual can be an individual who is not performing work functions (Public dose limits  
Shallow Dose Equivalent (SDE) - Dose resulting from external exposure of the skin or extremity, at a depth of 0.007 centimeters (7 mg/cm2) averaged over an area of one square centimeter.
 
Total Effective Dose Equivalent (TEDE) - Sum of the deep dose equivalent and committed effective dose equivalent.
apply). 3.0 INSTRUCTIONS
Total Organ Dose Equivalent (TODE) - Sum of the deep dose equivalent and committed dose equivalent.
 
Visitors - Individual that is not trained in radiation protection as required by 10CFR19. This individual can be a worker (Federal dose limits for an occupationally exposed worker apply) or the individual can be an individual who is not performing work functions (Public dose limits apply).
===3.1 INSTRUCTIONAL===
3.0 INSTRUCTIONS 3.1 INSTRUCTIONAL DETAILS (1) Each radiation worker shall be responsible for maintaining awareness of their administrative dose limit, for maintaining their dose ALARA, and for ensuring that their dose limit is not exceeded.
DETAILS (1) Each radiation worker shall be responsible for maintaining awareness of their administrative dose limit, for maintaining their dose ALARA, and for ensuring that their dose limit is not exceeded. (2) Supervisors and managers or designees shall be responsible for approving dose limit extensions. (3) The Radiation Protection Manager shall be responsible for: (a) Establishing and maintaining the personnel dose monitoring program consistent with the requirements of 10CFR20. (b) Ensuring administrative dose limits are established.
(2) Supervisors and managers or designees shall be responsible for approving dose limit extensions.
ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 5 of 11 (4) Female radiation workers wishing to declare their pregnancy shall inform the Radiation Protection Manager in writing prior to receiving Pregnancy Exposure Limits. (5) Radiation workers are required to obtain the required authorizations before exceeding an administrative dose limit. (6) Extensions to the administrative dose limit s shall be approved by the appropriate level of management as delineated in Section 3.3 of this procedure. (7) The Site Vice President shall be responsible for approving dose extensions beyond 4,500 millirem for TEDE. 3.2 FEDERAL REGULATORY DOSE LIMITS (1) The occupational dose limits established by the NRC (10CFR20.1201) are: Dose Category Rem/Year Total Effective Dose Equivalent (TEDE) 5 Total Organ Dose Equivalent (TODE) 50 Lens of the Eye Dose Equivalent (LDE) 15 Shallow Dose Equivalent (SDE) to skin of the whole body or extremities 50 (2) Furthermore, 10CFR20.1206 allows for additional exposure under unusual circumstances. The additional dose a worker with a fully documented radiation exposure history may receive under the provisions of a Planned Special Exposure (PSE) are: Dose Category Rem/Year Rem in a Lifetime TEDE 5 25 TODE 50 250 LDE 15 75 SDE 50 250 (3) The dose equivalent limit to the embryo/fetus of an occupationally exposed woman, who has declared her pregnancy, is: (a) 500 millirem TEDE during the gestation period, or (b) 50 millirem TEDE for the remainder of the gestation period, if the embryo/fetus dose exceeds 500 millirem or is within 50 millirem of this dose at the time of declaration.
(3) The Radiation Protection Manager shall be responsible for:
ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 6 of 11 (4) The U.S. Environmental Protection Agency Guidance on Dose Limits for workers performing emergency activities are as follows: Activity Dose Category Limit (rem) Routine Emergency Worker Activities TEDE 5 Protecting Property TEDE 10  LDE 30  SDE / TODE 100 Life Saving or Protection of Large Populations (may exceeded if volunteers used) TEDE 25  LDE 75  SDE / TODE 250 3.3 DAEC ADMINISTRATI VE DOSE LIMITS FOR ROUTINE OPERATIONS (1) DAEC uses administrative dose limits in order to: (a) Ensure federal regulatory dose limits will not be exceeded.
(a) Establishing and maintaining the personnel dose monitoring program consistent with the requirements of 10CFR20.
(b) Alert appropriate levels of management to exposures which are significant or out of the ordinary. (c) Encourage supervisory review and management of doses to their workers. (2) No radiation worker's annual TEDE (in rem) from all facilities or sources will be allowed to exceed the value listed below unless authorized to do so by the designated level of supervision and the Increased Exposure Request Prerequisites listed in paragraph 3.4.1 are met. Administrative Limit TEDE (millirem) Permission to Exceed Granted By:
(b) Ensuring administrative dose limits are established.
2,000 Radiation Protection Manager approval 3,000 Radiation Protection Manager with concurrence from Plant General Manager 4,000 Plant General Manager, Site Vice President and Radiation Protection Manager approval 4,500 Site Vice President (with Radiation Protection Manager (RPM) and Plant General Manager concurrence) 


ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 7 of 11 (3) The following unique conditions may affect a worker's administrative dose limits:  (a) Radiation workers who attest to have been occupationally exposed at other facilities  during the current year shall be placed on an annual TEDE limit of 250 millirem until  documented evidence of their current year's dose is obtained by the DAEC per 10CFR20, Paragraph 2104 and a signed NRC Form 4 is on file at the DAEC. (b) The worker is a "declared pregnant woman". See Section 3.6.  (4) If an individual is found to have exceeded an administrative dose limit without prior  approval, it shall be brought to the attention of the Radiation Protection Manager and the individual supervisor for investigation. 3.4 EXPOSURE HISTORY  (1) The DAEC will actively seek Current Y ear TEDE, SDE, LDE, and CEDE exposure on radiation workers expected to be assigned to the DAEC less than or equal to 1 (one) year. A lifetime estimate of the worker's TEDE exposure may be documented per 10 CFR 20, Paragraph 2104. The following may be used to document an exposure history:  (a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record (e) Data Obtained from REIRS (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104 (2) The DAEC will actively seek lifetime TEDE exposure on radiation workers expected to be assigned to the DAEC greater than 1 (one) year in addition to Current Year TEDE, DDE, SDE, LDE, and CEDE to ensure adequate numbers of radiation workers eligible for a Planned Special Exposure. The following may be used to document an exposure history: (a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record  (e) Data Obtained from REIRS  (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104 ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 8 of 11
ADMINISTRATIVE CONTROL PROCEDURE                                   ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                       Rev. 22 Page 5 of 11 (4) Female radiation workers wishing to declare their pregnancy shall inform the Radiation Protection Manager in writing prior to receiving Pregnancy Exposure Limits.
(5) Radiation workers are required to obtain the required authorizations before exceeding an administrative dose limit.
(6) Extensions to the administrative dose limits shall be approved by the appropriate level of management as delineated in Section 3.3 of this procedure.
(7) The Site Vice President shall be responsible for approving dose extensions beyond 4,500 millirem for TEDE.
3.2 FEDERAL REGULATORY DOSE LIMITS (1) The occupational dose limits established by the NRC (10CFR20.1201) are:
Dose Category                              Rem/Year Total Effective Dose Equivalent (TEDE)                               5 Total Organ Dose Equivalent (TODE)                                   50 Lens of the Eye Dose Equivalent (LDE)                               15 Shallow Dose Equivalent (SDE) to skin of the whole body              50 or extremities (2) Furthermore, 10CFR20.1206 allows for additional exposure under unusual circumstances.
The additional dose a worker with a fully documented radiation exposure history may receive under the provisions of a Planned Special Exposure (PSE) are:
Dose Category                    Rem/Year                Rem in a Lifetime TEDE                              5                           25 TODE                              50                          250 LDE                              15                          75 SDE                              50                          250 (3) The dose equivalent limit to the embryo/fetus of an occupationally exposed woman, who has declared her pregnancy, is:
(a) 500 millirem TEDE during the gestation period, or (b) 50 millirem TEDE for the remainder of the gestation period, if the embryo/fetus dose exceeds 500 millirem or is within 50 millirem of this dose at the time of declaration.


===3.5 INCREASED===
ADMINISTRATIVE CONTROL PROCEDURE                                ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                    Rev. 22 Page 6 of 11 (4) The U.S. Environmental Protection Agency Guidance on Dose Limits for workers performing emergency activities are as follows:
EXPOSURE REQUESTS
Activity                      Dose Category        Limit (rem)
Routine Emergency Worker Activities                    TEDE                  5 Protecting Property                                    TEDE                  10 LDE                  30 SDE / TODE            100 Life Saving or Protection of Large Populations          TEDE                  25 (may exceeded if volunteers used)
LDE                  75 SDE / TODE            250 3.3 DAEC ADMINISTRATIVE DOSE LIMITS FOR ROUTINE OPERATIONS (1) DAEC uses administrative dose limits in order to:
(a) Ensure federal regulatory dose limits will not be exceeded.
(b) Alert appropriate levels of management to exposures which are significant or out of the ordinary.
(c) Encourage supervisory review and management of doses to their workers.
(2) No radiation workers annual TEDE (in rem) from all facilities or sources will be allowed to exceed the value listed below unless authorized to do so by the designated level of supervision and the Increased Exposure Request Prerequisites listed in paragraph 3.4.1 are met.
Administrative Limit TEDE                        Permission to Exceed Granted By:
(millirem) 2,000      Radiation Protection Manager approval 3,000      Radiation Protection Manager with concurrence from Plant General Manager 4,000      Plant General Manager, Site Vice President and Radiation Protection Manager approval 4,500      Site Vice President (with Radiation Protection Manager (RPM) and Plant General Manager concurrence)


====3.5.1 PREREQUISITES====
ADMINISTRATIVE CONTROL PROCEDURE                                  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                      Rev. 22 Page 7 of 11 (3) The following unique conditions may affect a worker's administrative dose limits:
(1) A completed, signed, NRC Form-4 (or equivalent) must be on file at the Dosimetry Group. The completed, signed Form 4 shall not include a worker's "Estimate of TEDE Exposure" for the current year. (2) The radiation worker's exposure shall not exceed 10 rem in the past 5 consecutive years. This may require additional dose history evaluations be performed. Contact the Dosimetry Group for assistance in determining historical dose. (3) The radiation worker's year-to-date LDE and SDE must be less than three times his/her year-to-date TEDE. (4) The worker's need for an increase in allowed exposure is documented per Section 3.4.2 of this procedure. 3.5.2 UPGRADING ADMINISTRATIVE LIMITS (1) The radiation worker's supervisor shall complete the demographic information and Sections 1 and 2 of Form NG-165K, "Increased Administrative Dose Limit Request." (2) Forward the form to Dosimetry.
(a) Radiation workers who attest to have been occupationally exposed at other facilities during the current year shall be placed on an annual TEDE limit of 250 millirem until documented evidence of their current years dose is obtained by the DAEC per 10CFR20, Paragraph 2104 and a signed NRC Form 4 is on file at the DAEC.
(3) Dosimetry shall verify the appropriate TEDE records are on file and the SDE and/or LDE are not limiting factors. (4) Dosimetry will complete Section 3 of the form and return to the radiation worker's supervisor. If the request is denied, Dosimetry shall indicate the reason for denial. This section may be completed per telecon if necessary as long as the telecon is documented. (5) The appropriate level of management/supervision should sign and date the form (see Section 3.3). (6) The radiation worker shall be told of his/her new administrative limits and he/she shall acknowledge that he/she understands the limits have been changed by signing Form  NG-165K. (7) Forward Form NG-165K to Dosimetry for updating the radiation worker's records and filing.
(b) The worker is a "declared pregnant woman". See Section 3.6.
ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 9 of 11
(4) If an individual is found to have exceeded an administrative dose limit without prior approval, it shall be brought to the attention of the Radiation Protection Manager and the individual supervisor for investigation.
3.4 EXPOSURE HISTORY (1) The DAEC will actively seek Current Year TEDE, SDE, LDE, and CEDE exposure on radiation workers expected to be assigned to the DAEC less than or equal to 1 (one) year.
A lifetime estimate of the workers TEDE exposure may be documented per 10 CFR 20, Paragraph 2104. The following may be used to document an exposure history:
(a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record (e) Data Obtained from REIRS (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104 (2) The DAEC will actively seek lifetime TEDE exposure on radiation workers expected to be assigned to the DAEC greater than 1 (one) year in addition to Current Year TEDE, DDE, SDE, LDE, and CEDE to ensure adequate numbers of radiation workers eligible for a Planned Special Exposure. The following may be used to document an exposure history:
(a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record (e) Data Obtained from REIRS (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104


===3.6 EXPOSURE===
ADMINISTRATIVE CONTROL PROCEDURE                                ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                    Rev. 22 Page 8 of 11 3.5 INCREASED EXPOSURE REQUESTS 3.5.1 PREREQUISITES (1) A completed, signed, NRC Form-4 (or equivalent) must be on file at the Dosimetry Group.
TO A DEVELOPING EMBRYO AND FETUS (1) A woman may, at her discretion, declare her pregnancy to NextEra Energy. (a) The declaration by the woman must be made in writing to the Radiation Protection Manager. (b) The declaration must have the approximate date of conception. (2) The designation of Declared Pregnant Woman will remain in effect until:  (a) The end of pregnancy, or (b) The woman requests, in writing that it be removed. (3) The Radiation Protection Manager shall forward the declaration to the Dosimetry Group for inclusion in her file. (4) The Dosimetry Group will: (a) Reduce the woman's administrative dose limits as instructed by the Radiation Protection Manager.  (Normally an administrative dose limit of 450 millirem is set for the gestation period with monthly dose limits of 50 millirem.)  (5) For declared pregnant workers who have already exceeded 450 millirem since the date of conception prior to declaration, the declared pregnant worker will be restricted from the Radiation Controlled Area (RCA).
The completed, signed Form 4 shall not include a workers Estimate of TEDE Exposure for the current year.
NOTE At boiling water reactors, such as Duane Arnold, workers can receive a small incremental dose while working in the Protected Area (typically 10 to 20 millirem per quarter). Declared pregnant women with greater than 450 millirem at the time of declaration will be monitored by personnel dosimetry while in the Protected Area and their dose maintained as low as reasonably achievable. In no case shall their dose exceed an additional 50 millirem during the remainder of their pregnancy, as stipulated in 10CFR 20.1208(d).  
(2) The radiation workers exposure shall not exceed 10 rem in the past 5 consecutive years.
(6) A woman planning to become pregnant may request to be placed on the 450 millirem limit. NextEra Energy will make every reasonable effort to accommodate such a request. (7) Refer to Policy Number NP-906 for further guidance.  
This may require additional dose history evaluations be performed. Contact the Dosimetry Group for assistance in determining historical dose.
(3) The radiation worker's year-to-date LDE and SDE must be less than three times his/her year-to-date TEDE.
(4) The workers need for an increase in allowed exposure is documented per Section 3.4.2 of this procedure.
3.5.2 UPGRADING ADMINISTRATIVE LIMITS (1) The radiation worker's supervisor shall complete the demographic information and Sections 1 and 2 of Form NG-165K, Increased Administrative Dose Limit Request.
(2) Forward the form to Dosimetry.
(3) Dosimetry shall verify the appropriate TEDE records are on file and the SDE and/or LDE are not limiting factors.
(4) Dosimetry will complete Section 3 of the form and return to the radiation worker's supervisor. If the request is denied, Dosimetry shall indicate the reason for denial. This section may be completed per telecon if necessary as long as the telecon is documented.
(5) The appropriate level of management/supervision should sign and date the form (see Section 3.3).
(6) The radiation worker shall be told of his/her new administrative limits and he/she shall acknowledge that he/she understands the limits have been changed by signing Form NG-165K.
(7) Forward Form NG-165K to Dosimetry for updating the radiation worker's records and filing.


ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 10 of 11
ADMINISTRATIVE CONTROL PROCEDURE                               ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                   Rev. 22 Page 9 of 11 3.6 EXPOSURE TO A DEVELOPING EMBRYO AND FETUS (1) A woman may, at her discretion, declare her pregnancy to NextEra Energy.
(a) The declaration by the woman must be made in writing to the Radiation Protection Manager.
(b) The declaration must have the approximate date of conception.
(2) The designation of Declared Pregnant Woman will remain in effect until:
(a) The end of pregnancy, or (b) The woman requests, in writing that it be removed.
(3) The Radiation Protection Manager shall forward the declaration to the Dosimetry Group for inclusion in her file.
(4) The Dosimetry Group will:
(a) Reduce the woman's administrative dose limits as instructed by the Radiation Protection Manager. (Normally an administrative dose limit of 450 millirem is set for the gestation period with monthly dose limits of 50 millirem.)
(5) For declared pregnant workers who have already exceeded 450 millirem since the date of conception prior to declaration, the declared pregnant worker will be restricted from the Radiation Controlled Area (RCA).
NOTE At boiling water reactors, such as Duane Arnold, workers can receive a small incremental dose while working in the Protected Area (typically 10 to 20 millirem per quarter). Declared pregnant women with greater than 450 millirem at the time of declaration will be monitored by personnel dosimetry while in the Protected Area and their dose maintained as low as reasonably achievable. In no case shall their dose exceed an additional 50 millirem during the remainder of their pregnancy, as stipulated in 10CFR 20.1208(d).
(6) A woman planning to become pregnant may request to be placed on the 450 millirem limit. NextEra Energy will make every reasonable effort to accommodate such a request.
(7) Refer to Policy Number NP-906 for further guidance.


===3.7 NEXTERA===
ADMINISTRATIVE CONTROL PROCEDURE                                ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                                    Rev. 22 Page 10 of 11 3.7 NEXTERA ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC (1) The dose to visitors classified as members of the public and minors shall be limited to 100 millirem/year.
ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC (1) The dose to visitors classified as members of the public and minors shall be limited to 100 millirem/year. 3.8 DAEC DOSE GUIDANCE FOR EMERGENCIES (1) In the event of emergencies which threaten human life, equipment important for the safe operation of the plant, or large populations the guidance on dose limits contained in the Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (EPA Manual 400-R-92-00, dated Oct 91) shall take precedence over the limits of 10CFR20. Such events include, but are not limited, a declared Alert, Site Area Emergency and  
3.8 DAEC DOSE GUIDANCE FOR EMERGENCIES (1) In the event of emergencies which threaten human life, equipment important for the safe operation of the plant, or large populations the guidance on dose limits contained in the Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (EPA Manual 400-R-92-00, dated Oct 91) shall take precedence over the limits of 10CFR20.
Such events include, but are not limited, a declared Alert, Site Area Emergency and General Emergencies.
(2) The radiation worker's year-to-date normal occupation dose will not impact the dose that an emergency worker can receive during the emergency.
(3) All exposures received during a declared emergency will be tracked separately from the normal occupational dose.
(4) After the emergency, the dose received during the emergency shall be added to the individuals occupational dose to determine availability for additional exposure.
(5) Although not Planned Special Exposure dose, dose received during an emergency shall be credited to an individuals Planned Special Exposure limit of 25 rem.
(6) During the recovery phase of an emergency, consideration shall be given to the use of the Planned Special Exposure.
4.0 RECORDS (1) The following are QA Records and shall be forwarded to Dosimetry when complete and reviewed. These records shall be maintained in accordance with ACP 115.1, Record Control. These records shall be microfilmed and retained for the life of the plant.
(a) NG-165K, Increased Administrative Dose Limit Request (b) Declaration of Pregnancy


General Emergencies. (2) The radiation worker's year-to-date normal occupation dose will not impact the dose that an emergency worker can receive during the emergency. (3) All exposures received during a declared emergency will be tracked separately from the normal occupational dose. (4) After the emergency, the dose received during the emergency shall be added to the individual's occupational dose to determine availability for additional exposure. (5) Although not Planned Special Exposure dose, dose received during an emergency shall be credited to an individual's Planned Special Exposure limit of 25 rem.  (6) During the recovery phase of an emergency, consideration shall be given to the use of the Planned Special Exposure.  
==5.0 REFERENCES==


==4.0 RECORDS==
(1) 10 CFR 20, Standards for Protection Against Radiation (2) INPO 91-014, Rev. 1, Guidelines for Radiological Protection at Nuclear Power Stations
(1) The following are QA Records and shall be forwarded to Dosimetry when complete and reviewed. These records shall be maintained in accordance with ACP 115.1, Record Control. These records shall be microfilmed and retained for the life of the plant. (a) NG-165K, Increased Administrative Dose Limit Request (b) Declaration of Pregnancy


==5.0  REFERENCES==
ADMINISTRATIVE CONTROL PROCEDURE                            ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES                              Rev. 22 Page 11 of 11 (3) Nuclear Regulatory Commission Regulatory Guide 8.13, Appendix A, Possible Health Risks of Women who are Exposed to Radiation During Pregnancy (4) NRC Information Notice IN 90-48, NRC Hot Particle Enforcement Policy (5) EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (6) AR 95-1935 (7) RP Manual Section A (8) 10CFR20 Policy and Implementation Cross Reference (9) NG-165K, Increased Administrative Dose Limit Request (10) AR 15148 (11) AR 18739 (12) NUREG/CR-6204, Questions and Answers Based on 10CFR20 Revision Dated 11/1/94, Question #142 (13) Corporate Directive 9.2, Radiation Dose Guidelines (14) CA039415 (15) FPL Nuclear Policy # NP-906, Administrative Radiation Exposure Limits and Prenatal Radiation Exposure Policy (16) CA50161, INPO 05-008


(1) 10 CFR 20, Standards for Protection Against Radiation (2) INPO 91-014, Rev. 1, Guidelines for Radiological Protection at Nuclear Power Stations ADMINISTRATIVE CONTROL PROCEDURE  ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 11 of 11 (3) Nuclear Regulatory Commission Regulatory Guide 8.13, Appendix A, Possible Health Risks of Women who are Exposed to Radiation During Pregnancy (4) NRC Information Notice IN 90-48, NRC Hot Particle Enforcement Policy (5) EPA-400-R-92-001, Manual of Protective Ac tion Guides and Protective Actions for Nuclear Incidents (6) AR 95-1935 (7) RP Manual Section A (8) 10CFR20 Policy and Implementation Cross Reference (9)  NG-165K, Increased Administrative Dose Limit Request (10) AR 15148 (11) AR 18739 (12) NUREG/CR-6204, Questions and Answers Based on 10CFR20 Revision Dated 11/1/94, Question #142 (13) Corporate Directive 9.2, "Radiation Dose Guidelines" (14) CA039415 (15) FPL Nuclear Policy # NP-906, "Administrative Radiation Exposure Limits and Prenatal Radiation Exposure Policy" (16) CA50161, INPO 05-008 NRC 2011 SRO ADMIN JPM EP.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM EP
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM EP NRC 2011 SRO ADMIN JPM EP.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 SRO ADMIN JPM EP.docx Page 2 of 12  JOB PERFORMANCE MEASURE (JPM)
JPM TITLE:                   EVENT CLASSIFICATION / RECLASSIFICATION JPM NUMBER:                 NRC 2011 SRO ADMIN           REV.       0 JPM EP TASK NUMBER(S) /
JPM TITLE:
TASK TITLE(S):
EVENT CLASSIFICATION / RECLASSIFICATION JPM NUMBER:
KNOWLEDGE OF THE K/A NUMBERS:                 2.4.29 (4.4)               K/A VALUE:
NRC 2011 SRO ADMIN JPM EP  REV. 0   TASK NUMBER(S) / TASK TITLE(S):
EMERGENCY PLAN Justification (FOR K/A VALUES <3.0):
K/A NUMBERS:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
2.4.29 (4.4)
Simulator:                     Other:
K/A VALUE:
Lab:                           Classroom               X Time for Completion:           30   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
KNOWLEDGE OF THE EMERGENCY PLAN Justification (FOR K/A VALUES <3.0):
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
TASK APPLICABILITY:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM EP.docx                    Page 2 of 12
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:   Classroom X   Time for Completion:
30 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No   Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 NRC 2011 SRO ADMIN JPM EP.docx Page 3 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS                                                                         YES NO   N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 1,301: Line 1,119:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?   13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
      / Time Critical) appropriately?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 13. Are all references identified, current, accurate, and available to the trainee?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
RE-VALIDATION SIGNATURE JPMs must be re
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 NRC 2011 SRO ADMIN JPM EP.docx Page 4 of 12 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Simulator Setup Instructions:
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
None SIMULATOR MALFUNCTIONS:
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
None SIMULATOR OVERRIDES:
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 SRO ADMIN JPM EP.docx                                Page 3 of 12
None SIMULATOR REMOTE FUNCTIONS:
 
None Required Materials:
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
: 1. EPIP 1.1, Determination of Emergency Action Levels
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       1. EPIP 1.1, Determination of Emergency Action Levels
: 2. EPIP 1.2, Notifications
: 2. EPIP 1.2, Notifications
: 3. Note 5, DAEC Emergency Action Level Notification Form General  
: 3. Note 5, DAEC Emergency Action Level Notification Form General  


==References:==
==References:==
EPIP 1.1, 1.2, DAEC Notification Form Task Standards:            The following critical tasks are for the SS1.1 declaration.
* Within 15 minutes of being handed the initial conditions, determine that the EAL is an SS1.1 Site Area Emergency.
* Candidate will circle [c] Site Area Emergency.
* Candidate will: Place an N/A in both the TIME and DATE blanks for the PAR change, Print S S 1.1 in the blanks for the EAL. and Circle S in the Category, circle S in the Classification, and circle 1.1 in the Sequence.
* Candidate will circle No and proceed to block 9.
* Candidate will write in 6 mph.
* Candidate will write in 45 degrees.
* Candidate will X the Site Area Emergency [C] box.
* When filled out, the candidate will sign within the 15 minutes from the declaration of the SS1.1, and then give the form to the Security Guard to perform the notifications.
NRC 2011 SRO ADMIN JPM EP.docx                      Page 4 of 12


EPIP 1.1, 1.2, DAEC Notification Form Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
The following critical tasks are for the SS1.1 declaration.
* You are the Shift Manager at DAEC. The STA is unavailable.
Within 15 minutes of being handed the initial conditions, determine that the EAL is an SS1.1 Site Area Emergency.
* The following conditions exist at DAEC, which had been operating at 100% power.
Candidate will circle [c] Site Area Emergency.
* Time 12:00
Candidate will:  Place an N/A in both the TIME and DATE blanks for the PAR change, Print  S  S  1.1 in the blanks for the EAL. and Circle  S  in the Category, circle  S  in the Classification, and circle 1.1 in the Sequence.
* A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
Candidate will circle No and proceed to block 9.
* The Emergency Diesels tripped immediately after starting and can NOT be re-started.
Candidate will write in 6 mph.
* The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours.
Candidate will write in 45 degrees.
* Drywell Pressure is 1.1 psig and slowly rising.
Candidate will X the Site Area Emergency [C] box.
* Reactor Level is normal
When filled out, the candidate will sign within the 15 minutes from the declaration of the SS1.1, and then give the form to the Security Guard to perform the notifications.
* The current Wind Speed is 6 MPH from 45 degrees INITIATING CUES (IF APPLICABLE):
 
Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note-05.
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP.docx Page 5 of 12 TURNOVER SHEET INITIAL CONDITIONS:
This is a time critical JPM.
You are the Shift Manager at DAEC. The STA is unavailable.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
The following conditions exist at DAEC, which had been operating at 100% power.
NRC 2011 SRO ADMIN JPM EP.docx                    Page 5 of 12
Time 12:00 A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
The Emergency Diesels tripped immediately after starting and can NOT be re
-started. The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours.
Drywell Pressure is 1.1 psig and slowly rising.
Reactor Level is normal The current Wind Speed is 6 MPH from 45 degrees INITIATING CUES (IF APPLICABLE):
Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note
-05. This is a time critical JPM.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP.docx Page 6 of 12 EVALUATOR TURNOVER SHEET (Read to Applicant)
QF-1030-11 Rev. 7 EVALUATOR TURNOVER SHEET (Read to Applicant)
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Shift Manager at DAEC. The STA is unavailable.
* You are the Shift Manager at DAEC. The STA is unavailable.
The following conditions exist at DAEC, which had been operating at 100% power.
* The following conditions exist at DAEC, which had been operating at 100% power.
Time 12:00 A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
* Time 12:00
The Emergency Diesels tripped immediately after starting and can NOT be re
* A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
-started. The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours.
* The Emergency Diesels tripped immediately after starting and can NOT be re-started.
Drywell Pressure is 1.1 psig and slowly rising.
* The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours.
Reactor Level is normal The current Wind Speed is 6 MPH from 45 degrees   INITIATING CUES (IF APPLICABLE):
* Drywell Pressure is 1.1 psig and slowly rising.
Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note
* Reactor Level is normal
-05. This is a time critical JPM.
* The current Wind Speed is 6 MPH from 45 degrees INITIATING CUES (IF APPLICABLE):
Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note-05.
This is a time critical JPM.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
{C002}
NRC 2011 SRO ADMIN JPM EP.docx                          Page 6 of 12


NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
QF-1030-11 Rev. 7 Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY INITIAL CONDITIONS:
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP.docx Page 7 of 12 Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY   INITIAL CONDITIONS:
: 1. Standby Diesel Generator A (1G-31) has been restored
: 1. Standby Diesel Generator A (1G
-31) has been restored
: 2. Reactor Level is normal
: 2. Reactor Level is normal
: 3. Drywell Pressure is 1.1 psig and stable.
: 3. Drywell Pressure is 1.1 psig and stable.
Line 1,367: Line 1,190:
Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.
Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.
This is time critical.
This is time critical.
NRC 2011 SRO ADMIN JPM EP.docx                  Page 7 of 12


NRC 2011 SRO ADMIN JPM EP.docx Page 8 of 12 EVALUATOR TURNOVER SHEET (Read to Applicant)
EVALUATOR TURNOVER SHEET (Read to Applicant)
Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY   INITIAL CONDITIONS:
Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY INITIAL CONDITIONS:
: 1. Standby Diesel Generator A (1G
: 1. Standby Diesel Generator A (1G-31) has been restored
-31) has been restored
: 2. Reactor Level is normal
: 2. Reactor Level is normal
: 3. Drywell Pressure is 1.1 psig and stable.
: 3. Drywell Pressure is 1.1 psig and stable.
Line 1,378: Line 1,201:
Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.
Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.
This is time critical.
This is time critical.
NRC 2011 SRO ADMIN JPM EP.docx                  Page 8 of 12


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 NRC 2011 SRO ADMIN JPM EP.docx Page 9 of 12  JPM PERFORMANCE INFORMATION Start Time:
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step:             Reviews the given conditions and determines that a Site Area Emergency Critical Y (SEQ-)            declaration is required per EPIP 1.1.
Critical  Y (SEQ-) Reviews the given conditions and determines that a Site Area Emergency declaration is required per EPIP 1.1.
Standard:                     Declares a Site Area Emergency within fifteen minutes of the JPM start Evaluator Note:               The 15 minute clock will not start until the applicant states they understand the task conditions. No procedures can be referenced prior to the clock starting.
Standard: Declares a Site Area Emergency within fifteen minutes of the JPM start Evaluator Note:
The 15 minute clock will not start until the applicant states they understand the task conditions. No procedures can be referenced prior to the clock starting.
15 Minute Clock Start Time_______.
15 Minute Clock Start Time_______.
Time of Declaration ____________ .
Time of Declaration ____________ .
Performance:
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 SRO ADMIN JPM EP.docx                    Page 9 of 12
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 NRC 2011 SRO ADMIN JPM EP.docx Page 10 of 12 Performance Step:
 
Critical  Y (SEQ-) Within additional 14 minutes (allows for transmission time) Provides Notification Form Standard: Fills out the Notification Form correctly Evaluator Note:
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 Performance Step:         Within additional 14 minutes (allows for transmission time) Provides Critical Y (SEQ-)        Notification Form Standard:                 Fills out the Notification Form correctly Evaluator Note:           The 14 minute standard allows for transmission time of the form.
The 14 minute standard allows for transmission time of the form.
Time Notification Form is provided _________.
Time Notification Form is provided _________.
Note Completed in highlighted areas in Key below Step #9 should state 6 M/Hr, Step #10 Should state From 45 degrees Evaluator Cue:
Note Completed in highlighted areas in Key below Step #9 should state 6 M/Hr, Step #10 Should state From 45 degrees Evaluator Cue:           Inform candidate that you will act as Security, and transmit the form when complete.
Inform candidate that you will act as Security, and transmit the form when complete. Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     EVALUATOR PROMPT: Once the filled in paperwork is handed to Security for transmittal, provide the applicant with Handout #2 and have them re
EVALUATOR PROMPT: Once the filled in paperwork is handed to Security for transmittal, provide the applicant with Handout #2 and have them re-evaluate the event NOTE: This is also Time Critical.
-evaluate the event NOTE: This is also Time Critical.
Performance Step:         Reviews the given conditions and determines that a General Emergency Critical Y (SEQ-)        declaration is required per EAL HG1.1.
Performance Step:
Standard:                 Declares General Emergency within 15 minutes IAW EAL HG1.1.
Critical Y (SEQ-) Reviews the given conditions and determines that a General Emergency declaration is required per EAL HG1.1.
Standard: Declares General Emergency within 15 minutes IAW EAL HG1.1.
Evaluator Note:
Evaluator Note:
15 Minute Clock Start Time_______.
15 Minute Clock Start Time_______.
Time of Declaration ____________ .
Time of Declaration ____________ .
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  
Stop Time:
NRC 2011 SRO ADMIN JPM EP.docx                  Page 10 of 12


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 NRC 2011 SRO ADMIN JPM EP.docx Page 11 of 12   KEY - DO NOT HANDOUT
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 KEY - DO NOT HANDOUT NRC 2011 SRO ADMIN JPM EP.docx         Page 11 of 12


QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP.docx Page 12 of 12 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 Examinee: Evaluator:
QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 Examinee:                                           Evaluator:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
RO     SRO     STA     NSPEO       SRO CERT               Date:
SAT: UNSAT:   Remediation required:
ILT RO         ILT SRO PERFORMANCE RESULTS:                     SAT:                         UNSAT:
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Remediation required:         YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 SRO ADMIN JPM EP.docx                Page 12 of 12


DAEC EMERGENCY RESPONSE ORGANIZATION NOTE-05 DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM Signature Page NOTE-05  Rev. 14 Approved for
DAEC EMERGENCY RESPONSE ORGANIZATION NOTE-05 DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM Signature Page Approved for Point-of-Use printing IF NO Temporary Changes are in effect for this procedure.
'Point-of-Use' printing IF NO Temporary Changes are in effect for this procedure.
Record the following: Date / Time: _____________ / _________ Initials: ____
Record the following: Date / Time: _____________ / _________ Initials: ____
NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours if active document use exceeds a 24 hour period as determined from the date and time recorded above.
NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours if active document use exceeds a 24 hour period as determined from the date and time recorded above.
Prepared By:
Prepared By:                               /                                           Date:
  / Date:   Print Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)
Print                             Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)
Reviewed By:
Reviewed By:                                 /                                           Date:
  / Date:   Print Signature   Reviewed By:
Print                             Signature Reviewed By:                                 /                                           Date:
  / Date:   Print Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By  
Print                             Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By                                 /                                           Date:
  / Date:   Print Signature This EPIP Form requires a 50.54q Review for any non-editorial change(s).
Print                             Signature This EPIP Form requires a 50.54q Review for any non-editorial change(s).
NOTE-05                                                                                      Rev. 14


NOTE-05 Page 1 of 3 Rev. 14 DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM INITIAL ROLL CALL  Benton County  Linn County  Iowa HSEMD MESSAGE INITIATED Time: __________
DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM MESSAGE                   1. FACILITY IN COMMAND &                     2. STATUS                      3. ACCIDENT CLASSIFICATION INITIAL                                                          CONTROL                                                               [A] UNUSUAL EVENT INITIATED ROLL CALL                                                    [A] Control Room..2222                     [A] ACTUAL                      [B] ALERT Benton County              Time: __________
Date: __________
[C] SITE AREA EMERGENCY
: 1. FACILITY IN COMMAND & CONTROL [A] Control Room-..2222 [B] TSC---.-.....3333  
[B] TSC......3333 Linn County                                                                                                                            [D] GENERAL EMERGENCY
[C] EOF-----..4444  
[C] EOF..4444                         [B] DRILL (or from Date: __________                                                                SIMULATOR)                  [E] RECOVERY Iowa HSEMD
: 2. STATUS [A] ACTUAL [B] DRILL (or from SIMULATOR)
[F] CANCELLATION/TERMINATION (If this notification is for a PAR change ONLY, write N/A for information in Block 4.)
: 3. ACCIDENT CLASSIFICATION
: 4.      PAR CHANGE ONLY                                            EAL CLASSIFIED @ TIME: _________ DATE:__________
[A] UNUSUAL EVENT [B] ALERT [C] SITE AREA EMERGENCY [D] GENERAL EMERGENCY
(For EAL CLASSIFIED, fill in blank below AND circle appropriate letter or number applicable under Category, Classification and Sequence. For EALs with multiple initiating conditions, specify in Block 12 which initiating condition is applicable.)
EAL _____ _____ _____ . _____
Category                        Classification                                                              Sequence #
R      F H          S      E C          U A            S G            1 2 3 4 5 6 7 8 . 0 1 2                                                 3    4    5 6          7      8    9
: 5. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT?                                              (e.g. KAMAN Hi Alarm or field team reports)
Has Not Occurred (Proceed To Block 9)                  Has Occurred, Is Now Terminated (Proceed To Block 6)                  Is Occurring (Proceed To Block 6)
: 6. AIRBORNE RELEASE TO ENVIRONMENT                                        7. TYPE OF RELEASE (mark all that apply)                      8. PROJECTED DURATION OF RELEASE:
[A] BELOW FEDERAL LIMITS                                                  [A] RADIOACTIVE AIRBORNE (FILTERED)                            [A] UNKNOWN (4 hour default)
(No KAMAN Hi-Hi alarm)
[B] RADIOACTIVE AIRBORNE (UNFILTERED)
[B] AT, OR ABOVE, FEDERAL LIMITS                                                                                                        [B] 1 HOUR OR LESS (KAMAN Hi-Hi alarm)                                                  [C] RADIOACTIVE LIQUID
[C] RELEASE DURATION ____ hour(s)
: 9. WIND SPEED:            _______ MILES/HR (50m value preferred)                          10. WIND DIRECTION : FROM ______ DEGREES (50m value preferred)
: 11. UTILITY PROTECTIVE ACTION RECOMMENDATIONS (If this notification is for a PAR change ONLY, note time & date. Otherwise write N/A in TIME and DATE in Block 11.)
PAR DETERMINATION @ TIME: _________ DATE:__________
Unusual Event                                                  Alert                                  Site Area Emergency
[A]   No actions recommended                                  [B]   No actions                      [C]   Activate the Prompt Alert and Notification System.
recommended General Emergency (From EPIP 3.3)
[D] Default, or Dose projections  1 REM TEDE                    [E] Dose projections  1 REM TEDE or 5                      [F]    Dose projections  1 REM TEDE or 5 or 5 REM CDE @ 0-2 miles from site                                REM CDE @ 2-5 miles from site                                REM CDE @ 5-10 miles from site boundary.                                                          boundary.                                                    boundary.
Evacuate, (or shelter if release duration is                      Evacuate, (or shelter if release duration is 1-hour or      Evacuate, (or shelter if release duration is 1-hour or 1-hour or less), within a 2 mile radius and to                    less), within a 2 mile radius and to 5 miles in the        less), within a 2 mile radius, evacuate, (or shelter if 5 miles in the downwind subareas.                                  downwind subareas, and shelter downwind                    release duration is 1-hour or less), from 2 miles to EPZ AND                                    subareas from 5 miles to EPZ edge.                          edge in downwind subareas, and shelter as appropriate Activate the Prompt Alert and Notification System.                                          AND                                beyond EPZ edge.
Activate the Prompt Alert and Notification System.                                    AND Activate the Prompt Alert and Notification System.
: 12. ADDITIONAL INFORMATION :
: 13. APPROVED BY: _____________________________________________                                (TIME) ___________ (DATE) ___________
(OSM, EC, or ER&RD)
MESSAGE TRANSMITTED BY:                                                                  FINAL ROLL CALL (Agency Reps INITIALS)
Name: ________________________ Time: __________                                                        Benton: ______ Linn: ______ Iowa HSEMD: ______
: 14. STATE PROTECTIVE ACTIONS                          0-2 m            2-5 m                                  5-10 m                              10-EPZ Shelter Subareas (circle appropriate subareas)          1      2, 3, 4, 5, 6, 7, 8        9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22      23,24 Evacuate Subareas (circle appropriate subareas)        1      2, 3, 4, 5, 6, 7, 8        9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22      23,24 Fax page 1 of this form to the State & Counties immediately after Final Roll Call.
NOTE-05                                                            Page 1 of 3                                                                          Rev. 14


[E] RECOVERY [F] CANCELLATION/TERMINATION (If this notification is for a PAR change ONLY, write "N/A" for information in Block 4.) 4. PAR CHANGE ONLY  EAL CLASSIFIED
INSTRUCTIONS FOR USE Items 2, 3, 4, 5, 9, 10 & 11 MUST be accurate- The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.
  @  TIME: _________  DATE:__________
: 1. FACILITY IN COMMAND & CONTROL - Select the appropriate box, phone numbers are microwave line numbers for the listed facility.
(For "EAL CLASSIFIED", fill in blank below AND circle appropriate letter or number applicable under Category , Classification and Sequence. For EALs with multiple initiating conditions, specify in Block 12 which initiating condition is applicable.)
a) Select box "A" if the Control Room is in Command & Control.
E E A A L L _____  _____  _____ . _____ Category  Classification Sequence #
b) Select box "B" if the TSC is in Command & Control.
R F H S E C U A S G 1 2345678.012 3 4 567 8 95. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT? (e.g. KAMAN Hi Alarm or field team reports)
c) Select box "C" if the EOF is in Command & Control.
Has Not Occurred (Proceed To Block 9)    Has Occurred, Is Now Terminated (Proceed To Block 6)    Is Occurring (Proceed To Block 6)
: 2. STATUS a) Select box "A" for an ACTUAL event.
: 6. AIRBORNE RELEASE TO ENVIRONMENT
b) Select box "B" "DRILL" for ALL Drills, Exercises, Table Tops, and Training Sessions.
[A] BELOW FEDERAL LIMITS (No KAMAN Hi-Hi alarm) [B] AT, OR ABOVE, FEDERAL LIMITS (KAMAN Hi-Hi alarm
: 3. ACCIDENT CLASSIFICATION - Select the letter corresponding to the latest classification issued by the ERO facility in command and control.
) 7. TYPE OF RELEASE (mark all that apply)
a)   Select box "A" for an Unusual Event classification.
[A] RADIOACTIVE AIRBORNE (FILTERED) [B] RADIOACTIVE AIRBORNE (UNFILTERED) [C] RADIOACTIVE LIQUID
b)   Select box "B" for an Alert classification.
: 8. PROJECTED DURATION OF RELEASE:
c)   Select box "C" for a Site Area Emergency classification.
[A] UNKNOWN (4 hour default) [B] 1 HOUR OR LESS  [C] RELEASE DURATION ____ hour(s)
d)   Select box "D" for a General Emergency classification.
: 9. WIND SPEED:    _______ MILES/HR (50m value preferred)
e)   Select box "E" for a Recovery classification.
: 10. WIND DIRECTION :
f)   Select box "F" for a Cancellation or Termination classification.
FROM ______
: 4. EAL CLASSIFIED a) IF this Notification is for a PAR CHANGE ONLY, check the "PAR CHANGE ONLY" checkbox, write "N/A" in the "Time" and "Date" blanks, and proceed to Block 5.
DEGREES (50m value preferred)
b) For All other notifications:
: 11. UTILITY PROTECTIVE ACTION RECOMMENDATIONS (If this notification is for a PAR change ONLY, note time & date. Otherwise write 'N/A' in 'TIME' and 'DATE' in Block 11.)        PAR DETERMINATION
  @  TIME: _________  DATE:__________
Unusual Event Alert Site Area Emergency
  [A]  No actions recommended
  [B]  No actions recommended
  [C]  Activate the Prompt Alert and Notification System. General Emergency (From EPIP 3.3)
  [D] Default, or Dose projections  1 REM TEDE or 5 REM CDE @ 0-2 miles from site boundary.  [E] Dose projections  1 REM TEDE or 5 REM CDE @ 2-5 miles from site boundary.  [F] Dose projections  1 REM TEDE or 5 REM CDE  @ 5-10 miles from site boundary. Evacuate, (or shelter if release duration is 1-hour or less), within a 2 mile radius and to 5 miles in the downwind subareas.
AND Activate the Prompt Alert and Notification System. Evacuate, (or shelter if release duration is 1-hour or less), within a 2 mile radius and to 5 miles in the downwind subareas, and shelter downwind subareas from 5 miles to EPZ edge.
AND Activate the Prompt Alert and Notification System. Evacuate, (or shelter if release duration is 1-hour or less), within a 2 mile radius, evacuate, (or shelter if release duration is 1-hour or less), from 2 miles to EPZ edge in downwind subareas, and shelter as appropriate beyond EPZ edge.
AND Activate the Prompt Alert and Notification System. 12. ADDITIONAL INFORMATION :
: 13. APPROVED BY: _____________________________________________      (TIME)  ___________  (DATE)  ___________
(OSM, EC, or ER&RD)
MESSAGE TRANSMITTED BY:
FINAL ROLL CALL (Agency Reps INITIALS) Name: ________________________ Time: __________ Benton: ______ Linn: ______ Iowa HSEMD: ______ 14. STATE PROTECTIVE ACTIONS        0-2 m                2-5 m                                                5-10 m                                            10-EPZ Shelter Subareas (circle appropriate subareas)            1          2,  3,  4,  5,  6,  7,  8        9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22        23,24 Evacuate Subareas (circle appropriate subareas)          1          2,  3,  4,  5,  6,  7,  8        9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22        23,24 Fax page 1 of this form to the State & Counties immediately after Final Roll Call.
NOTE-05 Page 2 of 3 Rev. 14 INSTRUCTIONS FOR USE Items 2, 3, 4, 5, 9, 10 & 11 MUST be accurate
- The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.
: 1. FACILITY IN COMMAND & CONTROL
- Select the appropriate box, phone numbers are microwave line numbers for the listed facility.
a) Select box " A" if the Control Room is in Command & Control.
b) Select box " B" if the TSC is in Command & Control. c) Select box " C" if the EOF is in Command & Control.  
: 2. STAT U S a) Select box " A" for an ACTUAL event. b) Select box " B" " DRILL" for ALL Drills, Exercises, Table Tops, and Training Sessions.  
: 3. ACCIDENT CLASSIFICATION
- Select the letter corresponding to the latest classification issued by the ERO facility in command and control.
a) Select box " A" for an Unusual Event classification.
b) Select box " B" for an Alert classification. c) Select box " C" for a Site Area Emergency classification.
d) Select box " D" for a General Emergency classification.
e) Select box " E" for a Recovery classification.
f) Select box " F" for a Cancellation or Termination classification.  
: 4. EAL CLASSIFIED a) IF this Notification is for a PAR CHANGE ONLY, check the "PAR CHANGE ONLY" checkbox, write "N/A" in the "Time" and "Date" blanks, and proceed to Block 5. b) For All other notifications:  
: i. Write in the TIME that the EAL declaration was made.
: i. Write in the TIME that the EAL declaration was made.
ii. Write in the DATE of the event.
ii. Write in the DATE of the event.
iii. On the lines provided, write the Alpha-numeric code of the EAL, (e.g. HA2.1).
iii. On the lines provided, write the Alpha-numeric code of the EAL, (e.g. HA2.1).
iv. Circle the corresponding digits for category, classification and sequence #. For Fission Product Barrier Table EALs, a zero may be added (e.g. FG1.0)  
iv. Circle the corresponding digits for category, classification and sequence #. For Fission Product Barrier Table EALs, a zero may be added (e.g. FG1.0)
: 5. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT?
: 5. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT? - select the appropriate checkbox and proceed as directed. NOTE: a KAMAN Hi alarm is indicative of abnormal release rates.
- select the appropriate checkbox and proceed as directed. NOTE: a KAMAN Hi alarm is indicative of abnormal release rates.
a) IF no KAMAN Hi alarms have occurred, select "Has Not Occurred" and proceed to Block 9.
a) IF no KAMAN Hi alarms have occurred, select "Has Not Occurred" and proceed to Block 9. b) IF a KAMAN Hi alarm has been received as a result of the event, but the release is now terminated, select "Has Occurred, is Now Terminated" and proceed to Block 6. c) IF a KAMAN Hi alarm has been reached as a result of the event, and is still in alarm , and the release is not isolated , select " Is Occurring" and proceed to Block 6. 6. AIRBORNE RELEASE TO ENVIRONMENT a) Select box " A" if there is no KAMAN Hi-HI alarm. b) Select box " B" if there IS one or more KAMAN Hi-HI alarms. 7. TYPE OF RELEASE
b) IF a KAMAN Hi alarm has been received as a result of the event, but the release is now terminated, select "Has Occurred, is Now Terminated" and proceed to Block 6.
- Mark ALL that apply:
c) IF a KAMAN Hi alarm has been reached as a result of the event, and is still in alarm, and the release is not isolated, select "Is Occurring" and proceed to Block 6.
a) Select box " A" "RADIOACTIVE AIRBORNE (FILTERED)" for any release flowpath through any operable Standby Gas Treatment train or through the Offgas System adsorbers to the OFFGAS STACK. This release is monitored by the Offgas stack KAMAN monitor.
: 6. AIRBORNE RELEASE TO ENVIRONMENT a) Select box "A" if there is no KAMAN Hi-HI alarm.
b) Select box " B" "RADIOACTIVE AIRBORNE (UNFILTERED)" for ANY OTHER airborne release path. This release path may be monitored by the Reactor/Turbine Building KAMAN monitors OR may be an unmonitored release. c) Select box " C" for a"RADI0ACTIVE LIQUID" release. Contact the Site Rad Protection Coordinator for additional information and support.
b) Select box "B" if there IS one or more KAMAN Hi-HI alarms.
: 7. TYPE OF RELEASE - Mark ALL that apply:
a) Select box "A" "RADIOACTIVE AIRBORNE (FILTERED)" for any release flowpath through any operable Standby Gas Treatment train or through the Offgas System adsorbers to the OFFGAS STACK. This release is monitored by the Offgas stack KAMAN monitor.
b) Select box "B" "RADIOACTIVE AIRBORNE (UNFILTERED)" for ANY OTHER airborne release path. This release path may be monitored by the Reactor/Turbine Building KAMAN monitors OR may be an unmonitored release.
c) Select box "C" for a"RADI0ACTIVE LIQUID" release. Contact the Site Rad Protection Coordinator for additional information and support.
d) IF a release has multiple paths to the environment, mark ALL that apply.
d) IF a release has multiple paths to the environment, mark ALL that apply.
NOTE-05 Page 3 of 3 Rev. 14 INSTRUCTIONS FOR USE (CONTINUED)  
NOTE-05                                           Page 2 of 3                                                   Rev. 14
: 8. PROJECTED DURATION OF RELEASE a) Select box " A" if the duration of release is unknown. This should be the default unless the release duration can be determined with certainty.
 
