ML12173A481: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/29/2012
| issue date = 07/29/2012
| title = G20120149/EDATS: OEDO-2012-0127 - Response to Thomas Saporito Ltr. & 2.206 Petition & Email 2.206 - Palisades Nuclear Power Plant
| title = G20120149/EDATS: OEDO-2012-0127 - Response to Thomas Saporito Ltr. & 2.206 Petition & Email 2.206 - Palisades Nuclear Power Plant
| author name = Howe A G
| author name = Howe A
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Saporito T
| addressee name = Saporito T
Line 9: Line 9:
| docket = 05000255
| docket = 05000255
| license number = DPR-020
| license number = DPR-020
| contact person = Chawla M L
| contact person = Chawla M
| case reference number = TAC ME8112, G20120149, OEDO-2012-0127
| case reference number = TAC ME8112, G20120149, OEDO-2012-0127
| package number = ML12181A245
| package number = ML12181A245
Line 15: Line 15:
| page count = 12
| page count = 12
| project = TAC:ME8112
| project = TAC:ME8112
| stage =  
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 29, 2012 Mr. Thomas Saporito Saprodani Associates 177 US Hwy 1N, Unit 212 Tequesta, Florida 33469 Dear Mr. Saporito: In your letter to the Executive Director for Operations (EDO) of the Nuclear Regulatory Commission (NRC), dated March 1,2012, pursuant to Title 10 of the Code ofFederal Regulations (10 CFR) Section 2.206 of the NRC's regulations, you made the following request for enforcement related action: "Petitioner respectfully requests that the NRC: (1) take escalated enforcement action against the above-captioned licensee(s) and suspend, or revoke the NRC license(s) granted to the licensee for operation of the licensees' Palisades Nuclear Plant in the USA; (2) that the NRC issue a notice of violation with a proposed civil penalty against the licensee in the total amount of $1,000,000.00 (One-Million) dollars; and (3) that the NRC issue a Confirmatory Order requiring the licensee (to take certain and specific actions) and to bring the Palisades Nuclear Plant to a "cold-shutdown" mode of operation until such time as: The licensee completes an lIindependent" Safety Culture Assessment (SCA) to more fully understand and correct the "root-cause" of multiple violations of NRC safety regulations and requirements at the Palisades Nuclear Plant2; and The licensee completes a comprehensive training program of all station maintenance personnel (including supervision) to ensure the all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and The licensee completes a comprehensive training program of all station operations personnel (including supervision) to ensure that all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and The licensee completes an lIindependent" safety-assessment thorough [through] a 3rd party contractor to review all Palisades Nuclear Plant operation and maintenance procedures to ascertain whether the procedures require IIrisk assessment" by licensed operations personnel prior to execution; and The licensee completes IIdestructive" testing and analysis to determine: (1) the extent of embrittlement of the Palisades Nuclear Plant reactor vessel; and (2) whether the nuclear reactor vessel remains in full compliance with NRC safety regulations and requirements under 10 C.F.R. §50; and under other NRC authority." 2 See, NRC February 14. 2012 -Final Significance Determination of Yellow and White Findings with Assessment Follow up and Notice of Violation NRC Inspection Report Nos. 05000255/2011019 and 05000255/2011020 Palisades Nuclear Plant."