b) Select box " B" if the duration is/was 1 hour or less. i. IF the duration of release is one hour or less, note the effect it has on the PAR determination when at a General Emergency. c) Select box " C" if the duration of release is known, and write in the duration in the space provided.  
INSTRUCTIONS FOR USE (CONTINUED)
: 9. WIND SPEED - Fill in the wind speed in miles per hour. The preferred value is the 50 meter value. If the 50 meter value is unavailable, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357. 10. WIND DIRECTION
: 8. PROJECTED DURATION OF RELEASE a) Select box "A" if the duration of release is unknown. This should be the default unless the release duration can be determined with certainty.
- Write in the wind direction in degrees, from the direction of origin. The preferred value is the 50 meter value. If the 50 meter value is not available, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357. 11. PROTECTIVE ACTION RECOMMENDATION
b) Select box "B" if the duration is/was 1 hour or less.
- Refer to EPIP 3.3 for guidance on Protective Action decision-making.
: i. IF the duration of release is one hour or less, note the effect it has on the PAR determination when at a General Emergency.
c) Select box "C" if the duration of release is known, and write in the duration in the space provided.
: 9. WIND SPEED - Fill in the wind speed in miles per hour. The preferred value is the 50 meter value. If the 50 meter value is unavailable, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357.
: 10. WIND DIRECTION - Write in the wind direction in degrees, from the direction of origin. The preferred value is the 50 meter value. If the 50 meter value is not available, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357.
: 11. PROTECTIVE ACTION RECOMMENDATION - Refer to EPIP 3.3 for guidance on Protective Action decision-making.
a) IF this notification is for a PAR change ONLY, write in the TIME and DATE of the new PAR Determination in the blanks provided, otherwise write "N/A" in these blanks.
a) IF this notification is for a PAR change ONLY, write in the TIME and DATE of the new PAR Determination in the blanks provided, otherwise write "N/A" in these blanks.
b) Select the appropriate checkbox for the curren t recommendation. 12. ADDITIONAL INFORMATION
b) Select the appropriate checkbox for the current recommendation.
- Include information when:
: 12. ADDITIONAL INFORMATION - Include information when:
a) A wind shift results in additional downwind subareas (see EPIP 3.3 Att. 2).
a)   A wind shift results in additional downwind subareas (see EPIP 3.3 Att. 2).
b) Corrections to current State/County notifications are made. c) Clarification of entry conditions for EALs with multiple initiating conditions is needed.
b)   Corrections to current State/County notifications are made.
d) Other information is needed by the State and/or Counties. 13. APPROVED BY
c)   Clarification of entry conditions for EALs with multiple initiating conditions is needed.
- Authorizing signature of OSM, Emergency Coordinator, or ER&RD. INITIAL ROLL CALL - Dial 9999 (#### to stop the ringing) and mark appropriate box for the applicable agency as they answer the initial roll call. MESSAGE INITIATED - Document the time and date you get at least one agency on the phone. Read Items 1-13 on Notification Message Above - Read message from Item 1 through to Item 13, (For example, "One, bravo, drill. Two, delta, simulator-" etc. MESSAGE TRANSMITTED BY
d)   Other information is needed by the State and/or Counties.
- Applicable Communicator writes in their name and time message completed. FINAL ROLL CALL
: 13. APPROVED BY - Authorizing signature of OSM, Emergency Coordinator, or ER&RD.
- Enter initials of agency representatives receiving this notification. FAX - Fax page 1 of this form to the State & Counties. Fax to Benton County, Linn County, and the Iowa Homeland Security and Emergency Management Division (HS-EMD) to confirm the notification. In the Control Room and TSC, push button "01" for working hour distribution and button "02" for off hour and weekend distribution. If the fax is not operable, confirmation will be made via microwave, commercial phone, or point-to-point radio.
INITIAL ROLL CALL - Dial 9999 (#### to stop the ringing) and mark appropriate box for the applicable agency as they answer the initial roll call.
: 14. STATE PROTECTIVE ACTIONS
MESSAGE INITIATED - Document the time and date you get at least one agency on the phone.
- IF AVAILABLE, circle subareas the STATE has chosen to shelter or evacuate. If not available, leave this section blank.
Read Items 1-13 on Notification Message Above - Read message from Item 1 through to Item 13, (For example, One, bravo, drill. Two, delta, simulator etc.
NRC 2011 JPM S
MESSAGE TRANSMITTED BY - Applicable Communicator writes in their name and time message completed.
-1 rev 5-7.docx  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
FINAL ROLL CALL - Enter initials of agency representatives receiving this notification.
FAX - Fax page 1 of this form to the State & Counties. Fax to Benton County, Linn County, and the Iowa Homeland Security and Emergency Management Division (HS-EMD) to confirm the notification. In the Control Room and TSC, push button 01 for working hour distribution and button 02 for off hour and weekend distribution. If the fax is not operable, confirmation will be made via microwave, commercial phone, or point-to-point radio.
: 14. STATE PROTECTIVE ACTIONS - IF AVAILABLE, circle subareas the STATE has chosen to shelter or evacuate. If not available, leave this section blank.
NOTE-05                                          Page 3 of 3                                                      Rev. 14


2011 NRC JPM S
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-1 NRC 2011 JPM S-1 rev 5-7.docx
-1


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   PERFORM REQUIRED ACTIONS FOR RESETTING A RECIRC MG SCOOP TUBE LOCKOUT JPM NUMBER:                 NRC 2011 JPM S-1             REV.       2 TASK NUMBER(S) /             12.11 TASK TITLE(S):               RESET SCOOP TUBE LOCKUP K/A NUMBERS:                 202002                     K/A VALUE:       A2.05 3.1/3.1 Justification (FOR K/A VALUES <3.0):
-1 rev 5-7.docx Page 1 of 15  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
PERFORM REQUIRED ACTIONS FOR RESETTING A RECIRC MG SCOOP TUBE LOCKOUT JPM NUMBER:
Simulator:             X       Other:
NRC 2011 JPM S
Lab:
-1 REV. 2   TASK NUMBER(S) / TASK TITLE(S):
Time for Completion:           30   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
12.11 RESET SCOOP TUBE LOCKUP K/A NUMBERS:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
202002 K/A VALUE:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-1 rev 5-7.docx                    Page 1 of 15
A2.05 3.1/3.1   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
30 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
REVIEW STATEMENTS                                                                         YES NO   N/A
-1 rev 5-7.docx Page 2 of 15 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
: 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 1,553: Line 1,367:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
RE-VALIDATION SIGNATURE JPMs must be re
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 JPM S
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 JPM S-1 rev 5-7.docx                                Page 2 of 15
-1 rev 5-7.docx Page 3 of 15  SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
: 1. Reset to 100% power (IC 20 preferred.)
: 1. Reset to 100% power (IC 20 preferred.)
: 2. Go to RUN.
: 2. Go to RUN.
: 3. Lock BOTH Recirc MG Scoop Tubes.
: 3. Lock BOTH Recirc MG Scoop Tubes.
: 3. Verify Master Feedwater Level Controller in AUTO, set at 190.6.
: 3. Verify Master Feedwater Level Controller in AUTO, set at 190.6.
: 4. Push the recorder reset PB in the back of 1C05 to erase recorder data.
: 4. Push the recorder reset PB in the back of 1C05 to erase recorder data.
SIMULATOR MALFUNCTIONS:
SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       OI 264 General  
None SIMULATOR OVERRIDES:
None SIMULATOR REMOTE FUNCTIONS:
None   Required Materials:
OI 264 General  


==References:==
==References:==
OI 264 ARP 1C04A (C-5)
Task Standards:            Both Scoop Tube Lockouts Reset NRC 2011 JPM S-1 rev 5-7.docx                Page 3 of 15


OI 264 ARP 1C04A (C
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-5) Task Standards:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
Both Scoop Tube Lockouts Reset
* Reactor power is at approximately 100%.
* Both Recirc MG set scoop tubes were manually locked up for I & C testing of the controllers.
* The testing is complete.
INITIATING CUES (IF APPLICABLE):
* The CRS directs you to reset both scoop tube lockouts starting with the A Recirc MG set, IAW OI 264, Section 10.2 (1).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-1 rev 5-7.docx                      Page 4 of 15


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-1 rev 5-7.docx Page 4 of 15 TURNOVER SHEET INITIAL CONDITIONS:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
Reactor power is at approximately 100%.
* Reactor power is at approximately 100%.
Both Recirc MG set scoop tubes were manually locked up for I & C testing of the controllers.
* Both Recirc MG set scoop tubes were manually locked up for I & C testing of the controllers.
The testing is complete. INITIATING CUES (IF APPLICABLE):
* The testing is complete.
The CRS directs you to reset both scoop tube lockouts starting with the "A" Recirc MG set, IAW OI 264, Section 10.2 (1)
INITIATING CUES (IF APPLICABLE):
.
* The CRS directs you to reset both scoop tube lockouts starting with the A Recirc MG set, IAW OI 264, Section 10.2 (1).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-1 rev 5-7.docx                          Page 5 of 15


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 JPM PERFORMANCE INFORMATION Start Time:
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-1 rev 5-7.docx Page 5 o f 15  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
NOTE: Critical steps are shaded GREY and marked with a Y below the performance step number.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Failure to meet the standard for any critical step shall result in failure of this JPM.
Begins in OI 264, Section 10.2 (1) for the A Scoop Tube Performance Step: 1          NOTE Critical N                    Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.
During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C-8, [1C08A B-8]) inverter overload alarm may be received.
CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.
Standard:                    Reviews Note & Caution.
Performance:                  SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 2          If A Recirc MG is running with either a 20% or 45% runback in effect, then Critical N                    perform ARP 1C04A, D-2 prior to resetting the Scoop Tube Lockout.
Standard:                    Determine that there are no runbacks in effect.
Performance:                  SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-1 rev 5-7.docx                    Page 6 of 15


DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 3      If a DEV ALRM is flashing on SIC9245A, clear the DEV ALRM by performing Critical N                the following, otherwise N/A:
Standard:                Determines that the step is N/A. Continues at procedure step 10.2 (3).
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 4      If A Recirc MG is running, reset the Scoop Tube as follows:
Critical N NOTE:
For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr. (Reference Appendix B in STP 3.4.1-02).
Verify Scoop Tube Position P-%.
Standard:                Reviews Note and verifies Scoop Tube Position P-% by depressing the D button on the controller.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 5      Adjust setpoint S-% to approximately match Scoop Tube Position P-%.
Critical Y Standard:                Depresses D button on controller until setpoint S is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-1 rev 5-7.docx                Page 7 of 15


INITIAL CONDITIONS:
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 6      Verify controller output V-% approximately matches Scoop Tube Position P-%.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
Critical N Standard:                Verifies V approximately matches P.
Reactor power is at approximately 100%.
NOTE: This cannot be adjusted on the controller.
Both Recirc MG set scoop tubes were manually locked up for I
Evaluator Note:          The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if approximate is met.
& C testing of the controllers.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
The testing is complete.
Performance Step: 7      At 1C04, reset scoop tube lock by momentarily placing handswitch Critical Y                B31A-S3A to RESET and then verify the following:
* Annunciator 1C04A, C-5, "A RECIRC MG SCOOP TUBE LOCK" resets.
Amber SCOOP TUBE LOCKED light located at 1C04 (above A Scoop Tube Control handswitch B31A-S3A) is OFF.
Standard:                Momentarily places handswitch B31A-S3A to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04A, C-5 is OFF Performance:              SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-1 rev 5-7.docx                  Page 8 of 15


INITIATING CUES (IF APPLICABLE):
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 8      Verify that the Recirc pump speed is stable by observing the following Critical N                parameters:
The CRS directs you to reset both scoop tube lockouts starting with the "A" Recirc MG set, IAW OI 264, Section 10.2 (1)
Standard:                The operator identifies that the following indications are stable by one or more of the following:
. NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* SETPOINT (S)
* Percent Position (P)
* Percent Speed (X)
* Recirc pump discharge flow
* Total core flow
* Core pressure drop
* APRM readings Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 9      Verify that SETPOINT (S) is selected for digital display.
Critical N Standard:                Verifies that SETPOINT (S) is selected for digital display.
Evaluator Cue:            If the Candidate asks to adjust power, cue the Candidate to maintain power steady and continue with unlocking the B Scoop Tube.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NOTE: The applicant has reset the A Scoop Tube and now returns to step 10.2 (1) for the B Scoop Tube reset NRC 2011 JPM S-1 rev 5-7.docx                Page 9 of 15


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 10      NOTE:
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
Critical N               Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.
-1 rev 5-7.docx Page 6 o f 15  JPM PERFORMANCE INFORMATION Start Time:
During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C-8, [1C08A B-8]) inverter overload alarm may be received.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.
NOTE: Critical steps are shaded GREY and marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Standard:                 Reviews Note & Caution.
Begins in OI 264, Section 10.2 (1) for the A Scoop Tube Performance Step:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
1 Critical   N NOTE Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.
Performance Step: 11      If B Recirc MG is running with either a 20% or 45% runback in effect, then Critical N                perform ARP 1C04A, D-8 prior to resetting the Scoop Tube Lockout.
During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C
Standard:                 Determine that there are no runbacks in effect.
-8, [1C08A B
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-8]) inverter overload alarm may be received. CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.
Performance Step: 12      If a DEV ALRM is flashing on SIC9245B, clear the DEV ALRM by performing Critical N                the following, otherwise N/A:
Standard: Reviews Note & Caution.
Standard:                 Determines that the step is N/A. Continues at procedure step 10.2 (3).
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 2 Critical N  If "A" Recirc MG is running with either a 20% or 45% runback in effect, then perform ARP 1C04A, D-2 prior to resetting the Scoop Tube Lockout.
NRC 2011 JPM S-1 rev 5-7.docx                 Page 10 of 15
Standard: Determine that there are no runbacks in effect.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 7 o f 15  Performance Step:
3 Critical N  If a DEV ALRM is flashing on SIC9245A, clear the DEV ALRM by performing the following, otherwise N/A:
Standard: Determines that the step is N/A. Continues at procedure step 10.2 (3).
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical N  If "A" Recirc MG is running, reset the Scoop Tube as follows:
NOTE: For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR
-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr.  (Reference Appendix B in STP 3.4.1-02). Verify Scoop Tube Position P
-%. Standard: Reviews Note and verifies Scoop Tube Position P
-% by depressing the "D" button on the controller.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical Y  Adjust setpoint S
-% to approximately match Scoop Tube Position P
-%. Standard: Depresses "D" button on controller until setpoint "S" is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 8 o f 15 Performance Step:
6 Critical N  Verify controller output V
-% approximately matches Scoop Tube Position P
-%. Standard: Verifies V approximately matches P.
NOTE: This cannot be adjusted on the controller.
Evaluator Note:
The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if "approximate" is met.
Performance:
SATISFACTORY UNSATISFACTORY Comments:        Performance Step:
7 Critical Y  At 1C04, reset scoop tube lock by momentarily placing handswitch B31A-S3A to RESET and then verify the following:
Annunciator 1C04A, C
-5, "A RECIRC MG SCOOP TUBE LOCK" resets. Amber SCOOP TUBE LOCKED light located at 1C04 (above A Scoop Tube Control handswitch B31A
-S3A) is OFF. Standard: Momentarily places handswitch B31A
-S3A to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04A, C
-5 is OFF    Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 9 o f 15 Performance Step:
8 Critical N  Verify that the Recirc pump speed is stable by observing the following parameters:
Standard: The operator identifies that the following indications are stable by one or more of the following:
SETPOINT (S)
Percent Position (P)
Percent Speed (X)
Recirc pump discharge flow Total core flow Core pressure drop APRM readings Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step: 9 Critical N  Verify that SETPOINT (S) is selected for digital display.
Standard: Verifies that SETPOINT (S) is selected for digital display.
Evaluator Cue:
If the Candidate asks to adjust power, cue the Candidate to "maintain power steady and continue with unlocking the 'B' Scoop Tube."
Performance:
SATISFACTORY UNSATISFACTORY Comments:      NOTE:  The applicant has reset the "A" Scoop Tube and now returns to step 10.2 (1) for the "B" Scoop Tube reset


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 13     If B Recirc MG is running, reset the Scoop Tube as follows:
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
Critical N NOTE:
-1 rev 5-7.docx Page 10 o f 15 Performance Step:
For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr. (Reference Appendix B in STP 3.4.1-02).
10 Critical N  NOTE: Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.
Verify Scoop Tube Position P-%.
During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C
Standard:                 Reviews Note and Verifies Scoop Tube Position P-% by depressing the D button on the controller.
-8, [1C08A B
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-8]) inverter overload alarm may be received. CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.
Performance Step: 14     Adjust setpoint S-% to approximately match Scoop Tube Position P-%.
Standard: Reviews Note & Caution.
Critical Y Standard:                 Depresses D button on controller until setpoint S is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance Step: 15     Verify controller output V-% approximately matches Scoop Tube Position P-%.
11 Critical N  If "B" Recirc MG is running with either a 20% or 45% runback in effect, then perform ARP 1C04A, D-8 prior to resetting the Scoop Tube Lockout.
Critical N Standard:                 Depresses D button on controller until output V is displayed. Adjusts output to match value obtained in for position P by rotating the controller knob in the appropriate direction.
Standard: Determine that there are no runbacks in effect.
Evaluator Note:           The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if approximate is met.
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
NRC 2011 JPM S-1 rev 5-7.docx                 Page 11 of 15
12 Critical N  If a DEV ALRM is flashing on SIC9245B, clear the DEV ALRM by performing the following, otherwise N/A:
Standard: Determines that the step is N/A. Continues at procedure step 10.2 (3)
. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 11 o f 15 Performance Step: 13 Critical N  If "B" Recirc MG is running, reset the Scoop Tube as follows:
NOTE: For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR
-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr. (Reference Appendix B in STP 3.4.1-02). Verify Scoop Tube Position P
-%. Standard: Reviews Note and Verifies Scoop Tube Position P
-% by depressing the "D" button on the controller.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
14 Critical Y  Adjust setpoint S
-% to approximately match Scoop Tube Position P
-%. Standard: Depresses "D" button on controller until setpoint "S" is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
15 Critical N  Verify controller output V
-% approximately matches Scoop Tube Position P
-%. Standard: Depresses "D" button on controller until output "V" is displayed. Adjusts output to match value obtained in for position "P" by rotating the controller knob in the appropriate direction
. Evaluator Note:
The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if "approximate" is met.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 12 o f 15 Performance Step:
16 Critical Y  At 1C04, reset scoop tube lock by momentarily placing handswitch B31A
-S3B to RESET and then verify the following:
Annunciator 1C04B, C
-2, "B RECIRC MG SCOOP TUBE LOCK" resets. Amber SCOOP TUBE LOCKED light located at 1C04 (above B Scoop Tube Control handswitch B31A
-S3B) is OFF. Standard: Momentarily places handswitch B31A
-S3B to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04B, C
-2 is OFF    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
17 Critical N  Verify that the Recirc pump speed is stable by observing the following parameters:
Standard: The operator identifies that the following indications are stable by one or more of the following:
SETPOINT (S)
Percent Position (P)
Percent Speed (X)
Recirc pump discharge flow Total core flow Core pressure drop APRM readings Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 NRC 2011 JPM S
-1 rev 5-7.docx Page 13 o f 15 Performance Step:
18 Critical N  Verify that SETPOINT (S) is selected for digital display
. Standard: Verifies that SETPOINT (S) is selected for digital display.
Evaluator Note:
If the Candidate asks to adjust power, cue the Candidate to "maintain power steady"    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
19 Critical N  Communicate to the CRS/ Shift Manager that both scoop tubes are reset.
Standard: Status communicated to the CRS/Shift Manager.
Evaluator Note:
Role play as CRS and acknowledge Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
Informed that both scoop tubes are reset NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 16      At 1C04, reset scoop tube lock by momentarily placing handswitch B31A-S3B Critical Y                to RESET and then verify the following:
-1 rev 5-7.docx Page 14 of 15 NRC 2011 JPM S
* Annunciator 1C04B, C-2, "B RECIRC MG SCOOP TUBE LOCK" resets.
-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Examinee: Evaluator:
Amber SCOOP TUBE LOCKED light located at 1C04 (above B Scoop Tube Control handswitch B31A-S3B) is OFF.
RO    SRO    STA    NSPEO  SRO CERT Date:   ILT RO  ILT SRO    PERFORMANCE RESULTS:
Standard:                 Momentarily places handswitch B31A-S3B to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04B, C-2 is OFF Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
SAT: UNSAT:   Remediation required:
Performance Step: 17      Verify that the Recirc pump speed is stable by observing the following Critical N                parameters:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
Standard:                 The operator identifies that the following indications are stable by one or more of the following:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
* SETPOINT (S)
EVALUATOR'S SIGNATURE:
* Percent Position (P)
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
* Percent Speed (X)
* Recirc pump discharge flow
* Total core flow
* Core pressure drop
* APRM readings Performance:             SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-1 rev 5-7.docx                Page 12 of 15


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 18      Verify that SETPOINT (S) is selected for digital display.
-2 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
Critical N Standard:                Verifies that SETPOINT (S) is selected for digital display.
Evaluator Note:          If the Candidate asks to adjust power, cue the Candidate to maintain power steady Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 19      Communicate to the CRS/ Shift Manager that both scoop tubes are reset.
Critical N Standard:                Status communicated to the CRS/Shift Manager.
Evaluator Note:          Role play as CRS and acknowledge Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Terminating Cues:    Informed that both scoop tubes are reset NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 JPM S-1 rev 5-7.docx               Page 13 of 15


2011 NRC JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Examinee:                                            Evaluator:
-
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-1 rev 5-7.docx                Page 14 of 15


QF-1030-11  Rev. 7 Retention: Life of policy + 10yrs.
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-2 NRC 2011 JPM S-2 rev 5-7.docx
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
-2 rev 5-7.docx Page 1 of 10  JOB PERFORMANCE MEASURE (JPM)    JPM TITLE:
SHIFTING FROM THE "B" FRV TO THE START UP FRV. FAILURE OF THE S/U FRV    JPM NUMBER:
NRC 2011 JPM S
-2 REV. 0  TASK NUMBER(S) / TASK TITLE(S):
Shifting from the "B" FRV to the Startup FRV. Failure of S/U FRV K/A NUMBERS:
295002  K/A VALUE:
A4.03 3.8/3.6  Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO  SRO    STA    NSPEO  SRO CERT  APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X  EVALUATION LOCATION:
In-Plant:  Control Room:
Simulator:
X  Other:          Lab:      Time for Completion:
15 Minutes Time Critical:
Yes  No      Alternate Path [NRC]:
Yes  No  Alternate Path [INPO]:
Yes  No      Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
JPM TITLE:                  SHIFTING FROM THE B FRV TO THE STARTUP FRV. FAILURE OF THE S/U FRV JPM NUMBER:                  NRC 2011 JPM S-2             REV.        0 TASK NUMBER(S) /
-2 rev 5-7.docx Page 2 of 10 SIMULATOR SET UP:
TASK TITLE(S):              Shifting from the B FRV to the Startup FRV. Failure of S/U FRV K/A NUMBERS:                295002                    K/A VALUE:      A4.03 3.8/3.6 Justification (FOR K/A VALUES <3.0):
  (Modify table as necessary) (Only required for simulator JPMs)
TASK APPLICABILITY:          RO      SRO    STA      NSPEO        SRO CERT APPLICABLE METHOD OF TESTING:                  Simulate/Walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                      Control Room:
IC 12 Verify that STARTUP FEED LINE BLOCK MO
Simulator:            X        Other:
-1631 on 1C06 is CLOSED SIMULATOR TRIGGERS TRIGGER NUMBER TRIGGER FORMULA TRIGGER DESCRIPTION 2 HC1622MAN < 1 SU FRV Controller to AUTO
Lab:
Time for Completion:          15    Minutes  Time Critical:          Yes        No Alternate Path [NRC]:          Yes    No Alternate Path [INPO]:          Yes    No Commitments:      {C001} ACE 001729, Review recommendation 4 of OE 001501.
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Retention: Life of policy + 10yrs.                                         Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-2 rev 5-7.docx                     Page 1 of 10


SIMULATOR MALFUNCTIONS:
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
TIME MALFUNCTION #
IC 12 Verify that STARTUP FEED LINE BLOCK MO-1631 on 1C06 is CLOSED SIMULATOR TRIGGERS TRIGGER NUMBER            TRIGGER FORMULA                      TRIGGER DESCRIPTION 2            HC1622MAN < 1                        SU FRV Controller to AUTO SIMULATOR MALFUNCTIONS:
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.
TIME       MALFUNCTION #     MALFUNCTION         ET   DELAY     F. SEV. RAMP       I. SEV.
SIMULATOR OVERRIDES:
TITLE SIMULATOR OVERRIDES:
TIME OVERRIDE #
TIME       OVERRIDE #       OVERRIDE           ET   DELAY     F. SEV. RAMP       I. SEV.
OVERRIDE TITLE ET DELAY F. SEV. RAMP I. SEV. Setup AO-FW-046 HIC-1622(2) FW STARTUP CONTROL VALVE CONT INPUT (0-100%)
TITLE Setup       AO-FW-046         HIC-1622(2) FW STARTUP CONTROL VALVE CONT INPUT (0-100%)
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS: None Required Materials:     OI 644 General  
None   Required Materials:
OI 644 General  


==References:==
==References:==
OI 644 Task Standards:        B FRV in manual and RPV level controlled between 191 and 195 inches NRC 2011 JPM S-2 rev 5-7.docx                  Page 2 of 10


OI 644 Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
  "B" FRV in manual and RPV level controlled between 191 and 195 inches
 
QF-1030-11 Rev. 7   NRC 2011 JPM S
-2 rev 5-7.docx Page 3 of 10 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
: 1. The plant is shutting down
: 1. The plant is shutting down
: 2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
: 2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
Shift from the "B" FEED REG VALVE CV
* Shift from the B FEED REG VALVE CV-1621 to the STARTUP FEED REG VALVE CV-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-1621 to the STARTUP FEED REG VALVE CV
NRC 2011 JPM S-2 rev 5-7.docx                       Page 3 of 10
-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
QF-1030-11  Rev. 7 NRC 2011 JPM S
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
-2 rev 5-7.docx Page 4 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
: 1. The plant is shutting down
: 1. The plant is shutting down
: 2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
: 2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
Shift from the "B" FEED REG VALVE CV
* Shift from the B FEED REG VALVE CV-1621 to the STARTUP FEED REG VALVE CV-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-1621 to the STARTUP FEED REG VALVE CV
NRC 2011 JPM S-2 rev 5-7.docx                          Page 4 of 10
-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          At operators discretion with <1.4 Mlb/hr feedwater flow, place STARTUP FEED Critical N                    REG VALVE CV-1622 in operation as follows:
Standard:                    Reads and continues to action steps (next)
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 2          Verify MASTER FEED REG VALVE CONTROLLER, LC-4577, is in AUTO.
Critical N Standard:                    Verifies MASTER FEED REG VALVE CONTROLLER, LC-4577, is in AUTO.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 3          Verify that the operating [B] FEED REG VALVE CONTROLLER, Critical N                    HC-1621 is in AUTO Standard:                    Verifies that the operating [B] FEED REG VALVE CONTROLLER, HC-1621 is in AUTO Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-2 rev 5-7.docx                    Page 5 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 4                             CAUTION Critical N               Valves V-07-271 and V-07-272 should not be open at the same time when both Reactor Feed Pumps are operating. Feedwater flow through the Startup Feed Control Valve supply line may cause uneven loading on the Reactor Feed Pumps and possibly overload one Reactor Feed Pump.
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
Standard:                 Reviews Caution Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-2 rev 5-7.docx Page 5 of 10  JPM PERFORMANCE INFORMATION Start Time:
Performance Step: 5       Verify [V-07-271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP Critical N                CONTROL VALVE CV-1622 CLOSED.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Standard:                 Verifies [V-07-271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV-1622 CLOSED.
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Evaluator Cue:           IF candidate directs a local operator to verify, then report that V-07-271 is SHUT.
Performance Step:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
1 Critical  N  At operator's discretion with <1.4 Mlb/hr feedwater flow, place STARTUP FEED REG VALVE CV
Performance Step: 6       Verify [V-07-272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP Critical N                CONTROL VALVE CV-1622 on the feedwater header with the operating feed reg valve is OPEN Standard:                 Verifies [V-07-272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV-1622 on the feedwater header with the operating feed reg valve is OPEN Evaluator Cue:           IF candidate directs a local operator to verify, then report that V-07-272 is SHUT.
-1622 in operation as follows:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Reads and continues to action steps (next)
NRC 2011 JPM S-2 rev 5-7.docx                 Page 6 of 10
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
2 Critical N  Verify MASTER FEED REG VALVE CONTROLLER, LC
-4577, is in AUTO.
Standard: Verifies MASTER FEED REG VALVE CONTROLLER, LC
-4577, is in AUTO.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
3 Critical N  Verify that the operating [B] FEED REG VALVE CONTROLLER,  HC-1621 is in AUTO Standard: Verifies that the operating [B] FEED REG VALVE CONTROLLER, HC-1621 is in AUTO Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
-2 rev 5-7.docx Page 6 of 10 Performance Step:
4 Critical N CAUTION Valves V-07-271 and V-07-272 should not be open at the same time when both Reactor Feed Pumps are operating. Feedwater flow through the Startup Feed Control Valve supply line may cause uneven loading on the Reactor Feed Pumps and possibly overload one Reactor Feed Pump.
Standard: Reviews Caution Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
5 Critical N  Verify [V-07-271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV
-1622 CLOSED.
Standard: Verifies [V 271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV
-1622 CLOSED.
Evaluator Cue:
IF candidate directs a local operator to verify, then report that V 271 is SHUT. Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
6 Critical N  Verify [V-07-272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV
-1622 on the feedwater header with the operating feed reg valve is OPEN Standard: Verifies [V 272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV
-1622 on the feedwater header with the operating feed reg valve is OPEN Evaluator Cue: IF candidate directs a local operator to verify, then report that V 272 is SHUT. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
-2 rev 5-7.docx Page 7 of 10 Performance Step:
7 Critical Y  Verify STARTUP FEED REG VALVE CONTROLLER, HC
-1622, is in MANUAL, with zero percent open signal (V=0).
Standard: Places STARTUP FEED REG VALVE CONTROLLER, HC
-1622, in MANUAL, with zero percent open signal (V=0).
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
8 Critical Y  Verify open STARTUP FEED LINE BLOCK MO
-1631 on 1C06 Standard: Opens STARTUP FEED LINE BLOCK MO
-1631 on 1C06 Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
9 Critical Y  Slowly adjust STARTUP FEED REG VALVE CV
-1622 position by adjusting the potentiometer to obtain a zero reading on the deviation meter (DM
-1622). Standard: Slowly adjusts STARTUP FEED REG VALVE CV
-1622 position by adjusting the potentiometer to obtain a zero reading on the deviation meter (DM
-1622). Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
10 Critical N  Observe operating A[B] FEED REG. VALVE throttles closed automatically.
Standard: Observes operating [B] FEED REG. VALVE throttles closed automatically.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-2, Shifting from the "B" FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 NRC 2011 JPM S
-2 rev 5-7.docx Page 8 of 10 Performance Step:
11 Critical Y  Place the STARTUP FEED REG VALVE CONTROLLER to AUTO.
Standard: Places the STARTUP FEED REG VALVE CONTROLLER to AUTO.
Evaluator Note:
Once the candidate places the S/U Feed Reg Valve in AUTO the SU Feed Reg Valve will slowly fail open.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
12 Critical Y  Recognizes the STARTUP FEED REG VALVE CONTROLLER is malfunctioning Standard: Places STARTUP FEED REG VALVE CONTROLLER to MANUAL to attempt level control Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
  "SU" FRV in manual and RPV level controlled


NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 7      Verify STARTUP FEED REG VALVE CONTROLLER, HC-1622, is in MANUAL, Critical Y                with zero percent open signal (V=0).
Stop Time:  
Standard:                Places STARTUP FEED REG VALVE CONTROLLER, HC-1622, in MANUAL, with zero percent open signal (V=0).
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 8      Verify open STARTUP FEED LINE BLOCK MO-1631 on 1C06 Critical Y Standard:                Opens STARTUP FEED LINE BLOCK MO-1631 on 1C06 Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 9      Slowly adjust STARTUP FEED REG VALVE CV-1622 position by adjusting the Critical Y                potentiometer to obtain a zero reading on the deviation meter (DM-1622).
Standard:                Slowly adjusts STARTUP FEED REG VALVE CV-1622 position by adjusting the potentiometer to obtain a zero reading on the deviation meter (DM-1622).
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 10      Observe operating A[B] FEED REG. VALVE throttles closed automatically.
Critical N Standard:                Observes operating [B] FEED REG. VALVE throttles closed automatically.
Performance:             SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-2 rev 5-7.docx                  Page 7 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 11      Place the STARTUP FEED REG VALVE CONTROLLER to AUTO.
-2 rev 5-7.docx Page 9 of 10 NRC 2011 JPM S
Critical Y Standard:                 Places the STARTUP FEED REG VALVE CONTROLLER to AUTO.
-2, Shifting from the "B" FRV to the Startup FRV. Failure of theS/U/FRV, Rev. 0 Examinee: Evaluator:
Evaluator Note:           Once the candidate places the S/U Feed Reg Valve in AUTO the SU Feed Reg Valve will slowly fail open.
RO    SRO    STA    NSPEO  SRO CERT Date:   ILT RO  ILT SRO    PERFORMANCE RESULTS:
Performance:             SATISFACTORY                  UNSATISFACTORY Comments:
SAT: UNSAT:   Remediation required:
Performance Step: 12      Recognizes the STARTUP FEED REG VALVE CONTROLLER is Critical Y                malfunctioning Standard:                 Places STARTUP FEED REG VALVE CONTROLLER to MANUAL to attempt level control Performance:             SATISFACTORY                  UNSATISFACTORY Comments:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
Terminating Cues:   SU FRV in manual and RPV level controlled NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
Stop Time:
EVALUATOR'S SIGNATURE:
NRC 2011 JPM S-2 rev 5-7.docx                  Page 8 of 10
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of theS/U/FRV, Rev. 0 Examinee:                                            Evaluator:
-3 rev 5-7.docx     DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-2 rev 5-7.docx                 Page 9 of 10


2011 NRC JPM S
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-3 NRC 2011 JPM S-3 rev 5-7.docx
-3


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   ESTABLISH A LEAKAGE PATH TO THE MAIN CONDENSER IAW AOP 672.2, OFFGAS RADIATION/REACTOR COOLANT HIGH ACTIVITY JPM NUMBER:                 NRC 2011 JPM S-3             REV.       1 TASK NUMBER(S) /             94.21 TASK TITLE(S):
-3 rev 5-7.docx Page 1 of 10  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
K/A NUMBERS:                 272000                     K/A VALUE:       A2.11 3.4/3.7 Justification (FOR K/A VALUES <3.0):
ESTABLISH A LEAKAGE PATH TO THE MAIN CONDENSER IAW AOP 672.2, OFFGAS RADIATION/REACTOR COOLANT HIGH ACTIVITY JPM NUMBER:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
NRC 2011 JPM S
Simulator:             X       Other:
-3 REV. 1   TASK NUMBER(S) / TASK TITLE(S):
Lab:
94.21  K/A NUMBERS:
Time for Completion:           20   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
272000 K/A VALUE:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
A2.11 3.4/3.7   Justification (FOR K/A VALUES <3.0):
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-3 rev 5-7.docx                    Page 1 of 10
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1 NRC 2011 JPM S
-3 rev 5-7.docx Page 2 of 10 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
Reset to any full power IC.
Reset to any full power IC.
Note that the following are suggestions. The Setup may vary based on the set of JPMs to be performed. For this JPM, the main thing is to have the MSIVs closed. Insert malfunctions.
Note that the following are suggestions. The Setup may vary based on the set of JPMs to be performed. For this JPM, the main thing is to have the MSIVs closed.
Insert a manual scram.
* Insert malfunctions.
Take the mode switch to shutdown.
* Insert a manual scram.
Place feedwater to 158 in auto. o If necessary secure ECCS injection.
* Take the mode switch to shutdown.
o Close the MSIVs.
* Place feedwater to 158 in auto.
o Start the Mechanical Vacuum Pump SIMULATOR MALFUNCTIONS:
o If necessary secure ECCS injection.
NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is no t
o     Close the MSIVs.
changed. TIME MALFUNCTION #
o     Start the Mechanical Vacuum Pump SIMULATOR MALFUNCTIONS:
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV. T=0 RX01 Fuel failure 5                                                                                                                                                     SIMULATOR OVERRIDES:
NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
None SIMULATOR REMOTE FUNCTIONS:
TIME       MALFUNCTION #         MALFUNCTION         ET   DELAY       F. SEV. RAMP         I. SEV.
None Required Materials:
TITLE T=0     RX01                 Fuel failure                         5 SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:         1. AOP 672.2, Rev. 35 General  
: 1. AOP 672.2, Rev. 35 General  


==References:==
==References:==


Task Standards:
Task Standards:
MO-1362A Closed MO-1362B Closed MO-1169 Closed MO 1054 and MO1055 are Closed Mechanical Vacuum Pump is secured MO-1043 Open MO-1044 Open QF-1030-11  Rev. 7 NRC 2011 JPM S
* MO-1362A Closed
-3 rev 5-7.docx Page 3 of 10 TURNOVER SHEET INITIAL CONDITIONS:
* MO-1362B Closed
* MO-1169 Closed
* MO 1054 and MO1055 are Closed
* Mechanical Vacuum Pump is secured
* MO-1043 Open
* MO-1044 Open NRC 2011 JPM S-3 rev 5-7.docx                     Page 2 of 10
 
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
A plant transient has occurred which has resulted in a reactor scram.
* A plant transient has occurred which has resulted in a reactor scram.
AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.
* AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.
The MSIVs have isolated.
* The MSIVs have isolated.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to establish a leakage path to the main condenser IAW AOP 672.2, Step 7.
* The CRS directs you to establish a leakage path to the main condenser IAW AOP 672.2, Step 7.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-3 rev 5-7.docx                      Page 3 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1 NRC 2011 JPM S
-3 rev 5-7.docx Page 4 of 10  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
A plant transient has occurred which has resulted in a reactor scram.
* A plant transient has occurred which has resulted in a reactor scram.
AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.
* AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.
The MSIVs have isolated.
* The MSIVs have isolated.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to establish a leakage path to the main condenser IAW AOP 672.2, Step 7.
* The CRS directs you to establish a leakage path to the main condenser IAW AOP 672.2, Step 7.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-3 rev 5-7.docx                          Page 4 of 10
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the Critical Y                    following handswitches in the CLOSE position.
SJAE & OFFGAS MSL A STEAM SUPPLY MO-1362A.
Standard:                    MO 1362A is closed.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 2          At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the Critical Y                    following handswitches in the CLOSE position.
SJAE & OFFGAS MSL B STEAM SUPPLY MO-1362B.
Standard:                    MO 1362B is closed.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-3 rev 5-7.docx                    Page 5 of 10
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 3      At 1C07, isolate the main steam supply to the Turbine Steam Seal System by Critical Y                placing the following handswitches in the CLOSE position:
MAIN STEAM SUPPLY MO-1169.
Standard:                MO-1169 is closed.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 4      At 1C07, isolate the main steam supply to the Turbine Steam Seal System by Critical N                placing the following handswitches in the CLOSE position:
REGULATOR BYPASS MO-1170.
Standard:                MO- 1170 is verified closed.
Evaluator Note:          Note MO-1170 is a normally closed valve, unless the steam seal regulator is inoperable. MO-1170 will be verified closed or closed if open.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 5      At 1C07, verify that the main steam supply to MSR 2nd Stage Reheat is isolated Critical Y                by holding the following handswitch is in the CLOSE position:
MAIN STEAM TO MSR SECOND STAGE MO-1054 & MO-1055.
Standard:                MO-1054 and 1055 are closed.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-3 rev 5-7.docx                Page 6 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 6       At 1C07, verify that Mechanical Vacuum Pump 1P-32 is secured.
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1 NRC 2011 JPM S
Critical Y Standard:                 1P-32 is secured.
-3 rev 5-7.docx Page 5 of 10  JPM PERFORMANCE INFORMATION Start Time:
Evaluator Note:           Note that per the AOP, the Candidate may just take the HS for the Mechanical Vacuum Pump to stop to secure it, or he may get OI 691 and secure the pump per section 5.0. After he secures the pump, there are steps for the inplant operator to perform, cue the Candidate that the inplant operator will finish the actions of OI 691 Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step: 7       At 1C04, establish the preferred MSIV leakage path by placing the following Critical Y                handswitches in the OPEN position:
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
MSL HEADER DRAINS BYPASS MO-1043.
Performance Step:
Standard:                 MO-1043 is Opened.
1 Critical  Y  At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the following handswitches in the CLOSE position
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
. SJAE & OFFGAS MSL A STEAM SUPPLY MO
Performance Step: 8       At 1C04, establish the preferred MSIV leakage path by placing the following Critical Y                handswitches in the OPEN position:
-1362A. Standard: MO 1362A is closed.
MSL DRAIN ORIFICE BYPASS MO-1044.
Performance:
Standard:                 MO-1044 is Opened.
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
2 Critical Y  At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the following handswitches in the CLOSE position
NRC 2011 JPM S-3 rev 5-7.docx                Page 7 of 10
. SJAE & OFFGAS MSL B STEAM SUPPLY MO
 
-1362B. Standard: MO 1362B is closed.
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 9       If the preferred MSIV leakage path cannot be established, establish the Critical N                alternate path by opening MSL HEADER DRAIN CV-1064 using HS-1064 on 1C04.
Performance:
Standard:                 Leakage path can be established.
SATISFACTORY UNSATISFACTORY Comments:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
Terminating Cues:   The JPM is complete when MO-1044 is full open.
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1  NRC 2011 JPM S
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-3 rev 5-7.docx Page 6 of 1 0 Performance Step:
Stop Time:
3 Critical Y  At 1C07, isolate the main steam supply to the Turbine Steam Seal System by placing the following handswitches in the CLOSE position:
NRC 2011 JPM S-3 rev 5-7.docx                Page 8 of 10
MAIN STEAM SUPPLY MO
-1169. Standard: MO-1169 is closed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical N  At 1C07, isolate the main steam supply to the Turbine Steam Seal System by placing the following handswitches in the CLOSE position:
REGULATOR BYPASS MO
-1170. Standard: MO- 1170 is verified closed.
Evaluator Note:
Note MO-1170 is a normally closed valve, unless the steam seal regulator is inoperable. MO
-1170 will be verified closed or closed if open. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical Y  At 1C07, verify that the main steam supply to MSR 2 nd Stage Reheat is isolated by holding the following handswitch is in the CLOSE position:
MAIN STEAM TO MSR SECOND STAGE MO
-1054 & MO-1055. Standard: MO-1054 and 1055 are closed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1  NRC 2011 JPM S
-3 rev 5-7.docx Page 7 of 10 Performance Step:
6 Critical Y  At 1C07, verify that Mechanical Vacuum Pump 1P
-32 is secured.
Standard: 1P-32 is secured.
Evaluator Note:
Note that per the AOP, the Candidate may just take the HS for the Mechanical Vacuum Pump to stop to secure it, or he may get OI 691 and secure the pump per section 5.0. After he secures the pump, there are steps for the inplant operator to perform, cue the Candidate that the inplant operator will finish the actions of OI 691 Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
7 Critical Y  At 1C04, establish the preferred MSIV leakage path by placing the following handswitches in the OPEN position:
MSL HEADER DRAINS BYPASS MO
-1043. Standard: MO-1043 is Opened.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
8 Critical Y  At 1C04, establish the preferred MSIV leakage path by placing the following handswitches in the OPEN position:
MSL DRAIN ORIFICE BYPASS MO
-1044. Standard: MO-1044 is Opened.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM S
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1 NRC 2011 JPM S
-3 rev 5-7.docx Page 8 of 10 Performance Step:
9 Critical N  If the preferred MSIV leakage path cannot be established, establish the alternate path by opening MSL HEADER DRAIN CV
-1064 using HS
-1064 on 1C04. Standard: Leakage path can be established.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
The JPM is complete when MO
-1044 is full open.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Examinee:                                             Evaluator:
-3 rev 5-7.docx Page 9 of 10 NRC 2011 JPM S
RO     SRO     STA       NSPEO       SRO CERT               Date:
-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity , Rev. 1 Examinee: Evaluator:
ILT RO       ILT SRO PERFORMANCE RESULTS:                       SAT:                         UNSAT:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
Remediation required:           YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
SAT: UNSAT:   Remediation required:
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
EVALUATOR'S SIGNATURE:
NRC 2011 JPM S-3 rev 5-7.docx                  Page 9 of 10
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 JPM S
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-4 NRC 2011 JPM S-4 rev 5-7.docx
-4 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE


2011 NRC JPM S
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
-4 QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
JPM TITLE:                   MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE JPM NUMBER:                 NRC 2011 JPM S-4             REV.       0 TASK NUMBER(S) /
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
TASK TITLE(S):               MANUAL STARTUP OF HPCI USING THE TEST POT K/A NUMBERS:                 206000                     K/A VALUE:       A4.01 3.8/3.7 Justification (FOR K/A VALUES <3.0):
-4 rev 5-7.docx Page 1 of 16    JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE JPM NUMBER:
Simulator:             X       Other:
NRC 2011 JPM S
Lab:
-4 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Time for Completion:           20   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
MANUAL STARTUP OF HPCI USING THE TEST POT K/A NUMBERS:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
206000 K/A VALUE:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-4 rev 5-7.docx                    Page 1 of 16
A4.01 3.8/3.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
-4 rev 5-7.docx Page 2 of 16 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
IC 20 Setup a Schedule file to delete both overrides below when ET 3 goes true. Notice the 7 second delay in the green light.
IC 20 Setup a Schedule file to delete both overrides below when ET 3 goes true. Notice the 7 second delay in the green light.
SIMULATOR TRIGGERS Event Trigger Trigger Formula Trigger Description 1 HPNT > 800 HPCI speed exceeds 800 rpm 3 ZDIHPHS2318(1) >= 1 MO 2318, HPCI Min Flow Valve taken to CLOSE   SIMULATOR MALFUNCTIONS:
SIMULATOR TRIGGERS Event Trigger     Trigger Formula                   Trigger Description 1         HPNT > 800                       HPCI speed exceeds 800 rpm 3         ZDIHPHS2318(1) >= 1               MO 2318, HPCI Min Flow Valve taken to CLOSE SIMULATOR MALFUNCTIONS:
TIME MALFUNCTION #
TIME       MALFUNCTION #       MALFUNCTION       ET   DELAY     F. SEV. RAMP     I. SEV.
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.
TITLE SIMULATOR OVERRIDES: N/A TIME       MALFUNCTION #       MALFUNCTION       ET   DELAY     F. SEV. RAMP     I. SEV.
SIMULATOR OVERRIDES:
TITLE Preset     DO-HP-047           HS-2318(2) MIN   1              ON                  OFF FLOW BYPASS NOTE delete with    MOV-2318 LITES schedule file        (RED)
N/A TIME MALFUNCTION #
Preset     DO-HP-046           HS-2318(1) MIN   1    7 secs    OFF                ON FLOW BYPASS NOTE delete with    MOV-2318 LITES schedule file        (GREEN)
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV. Preset DO-HP-047 NOTE delete with schedule file HS-2318(2) MIN FLOW BYPASS MOV-2318 LITES (RED) 1  ON      OFF Preset DO-HP-046 NOTE delete with schedule file HS-2318(1) MIN FLOW BYPASS MOV-2318 LITES (GREEN) 1 7 secs OFF  ON Preset DO-HP-047 (NEW) DELETE in 7 seconds HS-2318(2) MIN FLOW BYPASS MOV-2318 LITES (RED) 3  ON      OFF    SIMULATOR REMOTE FUNCTIONS:
Preset     DO-HP-047           HS-2318(2) MIN   3              ON                  OFF (NEW)                FLOW BYPASS DELETE in 7          MOV-2318 LITES seconds              (RED)
N/A Required Materials:
SIMULATOR REMOTE FUNCTIONS: N/A Required Materials:       OI 152 General  
OI 152 General  


==References:==
==References:==
OI 152 NRC 2011 JPM S-4 rev 5-7.docx                Page 2 of 16


OI 152 QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Task Standards:         1. HPCI in pressure control mode (CST to CST)
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
: 2. HPCI Min Flow Bypass Valve (MO-2318) closed NRC 2011 JPM S-4 rev 5-7.docx                Page 3 of 16
-4 rev 5-7.docx Page 3 of 16 Task Standards:
: 1. HPCI in pressure control mode (CST to CST)
: 2. HPCI Min Flow Bypass Valve (MO
-2318) closed


QF-1030-11 Rev. 7   NRC 2011 JPM S
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-4 rev 5-7.docx Page 4 of 16 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant is at rated power A manual startup of HPCI is required using the Test Pot A field operator is stationed near the HPCI Turbine OI-152 Section 5.1 is complete through Step (12)
* The plant is at rated power
* A manual startup of HPCI is required using the Test Pot
* A field operator is stationed near the HPCI Turbine
* OI-152 Section 5.1 is complete through Step (12)
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.
* Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-4 rev 5-7.docx                      Page 4 of 16


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
-4 rev 5-7.docx Page 5 of 16  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may no t exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant is at rated power A manual startup of HPCI is required using the Test Pot A field operator is stationed near the HPCI Turbine OI-152 Section 5.1 is complete through Step (12)
* The plant is at rated power
* A manual startup of HPCI is required using the Test Pot
* A field operator is stationed near the HPCI Turbine
* OI-152 Section 5.1 is complete through Step (12)
INITIATING CUES (IF APPLICABLE):
* Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-4 rev 5-7.docx                          Page 5 of 16


INITIATING CUES (IF APPLICABLE):
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Verify HPCI Vacuum Tank Hi Level Alarm (1C03C, D-7) is clear Critical N Standard:                    Verifies HPCI Vacuum Tank Hi Level Alarm (1C03C, D-7) is clear Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 2          Start the 1P-233 HPCI VACUUM PUMP by placing Handswitch HS-2221 on Critical Y                    1C03 to START Standard:                    Starts the 1P-233 HPCI VACUUM PUMP by placing Handswitch HS-2221 on 1C03 to START Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-4 rev 5-7.docx                    Page 6 of 16
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 3      Open MO-2247 LUBE OIL & CONDENSER CLG SUPPLY Valve by placing HS-Critical Y                2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.
Standard:                Opens MO-2247 LUBE OIL & CONDENSER CLG SUPPLY Valve by placing HS-2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 4      Place TURBINE SPEED TEST SELECT Handswitch HS-2257 on 1C03 in the Critical Y                "TURB TEST" position.
Standard:                Places TURBINE SPEED TEST SELECT Handswitch HS-2257 on 1C03 in the "TURB TEST" position.
Evaluator Note:          Annunciator C-6 Alarms Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 5      Place HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on Critical Y                1C03 to the "ON" position.
Standard:                Places HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on 1C03 to the "ON" position.
Performance:              SATISFACTORY              UNSATISFACTORY Amber light turns ON Comments:
NRC 2011 JPM S-4 rev 5-7.docx              Page 7 of 16
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 6      Rotate TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 fully Critical Y                counter-clockwise.
Standard:                Verifies TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 fully counter-clockwise.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 7      Verify MO-2311 PUMP DISCHARGE valve open .
Critical N Standard:                Verifies MO-2311 PUMP DISCHARGE valve open .
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 8      The following step makes HPCI inoperable.
Critical N                Verify the CRS has entered the LCO for HPCI being inoperable. NA if not running CST to CST.
Standard:                Informs the SRO that the HPCI LCO must be entered Evaluator Cue:            The LCO has been entered Performance:              SATISFACTORY              UNSATISFACTORY Comments:
NRC 2011 JPM S-4 rev 5-7.docx                Page 8 of 16
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 9      If operation in the CST to CST Mode is desired, perform the following:
Critical Y (a) Open MO-2316 REDUNDANT SHUTOFF valve.
(b) Throttle open CV-2315 TEST BYPASS valve to 46-48% open as indicated on ZI-2315 Standard:                Opens MO-2316 REDUNDANT SHUTOFF valve Throttles open CV-2315 TEST BYPASS valve to 46-48% open as indicated on ZI-2315 Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 10      Initiate torus water temperature monitoring per STP 3.6.2.1-01. This is only Critical N                required while heat is being added to the torus.
Standard:                 Informs the CRS that torus temperature monitoring is required per STP 3.6.2.1-01 while heat is being added to the torus.
Evaluator Cue:            Another operator will perform torus temperature monitoring.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-4 rev 5-7.docx                  Page 9 of 16


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 11      If time permits, ensure unnecessary/unauthorized personnel are clear of the Critical N                HPCI Room.
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
Standard:                 May announce via page that unnecessary/unauthorized personnel are clear of the HPCI Room.
-4 rev 5-7.docx Page 6 of 16  JPM PERFORMANCE INFORMATION Start Time:
Evaluator Note:          The following annunciators will be received if the AUX OIL PUMP is not started within 15 seconds after opening MO-2202 TURBINE STEAM SUPPLY:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
HPCI TURBINE TRIPPED (alarm only) (1C03C, A-4)
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
HPCI LO FLOW (1C03C, B-3)
Performance Step:
HPCI TURBINE BEARING OIL LO PRESSURE (1C03C, A-6)
1 Critical  N  Verify HPCI Vacuum Tank Hi Level Alarm (1C03C, D
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
-7) is clear Standard: Verifies HPCI Vacuum Tank Hi Level Alarm (1C03C, D
Performance Step: 12      Open MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS-Critical N                2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.
-7) is clear Performance:
Standard:                 Opens MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS-2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
2 Critical  Y  Start the 1P
Performance Step: 13                  CONTINUOUS RECHECK STATEMENT Critical N                            (applicable to the remainder of this section)
-233 HPCI VACUUM PUMP by placing Handswitch HS
IF injection to the RPV is desired, THEN be prepared to open MO-2312 HPCI INJECT valve immediately after 1P-218 is started to prevent a possible HPCI Turbine Overspeed trip.
-2221 on 1C03 to START Standard: Starts the 1P
Standard:                 Reviews Continuous Recheck Statement Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
-233 HPCI VACUUM PUMP by placing Handswitch HS-2221 on 1C03 to START Performance:
NRC 2011 JPM S-4 rev 5-7.docx                  Page 10 of 16
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0  NRC 2011 JPM S
-4 rev 5-7.docx Page 7 of 16 Performance Step:
3 Critical  Y  Open MO-2247 LUBE OIL &
CONDENSER CLG SUPPLY Valve by placing HS
-2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.
Standard: Opens MO-2247 LUBE OIL &
CONDENSER CLG SUPPLY Valve by placing HS-2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
4 Critical Y  Place TURBINE SPEED TEST SELECT Handswitch HS
-2257 on 1C03 in the "TURB TEST" position.
Standard: Places TURBINE SPEED TEST SELECT Handswitch HS
-2257 on 1C03 in the "TURB TEST" position.
Evaluator Note:
Annunciator C
-6 Alarms    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical Y  Place HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on 1C03 to the "ON" position.
Standard: Places HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on 1C03 to the "ON" position.
Performance:
SATISFACTORY UNSATISFACTORY Comments: Amber light turns ON


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 14     At 1C03, perform the following in rapid succession:
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
Critical Y Place 1P-218 AUX OIL PUMP Handswitch HS-2256 on 1C03 in the START position and verify that the following indicating lights on 1C03 turn ON:
-4 rev 5-7.docx Page 8 of 16 Performance Step:
: 1. 1P-218 AUX OIL PUMP red (running) light ON ___________
6 Critical Y  Rotate TEST MODE TURBINE SPEED ADJUST potentiometer HS
-2273 fully counter-clockwise.
Standard: Verifies TEST MODE TURBINE SPEED ADJUST potentiometer HS
-2273 fully counter-clockwise.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
7 Critical N  Verify MO-2311 PUMP DISCHARGE valve open .
Standard: Verifies MO
-2311 PUMP DISCHARGE valve open .
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
8 Critical N  The following step makes HPCI inoperable.
Verify the CRS has entered the LCO for HPCI being inoperable. NA if not running CST to CST.
Standard: Informs the SRO that the HPCI LCO must be entered Evaluator Cue:
The LCO has been entered Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0  NRC 2011 JPM S
-4 rev 5-7.docx Page 9 of 16 Performance Step:
9 Critical Y  If operation in the CST to CST Mode is desired, perform the following:
  (a) Open MO
-2316 REDUNDANT SHUTOFF valve.
  (b) Throttle open CV
-2315 TEST BYPASS valve to 46
-48% open as indicated on ZI
-2315  Standard: Opens MO-2316 REDUNDANT SHUTOFF valve Throttles open CV
-2315 TEST BYPASS valve to 46
-48% open as indicated on ZI
-2315    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
10 Critical N  Initiate torus water temperature monitoring per STP 3.6.2.1
-01. This is only required while heat is being added to the torus.
Standard: Informs the CRS that torus temperature monitoring is required per STP 3.6.2.1
-01 while heat  is being added to the torus.
Evaluator Cue:
Another operator will perform torus temperature monitoring.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0  NRC 2011 JPM S
-4 rev 5-7.docx Page 10 of 16 Performance Step:
11 Critical N  If time permits, ensure unnecessary/unauthorized personnel are clear of the HPCI Room.
Standard: May announce via page that unnecessary/unauthorized personnel are clear of the HPCI Room.
Evaluator Note:
The following annunciators will be received if the AUX OIL PUMP is not started within 15 seconds after opening MO
-2202 TURBINE STEAM SUPPLY: HPCI TURBINE TRIPPED (alarm only) (1C03C, A
-4) HPCI LO FLOW (1C03C, B
-3) HPCI TURBINE BEARING OIL LO PRESSURE (1C03C, A
-6)    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
12 Critical N  Open MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS
-2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.
Standard: Opens MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS
-2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
13 Critical N                    CONTINUOUS RECHECK STATEMENT (applicable to the remainder of this section)
IF injection to the RPV is desired, THEN be prepared to open MO
-2312 HPCI INJECT valve immediately after 1P
-218 is started to prevent a possible HPCI Turbine Overspeed trip.
Standard: Reviews Continuous Recheck Statement Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0  NRC 2011 JPM S
-4 rev 5-7.docx Page 11 of 16 Performance Step:
14 Critical Y  At 1C03, perform the following in rapid succession:
Place 1P-218 AUX OIL PUMP Handswitch HS
-2256 on 1C03 in the START position and verify that the following indicating lights on 1C03 turn ON: 1. 1P-218 AUX OIL PUMP red (running) light ON ___________
: 2. HV-2201 TURBINE STOP VALVE red (open) light ON
: 2. HV-2201 TURBINE STOP VALVE red (open) light ON
___________
: 3. Verify HV-2200 TURBINE CONTROL VALVE open or throttled, controlling HPCI Turbine speed. ___________
: 3. Verify HV
Standard:                 Places 1P-218 AUX OIL PUMP Handswitch HS-2256 on 1C03 in the START position and verifies the above indications Evaluator Cue:           If operator is struggling with HV-2200 position, cue the operator that HV-2200 is throttled to maintain speed. Continue.
-2200 TURBINE CONTROL VALVE open or throttled, controlling HPCI Turbine speed. ___________
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
Standard: Places 1P-218 AUX OIL PUMP Handswitch HS
Performance Step: 15     If injection into the RPV is desired, immediately open MO-2312 HPCI Critical N                INJECT valve and confirm proper valve position indication.
-2256 on 1C03 in the START position and verifies the above indications Evaluator Cue:
Standard:                 Reviews step and continues Evaluator Note:           This step is N/A Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
If operator is struggling with HV
NRC 2011 JPM S-4 rev 5-7.docx                  Page 11 of 16
-2200 position, cue the operator that HV-2200 is throttled to maintain speed. Continue.
 
Performance:
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 16     Rapidly raise HPCI TURBINE SPEED using the TEST MODE Critical Y                TURBINE SPEED ADJUST potentiometer HS-2273 until turbine speed () 2000 rpm.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Standard:                 Using the TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273, Rapidly raises HPCI TURBINE SPEED until turbine speed () 2000 rpm.
15 Critical N  If injection into the RPV is desired, immediately open MO
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
-2312 HPCI INJECT valve and confirm proper valve position indication.
Performance Step: 17     Confirm that HPCI speed and HPCI Pump discharge pressure indicate Critical N                increases.
Standard: Reviews step and continues Evaluator Note:
Standard:                 Confirms that HPCI speed and HPCI Pump discharge pressure indicate increases.
This step is N/A Performance:
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 18     Verify that MO-2318 MIN FLOW BYPASS valve is open when HPCI flow is less Critical N (SEQ-)        than 600 gpm with pump discharge pressure greater than 125 psig.
QF-1030-11 Rev. 7 NRC 2011 JPM S
Standard:                 Verifies that MO-2318 MIN FLOW BYPASS valve is open when HPCI flow is less than 600 gpm with pump discharge pressure greater than 125 psig.
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
-4 rev 5-7.docx Page 12 of 16 Performance Step:
NRC 2011 JPM S-4 rev 5-7.docx              Page 12 of 16
16 Critical Y  Rapidly raise HPCI TURBINE SPEED using the TEST MODE TURBINE SPEED ADJUST potentiometer HS
 
-2273 until turbine speed (rpm. Standard: Using the TEST MODE TURBINE SPEED ADJUST potentiometer HS
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 19     Verify 1P-218 AUX OIL PUMP stops automatically and that turbine speed Critical N (SEQ-)        remains steady and does not decrease Standard:                 Verifies 1P-218 AUX OIL PUMP stops automatically and that turbine speed remains steady and does not decrease Evaluator Note:           There is a 2 second time delay between automatic cycles on MO-2318.
-2273, Rapidly raises HPCI TURBINE SPEED until turbine speed (   Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 20     Verify on 1C03 that MO-2318 MIN FLOW BYPASS valve closes as HPCI flow Critical Y (SEQ-)        increases above 600 gpm.
17 Critical N  Confirm that HPCI speed and HPCI Pump discharge pressure indicate increases.
Standard:                 Recognizes MO-2318 MIN FLOW BYPASS valve failed to close and manually closes the valve.
Standard: Confirms that HPCI speed and HPCI Pump discharge pressure indicate increases.
Evaluator Note:           The Min Flow valve will fail to close and the operator must take action to manually close the valve:
Performance:
Evaluator Cue:           Once the valve is closed, tell the operator to continue with the procedure.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 18 Critical N (SEQ-) Verify that MO
I&C will look into the min flow valve issue.
-2318 MIN FLOW BYPASS valve is open when HPCI flow is less than 600 gpm with pump discharge pressure greater than 125 psig.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Verifies that MO
Performance Step: 21     Verify that the following drain valves automatically close: Valve Description Critical N (SEQ-)              CV-2211 HPCI STEAM LINE DRAIN ISOL CV-2212 HPCI STEAM LINE DRAIN ISOL CV-2234 CLOSED RADWASTE DISCH ISOL Standard:                 Verifies the above drain valves are closed Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-2318 MIN FLOW BYPASS valve is open when HPCI flow is less than 600 gpm with pump discharge pressure greater than 125 psig.
NRC 2011 JPM S-4 rev 5-7.docx                 Page 13 of 16
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 NRC 2011 JPM S
-4 rev 5-7.docx Page 13 of 16 Performance Step:
19 Critical N (SEQ-) Verify 1P-218 AUX OIL PUMP stops automatically and that turbine speed remains steady and does not decrease Standard: Verifies 1P
-218 AUX OIL PUMP stops automatically and that turbine speed remains steady and does not decrease Evaluator Note:
There is a 2 second time delay between automatic cycles on MO
-2318. Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
20 Critical Y (SEQ-) Verify on 1C03 that MO
-2318 MIN FLOW BYPASS valve closes as HPCI flow increases above 600 gpm.
Standard: Recognizes MO-2318 MIN FLOW BYPASS valve failed to close and manually closes the valve.
Evaluator Note:
The Min Flow valve will fail to close and the operator must take action to manually close the valve:
Evaluator Cue:
Once the valve is closed, tell the operator to continue with the procedure. I&C will look into the min flow valve issue.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
21 Critical N (SEQ-) Verify that the following drain valves automatically close: Valve Description CV-2211 HPCI STEAM LINE DRAIN ISOL CV-2212 HPCI STEAM LINE DRAIN ISOL CV-2234 CLOSED RADWASTE DISCH ISOL Standard: Verifies the above drain valves are closed Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0  NRC 2011 JPM S
-4 rev 5-7.docx Page 14 of 16 Performance Step:
22 Critical Y (SEQ-) At 1C03, establish desired HPCI flow and pressure by:
  (a) Adjusting HPCI Turbine Speed to >2000 rpm using the TEST MODE TURBINE SPEED ADJUST potentiometer HS
-2273 AND  (b) If in CST to CST mode, throttling TEST BYPASS CV
-2315. Standard: Establishes HPCI flow of 3100 gpm and pressure at approximately 1065 psig using the TEST BYPASS CV
-2315    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical N (SEQ-) In the HPCI Room, verify Jockey Oil Pump 1P
-283 is not running.
Standard:    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
HPCI is in CST
-CST mode with Min Flow Valve Closed.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 22      At 1C03, establish desired HPCI flow and pressure by:
-4 rev 5-7.docx Page 15 of 16 NRC 2011 JPM S
Critical Y (SEQ-)
-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Examinee: Evaluator:
(a) Adjusting HPCI Turbine Speed to >2000 rpm using the TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 AND (b) If in CST to CST mode, throttling TEST BYPASS CV-2315.
RO    SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
Standard:                 Establishes HPCI flow of 3100 gpm and pressure at approximately 1065 psig using the TEST BYPASS CV-2315 Performance:             SATISFACTORY                UNSATISFACTORY Comments:
SAT: UNSAT:   Remediation required:
Performance Step:         In the HPCI Room, verify Jockey Oil Pump 1P-283 is not running.
YES  NO    COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Critical N (SEQ-)
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
Standard:
EVALUATOR'S SIGNATURE:
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Terminating Cues:   HPCI is in CST-CST mode with Min Flow Valve Closed.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 JPM S-4 rev 5-7.docx                Page 14 of 16


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Examinee:                                            Evaluator:
-5 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-4 rev 5-7.docx                 Page 15 of 16


201 1 NRC JPM S-5
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-5 NRC 2011 JPM S-5 rev 5-7.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT JPM NUMBER:                 NRC 2011 JPM S-5             REV.       0 TASK NUMBER(S) /
-5 rev 5-7.docx Page 1 of 10  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK TITLE(S):               CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT A4.04 3.5/3.6 K/A NUMBERS:                 223001                     K/A VALUE:
CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT   JPM NUMBER:
A4.05 3.6/3.6 Justification (FOR K/A VALUES <3.0):
NRC 2011 JPM S
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
-5 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Simulator:             X       Other:
CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT   K/A NUMBERS:
Lab:
223001 K/A VALUE:
Time for Completion:           15   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
A4.04 3.5/3.6 A4.05 3.6/3.6 Justification (FOR K/A VALUES <3.0):
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
TASK APPLICABILITY:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-5 rev 5-7.docx                    Page 1 of 10
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
15 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 NRC 2011 JPM S
Ensure a Group 3 isolation has occurred.
-5 rev 5-7.docx Page 2 of 10 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
SIMULATOR MALFUNCTIONS: N/A SIMULATOR OVERRIDES: N/A SIMULATOR REMOTE FUNCTIONS: N/A Required Materials:       Defeat 16 General  
Ensure a Group 3 isolation has occurred. SIMULATOR MALFUNCTIONS:
N/A SIMULATOR OVERRIDES:
N/A SIMULATOR REMOTE FUNCTIONS:
N/A Required Materials:
Defeat 16 General  


==References:==
==References:==
Defeat 16 Task Standards:          1. Open Drywell and Torus Sample Lines after a PCIS Group 3 isolation.
: 2. H2-O2 Analyzers placed in service and then secured after sampling.
NRC 2011 JPM S-5 rev 5-7.docx                  Page 2 of 10


Defeat 16 Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
: 1. Open Drywell and Torus Sample Lines after a PCIS Group 3 isolation
The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
: 2. H 2-O 2 Analyzers placed in service and then secured after sampling.
* The plant was at rated power
* A Group 3 isolation has occurred following an event
* Drywell Sprays have been initiated
* The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
* Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-5 rev 5-7.docx                        Page 3 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-5 rev 5-7.docx Page 3 of 10 TURNOVER SHEET INITIAL CONDITIONS:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant was at rated power A Group 3 isolation has occurred following an event Drywell Sprays have been initiated The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
* The plant was at rated power
Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* A Group 3 isolation has occurred following an event
* Drywell Sprays have been initiated
* The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
* Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-5 rev 5-7.docx                          Page 4 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 NRC 2011 JPM S
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-5 rev 5-7.docx Page 4 of 10  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
Performance Step: 1          If a large-break LOCA is suspected, verify that drywell sprays have been Critical N                    initiated prior to overriding the containment atmosphere sample line isolations.
If drywell sprays have NOT initiated, consult with the TSC Accident Management Team prior to overriding the isolation Standard:                    Reviews Step and determines that the initiating cue stated that Drywell Sprays have been placed in service.
Performance:                  SATISFACTORY                    UNSATISFACTORY Comments:
Performance Step: 2          At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch Critical Y                    HS-8101A in OVERRIDE Standard:                    Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101A in OVERRIDE Performance:                  SATISFACTORY                    UNSATISFACTORY Comments:
NRC 2011 JPM S-5 rev 5-7.docx                      Page 5 of 10


INITIAL CONDITIONS:
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 3      At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y                8100A in OVERRIDE Standard:                Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS-8100A in OVERRIDE Performance:              SATISFACTORY              UNSATISFACTORY Comments:
The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
Performance Step: 4      At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y                8100B in OVERRIDE Standard:                Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS-8100B in OVERRIDE Performance:              SATISFACTORY              UNSATISFACTORY Comments:
The plant was at rated power A Group 3 isolation has occurred following an event Drywell Sprays have been initiated The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
Performance Step: 5      At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y                8101B in OVERRIDE Standard:                Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101B in OVERRIDE Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Performance Step: 6      Confirm ISOLATION OVERRIDE amber lights are ON Critical N Standard:                Confirms ISOLATION OVERRIDE amber lights are ON Performance:              SATISFACTORY              UNSATISFACTORY Comments:
NRC 2011 JPM S-5 rev 5-7.docx              Page 6 of 10


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 7                                             NOTE Critical N               Both samplers should be placed in service, with one sampling the Drywell and the other sampling the Torus.
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 NRC 2011 JPM S
-5 rev 5-7.docx Page 5 of 10  JPM PERFORMANCE INFORMATION Start Time:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
1 Critical  N  If a large
-break LOCA is suspected, verify that drywell sprays have been initiated prior to overriding the containment atmosphere sample line isolations. If drywell sprays have NOT initiated, consult with the TSC Accident Management Team prior to overriding the isolation Standard: Reviews Step and determines that the initiating cue stated that Drywell Sprays have been placed in service.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step: 2 Critical  Y  At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101A in OVERRIDE Standard: Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS
-8101A in OVERRIDE    Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0  NRC 2011 JPM S
-5 rev 5-7.docx Page 6 of 10 Performance Step:
3 Critical  Y  At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS
-8100A in OVERRIDE Standard: Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS-8100A in OVERRIDE Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical  Y  At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS
-8100B in OVERRIDE Standard: Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS
-8100B in OVERRIDE    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical  Y  At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS
-8101B in OVERRIDE Standard: Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101B in OVERRIDE    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
6 Critical  N  Confirm ISOLATION OVERRIDE amber lights are ON Standard: Confirms ISOLATION OVERRIDE amber lights are ON Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0  NRC 2011 JPM S
-5 rev 5-7.docx Page 7 of 10 Performance Step:
7 Critical   N NOTE Both samplers should be placed in service, with one sampling the Drywell and the other sampling the Torus.
If only one sampler is available, the Drywell should be sampled first CAUTION During flooding of the Primary Containment, the Containment Atmosphere Monitors shall either be isolated or shifted to a higher sample point prior to containment level rising above the sample line containment penetrations. When all containment sample taps are isolated and/or covered, coordinate with the TSC to establish alternate monitoring, if possible.
If only one sampler is available, the Drywell should be sampled first CAUTION During flooding of the Primary Containment, the Containment Atmosphere Monitors shall either be isolated or shifted to a higher sample point prior to containment level rising above the sample line containment penetrations. When all containment sample taps are isolated and/or covered, coordinate with the TSC to establish alternate monitoring, if possible.
Standard: Reviews Note and Caution Evaluator Cue:
Standard:                 Reviews Note and Caution Evaluator Cue:           If asked, cue the candidate that Primary Containment Flood is NOT in progress.
If asked, cue the candidate that Primary Containment Flood is NOT in progress. Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 8       At 1C09, select a containment sampling point for the H2O2 Analyzers:
8 Critical  Y  At 1C09, select a containment sampling point for the H2O2 Analyzers:
Critical Y
To sample the Torus, position TORUS SAMPLE POINT SELECT switch HS-8116C[D] to OPEN.
* To sample the Torus, position TORUS SAMPLE POINT SELECT switch HS-8116C[D] to OPEN.
To sample Drywell Elevation 817', position DRYWELL SAMPLE POINT 1 SELECT switch HS
* To sample Drywell Elevation 817', position DRYWELL SAMPLE POINT 1 SELECT switch HS-8114C[D] to OPEN.
-8114C[D] to OPEN.
* To sample Drywell Elevation 764', position DRYWELL SAMPLE POINT 2 SELECT switch HS-8115C[D] to OPEN.
To sample Drywell Elevation 764', position DRYWELL SAMPLE POINT 2 SELECT switch HS
Standard:                 Samples the Torus on one of the analyzers and samples either drywell sampling point on the other analyzer.
-8115C[D] to OPEN.
Evaluator Note:           If asked, tell the candidate that Drywell Sample Point 1 is desired Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Samples the Torus on one of the analyzers and samples either drywell sampling point on the other analyzer.
NRC 2011 JPM S-5 rev 5-7.docx                 Page 7 of 10
Evaluator Note:
If asked, tell the candidate that Drywell Sample Point 1 is desired Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0  NRC 2011 JPM S
-5 rev 5-7.docx Page 8 of 10 Performance Step:
9 Critical  Y  At 1C09, verify the ANALYZER MODE SELECT switch is in the ANAL position for each monitor in use.
Standard: Places the ANALYZER MODE SELECT switch is in the ANAL position for each monitor in use.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
10 Critical  Y  At 1C09, reset the Analyzer Trouble Lights by depressing the RESET pushbuttons and confirm ANALZER TROUBLE amber light is OFF.
Standard: Resets the Analyzer Trouble Lights by depressing the RESET pushbuttons and confirms ANALZER TROUBLE amber lights are OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
11 Critical  N  At 1C09, reset the "A" CONTAINMENT H2/O2 ANALZER TROUBLE (1C09A, B-4) and/or "B" CONTAINMENT H2/O2 ANALZER TROUBLE (1C09B, B
-4) Annunciators.
Standard: Resets both Trouble Annunciators.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
The A & B analyzer in service with sample points from both torus and drywell
. NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 9      At 1C09, verify the ANALYZER MODE SELECT switch is in the ANAL position for Critical Y                each monitor in use.
-5 rev 5-7.docx Page 9 of 10 NRC 2011 JPM S
Standard:                 Places the ANALYZER MODE SELECT switch is in the ANAL position for each monitor in use.
-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Examinee: Evaluator:
Performance:             SATISFACTORY                UNSATISFACTORY Comments:
RO    SRO    STA    NSPEO  SRO CERT Date:   ILT RO  ILT SRO    PERFORMANCE RESULTS:
Performance Step: 10      At 1C09, reset the Analyzer Trouble Lights by depressing the RESET pushbuttons Critical Y                and confirm ANALZER TROUBLE amber light is OFF.
SAT: UNSAT:   Remediation required:
Standard:                 Resets the Analyzer Trouble Lights by depressing the RESET pushbuttons and confirms ANALZER TROUBLE amber lights are OFF.
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
Performance Step: 11      At 1C09, reset the A CONTAINMENT H2/O2 ANALZER TROUBLE (1C09A, Critical N                B-4) and/or B CONTAINMENT H2/O2 ANALZER TROUBLE (1C09B, B-4)
EVALUATOR'S SIGNATURE:
Annunciators.
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Standard:                 Resets both Trouble Annunciators.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Terminating Cues:    The A & B analyzer in service with sample points from both torus and drywell.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 JPM S-5 rev 5-7.docx                Page 8 of 10


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Examinee:                                            Evaluator:
-6 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-5 rev 5-7.docx                 Page 9 of 10


20 11 NRC JPM S-6
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-6 NRC 2011 JPM S-6 rev 5-7.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   MAIN GENERATOR SYNCH TO GRID - FAILURE OF MAIN GENERATOR TO AUTO TRIP ON A PRIMARY LOCKOUT JPM NUMBER:                 NRC 2011 JPM S-6             REV.       0 TASK NUMBER(S) /             ROXX TASK TITLE(S):
-6 rev 5-7.docx Page 1 of 19  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
K/A NUMBERS:                 262001                     K/A VALUE:       A4.04 3.6 / 3.7 Justification (FOR K/A VALUES <3.0):
MAIN GENERATOR SYNCH TO GRID  
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
- FAILURE OF MAIN GENERATOR TO AUTO TRIP ON A PRIMARY LOCKOUT JPM NUMBER:
Simulator:             X       Other:
NRC 2011 JPM S
Lab:
-6 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Time for Completion:           30   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
ROXX  K/A NUMBERS:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
262001 K/A VALUE:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-6 rev 5-7.docx                    Page 1 of 19
A4.04 3.6 / 3.7 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
30 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
-6, Main Generator Synch to Grid  
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 2 of 19 SIMULATOR SET UP:
  (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
: 1. Reset simulator to IC 12
: 1. Reset simulator to IC 12
: 2. Mark up OI 698, section 3.3 complete through step 2
: 2. Mark up OI 698, section 3.3 complete through step 2
: 3. Input the simulator triggers and malfunctions as shown below.
: 3. Input the simulator triggers and malfunctions as shown below.
Triggers: Trigger No.
Triggers:
Trigger Logic Statement Trigger Word Description 4 ZDIEGX390(2) >= 1 Power System Stabilizer Switch to ON SIMULATOR MALFUNCTIONS:
Trigger No.       Trigger Logic Statement                     Trigger Word Description 4       ZDIEGX390(2) >= 1                     Power System Stabilizer Switch to ON SIMULATOR MALFUNCTIONS:
TIME MALFUNCTION #  MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV. Setup EG02A Main Gen Lockout Relay Fails Act- Primary Lockout (286/P)   Active  Active Setup EG02B Main Gen Lockout Relay Fails Act- Backup Lockout (286/B)   Active  Active As Dir AN1C08C(1) 1C08C (A-01) Main Generator Primary Lockout Trip 4  ON  OFF As Dir TC01 Main Turbine Trip 4 1 sec Active Inactive SIMULATOR OVERRIDES:
TIME       MALFUN      MALFUNCTION TITLE                   ET   DELAY       F. SEV.     RAMP     I. SEV.
TIME OVERRIDE ID OVERRIDE DESCRIPTION ET DELAY VALUE RAMP Setup DI-EG-028 X389 Main Generator Emergency Trip OFF        SIMULATOR REMOTE FUNCTIONS:
CTION #
NONE Required Materials:
Setup     EG02A     Main Gen Lockout Relay Fails                         Active                Active Act- Primary Lockout (286/P)
OI 698, Rev. 76 1C08C A-1, Rev. 48 General  
Setup     EG02B     Main Gen Lockout Relay Fails                         Active                Active Act- Backup Lockout (286/B)
As Dir   AN1C08C     1C08C (A-01) Main Generator         4              ON                    OFF (1)      Primary Lockout Trip As Dir       TC01     Main Turbine Trip                   4   1 sec       Active                 Inactive SIMULATOR OVERRIDES:
TIME         OVERRI    OVERRIDE DESCRIPTION               ET       DELAY       VALUE         RAMP DE ID Setup       DI-EG-     X389 Main Generator                                       OFF 028        Emergency Trip SIMULATOR REMOTE FUNCTIONS: NONE Required Materials:         OI 698, Rev. 76 1C08C A-1, Rev. 48 General  


==References:==
==References:==
OI 698 Task Standards:            1. Synchronize Main Generator to the Grid
: 2. Recognize failure of main generator to auto trip on Primary Lockout, failure trip PBs AND Exciter Field breaker to auto open.
: 3. Manually opens outputs and exciter field breaker NRC 2011 JPM S-6 rev 5-7.docx                    Page 2 of 19
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
* The plant is starting up.
* The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
* The CRS directs you to synchronize the Main Generator to the grid IAW OI-698 Sections 3.3 and 3.4
* OI 698 is completed through Section 3.3 Step 2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-6 rev 5-7.docx                    Page 3 of 19
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* The plant is starting up.
* The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
* The CRS directs you to synchronize the Main Generator to the grid IAW OI-698 Sections 3.3 and 3.4
* OI 698 is completed through Section 3.3 Step 2.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-6 rev 5-7.docx                          Page 4 of 19
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Review OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Critical N Standard:                    Reviews OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 2          Verify MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A-12) annunciator is Critical N                    RESET.
Standard:                    Verifies MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A-12) annunciator is RESET.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-6 rev 5-7.docx                    Page 5 of 19


OI 698 Task Standards:
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 3      Verify AUX TRANSFORMER 1X2 TROUBLE (1C08B, C-5) annunciator is Critical N                RESET.
: 1. Synchronize Main Generator to the Grid
Standard:                Verifies AUX TRANSFORMER 1X2 TROUBLE (1C08B, C-5) annunciator is RESET.
: 2. Recognize failure of main generator to auto trip on Primary Lockout, failure trip PBs AND Exciter Field breaker to auto open.  
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
: 3. Manually opens outputs and exciter field breaker
Performance Step: 4      Verify that the main turbine is at 1,800 rpm by observing the SPEED indicator on Critical N                1C07.
Standard:                Verifies that the main turbine is at 1,800 rpm by observing the SPEED indicator on 1C07.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 5      If the Hydrogen Seal Oil system was kept in service, verify OPEN V-45-84, Critical N                PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.
Standard:                Contacts field operator to verify OPEN V-45-84, PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.
Evaluator Cue:            Respond as field operator that PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION is OPEN Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-6 rev 5-7.docx                  Page 6 of 19


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 6      Place 241CS, GENERATOR EXCITER FIELD BREAKER control switch, Critical Y                momentarily in the CLOSE position.
-6 rev 5-7.docx Page 3 of 19 TURNOVER SHEET INITIAL CONDITIONS:
Standard:                Places 241CS, GENERATOR EXCITER FIELD BREAKER control switch, momentarily in the CLOSE position.
The plant is starting up.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
Performance Step: 7      Verify the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, Critical N                indicating the exciter deexcitation circuit is deactivated on 1C08.
The CRS directs you to synchronize the Main Generator to the grid IAW OI
Standard:                 Verifies the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, indicating the exciter deexcitation circuit is deactivated on 1C08.
-698 Sections 3.3 and 3.4 OI 698 is completed through Section 3.3 Step 2.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Performance Step: 8      Using the GENERATOR VOLTAGE SELECT switch, observe on the Critical N                GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.
Standard:                 Using the GENERATOR VOLTAGE SELECT switch, observes on the GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-6 rev 5-7.docx                  Page 7 of 19


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 9      Observe proper voltage regulator response by varying 270CS, GENERATOR Critical Y                MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.
-6, Main Generator Synch to Grid  
Standard:                Observes proper voltage regulator response by varying 270CS, GENERATOR MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
-6 rev 5-7.docx Page 4 of 19  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Performance Step: 10      Raise generator phase voltage to 22,000 volts by adjusting the GENERATOR Critical Y                MANUAL VOLTAGE ADJUST.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. INITIAL CONDITIONS:
Standard:                Raises generator phase voltage to 22,000 volts by adjusting the GENERATOR MANUAL VOLTAGE ADJUST.
The plant is starting up.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
Performance Step: 11                                          NOTE:
The CRS directs you to synchronize the Main Generator to the grid IAW OI
Critical N
-698 Sections 3.3 and 3.4 OI 698 is completed through Section 3.3 Step 2.
* Placing the Main Generator on the Grid with Manual Voltage Regulation, is being performed.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE
* NERC Std VAR-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes.
Standard:                Reviews NOTES and continues to procedure step 12.
Evaluator Cue:           If asked, inform the candidate that they will NOT be placing the Main Generator on the Grid with Manual Voltage Regulation, Performance:              SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-6 rev 5-7.docx                Page 8 of 19


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 12      Transfer voltage regulation to automatic as follows:
-6, Main Generator Synch to Grid  
Critical Y                    a. Adjust 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, until zero is obtained on the GENERATOR REGULATOR VOLTS meter.
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 5 of 19  JPM PERFORMANCE INFORMATION Start Time:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
1 Critical  N  Review OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Standard: Reviews OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
2 Critical  N  Verify MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A
-12) annunciator is RESET. Standard: Verifies MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A
-12) annunciator is RESET. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 6 of 19 Performance Step:
3 Critical  N  Verify AUX TRANSFORMER 1X2 TROUBLE (1C08B, C
-5) annunciator is RESET. Standard: Verifies AUX TRANSFORMER 1X2 TROUBLE (1C08B, C
-5) annunciator is RESET. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical  N  Verify that the main turbine is at 1,800 rpm by observing the SPEED indicator on 1C07. Standard: Verifies that the main turbine is at 1,800 rpm by observing the SPEED indicator on 1C07. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical  N  If the Hydrogen Seal Oil system was kept in service, verify OPEN V 84, PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.
Standard: Contacts field operator to verify OPEN V 84, PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.
Evaluator Cue:
Respond as field operator that PCV
-3635 D/P REGULATOR HIGH SIDE ISOLATION is OPEN Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 7 of 19 Performance Step:
6 Critical  Y  Place 241CS, GENERATOR EXCITER FIELD BREAKER control switch, momentarily in the CLOSE position.
Standard: Places 241CS, GENERATOR EXCITER FIELD BREAKER control switch, momentarily in the CLOSE position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
7 Critical  N  Verify the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, indicating the exciter deexcitation circuit is deactivated on 1C08.
Standard: Verifies the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, indicating the exciter deexcitation circuit is deactivated on 1C08.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
8 Critical  N  Using the GENERATOR VOLTAGE SELECT switch, observe on the GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.
Standard: Using the GENERATOR VOLTAGE SELECT switch, observes on the GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 8 of 19 Performance Step:
9 Critical  Y  Observe proper voltage regulator response by varying 270CS, GENERATOR MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter. Standard: Observes proper voltage regulator response by varying 270CS, GENERATOR MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
10 Critical  Y  Raise generator phase voltage to 22,000 volts by adjusting the GENERATOR MANUAL VOLTAGE ADJUST.
Standard: Raises generator phase voltage to 22,000 volts by adjusting the GENERATOR MANUAL VOLTAGE ADJUST.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
11 Critical  N  NOTE:  Placing the Main Generator on the Grid with Manual Voltage Regulation, is being performed.
NOTE  NERC Std VAR
-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes. Standard: Reviews NOTES and continues to procedure step 12.
Evaluator Cue:
If asked, inform the candidate that they will NOT be placing the Main Generator on the Grid with Manual Voltage Regulation,    Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 9 of 19 Performance Step:
12 Critical  Y  Transfer voltage regulation to automatic as follows:
: a. Adjust 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, until zero is obtained on the GENERATOR REGULATOR VOLTS meter.
: b. Place 243CS, REGULATOR TRANSFER switch, to the AUTO position.
: b. Place 243CS, REGULATOR TRANSFER switch, to the AUTO position.
: c. Observe proper voltage regulator response by varying 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.
: c. Observe proper voltage regulator response by varying 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.
: d. Return generator phase voltage to 22,000 volts by adjusting the GENERATOR AUTOMATIC VOLTAGE ADJUST.
: d. Return generator phase voltage to 22,000 volts by adjusting the GENERATOR AUTOMATIC VOLTAGE ADJUST.
Standard: Transfers voltage regulation to automatic IAW the above steps.
Standard:                 Transfers voltage regulation to automatic IAW the above steps.
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 13     Record the time that the REGULATOR TRANSFER switch was placed in AUTO Critical N                in the Operating Log.
13 Critical  N  Record the time that the REGULATOR TRANSFER switch was placed in AUTO in the Operating Log.
Standard:                 Records the time that the REGULATOR TRANSFER switch was placed in AUTO in the Operating Log.
Standard: Records the time that the REGULATOR TRANSFER switch was placed in AUTO in the Operating Log.
Evaluator Cue:           Another operator will record the time in the log Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Evaluator Cue:
NRC 2011 JPM S-6 rev 5-7.docx                Page 9 of 19
Another operator will record the time in the log Performance:
 
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 14       Inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR Critical N                TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.
QF-1030-11 Rev. 7 NRC 2011 JPM S
Standard:                 Informs the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.
-6, Main Generator Synch to Grid  
Evaluator Cue:             Another operator will inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
-6 rev 5-7.docx Page 10 of 19 Performance Step: 14 Critical  N  Inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid. Standard: Informs the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid. Evaluator Cue:
Performance Step: 15       Record the time that the Load Dispatcher, ATC and Real Time Desk were Critical N                notified in the Operating Log.
Another operator will inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.
Standard:                 Records the time that the Load Dispatcher, ATC and Real Time Desk were notified in the Operating Log.
Performance:
Evaluator Cue:             Another operator will record the time in the log.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
15 Critical  N  Record the time that the Load Dispatcher, ATC and Real Time Desk were notified in the Operating Log.
Evaluator NOTE: After the above steps are complete, the candidate will transfer to section 3.4 to continue.
Standard: Records the time that the Load Dispatcher, ATC and Real Time Desk were notified in the Operating Log.
NRC 2011 JPM S-6 rev 5-7.docx                  Page 10 of 19
Evaluator Cue:
 
Another operator will record the time in the log.
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 16                                          NOTE:
Performance:
Critical N The generator may be placed on either the East or the West 161 KV Bus first, depending on system requirements. The following instructions assume that GENERATOR OUTPUT I BREAKER (OCB 4290) (161 KV West Bus) is closed first. Designations shown in brackets should be used if GENERATOR OUTPUT H BREAKER (OCB 0220) (161 KV East Bus) is closed first.
SATISFACTORY UNSATISFACTORY Comments:       Evaluator NOTE: After the above steps are complete, the candidate will transfer to section 3.4 to continue.
Standard:                 Reviews NOTE Evaluator Note:           If the candidate asks for guidance, you may direct them to close the I breaker first.
QF-1030-11 Rev. 7 NRC 2011 JPM S
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
-6, Main Generator Synch to Grid  
Performance Step: 17     Close Generator MO - Disconnect SW 0236 and verify closed by red flag and Critical Y                red light on.
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Standard:                 Closes Generator MO - Disconnect SW 0236 and verify closed by red flag and red light on.
-6 rev 5-7.docx Page 11 of 19 Performance Step:
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
16 Critical   N NOTE: The generator may be placed on either the East or the West 161 KV Bus first, depending on system requirements. The following instructions assume that GENERATOR OUTPUT I BREAKER (OCB 4290) (161 KV West Bus) is closed first. Designations shown in brackets should be used if GENERATOR OUTPUT H BREAKER (OCB 0220) (161 KV East Bus) is closed first.
Performance Step: 18     Close Generator MO - Disconnect SW 4292 and verify closed by red flag and Critical Y                red light on.
Standard: Reviews NOTE   Evaluator Note:
Standard:                 Closes Generator MO - Disconnect SW 4292 and verify closed by red flag and red light on.
If the candidate asks for guidance, you may direct them to close the "I" breaker first.
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
Performance:
NRC 2011 JPM S-6 rev 5-7.docx                Page 11 of 19
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
 
17 Critical  Y  Close Generator MO  
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 19     Place GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the Critical N                ON position.
- Disconnect SW 0236 and verify closed by red flag and red light on.
Standard:                 Places GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the ON position.
Standard: Closes Generator MO  
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
- Disconnect SW 0236 and verify closed by red flag and red light on. Performance:
Performance Step: 20     Adjust voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, Critical Y                so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 18 Critical  Y  Close Generator MO  
Standard:                 Adjusts voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.
- Disconnect SW 4292 and verify closed by red flag and red light on.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Closes Generator MO  
Performance Step: 21     Adjust the LOAD SET ADJUST INCREASE button on 1C07 until the Critical Y                synchroscope is rotating slowly in the clockwise direction.
- Disconnect SW 4292 and verify closed by red flag and red light on. Performance:
Standard:                 Adjusts the LOAD SET ADJUST INCREASE button on 1C07 until the synchroscope is rotating slowly in the clockwise direction.
SATISFACTORY UNSATISFACTORY Comments:
Evaluator Cue:           If the candidate raises Turbine/Generator speed too much they may want to use the DECREASE pushbutton to adjust speed. If the candidate requests permission to use the DECREASE pushbutton then acknowledge the request and give permission.
QF-1030-11  Rev. 7 NRC 2011 JPM S
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-6, Main Generator Synch to Grid  
NRC 2011 JPM S-6 rev 5-7.docx                Page 12 of 19
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
 
-6 rev 5-7.docx Page 12 of 19 Performance Step:
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 22     If necessary, further adjust 290CS, GENERATOR AUTOMATIC VOLTAGE Critical Y                ADJUST, to match the incoming and running volts.
19 Critical  N  Place GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the ON position.
Standard:                 If necessary, further adjusts 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, to match the incoming and running volts.
Standard: Places GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the ON position. Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 23     As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily Critical Y                place the GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] control switch in the CLOSE position.
20 Critical  Y  Adjust voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.
Standard:                 As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily places the GENERATOR OUTPUT I BREAKER (OCB 4290) control switch in the CLOSE position.
Standard: Adjusts voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
Performance:
Performance Step: 24     Observe the synchroscope pointer locks in at the 12 o'clock position and that Critical N                GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] breaker is closed as indicated by the red breaker position indicating light.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 21 Critical  Y  Adjust the LOAD SET ADJUST INCREASE button on 1C07 until the synchroscope is rotating slowly in the clockwise direction.
Standard:                 Observes the synchroscope pointer locks in at the 12 o'clock position and that GENERATOR OUTPUT I BREAKER (OCB 4290) breaker is closed as indicated by the red breaker position indicating light.
Standard: Adjusts the LOAD SET ADJUST INCREASE button on 1C07 until the synchroscope is rotating slowly in the clockwise direction.
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Cue:
NRC 2011 JPM S-6 rev 5-7.docx                Page 13 of 19
If the candidate raises Turbine/Generator speed too much they may want to use the DECREASE pushbutton to adjust speed. If the candidate requests permission to use the DECREASE pushbutton then acknowledge the request and give permission.
 
Performance:
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 25     Establish an initial load as specified by the Operations Shift Supervisor or OI Critical Y                693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                 Establishes an initial load as specified by the Operations Shift Supervisor or OI 693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.
QF-1030-11 Rev. 7 NRC 2011 JPM S
Evaluator Cue:           If the candidate requests guidance then direct them to pick up load as necessary to close the Turbine Bypass Valve.
-6, Main Generator Synch to Grid  
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Performance Step: 26     Place the GENERATOR OUTPUT I BREAKER SYNCHRONIZE [GENERATOR Critical N                OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position.
-6 rev 5-7.docx Page 13 of 19 Performance Step:
Standard:                 Places the GENERATOR OUTPUT I BREAKER SYNCHRONIZE
22 Critical  Y  If necessary, further adjust 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, to match the incoming and running volts.
[GENERATOR OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position.
Standard: If necessary, further adjusts 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, to match the incoming and running volts.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step: 27     Place the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE)
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical N                [GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.
23 Critical  Y  As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily place the GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] control switch in the CLOSE position.
Standard:                 Places the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE)
Standard: As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily places the GENERATOR OUTPUT I BREAKER (OCB 4290) control switch in the CLOSE position.
[GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
NRC 2011 JPM S-6 rev 5-7.docx                  Page 14 of 19
24 Critical  N  Observe the synchroscope pointer locks in at the 12 o'clock position and that GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] breaker is closed as indicated by the red breaker position indicating light.
 
Standard: Observes the synchroscope pointer locks in at the 12 o'clock position and that GENERATOR OUTPUT I BREAKER (OCB 4290) breaker is closed as indicated by the red breaker position indicating light.
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 28     Place the GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR Critical Y                OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position.
Performance:
Standard:                 Places the GENERATOR OUTPUT H BREAKER (OCB 0220)
SATISFACTORY UNSATISFACTORY Comments:
[GENERATOR OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position.
QF-1030-11 Rev. 7 NRC 2011 JPM S
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-6, Main Generator Synch to Grid  
Performance Step: 29     Observe that GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR Critical N                OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Standard:                 Observes that GENERATOR OUTPUT H BREAKER (OCB 0220)
-6 rev 5-7.docx Page 14 of 19 Performance Step:
[GENERATOR OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.
25 Critical  Y  Establish an initial load as specified by the Operations Shift Supervisor or OI 693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Establishes an initial load as specified by the Operations Shift Supervisor or OI 693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.
Performance Step: 30     Place the GENERATOR OUTPUT H BREAKER SYNCHRONIZE Critical N                [GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position.
Evaluator Cue:
Standard:                 Places the GENERATOR OUTPUT H BREAKER SYNCHRONIZE
If the candidate requests guidance then direct them to pick up load as necessary to close the Turbine Bypass Valve.
[GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position.
Performance:
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
NRC 2011 JPM S-6 rev 5-7.docx                Page 15 of 19
26 Critical  N  Place the GENERATOR OUTPUT I BREAKER SYNCHRONIZE [GENERATOR OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position.
 