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 2012 Mr. Thomas Saporito Saprodani Associates 177 US Hwy 1N, Unit 212 Tequesta, Florida 33469
T. Saporito As the basis for this request, you referenced the NRC Inspection Report 05000255/2011019 and 05000255/2011020 for Palisades Nuclear Plant (PNP). You various plant events such as direct current (DC) bus event which occurred on September 2011, and the failure of Service Water pump couplings which occurred in 2007. You that the NRC's Notice of Violation issued on February 14, 2012, does not adequately serve protect public health and safety in these circumstances where, according to your petition, exists a pervasive and problematic Safety Conscience Work Environment (SCWE) at the Your petition further states that during a recent NRC hosted public meeting, the NRC andlor acknowledged that the reactor vessel at the PNP was one of the most brittle reactor vessels in the On March 12, 2012, the petition manager contacted you via e-mail to describe the process under Section 2.206 of Title 10 of the Code of Federal Regulations and also confirmation for processing your request under 2.206 process. You were also provided opportunity to address the Petition Review Board On March 15, 2012, you provided the petition manager an acknowledgement via e-mail also requested the teleconference details to enable you to address the On March 16, 2012, the PRB met internally to discuss the request for immediate action. PRB denied the petition request for immediate action on the basis that there was no safety concern to the plant, or to the health and safety of the public. You did not provide additional information beyond reference to these events which have been the subject previous NRC inspection activities for which a resolution has been achieved. In general all requested actions in the petition do not have sufficient basis for the NRC to take the enforcement. Therefore, the request to require the escalated enforcement action to PNP and the requested civil penalty were On March 20, 2012, the petition manager contacted you via e-mail to inform you about the decision on your immediate action request. The petition manager also confirmed the date of teleconference to address the PRB by phone and provided the necessary details. On April 2012, you addressed the PRB regarding the Palisades issues listed in your petition. Prior to teleconference, you provided five additional exhibits (Agencywide Documents Access Management System (ADAMS) Accession No. ML 120930709) for consideration supplemental information to the The transcript for this teleconference is publicly available (ADAMS Accession ML 120970603). During the teleconference, you provided your concerns with regard to Reactor Oversight Process (ROP) process and also requested additional actions which described in the table in Enclosure 1. The PRB reviewed your petition, including the and supplements, and found that each of the events described in the petition was identified in various NRC inspection reports for which a resolution had already been This list is provided in Enclosure On May 3, 2012, the PRB met internally and recommended rejecting the petition. The to reject the petition was based on the following T. Saporito -3 The petitioner does not provide any additional information beyond reference to events which have been the subject of the previous NRC inspection activities (see Enclosure 2) for which a resolution has been achieved. In addition, the petitioner does not provide any additional basis for assessing a violation and civil penalty. Additionally, the issue of embrittlement of the PNP reactor vessel has also been reviewed by the NRC staff. On December 7, 2011, the NRC issued an evaluation (ADAMS Accession No. ML 112870050) concluding that the pressurized thermal shock (PTS) screening criteria will not be reached until April 2017. The licensee has options available to address the PTS issue beyond April 2017. Thus, the NRC considers these issues resolved; the petitioner has not provided any additional basis to support his requested actions. In general all the requested actions in the petition do not have sufficient basis for the NRC to take the escalated enforcement because the NRC is already aware of, and has resolved, the issues identified. Therefore, your request to take escalated enforcement action to shutdown PNP and the requested civil penalty is denied. On May 17, 2012, the petition manager informed you via e-mail regarding the initial recommendation of the PRB to reject the petition, and also offered you a second opportunity to address the PRB. On May 17, 2012, you requested written explanation describing in "great detail" about the exact language and the specific reasons for the PRB's initial recommendation. You also requested to address the PRB "in person", with attendance by the full NRC Commission at this meeting. On May 24, 2012, the petition manager provided you the summary of the basis for rejection of the petition and also provided you with the possible date for the second opportunity to address the PRB in person at the NRC headquarters. On May 25, 2012, you provided your availability for a meeting on July 19,2012, which was later confirmed by the petition manager. On June 2, 2012, however, you provided us with your decision to decline a second meeting with the PRB on July 19, 2012. On June 6, 2012, the petition manager acknowledged your withdrawal of this request. The PRB's final determination is to reject your petition for review under the 10 CFR 2.206 process because it does not meet the criteria for review. The table in Enclosure 1 provides the details for rejecting this petition. There are some issues that are outside the 10 CFR 2.206 process, and other issues identified in your petition that have already been the subject of NRC review, for which resolution has been achieved as stated in NRC MD 8.11, Review Process for 10 CFR 2.206 petitions.