Standard: Places the GENERATOR OUTPUT I BREAKER SYNCHRONIZE [GENERATOR OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position. Performance:
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 31                                               NOTE Critical N
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
* NERC Std VAR-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes.
27 Critical  N  Place the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE) [GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.
Standard:                     Reviews NOTES and continues.
Standard: Places the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE) [GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.
Performance:                 SATISFACTORY               UNSATISFACTORY Comments:
Performance:
Evaluator NOTE: When the next step is performed, the Main Turbine will trip, the Primary Generator Lockout will alarm, but the Main Generator will not trip either automatically or with the Main Generator trip pushbutton located on 1C08. The candidate will have to open the H and I breakers, then open the Generator field breaker (in that order).
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 32          Place the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power Critical N                    System Stabilizer) in the ON position.
QF-1030-11  Rev. 7 NRC 2011 JPM S
Standard:                     Places the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power System Stabilizer) in the ON position.
-6, Main Generator Synch to Grid  
Performance:                 SATISFACTORY               UNSATISFACTORY Comments:
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
Performance Step: 33          Diagnose Turbine Trip Critical N Standard:                     Diagnoses and announces Turbine Trip Performance:                 SATISFACTORY               UNSATISFACTORY Comments:
-6 rev 5-7.docx Page 15 of 19 Performance Step:
NRC 2011 JPM S-6 rev 5-7.docx                   Page 16 of 19
28 Critical  Y  Place the GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position. Standard: Places the GENERATOR OUTPUT H BREAKER (OCB 0220)
[GENERATOR OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
29 Critical  N  Observe that GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.
Standard: Observes that GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
30 Critical  N  Place the GENERATOR OUTPUT H BREAKER SYNCHRONIZE [GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position. Standard: Places the GENERATOR OUTPUT H BREAKER SYNCHRONIZE [GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid  
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 16 of 19 Performance Step:
31 Critical N NOTE  NERC Std VAR
-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes. Standard: Reviews NOTES and continues.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Evaluator NOTE: When the next step is performed, the Main Turbine will trip, the Primary Generator Lockout will alarm, but the Main Generator will not trip either automatically or with the Main Generator trip pushbutton located on 1C08. The candidate will have to open the H and I breakers, then open the Generator field breaker (in that order).
Performance Step:
3 2 Critical  N  Place the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power System Stabilizer) in the ON position.
Standard: Places the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power System Stabilizer) in the ON position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
3 3 Critical  N  Diagnose Turbine Trip Standard: Diagnoses and announces Turbine Trip Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-6, Main Generator Synch to Grid
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 NRC 2011 JPM S
-6 rev 5-7.docx Page 17 of 19 Performance Step:
3 4 Critical  N  Diagnose the failure of the Main Generator to Trip Standard: Diagnoses the failure of the Main Generator to Trip and proceeds to separate the Generator from the buses.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
3 5 Critical  Y Verify the following:
Generator Output H Breaker OPEN Generator Output H Breaker OPEN Generator Field Breaker OPEN Standard: Opens the following breakers:
Generator Output H Breaker Generator Output H Breaker Generator Field Breaker (LAST)    Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
Turbine and Generator Tripped. Output Breakers OPEN, Exciter Field Breaker OPEN. NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 34      Diagnose the failure of the Main Generator to Trip Critical N Standard:                 Diagnoses the failure of the Main Generator to Trip and proceeds to separate the Generator from the buses.
-6 rev 5-7.docx Page 18 of 19 NRC 2011 JPM S
Performance:             SATISFACTORY                UNSATISFACTORY Comments:
-6, Main Generator Synch to Grid  
Performance Step: 35      Verify the following:
- Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Examinee: Evaluator:
Critical Y
RO    SRO    STA    NSPEO  SRO CERT Date:   ILT RO  ILT SRO    PERFORMANCE RESULTS:
* Generator Output H Breaker OPEN
SAT: UNSAT:   Remediation required:
* Generator Output H Breaker OPEN
YES  NO    COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
* Generator Field Breaker OPEN Standard:                Opens the following breakers:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
* Generator Output H Breaker
EVALUATOR'S SIGNATURE:
* Generator Output H Breaker
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
* Generator Field Breaker (LAST)
Performance:             SATISFACTORY                UNSATISFACTORY Comments:
Terminating Cues:   Turbine and Generator Tripped. Output Breakers OPEN, Exciter Field Breaker OPEN.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 JPM S-6 rev 5-7.docx                Page 17 of 19


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Examinee:                                            Evaluator:
-7 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-6 rev 5-7.docx                 Page 18 of 19


201 1 NRC JPM S-7
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-7 NRC 2011 JPM S-7 rev 5-7.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   PERFORM DOWNSCALE/UPSCALE TRIP OPERATIONAL CHECK OF ARMS JPM NUMBER:                 NRC 2011 JPM S-7             REV.       8 TASK NUMBER(S) /             86.04 TASK TITLE(S):               Perform Downscale/Upscale Trip Setpoint Check K/A NUMBERS:                 272000                     K/A VALUE:       A4.02 3.0/3.0 Justification (FOR K/A VALUES <3.0):
-7 rev 5-7.docx Page 2 of 13  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
PERFORM DOWNSCALE/UPSCALE TRIP OPERATIONAL CHECK OF ARMS JPM NUMBER:
Simulator:             X       Other:
NRC 2011 JPM S
Lab:
-7 REV. 8   TASK NUMBER(S) / TASK TITLE(S):
Time for Completion:           15   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
86.04 Perform Downscale/Upscale Trip Setpoint Check K/A NUMBERS:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
272000 K/A VALUE:
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-7 rev 5-7.docx                    Page 2 of 13
A4.02 3.0/3.0 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
15 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 NRC 2011 JPM S-7 rev 5-7.docx Page 3 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
: 1. Reset to any full power IC.
: 1. Reset to any full power IC.
: 2. Simulator instructor to acknowledge alarms received during performance of the JPM and to function as front panel operator for communications with the operator.
: 2. Simulator instructor to acknowledge alarms received during performance of the JPM and to function as front panel operator for communications with the operator.
SIMULATOR MALFUNCTIONS:
SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:         Simulator General  
None SIMULATOR OVERRIDES:
None SIMULATOR REMOTE FUNCTIONS:
None Required Materials:
Simulator General  


==References:==
==References:==
 
OI 879.2, Rev. 22 Task Standards:             1. Determine the Downscale and Upscale Trip Setpoints.
OI 879.2, Rev. 22 Task Standards:
: 1. Determine the Downscale and Upscale Trip Setpoints.
: 2. Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.
: 2. Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.
: 3. ARM indicator is placed between Downscale and Upscale setpoints.
: 3. ARM indicator is placed between Downscale and Upscale setpoints.
Line 2,800: Line 2,242:
: 11. Mode Selector switch is placed in OPERATE.
: 11. Mode Selector switch is placed in OPERATE.
: 12. Reset pushbutton is depressed.
: 12. Reset pushbutton is depressed.
NRC 2011 JPM S-7 rev 5-7.docx                    Page 3 of 13


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-7 rev 5-7.docx Page 4 of 13 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.
* RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.
 
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI
* The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI-9167, Reactor Building Railroad Access Area, per OI-879.2, Section 6.0.
-9167, Reactor Building Railroad Access Area, per OI
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-879.2, Section 6.0. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-7 rev 5-7.docx                       Page 4 of 13
 
QF-1030-11  Rev. 7 NRC 2011 JPM S
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8  NRC 2011 JPM S
-7 rev 5-7.docx Page 5 of 13 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.


QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.
* RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI
* The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI-9167, Reactor Building Railroad Access Area, per OI-879.2, Section 6.0.
-9167, Reactor Building Railroad Access Area, per OI
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-879.2, Section 6.0.
NRC 2011 JPM S-7 rev 5-7.docx                          Page 5 of 13
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          The control room operator should check the Downscale and Upscale Trip Critical N                    Setpoints on each ARM when placed in service or whenever the trip setpoints are suspect.
Standard:                    The ARM to be tested was given in the turnover.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 2          For the Upscale Trip Setpoint verification, the operator shall use the trip setpoint Critical Y                    data contained in Appendix 1 of this procedure. The ARM trip setpoint checks will be performed on the respective ARM Indicator and Trip Units at Panel 1C11.
Standard:                    Candidate will reference Attachment 1 and determine that the Downscale reading for RI-9167 is .1 mR/Hr and the Upscale setpoint is 10 mR/Hr.
Evaluator Note:              The Upscale and Downscale setpoints are also on the RI on a faceplate.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-7 rev 5-7.docx                    Page 6 of 13
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 3      Turn the Trip Check Adjust knob on the respective power supply Critical N                E/S9150A[ B or C] for the ARM being tested fully counter-clockwise.
Standard:                Turns the Trip Check Adjust knob fully counter-clockwise on power supply E/S9150A.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 4      Place the Mode Selector Switch for the ARM being tested in the TRIP TEST Critical Y                position.
Standard:                Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.
Evaluator Note:          Candidate may state that they are expecting an alarm.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 5      Verify that the ARM DNSCL/INOP (1C04B, C-7) annunciator is activated.
Critical N Standard:                Verifies that the ARM DNSCL/INOP (1C04B, C-7) annunciator is activated.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step: 6      Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y                Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
Standard:                ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.
Performance:              SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-7 rev 5-7.docx                Page 7 of 13


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 7       Verify that both low and high front panel lights are OFF.
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 NRC 2011 JPM S
Critical N Standard:                 Reset pushbutton pushed and both the LOW and HIGH lights are OFF.
-7 rev 5-7.docx Page 6 of 13  JPM PERFORMANCE INFORMATION Start Time:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step: 8       Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is Critical Y                activated, then verify the following:
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
1 Critical  N  The control room operator should check the Downscale and Upscale Trip Setpoints on each ARM when placed in service or whenever the trip setpoints are suspect.
Standard: The ARM to be tested was given in the turnover.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
2 Critical Y  For the Upscale Trip Setpoint verification, the operator shall use the trip setpoint data contained in Appendix 1 of this procedure. The ARM trip setpoint checks will be performed on the respective ARM Indicator and Trip Units at Panel 1C11. Standard: Candidate will reference Attachment 1 and determine that the Downscale reading for RI
-9167 is .1 mR/Hr and the Upscale setpoint is 10 mR/Hr.
Evaluator Note:
The Upscale and Downscale setpoints are also on the RI on a faceplate.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8  NRC 2011 JPM S
-7 rev 5-7.docx Page 7 of 13 Performance Step:
3 Critical N  Turn the Trip Check Adjust knob on the respective power supply E/S9150A[ B or C] for the ARM being tested fully counter
-clockwise.
Standard: Turns the Trip Check Adjust knob fully counter
-clockwise on power supply E/S9150A. Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical Y  Place the Mode Selector Switch for the ARM being tested in the TRIP TEST position. Standard: Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.
Evaluator Note:
Candidate may state that they are expecting an alarm.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
5 Critical N  Verify that the ARM DNSCL/INOP (1C04B, C
-7) annunciator is activated.
Standard: Verifies that the ARM DNSCL/INOP (1C04B, C
-7) annunciator is activated.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
6 Critical Y  Position the Trip Check Adjust Knob such that the indication on the ARM Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8  NRC 2011 JPM S
-7 rev 5-7.docx Page 8 of 13 Performance Step:
7 Critical N  Verify that both low and high front panel lights are OFF.
Standard: Reset pushbutton pushed and both the LOW and HIGH lights are OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
8 Critical Y  Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is activated, then verify the following:
The HIGH light on the front panel of the ARM Indicator and Trip Unit turns on.
The HIGH light on the front panel of the ARM Indicator and Trip Unit turns on.
Standard: Trip Check Adjust knob turned until the Upscale Trip is activated and the HIGH light turns on.
Standard:                 Trip Check Adjust knob turned until the Upscale Trip is activated and the HIGH light turns on.
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 9       Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is Critical N                activated, then verify the following:
9 Critical N  Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is activated, then verify the following:
* The corresponding ARM Upscale Trip Annunciator on Panel 1C04B or Panel 1C35A is activated. (See Appendix 2 for a listing of ARM annunciators.)
The corresponding ARM Upscale Trip Annunciator on Panel 1C04B or Panel 1C35A is activated. (See Appendix 2 for a listing of ARM annunciators.
Standard:                 Verifies that 1C04B annunciator activated Evaluator Note:           Appendix 2 references this alarm as 1C04B <A-6>.
)    Standard: Verifies that 1C04B annunciator activated Evaluator Note:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
Appendix 2 references this alarm as 1C04B <A
NRC 2011 JPM S-7 rev 5-7.docx                  Page 8 of 13
-6>. Performance:
 
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 10     Slowly turn the Trip Check Adjust know clockwise until the Upscale Trip is Critical Y                activated, then verify the following;
QF-1030-11 Rev. 7 NRC 2011 JPM S
* The Upscale Trip Setpoint is approximately the same as that provided by the Health Physics Department (Appendix 1 is a representative setpoint).
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 NRC 2011 JPM S
Standard:                 Determines that the trip setpoint is approximately the same as that provided by Appendix 1.
-7 rev 5-7.docx Page 9 of 13 Performance Step:
Candidate may call Health Physics Dept to verify the Appendix 1 data is Evaluator Cue:
10 Critical Y  Slowly turn the Trip Check Adjust know clockwise until the Upscale Trip is activated, then verify the following; The Upscale Trip Setpoint is approximately the same as that provided by the Health Physics Department (Appendix 1 is a representative setpoint).
current/valid. Inform him that Appendix 1 data is current.
Standard: Determines that the trip setpoint is approximately the same as that provided by Appendix 1.
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 11     Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y                Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
Candidate may call Health Physics Dept to verify the Appendix 1 data is current/valid. Inform him that Appendix 1 data is current.
Standard:                 ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 12     Depress the RESET pushbutton on the ARM being tested, then verify the Critical Y                following:
11 Critical Y  Position the Trip Check Adjust Knob such that the indication on the ARM Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
12 Critical  Y  Depress the RESET pushbutton on the ARM being tested, then verify the following:
The HIGH light on the front panel of the Indicator and Trip Unit turns OFF.
The HIGH light on the front panel of the Indicator and Trip Unit turns OFF.
Standard: HIGH light on the front panel of the Indicator and Trip Unit is OFF.
Standard:                 HIGH light on the front panel of the Indicator and Trip Unit is OFF.
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 JPM S-7 rev 5-7.docx                  Page 9 of 13
QF-1030-11 Rev. 7 NRC 2011 JPM S
 
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 13     Depress the RESET pushbutton on the ARM being tested, then verify the Critical N                following:
-7 rev 5-7.docx Page 1 0 of 13 Performance Step:
The corresponding ARM Upscale Trip Annunciator on Panel 1C04B or Panel 1C35A resets Standard:                 Annunciator on 1C04B is resets.
13 Critical  N  Depress the RESET pushbutton on the ARM being tested, then verify the following:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
The corresponding ARM Upscale Trip Annunciator on Panel 1C04B or Panel 1C35A resets Standard: Annunciator on 1C04B is resets.
Performance Step: 14     Slowly turn the Trip Check Adjust Knob counter-clockwise until the downscale Critical Y                trip is activated, then verify the following:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
14 Critical  Y  Slowly turn the Trip Check Adjust Knob counter
-clockwise until the downscale trip is activated, then verify the following:
The LOW light on the front panel of the ARM Indicator and Trip Unit turns ON.
The LOW light on the front panel of the ARM Indicator and Trip Unit turns ON.
Standard: Trip Check Adjust Knob turned clockwise until the downscale trip is activated and LOW light on.
Standard:                 Trip Check Adjust Knob turned clockwise until the downscale trip is activated and LOW light on.
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 15     Slowly turn the Trip Check Adjust Knob counter-clockwise until the downscale Critical N                trip is activated, then verify the following:
15 Critical  N  Slowly turn the Trip Check Adjust Knob counter
-clockwise until the downscale trip is activated, then verify the following:
The Downscale Trip Setpoint is approximately the same as that listed in Appendix 1.
The Downscale Trip Setpoint is approximately the same as that listed in Appendix 1.
Standard: Determines that the trip setpoint is approximately the same as that provided by Appendix 1.
Standard:                 Determines that the trip setpoint is approximately the same as that provided by Appendix 1.
Performance:
Performance:             SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 JPM S-7 rev 5-7.docx                  Page 10 of 13
QF-1030-11 Rev. 7 NRC 2011 JPM S
 
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 16     Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y                Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
-7 rev 5-7.docx Page 11 of 13 Performance Step:
Standard:                 ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.
16 Critical  Y  Position the Trip Check Adjust Knob such that the indication on the ARM Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.
Verify that the LOW light turns OFF.
Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints. Verify that the LOW light turns OFF.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step: 17     Verify that the LOW light turns OFF.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical N Standard:                 Reset pushbutton on the ARM is depressed and the LOW light is OFF.
17 Critical  N  Verify that the LOW light turns OFF.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Reset pushbutton on the ARM is depressed and the LOW light is OFF.
Performance Step: 18     Return the Mode Selector Switch for the ARM being tested to the OPERATE Critical Y                position.
Performance:
Standard:                 Mode Selector switch is placed in OPERATE.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 18 Critical Y  Return the Mode Selector Switch for the ARM being tested to the OPERATE position. Standard: Mode Selector switch is placed in OPERATE.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step: 19     Depress the RESET pushbutton and verify that the ARM DNSCL/INOP Critical Y                (1C04B, C-7) annunciator is reset.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Standard:                 RESET pushbutton is depressed and annunciator 1C04B C-7 is reset.
19 Critical Y  Depress the RESET pushbutton and verify that the ARM DNSCL/INOP (1C04B, C-7) annunciator is reset.
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
Standard: RESET pushbutton is depressed and annunciator 1C04B C
NRC 2011 JPM S-7 rev 5-7.docx               Page 11 of 13
-7 is reset.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8  NRC 2011 JPM S
-7 rev 5-7.docx Page 12 of 13 Terminating Cues:
The JPM is complete when the Downscale/Upscale Trip Operational check has been performed on RI 9167, Reactor Building Railroad Access Area.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Terminating Cues:    The JPM is complete when the Downscale/Upscale Trip Operational check has been performed on RI 9167, Reactor Building Railroad Access Area.
-7 rev 5-7.docx Page 13 of 13 NRC 2011 JPM S
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Examinee: Evaluator:
Stop Time:
RO   SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
NRC 2011 JPM S-7 rev 5-7.docx              Page 12 of 13
SAT:  UNSAT:  Remediation required:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:  ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Examinee:                                            Evaluator:
-8 rev 5-7.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                        UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-7 rev 5-7.docx                 Page 13 of 13


2011 NRC JPM S
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-8 NRC 2011 JPM S-8 rev 5-7.docx
-8


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM S
JPM TITLE:                   INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER:                 NRC 2011 JPM S-8             REV.       0 TASK NUMBER(S) /             95.14 TASK TITLE(S):
-8 rev 5-7.docx Page 1 of 11  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
K/A NUMBERS:                 400000                     K/A VALUE:       A4.01 3.1/3.0 Justification (FOR K/A VALUES <3.0):
INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER:
TASK APPLICABILITY:           RO       SRO     STA     NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:               Perform:     X EVALUATION LOCATION:             In-Plant:                       Control Room:
NRC 2011 JPM S
Simulator:             X       Other:
-8 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Lab:
95.14  K/A NUMBERS:
Time for Completion:           20   Minutes   Time Critical:         Yes         No Alternate Path [NRC]:           Yes     No Alternate Path [INPO]:         Yes     No Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
400000 K/A VALUE:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
A4.01 3.1/3.0 Justification (FOR K/A VALUES <3.0):
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-8 rev 5-7.docx                    Page 1 of 11
TASK APPLICABILITY:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
X Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 SIMULATOR SETUP: (Modify table as necessary) (Only required for simulator JPMs)
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM S
-8 rev 5-7.docx Page 2 of 11 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
: 1. Reset to an IC that supports installing Defeat 4 Group 7 bypass and re
: 1. Reset to an IC that supports installing Defeat 4 Group 7 bypass and re-establishing drywell cooling.
-establishing drywell cooling.
(saved IC file for 2011 NRC Exam)
(saved IC file for 2011 NRC Exam)
: 2. Ensure only the D Well Water pump is the only well pump operating. Secure the A Well Pump, and set its controller to 10.
: 2. Ensure only the "D" Well Water pump is the only well pump operating. Secure the A Well Pump, and set its controller to 10.
 
SIMULATOR MALFUNCTIONS:
SIMULATOR MALFUNCTIONS:
NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
NOTE:     The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
TIME MALFUNCTION #
TIME       MALFUNCTION #         MALFUNCTION         ET   DELAY     F. SEV. RAMP     I. SEV.
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV. T=0 RR30 Reactor bottom drain leak 10 As is T=0 MS32 Spurious group 7 isolation       SIMULATOR OVERRIDES:
TITLE T=0       RR30                   Reactor bottom                       10                 As is drain leak T=0       MS32                   Spurious group 7 isolation SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:         1. EOP Defeat 4, Rev. 8
None SIMULATOR REMOTE FUNCTIONS:
None   Required Materials:
: 1. EOP Defeat 4, Rev. 8
: 2. OI 408, Rev 64 General  
: 2. OI 408, Rev 64 General  


==References:==
==References:==


Task Standards:
Task Standards:             1. FC 4414A is dialed to zero flow.
: 1. FC 4414A is dialed to zero flow. 2. HS-4321A taken to OVERRIDE position and amber light is ON.
: 2. HS-4321A taken to OVERRIDE position and amber light is ON.
: 3. HS-4321B taken to OVERRIDE position and amber light is ON.
: 3. HS-4321B taken to OVERRIDE position and amber light is ON.
: 4. HS-4417D for "A" Well Water Pump taken to start.
: 4. HS-4417D for A Well Water Pump taken to start.
: 5. "A" Well flow adjusted at 1C23 via FC 4414A.
: 5. A Well flow adjusted at 1C23 via FC 4414A.
NRC 2011 JPM S-8 rev 5-7.docx                      Page 2 of 11


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-8 rev 5-7.docx Page 3 of 11 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
A plant Scram has occurred.
* A plant Scram has occurred.
RPV level lowered rapidly, but now is restored.
* RPV level lowered rapidly, but now is restored.
EOP 1 and 2 have been entered. Drywell pressure is above 2 psig.
* EOP 1 and 2 have been entered.
Drywell temperatures are rising.
* Drywell pressure is above 2 psig.
 
* Drywell temperatures are rising.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to install EOP Defeat 4 and re
* The CRS directs you to install EOP Defeat 4 and re-establish drywell cooling.
-establish drywell cooling.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-8 rev 5-7.docx                       Page 3 of 11
 
QF-1030-11  Rev. 7 NRC 2011 JPM S
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM S
-8 rev 5-7.docx Page 4 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
A plant Scram has occurred.
* A plant Scram has occurred.
RPV level lowered rapidly, but now is restored.
* RPV level lowered rapidly, but now is restored.
EOP 1 and 2 have been entered.
* EOP 1 and 2 have been entered.
Drywell pressure is above 2 psig.
* Drywell pressure is above 2 psig.
Drywell temperatures are rising.
* Drywell temperatures are rising.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to install EOP Defeat 4 and re
* The CRS directs you to install EOP Defeat 4 and re-establish drywell cooling.
-establish drywell cooling.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM S-8 rev 5-7.docx                          Page 4 of 11
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          If a PCIS Group 7 Isolation exists AND any well water pump is running, secure Critical N                    all operating well water pumps per OI 408, Section 6.7.
Standard:                    It is determined that a group 7 isolation exists, AND the running well water pumps must be secured.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
At this point the operator will leave EOP Defeat 4 and enter OI 408, Well Water System, Section 6.8, and secure the running well water pumps.
Also NOTE that the only running well water pump is the D Well.
Performance Step: 2          If a PCIS group 7 isolation exists and a well water pump is running, perform the Critical N                    following steps, as applicable, to secure the operating well water pumps, otherwise N/A this step.
Standard:                    The operator determines that the only well water pump that is running is the D Well.
Evaluator Note:              The Candidate will N/A the steps for the A, B, C Well Water pumps.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM S-8 rev 5-7.docx                      Page 5 of 11
 
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 3          Secure the D Well Water Pump 1P-58D as follows:
Critical Y
* Lower the D well water pump 1P-58D flow to zero.
* IN Auto: Flow controller FC-4414D on Panel 1C23.
Standard:                    FC 4414D is dialed down until the pump trips. This occurs when flow is below 400 gpm.
Evaluator Note:              In the evolution, you will receive the D Well lo flow alarm.
Performance:                  SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 4          Observe the respective indicating lights on panel 1C06 and verify that D well water Critical N                    pump 1P-58D is not running.
Standard:                    Verified on 1C06 that the D Well is not running.
Performance:                  SATISFACTORY                UNSATISFACTORY Comments:
At this point the operator will leave OI 408, Well Water System, and enter and re-enter EOP Defeat 4.
Performance Step: 5          Place GROUP 7 CHANNEL A DW COOLING AND FAN SPEED OVERRIDE Critical Y                    keylock switch HS-4321A to OVERRIDE position and confirm amber light is ON.
Standard:                    HS-4321A taken to OVERRIDE position and amber light is ON.
Performance:                  SATISFACTORY                UNSATISFACTORY Comments:
NRC 2011 JPM S-8 rev 5-7.docx                    Page 6 of 11


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 6       Place GROUP 7 CHANNEL B DW COOLING AND FAN SPEED OVERRIDE Critical Y                 keylock switch HS-4321B to OVERRIDE position and confirm amber light is ON.
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM S
Standard:                 HS-4321B taken to OVERRIDE position and amber light is ON.
-8 rev 5-7.docx Page 5 of 11  JPM PERFORMANCE INFORMATION Start Time:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step: 7       Verify the following:
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Critical N
Performance Step:
* If high drywell pressure exists, verify that any running drywell cooling fan shifts from low speed (amber light) to high speed (red light).
1 Critical  N  If a PCIS Group 7 Isolation exists AND any well water pump is running, secure all operating well water pumps per OI 408, Section 6.7.
Standard:                 DW fans verified shifted to high speed.
Standard: It is determined that a group 7 isolation exists, AND the running well water pumps must be secured.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step: 8       Verify MODE SELECT switches HS-5718 A and B are in START position.
SATISFACTORY UNSATISFACTORY Comments:      At this point the operator will leave EOP Defeat 4 and enter OI 408, Well Water System, Section 6.8, and secure the running well water pumps.
Critical N Standard:                 MODE SELECT switches HS-5718 A and B are verified in START position.
Also NOTE that the only running well water pump is the "D" Well.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step:
NRC 2011 JPM S-8 rev 5-7.docx                   Page 7 of 11
2 Critical  N  If a PCIS group 7 isolation exists and a well water pump is running, perform the following steps, as applicable, to secure the operating well water pumps, otherwise N/A this step.
Standard: The operator determines that the only well water pump that is running is the "D" Well. Evaluator Note:
The Candidate will N/A the steps for the A, B, C Well Water pumps.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM S
-8 rev 5-7.docx Page 6 of 11 Performance Step: 3 Critical  Y  Secure the "D" Well Water Pump 1P
-58D as follows:
Lower the D well water pump 1P
-58D flow to zero.
IN Auto:  Flow controller FC
-4414D on Panel 1C23.
Standard: FC 4414D is dialed down until the pump trips. This occurs when flow is below 400 gpm. Evaluator Note:
In the evolution, you will receive the "D" Well lo flow alarm.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
4 Critical  N  Observe the respective indicating lights on panel 1C06 and verify that D well water pump 1P-58D is not running.
Standard: Verified on 1C06 that the D Well is not running.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      At this point the operator will leave OI 408, "Well Water System," and enter and re
-enter EOP Defeat 4.
Performance Step:
5 Critical  Y  Place GROUP 7 CHANNEL A DW COOLING AND FAN SPEED OVERRIDE keylock switch HS
-4321A to OVERRIDE position and confirm amber light is ON.
Standard: HS-4321A taken to OVERRIDE position and amber light is ON.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM S
-8 rev 5-7.docx Page 7 of 11 Performance Step:
6 Critical Y Place GROUP 7 CHANNEL B DW COOLING AND FAN SPEED OVERRIDE keylock switch HS
-4321B to OVERRIDE position and confirm amber light is ON.
Standard: HS-4321B taken to OVERRIDE position and amber light is ON.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
7 Critical N  Verify the following:
If high drywell pressure exists, verify that any running drywell cooling fan shifts from low speed (amber light) to high speed (red light).
Standard: DW fans verified shifted to high speed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
8 Critical N  Verify MODE SELECT switches HS
-5718 A and B are in START position.
Standard: MODE SELECT switches HS
-5718 A and B are verified in START position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM S
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM S
-8 rev 5-7.docx Page 8 of 11 Performance Step:
9 Critical N  If well water was not in operation and a well water pump can be restarted, start a well water pump and SLOWLY restore well water flow per OI 408, Section 6.
: 9. Standard: It is determined that Well Water can be restarted.
Evaluator Note:
When the Candidate comes to this step, IF he says that he would ask the CRS what he should do, reread the initiating cue and ask the Candidate what he recommends.
Evaluator Cue:
Reread the initiating cue and ask the Candidate what he recommends.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      At this point the operator will leave EOP Defeat 4 and enter OI 408, "Well Water System," and restart the well water system.
Performance Step:
10 Critical N  If well water is not in operation restore well water as follows:
Start the 1P
-58A as follows:
At 1C23 verify that FC 4414A well water controller is set a 10% open.
Standard: FC 4414A well water controller is set a 10% open.
Evaluator Note:
Based on the note on page 34 of OI 408, if the operator asks if it is ok to start the "A" Well or if he asks the CRS which Well he wants started, cue him to start the "A" well.
Evaluator Cue:
Cue him to start the "A" well.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Evaluator Note:  The selection of the "A" Well Pump is NOT critical.


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 9          If well water was not in operation and a well water pump can be restarted, start a Critical N                    well water pump and SLOWLY restore well water flow per OI 408, Section 6.9.
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM S
Standard:                     It is determined that Well Water can be restarted.
-8 rev 5-7.docx Page 9 of 11 Performance Step:
Evaluator Note:              When the Candidate comes to this step, IF he says that he would ask the CRS what he should do, reread the initiating cue and ask the Candidate what he recommends.
11 Critical Y  Start the "A" well water pump 1P
Evaluator Cue:               Reread the initiating cue and ask the Candidate what he recommends.
-58A by performing the following as necessary:
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
Place the respective handswitch to START position.
At this point the operator will leave EOP Defeat 4 and enter OI 408, Well Water System, and restart the well water system.
HS 4417A    A Well Water Pump 1P
Performance Step: 10          If well water is not in operation restore well water as follows:
-58A. Standard: HS 4417A for "A" Well Water Pump taken to start.
Critical N
Performance:
* Start the 1P-58A as follows:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
* At 1C23 verify that FC 4414A well water controller is set a 10% open.
12 Critical N  At 1C06, verify the red light is on for the respective well water pump.
Standard:                     FC 4414A well water controller is set a 10% open.
Standard: Red light for the "A" well is verified ON.
Evaluator Note:               Based on the note on page 34 of OI 408, if the operator asks if it is ok to start the A Well or if he asks the CRS which Well he wants started, cue him to start the A well.
Performance:
Evaluator Cue:               Cue him to start the A well.
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
13 Critical Y  Adjust flow as desired by adjusting FC4414A at 1C23.
Evaluator Note: The selection of the A Well Pump is NOT critical.
Standard: "A" Well flow adjusted at 1C23 via FC4414A. Flow should be adjusted to between 350 and 750 gpm.
NRC 2011 JPM S-8 rev 5-7.docx                        Page 8 of 11
Evaluator Note:
If the operator wants to continue on to restart the D or C well, note the flow reference is in the Precautions and Limitations portion of the OI 920.
Evaluator Cue:
Cue him that another operator will re
-start other wells as needed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
When the well water is restored to the drywell the JPM is complete.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM S
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 11      Start the A well water pump 1P-58A by performing the following as necessary:
-8 rev 5-7.docx Page 10 of 11 NRC 2011 JPM S
Critical Y
-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee: Evaluator:
* Place the respective handswitch to START position.
RO    SRO    STA    NSPEO  SRO CERT Date:   ILT RO  ILT SRO    PERFORMANCE RESULTS:
* HS 4417A A Well Water Pump 1P-58A.
SAT: UNSAT:   Remediation required:
Standard:                  HS 4417A for A Well Water Pump taken to start.
YES  NO    COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
Performance:               SATISFACTORY                    UNSATISFACTORY Comments:
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
Performance Step: 12      At 1C06, verify the red light is on for the respective well water pump.
EVALUATOR'S SIGNATURE:
Critical N Standard:                 Red light for the A well is verified ON.
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Performance:               SATISFACTORY                    UNSATISFACTORY Comments:
Performance Step: 13      Adjust flow as desired by adjusting FC4414A at 1C23.
Critical Y Standard:                 A Well flow adjusted at 1C23 via FC4414A. Flow should be adjusted to between 350 and 750 gpm.
Evaluator Note:           If the operator wants to continue on to restart the D or C well, note the flow reference is in the Precautions and Limitations portion of the OI 920.
Evaluator Cue:            Cue him that another operator will re-start other wells as needed.
Performance:              SATISFACTORY                    UNSATISFACTORY Comments:
Terminating Cues:     When the well water is restored to the drywell the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
NRC 2011 JPM S-8 rev 5-7.docx                    Page 9 of 11


NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee:                                            Evaluator:
-1.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO    STA      NSPEO      SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                      SAT:                          UNSAT:
Remediation required:            YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM S-8 rev 5-7.docx                 Page 10 of 11


2011 NRC JPM P
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-1 NRC 2011 JPM P-1.docx
-1


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM P
JPM TITLE:                   MANUALLY INITIATION CABLE SPREADING ROOM CO2 JPM NUMBER:                 NRC 2011 JPM P-1                   REV.       0 TASK NUMBER(S) /             NSPEO 9.08 TASK TITLE(S):               Manually Initiate Cable Spreading Room C02 Flood System K/A NUMBERS:                 286000                           K/A VALUE:       2.1.30 4.4 / 4.0 Justification (FOR K/A VALUES <3.0):
-1.docx Page 1 of 15  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:           X     Perform:
MANUALLY INITIATION CABLE SPREADING ROOM CO 2  JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                   X       Control Room:
NRC 2011 JPM P
Simulator:                           Other:
-1 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Lab:
NSPEO 9.08 Manually Initiate Cable Spreading Room C0 2 Flood System K/A NUMBERS:
Time for Completion:           40     Minutes       Time Critical:         Yes         No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
286000 K/A VALUE:
Instructor                                     Date Validated by:
2.1.30   4.4 / 4.0 Justification (FOR K/A VALUES <3.0):
Validation Instructor                               Date Reviewed by:
TASK APPLICABILITY:
Plant Reviewer                                   Date Approved by:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Training Supervisor                                 Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Simulate/Walkthrough:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
X Perform:   EVALUATION LOCATION:
Retention: Life of policy + 10yrs.                                                Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-1.docx                                Page 1 of 15
In-Plant: X Control Room:
Simulator:
Other:           Lab:       Time for Completion:
40 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
-1, Manually Initiation Cable Spreadin g Room Co 2 , Rev. 0 NRC 2011 JPM P
REVIEW STATEMENTS                                                                         YES NO   N/A
-1.docx Page 2 of 15 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
: 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 3,207: Line 2,533:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. RE-VALIDATION SIGNATURE JPMs must be re
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 JPM P
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
-1, Manually Initiation Cable Spreadin g Room Co 2 , Rev. 0 NRC 2011 JPM P
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
-1.docx Page 3 of 15 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 JPM P-1.docx                                        Page 2 of 15
 
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
: 1. No simulator setup required.
: 1. No simulator setup required.
SIMULATOR MALFUNCTIONS:
SIMULATOR MALFUNCTIONS:
NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
NOTE:     The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
TIME MALFUNCTION #
TIME       MALFUNCTION #         MALFUNCTION       ET     DELAY   F. SEV. RAMP       I. SEV.
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.
TITLE SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       OI 513, FIRE PROTECTION, Section 5 General  
SIMULATOR OVERRIDES:
None SIMULATOR REMOTE FUNCTIONS:
None   Required Materials:
OI 513, FIRE PROTECTION, Section 5 General  


==References:==
==References:==
OI 513, FIRE PROTECTION, Rev. 96 Task Standards:            1. Proceeds to alternate initiation method.
: 2. Breaks the glass and opens the Master Pilot Valve Controller SV-8521.
: 3. Verifies CABLE SPREADING ROOM SUPPLY and EXHAUST FANS have tripped.
NRC 2011 JPM P-1.docx                          Page 3 of 15


OI 513, FIRE PROTECTION, Rev. 96 Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
: 1. Proceeds to alternate initiation method.
: 2. Breaks the glass and opens the Master Pilot Valve Controller SV
-8521. 3. Verifies CABLE SPREADING ROOM SUPPLY and EXHAUST FANS have tripped.
QF-1030-11 Rev. 7 NRC 2011 JPM P
-1.docx Page 4 of 15 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
You are the NSPEO.
* You are the NSPEO.
The plant is operating at full power.
* The plant is operating at full power.
1C40 annunciator F
* 1C40 annunciator F-6 (CARDOX PRE-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
-6 (CARDOX PRE
* Cable Spreading Room has been verified to be unoccupied.
-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
Cable Spreading Room has been verified to be unoccupied.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Manually initiate Cable Spreading Room CO 2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.
* Manually initiate Cable Spreading Room CO2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.
 
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM P-1.docx                              Page 4 of 15


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
-1.docx Page 5 of 15  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
You are the NSPEO.
* You are the NSPEO.
The plant is operating at full power.
* The plant is operating at full power.
1C40 annunciator F
* 1C40 annunciator F-6 (CARDOX PRE-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
-6 (CARDOX PRE
* Cable Spreading Room has been verified to be unoccupied.
-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
Cable Spreading Room has been verified to be unoccupied.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Manually initiate Cable Spreading Room CO 2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.
* Manually initiate Cable Spreading Room CO2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM P-1.docx                                  Page 5 of 15


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-1.docx Page 6 of 15  JPM PERFORMANCE INFORMATION Start Time:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step:             Obtains Procedure Critical N (SEQ-)
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Standard:                     Operator states that he/she would obtain procedure from Control Room, WCCS or approved printer depending on location when ordered to initiate Cardox.
Performance Step:
Evaluator Cue:               When the Operator states how to obtain procedure, hand him/her the copy provided.
Critical   N (SEQ-) Obtains Procedure Standard: Operator states that he/she would obtain procedure from Control Room, WCCS or approved printer depending on location when ordered to initiate Cardox.
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step:             Ensure all personnel are out of the Cable Spreading Room before operating Critical N (SEQ-)             either pilot selector valve Procedure Step OI 513 Step 5.3.1(1)
When the Operator states how to obtain procedure, hand him/her the copy provided. Performance:
Standard:                     Turnover item - No additional action required.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Critical N (SEQ-) Procedure Step OI 513 Step 5.3.1(1)
NRC 2011 JPM P-1.docx                              Page 6 of 15
Ensure all personnel are out of the Cable Spreading Room before operating either pilot selector valve Standard: Turnover item  
- No additional action required.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         At the Cable Spreading Room South door, pull out the locking pin and depress Critical Y (SEQ-)         the green START pushbutton Procedure Step OI 513 Step 5.3.1(2)(a)
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
Standard:                 Locking pin pulled out and START pushbutton depressed.
-1.docx Page 7 of 15 Performance Step:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.1(2)(a)
Performance Step:         Verify the local horn sounds at Panel 1C179.
At the Cable Spreading Room South door, pull out the locking pin and depress the green START pushbutton Standard: Locking pin pulled out and START pushbutton depressed.
Critical N (SEQ-)
Performance:
Standard:                 Operator listens for horn sounding.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Evaluator Note:           Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Steps 5 & 6 may be N/Ad.
Critical N (SEQ-) Verify the local horn sounds at Panel 1C179.
Evaluator Cue:             When Operator listens for horn sounding at Panel 1C179, inform Operator that no horn sound is heard.
Standard: Operator listens for horn sounding.
If asked, inform Operator that no audible sound of CO2 discharge is heard (even after 24 second time delay has expired).
Evaluator Note:
Operator may contact CRS at this time to state CO 2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Steps 5 & 6 may be N/A'd.
Evaluator Cue:
When Operator listens for horn sounding at Panel 1C179, inform Operator that no horn sound is heard.
If asked, inform Operator that no audible sound of CO 2 discharge is heard (even after 24 second time delay has expired).
If Operator checks status of red light at 1C179, inform operator it is OFF.
If Operator checks status of red light at 1C179, inform operator it is OFF.
If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2,Alternate Initiation.
If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2,Alternate Initiation.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 JPM P-1.docx                          Page 7 of 15
QF-1030-11 Rev. 7 NRC 2011 JPM P
 
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM Critical N (SEQ-)          SUPPLY FAN 1V-AC-32 and CABLE SPREADING ROOM EXH FAN 1V-EF-33 have Auto tripped by observing the green OFF lights turn on.
-1.docx Page 8 of 15 Performance Step:
Procedure Step OI 513 Step 5.3.1(2)(c)
Critical N (SEQ-)  Procedure Step OI 513 Step 5.3.1(2)(c)
Standard:                 Operator attempts to verify Green OFF lights are ON by going to 1C26 or calls control room.
Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM SUPPLY FAN 1V
Evaluator Note:           Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Step 6 may be N/Ad Evaluator Cue:             If asked, inform Operator either
-AC-32 and CABLE SPREADING ROOM EXH FAN 1V
* CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are still running (role play as control room) or
-EF-33 have Auto tripped by observing the green OFF lights turn on.
* Green lights are OFF and Red running lights are ON (panel 1C26).
Standard: Operator attempts to verify Green OFF lights are ON by going to 1C26 or calls control room.
If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.
Evaluator Note:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Operator may contact CRS at this time to state CO 2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Step 6 may be N/A'd Evaluator Cue:
Performance Step:         Verify discharge using audible indication at Cable Spreading Room access or Critical N (SEQ-)         CO2 tank pressure and level decrease.
If asked, inform Operator either CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are still running (role play as control room) or Green lights are OFF and Red running lights are ON (panel 1C26). If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.
Procedure Step OI 513 Step 5.3.1(2)(d)
Performance:
Standard:                 Operator attempts to verify CO2 discharge by audible indications or tank pressure or level decrease.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Evaluator Note:           Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7.
Critical N (SEQ-) Procedure Step OI 513 Step 5.3.1(2)(d)
Evaluator Cue:             If asked, there is NO audible indication of CO2 discharge, NO tank pressure decrease, and NO tank level decrease.
Verify discharge using audible indication at Cable Spreading Room access or CO 2 tank pressure and level decrease.
Standard: Operator attempts to verify CO 2 discharge by audible indications or tank pressure or level decrease.
Evaluator Note:
Operator may contact CRS at this time to state CO 2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Evaluator Cue:
If asked, there is NO audible indication of CO 2 discharge, NO tank pressure decrease, and NO tank level decrease.
If asked, role play as Control Room to inform Operators that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.
If asked, role play as Control Room to inform Operators that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 JPM P-1.docx                          Page 8 of 15
QF-1030-11 Rev. 7 NRC 2011 JPM P
 
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         If no discharge occurs, proceed to Section 5.3.2 (Alternate Initiation Method).
-1.docx Page 9 of 15 Performance Step:
Critical Y (SEQ-)
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.1(2)(e)
Procedure Step OI 513 Step 5.3.1(2)(e)
If no discharge occurs, proceed to Section 5.3.2 (Alternate Initiation Method).
Standard:                 Operator proceeds with Alternate Initiation Method.
Standard: Operator proceeds with Alternate Initiation Method.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step:         At North Cable Spreading Room door, break or remove the glass cover on the Critical Y (SEQ-)         Pilot box (SV-8522).
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Procedure Step OI 513 Step 5.3.2(1)(a)
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(a)
Standard:                 Pilot box located and glass simulated to be broken.
At North Cable Spreading Room door, break or remove the glass cover on the Pilot box (SV
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
-8522). Standard: Pilot box located and glass simulated to be broken.
Performance Step:         Place Pilot Control Valve SV-8522 handle in the OPEN position.
Performance:
Critical Y (SEQ-)
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Procedure Step OI 513 Step 5.3.2(1)(a)1.
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(a)1.
Standard:                 Simulates placing SV-8522 handle in the OPEN position.
Place Pilot Control Valve SV
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
-8522 handle in the OPEN position.
NRC 2011 JPM P-1.docx                          Page 9 of 15
Standard: Simulates placing SV
 
-8522 handle in the OPEN position.
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         If Cardox initiates (evidenced by the noise of CO2 discharging into the Cable Critical N (SEQ-)          Spreading Room), perform the following (N/A if Cardox did not initiate):
Performance:
Procedure Step OI 513 Step 5.3.2(1)(a)2.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                 Operator attempts to verify CO2 discharge by audible indications; N/As remaining portion of step when none is heard and proceeds to next step.
QF-1030-11 Rev. 7 NRC 2011 JPM P
Evaluator Cue:             If asked, there is no audible indication of CO2 discharge.
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
-1.docx Page 10 of 15 Performance Step:
Performance Step:         Proceed to the Master Pilot Valve Controller SV-8521 at the CARDOX unit.
Critical N (SEQ-)  Procedure Step OI 513 Step 5.3.2(1)(a)2.
Critical Y (SEQ-)          Break the glass. Inform the control room that you are about to initiate Cardox.
If Cardox initiates (evidenced by the noise of CO 2 discharging into the Cable Spreading Room), perform the following (N/A if Cardox did not initiate):
Procedure Step OI 513 Step 5.3.2(1)(b)
Standard: Operator attempts to verify CO 2 discharge by audible indications; N/A's remaining portion of step when none is heard and proceeds to next step.
Standard:                 Locates Master Pilot Valve Controller; simulates breaking or removing glass, and calls control room.
Evaluator Cue:
Evaluator Note:           Only breaking or removal of glass is critical.
If asked, there is no audible indication of CO 2 discharge.
Evaluator Cue:             Role play as control room and acknowledge that Cardox is about to be initiated.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
NRC 2011 JPM P-1.docx                          Page 10 of 15
Critical Y (SEQ-)  Procedure Step OI 513 Step 5.3.2(1)(b)
 
Proceed to the Master Pilot Valve Controller SV
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         Place the pilot control valve SV-8521 handle in the OPEN position.
-8521 at the CARDOX unit. Break the glass. Inform the control room that you are about to initiate Cardox.
Critical Y (SEQ-)
Standard: Locates Master Pilot Valve Controller; simulates breaking or removing glass, and calls control room.
Procedure Step OI 513 Step 5.3.2(1)(b)1.
Evaluator Note:
Standard:                 Simulates placing SV-8521 in OPEN position.
Only breaking or removal of glass is critical.
Evaluator Note:           Note time SV-8521 was opened: _________
Evaluator Cue:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Role play as control room and acknowledge that Cardox is about to be initiated.
Performance Step:         Verify CO2 discharge by observing CO2 tank indicators.
Performance:
Critical N (SEQ-)
SATISFACTORY UNSATISFACTORY Comments:
Procedure Step OI 513 Step 5.3.2(1)(b)2.
QF-1030-11 Rev. 7 NRC 2011 JPM P
Standard:                 Observes tank level and/or pressure gauges or listens for flow noise to verify discharge of Cardox.
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
Evaluator Cue:             If asked, the Cardox tank level and/or pressure are lowering; sound of Cardox flow is heard.
-1.docx Page 11 of 15 Performance Step:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(b)1.
NRC 2011 JPM P-1.docx                        Page 11 of 15
Place the pilot control valve SV
 
-8521 handle in the OPEN position.
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:         Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM Critical Y (SEQ-)          SUPPLY 1V-AC-32 and EXHAUST 1V-EF-33 FANS have auto tripped by observing the green OFF lights turn ON.
Standard: Simulates placing SV
Procedure Step OI 513 Step 5.3.2(1)(b)3.
-8521 in OPEN position.
Standard:                 Operator goes to 1C26 or calls Control Room to verify fans have tripped.
Evaluator Note:
Evaluator Cue:             If asked, inform operator either
Note time SV
* CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are NOT running (role play as control room) or
-8521 was opened: _________
* Green lights are ON and Red running lights are OFF (panel 1C26).
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step:         After 3 minutes 30 seconds of Cardox release, place the pilot control valve Critical Y (SEQ-)         SV-8521 handle in the CLOSED position.
Critical N (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(b)2.
Procedure Step OI 513 Step 5.3.2(1)(b)4.
Verify CO 2 discharge by observing CO 2 tank indicators.
Standard:                 SV-8521 in CLOSED position in no less than 3 minutes 30 seconds of release.
Standard: Observes tank level and/or pressure gauges or listens for flow noise to verify discharge of Cardox.
Evaluator Note:           Note time SV-8521 was closed: _________
Evaluator Cue:
The critical portion is for the operator to wait at least 3.5 minutes prior to closing SV-8521.
If asked, the Cardox tank level and/or pressure are lowering; sound of Cardox flow is heard.
Evaluator Cue:             If asked, the Cardox tank level and/or pressure has stabilized; sound of Cardox flow has stopped.
Performance:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
NRC 2011 JPM P-1.docx                        Page 12 of 15
QF-1030-11 Rev. 7 NRC 2011 JPM P
 