 
T. Saporito -Thank you for bringing these issues to the attention of the NRC. Sincerely, Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via Listserv Enclosure 1: Summary of Issues and PRB Disposition Enclosure 2: List of Inspection Reports Summary of Issues and Petition Review Board Disposition Specific Issue Reference PRB 1. Escalated Petition The PRB rejected this request, since all the issues raised in enforcement action Page 3/8 support of the requested action have been the subject against NRC staff review and evaluation. Therefore it meets Nuclear Plant criteria for rejection as discussed in Management to suspend (MD) 8.11. ! revoke the NRC , license granted to the licensee operation of PNP 2. NRC to issue a Petition The PRB rejected this request, since all the issues raised in notice of violation Page 3/8 support of the requested action have been the subject with a proposed NRC staff review and evaluation. Therefore it meets the
==Dear Mr. Saporito:==
* penalty against the . Transcript-criteria for rejection as discussed in MD 8 licensee in the 4/2/12 Page Million amount of 3. NRC to issue a Petition The PRB rejected this request, since all the issues raised in Confirmatory Order Page 3/8 support of the requested action have been the subject requiring NRC staff review and evaluation. Therefore it meets licensee to criteria for rejection as discussed in MD specific actions bring PNP down to mode of until a number requested specified in take The PRB rejected this request, since all the issues raised in complete an 4. The licensee to Petition support of the requested action have been the subject Independent Page 3/8 NRC staff review and evaluation. Therefore it meets Culture criteria for rejection as discussed in MD 8.11. On January 11, 2012, at the regulatory conference for the DC breaker event the licensee stated that a third party safety culture assessment was initiated. A 95002 Supplemental inspection will consider any safety culture contribution to this event. The PRB rejected this request, since all the issues raised in complete a 5. The licensee to Petition support of the requested action have been the subject Page 3/8 NRC staff review and evaluation (see enclosure training program
 
* Therefore it meets the criteria for rejection as discussed all station MD Enclosure 1 
In your letter to the Executive Director for Operations (EDO) of the Nuclear Regulatory Commission (NRC), dated March 1,2012, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 of the NRC's regulations, you made the following request for enforcement related action:
-Specific Issue
"Petitioner respectfully requests that the NRC: (1) take escalated enforcement action against the above-captioned licensee(s) and suspend, or revoke the NRC license(s) granted to the licensee for operation of the licensees' Palisades Nuclear Plant in the USA; (2) that the NRC issue a notice of violation with a proposed civil penalty against the licensee in the total amount of $1,000,000.00 (One-Million) dollars; and (3) that the NRC issue a Confirmatory Order requiring the licensee (to take certain and specific actions) and to bring the Palisades Nuclear Plant to a "cold-shutdown" mode of operation until such time as:
* Reference I PRB personnel. 6. The licensee to Petition The PRB rejected this request, since all the issues raised in complete a Page 3/8
: 1. The licensee completes an lIindependent" Safety Culture Assessment (SCA) to more fully understand and correct the "root-cause" of multiple violations of NRC safety 2
* support of the requested action have been the subject NRC staff review and evaluation (see enclosure 2). training program of Therefore it meets the criteria for rejection as discussed in all station operations
regulations and requirements at the Palisades Nuclear Plant ; and
* I MD 8.11. personnel. 7. The licensee to Petition The PRB rejected this request, since all the issues raised in complete an Page 3/8 support of the requested action have been the subject independent
: 2. The licensee completes a comprehensive training program of all station maintenance personnel (including supervision) to ensure the all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and
* NRC staff review and evaluation (see enclosure Therefore it meets the criteria for rejection as discussed in MD 8.11. 8. The licensee to ! Petition The PRB rejected this request for not meeting the criterion complete Page 3/8 in IVID 8.11. The facts provided are not sufficient to support "destructive" testing the statement that the sustained embrittlement is not and analysis of
: 3. The licensee completes a comprehensive training program of all station operations personnel (including supervision) to ensure that all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and
* compliance with NRC regulations of 10 CFR, Part reactor 9. The petitioner is Petition The PRB rejected this request because it is not a request concerned that the Page 5/8 for enforcement action against the licensee. Therefore, it NRC's Notice of does not meet the first criteria for reviewing petitions under Violation issued on 10 CFR February 14th, does not serve to public health safety at Palisades
: 4. The licensee completes an lIindependent" safety-assessment thorough [through] a 3rd party contractor to review all Palisades Nuclear Plant operation and maintenance procedures to ascertain whether the procedures require IIrisk assessment" by licensed operations personnel prior to execution; and
* Plant. 10. The petitioner's The PRB rejected this request because it is not a request concerns were that Transcript 4/2/12 for enforcement action against the licensee. Therefore, it his teleconference does not meet the first criteria for reviewing petitions under with PRB was not Page 15 & 10 CFR noticed and NRC actions do 16 The PRB notes that you were advised via e-mail on April 2, protect public health 2012, that page 10 of MD 8.11, "Review Process for and CFR 2.206 Petitions," states: "If the petitioner chooses to address PRB by telephone, it is not considered a meeting and no public notice is necessary." 11. The petitioner's Transcript -I The PRB rejected this request because it is not a request concern is with 4/2/12 -* for enforcement action against the licensee. Therefore, it ..does not meet the first criteria for reviewing petitions under Reactor Oversight I Pages 17 & 10 CFR 2.206. However, the PRB referred this to the Process (ROP) 43 I which he believes to Office of the Ins ector General OIG.