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step:             Notify control room that the manual initiation process for the Cardox System is Critical N (SEQ-)             complete.
-1.docx Page 12 of 15 Performance Step:
Procedure Step OI 513 Step 5.3.2(1)(b)5.
Critical Y (SEQ-)  Procedure Step OI 513 Step 5.3.2(1)(b)3.
Standard:                     Calls control room to report completion of manual initiation.
Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM SUPPLY 1V-AC-32 and EXHAUST 1V
Evaluator Cue:               Role play as control room and acknowledge completion of manual Cardox initiation.
-EF-33 FANS have auto tripped by observing the green OFF lights turn ON.
Standard: Operator goes to 1C26 or calls Control Room to verify fans have tripped.
Evaluator Cue:
If asked, inform operator either CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are NOT running (role play as control room) or Green lights are ON and Red running lights are OFF (panel 1C26). Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical Y (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(b)4.
After 3 minutes 30 seconds of Cardox release, place the pilot control valve SV-8521 handle in the CLOSED position.
Standard: SV-8521 in CLOSED position in no less than 3 minutes 30 seconds of release.
Evaluator Note:
Note time SV
-8521 was closed: _________
The critical portion is for the operator to wait at least 3.5 minutes prior to closing SV
-8521. Evaluator Cue:
If asked, the Cardox tank level and/or pressure has stabilized; sound of Cardox flow has stopped.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM P
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 NRC 2011 JPM P
-1.docx Page 13 of 15 Performance Step:
Critical N (SEQ-) Procedure Step OI 513 Step 5.3.2(1)(b)5.
Notify control room that the manual initiation process for the Cardox System is complete. Standard: Calls control room to report completion of manual initiation.
Evaluator Cue:
Role play as control room and acknowledge completion of manual Cardox initiation.
If asked about the status of the fire; state that the fire is out.
If asked about the status of the fire; state that the fire is out.
Performance:
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
Terminating Cues:       When the Operator notifies the control room that the manual initiation process for the Cardox System is complete, inform the Operator that another operator will complete the procedure and that the JPM is complete.
When the Operator notifies the control room that the manual initiation process for the Cardox System is complete, inform the Operator that another operator will complete the procedure and that the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:
Stop Time:  
NRC 2011 JPM P-1.docx                           Page 13 of 15
 
QF-1030-11  Rev. 7 NRC 2011 JPM P
-1.docx Page 14 of 15 NRC 2011 JPM P
-1, Manually Initiation Cable Spreadin g Room Co 2, Rev. 0 Examinee:  Evaluator:
RO    SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
SAT:  UNSAT:  Remediation required:
YES  NO    COMMENTS/FEEDBACK:  (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:  ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Examinee:                                            Evaluator:
-2.docx   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO      STA    NSPEO        SRO CERT              Date:
ILT RO        ILT SRO PERFORMANCE RESULTS:                    SAT:                          UNSAT:
Remediation required:          YES                          NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:      ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM P-1.docx                         Page 14 of 15


2011 NRC JPM P
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-2 NRC 2011 JPM P-2.docx
-2


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM P
JPM TITLE:                   INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER:                 NRC 2011 JPM P-2                   REV.       0 TASK NUMBER(S) /             NSPEO 27.01 TASK TITLE(S):               Startup the A RPS Generator Set K/A NUMBERS:                 K2.01                           K/A VALUE:       3.2/3.3 Justification (FOR K/A VALUES <3.0):
-2.docx Page 1 of 13  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE:
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:           X     Perform:
INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                   X       Control Room:
NRC 2011 JPM P
Simulator:                           Other:
-2 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Lab:
NSPEO 27.01 Startup the "A" RPS Generator Set K/A NUMBERS:
Time for Completion:           20     Minutes       Time Critical:           Yes       No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
K2.01 K/A VALUE:
Instructor                                     Date Validated by:
3.2/3.3   Justification (FOR K/A VALUES <3.0):
Validation Instructor                               Date Reviewed by:
TASK APPLICABILITY:
Plant Reviewer                                   Date Approved by:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Training Supervisor                                 Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Simulate/Walkthrough:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
X Perform:   EVALUATION LOCATION:
Retention: Life of policy + 10yrs.                                                Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-2.docx                                Page 1 of 13
In-Plant: X Control Room:
Simulator:
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
REVIEW STATEMENTS                                                                         YES NO   N/A
-2.docx Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
: 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 3,471: Line 2,734:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. RE-VALIDATION SIGNATURE JPMs must be re
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 JPM P
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
-2.docx Page 3 of 13 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 JPM P-2.docx                                        Page 2 of 13
 
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
Simulator Setup Instructions:
Simulator Setup Instructions:
None SIMULATOR MALFUNCTIONS:
None SIMULATOR MALFUNCTIONS:
NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
NOTE:     The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.
TIME MALFUNCTION #
TIME       MALFUNCTION #         MALFUNCTION         ET   DELAY       F. SEV. RAMP   I. SEV.
MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.                                                                                                                                                                                     SIMULATOR OVERRIDES:
TITLE SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Instructor Actions:       1. Read initial conditions and initiating cues to the operator.
None SIMULATOR REMOTE FUNCTIONS:
None Instructor Actions:
: 1. Read initial conditions and initiating cues to the operator.
: 2. This JPM will take place in the 1A3 switch gear room.
: 2. This JPM will take place in the 1A3 switch gear room.
: 3. This JPM takes place around the "A" RPS MG set and associated EPA breakers. Extreme caution shall be exercised to preclude any unwanted trips or isolations.
: 3. This JPM takes place around the A RPS MG set and associated EPA breakers. Extreme caution shall be exercised to preclude any unwanted trips or isolations.
Required Materials:
Required Materials:       OI 358 (in procedure holder in SWGR room)
OI 358 (in procedure holder in SWGR room)
General  
General  


==References:==
==References:==
 
OI 358, Rev. 50, Section 3.2 Task Standards:           1. 1B3211 is closed.
OI 358, Rev. 50, Section 3.2 Task Standards:
: 2. On Panel 1G51 press and hold the MOTOR ON push-button.
: 1. 1B3211 is closed.
: 3. EPA-A1 circuit breaker closed.
: 2. On Panel 1G51 press and hold the MOTOR ON push
-button. 3. EPA-A1 circuit breaker closed.
: 4. EPA-A2 circuit breaker closed.
: 4. EPA-A2 circuit breaker closed.
NRC 2011 JPM P-2.docx                            Page 3 of 13


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
-2.docx Page 4 of 13 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The "A" RPS MG set was removed from service and tagged out for planned maintenance.
* The A RPS MG set was removed from service and tagged out for planned maintenance.
RPS bus "A" has been placed on the alternate source IAW OI 358.
* RPS bus A has been placed on the alternate source IAW OI 358.
The work has been completed and the tagout has been cleared and verified.
* The work has been completed and the tagout has been cleared and verified.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the in
* The CRS directs you to perform the in-plant actions to start up the A RPS MG set IAW OI 358 Section 3.2.
-plant actions to start up the "A" RPS MG set IAW OI 358 Section 3.2. Notify the control room when the in
* Notify the control room when the in-plant actions for A RPS MG set start-up have been completed.
-plant actions for "A" RPS MG set start
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-up have been completed.
NRC 2011 JPM P-2.docx                               Page 4 of 13
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
 
QF-1030-11  Rev. 7 NRC 2011 JPM P
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM P
-2.docx Page 5 of 13 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The "A" RPS MG set was removed from service and tagged out for planned maintenance.
* The A RPS MG set was removed from service and tagged out for planned maintenance.
RPS bus "A" has been placed on the alternate source IAW OI 358.
* RPS bus A has been placed on the alternate source IAW OI 358.
The work has been completed and the tagout has been cleared and verified.
* The work has been completed and the tagout has been cleared and verified.
 
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the in
* The CRS directs you to perform the in-plant actions to start up the A RPS MG set IAW OI 358 Section 3.2.
-plant actions to start up the "A" RPS MG set IAW OI 358 Section 3.2. Notify the control room when the in
* Notify the control room when the in-plant actions for A RPS MG set start-up have been completed.
-plant actions for "A" RPS MG set start
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
-up have been completed.
NRC 2011 JPM P-2.docx                                  Page 5 of 13
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-2.docx Page 6 of 13  JPM PERFORMANCE INFORMATION Start Time:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step:             Verify the A[B] RPS MG set motor supply circuit breaker 1B3211 [1B4216] is Critical Y (SEQ-)            closed by observing that the GREEN (MOTOR OFF) light on Panel 1G51
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
[1G61] is ON.
Performance Step:
Standard:                     1B3211 is closed.
Critical  Y (SEQ-) Verify the A[B] RPS MG set motor supply circuit breaker 1B3211 [1B4216] is closed by observing that the GREEN (MOTOR OFF) light on Panel 1G51 [1G61] is ON.
Evaluator Cue:               Instructor to cue that the GREEN light is ON.
Standard: 1B3211 is closed.
Performance:                 SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step:             On the RPS MG Set Electrical Protection Assemblies EPA A1 and EPA A2 Critical N (SEQ-)            [EPA B1 and EPA B2], verify the following:
Instructor to cue that the GREEN light is ON.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical  N (SEQ-) On the RPS MG Set Electrical Protection Assemblies EPA A1 and EPA A2 [EPA B1 and EPA B2], verify the following:
The circuit breakers are in the OFF position.
The circuit breakers are in the OFF position.
Standard: EPA A1 and A2 breakers are verified OFF (position would be down).
Standard:                     EPA A1 and A2 breakers are verified OFF (position would be down).
Evaluator Cue:
Evaluator Cue:               Instructor to cue the student that the breakers are OFF (down).
Instructor to cue the student that the breakers are OFF (down).
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
NRC 2011 JPM P-2.docx                            Page 6 of 13
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step:         Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] MAINTENANCE/TEST Critical N (SEQ-)          keylock switches EPA A1 S1 and EPA A2 S1 [EPA B1 S1 and EPA B2 S1] are in the NORMAL position.
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
Standard:                 Keylock switch verified in the NORMAL position.
-2.docx Page 7 of 13 Performance Step:
Evaluator Note:           Keylock switch should be in NORMAL, keys removed.
Critical  N (SEQ-) Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] MAINTENANCE/TEST keylock switches EPA A1 S1 and EPA A2 S1 [EPA B1 S1 and EPA B2 S1] are in the NORMAL position.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Standard: Keylock switch verified in the NORMAL position.
Performance Step:         Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] TRIP/RESET keylock Critical N (SEQ-)          switches EPA A1 S2 and EPA A2 S2 [EPA B1 S2 and EPA B2 S2] are in the OPER position.
Evaluator Note:
Standard:                 Keylock switch verified in the OPER position.
Keylock switch should be in NORMAL, keys removed.
Evaluator Note:           Keylock switch should be in OPER Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step:         On Panel 1G51, press and momentarily hold the MG set A MOTOR ON push-Critical Y (SEQ-)          button.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Standard:                 At Panel 1G51, the MOTOR ON push-button is SIMULATED pressed and momentarily held.
Critical  N (SEQ-) Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] TRIP/RESET keylock switches EPA A1 S2 and EPA A2 S2 [EPA B1 S2 and EPA B2 S2] are in the OPER position.
Evaluator Cue:             Instructor cue that the MG set is observed to start and is coming up to speed.
Standard: Keylock switch verified in the OPER position.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Evaluator Note:
NRC 2011 JPM P-2.docx                        Page 7 of 13
Keylock switch should be in OPER Performance:
 
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step:          Verify the following indications:
Critical  Y (SEQ-) On Panel 1G51, press and momentarily hold the MG set "A" MOTOR ON push
Critical N (SEQ-)         1) RED (MOTOR ON) light turns ON.
-button. Standard: At Panel 1G51, the MOTOR ON push
-button is SIMULATED pressed and momentarily held.
Evaluator Cue:
Instructor cue that the MG set is observed to start and is coming up to speed. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11 Rev. 7 NRC 2011 JPM P
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
-2.docx Page 8 of 13 Performance Step:
Critical   N (SEQ-) Verify the following indications:
: 1) RED (MOTOR ON) light turns ON.
: 2) GREEN (MOTOR OFF) light turns OFF.
: 2) GREEN (MOTOR OFF) light turns OFF.
: 3) MG set accelerates to set speed.
: 3) MG set accelerates to set speed.
: 4) 120 VAC is indicated on the RPS MG SET "A".
: 4) 120 VAC is indicated on the RPS MG SET A.
OUTPUT VOLTAGE meter EI
OUTPUT VOLTAGE meter EI-1G051.
-1G051. Standard: The following indications are verified: 1) RED light is ON.
Standard:                 The following indications are verified:
: 1) RED light is ON.
: 2) GREEN light is OFF
: 2) GREEN light is OFF
: 3) MG set accelerates to set speed.
: 3) MG set accelerates to set speed.
: 4) 120 VAC is indicated on EI
: 4) 120 VAC is indicated on EI-1G051.
-1G051. Evaluator Note:
Evaluator Note:           There are no amps until output breaker is closed.
There are no amps until output breaker is closed.
Evaluator Cue:             Cue examinee on proper indications.
Evaluator Cue:
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Cue examinee on proper indications.
Performance Step:         On EPA A1 observe the POWER IN light is ON Critical N (SEQ-)
Performance:
Standard:                 POWER IN light is observed to be ON.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Evaluator Cue:             Cue that the light is ON.
Critical  N (SEQ-) On EPA A1 observe the POWER IN light is ON Standard: POWER IN light is observed to be ON.
Performance:               SATISFACTORY                 UNSATISFACTORY Comments:
Evaluator Cue:
NRC 2011 JPM P-2.docx                          Page 8 of 13
Cue that the light is ON.
 
Performance:
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step:         On EPA A1 observe the following:
SATISFACTORY UNSATISFACTORY Comments:
Critical N (SEQ-)          1) OVER-VOLTAGE light OFF.
QF-1030-11 Rev. 7 NRC 2011 JPM P
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
-2.docx Page 9 of 13 Performance Step:
Critical  N (SEQ-) On EPA A1 observe the following:
: 1) OVER-VOLTAGE light OFF.
: 2) UNDER-VOLTAGE light OFF.
: 2) UNDER-VOLTAGE light OFF.
: 3) UNDER FREQUENCY light OFF.
: 3) UNDER FREQUENCY light OFF.
: 4) POWER OUT light OFF.
: 4) POWER OUT light OFF.
Standard: Light verified to be OFF.
Standard:                 Light verified to be OFF.
Evaluator Note:
Evaluator Note:           UNDER FREQUENCY light is ON, the others are off Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
UNDER FREQUENCY light is ON, the others are off Performance:
Performance Step:         If the OVER-VOLTAGE, UNDER-VOLTAGE, and/or UNDER-FREQUENCY trip Critical Y (SEQ-)          status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A1-S2 [EPA-B1-S2] in the RESET position and verify the light(s) turn(s)
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
OFF; then place the switch back to the OPER position.
Critical  Y (SEQ-) If the OVER
Standard:                 Momentarily places the TRIP/RESET keylock switch EPA-A1-S2 in the RESET position and verifies the light(s) turn(s) OFF; then place the switch back to the OPER position.
-VOLTAGE, UNDER
Evaluator Note:           UNDER FREQUENCY light is OFF Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
-VOLTAGE, and/or UNDER
Performance Step:         Close the EPA-A1 circuit breaker and observe that the POWER OUT light turns Critical Y (SEQ-)          ON.
-FREQUENCY trip status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A1-S2 [EPA-B1-S2] in the RESET position and verify the light(s) turn(s) OFF; then place the switch back to the OPER position.
Standard:                 EPA-A1 is turned ON (breaker handle UP) and power out light turns ON.
Standard: Momentarily places the TRIP/RESET keylock switch EPA
Evaluator Cue:             Cue that the handle is up (breaker ON) and the POWER OUT light is ON.
-A1-S2 in the RESET position and verifies the light(s) turn(s) OFF; then place the switch back to the OPER position.
Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Note:
NRC 2011 JPM P-2.docx                            Page 9 of 13
UNDER FREQUENCY light is OFF Performance:
 
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step:         On EPA-A2 verify that the POWER IN light is ON.
Critical  Y (SEQ-) Close the EPA
Critical N (SEQ-)
-A1 circuit breaker and observe that the POWER OUT light turns ON. Standard: EPA-A1 is turned ON (breaker handle UP) and power out light turns ON.
Standard:                 EPA -A2 POWER IN light verified ON.
Evaluator Cue: Cue that the handle is up (breaker ON) and the POWER OUT light is ON.
Evaluator Cue:             Cue examine that the light is on, if needed.
Performance:
Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:         On EPA-A2 , the following lights are verified OFF:
QF-1030-11 Rev. 7 NRC 2011 JPM P
Critical N (SEQ-)          1) OVER-VOLTAGE
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 NRC 2011 JPM P
: 2) UNDER-VOLTAGE
-2.docx Page 10 of 13 Performance Step:
: 3) UNDER-FREQUENCY
Critical  N (SEQ-) On EPA-A2 verify that the POWER IN light is ON.
: 4) POWER OUT Standard:                 Lights are verified OFF.
Standard: EPA -A2 POWER IN light verified ON.
Evaluator Note:           UNDER FREQUENCY light is ON, the others are off add step Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step:         If the OVER-VOLTAGE, UNDER-VOLTAGE, and/or UNDER-FREQUENCY trip Critical N (SEQ-)          status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A2-S2 [EPA-B2-S2] in the RESET position and verify the light(s) turn(s)
Cue examine that the light is on, if needed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical  N (SEQ-) On EPA-A2 , the following lights are verified OFF:
: 1) OVER-VOLTAGE 2) UNDER-VOLTAGE 3) UNDER-FREQUENCY 4) POWER OUT   Standard: Lights are verified OFF.
Evaluator Note:
UNDER FREQUENCY light is ON, the others are off add step   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical  N (SEQ-) If the OVER
-VOLTAGE, UNDER
-VOLTAGE, and/or UNDER
-FREQUENCY trip status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A2-S2 [EPA-B2-S2] in the RESET position and verify the light(s) turn(s)
OFF; then place the switch back to the OPER position.
OFF; then place the switch back to the OPER position.
Standard: Momentarily places the TRIP/RESET keylock switch EPA
Standard:                 Momentarily places the TRIP/RESET keylock switch EPA-A2-S2 in the RESET position and verifies the light(s) turn(s) OFF; then places the switch back to the OPER position.
-A2-S2 in the RESET position and verifies the light(s) turn(s) OFF; then places the switch back to the OPER position.
Evaluator Note:           UNDER FREQUENCY light is OFF Performance:               SATISFACTORY                   UNSATISFACTORY Comments:
Evaluator Note:
NRC 2011 JPM P-2.docx                           Page 10 of 13
UNDER FREQUENCY light is OFF Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM P
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0  NRC 2011 JPM P
-2.docx Page 11 of 13 Performance Step:
Critical  Y (SEQ-) Close the EPA
-A2 circuit breaker and observe that the POWER OUT lights turns ON. Standard: The EPA A2 circuit breaker is turned on (handle UP) and POWER OUT light is verified ON.
Evaluator Cue:
Cue that EPA
-A2 breaker is ON (handle UP) and POWER OUT light is ON.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Terminating Cues:
The next step of the OI is performed in the Control Room. It is to close a breaker on 1C-15. When the Student states that he will call the Control  Room, State that the Control Room will finish the rest of this section and  that the JPM is completed.
NOTE:  Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  {C002}
Stop Time:


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step:         Close the EPA-A2 circuit breaker and observe that the POWER OUT lights Critical Y (SEQ-)          turns ON.
-2.docx Page 12 of 13 NRC 2011 JPM P
Standard:                 The EPA A2 circuit breaker is turned on (handle UP) and POWER OUT light is verified ON.
-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee: Evaluator:
Evaluator Cue:             Cue that EPA-A2 breaker is ON (handle UP) and POWER OUT light is ON.
RO    SRO    STA    NSPEO  SRO CERT Date:    ILT RO  ILT SRO    PERFORMANCE RESULTS:
Performance:               SATISFACTORY                  UNSATISFACTORY Comments:
SAT: UNSAT:  Remediation required:
Terminating Cues:     The next step of the OI is performed in the Control Room. It is to close a breaker on 1C-15. When the Student states that he will call the Control Room, State that the Control Room will finish the rest of this section and that the JPM is completed.
YES  NO    COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
EXAMINER NOTE:  ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
Stop Time:
EVALUATOR'S SIGNATURE:
NRC 2011 JPM P-2.docx                          Page 11 of 13
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee:                                            Evaluator:
-3.docx DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
RO      SRO      STA    NSPEO        SRO CERT              Date:
ILT RO          ILT SRO PERFORMANCE RESULTS:                    SAT:                          UNSAT:
Remediation required:          YES                        NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:        ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NRC 2011 JPM P-2.docx                         Page 12 of 13


201 1 NRC JPM P-3
DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-3 NRC 2011 JPM P-3.docx


QF-1030-11 Rev. 7 Retention: Life of policy + 10yrs.
QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)
Disposition: Reviewer and Approver Retain in:  Training Program File NRC 2011 JPM P
JPM TITLE:                   MAXIMIZE CRD INJECTION IAW AIP 407 JPM NUMBER:                 NRC 2011 JPM P-3                   REV.       0 TASK NUMBER(S) /
-3.docx Page 1 of 14  JOB PERFORMANCE MEASURE (JPM)   JPM TITLE: MAXIMIZE CRD INJECTION IAW AIP 407 JPM NUMBER:
TASK TITLE(S):
NRC 2011 JPM P
K/A NUMBERS:                 201001 2.1.23                   K/A VALUE:       4.3/4.4 Justification (FOR K/A VALUES <3.0):
-3 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
TASK APPLICABILITY:           RO       SRO       STA         NSPEO         SRO CERT APPLICABLE METHOD OF TESTING:                     Simulate/Walkthrough:           X     Perform:
K/A NUMBERS:
EVALUATION LOCATION:             In-Plant:                   X       Control Room:
201001 2.1.23 K/A VALUE:
Simulator:                           Other:
4.3/4.4   Justification (FOR K/A VALUES <3.0):
Lab:
TASK APPLICABILITY:
Time for Completion:                   Minutes       Time Critical:           Yes       No Alternate Path [NRC]:           Yes       No Alternate Path [INPO]:         Yes       No Developed by:
RO   SRO   STA   NSPEO   SRO CERT APPLICABLE METHOD OF TESTING:
Instructor                                     Date Validated by:
Simulate/Walkthrough:
Validation Instructor                               Date Reviewed by:
X Perform:   EVALUATION LOCATION:
Plant Reviewer                                   Date Approved by:
In-Plant: X Control Room:
Training Supervisor                                 Date Commitments:       {C001} ACE 001729, Review recommendation 4 of OE 001501.
Simulator:
{C002} CA046394, Improvements needed for Operations Simulator JPMs.
Other:           Lab:       Time for Completion:
Retention: Life of policy + 10yrs.                                                Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-3.docx                                Page 1 of 14
Minutes Time Critical:
Yes No     Alternate Path [NRC]:
Yes No   Alternate Path [INPO]:
Yes No     Developed by:
Instructor Date   Validated by:
Validation Instructor Date Reviewed by:
Plant Reviewer Date   Approved by:
Training Supervisor Date Commitments:
{C001} ACE 001729, Review recommendation 4 of OE 001501.
  {C002} CA046394, Improvements needed for Operations Simulator JPMs.


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
REVIEW STATEMENTS                                                                         YES NO   N/A
-3.docx Page 2 of 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
: 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 6. Has the completion time been established based on validation data or incumbent experience?
Line 3,715: Line 2,918:
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 11. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have the performance steps been identified and typed (Critical / Sequence
      / Time Critical) appropriately?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Are all references identified, current, accurate, and available to the trainee?
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
: 14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
: 15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?
RE-VALIDATION SIGNATURE JPMs must be re
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}
-validated prior to use. Verify the above Review Statements are "YES" or "N/A". When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date QF-1030-11 Rev. 7 NRC 2011 JPM P
RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
Re-Validation Personnel                               Date       Re-Validation Personnel           Date Re-Validation Personnel                                 Date       Re-Validation Personnel           Date NRC 2011 JPM P-3.docx                                        Page 2 of 14
-3.docx Page 3 of 14 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
 
Simulator Setup Instructions:
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)
None SIMULATOR MALFUNCTIONS:
Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:       AIP 407 General  
None SIMULATOR OVERRIDES:
None SIMULATOR REMOTE FUNCTIONS:
None Required Materials:
AIP 407 General  


==References:==
==References:==
AIP 407 Task Standards:            CRD suction Filters Swapped CRD Flow Controllers Swapped Task completion communicated to the Control Room CRD flow maximized NRC 2011 JPM P-3.docx                          Page 3 of 14


AIP 407 Task Standards:
QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:
CRD suction Filters Swapped CRD Flow Controllers Swapped Task completion communicated to the Control Room CRD flow maximized
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
* RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable.
INITIATING CUES (IF APPLICABLE):
* The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM P-3.docx                              Page 4 of 14


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-3.docx Page 4 of 14 TURNOVER SHEET INITIAL CONDITIONS:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable
* RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable.
. INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
* The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
NRC 2011 JPM P-3.docx                                  Page 5 of 14


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-3.docx Page 5 of 14  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
Performance Step:            (Begins at AIP 407 Step 6)
Critical Y (SEQ-)
OPEN V-17-93, CRD Pump Suction Filters 1F-15A/B BYPASS.
Standard:                    Opens V-17-93, CRD Pump Suction Filters 1F-15A/B BYPASS Evaluator Cue:                This action is complete.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:            Place the second CRD Suction Filter 1F-15B in service as follows:
Critical N (SEQ-)
Standard:                    Places the second CRD Suction Filter 1F-15B in service as follows:
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM P-3.docx                            Page 6 of 14


INITIAL CONDITIONS:
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:           In the CRD pump room, verify isolation Valve V-17-108 is OPEN for the standby Critical Y (SEQ-)            CRD Pump Suction Filter 1F-15B Standard:                    Verifies isolation Valve V-17-108 is OPEN for the standby CRD Pump Suction Filter 1F-15B.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
Evaluator Cue:              This action is complete.
RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable
Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
. INITIATING CUES (IF APPLICABLE):
IF CRD Pump 1P-209A[B] becomes air bound              THEN immediately STOP the pump to prevent (indicated by motor current dropping to                  damage and vent CRD suction piping, approximately 9 amps).                                  suction filters, and pump casing.
The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Performance Step:            Slowly OPEN Outlet Isolation Valve V-17-109 for the standby CRD Pump Suction Critical Y (SEQ-)           Filter 1F-15B.
Standard:                    Opens Outlet Isolation Valve V-17-109 for the standby CRD Pump Suction Filter 1F-15B.
Evaluator Cue:              This action is complete.
Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:            Place the second CRD Discharge Filter 1F-201B in service as follows:
Critical N (SEQ-)
Standard:                   Places the second CRD Discharge Filter 1F-201B in service as follows:
Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
CAUTION:      Since the CRD Pump discharge Filters are normally pressurized to 1500 psig, valve operations should be performed carefully/slowly.
NRC 2011 JPM P-3.docx                            Page 7 of 14


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:       At the CRD discharge filters on RB 1st floor South side, verify Isolation Valve V Critical Y (SEQ-)      14 is OPEN for the standby CRD Pump Discharge Filter 1F-201B.
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
Standard:               Verifies Isolation Valve V-17-14 is OPEN for the standby CRD Pump Discharge Filter 1F-201B.
-3.docx Page 6 of 14  JPM PERFORMANCE INFORMATION Start Time:
Evaluator Cue:          This action is complete.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance:            SATISFACTORY                  UNSATISFACTORY Comments:
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:       Coordinate with Control Room to ensure CRD pump amps are adequate and Critical N (SEQ-)       slowly OPEN Outlet Isolation Valve V-17-22.
Performance Step:
Standard:               Coordinates with Control Room to ensure CRD pump amps are adequate and slowly OPEN Outlet Isolation Valve V-17-22.
Critical   Y (SEQ-) (Begins at AIP 407 Step 6)
Evaluator Cue:         Acting as Control Room Operator coordinates with examinee to ensure CRD pump amps are adequate.
OPEN V-17-93, CRD Pump Suction Filters 1F
-15A/B BYPASS.
Standard: Opens V-17-93, CRD Pump Suction Filters 1F
-15A/B BYPASS Evaluator Cue:
This action is complete.
This action is complete.
Performance:
Performance:           SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step:       Place the second Flow control Valve CV-1822 in service as follows:
Critical N (SEQ-) Place the second CRD Suction Filter 1F
Critical N (SEQ-)
-15B in service as follows:
Standard:               Places the second Flow Control Valve CV-1822 in service as follows.
Standard: Places the second CRD Suction Filter 1F
Evaluator Cue:         This action is complete.
-15B in service as follows:
Performance:           SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
NRC 2011 JPM P-3.docx                        Page 8 of 14
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:          At 1C05, verify FC-1814 CRD SYSTEM FLOW CONTROL in MANUAL.
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
Critical N (SEQ-)
-3.docx Page 7 of 14 Performance Step:
Standard:                  Verifies FC-1814 CRD SYSTEM FLOW CONTROL in MANUAL.
Critical Y (SEQ-) In the CRD pump room, verify isolation Valve V 108 is OPEN for the standby CRD Pump Suction Filter 1F
Evaluator Cue:            This action is complete.
-15B    Standard: Verifies isolation Valve V 108 is OPEN for the standby CRD Pump Suction Filter 1F-15B. Evaluator Cue:
Performance:              SATISFACTORY                    UNSATISFACTORY Comments:
This action is complete.
NOTE:        Steps below are performed at the CRD Flow Control Station.
Performance:
Performance Step:         Verify the standby Flow Control Valve V-17-29 Outlet Isolation for CV-1822 is Critical Y (SEQ-)         closed.
SATISFACTORY UNSATISFACTORY Comments:     IF CRD Pump 1P
Standard:                  Verifies the standby Flow Control Valve V-17-29 Outlet Isolation for CV-1822 is closed.
-209A[B] becomes air bound (indicated by motor current dropping to approximately 9 amps).
Evaluator Cue:            This action is complete.
THEN immediately STOP the pump to prevent damage and vent CRD suction piping, suction filters, and pump casing.
Performance:              SATISFACTORY                    UNSATISFACTORY Comments:
Performance Step:
Performance Step:          Verify inlet isolation V-17-27 for standby Flow Control Valve CV-1822 is open..
Critical Y (SEQ-) Slowly OPEN Outlet Isolation Valve V 109 for the standby CRD Pump Suction Filter 1F-15B. Standard: Opens Outlet Isolation Valve V 109 for the standby CRD Pump Suction Filter 1F-15B. Evaluator Cue:
Critical Y (SEQ-)
Standard:                 Verifies inlet isolation V-17-27 for standby Flow Control Valve CV-1822 is open.
Evaluator Cue:            This action is complete.
Performance:              SATISFACTORY                    UNSATISFACTORY Comments:
NRC 2011 JPM P-3.docx                            Page 9 of 14
 
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:      Verify local AUTO/MAN transfer switch HC-1843B for the standby CV-1822 Critical Y (SEQ-)      selected to MAN.
Standard:              Verifies local AUTO/MAN transfer switch HC-1843B for the standby CV-1822 selected to MAN.
Evaluator Cue:         This action is complete.
Performance:           SATISFACTORY                   UNSATISFACTORY Comments:
Performance Step:      Raise and lower the air signal to CV-1822 with the manual control knob, and verify Critical Y (SEQ-)       that the valve strokes normally.
Standard:              Raises and lower the air signal to CV-1822 with the manual control knob, and verifies that the valve strokes normally.
Evaluator Cue:          This action is complete.
Performance:            SATISFACTORY                  UNSATISFACTORY Comments:
Performance Step:       Match manual and automatic air signals for CV-1822.
Critical Y (SEQ-)
Standard:              Matches manual and automatic air signals for CV-1822.
Evaluator Cue:          This action is complete.
Performance:            SATISFACTORY                  UNSATISFACTORY Comments:
NRC 2011 JPM P-3.docx                        Page 10 of 14
 
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:      Coordinate with Control Room to ensure CRD pump amps are adequate for Critical Y (SEQ-)      placing the standby Control Valve CV-1822 in service.
Standard:               Coordinates with Control Room to ensure CRD pump amps are adequate for placing the standby Control Valve CV-1822 in service.
Evaluator Cue:         Acting as Control Room Operator coordinates ensure CRD pump amps are adequate for placing the standby Control Valve CV-1822 in service.
This action is complete.
This action is complete.
Performance:
Performance:           SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step:       Slowly throttle open V-17-29 Outlet Isolation for CV-1822 to obtain CRD System Critical Y (SEQ-)       flow as desired on FI-1815.
Critical N (SEQ-) Place the second CRD Discharge Filter 1F
Standard:              Throttles open V-17-29 Outlet Isolation for CV-1822 to obtain CRD System flow as desired on FI-1815.
-201B in service as follows:
Evaluator Cue:          This action is complete.
Standard: Places the second CRD Discharge Filter 1F
Performance:            SATISFACTORY                UNSATISFACTORY Comments:
-201B in service as follows:
Performance Step:      Verify that the manual and automatic for air signals on HIC-1834B for CV-1822 are Critical Y (SEQ-)      balanced.
Performance:
Standard:               Verifies the manual and automatic for air signals on HIC-1834B for CV-1822 are balanced.
SATISFACTORY UNSATISFACTORY Comments:     CAUTION: Since the CRD Pump discharge Filters are normally pressurized to 1500 psig, valve operations should be performed carefully/slowly.
Evaluator Cue:         This action is complete.
Performance:           SATISFACTORY                 UNSATISFACTORY Comments:
NRC 2011 JPM P-3.docx                      Page 11 of 14


QF-1030-11 Rev. 7 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step:         Place the AUTO/MANUAL transfer switch HIC-1834B for CV-1822 in the AUTO Critical Y (SEQ-)         position.
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 NRC 2011 JPM P
Standard:                 Places the AUTO/MANUAL transfer switch HIC-1834B for CV-1822 in the AUTO position.
-3.docx Page 8 of 14 Performance Step:
Evaluator Cue:           This action is complete.
Critical Y (SEQ-) At the CRD discharge filters on RB 1st floor South side, verify Isolation Valve V 14 is OPEN for the standby CRD Pump Discharge Filter 1F
Performance:             SATISFACTORY               UNSATISFACTORY Comments:
-201B. Standard: Verifies Isolation Valve V 14 is OPEN for the standby CRD Pump Discharge Filter 1F-201B. Evaluator Cue:
Terminating Cues:   This JPM is complete.
This action is complete. Performance:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Stop Time:
Critical N (SEQ-) Coordinate with Control Room to ensure CRD pump amps are adequate and slowly OPEN Outlet Isolation Valve V 22. Standard: Coordinates with Control Room to ensure CRD pump amps are adequate and slowly OPEN Outlet Isolation Valve V 22. Evaluator Cue:
NRC 2011 JPM P-3.docx                      Page 12 of 14
Acting as Control Room Operator coordinates with examinee to ensure CRD pump amps are adequate.
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical N (SEQ-) Place the second Flow control Valve CV
-1822 in service as follows:
Standard: Places the second Flow Control Valve CV
-1822 in service as follows. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM P
-3, Maximize CRD Injection IAW AIP 407, Rev. 0  NRC 2011 JPM P
-3.docx Page 9 of 14 Performance Step:
Critical N (SEQ-) At 1C05, verify FC
-1814 CRD SYSTEM FLOW CONTROL in MANUAL.
Standard: Verifies FC
-1814 CRD SYSTEM FLOW CONTROL in MANUAL.
Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      NOTE: Steps below are performed at the CRD Flow Control Station.
Performance Step:
Critical Y (SEQ-) Verify the standby Flow Control Valve V 29 Outlet Isolation for CV
-1822 is closed. Standard: Verifies the standby Flow Control Valve V 29 Outlet Isolation for CV
-1822 is closed. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Verify inlet isolation V 27 for standby Flow Control Valve CV
-1822 is open..
Standard: Verifies inlet isolation V 27 for standby Flow Control Valve CV-1822 is open.
Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM P
-3, Maximize CRD Injection IAW AIP 407, Rev. 0  NRC 2011 JPM P
-3.docx Page 10 of 14 Performance Step:
Critical Y (SEQ-) Verify local AUTO/MAN transfer switch HC
-1843B for the standby CV
-1822 selected to MAN. Standard: Verifies local AUTO/MAN transfer switch HC
-1843B for the standby CV
-1822 selected to MAN.
Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Raise and lower the air signal to CV
-1822 with the manual control knob, and verify that the valve strokes normally.
Standard: Raises and lower the air signal to CV
-1822 with the manual control knob, and verifies that the valve strokes normally. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Match manual and automatic air signals for CV
-1822. Standard: Matches manual and automatic air signals for CV
-1822. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM P
-3, Maximize CRD Injection IAW AIP 407, Rev. 0  NRC 2011 JPM P
-3.docx Page 11 of 14 Performance Step:
Critical Y (SEQ-) Coordinate with Control Room to ensure CRD pump amps are adequate for placing the standby Control Valve CV
-1822 in service.
Standard: Coordinates with Control Room to ensure CRD pump amps are adequate for placing the standby Control Valve CV
-1822 in service.
Evaluator Cue:
Acting as Control Room Operator coordinates ensure CRD pump amps are adequate for placing the standby Control Valve CV
-1822 in service.
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Slowly throttle open V-17-29 Outlet Isolation for CV
-1822 to obtain CRD System flow as desired on FI
-1815. Standard: Throttles open V 29 Outlet Isolation for CV
-1822 to obtain CRD System flow as desired on FI
-1815. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Critical Y (SEQ-) Verify that the manual and automatic for air signals on HIC
-1834B for CV
-1822 are balanced. Standard: Verifies the manual and automatic for air signals on HIC
-1834B for CV
-1822 are balanced. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1030-11  Rev. 7 NRC 2011 JPM P
-3, Maximize CRD Injection IAW AIP 407, Rev. 0  NRC 2011 JPM P
-3.docx Page 12 of 14 Performance Step:
Critical Y (SEQ-) Place the AUTO/MANUAL transfer switch HIC
-1834B for CV-1822 in the AUTO position. Standard: Places the AUTO/MANUAL transfer switch HIC
-1834B for CV
-1822 in the AUTO position. Evaluator Cue:
This action is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues: This JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}
Stop Time:  


QF-1030-11 Rev. 7 NRC 2011 JPM P-3.docx Page 13 of 14 NRC 2011 JPM P
QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Examinee:                                           Evaluator:
-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Examinee: Evaluator:
RO     SRO     STA     NSPEO       SRO CERT               Date:
RO   SRO   STA   NSPEO   SRO CERT Date:   ILT RO   ILT SRO   PERFORMANCE RESULTS:
ILT RO         ILT SRO PERFORMANCE RESULTS:                     SAT:                         UNSAT:
SAT: UNSAT:   Remediation required:
Remediation required:         YES                         NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
YES   NO   COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE:       ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
EVALUATOR'S SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.}}
NRC 2011 JPM P-3.docx                        Page 13 of 14}}

Latest revision as of 20:13, 6 February 2020

2011 DAEC Initial License Examination Proposed JPMs
ML11319A189
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/30/2011
From: Chuck Zoia
Operations Branch III
To:
NextEra Energy Duane Arnold
References
QF-1030-11, Rev 7
Download: ML11319A189 (299)


Text

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO1 NRC 2011 RO ADMIN JPM a.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: PERFORMANCE OF ATTACHMENT 10, VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE, OF STP 3.0.0-01, INSTRUMENT CHECKS JPM NUMBER: NRC 2011 RO C0001 REV. 0 DAEC BANK #2.1.7-05 TASK NUMBER(S) / 1.07 (REACTOR OPERATOR)

TASK TITLE(S):

K/A NUMBERS: 2.1.7 (4.4) K/A VALUE:

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM a.docx Page 2 of 11

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant is operating at 100% electrical output.
  • Its a very hot and humid day.
  • The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre-job Brief.

o SPDS point SPDS006 has gone bad.

o Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.

INITIATING CUES (IF APPLICABLE):

  • Complete Attachment 10 of STP 3.0.0-01, Instrument Checks.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM a.docx Page 3 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant is operating at 100% electrical output.
  • Its a very hot and humid day.
  • The RO who was performing the Instrument Checks STP has just been called to the Multi-Shop briefing room to attend a Pre-job Brief.

o SPDS point SPDS006 has gone bad.

o Just prior to the RO being called away he recorded the required drywell temperature readings from 1C29 on to Attachment #10.

INITIATING CUES (IF APPLICABLE):

  • Complete Attachment 10 of STP 3.0.0-01, Instrument Checks.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM a.docx Page 4 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Takes the reading from TR-4383A Pen 1 (R) and multiplies it by the Critical N (SEQ-) Volume Fraction:

188.38 X 0.1067 Standard: Multiplies 188.38 X 0.1067 and gets 20.1.

Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Takes the reading from TR-4383A Pen 2 (G) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 166.98 X 0.1244.

Standard: Multiplies 166.98 X 0.1244 and gets 20.77.

Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM a.docx Page 5 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step: Takes the reading from TR-4383A Pen 3 (B) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 122.97 X 0.1737.

Standard: Multiplies 122.97 X 0.1737 and gets 21.36 Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Takes the reading from TR-4383B Pen 1 (R) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 167.34 X 0.1244.

Standard: Multiplies 167.34 X 0.1244 and gets 20.82 Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM a.docx Page 6 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step: Takes the reading from TR-4383B Pen 2 (G) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 134.88 X 0.1737.

Standard: Multiplies 134.88 X 0.1737 and gets 23.43 Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Takes the reading from TR-4383B Pen 3 (B) and multiplies it by the Critical Y (SEQ-) Volume Fraction:

  • 114.99 X 0.1259.

Standard: Multiplies 114.99 X 0.1259 and gets 14.48.

Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM a.docx Page 7 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step: Takes the reading from TR-4383C Pen 1 (R) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 122.75 X 0.1259.

Standard: Multiplies 122.75 X 0.1259 and gets 15.45.

Then records this number in the PRODUCT (3.0) column.

Evaluator Note: It is acceptable to round off the reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Takes the reading from TR-4383C Pen 2 (G) and multiplies it by the Critical N (SEQ-) Volume Fraction:

  • 113.83 X 0.0453.

Standard: Multiplies 113.83 X 0.0453 and gets 5.16 Then records this number in the PRODUCT (3.0) column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM a.docx Page 8 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Performance Step: Adds up column PRODUCT (3.0).

Critical Y (SEQ-)

20.1 20.77 21.36 20.82 23.43 14.48 15.45 5.16 141.57 Standard: Adds up the volume fractions for each drywell temperatures and gets a value of 141.57.

Evaluator Note: The number does not have to be exactly the same as above, it will depend on how he rounded off the Volume Fraction calculations.

The critical portion is that the calculation be above 135 degrees.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Instrument Checks Acceptance Criteria for Volume Weighted Drywell Critical Y (SEQ-) Average Air Temperature is less than or equal to 135 degrees F.

Standard: Determines that the Attachment 10 value determined in previous step is above the Acceptance Criteria for the STP, and reports the findings to the CRS/SM.

Evaluator Note: If the candidate does not recognize that this reading is above the T.S.

acceptance criteria it should be noted as a competency.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM a.docx Page 9 of 11

QF-1030-11 Rev. 7 NRC 2011 RO C001, DAEC Bank # 2.1.7-05Performance of Attachment 10, Volume Weighted Drywell Average Air Temperature, of STP 3.0.0-01, Instrument Checks, Rev. 0 Terminating Cues: When the Candidate informs the CRS/SM that they do not meet the acceptance criteria for Drywell average air temperatures, the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 RO ADMIN JPM a.docx Page 10 of 11

QF-1030-11 Rev. 7 Page 1 of 1 ATTACHMENT 10 VOLUME WEIGHTED DRYWELL AVERAGE AIR TEMPERATURE NOTE ________

Attachment 10 is to be performed whenever Computer Point SPDS006 is unavailable or inaccurate. Four different options are available for obtaining alternate temperature readings for each Drywell location and all readings do not have to be from the same option. The 1C29 temperatures used in Step 2.1 and the computer points used in Step 2.2 are sensed from the same temperature elements which input to SPDS006 but the computer points used in Step 2.3 and the 1C142 readings used in Step 2.4 are sensed from different temperature elements. If readings are obtained per Step 2.3 or 2.4, the calculated value may be different than what SPDS006 indicates and the System Engineer should be notified for further evaluation if the change is significant or exceeds the Tech Spec limit of 135°F. Any one of the four options is acceptable to use, but the Step 2.1 or Step 2.2 options should be used if available for better accuracy. Assistance from an I&C Tech will be needed for using Step 2.4 option.

1. Determine which individual instruments are available, circle and initial the instrument chosen in each row.
2. Obtain the readings per the following as appropriate:

2.1 At 1C29, record the recorder reading in the table.

2.2 Using the Plant Process Computer, record the computer point reading in the table.

2.3 Using the Plant Process Computer, record the computer point reading plus the correction in the table.

2.4 At 1C142, select the ILRT position on switch HSS-4354 and use an L&N Temperature Calibrator to record the temperature reading plus the correction in the table. Refer to NG-96-1963 (Temperature Conversion Reference Tables) Tab 7 for converting resistance readings to temperatures.

3. Multiply each reading by its volume fraction and record the product in the table.
4. Determine the Volume Weighted Drywell Average Air Temperature by adding the eight products.

INSTRUMENT (1.0) READING (2.0) VOLUME PRODUCT (3.0) 1C29 (2.1) Comp. Pt. (2.2) Comp. Pt. (2.3) 1C142 (2.4) FRACTION TR-4383A Channel 1 (R) B147 B095 + 4.0 TE-4328L + 4.0 X 0.1067 TR-4383A Channel 2 (G) B145 B093 + 10.0 TE-4328J + 10.0 X 0.1244 TR-4383A Channel 3 (B) B143 B091 + 4.0 TE-4328G + 4.0 X 0.1737 TR-4383B Channel 1 (R) B146 B094 + 10.0 TE-4328K + 10.0 X 0.1244 TR-4383B Channel 2 (G) B144 B092 + 4.0 TE-4328H + 4.0 X 0.1737 TR-4383B Channel 3 (B) B141 B089 + 4.0 TE-4328E + 4.0 X 0.1259 TR-4383C Channel 1 (R) B142 B090 + 4.0 TE-4328F + 4.0 X 0.1259 TR-4383C Channel 2 (G) B149 B096 + 4.0 TE-4328M + 4.0 X 0.0453 Volume Weighted Drywell Average Air Temperature (4.0)

NRC 2011 RO ADMIN JPM a.docx Page 11 of 11

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM COO2 NRC 2011 RO ADMIN JPM C002.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER: NRC 2011 RO C0002 REV. 0 TASK NUMBER(S) / 2.1.4 (3.3/3.8)

TASK TITLE(S):

Knowledge of individual licensed operator responsibilities related to shift K/A NUMBERS: N/A K/A VALUE: staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab: Classroom X Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM C002.docx Page 2 of 11

QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 RO ADMIN JPM C002.docx Page 3 of 11

QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements General

References:

10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements Task Standards: Identifies which personnel are available to assume the watch and the reaon(s) other(s) are not.

NRC 2011 RO ADMIN JPM C002.docx Page 4 of 11

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Today is July 4, 2011.
  • You are the RO.
  • You must leave shift.
  • Three replacement operators are available.

INITIATING CUES (IF APPLICABLE):

  • Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
  • Record your findings on Handout #2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM C002.docx Page 5 of 11

QF-1030-11 Rev. 7 PERFORMANCE:

EXAMINER NOTE: Provide candidate with Handout #1 START TIME:

1. Procedure Step: Operator reviews the handout and applicable sections of the procedures.

Standard Determines eligibility of the operators in accordance with the below key Comments Results SAT UNSAT Terminating Cue: ONCE candidate discusses their findings the JPM can be terminated Answer Key If No, what requirement is not Qualified for Relief? (Yes/No) being met.

Does not have a medical exam within the past 2 years RO #1 NO Does not have the annual fit test Does not meet the required number of hours performing RO #2 NO duties as a licensed operator for the last quarter (Work Control hours do NOT count)

RO #3 YES N/A NRC 2011 RO ADMIN JPM C002.docx Page 6 of 11

QF-1030-11 Rev. 7 HANDOUT #1 RO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - ANSOE 4/17/11 - 0700 - 1900 - NSOE 4/25/11 - 0700 - 1900 - ANSOE 5/5/11 - 0700 - 1900 - Work Control Tagout Coordinator 5/6/11 - 0700 - 1900 - ANSOE 5/7/11 - 0700 - 1900 - NSOE 6/4/11 - 0700 - 1900 - NSOE 6/5/11 - 0700 - 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam - 4/10/2009 Latest Mask Fit Test - 12/28/2009 RO#2 Hours Performing Operator Duties in Last Quarter 5/21/11: 0700 - 1900 - Work Control Tagout Coordinator 5/30/11: 0700 - 1900 - ANSOE 6/14/11: 0700 - 1900 - NSOE 6/15/11: 0700 - 1900 - Work Control Tagout Coordinator 6/24/11: 0700 - 1900 - NSOE 6/25/11: 0700 - 1900 - NSOE 6/26/11: 0700 - 1900 - Work Control Tagout Coordinator Date of Most Recent Medical Exam - 10/14/2009 Latest Mask Fit Test - 11/16/2010 RO#3 Hours Performing Operator Duties in Last Quarter 4/6/11 0700 - 1900 - ANSOE 5/8/11: 0700 - 1900 - ANSOE 5/9/11: 0700 - 1900 - NSOE 5/15/11: 0700 - 1900 - Work Control Tagout Coordinator 6/1/11: 0700 - 1900 - NSOE 6/21/11: 0700 - 1900 - ANSOE Date of Most Recent Medical Exam - 7/15/2010 Latest Mask Fit Test - 6/10/2010 NRC 2011 RO ADMIN JPM C002.docx Page 7 of 11

QF-1030-11 Rev. 7 HANDOUT #2 If No, what requirement(s)

Qualified for Relief? (Yes/No) is/are not being met.