: 5. The licensee completes IIdestructive" testing and analysis to determine: (1) the extent of embrittlement of the Palisades Nuclear Plant reactor vessel; and (2) whether the nuclear reactor vessel remains in full compliance with NRC safety regulations and requirements under 10 C.F.R. §50; and under other NRC authority."
-Specific Issue Reference PRB Disposition Raised be a reactive process, rather than a proactive process and that it is because of failure of NRC's regulatory framework for ROP that resulted at least in part to the serious nuclear safety violations at the Palisades Nuclear Plant. 12. The petitioner Transcript The PRB rejected this request because it is not a request would like the PRB 4/2/12 for enforcement action against the licensee. Therefore, it and IG to make a Page 21 does not meet the first criteria for reviewing petitions under special note of Mr. 10 CFR 2.206. However, the PRB referred this to the Mcintyre's Office of the Inspector General. comments referenced in the transcript. 13. The petitioner Transcript The PRB rejected this request because it is not a request made the statement 4/2/12 for enforcement action against the licensee. Therefore, it that regulators and Page 26 does not meet the first criteria for reviewing petitions under reactor operators 10 CFR 2.206. However, the PRB referred this to the have loosened or Office of the Inspector General. bent the rules. The petitioner further states, 'They're just trying to get more and more out of these plants." 14. The petitioner Transcript The PRB rejected this request because the Reactor requests that the 4/2/12 Oversight Process provides for licensee performance NRC must review Page 40 assessment on a continuing basis through mid-cycle and the entirety of the end-of-cycle assessments and an Action Matrix of licensee's history of responses from the NRC. An assessment of safety culture violations over the is provided through crosscutting issues defined in Chapter years, significant 0310 of the NRC Inspection Manual. In addition, past and serious performance is a consideration in determining traditional violations of NRC escalated enforcement actions. regulations and requirements during
2 See, NRC February 14. 2012 - Final Significance Determination of Yellow and White Findings with Assessment Follow up and Notice of Violation NRC Inspection Report Nos. 05000255/2011019 and 05000255/2011020 Palisades Nuclear Plant."
-4 Specific Issue Reference PRB licensed operations . at the Palisades
 
* Nuclear Plant. 15. The petitioner is The PRB rejected this request because it is not a request not satisfied with the Transcript 4/2/12 for enforcement action against the licensee. Therefore, it enforcement of Page 41 does not meet the first criteria for reviewing petitions under fines. He feels that 10 CFR in comparison other Palisades was given the i monetary fines. 16. The petitioner is Transcript The PRB rejected this request because the petitioner does requesting profiling 4/2/12 not provide sufficient facts that constitute bases for of each Page 42 action as required by the criteria under 10 CFR 17. The petitioner is The PRB rejected this request because the also stressing Transcript request is not a process established by regulation NRC should 4/2/12 Page 47 would lead to an enforcement action against the licensee. outside of the box in Therefore, it does not meet the criteria for reviewing light of petitions under 10 CFR Fukushima List of Inspection Reports In the teleconference with the PRB the petitioner cited various plant events (see transcript April 2, 2012 (Agencywide Documents Access and Management System (ADAMS) No. ML Following is the list of inspection reports associated with the On Page 30 of the transcript, reference is made to the order issued to Entergy Operations, Inc. for the operator leaving the controls. The document has inspection number January 25, EA-11-214 (Accession No. ML SUBJECT: CONFIRMATORY ORDER (EFFECTIVE (NRC INSPECTION REPORT NO. 05000255/2011015 AND NRC OFFICE INVESTIGATIONS REPORT NO. PALISADES NUCLEAR On pages 30-31 of the transcript, reference is made to the auxiliary feedwater pump finding documented in inspection report January EA-11-227 (Accession No. ML SUBJECT: FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING ASSESSMENT FOLLOWUP AND NOTICE OF NRC INSPECTION REPORT NO. PALISADES NUCLEAR On pages 31 of the transcript, reference is made to the spent fuel pool WHITE issued in inspection report January 20, EA-09-269 (Accession No. ML SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A WHITE NOTIFICATION OF FOLLOW-UP ASSESSMENT; AND NOTICE VIOLATION; NRC INSPECTION REPORT NO. PALISADES NUCLEAR On pages 32 of the transcript, reference is made to the radiological exposure WHITE finding inspection report numbered January 30, EA-08-322 (Accession No. SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. PALISADES NUCLEAR Enclosure 2
T. Saporito                                 -2 As the basis for this request, you referenced the NRC Inspection Report Nos.