RO #1 RO #2 RO #3 NRC 2011 RO ADMIN JPM C002.docx Page 8 of 11

QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Today is July 4, 2011.
  • You are the RO.
  • You must leave shift.
  • Three replacement operators are available.

INITIATING CUES (IF APPLICABLE):

  • Using the given information on Handout #1, determine which of the three operators, if any, are qualified to relieve you IAW the plant procedures. If not qualified, record reason why.
  • Record your findings on Handout #2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM C002.docx Page 9 of 11

QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:

Critical Standard:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 RO ADMIN JPM C002.docx Page 10 of 11

QF-1030-11 Rev. 7 NRC 2011 RO COO2, Verification of License Requirements, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 RO ADMIN JPM C002.docx Page 11 of 11

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM EC NRC 2011 RO ADMIN JPM EC.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: DETERMINE CLEARANCE POINTS FOR RBCCW "B" PUMP REPLACEMENT JPM NUMBER: NRC 2011 EC REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

Knowledge of tagging and K/A NUMBERS: 2.2.13 (4.1) K/A VALUE:

clearance procedures.

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab: Classroom X Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM EC.docx Page 2 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 RO ADMIN JPM EC.docx Page 3 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 General

References:

BECH-M112 BECH-E111<0007> Rev.3 OI 414 Rev 36 OI 414 Att.1 Rev 2 OI 414 Att.2 Rev 1 Clearance 1400-1P081B: CYCLE-23 Task Standards: Identifies the isolation points, tag type, component position and tag sequence for a B RBCCW clearance NRC 2011 RO ADMIN JPM EC.docx Page 4 of 10

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
  • Identify the components required to isolate the B RBCCW Pump for pump replacement.
  • Record the required components, tag type, component positions and tagging sequence on the handout provided.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM EC.docx Page 5 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • eSOMS is NOT Available INITIATING CUES (IF APPLICABLE):
  • Identify the components required to isolate the B RBCCW Pump for pump replacement.
  • Record the required components, tag type, component positions and tagging sequence on the handout provided.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM EC.docx Page 6 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Obtain references, as required:

Critical N (SEQ-)

  • P&ID BECH-M-112 & BECH-E111<0007>

Standard: Obtains references P&ID BECH-M- 112 & BECH-E111<0007 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Records the isolation points Critical Y (SEQ-)

Standard: See Key Below Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 RO ADMIN JPM EC.docx Page 7 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 KEY Component Tag Type Sequence** Component Description Position/Configuration Handswitch Maintenance in Anytime Tag on Handswitch HS4833 Progress OR Caution OR Info Breaker 1B4320 Danger 1 OFF Discharge Danger 2 Closed Valve V12-0007 Suction Valve Danger 2 Closed V12-0005 Drain Valve Caution 3 Operate As Needed To V12-0125 Drain OR Open Pressure Point Caution 3 Operate as needed to Drain V12-0125 OR Open Pressure Point Caution 3 Operate as needed to Drain V12-0126 OR Open

    • Examiner Note:

The sequence must be electrical first (control switch, fuses, breaker),

valve isolations second (suction, discharge) and drains third.

The Pressure Points and Sequence Info for the Handswitch are NOT CRITICAL and in a smaller font size Critical Portions are BOLD, identified in RED and in a LARGER Font size NRC 2011 RO ADMIN JPM EC.docx Page 8 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 HANDOUT #1 Component Tag Type Sequence Component Description Position/Configuration 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

NRC 2011 RO ADMIN JPM EC.docx Page 9 of 10

QF-1030-11 Rev. 7 NRC 2011 EC, Determine Clearance Points for RBCCW B Pump Replacement, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 RO ADMIN JPM EC.docx Page 10 of 10

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 RO ADMIN JPM RC NRC 2011 RO ADMIN JPM RC.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: DETERMINE PERSONNEL AVAILABILITY TO PERFORM RADIATION AREA TASK JPM NUMBER: NRC 2011 RO ADMIN JPM REV. 0 RC TASK NUMBER(S) / 96.05 TASK TITLE(S): CONDUCT PLNAT OPERATIONS IN ACCORDANCE WITH ADMINISTRATIVE PROCEDURES K/A NUMBERS: 2.3.12 K/A VALUE:

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 RO ADMIN JPM RC.docx Page 2 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 RO ADMIN JPM RC.docx Page 3 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE SIMULATOR OVERRIDES:

TIME OVERRIDE ID OVERRIDE ET DELAY VALUE RAMP DESCRIPTION SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION #

Required Materials: Calculator Candidate may refer to ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES (Level of Usage is Information Use). If stated they would refer to the ACP, provide a copy.

General

References:

ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES, Revision 21 Task Standards: Determines the expected exposure for the task Selects the operator who can perform the task without exceeding DAEC limits NRC 2011 RO ADMIN JPM RC.docx Page 4 of 9

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWCU.
  • DAEC Management has decided that an operator will make the required area entry.
  • Time to complete the task for an experienced operator will be 24 minutes.
  • Time to complete the task for a new operator will be 30 minutes
  • Radiation levels at the valve are as high as 1500 mR/hr.
  • Four (4) individuals are available to perform the task.

A. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employee # - 00001, SSN: 111-11-1111).

B. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).

C. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).

D. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444-44-4444).

INITIATING CUES (IF APPLICABLE):

  • Determine the following using the maximum dose rate expected and information above:
  • The individual(s) available to close MO-2701 without exceeding DAEC Administrative Limits
  • The radiation exposure the individuals would receive if they performed the task
  • The reason a particular worker would not be chosen for the task NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM RC.docx Page 5 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION, which failed to isolate remotely, due to a steam leak from a cracked weld in RWCU.
  • DAEC Management has decided that an operator will make the required area entry.
  • Time to complete the task for an experienced operator will be 24 minutes.
  • Time to complete the task for a new operator will be 30 minutes
  • Radiation levels at the valve are as high as 1500 mR/hr.
  • Four (4) individuals are available to perform the task.

E. Operator A is a volunteer who is an experienced Licensed Reactor Operator that received a planned special exposure, at another facility, this year, of 4.5R TEDE (TLD #1, Employee # - 00001, SSN: 111-11-1111).

F. Operator B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).

G. Operator C is a volunteer who is a new Licensed Reactor Operator that has received a dose of 600 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).

H. Operator D is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1500 mR this year (TLD #4, Employee # 00004, SSN: 444-44-4444).

INITIATING CUES (IF APPLICABLE):

  • Determine the following using the maximum dose rate expected and information above:
  • The individual(s) available to close MO-2701 without exceeding DAEC Administrative Limits
  • The radiation exposure the individuals would receive if they performed the task
  • The reason a particular worker would not be chosen for the task NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 RO ADMIN JPM RC.docx Page 6 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Determine the expected exposure for the task for both a new and experienced Critical Y (SEQ-) operator Standard: For an experienced operator - Calculates that a 24 minute exposure in a 1500 mR/hr field will cause a dose of 600 mR.

For a new operator - Calculates that a 30 minute exposure in a 1500 mR/hr field will cause a dose of 750 mR.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 RO ADMIN JPM RC.docx Page 7 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 Performance Step: Determine which, if any, of the individuals is available to close MO-2701 without Critical Y (SEQ-) exceeding his annual DAEC Administrative Limit.

Standard: Determines operator C is the only operator available to close MO-2701 without exceeding DAEC Administrative Limits:

  • Operator A has previously received a planned special exposure.

600 mR would cause him/her to exceed 5 R TEDE.

  • Operator B is a declared pregnant worker. 600 mR would cause her to exceed 450mR.
  • Operator C is a new Licensed Reactor Operator. 750 mR will cause him/her to have a total of 1350 mR.
  • Operator D is an experienced Licensed Reactor Operator. 600 mR will cause him to exceed 2000 mR.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the candidate has stated the expected dose for the task and states which operator(s), if any, are available for the task without exceeding DAEC Administrative limits, inform him that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 RO ADMIN JPM RC.docx Page 8 of 9

QF-1030-11 Rev. 7 NRC 2011 RO Admin JPM RC. Determine Personnel Availability to Perform Radiation Area Task, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 RO ADMIN JPM RC.docx Page 9 of 9

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO1 NRC 2011 SRO ADMIN JPM C001.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: PERFORM STP 3.0.0-01, ATT. 11 - CORE THERMAL LIMITS CHECK JPM NUMBER: NRC 2011 ADMIN JPM REV. 0 SRO C001 TASK NUMBER(S) / 82.00 TASK TITLE(S): Monitor the Rod Block Monitoring System Ability to evaluate plant performance and make operational K/A NUMBERS: 2.1.7 (4.7)2.1.7 (4.7) K/A VALUE: judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab: Classroom X Time for Completion: 15 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM C001.docx Page 2 of 14

QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 SRO ADMIN JPM C001.docx Page 3 of 14

QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: ARP 1C05B (A-6) (B-6)

Plant process computer Technical Specifications Copy of Official 3D Case with MFLCPR and Load Line OOS Power to Flow Map COLR General

References:

ARP 1C05B (A-6) (B-6), Rev 74 Technical Specifications, LCO 3.2.2, Amendment 243 Power to Flow Map Task Standards: Identify Tech Spec Safety Limit violation (MCPR)

Identify Load Line and MFLCPR limits are exceeded NRC 2011 SRO ADMIN JPM C001.docx Page 4 of 14

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is at rated power INITIATING CUES (IF APPLICABLE):
  • Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0-01, and determine actions required, if any.

EVALUATOR CUE:

  • Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM C001.docx Page 5 of 14

QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is at rated power INITIATING CUES (IF APPLICABLE):
  • Perform a review of a just completed Attachment 11, Sections 1.0 and 2.0 of STP 3.0.0-01, and determine actions required, if any.

EVALUATOR CUE:

  • Provide the candidate with the 3D Monicore printout and the filled in copy of the STP NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM C001.docx Page 6 of 14

QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Takes initial data including Load Line.

Critical Y (SEQ-)

Standard: Identifies that the load line is greater than the allowable value and is also greater than the MELLA Limit. Recommends that load line be reduced to below MELLA immediately (IAW Power to Flow Map note)

Enters AOP 255.2 at Step 7. for actions Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Continues review and notes MCPR and MFLCPR limit is OOS Critical Y (SEQ-)

Standard: Determines MCPR is OOS and enters Technical Specification 3.2.2 Condition A which requires the plant to reduce MCPR to within limits in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Evaluator Note: May reference COLR Evaluator Note: Provide a copy of Power to Flow Map if requested Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the candidate identifies entry into TS 3.2.2 Condition A and that the MELLA limit has been exceeded and immediate action is required, the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 SRO ADMIN JPM C001.docx Page 7 of 14

Page 1 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT (Note: Not required in Mode 4 )

NOTE ___crs___

If the reactor is operating in Single Loop (SLO), then N/A Attachment 11 and perform the Combined Single Loop Surveillance Procedure STP-3.4.1-02. APRM Gain Adjustment shall be accomplished once per day when in MODE 1 while greater than or equal to () 21.7% RTP and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after greater than or equal to () 21.7% RTP on startup. Attachment 11 may be marked N/A if operating at less than (<) 21.7% RTP for an extended period of time.

1.0 APRM GAIN ADJUSTMENT (TWO LOOP OPERATION ONLY) 1.1 Record CORE POWER and indicate source below: ___crs___

(X) From PERIODIC LOG

( ) From POWER and FLOW LOG

( ) From Computer Point C133

( ) From heat balance conducted by Reactor Engineer CORE POWER = ___99.9___ % Power.

1.2 Determine desired APRM setting. APRM setting shall be greater than or equal to () ___crs___

CORE POWER minus 2% from Step 1.1 and less than or equal to () CORE POWER plus 2%.

Desired APRM setting: _97.9___% Power and _101.9___% Power A B C D E F 1.3 Record as found 100 100 101 100 101 101 ___crs___

indicated APRM power % @ 1C37 1.4 If APRM requires adjustment, perform Steps a through f, otherwise N/A Steps a through f.

a) Bypass, and _____ _____ _____ _____ _____ _____ ___N/A___

adjust desired APRM setting if necessary.

b) Confirm bypass _____ _____ _____ _____ _____ _____ ___N/A___

light on Panel 1C05 c) Confirm bypass _____ _____ _____ _____ _____ _____ ___N/A___

light on Panel 1C37 d) Confirm computer _____ _____ _____ _____ _____ _____ ___N/A___

alarm message A548 A549 A550 A551 A552 A553 e) Confirm all _____ _____ _____ _____ _____ _____ ___N/A___

alarms are reset f) Record as left _100_ _100_ _101_ 100_ _101_ _101_ ___N/A___

indicated APRM power, % @ 1C37 NRC 2011 SRO ADMIN JPM C001.docx Page 8 of 14

Page 2 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT 1.5 Confirm APRM Computer Points (B000-B005) values are approximately the same ___crs___

as the As-Left values on 1C37. If not, notify the Reactor Engineer and appropriate System Engineer.

2.0 CORE THERMAL LIMITS 2.1 If the process computer is not available, responsibility for Attachment 11 has been N/A _

turned over to a Reactor Engineer. (N/A this step if process computer is available.)

2.2 Check the method or methods used to determine the core parameters. ___crs___

Periodic Log: _______X_______ Power and Flow Log: _____________

Heat Balance by RE: __________________

2.3 Record the following core parameters.

2.3.1 Core Megawatt Thermal (POWER MWT) _____1909_______ Mwt ___crs___

2.3.2 Percent Reactor Pwr (CORE POWER) _____99.9_______ % ___crs___

2.3.3 Percent Load Line (LOAD LINE) _____100.68_________% ___crs___

a) If Load Line is greater than (>) 100.4%, immediately notify the CRS. Otherwise, ___crs___

mark this step N/A.

2.3.4 Core flow (FLOW) _____48.760________ Mlb/hr ___crs___

a) If Core flow is greater than (>) 51.3 Mlb/hr, immediately notify the CRS. Otherwise, N/A _

mark this step N/A.

2.3.5 Percent Core Flow (CORE FLOW) ____99.5________% ___crs___

2.3.6 Most Limiting Maximum Fraction of Limiting Critical Power Ratio ___crs___

(MFLCPR) __1.002________

a) If Most Limiting MFLCPR is 0.99, N/A Steps 2.3.6.b and c and proceed to N/A _

Step 2.3.7.

b) If Most Limiting MFLCPR is > 0.99 but 1.00, notify the CRS, N/A Step 2.3.6.c and N/A _

proceed to Step 2.3.7.

c) If Most Limiting MFLCPR is > 1.00, observe General Instructions 4.3 through 4.5. ___crs___

NRC 2011 SRO ADMIN JPM C001.docx Page 9 of 14

Page 3 of 3 ATTACHMENT 11 CORE THERMAL LIMITS AND APRM GAIN ADJUSTMENT 2.3.7 Most Limiting Max Fraction of Limiting Power Density ___crs___

(MFLPD) ___0.848________

a) If Most Limiting MFLPD is 0.99, N/A Steps 2.3.7.b and c and proceed to ___crs___

Step 2.3.8.

b) If Most Limiting MFLPD is > 0.99 but 1.0, notify the CRS, N/A Step 2.3.7.c and N/A _

proceed to Step 2.3.8.

c) If MFLPD is > 1.0, observe General Instructions 4.3 through 4.5. N/A _

2.3.8 Most Limiting Maximum Average Planar Linear Heat Generation Rate Ratio ___crs___

(MAPRAT) ____0.717______

a) If the Most Limiting MAPRAT is 0.99, N/A Steps 2.3.8.b and c. ___crs___

b) If Most Limiting MAPRAT is > 0.99 but 1.0, notify the CRS and N/A Step 2.3.8.c. N/A _

c) If Most Limiting MAPRAT is > 1.0, observe General Instructions 4.3 through 4.5. N/A _

NRC 2011 SRO ADMIN JPM C001.docx Page 10 of 14

HANDOUT #1 PAGE 1

>>>> SIMULATOR <<<< SEQUENCE NO 2 CORE PARAMETERS 3DM/P11 TODAY 5 MINUTES AGO CALCULATED POWER MWT 1909. PERIODIC LOG TODAY 5 MINUTES AGO PRINTED POWER MWE 646. USER REQUEST CASE ID FMLD1090730012821 FLOW MLB/HR 48.760 CALC RESULTS RESTART FMLD1090730012821 FPAPDR 0.833 LPRM SHAPE - FULL CORE SUBC BTU/LB 22.91 Keff 1.0037 PR PSIa 1038.5 XE WORTH  % -2.34 LOAD LINE

SUMMARY

CORE MWD/sT 21469.0 XE/RATED 1.01 CORE POWER 99.9%

CYCLE MWD/sT 7900.6 AVE VF 0.494 CORE FLOW 99.5%

MCPR 1.337 LOAD LINE 100.68%

CORRECTION FACTOR: MFLCPR= 1.008 MFLPD= 1.000 MAPRAT= 1.000 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM= 1.34 MOST LIMITING LOCATIONS (NON-SYMMETRIC)

MFLCPR LOC MFLPD LOC MAPRAT LOC PCRAT LOC 1.002 25-28 0.848 9 6 0.717 9 6 0.783 35 6 1.000 25-18 0.846 35 6 0.716 9 6 0.781 9 6 0.998 19-28 0.845 9 6 0.714 35 6 0.779 35 6 0.996 19-18 0.843 35 6 0.690 15 5 0.767 9 6 0.993 25-36 0.816 15 5 0.689 29 5 0.752 29 5 0.991 25-10 0.814 29 5 0.687 29 5 0.750 15 5 0.989 19-36 0.812 29 5 0.685 15 5 0.749 15 5 0.987 23-20 0.811 15 6 0.682 7 6 0.747 29 5 0.984 21-26 0.808 37 6 0.681 37 6 0.745 7 6 0.982 23-26 0.807 7 6 0.679 37 6 0.743 37 6 SEQ. A-l C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL NOTCH REL PW LOC 0.263 25 00 0.527 24 02 0.651 23 43 04 0.776 22 L 06 0.836 21 39 08 0.895 20 10 0.925 19 35 12 0.954 18 L 14 1.006 17 31 38 22 38 P 16 1.059 16 18 1.070 15 27 C 20 1.082 14 L 22 1.108 13 23 22 8 22 24 1.134 12 26 1.162 11 19 28 1.189 10 L 30 1.234 09 15

  • 38 22 38 32 1.278 08 34 1.310 07 11 36 1.342 06 L 38 1.266 05 07 40 1.190 04 42 0.882 03 03 44 0.573 02 L L L L L 46 0.287 01 02 06 10 14 18 22 26 30 34 38 42 CORE AVERAGE RADIAL POWER DISTRIBUTION NRC 2011 SRO ADMIN JPM C001.docx Page 11 of 14

RING # 1 2 3 4 5 6 REL PW 0.849 1.227 1.191 1.203 1.154 0.629 NRC 2011 SRO ADMIN JPM C001.docx Page 12 of 14

HANDOUT #1 PAGE 2

>>>> SIMULATOR <<<< INSTRUMENT READINGS/STATUS SEQUENCE NO 2 RAW LPRM READINGS TODAY 5 MINUTES AGO CALCULATED TODAY 5 MINUTES AGO PRINTED 41D 18.8 24.0 CASE ID FMLD1090730012821 C 26.2 33.9 LPRM SHAPE - FULL CORE B 33.5 41.1 A 34.3 41.5 # OF TIPS NOT SCANNED: 1

  1. OF TIPS REJECTED: 1 33D 24.8 34.6 37.1C 30.9 C 36.1 49.9 53.7 45.5 FAILED SENSORS:

B 44.8 57.1 50.4 55.6 LPRM ( 0 SIGNAL FAILED)

A 47.8 53.2 49.1 49.5P LPRM ( 0 PANACEA-REJECTED)

OTHER SENSORS ( 0 TOTAL) 25D 31.9 42.2 41.0 37.4 24.3 SUB RODS C 45.9 61.8 50.3 57.6 34.8 NONE B 52.3 52.6 49.3 50.7 42.3 A 54.7 44.4 42.3 45.4 37.8 T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D 29.0 39.2 41.6 34.6 19.1 M = MAPRAT LOCATION C 43.0 58.6 61.7 54.5 26.2 D = MFLPD LOCATION B 51.8 62.4 52.3 61.5 33.7 P = PCRAT LOCATION A 54.3* 44.8 45.5 47.7 30.5 # = MULTIPLE LIMIT O9D 17.7 28.4 31.2 24.5 C 23.5 42.3 45.4 36.4 B 30.7 51.1 56.8 45.2 A 26.1 63.4 61.8 53.7 08 16 24 32 40 CORE

SUMMARY

INER 1.121 CORE POWER 99.9% CALC SUB FLOW 101.7% DP MEAS PSI 23.88 CORE FLOW 99.5% OPER SUB FLOW -2.0% DP CALC PSI 27.87 LOAD LINE 100.68% FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 8.26 APRM CALIBRATION A B C D E F READING 98.7 98.5 100.8 98.9 98.5 98.3 AGAF 1.016 1.018 0.995 1.015 1.017 1.018 APRM - %CTP -1.6 -1.8 0.5 -1.5 -1.7 -2.0 TIP RUNS RECOMMENDED STRINGS: NONE NRC 2011 SRO ADMIN JPM C001.docx Page 13 of 14

QF-1030-11 Rev. 7 NRC 2011 ADMIN JPM SRO C001, Perform STP 3.0.0-01, Att. 11 - Core Thermal Limits Check, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 SRO ADMIN JPM C001.docx Page 14 of 14

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM COO2 NRC 2011 SRO ADMIN JPM C002.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: VERIFICATION OF LICENSE REQUIREMENTS JPM NUMBER: NRC 2011 SRO ADMIN REV. 0 JPM C002 TASK NUMBER(S) /

TASK TITLE(S):

Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical K/A NUMBERS: 2.1.4 (3.3/3.8) K/A VALUE:

requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab: Classroom X Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM C002.docx Page 2 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 SRO ADMIN JPM C002.docx Page 3 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 General

References:

10 CFR 55.53 NAP-408-License Maintenance And Activation Program ACP 1411.20 -Respiratory Protection NP-912-Respiratory Qualification Requirements ODI-9 Task Standards: Identifies which personnel are available to assume the watch and the reason(s) other(s) are not.

NRC 2011 SRO ADMIN JPM C002.docx Page 4 of 11

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Today is July 4, 2011.
  • You are the CRS.
  • You must leave shift.
  • Three other Control Room Supervisors are available.

INITIATING CUES (IF APPLICABLE):

  • Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
  • Record your findings on Handout #2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM C002.docx Page 5 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Today is July 4, 2011.
  • You are the CRS.
  • You must leave shift.
  • Three other Control Room Supervisors are available.

INITIATING CUES (IF APPLICABLE):

  • Using the given information on Handout #1, determine which of the three Control Room Supervisors, if any, are qualified to relieve you IAW plant procedures.
  • Record your findings on Handout #2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM C002.docx Page 6 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Operator reviews the handout and applicable sections of the procedures.

Critical Standard: Determines eligibility of the operators in accordance with the below key Evaluator Note: Provide candidate with Handout #1 Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: ONCE candidate discusses their findings the JPM can be terminated NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 SRO ADMIN JPM C002.docx Page 7 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 Answer Key If No, what requirement is not Qualified for Relief? (Yes/No) being met.

Does not have a medical exam within the past 2 years SRO #1 NO Does have the annual fit test Does not meet the required number of hours performing SRO #2 NO duties as a licensed operator for the last quarter (Work Control Supervisor hours do NOT count)

SRO #3 YES N/A NRC 2011 SRO ADMIN JPM C002.docx Page 8 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 HANDOUT #1 SRO#1 Hours Performing Operator Duties in Last Quarter 4/16/11 - 0700 - 1900 - CRS 4/17/11 - 0700 - 1900 - CRS 4/25/11 - 0700 - 1900 - CRS 5/5/11 - 0700 - 1900 - Work Control Supervisor 5/6/11 - 0700 - 1900 - CRS 5/7/11 - 0700 - 1900 - CRS 6/4/11 - 0700 - 1900 - CRS 6/5/11 - 0700 - 1900 - Work Control Supervisor Date of Most Recent Medical Exam - 4/10/2009 Latest Mask Fit Test - 12/28/2009 SRO#2 Hours Performing Operator Duties in Last Quarter 5/21/11: 0700 - 1900 - Work Control Supervisor 5/30/11: 0700 - 1900 - CRS 6/14/11: 0700 - 1900 - CRS 6/15/11: 0700 - 1900 - Work Control Supervisor 6/24/11: 0700 - 1900 - CRS 6/25/11: 0700 - 1900 - CRS 6/26/11: 0700 - 1900 - Work Control Supervisor Date of Most Recent Medical Exam - 10/14/2009 Latest Mask Fit Test - 11/16/2010 SRO#3 Hours Performing Operator Duties in Last Quarter 4/6/11 0700 - 1900 - CRS 5/8/11: 0700 - 1900 - CRS 5/9/11: 0700 - 1900 - CRS 5/15/11: 0700 - 1900 - Work Control Supervisor 6/1/11: 0700 - 1900 - CRS 6/21/11: 0700 - 1900 - CRS Date of Most Recent Medical Exam - 7/15/2010 Latest Mask Fit Test - 6/10/2010 NRC 2011 SRO ADMIN JPM C002.docx Page 9 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 HANDOUT #2 If No, what requirement(s)

Qualified for Relief? (Yes/No) is/are not being met.

SRO #1 SRO #2 SRO #3 NRC 2011 SRO ADMIN JPM C002.docx Page 10 of 11

QF-1030-11 Rev. 7 NCR 2011 SRO Admin JPPM C002, Verification of License Requirements, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 SRO ADMIN JPM C002.docx Page 11 of 11

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM EC NRC 2011 SRO ADMIN JPM EC.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: REVIEW THE ISOLATION POINTS FOR RWS BAY A DIVER INSPECTION &

A CORE SPRAY PUMP MOTOR INSPECTION BY ELECTRICAL MAINTENANCE JPM NUMBER: NRC 2011 SRO ADMIN REV. 0 JPM EC TASK NUMBER(S) /

TASK TITLE(S):

2.2.13 (4.3)

KNOWLEDGE OF K/A NUMBERS: TAGGING AND K/A VALUE:

CLEARANCE PROCEDURES Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab: Classroom X Time for Completion: 25 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM EC.docx Page 2 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 SRO ADMIN JPM EC.docx Page 3 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: Clearances for the A Intake Structure Pit and the A Core Spray Pump Tech Specs General

References:

Clearances for the A Intake Structure Pit and the A Core Spray Pump Tech Specs Task Standards: Determines 2 incorrect blocking points and their correct replacements.

Determines applicable TS.

Clearance for CS Clearance for RWS NRC 2011 SRO ADMIN JPM EC.docx Page 4 of 9

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is operating at rated power.
  • All TS LCOs are currently met
  • Divers will be inspecting the A RWS intake structure pit
  • Electricians will be performing an inspection of the A Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
  • Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM EC.docx Page 5 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is operating at rated power.
  • All TS LCOs are currently met
  • Divers will be inspecting the A RWS intake structure pit
  • Electricians will be performing an inspection of the A Core Spray Pump motor INITIATING CUES (IF APPLICABLE):
  • Review the isolations points on the clearances provided to perform the work above and determine required Technical Specification actions, if any.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM EC.docx Page 6 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

EXAMINER NOTE: Provide candidate with the clearances for the A Intake Structure Pit and the A Core Spray Pump NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Obtain and reviews clearances.

Critical Y (SEQ-)

Standard: Determines the following clearance points are incorrect and then provides the correct blocking points:

1. The heater breaker for Core Spray Pump 1P-211A-M is identified as the heater breaker for B Core Spray Pump and should be 1L80-25 (Danger Tag 932).
2. The A Bay Screen Wash Nozzle Shutoff valve breaker is identified as 1B2112 and should be 1B9112 (Danger Tag 966)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Identifies the required TS entries Critical Y (SEQ-)

Standard: Determines that the following TS apply

1. RWS - TS 3.7.2 Condition A. - 7 day
2. Core Spray - TS 3.5.1 Condition B. - 7 days Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 SRO ADMIN JPM EC.docx Page 7 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 Terminating Cues: ONCE candidate discusses their findings the JPM can be terminated.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 SRO ADMIN JPM EC.docx Page 8 of 9

QF-1030-11 Rev. 7 NRC 2011 SRO Admin JPM EC, Review the Isolation Points for RWS Bay A Diver Inspection & A Core Spray Pump Motor Inspection by Electrical Maintenance, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 SRO ADMIN JPM EC.docx Page 9 of 9

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 ADMIN SRO JPM RC NRC 2011 SRO ADMIN JPM RC.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: SURVEY MAP REVIEW AND DOSE CALCULATIONS TO DETERMINE THE ADEQUACY OF THE RWP DOSE SETTING AND DETERMINE IF A DOSE EXTENSION IS REQUIRED JPM NUMBER: NRC 2011 ADMIN SRO REV. 1 JPM RC TASK NUMBER(S) / 1.11 (SENIOR REACTOR OPERATOR)

TASK TITLE(S):

Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, K/A NUMBERS: 2.3.13 (3.8) K/A VALUE: containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab: Classroom X Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM RC.docx Page 2 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 SRO ADMIN JPM RC.docx Page 3 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 1. Survey map of the Heater Bay at 61% power.

2. Copy of ACP 1411.17 to write on.
3. Copy of NG-165K when requested General

References:

ACP 1411.17 NG-165K Task Standards:

  • Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.
  • Determine that the worker will need a dose extension and completes Section 1 and 2 of NG-165K.

NRC 2011 SRO ADMIN JPM RC.docx Page 4 of 11

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is operating at about 60% power.
  • The date is currently 6/23/11. You are the CRS.
  • The piping supporting Level Transmitter LT-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E-05A heater, has failed.
  • The old piping and LT have been removed. The New piping and LT are ready for installation.
  • Brad Pit is the only qualified welder who can perform the job. SSN # 123-45-6789, TLD 9999
  • Brad Pits supervisor, Mike Heffley, has performed a pre-job brief.
  • A welder apprentice has run all of the required material to the job site.
  • The following are the estimated times required for the job:
  • 10 minutes to prep the welds.
  • 20 minutes to secure the new LT and pipes in place.
  • 15 minutes to actually weld the pipes.
  • Brad has received 1855 mrem for the year.
  • Scaffolding for the job has been erected at location 5 on the survey map.

INITIATING CUES (IF APPLICABLE):

  • Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
  • Show all work assumptions on the survey map.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM RC.docx Page 5 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is operating at about 60% power.
  • The date is currently 6/23/11. You are the CRS.
  • The piping supporting Level Transmitter LT-1065B, to the drain valve of 1T93A Moisture Separator Drain Tank that controls the Drain to the 1E-05A heater, has failed.
  • The old piping and LT have been removed. The New piping and LT are ready for installation.
  • Brad Pit is the only qualified welder who can perform the job. SSN # 123-45-6789, TLD 9999
  • Brad Pits supervisor, Mike Heffley, has performed a pre-job brief.
  • A welder apprentice has run all of the required material to the job site.
  • The following are the estimated times required for the job:
  • 10 minutes to prep the welds.
  • 20 minutes to secure the new LT and pipes in place.
  • 15 minutes to actually weld the pipes.
  • Brad has received 1855 mrem for the year.
  • Scaffolding for the job has been erected at location 5 on the survey map.

INITIATING CUES (IF APPLICABLE):

  • Given the above and a survey map, determine the specific dose for the job and whether a dose extension is required. Complete associated paperwork if required.
  • Show all work assumptions on the survey map.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM RC.docx Page 6 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Determine the dose needed for the job.

Critical Y (SEQ-)

Standard: Determines that the total dose for the prep, support and weld is approximately 157.5 mrem.

Evaluator Note: The Candidate may add some additional dose for the trip to and from the job. This will not affect the fact that Brad will need a dose extension for the job.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Determine if the worker will need a dose extension.

Critical Y (SEQ-)

Standard: Determine that the worker will need a dose extension and completes Sections 1 and 2 of NG-165K.

Evaluator Cue: Prompt to begin the paperwork required for the extension. When the candidate obtains the document, provide a copy and tell them to fill out sections 1 and 2 only.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 SRO ADMIN JPM RC.docx Page 7 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 Performance Step: Per ACP 1411.17, the workers first line supervisor may extend the individuals Critical Y (SEQ-) dose.

Standard: Determine that Brads supervisor or higher will have to extend his dose to greater than 2000 mrem. Completes section 1 and 2 of NG-165K, Increased Administrative Dose Limit Request Evaluator Note: Provide Copy of NG-165K when requested.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete when the candidate has determined the dose for the weld job, determined that a dose extension is required and completes section 1 and 2 of NG-165K.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 SRO ADMIN JPM RC.docx Page 8 of 11

NG-165K, ADMINISTRATIVE DOSE LIMIT REQUEST Worker Name: TLD Number: SSN:

Employed by: Supervisor:

1. Type of Extension Beyond 2,000 millirem per Year TEDE Beyond 4,000 millirem per Year TEDE Beyond 3,000 millirem per Year TEDE Beyond 4,500 millirem per Year TEDE
2. TEDE Review & Upgrade Request Workers current yearly TEDE: _____________ millirem Extend to yearly limit of: __________________ millirem Detailed Reason for extension (Required for all extensions): _____________________________
3. Dosimetry Review Dosimetry to verify: documented evidence of current year dose is on file with no personal estimate for current year; and SDE and LDE not limiting.

Approved Disapproved, reason:

Dosimetry / Date

4. Approval signatures Circle One Beyond 2,000 millirem/yr TEDE: Y/N Radiation Protection Manager / Date Beyond 3,000 millirem/yr TEDE: Y/N Radiation Protection Manager / Date Y /N Plant General Manager / Date Beyond 4 ,000 millirem//yr TEDE: Y /N Radiation Protection Manager / Date Y /N Plant General. Manager / Date Beyond 4,500 millirem/yr TEDE: Y/N Site Vice President/ Date
5. Workers Acknowledgment (Required for any increase) Worker / Date NRC 2011 SRO ADMIN JPM RC.docx Page 9 of 11

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM RC.docx Page 10 of 11

QF-1030-11 Rev. 7 NRC 2011 ADMIN SRO JPM RC, Survey Map Review and Dose Calculations to Determine the Adequacy of the RWP Dose Setting and Determine if a Dose Extension is Required, Rev. 1 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 SRO ADMIN JPM RC.docx Page 11 of 11

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 1 of 11 Usage Level Information Use Approved for Point-of-Use printing IF NO Temporary Changes are in effect for this procedure.

(on designated printers)

Record the following: Date / Time: _____________ / _________ Initials: ____

NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if active document use exceeds a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period as determined from the date and time recorded above.

Prepared By: / Date:

Print Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)

Reviewed By: / Date:

Print Signature Reviewed By: / Date:

Print Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By / Date:

Print Signature

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 2 of 11 Table of Contents Page 1.0 PURPOSE ............................................................................................................................. 3 2.0 DEFINITIONS ........................................................................................................................ 3 3.0 INSTRUCTIONS .................................................................................................................... 4 3.1 INSTRUCTIONAL DETAILS.................................................................................... 4 3.2 FEDERAL REGULATORY DOSE LIMITS............................................................... 5 3.3 DAEC ADMINISTRATIVE DOSE LIMITS FOR ROUTINE OPERATIONS.............. 6 3.4 EXPOSURE HISTORY............................................................................................ 7 3.5 INCREASED EXPOSURE REQUESTS .................................................................. 8 3.5.1 PREREQUISITES ........................................................................................ 8 3.5.2 UPGRADING ADMINISTRATIVE LIMITS.................................................... 8 3.6 EXPOSURE TO A DEVELOPING EMBRYO AND FETUS ..................................... 9 3.7 NEXTERA ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC ......................... 10 3.8 DAEC DOSE GUIDANCE FOR EMERGENCIES ................................................. 10 4.0 RECORDS ........................................................................................................................... 10

5.0 REFERENCES

.................................................................................................................... 10

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 3 of 11 1.0 PURPOSE This procedure provides guidance for ensuring that DAEC personnel do not exceed Federal exposure limits and instructions for increasing DAEC administrative dose limits and applies to all personnel entering the restricted area at DAEC as Radiation Workers or Visitors.

The DAEC shall attempt to obtain the records of cumulative occupational dose of workers in accordance with 10 CFR 20.2104. A Workers Declaration of Exposure for prior years may be used to meet the requirements of 10 CFR 20.2104.

NOTE Personnel receiving treatment with medical isotopes should not enter the restricted area unless approved by the Health Physics Supervisor or Radiation Protection Manager.

Contact Dosimetry for further guidance.

2.0 DEFINITIONS Administrative Dose Limit - Specified doses established to require review prior to exceeding.

Committed Dose Equivalent (CDE) - Dose to organs that will be received from an intake of radioactive material during the 50 year period following the intake.

Committed Effective Dose Equivalent (CEDE) - Sum of the products of the weighing factors applicable to each of the organs irradiated and the CDE.

Deep Dose Equivalent (DDE) - Dose resulting from external exposure of the whole body at a depth of 1 centimeter (1000 mg/cm2).

Escorted Radiation Worker (ERW) - A visitor who may receive occupational exposure and, therefore, is monitored while on site with a Thermoluminescent Dosimeter (TLD) and assigned exposure limits.

Extremity - Hand, elbow, arm below elbow, foot, knee, leg below the knee.

Form NRC Nuclear Regulatory Commission form entitled Occupational External Radiation Exposure History or equivalent.

Lens Dose Equivalent (LDE) - Applies to the external exposure of the lens of the eye and is taken as the dose equivalent at a tissue depth of 0.3 centimeters (300 mg/cm2).

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 4 of 11 Member of the Public - Member of the public means an individual in a controlled or unrestricted area. However, an individual is not a member of the public during any period in which the individual receives occupational exposure.

Minor - Minor means an individual less than 18 years of age.

Radiation Worker - Trained individuals, commensurate with risk, working in or frequenting any portion of the restricted area or RCA who are considered to receive occupational dose (their assigned duties involve exposure to radiation and radioactive materials).

Restricted Area or Radiologically Controlled Area (RCA) - Any area which is controlled on site for the purposes of protection of individuals from exposure to radiation and radioactive materials. For DAEC, the Restricted Area is the area within the security fence.

Shallow Dose Equivalent (SDE) - Dose resulting from external exposure of the skin or extremity, at a depth of 0.007 centimeters (7 mg/cm2) averaged over an area of one square centimeter.

Total Effective Dose Equivalent (TEDE) - Sum of the deep dose equivalent and committed effective dose equivalent.

Total Organ Dose Equivalent (TODE) - Sum of the deep dose equivalent and committed dose equivalent.

Visitors - Individual that is not trained in radiation protection as required by 10CFR19. This individual can be a worker (Federal dose limits for an occupationally exposed worker apply) or the individual can be an individual who is not performing work functions (Public dose limits apply).

3.0 INSTRUCTIONS 3.1 INSTRUCTIONAL DETAILS (1) Each radiation worker shall be responsible for maintaining awareness of their administrative dose limit, for maintaining their dose ALARA, and for ensuring that their dose limit is not exceeded.

(2) Supervisors and managers or designees shall be responsible for approving dose limit extensions.

(3) The Radiation Protection Manager shall be responsible for:

(a) Establishing and maintaining the personnel dose monitoring program consistent with the requirements of 10CFR20.

(b) Ensuring administrative dose limits are established.

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 5 of 11 (4) Female radiation workers wishing to declare their pregnancy shall inform the Radiation Protection Manager in writing prior to receiving Pregnancy Exposure Limits.

(5) Radiation workers are required to obtain the required authorizations before exceeding an administrative dose limit.

(6) Extensions to the administrative dose limits shall be approved by the appropriate level of management as delineated in Section 3.3 of this procedure.

(7) The Site Vice President shall be responsible for approving dose extensions beyond 4,500 millirem for TEDE.

3.2 FEDERAL REGULATORY DOSE LIMITS (1) The occupational dose limits established by the NRC (10CFR20.1201) are:

Dose Category Rem/Year Total Effective Dose Equivalent (TEDE) 5 Total Organ Dose Equivalent (TODE) 50 Lens of the Eye Dose Equivalent (LDE) 15 Shallow Dose Equivalent (SDE) to skin of the whole body 50 or extremities (2) Furthermore, 10CFR20.1206 allows for additional exposure under unusual circumstances.

The additional dose a worker with a fully documented radiation exposure history may receive under the provisions of a Planned Special Exposure (PSE) are:

Dose Category Rem/Year Rem in a Lifetime TEDE 5 25 TODE 50 250 LDE 15 75 SDE 50 250 (3) The dose equivalent limit to the embryo/fetus of an occupationally exposed woman, who has declared her pregnancy, is:

(a) 500 millirem TEDE during the gestation period, or (b) 50 millirem TEDE for the remainder of the gestation period, if the embryo/fetus dose exceeds 500 millirem or is within 50 millirem of this dose at the time of declaration.

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 6 of 11 (4) The U.S. Environmental Protection Agency Guidance on Dose Limits for workers performing emergency activities are as follows:

Activity Dose Category Limit (rem)

Routine Emergency Worker Activities TEDE 5 Protecting Property TEDE 10 LDE 30 SDE / TODE 100 Life Saving or Protection of Large Populations TEDE 25 (may exceeded if volunteers used)

LDE 75 SDE / TODE 250 3.3 DAEC ADMINISTRATIVE DOSE LIMITS FOR ROUTINE OPERATIONS (1) DAEC uses administrative dose limits in order to:

(a) Ensure federal regulatory dose limits will not be exceeded.

(b) Alert appropriate levels of management to exposures which are significant or out of the ordinary.

(c) Encourage supervisory review and management of doses to their workers.

(2) No radiation workers annual TEDE (in rem) from all facilities or sources will be allowed to exceed the value listed below unless authorized to do so by the designated level of supervision and the Increased Exposure Request Prerequisites listed in paragraph 3.4.1 are met.

Administrative Limit TEDE Permission to Exceed Granted By:

(millirem) 2,000 Radiation Protection Manager approval 3,000 Radiation Protection Manager with concurrence from Plant General Manager 4,000 Plant General Manager, Site Vice President and Radiation Protection Manager approval 4,500 Site Vice President (with Radiation Protection Manager (RPM) and Plant General Manager concurrence)

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 7 of 11 (3) The following unique conditions may affect a worker's administrative dose limits:

(a) Radiation workers who attest to have been occupationally exposed at other facilities during the current year shall be placed on an annual TEDE limit of 250 millirem until documented evidence of their current years dose is obtained by the DAEC per 10CFR20, Paragraph 2104 and a signed NRC Form 4 is on file at the DAEC.

(b) The worker is a "declared pregnant woman". See Section 3.6.

(4) If an individual is found to have exceeded an administrative dose limit without prior approval, it shall be brought to the attention of the Radiation Protection Manager and the individual supervisor for investigation.

3.4 EXPOSURE HISTORY (1) The DAEC will actively seek Current Year TEDE, SDE, LDE, and CEDE exposure on radiation workers expected to be assigned to the DAEC less than or equal to 1 (one) year.

A lifetime estimate of the workers TEDE exposure may be documented per 10 CFR 20, Paragraph 2104. The following may be used to document an exposure history:

(a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record (e) Data Obtained from REIRS (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104 (2) The DAEC will actively seek lifetime TEDE exposure on radiation workers expected to be assigned to the DAEC greater than 1 (one) year in addition to Current Year TEDE, DDE, SDE, LDE, and CEDE to ensure adequate numbers of radiation workers eligible for a Planned Special Exposure. The following may be used to document an exposure history:

(a) An NRC Form 5 (or equivalent) signed by the licensee (b) An NRC Form 4 (or equivalent) prepared and countersigned by a licensee (c) A termination report signed by a licensee (d) Data electronically maintained on PADS, as estimate or record (e) Data Obtained from REIRS (f) A Declaration of Occupational Exposure per 10 CFR 20, Paragraph 2104

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 8 of 11 3.5 INCREASED EXPOSURE REQUESTS 3.5.1 PREREQUISITES (1) A completed, signed, NRC Form-4 (or equivalent) must be on file at the Dosimetry Group.

The completed, signed Form 4 shall not include a workers Estimate of TEDE Exposure for the current year.

(2) The radiation workers exposure shall not exceed 10 rem in the past 5 consecutive years.

This may require additional dose history evaluations be performed. Contact the Dosimetry Group for assistance in determining historical dose.

(3) The radiation worker's year-to-date LDE and SDE must be less than three times his/her year-to-date TEDE.

(4) The workers need for an increase in allowed exposure is documented per Section 3.4.2 of this procedure.

3.5.2 UPGRADING ADMINISTRATIVE LIMITS (1) The radiation worker's supervisor shall complete the demographic information and Sections 1 and 2 of Form NG-165K, Increased Administrative Dose Limit Request.

(2) Forward the form to Dosimetry.

(3) Dosimetry shall verify the appropriate TEDE records are on file and the SDE and/or LDE are not limiting factors.

(4) Dosimetry will complete Section 3 of the form and return to the radiation worker's supervisor. If the request is denied, Dosimetry shall indicate the reason for denial. This section may be completed per telecon if necessary as long as the telecon is documented.

(5) The appropriate level of management/supervision should sign and date the form (see Section 3.3).

(6) The radiation worker shall be told of his/her new administrative limits and he/she shall acknowledge that he/she understands the limits have been changed by signing Form NG-165K.

(7) Forward Form NG-165K to Dosimetry for updating the radiation worker's records and filing.

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 9 of 11 3.6 EXPOSURE TO A DEVELOPING EMBRYO AND FETUS (1) A woman may, at her discretion, declare her pregnancy to NextEra Energy.

(a) The declaration by the woman must be made in writing to the Radiation Protection Manager.

(b) The declaration must have the approximate date of conception.

(2) The designation of Declared Pregnant Woman will remain in effect until:

(a) The end of pregnancy, or (b) The woman requests, in writing that it be removed.

(3) The Radiation Protection Manager shall forward the declaration to the Dosimetry Group for inclusion in her file.

(4) The Dosimetry Group will:

(a) Reduce the woman's administrative dose limits as instructed by the Radiation Protection Manager. (Normally an administrative dose limit of 450 millirem is set for the gestation period with monthly dose limits of 50 millirem.)

(5) For declared pregnant workers who have already exceeded 450 millirem since the date of conception prior to declaration, the declared pregnant worker will be restricted from the Radiation Controlled Area (RCA).

NOTE At boiling water reactors, such as Duane Arnold, workers can receive a small incremental dose while working in the Protected Area (typically 10 to 20 millirem per quarter). Declared pregnant women with greater than 450 millirem at the time of declaration will be monitored by personnel dosimetry while in the Protected Area and their dose maintained as low as reasonably achievable. In no case shall their dose exceed an additional 50 millirem during the remainder of their pregnancy, as stipulated in 10CFR 20.1208(d).

(6) A woman planning to become pregnant may request to be placed on the 450 millirem limit. NextEra Energy will make every reasonable effort to accommodate such a request.

(7) Refer to Policy Number NP-906 for further guidance.

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 10 of 11 3.7 NEXTERA ENERGY DUANE ARNOLD ADMINISTRATIVE DOSE GUIDELINES FOR MINORS AND MEMBERS OF THE PUBLIC (1) The dose to visitors classified as members of the public and minors shall be limited to 100 millirem/year.

3.8 DAEC DOSE GUIDANCE FOR EMERGENCIES (1) In the event of emergencies which threaten human life, equipment important for the safe operation of the plant, or large populations the guidance on dose limits contained in the Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (EPA Manual 400-R-92-00, dated Oct 91) shall take precedence over the limits of 10CFR20.

Such events include, but are not limited, a declared Alert, Site Area Emergency and General Emergencies.

(2) The radiation worker's year-to-date normal occupation dose will not impact the dose that an emergency worker can receive during the emergency.

(3) All exposures received during a declared emergency will be tracked separately from the normal occupational dose.

(4) After the emergency, the dose received during the emergency shall be added to the individuals occupational dose to determine availability for additional exposure.

(5) Although not Planned Special Exposure dose, dose received during an emergency shall be credited to an individuals Planned Special Exposure limit of 25 rem.

(6) During the recovery phase of an emergency, consideration shall be given to the use of the Planned Special Exposure.

4.0 RECORDS (1) The following are QA Records and shall be forwarded to Dosimetry when complete and reviewed. These records shall be maintained in accordance with ACP 115.1, Record Control. These records shall be microfilmed and retained for the life of the plant.