-2 On pages 33-34 of the transcript, reference is made to the DC breaker YELLOW finding inspection report numbered February 14, EA-11-243 (Accession No. ML SUBJECT: FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE WITH ASSESSMENT FOLLOWUP AND NOTICE OF NRC INSPECTION REPORT NOS. 05000255/2011019 AND PALISADES NUCLEAR On pages 35-36 of the transcript, reference is made to the service water (SW) pump coupling WHITE finding in inspection report numbered 05000255/2011019 issued February 14, EA-11-243 (Accession No. ML SUBJECT: FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE WITH ASSESSMENT FOLLOWUP AND NOTICE OF NRC INSPECTION REPORT NOS. 05000255/2011019 AND PALISADES NUCLEAR On pages 35-38 of the transcript, reference is made to the significance determination conclusions for both the SW pump P-7C coupling WHITE finding and the DC breaker finding in inspection reports numbered 050002011019 and 2011020 On pages 39 of the transcript, reference is made to the DC breaker YELLOW finding in inspection report numbered 050002011020 timeline or the special inspection team report of event in inspection report November 29, EA-11-243 (Accession No. SUB..IECT: PALISADES NUCLEAR PLANT -NRC SPECIAL INSPECTION TEAM REPORT 05000255/2011014 PRELIMINARY YELLOW October SUBJECT: PALISADES NUCLEAR PLANT -NRC SPECIAL INSPECTION TEAM REPORT 05000255/2011012 (Accession No. ML And, the preliminary SW coupling finding was issued in the following November 29, EA-11-241 (Accession No. SUBJECT: PALISADES NUCLEAR PLANT, NRC INSPECTION REPORT PRELIMINARY WHITE T. Saporito Thank you for bringing these issues to the attention of the NRC. Sincerely, IRAI Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 CC: Distribution via Listserv Enclosure 1: Summary of Issues and PRB Disposition Enclosure 2: List of Inspection Reports DISTRIBUTION: G20120149/EDATS: OEDO-2012-0127 PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 Resource RidsNrrPMPalisades Resource RidsNrrDorl Resource RidsNrrOd Resource RidsNrrLABTully Resource RidsNrrMailCenter Resource RidsOiMailCenter Resource RidsEdoMailCenter RidsOeMailCenter Resource RidsRgn3MailCenter Resource RidsOgcRp Resource RidsOcaMailCenter Resource JJandovitz, R3 RidsOpaMaii Resource MBanic, NRR MLemoncelli, OGC AZoulis, NRR DAiley, NRR KRoche, NRR SSheng, NRR DMuller, NRR VGoel. NRR MKeefe, NRR RidsNrrAcrsAcnwMailCTR RLerch, R3 JGiessner, R3 Pack ML12181A2 5 ncommg: ML12065A 1430 Response: ML12173A481 vaemaIIage: 4
05000255/2011019 and 05000255/2011020 for Palisades Nuclear Plant (PNP). You cite various plant events such as direct current (DC) bus event which occurred on September 25, 2011, and the failure of Service Water pump couplings which occurred in 2007. You contend that the NRC's Notice of Violation issued on February 14, 2012, does not adequately serve to protect public health and safety in these circumstances where, according to your petition, there exists a pervasive and problematic Safety Conscience Work Environment (SCWE) at the PNP.
* i OFFICE LPL3-1/PM LPL3-1/LA DElEEEB/BC DRAlAPLNBC DE/EVIB/BC DE/EPNB/BC(A) DRAlAHPB/BC NAME MChawla BTully JAndersen SWeerakkody' SRosenberg ICFairbanks for DAiley UShoop DATE 6/25/12 6/25/12 6/25/12 6/27112 6/28/12 6/28/12 OFFICE OIRSIIOLB/BC OIRSIIPAB/BC OPR/PM RGNIII OGC *NLv l/BC(A) NAME JMcHaie IDAlIsopp RFranovich IRFrahm for MBanic RLerch* MLemoncelii IFrankl AHowe DATE 6/29/12 6/28/12 6/29/12 6/25/12 7/11/12 6/29/12 7/26/12 OFFICIAL RECORD COPY
Your petition further states that during a recent NRC hosted public meeting, the NRC admitted andlor acknowledged that the reactor vessel at the PNP was one of the most brittle nuclear reactor vessels in the USA.
}}
On March 12, 2012, the petition manager contacted you via e-mail to describe the petition process under Section 2.206 of Title 10 of the Code of Federal Regulations and also requested confirmation for processing your request under 2.206 process. You were also provided the opportunity to address the Petition Review Board (PRB).
On March 15, 2012, you provided the petition manager an acknowledgement via e-mail and also requested the teleconference details to enable you to address the PRB.
On March 16, 2012, the PRB met internally to discuss the request for immediate action. The PRB denied the petition request for immediate action on the basis that there was no immediate safety concern to the plant, or to the health and safety of the public. You did not provide any additional information beyond reference to these events which have been the subject of previous NRC inspection activities for which a resolution has been achieved. In general all the requested actions in the petition do not have sufficient basis for the NRC to take the escalated enforcement. Therefore, the request to require the escalated enforcement action to shutdown PNP and the requested civil penalty were denied.
On March 20, 2012, the petition manager contacted you via e-mail to inform you about the PRB decision on your immediate action request. The petition manager also confirmed the date of the teleconference to address the PRB by phone and provided the necessary details. On April 2, 2012, you addressed the PRB regarding the Palisades issues listed in your petition. Prior to the teleconference, you provided five additional exhibits (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120930709) for consideration as supplemental information to the petition.
The transcript for this teleconference is publicly available (ADAMS Accession No. ML120970603). During the teleconference, you provided your concerns with regard to the Reactor Oversight Process (ROP) process and also requested additional actions which are described in the table in Enclosure 1. The PRB reviewed your petition, including the transcript and supplements, and found that each of the events described in the petition was previously identified in various NRC inspection reports for which a resolution had already been achieved.
This list is provided in Enclosure 2.
On May 3, 2012, the PRB met internally and recommended rejecting the petition. The decision to reject the petition was based on the following discussion:
 
T. Saporito                                   -3 The petitioner does not provide any additional information beyond reference to events which have been the subject of the previous NRC inspection activities (see Enclosure 2) for which a resolution has been achieved. In addition, the petitioner does not provide any additional basis for assessing a violation and civil penalty.
Additionally, the issue of embrittlement of the PNP reactor vessel has also been reviewed by the NRC staff. On December 7, 2011, the NRC issued an evaluation (ADAMS Accession No. ML112870050) concluding that the pressurized thermal shock (PTS) screening criteria will not be reached until April 2017. The licensee has options available to address the PTS issue beyond April 2017. Thus, the NRC considers these issues resolved; the petitioner has not provided any additional basis to support his requested actions.
In general all the requested actions in the petition do not have sufficient basis for the NRC to take the escalated enforcement because the NRC is already aware of, and has resolved, the issues identified. Therefore, your request to take escalated enforcement action to shutdown PNP and the requested civil penalty is denied.
On May 17, 2012, the petition manager informed you via e-mail regarding the initial recommendation of the PRB to reject the petition, and also offered you a second opportunity to address the PRB. On May 17, 2012, you requested written explanation describing in "great detail" about the exact language and the specific reasons for the PRB's initial recommendation.
You also requested to address the PRB "in person", with attendance by the full NRC Commission at this meeting.