(a) NG-165K, Increased Administrative Dose Limit Request (b) Declaration of Pregnancy

5.0 REFERENCES

(1) 10 CFR 20, Standards for Protection Against Radiation (2) INPO 91-014, Rev. 1, Guidelines for Radiological Protection at Nuclear Power Stations

ADMINISTRATIVE CONTROL PROCEDURE ACP 1411.17 OCCUPATIONAL DOSE LIMITS AND UPGRADES Rev. 22 Page 11 of 11 (3) Nuclear Regulatory Commission Regulatory Guide 8.13, Appendix A, Possible Health Risks of Women who are Exposed to Radiation During Pregnancy (4) NRC Information Notice IN 90-48, NRC Hot Particle Enforcement Policy (5) EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (6) AR 95-1935 (7) RP Manual Section A (8) 10CFR20 Policy and Implementation Cross Reference (9) NG-165K, Increased Administrative Dose Limit Request (10) AR 15148 (11) AR 18739 (12) NUREG/CR-6204, Questions and Answers Based on 10CFR20 Revision Dated 11/1/94, Question #142 (13) Corporate Directive 9.2, Radiation Dose Guidelines (14) CA039415 (15) FPL Nuclear Policy # NP-906, Administrative Radiation Exposure Limits and Prenatal Radiation Exposure Policy (16) CA50161, INPO 05-008

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE NRC 2011 SRO ADMIN JPM EP NRC 2011 SRO ADMIN JPM EP.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: EVENT CLASSIFICATION / RECLASSIFICATION JPM NUMBER: NRC 2011 SRO ADMIN REV. 0 JPM EP TASK NUMBER(S) /

TASK TITLE(S):

KNOWLEDGE OF THE K/A NUMBERS: 2.4.29 (4.4) K/A VALUE:

EMERGENCY PLAN Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab: Classroom X Time for Completion: 30 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 SRO ADMIN JPM EP.docx Page 2 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 SRO ADMIN JPM EP.docx Page 3 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 1. EPIP 1.1, Determination of Emergency Action Levels

2. EPIP 1.2, Notifications
3. Note 5, DAEC Emergency Action Level Notification Form General

References:

EPIP 1.1, 1.2, DAEC Notification Form Task Standards: The following critical tasks are for the SS1.1 declaration.

  • Within 15 minutes of being handed the initial conditions, determine that the EAL is an SS1.1 Site Area Emergency.
  • Candidate will circle [c] Site Area Emergency.
  • Candidate will: Place an N/A in both the TIME and DATE blanks for the PAR change, Print S S 1.1 in the blanks for the EAL. and Circle S in the Category, circle S in the Classification, and circle 1.1 in the Sequence.
  • Candidate will circle No and proceed to block 9.
  • Candidate will write in 6 mph.
  • Candidate will write in 45 degrees.
  • Candidate will X the Site Area Emergency [C] box.
  • When filled out, the candidate will sign within the 15 minutes from the declaration of the SS1.1, and then give the form to the Security Guard to perform the notifications.

NRC 2011 SRO ADMIN JPM EP.docx Page 4 of 12

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Shift Manager at DAEC. The STA is unavailable.
  • The following conditions exist at DAEC, which had been operating at 100% power.
  • Time 12:00
  • A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
  • The Emergency Diesels tripped immediately after starting and can NOT be re-started.
  • The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
  • Drywell Pressure is 1.1 psig and slowly rising.
  • Reactor Level is normal
  • The current Wind Speed is 6 MPH from 45 degrees INITIATING CUES (IF APPLICABLE):

Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note-05.

This is a time critical JPM.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 SRO ADMIN JPM EP.docx Page 5 of 12

QF-1030-11 Rev. 7 EVALUATOR TURNOVER SHEET (Read to Applicant)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Shift Manager at DAEC. The STA is unavailable.
  • The following conditions exist at DAEC, which had been operating at 100% power.
  • Time 12:00
  • A Tornado has hit the site causing a Station Blackout fifteen minutes ago.
  • The Emergency Diesels tripped immediately after starting and can NOT be re-started.
  • The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
  • Drywell Pressure is 1.1 psig and slowly rising.
  • Reactor Level is normal
  • The current Wind Speed is 6 MPH from 45 degrees INITIATING CUES (IF APPLICABLE):

Based on the above conditions, you are to determine the event classifications per EPIP 1.1, Determination of Emergency Action Levels. Complete State/County notifications per Note-05.

This is a time critical JPM.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

{C002}

NRC 2011 SRO ADMIN JPM EP.docx Page 6 of 12

QF-1030-11 Rev. 7 Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY INITIAL CONDITIONS:

1. Standby Diesel Generator A (1G-31) has been restored
2. Reactor Level is normal
3. Drywell Pressure is 1.1 psig and stable.
4. The Auxiliary Operator contacted the control room and notified you that two armed intruders have taken control of the 1G31 DG and Day Tank Rooms.

INITIATING CUES:

Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.

This is time critical.

NRC 2011 SRO ADMIN JPM EP.docx Page 7 of 12

EVALUATOR TURNOVER SHEET (Read to Applicant)

Handout Sheet #2 HANDOUT WHEN JPM PROMPTS, NOT INITIALLY INITIAL CONDITIONS:

1. Standby Diesel Generator A (1G-31) has been restored
2. Reactor Level is normal
3. Drywell Pressure is 1.1 psig and stable.
4. The Auxiliary Operator contacted the control room and notified you that two armed intruders have taken control of the 1G31 DG and Day Tank Rooms.

INITIATING CUES:

Based upon the above changes in the conditions, classify the EAL in accordance with EPIP 1.1.

This is time critical.

NRC 2011 SRO ADMIN JPM EP.docx Page 8 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Reviews the given conditions and determines that a Site Area Emergency Critical Y (SEQ-) declaration is required per EPIP 1.1.

Standard: Declares a Site Area Emergency within fifteen minutes of the JPM start Evaluator Note: The 15 minute clock will not start until the applicant states they understand the task conditions. No procedures can be referenced prior to the clock starting.

15 Minute Clock Start Time_______.

Time of Declaration ____________ .

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 SRO ADMIN JPM EP.docx Page 9 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 Performance Step: Within additional 14 minutes (allows for transmission time) Provides Critical Y (SEQ-) Notification Form Standard: Fills out the Notification Form correctly Evaluator Note: The 14 minute standard allows for transmission time of the form.

Time Notification Form is provided _________.

Note Completed in highlighted areas in Key below Step #9 should state 6 M/Hr, Step #10 Should state From 45 degrees Evaluator Cue: Inform candidate that you will act as Security, and transmit the form when complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

EVALUATOR PROMPT: Once the filled in paperwork is handed to Security for transmittal, provide the applicant with Handout #2 and have them re-evaluate the event NOTE: This is also Time Critical.

Performance Step: Reviews the given conditions and determines that a General Emergency Critical Y (SEQ-) declaration is required per EAL HG1.1.

Standard: Declares General Emergency within 15 minutes IAW EAL HG1.1.

Evaluator Note:

15 Minute Clock Start Time_______.

Time of Declaration ____________ .

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 SRO ADMIN JPM EP.docx Page 10 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 KEY - DO NOT HANDOUT NRC 2011 SRO ADMIN JPM EP.docx Page 11 of 12

QF-1030-11 Rev. 7 NRC 2011 SRO ADMIN JPM EP, Event Classification / Reclassification, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 SRO ADMIN JPM EP.docx Page 12 of 12

DAEC EMERGENCY RESPONSE ORGANIZATION NOTE-05 DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM Signature Page Approved for Point-of-Use printing IF NO Temporary Changes are in effect for this procedure.

Record the following: Date / Time: _____________ / _________ Initials: ____

NOTE: A check to ensure current revision and no temporary changes shall be performed and documented every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if active document use exceeds a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period as determined from the date and time recorded above.

Prepared By: / Date:

Print Signature CROSS-DISCIPLINE REVIEW (AS REQUIRED)

Reviewed By: / Date:

Print Signature Reviewed By: / Date:

Print Signature PROCEDURE APPROVAL BY QUALIFIED REVIEWER Approved By / Date:

Print Signature This EPIP Form requires a 50.54q Review for any non-editorial change(s).

NOTE-05 Rev. 14

DAEC EMERGENCY ACTION LEVEL NOTIFICATION FORM MESSAGE 1. FACILITY IN COMMAND & 2. STATUS 3. ACCIDENT CLASSIFICATION INITIAL CONTROL [A] UNUSUAL EVENT INITIATED ROLL CALL [A] Control Room..2222 [A] ACTUAL [B] ALERT Benton County Time: __________

[C] SITE AREA EMERGENCY

[B] TSC......3333 Linn County [D] GENERAL EMERGENCY

[C] EOF..4444 [B] DRILL (or from Date: __________ SIMULATOR) [E] RECOVERY Iowa HSEMD

[F] CANCELLATION/TERMINATION (If this notification is for a PAR change ONLY, write N/A for information in Block 4.)

4. PAR CHANGE ONLY EAL CLASSIFIED @ TIME: _________ DATE:__________

(For EAL CLASSIFIED, fill in blank below AND circle appropriate letter or number applicable under Category, Classification and Sequence. For EALs with multiple initiating conditions, specify in Block 12 which initiating condition is applicable.)

EAL _____ _____ _____ . _____

Category Classification Sequence #

R F H S E C U A S G 1 2 3 4 5 6 7 8 . 0 1 2 3 4 5 6 7 8 9

5. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT? (e.g. KAMAN Hi Alarm or field team reports)

Has Not Occurred (Proceed To Block 9) Has Occurred, Is Now Terminated (Proceed To Block 6) Is Occurring (Proceed To Block 6)

6. AIRBORNE RELEASE TO ENVIRONMENT 7. TYPE OF RELEASE (mark all that apply) 8. PROJECTED DURATION OF RELEASE:

[A] BELOW FEDERAL LIMITS [A] RADIOACTIVE AIRBORNE (FILTERED) [A] UNKNOWN (4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> default)

(No KAMAN Hi-Hi alarm)

[B] RADIOACTIVE AIRBORNE (UNFILTERED)

[B] AT, OR ABOVE, FEDERAL LIMITS [B] 1 HOUR OR LESS (KAMAN Hi-Hi alarm) [C] RADIOACTIVE LIQUID

[C] RELEASE DURATION ____ hour(s)

9. WIND SPEED: _______ MILES/HR (50m value preferred) 10. WIND DIRECTION : FROM ______ DEGREES (50m value preferred)
11. UTILITY PROTECTIVE ACTION RECOMMENDATIONS (If this notification is for a PAR change ONLY, note time & date. Otherwise write N/A in TIME and DATE in Block 11.)

PAR DETERMINATION @ TIME: _________ DATE:__________

Unusual Event Alert Site Area Emergency

[A] No actions recommended [B] No actions [C] Activate the Prompt Alert and Notification System.

recommended General Emergency (From EPIP 3.3)

[D] Default, or Dose projections 1 REM TEDE [E] Dose projections 1 REM TEDE or 5 [F] Dose projections 1 REM TEDE or 5 or 5 REM CDE @ 0-2 miles from site REM CDE @ 2-5 miles from site REM CDE @ 5-10 miles from site boundary. boundary. boundary.

Evacuate, (or shelter if release duration is Evacuate, (or shelter if release duration is 1-hour or Evacuate, (or shelter if release duration is 1-hour or 1-hour or less), within a 2 mile radius and to less), within a 2 mile radius and to 5 miles in the less), within a 2 mile radius, evacuate, (or shelter if 5 miles in the downwind subareas. downwind subareas, and shelter downwind release duration is 1-hour or less), from 2 miles to EPZ AND subareas from 5 miles to EPZ edge. edge in downwind subareas, and shelter as appropriate Activate the Prompt Alert and Notification System. AND beyond EPZ edge.

Activate the Prompt Alert and Notification System. AND Activate the Prompt Alert and Notification System.

12. ADDITIONAL INFORMATION :
13. APPROVED BY: _____________________________________________ (TIME) ___________ (DATE) ___________

(OSM, EC, or ER&RD)

MESSAGE TRANSMITTED BY: FINAL ROLL CALL (Agency Reps INITIALS)

Name: ________________________ Time: __________ Benton: ______ Linn: ______ Iowa HSEMD: ______

14. STATE PROTECTIVE ACTIONS 0-2 m 2-5 m 5-10 m 10-EPZ Shelter Subareas (circle appropriate subareas) 1 2, 3, 4, 5, 6, 7, 8 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 23,24 Evacuate Subareas (circle appropriate subareas) 1 2, 3, 4, 5, 6, 7, 8 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 23,24 Fax page 1 of this form to the State & Counties immediately after Final Roll Call.

NOTE-05 Page 1 of 3 Rev. 14

INSTRUCTIONS FOR USE Items 2, 3, 4, 5, 9, 10 & 11 MUST be accurate- The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.

1. FACILITY IN COMMAND & CONTROL - Select the appropriate box, phone numbers are microwave line numbers for the listed facility.

a) Select box "A" if the Control Room is in Command & Control.

b) Select box "B" if the TSC is in Command & Control.

c) Select box "C" if the EOF is in Command & Control.

2. STATUS a) Select box "A" for an ACTUAL event.

b) Select box "B" "DRILL" for ALL Drills, Exercises, Table Tops, and Training Sessions.

3. ACCIDENT CLASSIFICATION - Select the letter corresponding to the latest classification issued by the ERO facility in command and control.

a) Select box "A" for an Unusual Event classification.

b) Select box "B" for an Alert classification.

c) Select box "C" for a Site Area Emergency classification.

d) Select box "D" for a General Emergency classification.

e) Select box "E" for a Recovery classification.

f) Select box "F" for a Cancellation or Termination classification.

4. EAL CLASSIFIED a) IF this Notification is for a PAR CHANGE ONLY, check the "PAR CHANGE ONLY" checkbox, write "N/A" in the "Time" and "Date" blanks, and proceed to Block 5.

b) For All other notifications:

i. Write in the TIME that the EAL declaration was made.

ii. Write in the DATE of the event.

iii. On the lines provided, write the Alpha-numeric code of the EAL, (e.g. HA2.1).

iv. Circle the corresponding digits for category, classification and sequence #. For Fission Product Barrier Table EALs, a zero may be added (e.g. FG1.0)

5. ABNORMAL RELEASE IN PROGRESS DUE TO THIS EVENT? - select the appropriate checkbox and proceed as directed. NOTE: a KAMAN Hi alarm is indicative of abnormal release rates.

a) IF no KAMAN Hi alarms have occurred, select "Has Not Occurred" and proceed to Block 9.

b) IF a KAMAN Hi alarm has been received as a result of the event, but the release is now terminated, select "Has Occurred, is Now Terminated" and proceed to Block 6.

c) IF a KAMAN Hi alarm has been reached as a result of the event, and is still in alarm, and the release is not isolated, select "Is Occurring" and proceed to Block 6.

6. AIRBORNE RELEASE TO ENVIRONMENT a) Select box "A" if there is no KAMAN Hi-HI alarm.

b) Select box "B" if there IS one or more KAMAN Hi-HI alarms.

7. TYPE OF RELEASE - Mark ALL that apply:

a) Select box "A" "RADIOACTIVE AIRBORNE (FILTERED)" for any release flowpath through any operable Standby Gas Treatment train or through the Offgas System adsorbers to the OFFGAS STACK. This release is monitored by the Offgas stack KAMAN monitor.

b) Select box "B" "RADIOACTIVE AIRBORNE (UNFILTERED)" for ANY OTHER airborne release path. This release path may be monitored by the Reactor/Turbine Building KAMAN monitors OR may be an unmonitored release.

c) Select box "C" for a"RADI0ACTIVE LIQUID" release. Contact the Site Rad Protection Coordinator for additional information and support.

d) IF a release has multiple paths to the environment, mark ALL that apply.

NOTE-05 Page 2 of 3 Rev. 14

INSTRUCTIONS FOR USE (CONTINUED)

8. PROJECTED DURATION OF RELEASE a) Select box "A" if the duration of release is unknown. This should be the default unless the release duration can be determined with certainty.

b) Select box "B" if the duration is/was 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less.

i. IF the duration of release is one hour or less, note the effect it has on the PAR determination when at a General Emergency.

c) Select box "C" if the duration of release is known, and write in the duration in the space provided.

9. WIND SPEED - Fill in the wind speed in miles per hour. The preferred value is the 50 meter value. If the 50 meter value is unavailable, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357.
10. WIND DIRECTION - Write in the wind direction in degrees, from the direction of origin. The preferred value is the 50 meter value. If the 50 meter value is not available, use the 10 meter value. If both are unavailable, contact the National Weather Service at 1-800-803-9357.
11. PROTECTIVE ACTION RECOMMENDATION - Refer to EPIP 3.3 for guidance on Protective Action decision-making.

a) IF this notification is for a PAR change ONLY, write in the TIME and DATE of the new PAR Determination in the blanks provided, otherwise write "N/A" in these blanks.

b) Select the appropriate checkbox for the current recommendation.

12. ADDITIONAL INFORMATION - Include information when:

a) A wind shift results in additional downwind subareas (see EPIP 3.3 Att. 2).

b) Corrections to current State/County notifications are made.

c) Clarification of entry conditions for EALs with multiple initiating conditions is needed.

d) Other information is needed by the State and/or Counties.

13. APPROVED BY - Authorizing signature of OSM, Emergency Coordinator, or ER&RD.

INITIAL ROLL CALL - Dial 9999 (#### to stop the ringing) and mark appropriate box for the applicable agency as they answer the initial roll call.

MESSAGE INITIATED - Document the time and date you get at least one agency on the phone.

Read Items 1-13 on Notification Message Above - Read message from Item 1 through to Item 13, (For example, One, bravo, drill. Two, delta, simulator etc.

MESSAGE TRANSMITTED BY - Applicable Communicator writes in their name and time message completed.

FINAL ROLL CALL - Enter initials of agency representatives receiving this notification.

FAX - Fax page 1 of this form to the State & Counties. Fax to Benton County, Linn County, and the Iowa Homeland Security and Emergency Management Division (HS-EMD) to confirm the notification. In the Control Room and TSC, push button 01 for working hour distribution and button 02 for off hour and weekend distribution. If the fax is not operable, confirmation will be made via microwave, commercial phone, or point-to-point radio.

14. STATE PROTECTIVE ACTIONS - IF AVAILABLE, circle subareas the STATE has chosen to shelter or evacuate. If not available, leave this section blank.

NOTE-05 Page 3 of 3 Rev. 14

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-1 NRC 2011 JPM S-1 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: PERFORM REQUIRED ACTIONS FOR RESETTING A RECIRC MG SCOOP TUBE LOCKOUT JPM NUMBER: NRC 2011 JPM S-1 REV. 2 TASK NUMBER(S) / 12.11 TASK TITLE(S): RESET SCOOP TUBE LOCKUP K/A NUMBERS: 202002 K/A VALUE: A2.05 3.1/3.1 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-1 rev 5-7.docx Page 1 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 JPM S-1 rev 5-7.docx Page 2 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

1. Reset to 100% power (IC 20 preferred.)
2. Go to RUN.
3. Lock BOTH Recirc MG Scoop Tubes.
3. Verify Master Feedwater Level Controller in AUTO, set at 190.6.
4. Push the recorder reset PB in the back of 1C05 to erase recorder data.

SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: OI 264 General

References:

OI 264 ARP 1C04A (C-5)

Task Standards: Both Scoop Tube Lockouts Reset NRC 2011 JPM S-1 rev 5-7.docx Page 3 of 15

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • Reactor power is at approximately 100%.
  • Both Recirc MG set scoop tubes were manually locked up for I & C testing of the controllers.
  • The testing is complete.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to reset both scoop tube lockouts starting with the A Recirc MG set, IAW OI 264, Section 10.2 (1).

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-1 rev 5-7.docx Page 4 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • Reactor power is at approximately 100%.
  • Both Recirc MG set scoop tubes were manually locked up for I & C testing of the controllers.
  • The testing is complete.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to reset both scoop tube lockouts starting with the A Recirc MG set, IAW OI 264, Section 10.2 (1).

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-1 rev 5-7.docx Page 5 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are shaded GREY and marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM.

Begins in OI 264, Section 10.2 (1) for the A Scoop Tube Performance Step: 1 NOTE Critical N Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.

During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C-8, [1C08A B-8]) inverter overload alarm may be received.

CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.

Standard: Reviews Note & Caution.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 If A Recirc MG is running with either a 20% or 45% runback in effect, then Critical N perform ARP 1C04A, D-2 prior to resetting the Scoop Tube Lockout.

Standard: Determine that there are no runbacks in effect.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 6 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 3 If a DEV ALRM is flashing on SIC9245A, clear the DEV ALRM by performing Critical N the following, otherwise N/A:

Standard: Determines that the step is N/A. Continues at procedure step 10.2 (3).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 If A Recirc MG is running, reset the Scoop Tube as follows:

Critical N NOTE:

For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr. (Reference Appendix B in STP 3.4.1-02).

Verify Scoop Tube Position P-%.

Standard: Reviews Note and verifies Scoop Tube Position P-% by depressing the D button on the controller.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Adjust setpoint S-% to approximately match Scoop Tube Position P-%.

Critical Y Standard: Depresses D button on controller until setpoint S is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 7 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 6 Verify controller output V-% approximately matches Scoop Tube Position P-%.

Critical N Standard: Verifies V approximately matches P.

NOTE: This cannot be adjusted on the controller.

Evaluator Note: The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if approximate is met.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 At 1C04, reset scoop tube lock by momentarily placing handswitch Critical Y B31A-S3A to RESET and then verify the following:

Amber SCOOP TUBE LOCKED light located at 1C04 (above A Scoop Tube Control handswitch B31A-S3A) is OFF.

Standard: Momentarily places handswitch B31A-S3A to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04A, C-5 is OFF Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 8 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 8 Verify that the Recirc pump speed is stable by observing the following Critical N parameters:

Standard: The operator identifies that the following indications are stable by one or more of the following:

  • SETPOINT (S)
  • Percent Position (P)
  • Percent Speed (X)
  • Recirc pump discharge flow
  • Total core flow
  • Core pressure drop
  • APRM readings Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Verify that SETPOINT (S) is selected for digital display.

Critical N Standard: Verifies that SETPOINT (S) is selected for digital display.

Evaluator Cue: If the Candidate asks to adjust power, cue the Candidate to maintain power steady and continue with unlocking the B Scoop Tube.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NOTE: The applicant has reset the A Scoop Tube and now returns to step 10.2 (1) for the B Scoop Tube reset NRC 2011 JPM S-1 rev 5-7.docx Page 9 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 10 NOTE:

Critical N Any parameter (P, S, V or X) may be selected for digital display; however, controller adjustments using the control knob can only be made when SETPOINT (S) is selected.

During a reset from a scoop tube lockout / deviation lockup condition, annunciator (1C08A C-8, [1C08A B-8]) inverter overload alarm may be received.

CAUTION If Recirc MG speed becomes unstable during this procedure, the scoop tube should be immediately relocked by momentarily placing the A[B] SCOOP TUBE CONTROL hand switch on 1C04 to the LOCKED position.

Standard: Reviews Note & Caution.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 If B Recirc MG is running with either a 20% or 45% runback in effect, then Critical N perform ARP 1C04A, D-8 prior to resetting the Scoop Tube Lockout.

Standard: Determine that there are no runbacks in effect.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 If a DEV ALRM is flashing on SIC9245B, clear the DEV ALRM by performing Critical N the following, otherwise N/A:

Standard: Determines that the step is N/A. Continues at procedure step 10.2 (3).

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 10 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 13 If B Recirc MG is running, reset the Scoop Tube as follows:

Critical N NOTE:

For low core flow or single loop operation conditions (i.e., <27 Mlbm/hr), Core Plate dP can be obtained from PDR/FR-4528. The Core Flow vs Core Plate dP graph should be used to determine core flow in Mlbm/hr. (Reference Appendix B in STP 3.4.1-02).

Verify Scoop Tube Position P-%.

Standard: Reviews Note and Verifies Scoop Tube Position P-% by depressing the D button on the controller.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Adjust setpoint S-% to approximately match Scoop Tube Position P-%.

Critical Y Standard: Depresses D button on controller until setpoint S is displayed. Adjusts setpoint to match value obtained in previous step by rotating the controller knob in the appropriate direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Verify controller output V-% approximately matches Scoop Tube Position P-%.

Critical N Standard: Depresses D button on controller until output V is displayed. Adjusts output to match value obtained in for position P by rotating the controller knob in the appropriate direction.

Evaluator Note: The values will not be exactly matched and cannot be adjusted on the controller. The candidate may need to be prompted to continue if hesitating when determining if approximate is met.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 11 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 16 At 1C04, reset scoop tube lock by momentarily placing handswitch B31A-S3B Critical Y to RESET and then verify the following:

Amber SCOOP TUBE LOCKED light located at 1C04 (above B Scoop Tube Control handswitch B31A-S3B) is OFF.

Standard: Momentarily places handswitch B31A-S3B to RESET and then verifies the annunciator resets and the SCOOP TUBE LOCKED Light 1C04B, C-2 is OFF Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Verify that the Recirc pump speed is stable by observing the following Critical N parameters:

Standard: The operator identifies that the following indications are stable by one or more of the following:

  • SETPOINT (S)
  • Percent Position (P)
  • Percent Speed (X)
  • Recirc pump discharge flow
  • Total core flow
  • Core pressure drop
  • APRM readings Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-1 rev 5-7.docx Page 12 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Performance Step: 18 Verify that SETPOINT (S) is selected for digital display.

Critical N Standard: Verifies that SETPOINT (S) is selected for digital display.

Evaluator Note: If the Candidate asks to adjust power, cue the Candidate to maintain power steady Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Communicate to the CRS/ Shift Manager that both scoop tubes are reset.

Critical N Standard: Status communicated to the CRS/Shift Manager.

Evaluator Note: Role play as CRS and acknowledge Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Informed that both scoop tubes are reset NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-1 rev 5-7.docx Page 13 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM S-1, Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockout, Rev. 2 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-1 rev 5-7.docx Page 14 of 15

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-2 NRC 2011 JPM S-2 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: SHIFTING FROM THE B FRV TO THE STARTUP FRV. FAILURE OF THE S/U FRV JPM NUMBER: NRC 2011 JPM S-2 REV. 0 TASK NUMBER(S) /

TASK TITLE(S): Shifting from the B FRV to the Startup FRV. Failure of S/U FRV K/A NUMBERS: 295002 K/A VALUE: A4.03 3.8/3.6 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-2 rev 5-7.docx Page 1 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

IC 12 Verify that STARTUP FEED LINE BLOCK MO-1631 on 1C06 is CLOSED SIMULATOR TRIGGERS TRIGGER NUMBER TRIGGER FORMULA TRIGGER DESCRIPTION 2 HC1622MAN < 1 SU FRV Controller to AUTO SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE SIMULATOR OVERRIDES:

TIME OVERRIDE # OVERRIDE ET DELAY F. SEV. RAMP I. SEV.

TITLE Setup AO-FW-046 HIC-1622(2) FW STARTUP CONTROL VALVE CONT INPUT (0-100%)

SIMULATOR REMOTE FUNCTIONS: None Required Materials: OI 644 General

References:

OI 644 Task Standards: B FRV in manual and RPV level controlled between 191 and 195 inches NRC 2011 JPM S-2 rev 5-7.docx Page 2 of 10

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

1. The plant is shutting down
2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
  • Shift from the B FEED REG VALVE CV-1621 to the STARTUP FEED REG VALVE CV-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-2 rev 5-7.docx Page 3 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

1. The plant is shutting down
2. RPV level control must be transferred from the B Feed Reg Valve to the S/U Feed Reg Valve INITIATING CUES (IF APPLICABLE):
  • Shift from the B FEED REG VALVE CV-1621 to the STARTUP FEED REG VALVE CV-1622, IAW OI-644, Section 5.2 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-2 rev 5-7.docx Page 4 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 At operators discretion with <1.4 Mlb/hr feedwater flow, place STARTUP FEED Critical N REG VALVE CV-1622 in operation as follows:

Standard: Reads and continues to action steps (next)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Verify MASTER FEED REG VALVE CONTROLLER, LC-4577, is in AUTO.

Critical N Standard: Verifies MASTER FEED REG VALVE CONTROLLER, LC-4577, is in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Verify that the operating [B] FEED REG VALVE CONTROLLER, Critical N HC-1621 is in AUTO Standard: Verifies that the operating [B] FEED REG VALVE CONTROLLER, HC-1621 is in AUTO Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-2 rev 5-7.docx Page 5 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 4 CAUTION Critical N Valves V-07-271 and V-07-272 should not be open at the same time when both Reactor Feed Pumps are operating. Feedwater flow through the Startup Feed Control Valve supply line may cause uneven loading on the Reactor Feed Pumps and possibly overload one Reactor Feed Pump.

Standard: Reviews Caution Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Verify [V-07-271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP Critical N CONTROL VALVE CV-1622 CLOSED.

Standard: Verifies [V-07-271], 1P-1[A] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV-1622 CLOSED.

Evaluator Cue: IF candidate directs a local operator to verify, then report that V-07-271 is SHUT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Verify [V-07-272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP Critical N CONTROL VALVE CV-1622 on the feedwater header with the operating feed reg valve is OPEN Standard: Verifies [V-07-272], 1P-1[B] Feedwater Isolation to FEEDWATER STARTUP CONTROL VALVE CV-1622 on the feedwater header with the operating feed reg valve is OPEN Evaluator Cue: IF candidate directs a local operator to verify, then report that V-07-272 is SHUT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-2 rev 5-7.docx Page 6 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 7 Verify STARTUP FEED REG VALVE CONTROLLER, HC-1622, is in MANUAL, Critical Y with zero percent open signal (V=0).

Standard: Places STARTUP FEED REG VALVE CONTROLLER, HC-1622, in MANUAL, with zero percent open signal (V=0).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Verify open STARTUP FEED LINE BLOCK MO-1631 on 1C06 Critical Y Standard: Opens STARTUP FEED LINE BLOCK MO-1631 on 1C06 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Slowly adjust STARTUP FEED REG VALVE CV-1622 position by adjusting the Critical Y potentiometer to obtain a zero reading on the deviation meter (DM-1622).

Standard: Slowly adjusts STARTUP FEED REG VALVE CV-1622 position by adjusting the potentiometer to obtain a zero reading on the deviation meter (DM-1622).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Observe operating A[B] FEED REG. VALVE throttles closed automatically.

Critical N Standard: Observes operating [B] FEED REG. VALVE throttles closed automatically.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-2 rev 5-7.docx Page 7 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of the S/U FRV, Rev. 0 Performance Step: 11 Place the STARTUP FEED REG VALVE CONTROLLER to AUTO.

Critical Y Standard: Places the STARTUP FEED REG VALVE CONTROLLER to AUTO.

Evaluator Note: Once the candidate places the S/U Feed Reg Valve in AUTO the SU Feed Reg Valve will slowly fail open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Recognizes the STARTUP FEED REG VALVE CONTROLLER is Critical Y malfunctioning Standard: Places STARTUP FEED REG VALVE CONTROLLER to MANUAL to attempt level control Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: SU FRV in manual and RPV level controlled NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-2 rev 5-7.docx Page 8 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-2, Shifting from the B FRV to the Startup FRV. Failure of theS/U/FRV, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-2 rev 5-7.docx Page 9 of 10

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-3 NRC 2011 JPM S-3 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: ESTABLISH A LEAKAGE PATH TO THE MAIN CONDENSER IAW AOP 672.2, OFFGAS RADIATION/REACTOR COOLANT HIGH ACTIVITY JPM NUMBER: NRC 2011 JPM S-3 REV. 1 TASK NUMBER(S) / 94.21 TASK TITLE(S):

K/A NUMBERS: 272000 K/A VALUE: A2.11 3.4/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-3 rev 5-7.docx Page 1 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

Reset to any full power IC.

Note that the following are suggestions. The Setup may vary based on the set of JPMs to be performed. For this JPM, the main thing is to have the MSIVs closed.

  • Insert malfunctions.
  • Take the mode switch to shutdown.

o If necessary secure ECCS injection.

o Close the MSIVs.

o Start the Mechanical Vacuum Pump SIMULATOR MALFUNCTIONS:

NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE T=0 RX01 Fuel failure 5 SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 1. AOP 672.2, Rev. 35 General

References:

Task Standards:

  • MO-1362A Closed
  • MO-1362B Closed
  • MO-1169 Closed
  • MO 1054 and MO1055 are Closed
  • Mechanical Vacuum Pump is secured
  • MO-1043 Open
  • MO-1044 Open NRC 2011 JPM S-3 rev 5-7.docx Page 2 of 10

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.

INITIATING CUES (IF APPLICABLE):

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-3 rev 5-7.docx Page 3 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, has been entered due to fuel failure.

INITIATING CUES (IF APPLICABLE):

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-3 rev 5-7.docx Page 4 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the Critical Y following handswitches in the CLOSE position.

SJAE & OFFGAS MSL A STEAM SUPPLY MO-1362A.

Standard: MO 1362A is closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 At 1C04, isolate the main steam supply to Offgas and SJAEs by placing the Critical Y following handswitches in the CLOSE position.

SJAE & OFFGAS MSL B STEAM SUPPLY MO-1362B.

Standard: MO 1362B is closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-3 rev 5-7.docx Page 5 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 3 At 1C07, isolate the main steam supply to the Turbine Steam Seal System by Critical Y placing the following handswitches in the CLOSE position:

MAIN STEAM SUPPLY MO-1169.

Standard: MO-1169 is closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 At 1C07, isolate the main steam supply to the Turbine Steam Seal System by Critical N placing the following handswitches in the CLOSE position:

REGULATOR BYPASS MO-1170.

Standard: MO- 1170 is verified closed.

Evaluator Note: Note MO-1170 is a normally closed valve, unless the steam seal regulator is inoperable. MO-1170 will be verified closed or closed if open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 At 1C07, verify that the main steam supply to MSR 2nd Stage Reheat is isolated Critical Y by holding the following handswitch is in the CLOSE position:

MAIN STEAM TO MSR SECOND STAGE MO-1054 & MO-1055.

Standard: MO-1054 and 1055 are closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-3 rev 5-7.docx Page 6 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 6 At 1C07, verify that Mechanical Vacuum Pump 1P-32 is secured.

Critical Y Standard: 1P-32 is secured.

Evaluator Note: Note that per the AOP, the Candidate may just take the HS for the Mechanical Vacuum Pump to stop to secure it, or he may get OI 691 and secure the pump per section 5.0. After he secures the pump, there are steps for the inplant operator to perform, cue the Candidate that the inplant operator will finish the actions of OI 691 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 At 1C04, establish the preferred MSIV leakage path by placing the following Critical Y handswitches in the OPEN position:

MSL HEADER DRAINS BYPASS MO-1043.

Standard: MO-1043 is Opened.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 At 1C04, establish the preferred MSIV leakage path by placing the following Critical Y handswitches in the OPEN position:

MSL DRAIN ORIFICE BYPASS MO-1044.

Standard: MO-1044 is Opened.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-3 rev 5-7.docx Page 7 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Performance Step: 9 If the preferred MSIV leakage path cannot be established, establish the Critical N alternate path by opening MSL HEADER DRAIN CV-1064 using HS-1064 on 1C04.

Standard: Leakage path can be established.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete when MO-1044 is full open.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-3 rev 5-7.docx Page 8 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-3, Establish a Leakage Path to the Main Condenser IAW AOP 672.2, Offgas Radiation/Reactor Coolant High Activity, Rev. 1 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-3 rev 5-7.docx Page 9 of 10

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-4 NRC 2011 JPM S-4 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE JPM NUMBER: NRC 2011 JPM S-4 REV. 0 TASK NUMBER(S) /

TASK TITLE(S): MANUAL STARTUP OF HPCI USING THE TEST POT K/A NUMBERS: 206000 K/A VALUE: A4.01 3.8/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-4 rev 5-7.docx Page 1 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

IC 20 Setup a Schedule file to delete both overrides below when ET 3 goes true. Notice the 7 second delay in the green light.

SIMULATOR TRIGGERS Event Trigger Trigger Formula Trigger Description 1 HPNT > 800 HPCI speed exceeds 800 rpm 3 ZDIHPHS2318(1) >= 1 MO 2318, HPCI Min Flow Valve taken to CLOSE SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE SIMULATOR OVERRIDES: N/A TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE Preset DO-HP-047 HS-2318(2) MIN 1 ON OFF FLOW BYPASS NOTE delete with MOV-2318 LITES schedule file (RED)

Preset DO-HP-046 HS-2318(1) MIN 1 7 secs OFF ON FLOW BYPASS NOTE delete with MOV-2318 LITES schedule file (GREEN)

Preset DO-HP-047 HS-2318(2) MIN 3 ON OFF (NEW) FLOW BYPASS DELETE in 7 MOV-2318 LITES seconds (RED)

SIMULATOR REMOTE FUNCTIONS: N/A Required Materials: OI 152 General

References:

OI 152 NRC 2011 JPM S-4 rev 5-7.docx Page 2 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Task Standards: 1. HPCI in pressure control mode (CST to CST)

2. HPCI Min Flow Bypass Valve (MO-2318) closed NRC 2011 JPM S-4 rev 5-7.docx Page 3 of 16

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant is at rated power
  • A manual startup of HPCI is required using the Test Pot
  • A field operator is stationed near the HPCI Turbine
  • OI-152 Section 5.1 is complete through Step (12)

INITIATING CUES (IF APPLICABLE):

  • Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-4 rev 5-7.docx Page 4 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant is at rated power
  • A manual startup of HPCI is required using the Test Pot
  • A field operator is stationed near the HPCI Turbine
  • OI-152 Section 5.1 is complete through Step (12)

INITIATING CUES (IF APPLICABLE):

  • Place HPCI in service in the Pressure Control mode using the Test Pot IAW OI 152, Section 5.1, beginning at Step (13). Establish HPCI at approximately 1065 psig with flow of 3100 gpm.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-4 rev 5-7.docx Page 5 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Verify HPCI Vacuum Tank Hi Level Alarm (1C03C, D-7) is clear Critical N Standard: Verifies HPCI Vacuum Tank Hi Level Alarm (1C03C, D-7) is clear Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Start the 1P-233 HPCI VACUUM PUMP by placing Handswitch HS-2221 on Critical Y 1C03 to START Standard: Starts the 1P-233 HPCI VACUUM PUMP by placing Handswitch HS-2221 on 1C03 to START Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 6 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 3 Open MO-2247 LUBE OIL & CONDENSER CLG SUPPLY Valve by placing HS-Critical Y 2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.

Standard: Opens MO-2247 LUBE OIL & CONDENSER CLG SUPPLY Valve by placing HS-2247 on 1C03 to the OPEN position and allowing it to spring return to the AUTO position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Place TURBINE SPEED TEST SELECT Handswitch HS-2257 on 1C03 in the Critical Y "TURB TEST" position.

Standard: Places TURBINE SPEED TEST SELECT Handswitch HS-2257 on 1C03 in the "TURB TEST" position.

Evaluator Note: Annunciator C-6 Alarms Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Place HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on Critical Y 1C03 to the "ON" position.

Standard: Places HS-2258 AC POWER TO TURBINE SPEED TEST CKT Handswitch on 1C03 to the "ON" position.

Performance: SATISFACTORY UNSATISFACTORY Amber light turns ON Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 7 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 6 Rotate TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 fully Critical Y counter-clockwise.

Standard: Verifies TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 fully counter-clockwise.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Verify MO-2311 PUMP DISCHARGE valve open .

Critical N Standard: Verifies MO-2311 PUMP DISCHARGE valve open .

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 The following step makes HPCI inoperable.

Critical N Verify the CRS has entered the LCO for HPCI being inoperable. NA if not running CST to CST.

Standard: Informs the SRO that the HPCI LCO must be entered Evaluator Cue: The LCO has been entered Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 8 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 9 If operation in the CST to CST Mode is desired, perform the following:

Critical Y (a) Open MO-2316 REDUNDANT SHUTOFF valve.

(b) Throttle open CV-2315 TEST BYPASS valve to 46-48% open as indicated on ZI-2315 Standard: Opens MO-2316 REDUNDANT SHUTOFF valve Throttles open CV-2315 TEST BYPASS valve to 46-48% open as indicated on ZI-2315 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Initiate torus water temperature monitoring per STP 3.6.2.1-01. This is only Critical N required while heat is being added to the torus.

Standard: Informs the CRS that torus temperature monitoring is required per STP 3.6.2.1-01 while heat is being added to the torus.

Evaluator Cue: Another operator will perform torus temperature monitoring.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 9 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 11 If time permits, ensure unnecessary/unauthorized personnel are clear of the Critical N HPCI Room.

Standard: May announce via page that unnecessary/unauthorized personnel are clear of the HPCI Room.

Evaluator Note: The following annunciators will be received if the AUX OIL PUMP is not started within 15 seconds after opening MO-2202 TURBINE STEAM SUPPLY:

HPCI TURBINE TRIPPED (alarm only) (1C03C, A-4)

HPCI LO FLOW (1C03C, B-3)

HPCI TURBINE BEARING OIL LO PRESSURE (1C03C, A-6)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Open MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS-Critical N 2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.

Standard: Opens MO-2202 TURBINE STEAM SUPPLY valve by placing Handswitch HS-2202 on 1C03 in the OPEN position momentarily and observing proper valve indication.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 CONTINUOUS RECHECK STATEMENT Critical N (applicable to the remainder of this section)

IF injection to the RPV is desired, THEN be prepared to open MO-2312 HPCI INJECT valve immediately after 1P-218 is started to prevent a possible HPCI Turbine Overspeed trip.

Standard: Reviews Continuous Recheck Statement Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 10 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 14 At 1C03, perform the following in rapid succession:

Critical Y Place 1P-218 AUX OIL PUMP Handswitch HS-2256 on 1C03 in the START position and verify that the following indicating lights on 1C03 turn ON:

1. 1P-218 AUX OIL PUMP red (running) light ON ___________
2. HV-2201 TURBINE STOP VALVE red (open) light ON
3. Verify HV-2200 TURBINE CONTROL VALVE open or throttled, controlling HPCI Turbine speed. ___________

Standard: Places 1P-218 AUX OIL PUMP Handswitch HS-2256 on 1C03 in the START position and verifies the above indications Evaluator Cue: If operator is struggling with HV-2200 position, cue the operator that HV-2200 is throttled to maintain speed. Continue.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 If injection into the RPV is desired, immediately open MO-2312 HPCI Critical N INJECT valve and confirm proper valve position indication.

Standard: Reviews step and continues Evaluator Note: This step is N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 11 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 16 Rapidly raise HPCI TURBINE SPEED using the TEST MODE Critical Y TURBINE SPEED ADJUST potentiometer HS-2273 until turbine speed () 2000 rpm.

Standard: Using the TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273, Rapidly raises HPCI TURBINE SPEED until turbine speed () 2000 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Confirm that HPCI speed and HPCI Pump discharge pressure indicate Critical N increases.

Standard: Confirms that HPCI speed and HPCI Pump discharge pressure indicate increases.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Verify that MO-2318 MIN FLOW BYPASS valve is open when HPCI flow is less Critical N (SEQ-) than 600 gpm with pump discharge pressure greater than 125 psig.

Standard: Verifies that MO-2318 MIN FLOW BYPASS valve is open when HPCI flow is less than 600 gpm with pump discharge pressure greater than 125 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 12 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 19 Verify 1P-218 AUX OIL PUMP stops automatically and that turbine speed Critical N (SEQ-) remains steady and does not decrease Standard: Verifies 1P-218 AUX OIL PUMP stops automatically and that turbine speed remains steady and does not decrease Evaluator Note: There is a 2 second time delay between automatic cycles on MO-2318.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Verify on 1C03 that MO-2318 MIN FLOW BYPASS valve closes as HPCI flow Critical Y (SEQ-) increases above 600 gpm.

Standard: Recognizes MO-2318 MIN FLOW BYPASS valve failed to close and manually closes the valve.

Evaluator Note: The Min Flow valve will fail to close and the operator must take action to manually close the valve:

Evaluator Cue: Once the valve is closed, tell the operator to continue with the procedure.

I&C will look into the min flow valve issue.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 Verify that the following drain valves automatically close: Valve Description Critical N (SEQ-) CV-2211 HPCI STEAM LINE DRAIN ISOL CV-2212 HPCI STEAM LINE DRAIN ISOL CV-2234 CLOSED RADWASTE DISCH ISOL Standard: Verifies the above drain valves are closed Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-4 rev 5-7.docx Page 13 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Performance Step: 22 At 1C03, establish desired HPCI flow and pressure by:

Critical Y (SEQ-)

(a) Adjusting HPCI Turbine Speed to >2000 rpm using the TEST MODE TURBINE SPEED ADJUST potentiometer HS-2273 AND (b) If in CST to CST mode, throttling TEST BYPASS CV-2315.

Standard: Establishes HPCI flow of 3100 gpm and pressure at approximately 1065 psig using the TEST BYPASS CV-2315 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: In the HPCI Room, verify Jockey Oil Pump 1P-283 is not running.

Critical N (SEQ-)

Standard:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: HPCI is in CST-CST mode with Min Flow Valve Closed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-4 rev 5-7.docx Page 14 of 16

QF-1030-11 Rev. 7 NRC 2011 JPM S-4, MANUAL STARTUP USING THE TEST POT TO CONTROL HPCI IN PRESSURE CONTROL MODE, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-4 rev 5-7.docx Page 15 of 16

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-5 NRC 2011 JPM S-5 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT JPM NUMBER: NRC 2011 JPM S-5 REV. 0 TASK NUMBER(S) /

TASK TITLE(S): CONTAINMENT ATMOSPHERE MONITORING SAMPLE LINE ISOLATION DEFEAT A4.04 3.5/3.6 K/A NUMBERS: 223001 K/A VALUE:

A4.05 3.6/3.6 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-5 rev 5-7.docx Page 1 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Ensure a Group 3 isolation has occurred.

SIMULATOR MALFUNCTIONS: N/A SIMULATOR OVERRIDES: N/A SIMULATOR REMOTE FUNCTIONS: N/A Required Materials: Defeat 16 General

References:

Defeat 16 Task Standards: 1. Open Drywell and Torus Sample Lines after a PCIS Group 3 isolation.

2. H2-O2 Analyzers placed in service and then secured after sampling.

NRC 2011 JPM S-5 rev 5-7.docx Page 2 of 10

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant was at rated power
  • A Group 3 isolation has occurred following an event
  • Drywell Sprays have been initiated
  • The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
  • Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-5 rev 5-7.docx Page 3 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read does not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The plant was at rated power
  • A Group 3 isolation has occurred following an event
  • Drywell Sprays have been initiated
  • The H2O2 Analyzers are required to be placed in service for containment atmosphere monitoring INITIATING CUES (IF APPLICABLE):
  • Install Containment Atmosphere monitoring sample line isolation Defeat 16 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-5 rev 5-7.docx Page 4 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 If a large-break LOCA is suspected, verify that drywell sprays have been Critical N initiated prior to overriding the containment atmosphere sample line isolations.

If drywell sprays have NOT initiated, consult with the TSC Accident Management Team prior to overriding the isolation Standard: Reviews Step and determines that the initiating cue stated that Drywell Sprays have been placed in service.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch Critical Y HS-8101A in OVERRIDE Standard: Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101A in OVERRIDE Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-5 rev 5-7.docx Page 5 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 3 At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y 8100A in OVERRIDE Standard: Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS-8100A in OVERRIDE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 At 1C29, place INBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y 8100B in OVERRIDE Standard: Places INBOARD SAMPLE ISOLATION VALVES keylock switch HS-8100B in OVERRIDE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 At 1C29, place OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-Critical Y 8101B in OVERRIDE Standard: Places OUTBOARD SAMPLE ISOLATION VALVES keylock switch HS-8101B in OVERRIDE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Confirm ISOLATION OVERRIDE amber lights are ON Critical N Standard: Confirms ISOLATION OVERRIDE amber lights are ON Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-5 rev 5-7.docx Page 6 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 7 NOTE Critical N Both samplers should be placed in service, with one sampling the Drywell and the other sampling the Torus.

If only one sampler is available, the Drywell should be sampled first CAUTION During flooding of the Primary Containment, the Containment Atmosphere Monitors shall either be isolated or shifted to a higher sample point prior to containment level rising above the sample line containment penetrations. When all containment sample taps are isolated and/or covered, coordinate with the TSC to establish alternate monitoring, if possible.

Standard: Reviews Note and Caution Evaluator Cue: If asked, cue the candidate that Primary Containment Flood is NOT in progress.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 At 1C09, select a containment sampling point for the H2O2 Analyzers:

Critical Y

  • To sample the Torus, position TORUS SAMPLE POINT SELECT switch HS-8116C[D] to OPEN.
  • To sample Drywell Elevation 817', position DRYWELL SAMPLE POINT 1 SELECT switch HS-8114C[D] to OPEN.
  • To sample Drywell Elevation 764', position DRYWELL SAMPLE POINT 2 SELECT switch HS-8115C[D] to OPEN.

Standard: Samples the Torus on one of the analyzers and samples either drywell sampling point on the other analyzer.

Evaluator Note: If asked, tell the candidate that Drywell Sample Point 1 is desired Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-5 rev 5-7.docx Page 7 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Performance Step: 9 At 1C09, verify the ANALYZER MODE SELECT switch is in the ANAL position for Critical Y each monitor in use.

Standard: Places the ANALYZER MODE SELECT switch is in the ANAL position for each monitor in use.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 At 1C09, reset the Analyzer Trouble Lights by depressing the RESET pushbuttons Critical Y and confirm ANALZER TROUBLE amber light is OFF.

Standard: Resets the Analyzer Trouble Lights by depressing the RESET pushbuttons and confirms ANALZER TROUBLE amber lights are OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 At 1C09, reset the A CONTAINMENT H2/O2 ANALZER TROUBLE (1C09A, Critical N B-4) and/or B CONTAINMENT H2/O2 ANALZER TROUBLE (1C09B, B-4)

Annunciators.