On May 24, 2012, the petition manager provided you the summary of the basis for rejection of the petition and also provided you with the possible date for the second opportunity to address the PRB in person at the NRC headquarters. On May 25, 2012, you provided your availability for a meeting on July 19,2012, which was later confirmed by the petition manager. On June 2, 2012, however, you provided us with your decision to decline a second meeting with the PRB on July 19, 2012. On June 6, 2012, the petition manager acknowledged your withdrawal of this request.
The PRB's final determination is to reject your petition for review under the 10 CFR 2.206 process because it does not meet the criteria for review. The table in Enclosure 1 provides the details for rejecting this petition. There are some issues that are outside the 10 CFR 2.206 process, and other issues identified in your petition that have already been the subject of NRC review, for which resolution has been achieved as stated in NRC MD 8.11, Review Process for 10 CFR 2.206 petitions.
 
T. Saporito                               - 4 Thank you for bringing these issues to the attention of the NRC.
Sincerely, d&n~~
Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via Listserv : Summary of Issues and PRB Disposition : List of Inspection Reports
 
Summary of Issues and Petition Review Board Disposition Specific Issue       Reference     PRB Disposition Raised
: 1. Escalated         Petition     The PRB rejected this request, since all the issues raised in enforcement action   Page 3/8     support of the requested action have been the subject of against Palisades                  NRC staff review and evaluation. Therefore it meets the Nuclear Plant (PNP)                criteria for rejection as discussed in Management Directive to suspend or                      (MD) 8.11.
! revoke the NRC
, license granted to the licensee for operation of PNP in USA
: 2. NRC to issue a     Petition     The PRB rejected this request, since all the issues raised in notice of violation   Page 3/8     support of the requested action have been the subject of with a proposed civil              NRC staff review and evaluation. Therefore it meets the
* penalty against the . Transcript-   criteria for rejection as discussed in MD 8 11 licensee in the total 4/2/12 amount of One        Page 42 Million dollars
: 3. NRC to issue a     Petition     The PRB rejected this request, since all the issues raised in Confirmatory Order   Page 3/8     support of the requested action have been the subject of requiring the                      NRC staff review and evaluation. Therefore it meets the licensee to take                    criteria for rejection as discussed in MD 8.11.
specific actions and bring PNP down to a "cold-shutdown" mode of operation until a number of requested actions specified in the
  ~etition take place.
: 4. The licensee to    Petition      The PRB rejected this request, since all the issues raised in complete an           Page 3/8      support of the requested action have been the subject of Independent Safety                  NRC staff review and evaluation. Therefore it meets the Culture Assessment.                criteria for rejection as discussed in MD 8.11.
On January 11, 2012, at the regulatory conference for the DC breaker event the licensee stated that a third party safety culture assessment was initiated. A 95002 Supplemental inspection will consider any safety culture contribution to this event.
: 5. The licensee to    Petition      The PRB rejected this request, since all the issues raised in complete a           Page 3/8      support of the requested action have been the subject of comprehensive                      NRC staff review and evaluation (see enclosure 2).
training program of
* Therefore it meets the criteria for rejection as discussed in all station                         MD 8.11.
maintenance
                  ----~----------~------------------------------------------~
Enclosure 1
 
                                                  - 2 Specific Issue
* Reference    I PRB Disposition Raised personnel.
: 6. The licensee to      Petition      The PRB rejected this request, since all the issues raised in complete a              Page 3/8
* support of the requested action have been the subject of comprehensive                          NRC staff review and evaluation (see enclosure 2).
training program of                     Therefore it meets the criteria for rejection as discussed in all station operations
* I MD 8.11.
personnel.
: 7. The licensee to       Petition       The PRB rejected this request, since all the issues raised in complete an             Page 3/8       support of the requested action have been the subject of independent safety
* NRC staff review and evaluation (see enclosure 2).
assessment.                            Therefore it meets the criteria for rejection as discussed in MD 8.11.
: 8. The licensee to     ! Petition       The PRB rejected this request for not meeting the criterion complete                 Page 3/8       in IVID 8.11. The facts provided are not sufficient to support "destructive" testing                   the statement that the sustained embrittlement is not in and analysis of the
* compliance with NRC regulations of 10 CFR, Part 50.
reactor vessel.