Standard: Resets both Trouble Annunciators.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The A & B analyzer in service with sample points from both torus and drywell.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-5 rev 5-7.docx Page 8 of 10

QF-1030-11 Rev. 7 NRC 2011 JPM S-5, Containment Atmosphere Monitoring Sample Line Isolation Defeat, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-5 rev 5-7.docx Page 9 of 10

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-6 NRC 2011 JPM S-6 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: MAIN GENERATOR SYNCH TO GRID - FAILURE OF MAIN GENERATOR TO AUTO TRIP ON A PRIMARY LOCKOUT JPM NUMBER: NRC 2011 JPM S-6 REV. 0 TASK NUMBER(S) / ROXX TASK TITLE(S):

K/A NUMBERS: 262001 K/A VALUE: A4.04 3.6 / 3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-6 rev 5-7.docx Page 1 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

1. Reset simulator to IC 12
2. Mark up OI 698, section 3.3 complete through step 2
3. Input the simulator triggers and malfunctions as shown below.

Triggers:

Trigger No. Trigger Logic Statement Trigger Word Description 4 ZDIEGX390(2) >= 1 Power System Stabilizer Switch to ON SIMULATOR MALFUNCTIONS:

TIME MALFUN MALFUNCTION TITLE ET DELAY F. SEV. RAMP I. SEV.

CTION #

Setup EG02A Main Gen Lockout Relay Fails Active Active Act- Primary Lockout (286/P)

Setup EG02B Main Gen Lockout Relay Fails Active Active Act- Backup Lockout (286/B)

As Dir AN1C08C 1C08C (A-01) Main Generator 4 ON OFF (1) Primary Lockout Trip As Dir TC01 Main Turbine Trip 4 1 sec Active Inactive SIMULATOR OVERRIDES:

TIME OVERRI OVERRIDE DESCRIPTION ET DELAY VALUE RAMP DE ID Setup DI-EG- X389 Main Generator OFF 028 Emergency Trip SIMULATOR REMOTE FUNCTIONS: NONE Required Materials: OI 698, Rev. 76 1C08C A-1, Rev. 48 General

References:

OI 698 Task Standards: 1. Synchronize Main Generator to the Grid

2. Recognize failure of main generator to auto trip on Primary Lockout, failure trip PBs AND Exciter Field breaker to auto open.
3. Manually opens outputs and exciter field breaker NRC 2011 JPM S-6 rev 5-7.docx Page 2 of 19

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is starting up.
  • The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
  • The CRS directs you to synchronize the Main Generator to the grid IAW OI-698 Sections 3.3 and 3.4
  • OI 698 is completed through Section 3.3 Step 2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-6 rev 5-7.docx Page 3 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is starting up.
  • The Main Generator is ready to be synchronized to the grid INITIATING CUES (IF APPLICABLE):
  • The CRS directs you to synchronize the Main Generator to the grid IAW OI-698 Sections 3.3 and 3.4
  • OI 698 is completed through Section 3.3 Step 2.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-6 rev 5-7.docx Page 4 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Review OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Critical N Standard: Reviews OI 698 Precautions & Limitations and Sections 3.3 & 3.4 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Verify MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A-12) annunciator is Critical N RESET.

Standard: Verifies MAIN TRANSFORMER 1X1 TROUBLE (1C08B, A-12) annunciator is RESET.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 5 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 3 Verify AUX TRANSFORMER 1X2 TROUBLE (1C08B, C-5) annunciator is Critical N RESET.

Standard: Verifies AUX TRANSFORMER 1X2 TROUBLE (1C08B, C-5) annunciator is RESET.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Verify that the main turbine is at 1,800 rpm by observing the SPEED indicator on Critical N 1C07.

Standard: Verifies that the main turbine is at 1,800 rpm by observing the SPEED indicator on 1C07.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 If the Hydrogen Seal Oil system was kept in service, verify OPEN V-45-84, Critical N PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.

Standard: Contacts field operator to verify OPEN V-45-84, PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION.

Evaluator Cue: Respond as field operator that PCV-3635 D/P REGULATOR HIGH SIDE ISOLATION is OPEN Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 6 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 6 Place 241CS, GENERATOR EXCITER FIELD BREAKER control switch, Critical Y momentarily in the CLOSE position.

Standard: Places 241CS, GENERATOR EXCITER FIELD BREAKER control switch, momentarily in the CLOSE position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Verify the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, Critical N indicating the exciter deexcitation circuit is deactivated on 1C08.

Standard: Verifies the GENERATOR FIELD BREAKER BACKUP red indicating light is ON, indicating the exciter deexcitation circuit is deactivated on 1C08.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Using the GENERATOR VOLTAGE SELECT switch, observe on the Critical N GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.

Standard: Using the GENERATOR VOLTAGE SELECT switch, observes on the GENERATOR KILOVOLTS meter that all three phases build up to approximately 18,000 volts.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 7 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 9 Observe proper voltage regulator response by varying 270CS, GENERATOR Critical Y MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.

Standard: Observes proper voltage regulator response by varying 270CS, GENERATOR MANUAL VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Raise generator phase voltage to 22,000 volts by adjusting the GENERATOR Critical Y MANUAL VOLTAGE ADJUST.

Standard: Raises generator phase voltage to 22,000 volts by adjusting the GENERATOR MANUAL VOLTAGE ADJUST.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 NOTE:

Critical N

  • Placing the Main Generator on the Grid with Manual Voltage Regulation, is being performed.

NOTE

  • NERC Std VAR-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes.

Standard: Reviews NOTES and continues to procedure step 12.

Evaluator Cue: If asked, inform the candidate that they will NOT be placing the Main Generator on the Grid with Manual Voltage Regulation, Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 8 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 12 Transfer voltage regulation to automatic as follows:

Critical Y a. Adjust 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, until zero is obtained on the GENERATOR REGULATOR VOLTS meter.

b. Place 243CS, REGULATOR TRANSFER switch, to the AUTO position.
c. Observe proper voltage regulator response by varying 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, and observing the GENERATOR FIELD VOLTS meter.
d. Return generator phase voltage to 22,000 volts by adjusting the GENERATOR AUTOMATIC VOLTAGE ADJUST.

Standard: Transfers voltage regulation to automatic IAW the above steps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Record the time that the REGULATOR TRANSFER switch was placed in AUTO Critical N in the Operating Log.

Standard: Records the time that the REGULATOR TRANSFER switch was placed in AUTO in the Operating Log.

Evaluator Cue: Another operator will record the time in the log Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 9 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 14 Inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR Critical N TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.

Standard: Informs the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.

Evaluator Cue: Another operator will inform the Load Dispatcher, ATC and Real Time Desk that the REGULATOR TRANSFER switch was placed in AUTO and the unit is ready to be placed on the grid.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Record the time that the Load Dispatcher, ATC and Real Time Desk were Critical N notified in the Operating Log.

Standard: Records the time that the Load Dispatcher, ATC and Real Time Desk were notified in the Operating Log.

Evaluator Cue: Another operator will record the time in the log.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Evaluator NOTE: After the above steps are complete, the candidate will transfer to section 3.4 to continue.

NRC 2011 JPM S-6 rev 5-7.docx Page 10 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 16 NOTE:

Critical N The generator may be placed on either the East or the West 161 KV Bus first, depending on system requirements. The following instructions assume that GENERATOR OUTPUT I BREAKER (OCB 4290) (161 KV West Bus) is closed first. Designations shown in brackets should be used if GENERATOR OUTPUT H BREAKER (OCB 0220) (161 KV East Bus) is closed first.

Standard: Reviews NOTE Evaluator Note: If the candidate asks for guidance, you may direct them to close the I breaker first.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Close Generator MO - Disconnect SW 0236 and verify closed by red flag and Critical Y red light on.

Standard: Closes Generator MO - Disconnect SW 0236 and verify closed by red flag and red light on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Close Generator MO - Disconnect SW 4292 and verify closed by red flag and Critical Y red light on.

Standard: Closes Generator MO - Disconnect SW 4292 and verify closed by red flag and red light on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 11 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 19 Place GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the Critical N ON position.

Standard: Places GENERATOR OUTPUT I[H] BREAKER SYNCHRONIZE switch in the ON position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Adjust voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, Critical Y so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.

Standard: Adjusts voltage with 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, so that the INCOMING VOLTS SYNCHRONIZE meter is matched with the RUNNING VOLTS SYNCHRONIZE meter.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 Adjust the LOAD SET ADJUST INCREASE button on 1C07 until the Critical Y synchroscope is rotating slowly in the clockwise direction.

Standard: Adjusts the LOAD SET ADJUST INCREASE button on 1C07 until the synchroscope is rotating slowly in the clockwise direction.

Evaluator Cue: If the candidate raises Turbine/Generator speed too much they may want to use the DECREASE pushbutton to adjust speed. If the candidate requests permission to use the DECREASE pushbutton then acknowledge the request and give permission.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 12 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 22 If necessary, further adjust 290CS, GENERATOR AUTOMATIC VOLTAGE Critical Y ADJUST, to match the incoming and running volts.

Standard: If necessary, further adjusts 290CS, GENERATOR AUTOMATIC VOLTAGE ADJUST, to match the incoming and running volts.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily Critical Y place the GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] control switch in the CLOSE position.

Standard: As the SYNCHROSCOPE pointer reaches the 12 o'clock position, momentarily places the GENERATOR OUTPUT I BREAKER (OCB 4290) control switch in the CLOSE position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 24 Observe the synchroscope pointer locks in at the 12 o'clock position and that Critical N GENERATOR OUTPUT I BREAKER (OCB 4290) [GENERATOR OUTPUT H BREAKER (OCB 0220)] breaker is closed as indicated by the red breaker position indicating light.

Standard: Observes the synchroscope pointer locks in at the 12 o'clock position and that GENERATOR OUTPUT I BREAKER (OCB 4290) breaker is closed as indicated by the red breaker position indicating light.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 13 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 25 Establish an initial load as specified by the Operations Shift Supervisor or OI Critical Y 693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.

Standard: Establishes an initial load as specified by the Operations Shift Supervisor or OI 693.1, Appendix 3, by depressing the LOAD SET ADJUST INCREASE pushbutton on 1C07.

Evaluator Cue: If the candidate requests guidance then direct them to pick up load as necessary to close the Turbine Bypass Valve.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 26 Place the GENERATOR OUTPUT I BREAKER SYNCHRONIZE [GENERATOR Critical N OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position.

Standard: Places the GENERATOR OUTPUT I BREAKER SYNCHRONIZE

[GENERATOR OUTPUT H BREAKER SYNCHRONIZE] switch in the OFF position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 27 Place the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE)

Critical N [GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.

Standard: Places the GENERATOR OUTPUT H BREAKER (SYNCHRONIZE)

[GENERATOR OUTPUT I BREAKER (SYNCHRONIZE)] switch in the ON position. Observe that incoming and running volts are equal and that the synchroscope is stationary at the 12 o'clock position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 14 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 28 Place the GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR Critical Y OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position.

Standard: Places the GENERATOR OUTPUT H BREAKER (OCB 0220)

[GENERATOR OUTPUT I BREAKER (OCB 4290)] control switch momentarily to the CLOSE position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 29 Observe that GENERATOR OUTPUT H BREAKER (OCB 0220) [GENERATOR Critical N OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.

Standard: Observes that GENERATOR OUTPUT H BREAKER (OCB 0220)

[GENERATOR OUTPUT I BREAKER (OCB 4290)] breaker is closed as indicated by the red breaker position indicating light.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 30 Place the GENERATOR OUTPUT H BREAKER SYNCHRONIZE Critical N [GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position.

Standard: Places the GENERATOR OUTPUT H BREAKER SYNCHRONIZE

[GENERATOR OUTPUT I BREAKER SYNCHRONIZE] switch in the OFF position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 15 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 31 NOTE Critical N

  • NERC Std VAR-002-1, Requirement 3 requires notification of voltage regulator and/or power system stabilizer (PSS) status change within 30 minutes.

Standard: Reviews NOTES and continues.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Evaluator NOTE: When the next step is performed, the Main Turbine will trip, the Primary Generator Lockout will alarm, but the Main Generator will not trip either automatically or with the Main Generator trip pushbutton located on 1C08. The candidate will have to open the H and I breakers, then open the Generator field breaker (in that order).

Performance Step: 32 Place the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power Critical N System Stabilizer) in the ON position.

Standard: Places the GENERATOR ALTERREX SUPPLEMENTARY control switch (Power System Stabilizer) in the ON position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 33 Diagnose Turbine Trip Critical N Standard: Diagnoses and announces Turbine Trip Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-6 rev 5-7.docx Page 16 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Performance Step: 34 Diagnose the failure of the Main Generator to Trip Critical N Standard: Diagnoses the failure of the Main Generator to Trip and proceeds to separate the Generator from the buses.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 35 Verify the following:

Critical Y

  • Generator Output H Breaker OPEN
  • Generator Output H Breaker OPEN
  • Generator Field Breaker OPEN Standard: Opens the following breakers:
  • Generator Output H Breaker
  • Generator Output H Breaker
  • Generator Field Breaker (LAST)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Turbine and Generator Tripped. Output Breakers OPEN, Exciter Field Breaker OPEN.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-6 rev 5-7.docx Page 17 of 19

QF-1030-11 Rev. 7 NRC 2011 JPM S-6, Main Generator Synch to Grid - Failure of Main Generator to auto trip on a Primary Lockout, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-6 rev 5-7.docx Page 18 of 19

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-7 NRC 2011 JPM S-7 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: PERFORM DOWNSCALE/UPSCALE TRIP OPERATIONAL CHECK OF ARMS JPM NUMBER: NRC 2011 JPM S-7 REV. 8 TASK NUMBER(S) / 86.04 TASK TITLE(S): Perform Downscale/Upscale Trip Setpoint Check K/A NUMBERS: 272000 K/A VALUE: A4.02 3.0/3.0 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-7 rev 5-7.docx Page 2 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

1. Reset to any full power IC.
2. Simulator instructor to acknowledge alarms received during performance of the JPM and to function as front panel operator for communications with the operator.

SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: Simulator General

References:

OI 879.2, Rev. 22 Task Standards: 1. Determine the Downscale and Upscale Trip Setpoints.

2. Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.
3. ARM indicator is placed between Downscale and Upscale setpoints.
4. Trip Check Adjust knob turned until the Upscale Trip is activated and the HIGH light turns on.
5. Determines that the trip setpoint is approximately the same as that provided by Appendix 1.
6. ARM Indicator is placed between the Downscale and the Upscale Trip Setpoint.
7. RESET ARM alarms; the HIGH light is OFF
8. Trip Check Adjust Knob turned clockwise until the Downscale Trip is activated and LOW light on.
9. ARM indicator is placed between the Downscale and Upscale Trip
10. RESET ARM alarms; the LOW light is OFF
11. Mode Selector switch is placed in OPERATE.
12. Reset pushbutton is depressed.

NRC 2011 JPM S-7 rev 5-7.docx Page 3 of 13

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI-9167, Reactor Building Railroad Access Area, per OI-879.2, Section 6.0.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-7 rev 5-7.docx Page 4 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • RI-9167, Reactor Building Railroad Access Area ARM was deenergized for approximately two hours on the previous shift.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to perform the downscale/upscale trip setpoint check on ARM RI-9167, Reactor Building Railroad Access Area, per OI-879.2, Section 6.0.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-7 rev 5-7.docx Page 5 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 The control room operator should check the Downscale and Upscale Trip Critical N Setpoints on each ARM when placed in service or whenever the trip setpoints are suspect.

Standard: The ARM to be tested was given in the turnover.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 For the Upscale Trip Setpoint verification, the operator shall use the trip setpoint Critical Y data contained in Appendix 1 of this procedure. The ARM trip setpoint checks will be performed on the respective ARM Indicator and Trip Units at Panel 1C11.

Standard: Candidate will reference Attachment 1 and determine that the Downscale reading for RI-9167 is .1 mR/Hr and the Upscale setpoint is 10 mR/Hr.

Evaluator Note: The Upscale and Downscale setpoints are also on the RI on a faceplate.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 6 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 3 Turn the Trip Check Adjust knob on the respective power supply Critical N E/S9150A[ B or C] for the ARM being tested fully counter-clockwise.

Standard: Turns the Trip Check Adjust knob fully counter-clockwise on power supply E/S9150A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Place the Mode Selector Switch for the ARM being tested in the TRIP TEST Critical Y position.

Standard: Mode Selector Switch for the ARM 9167 taken to the TRIP TEST position.

Evaluator Note: Candidate may state that they are expecting an alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Verify that the ARM DNSCL/INOP (1C04B, C-7) annunciator is activated.

Critical N Standard: Verifies that the ARM DNSCL/INOP (1C04B, C-7) annunciator is activated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.

Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 7 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 7 Verify that both low and high front panel lights are OFF.

Critical N Standard: Reset pushbutton pushed and both the LOW and HIGH lights are OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is Critical Y activated, then verify the following:

The HIGH light on the front panel of the ARM Indicator and Trip Unit turns on.

Standard: Trip Check Adjust knob turned until the Upscale Trip is activated and the HIGH light turns on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Slowly turn the Trip Check Adjust knob clockwise until the Upscale Trip is Critical N activated, then verify the following:

Standard: Verifies that 1C04B annunciator activated Evaluator Note: Appendix 2 references this alarm as 1C04B <A-6>.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 8 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 10 Slowly turn the Trip Check Adjust know clockwise until the Upscale Trip is Critical Y activated, then verify the following;

  • The Upscale Trip Setpoint is approximately the same as that provided by the Health Physics Department (Appendix 1 is a representative setpoint).

Standard: Determines that the trip setpoint is approximately the same as that provided by Appendix 1.

Candidate may call Health Physics Dept to verify the Appendix 1 data is Evaluator Cue:

current/valid. Inform him that Appendix 1 data is current.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.

Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Depress the RESET pushbutton on the ARM being tested, then verify the Critical Y following:

The HIGH light on the front panel of the Indicator and Trip Unit turns OFF.

Standard: HIGH light on the front panel of the Indicator and Trip Unit is OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 9 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 13 Depress the RESET pushbutton on the ARM being tested, then verify the Critical N following:

The corresponding ARM Upscale Trip Annunciator on Panel 1C04B or Panel 1C35A resets Standard: Annunciator on 1C04B is resets.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Slowly turn the Trip Check Adjust Knob counter-clockwise until the downscale Critical Y trip is activated, then verify the following:

The LOW light on the front panel of the ARM Indicator and Trip Unit turns ON.

Standard: Trip Check Adjust Knob turned clockwise until the downscale trip is activated and LOW light on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Slowly turn the Trip Check Adjust Knob counter-clockwise until the downscale Critical N trip is activated, then verify the following:

The Downscale Trip Setpoint is approximately the same as that listed in Appendix 1.

Standard: Determines that the trip setpoint is approximately the same as that provided by Appendix 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 10 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Performance Step: 16 Position the Trip Check Adjust Knob such that the indication on the ARM Critical Y Indicator and Trip Unit is between the Downscale and Upscale Trip Setpoints.

Standard: ARM Indicator is placed between the Downscale and Upscale Trip Setpoints.

Verify that the LOW light turns OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Verify that the LOW light turns OFF.

Critical N Standard: Reset pushbutton on the ARM is depressed and the LOW light is OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Return the Mode Selector Switch for the ARM being tested to the OPERATE Critical Y position.

Standard: Mode Selector switch is placed in OPERATE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Depress the RESET pushbutton and verify that the ARM DNSCL/INOP Critical Y (1C04B, C-7) annunciator is reset.

Standard: RESET pushbutton is depressed and annunciator 1C04B C-7 is reset.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-7 rev 5-7.docx Page 11 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Terminating Cues: The JPM is complete when the Downscale/Upscale Trip Operational check has been performed on RI 9167, Reactor Building Railroad Access Area.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-7 rev 5-7.docx Page 12 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM S-7, Perform Downscale/Upscale Trip Operational Check of Arms, Rev. 8 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-7 rev 5-7.docx Page 13 of 13

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM S-8 NRC 2011 JPM S-8 rev 5-7.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER: NRC 2011 JPM S-8 REV. 0 TASK NUMBER(S) / 95.14 TASK TITLE(S):

K/A NUMBERS: 400000 K/A VALUE: A4.01 3.1/3.0 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM S-8 rev 5-7.docx Page 1 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 SIMULATOR SETUP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

1. Reset to an IC that supports installing Defeat 4 Group 7 bypass and re-establishing drywell cooling.

(saved IC file for 2011 NRC Exam)

2. Ensure only the D Well Water pump is the only well pump operating. Secure the A Well Pump, and set its controller to 10.

SIMULATOR MALFUNCTIONS:

NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE T=0 RR30 Reactor bottom 10 As is drain leak T=0 MS32 Spurious group 7 isolation SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 1. EOP Defeat 4, Rev. 8

2. OI 408, Rev 64 General

References:

Task Standards: 1. FC 4414A is dialed to zero flow.

2. HS-4321A taken to OVERRIDE position and amber light is ON.
3. HS-4321B taken to OVERRIDE position and amber light is ON.
4. HS-4417D for A Well Water Pump taken to start.
5. A Well flow adjusted at 1C23 via FC 4414A.

NRC 2011 JPM S-8 rev 5-7.docx Page 2 of 11

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • A plant Scram has occurred.
  • RPV level lowered rapidly, but now is restored.
  • EOP 1 and 2 have been entered.
  • Drywell pressure is above 2 psig.
  • Drywell temperatures are rising.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to install EOP Defeat 4 and re-establish drywell cooling.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-8 rev 5-7.docx Page 3 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • A plant Scram has occurred.
  • RPV level lowered rapidly, but now is restored.
  • EOP 1 and 2 have been entered.
  • Drywell pressure is above 2 psig.
  • Drywell temperatures are rising.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to install EOP Defeat 4 and re-establish drywell cooling.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM S-8 rev 5-7.docx Page 4 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 If a PCIS Group 7 Isolation exists AND any well water pump is running, secure Critical N all operating well water pumps per OI 408, Section 6.7.

Standard: It is determined that a group 7 isolation exists, AND the running well water pumps must be secured.

Performance: SATISFACTORY UNSATISFACTORY Comments:

At this point the operator will leave EOP Defeat 4 and enter OI 408, Well Water System, Section 6.8, and secure the running well water pumps.

Also NOTE that the only running well water pump is the D Well.

Performance Step: 2 If a PCIS group 7 isolation exists and a well water pump is running, perform the Critical N following steps, as applicable, to secure the operating well water pumps, otherwise N/A this step.

Standard: The operator determines that the only well water pump that is running is the D Well.

Evaluator Note: The Candidate will N/A the steps for the A, B, C Well Water pumps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-8 rev 5-7.docx Page 5 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 3 Secure the D Well Water Pump 1P-58D as follows:

Critical Y

  • Lower the D well water pump 1P-58D flow to zero.
  • IN Auto: Flow controller FC-4414D on Panel 1C23.

Standard: FC 4414D is dialed down until the pump trips. This occurs when flow is below 400 gpm.

Evaluator Note: In the evolution, you will receive the D Well lo flow alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Observe the respective indicating lights on panel 1C06 and verify that D well water Critical N pump 1P-58D is not running.

Standard: Verified on 1C06 that the D Well is not running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

At this point the operator will leave OI 408, Well Water System, and enter and re-enter EOP Defeat 4.

Performance Step: 5 Place GROUP 7 CHANNEL A DW COOLING AND FAN SPEED OVERRIDE Critical Y keylock switch HS-4321A to OVERRIDE position and confirm amber light is ON.

Standard: HS-4321A taken to OVERRIDE position and amber light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-8 rev 5-7.docx Page 6 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 6 Place GROUP 7 CHANNEL B DW COOLING AND FAN SPEED OVERRIDE Critical Y keylock switch HS-4321B to OVERRIDE position and confirm amber light is ON.

Standard: HS-4321B taken to OVERRIDE position and amber light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Verify the following:

Critical N

  • If high drywell pressure exists, verify that any running drywell cooling fan shifts from low speed (amber light) to high speed (red light).

Standard: DW fans verified shifted to high speed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Verify MODE SELECT switches HS-5718 A and B are in START position.

Critical N Standard: MODE SELECT switches HS-5718 A and B are verified in START position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM S-8 rev 5-7.docx Page 7 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 9 If well water was not in operation and a well water pump can be restarted, start a Critical N well water pump and SLOWLY restore well water flow per OI 408, Section 6.9.

Standard: It is determined that Well Water can be restarted.

Evaluator Note: When the Candidate comes to this step, IF he says that he would ask the CRS what he should do, reread the initiating cue and ask the Candidate what he recommends.

Evaluator Cue: Reread the initiating cue and ask the Candidate what he recommends.

Performance: SATISFACTORY UNSATISFACTORY Comments:

At this point the operator will leave EOP Defeat 4 and enter OI 408, Well Water System, and restart the well water system.

Performance Step: 10 If well water is not in operation restore well water as follows:

Critical N

  • At 1C23 verify that FC 4414A well water controller is set a 10% open.

Standard: FC 4414A well water controller is set a 10% open.

Evaluator Note: Based on the note on page 34 of OI 408, if the operator asks if it is ok to start the A Well or if he asks the CRS which Well he wants started, cue him to start the A well.

Evaluator Cue: Cue him to start the A well.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Evaluator Note: The selection of the A Well Pump is NOT critical.

NRC 2011 JPM S-8 rev 5-7.docx Page 8 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: 11 Start the A well water pump 1P-58A by performing the following as necessary:

Critical Y

  • Place the respective handswitch to START position.
  • HS 4417A A Well Water Pump 1P-58A.

Standard: HS 4417A for A Well Water Pump taken to start.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 At 1C06, verify the red light is on for the respective well water pump.

Critical N Standard: Red light for the A well is verified ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Adjust flow as desired by adjusting FC4414A at 1C23.

Critical Y Standard: A Well flow adjusted at 1C23 via FC4414A. Flow should be adjusted to between 350 and 750 gpm.

Evaluator Note: If the operator wants to continue on to restart the D or C well, note the flow reference is in the Precautions and Limitations portion of the OI 920.

Evaluator Cue: Cue him that another operator will re-start other wells as needed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the well water is restored to the drywell the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM S-8 rev 5-7.docx Page 9 of 11

QF-1030-11 Rev. 7 NRC 2011 JPM S-8, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM S-8 rev 5-7.docx Page 10 of 11

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-1 NRC 2011 JPM P-1.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: MANUALLY INITIATION CABLE SPREADING ROOM CO2 JPM NUMBER: NRC 2011 JPM P-1 REV. 0 TASK NUMBER(S) / NSPEO 9.08 TASK TITLE(S): Manually Initiate Cable Spreading Room C02 Flood System K/A NUMBERS: 286000 K/A VALUE: 2.1.30 4.4 / 4.0 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 40 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-1.docx Page 1 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 JPM P-1.docx Page 2 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

1. No simulator setup required.

SIMULATOR MALFUNCTIONS:

NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: OI 513, FIRE PROTECTION, Section 5 General

References:

OI 513, FIRE PROTECTION, Rev. 96 Task Standards: 1. Proceeds to alternate initiation method.

2. Breaks the glass and opens the Master Pilot Valve Controller SV-8521.
3. Verifies CABLE SPREADING ROOM SUPPLY and EXHAUST FANS have tripped.

NRC 2011 JPM P-1.docx Page 3 of 15

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • You are the NSPEO.
  • The plant is operating at full power.
  • 1C40 annunciator F-6 (CARDOX PRE-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
  • Cable Spreading Room has been verified to be unoccupied.

INITIATING CUES (IF APPLICABLE):

  • Manually initiate Cable Spreading Room CO2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-1.docx Page 4 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • You are the NSPEO.
  • The plant is operating at full power.
  • 1C40 annunciator F-6 (CARDOX PRE-INITIATION ALARM) was received and acknowledged. A report of smoke was received from the second floor admin bldg. After approximately 1 minute, annunciator 1C40 G-6 (CARDOX INITIATED) had still NOT been received.
  • Cable Spreading Room has been verified to be unoccupied.

INITIATING CUES (IF APPLICABLE):

  • Manually initiate Cable Spreading Room CO2 using the normal initiation method in accordance with OI 513, FIRE PROTECTION, Section 5.3.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-1.docx Page 5 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Obtains Procedure Critical N (SEQ-)

Standard: Operator states that he/she would obtain procedure from Control Room, WCCS or approved printer depending on location when ordered to initiate Cardox.

Evaluator Cue: When the Operator states how to obtain procedure, hand him/her the copy provided.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Ensure all personnel are out of the Cable Spreading Room before operating Critical N (SEQ-) either pilot selector valve Procedure Step OI 513 Step 5.3.1(1)

Standard: Turnover item - No additional action required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 6 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: At the Cable Spreading Room South door, pull out the locking pin and depress Critical Y (SEQ-) the green START pushbutton Procedure Step OI 513 Step 5.3.1(2)(a)

Standard: Locking pin pulled out and START pushbutton depressed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify the local horn sounds at Panel 1C179.

Critical N (SEQ-)

Standard: Operator listens for horn sounding.

Evaluator Note: Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Steps 5 & 6 may be N/Ad.

Evaluator Cue: When Operator listens for horn sounding at Panel 1C179, inform Operator that no horn sound is heard.

If asked, inform Operator that no audible sound of CO2 discharge is heard (even after 24 second time delay has expired).

If Operator checks status of red light at 1C179, inform operator it is OFF.

If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2,Alternate Initiation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 7 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM Critical N (SEQ-) SUPPLY FAN 1V-AC-32 and CABLE SPREADING ROOM EXH FAN 1V-EF-33 have Auto tripped by observing the green OFF lights turn on.

Procedure Step OI 513 Step 5.3.1(2)(c)

Standard: Operator attempts to verify Green OFF lights are ON by going to 1C26 or calls control room.

Evaluator Note: Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7. Step 6 may be N/Ad Evaluator Cue: If asked, inform Operator either

  • CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are still running (role play as control room) or
  • Green lights are OFF and Red running lights are ON (panel 1C26).

If asked, role play as Control Room to inform Operator that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify discharge using audible indication at Cable Spreading Room access or Critical N (SEQ-) CO2 tank pressure and level decrease.

Procedure Step OI 513 Step 5.3.1(2)(d)

Standard: Operator attempts to verify CO2 discharge by audible indications or tank pressure or level decrease.

Evaluator Note: Operator may contact CRS at this time to state CO2 initiation failure and obtain permission to go to Section 5.3.2. If so, then go to Performance Step 7.

Evaluator Cue: If asked, there is NO audible indication of CO2 discharge, NO tank pressure decrease, and NO tank level decrease.

If asked, role play as Control Room to inform Operators that CRS permission is granted for OI 513, Section 5.3.2, Alternate Initiation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 8 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: If no discharge occurs, proceed to Section 5.3.2 (Alternate Initiation Method).

Critical Y (SEQ-)

Procedure Step OI 513 Step 5.3.1(2)(e)

Standard: Operator proceeds with Alternate Initiation Method.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: At North Cable Spreading Room door, break or remove the glass cover on the Critical Y (SEQ-) Pilot box (SV-8522).

Procedure Step OI 513 Step 5.3.2(1)(a)

Standard: Pilot box located and glass simulated to be broken.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place Pilot Control Valve SV-8522 handle in the OPEN position.

Critical Y (SEQ-)

Procedure Step OI 513 Step 5.3.2(1)(a)1.

Standard: Simulates placing SV-8522 handle in the OPEN position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 9 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: If Cardox initiates (evidenced by the noise of CO2 discharging into the Cable Critical N (SEQ-) Spreading Room), perform the following (N/A if Cardox did not initiate):

Procedure Step OI 513 Step 5.3.2(1)(a)2.

Standard: Operator attempts to verify CO2 discharge by audible indications; N/As remaining portion of step when none is heard and proceeds to next step.

Evaluator Cue: If asked, there is no audible indication of CO2 discharge.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Proceed to the Master Pilot Valve Controller SV-8521 at the CARDOX unit.

Critical Y (SEQ-) Break the glass. Inform the control room that you are about to initiate Cardox.

Procedure Step OI 513 Step 5.3.2(1)(b)

Standard: Locates Master Pilot Valve Controller; simulates breaking or removing glass, and calls control room.

Evaluator Note: Only breaking or removal of glass is critical.

Evaluator Cue: Role play as control room and acknowledge that Cardox is about to be initiated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 10 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: Place the pilot control valve SV-8521 handle in the OPEN position.

Critical Y (SEQ-)

Procedure Step OI 513 Step 5.3.2(1)(b)1.

Standard: Simulates placing SV-8521 in OPEN position.

Evaluator Note: Note time SV-8521 was opened: _________

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify CO2 discharge by observing CO2 tank indicators.

Critical N (SEQ-)

Procedure Step OI 513 Step 5.3.2(1)(b)2.

Standard: Observes tank level and/or pressure gauges or listens for flow noise to verify discharge of Cardox.

Evaluator Cue: If asked, the Cardox tank level and/or pressure are lowering; sound of Cardox flow is heard.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 11 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: Verify on Panel 1C26 in the control room that the CABLE SPREADING ROOM Critical Y (SEQ-) SUPPLY 1V-AC-32 and EXHAUST 1V-EF-33 FANS have auto tripped by observing the green OFF lights turn ON.

Procedure Step OI 513 Step 5.3.2(1)(b)3.

Standard: Operator goes to 1C26 or calls Control Room to verify fans have tripped.

Evaluator Cue: If asked, inform operator either

  • CABLE SPREADING ROOM SUPPLY and EXHAUST FANS are NOT running (role play as control room) or
  • Green lights are ON and Red running lights are OFF (panel 1C26).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: After 3 minutes 30 seconds of Cardox release, place the pilot control valve Critical Y (SEQ-) SV-8521 handle in the CLOSED position.

Procedure Step OI 513 Step 5.3.2(1)(b)4.

Standard: SV-8521 in CLOSED position in no less than 3 minutes 30 seconds of release.

Evaluator Note: Note time SV-8521 was closed: _________

The critical portion is for the operator to wait at least 3.5 minutes prior to closing SV-8521.

Evaluator Cue: If asked, the Cardox tank level and/or pressure has stabilized; sound of Cardox flow has stopped.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-1.docx Page 12 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Performance Step: Notify control room that the manual initiation process for the Cardox System is Critical N (SEQ-) complete.

Procedure Step OI 513 Step 5.3.2(1)(b)5.

Standard: Calls control room to report completion of manual initiation.

Evaluator Cue: Role play as control room and acknowledge completion of manual Cardox initiation.

If asked about the status of the fire; state that the fire is out.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the Operator notifies the control room that the manual initiation process for the Cardox System is complete, inform the Operator that another operator will complete the procedure and that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM P-1.docx Page 13 of 15

QF-1030-11 Rev. 7 NRC 2011 JPM P-1, Manually Initiation Cable Spreading Room Co2, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM P-1.docx Page 14 of 15

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-2 NRC 2011 JPM P-2.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: INSTALL EOP DEFEAT 4 WITH A GROUP 7 ISOLATION JPM NUMBER: NRC 2011 JPM P-2 REV. 0 TASK NUMBER(S) / NSPEO 27.01 TASK TITLE(S): Startup the A RPS Generator Set K/A NUMBERS: K2.01 K/A VALUE: 3.2/3.3 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-2.docx Page 1 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 JPM P-2.docx Page 2 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions:

None SIMULATOR MALFUNCTIONS:

NOTE: The below malfunctions are suggested as a minimum to create the needed conditions for the JPM, if other JPM setups require these to be altered that is acceptable as long as the intent of this JPM is not changed.

TIME MALFUNCTION # MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

TITLE SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Instructor Actions: 1. Read initial conditions and initiating cues to the operator.

2. This JPM will take place in the 1A3 switch gear room.
3. This JPM takes place around the A RPS MG set and associated EPA breakers. Extreme caution shall be exercised to preclude any unwanted trips or isolations.

Required Materials: OI 358 (in procedure holder in SWGR room)

General

References:

OI 358, Rev. 50, Section 3.2 Task Standards: 1. 1B3211 is closed.

2. On Panel 1G51 press and hold the MOTOR ON push-button.
3. EPA-A1 circuit breaker closed.
4. EPA-A2 circuit breaker closed.

NRC 2011 JPM P-2.docx Page 3 of 13

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The A RPS MG set was removed from service and tagged out for planned maintenance.
  • RPS bus A has been placed on the alternate source IAW OI 358.
  • The work has been completed and the tagout has been cleared and verified.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to perform the in-plant actions to start up the A RPS MG set IAW OI 358 Section 3.2.
  • Notify the control room when the in-plant actions for A RPS MG set start-up have been completed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-2.docx Page 4 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • The A RPS MG set was removed from service and tagged out for planned maintenance.
  • RPS bus A has been placed on the alternate source IAW OI 358.
  • The work has been completed and the tagout has been cleared and verified.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to perform the in-plant actions to start up the A RPS MG set IAW OI 358 Section 3.2.
  • Notify the control room when the in-plant actions for A RPS MG set start-up have been completed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-2.docx Page 5 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Verify the A[B] RPS MG set motor supply circuit breaker 1B3211 [1B4216] is Critical Y (SEQ-) closed by observing that the GREEN (MOTOR OFF) light on Panel 1G51

[1G61] is ON.

Standard: 1B3211 is closed.

Evaluator Cue: Instructor to cue that the GREEN light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On the RPS MG Set Electrical Protection Assemblies EPA A1 and EPA A2 Critical N (SEQ-) [EPA B1 and EPA B2], verify the following:

The circuit breakers are in the OFF position.

Standard: EPA A1 and A2 breakers are verified OFF (position would be down).

Evaluator Cue: Instructor to cue the student that the breakers are OFF (down).

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-2.docx Page 6 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] MAINTENANCE/TEST Critical N (SEQ-) keylock switches EPA A1 S1 and EPA A2 S1 [EPA B1 S1 and EPA B2 S1] are in the NORMAL position.

Standard: Keylock switch verified in the NORMAL position.

Evaluator Note: Keylock switch should be in NORMAL, keys removed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify the EPA A1 and EPA A2 [EPA B1 and EPA B2] TRIP/RESET keylock Critical N (SEQ-) switches EPA A1 S2 and EPA A2 S2 [EPA B1 S2 and EPA B2 S2] are in the OPER position.

Standard: Keylock switch verified in the OPER position.

Evaluator Note: Keylock switch should be in OPER Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On Panel 1G51, press and momentarily hold the MG set A MOTOR ON push-Critical Y (SEQ-) button.

Standard: At Panel 1G51, the MOTOR ON push-button is SIMULATED pressed and momentarily held.

Evaluator Cue: Instructor cue that the MG set is observed to start and is coming up to speed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-2.docx Page 7 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: Verify the following indications:

Critical N (SEQ-) 1) RED (MOTOR ON) light turns ON.

2) GREEN (MOTOR OFF) light turns OFF.
3) MG set accelerates to set speed.
4) 120 VAC is indicated on the RPS MG SET A.

OUTPUT VOLTAGE meter EI-1G051.

Standard: The following indications are verified:

1) RED light is ON.
2) GREEN light is OFF
3) MG set accelerates to set speed.
4) 120 VAC is indicated on EI-1G051.

Evaluator Note: There are no amps until output breaker is closed.

Evaluator Cue: Cue examinee on proper indications.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On EPA A1 observe the POWER IN light is ON Critical N (SEQ-)

Standard: POWER IN light is observed to be ON.

Evaluator Cue: Cue that the light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-2.docx Page 8 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: On EPA A1 observe the following:

Critical N (SEQ-) 1) OVER-VOLTAGE light OFF.

2) UNDER-VOLTAGE light OFF.
3) UNDER FREQUENCY light OFF.
4) POWER OUT light OFF.

Standard: Light verified to be OFF.

Evaluator Note: UNDER FREQUENCY light is ON, the others are off Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If the OVER-VOLTAGE, UNDER-VOLTAGE, and/or UNDER-FREQUENCY trip Critical Y (SEQ-) status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A1-S2 [EPA-B1-S2] in the RESET position and verify the light(s) turn(s)

OFF; then place the switch back to the OPER position.

Standard: Momentarily places the TRIP/RESET keylock switch EPA-A1-S2 in the RESET position and verifies the light(s) turn(s) OFF; then place the switch back to the OPER position.

Evaluator Note: UNDER FREQUENCY light is OFF Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Close the EPA-A1 circuit breaker and observe that the POWER OUT light turns Critical Y (SEQ-) ON.

Standard: EPA-A1 is turned ON (breaker handle UP) and power out light turns ON.

Evaluator Cue: Cue that the handle is up (breaker ON) and the POWER OUT light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-2.docx Page 9 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: On EPA-A2 verify that the POWER IN light is ON.

Critical N (SEQ-)

Standard: EPA -A2 POWER IN light verified ON.

Evaluator Cue: Cue examine that the light is on, if needed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On EPA-A2 , the following lights are verified OFF:

Critical N (SEQ-) 1) OVER-VOLTAGE

2) UNDER-VOLTAGE
3) UNDER-FREQUENCY
4) POWER OUT Standard: Lights are verified OFF.

Evaluator Note: UNDER FREQUENCY light is ON, the others are off add step Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If the OVER-VOLTAGE, UNDER-VOLTAGE, and/or UNDER-FREQUENCY trip Critical N (SEQ-) status light(s) is/are ON, momentarily place the TRIP/RESET keylock switch EPA-A2-S2 [EPA-B2-S2] in the RESET position and verify the light(s) turn(s)

OFF; then place the switch back to the OPER position.

Standard: Momentarily places the TRIP/RESET keylock switch EPA-A2-S2 in the RESET position and verifies the light(s) turn(s) OFF; then places the switch back to the OPER position.

Evaluator Note: UNDER FREQUENCY light is OFF Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-2.docx Page 10 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Performance Step: Close the EPA-A2 circuit breaker and observe that the POWER OUT lights Critical Y (SEQ-) turns ON.

Standard: The EPA A2 circuit breaker is turned on (handle UP) and POWER OUT light is verified ON.

Evaluator Cue: Cue that EPA-A2 breaker is ON (handle UP) and POWER OUT light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The next step of the OI is performed in the Control Room. It is to close a breaker on 1C-15. When the Student states that he will call the Control Room, State that the Control Room will finish the rest of this section and that the JPM is completed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM P-2.docx Page 11 of 13

QF-1030-11 Rev. 7 NRC 2011 JPM P-2, Install EOP Defeat 4 with a Group 7 Isolation, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM P-2.docx Page 12 of 13

DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2011 NRC JPM P-3 NRC 2011 JPM P-3.docx

QF-1030-11 Rev. 7 JOB PERFORMANCE MEASURE (JPM)

JPM TITLE: MAXIMIZE CRD INJECTION IAW AIP 407 JPM NUMBER: NRC 2011 JPM P-3 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

K/A NUMBERS: 201001 2.1.23 K/A VALUE: 4.3/4.4 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY: RO SRO STA NSPEO SRO CERT APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by:

Instructor Date Validated by:

Validation Instructor Date Reviewed by:

Plant Reviewer Date Approved by:

Training Supervisor Date Commitments: {C001} ACE 001729, Review recommendation 4 of OE 001501.

{C002} CA046394, Improvements needed for Operations Simulator JPMs.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File NRC 2011 JPM P-3.docx Page 1 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and typed (Critical / Sequence

/ Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps clearly identified by procedural guidance? If licensing, EP or other groups were needed to determine correct actions, then the answer should be NO. {C001}
16. If the JPM is to be administered to an ILT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge. {C001}

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

RE-VALIDATION SIGNATURE JPMs must be re-validated prior to use. Verify the above Review Statements are YES or N/A. When it is determined that the JPM is still valid and can be performed as written, sign and date the form below.

Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date Re-Validation Personnel Date NRC 2011 JPM P-3.docx Page 2 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 SIMULATOR SET UP: (Modify table as necessary) (Only required for simulator JPMs)

Simulator Setup Instructions: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: AIP 407 General

References:

AIP 407 Task Standards: CRD suction Filters Swapped CRD Flow Controllers Swapped Task completion communicated to the Control Room CRD flow maximized NRC 2011 JPM P-3.docx Page 3 of 14

QF-1030-11 Rev. 7 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-3.docx Page 4 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

  • RPV level is lowering following an event. CRD System flow must be maximized as a means of injecting water into the RPV because normal injection systems are inadequate or unavailable.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to swap CRD Suction Filters and Flow Controllers IAW AIP 407 NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

NRC 2011 JPM P-3.docx Page 5 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: (Begins at AIP 407 Step 6)

Critical Y (SEQ-)

OPEN V-17-93, CRD Pump Suction Filters 1F-15A/B BYPASS.

Standard: Opens V-17-93, CRD Pump Suction Filters 1F-15A/B BYPASS Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the second CRD Suction Filter 1F-15B in service as follows:

Critical N (SEQ-)

Standard: Places the second CRD Suction Filter 1F-15B in service as follows:

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-3.docx Page 6 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: In the CRD pump room, verify isolation Valve V-17-108 is OPEN for the standby Critical Y (SEQ-) CRD Pump Suction Filter 1F-15B Standard: Verifies isolation Valve V-17-108 is OPEN for the standby CRD Pump Suction Filter 1F-15B.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

IF CRD Pump 1P-209A[B] becomes air bound THEN immediately STOP the pump to prevent (indicated by motor current dropping to damage and vent CRD suction piping, approximately 9 amps). suction filters, and pump casing.

Performance Step: Slowly OPEN Outlet Isolation Valve V-17-109 for the standby CRD Pump Suction Critical Y (SEQ-) Filter 1F-15B.

Standard: Opens Outlet Isolation Valve V-17-109 for the standby CRD Pump Suction Filter 1F-15B.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the second CRD Discharge Filter 1F-201B in service as follows:

Critical N (SEQ-)

Standard: Places the second CRD Discharge Filter 1F-201B in service as follows:

Performance: SATISFACTORY UNSATISFACTORY Comments:

CAUTION: Since the CRD Pump discharge Filters are normally pressurized to 1500 psig, valve operations should be performed carefully/slowly.

NRC 2011 JPM P-3.docx Page 7 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: At the CRD discharge filters on RB 1st floor South side, verify Isolation Valve V Critical Y (SEQ-) 14 is OPEN for the standby CRD Pump Discharge Filter 1F-201B.

Standard: Verifies Isolation Valve V-17-14 is OPEN for the standby CRD Pump Discharge Filter 1F-201B.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Coordinate with Control Room to ensure CRD pump amps are adequate and Critical N (SEQ-) slowly OPEN Outlet Isolation Valve V-17-22.

Standard: Coordinates with Control Room to ensure CRD pump amps are adequate and slowly OPEN Outlet Isolation Valve V-17-22.

Evaluator Cue: Acting as Control Room Operator coordinates with examinee to ensure CRD pump amps are adequate.

This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the second Flow control Valve CV-1822 in service as follows:

Critical N (SEQ-)

Standard: Places the second Flow Control Valve CV-1822 in service as follows.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-3.docx Page 8 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: At 1C05, verify FC-1814 CRD SYSTEM FLOW CONTROL in MANUAL.

Critical N (SEQ-)

Standard: Verifies FC-1814 CRD SYSTEM FLOW CONTROL in MANUAL.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NOTE: Steps below are performed at the CRD Flow Control Station.

Performance Step: Verify the standby Flow Control Valve V-17-29 Outlet Isolation for CV-1822 is Critical Y (SEQ-) closed.

Standard: Verifies the standby Flow Control Valve V-17-29 Outlet Isolation for CV-1822 is closed.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify inlet isolation V-17-27 for standby Flow Control Valve CV-1822 is open..

Critical Y (SEQ-)

Standard: Verifies inlet isolation V-17-27 for standby Flow Control Valve CV-1822 is open.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-3.docx Page 9 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: Verify local AUTO/MAN transfer switch HC-1843B for the standby CV-1822 Critical Y (SEQ-) selected to MAN.

Standard: Verifies local AUTO/MAN transfer switch HC-1843B for the standby CV-1822 selected to MAN.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Raise and lower the air signal to CV-1822 with the manual control knob, and verify Critical Y (SEQ-) that the valve strokes normally.

Standard: Raises and lower the air signal to CV-1822 with the manual control knob, and verifies that the valve strokes normally.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Match manual and automatic air signals for CV-1822.

Critical Y (SEQ-)

Standard: Matches manual and automatic air signals for CV-1822.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-3.docx Page 10 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: Coordinate with Control Room to ensure CRD pump amps are adequate for Critical Y (SEQ-) placing the standby Control Valve CV-1822 in service.

Standard: Coordinates with Control Room to ensure CRD pump amps are adequate for placing the standby Control Valve CV-1822 in service.

Evaluator Cue: Acting as Control Room Operator coordinates ensure CRD pump amps are adequate for placing the standby Control Valve CV-1822 in service.

This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Slowly throttle open V-17-29 Outlet Isolation for CV-1822 to obtain CRD System Critical Y (SEQ-) flow as desired on FI-1815.

Standard: Throttles open V-17-29 Outlet Isolation for CV-1822 to obtain CRD System flow as desired on FI-1815.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify that the manual and automatic for air signals on HIC-1834B for CV-1822 are Critical Y (SEQ-) balanced.

Standard: Verifies the manual and automatic for air signals on HIC-1834B for CV-1822 are balanced.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

NRC 2011 JPM P-3.docx Page 11 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Performance Step: Place the AUTO/MANUAL transfer switch HIC-1834B for CV-1822 in the AUTO Critical Y (SEQ-) position.

Standard: Places the AUTO/MANUAL transfer switch HIC-1834B for CV-1822 in the AUTO position.

Evaluator Cue: This action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator. {C002}

Stop Time:

NRC 2011 JPM P-3.docx Page 12 of 14

QF-1030-11 Rev. 7 NRC 2011 JPM P-3, Maximize CRD Injection IAW AIP 407, Rev. 0 Examinee: Evaluator:

RO SRO STA NSPEO SRO CERT Date:

ILT RO ILT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

NRC 2011 JPM P-3.docx Page 13 of 14