: 9. The petitioner is     Petition       The PRB rejected this request because it is not a request concerned that the       Page 5/8       for enforcement action against the licensee. Therefore, it NRC's Notice of                         does not meet the first criteria for reviewing petitions under Violation issued on                     10 CFR 2.206.
February 14th, 2012, does not adequately serve to protect public health and safety at the Palisades Nuclear
* Plant.
: 10. The petitioner's     Transcript    The PRB rejected this request because it is not a request concerns were that       4/2/12       for enforcement action against the licensee. Therefore, it his teleconference       Page 15 &      does not meet the first criteria for reviewing petitions under with PRB was not         16            10 CFR 2.206.
noticed and also NRC actions do not                      The PRB notes that you were advised via e-mail on April 2, protect public health                   2012, that page 10 of MD 8.11, "Review Process for 10 and safety.                            CFR 2.206 Petitions," states: "If the petitioner chooses to address PRB by telephone, it is not considered a meeting and no public notice is necessary."
I 11. The petitioner's     Transcript - I The PRB rejected this request because it is not a request concern is with         4/2/12 -
* for enforcement action against the licensee. Therefore, it Reactor Oversight      I Pages 17 &    does not meet the first criteria for reviewing petitions under Process (ROP)            43            10 CFR 2.206. However, the PRB referred this to the I which he believes to                   Office of the Ins ector General OIG.
 
                                            - 3 Specific Issue         Reference   PRB Disposition Raised be a reactive process, rather than a proactive process and that it is because of failure of NRC's regulatory framework for ROP that resulted at least in part to the serious nuclear safety violations at the Palisades Nuclear Plant.
: 12. The petitioner     Transcript The PRB rejected this request because it is not a request would like the PRB     4/2/12     for enforcement action against the licensee. Therefore, it and IG to make a       Page 21     does not meet the first criteria for reviewing petitions under special note of Mr.                 10 CFR 2.206. However, the PRB referred this to the Mcintyre's                         Office of the Inspector General.
comments referenced in the transcript.
: 13. The petitioner     Transcript The PRB rejected this request because it is not a request made the statement     4/2/12     for enforcement action against the licensee. Therefore, it that regulators and   Page 26     does not meet the first criteria for reviewing petitions under reactor operators                   10 CFR 2.206. However, the PRB referred this to the have loosened or                   Office of the Inspector General.
bent the rules. The petitioner further states, 'They're just trying to get more and more out of these plants."
: 14. The petitioner   Transcript The PRB rejected this request because the Reactor requests that the     4/2/12     Oversight Process provides for licensee performance NRC must review       Page 40     assessment on a continuing basis through mid-cycle and the entirety of the                 end-of-cycle assessments and an Action Matrix of licensee's history of               responses from the NRC. An assessment of safety culture violations over the                 is provided through crosscutting issues defined in Chapter years, significant                 0310 of the NRC Inspection Manual. In addition, past and serious                         performance is a consideration in determining traditional violations of NRC                   escalated enforcement actions.
regulations and requirements during
 
                                                -4 Specific Issue           Reference   PRB Disposition Raised licensed operations
. at the Palisades
* Nuclear Plant.
: 15. The petitioner is   Transcript  The PRB rejected this request because it is not a request not satisfied with the   4/2/12     for enforcement action against the licensee. Therefore, it enforcement of           Page 41     does not meet the first criteria for reviewing petitions under fines. He feels that                 10 CFR 2.206.
in comparison to other sites, Palisades was not given the stiff        i monetary fines.
: 16. The petitioner is   Transcript The PRB rejected this request because the petitioner does requesting profiling     4/2/12     not provide sufficient facts that constitute bases for this of each licensee        Page 42     action as required by the criteria under 10 CFR 2.206.
employee.
: 17. The petitioner is   Transcript  The PRB rejected this request because the petitioner's also stressing that      4/2/12      request is not a process established by regulation that NRC should think        Page 47     would lead to an enforcement action against the licensee.
outside of the box in                 Therefore, it does not meet the criteria for reviewing the light of the                          petitions under 10 CFR 2.206.
Fukushima event.
 
List of Inspection Reports In the teleconference with the PRB the petitioner cited various plant events (see transcript dated April 2, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120930709).
Following is the list of inspection reports associated with the events:
On Page 30 of the transcript, reference is made to the order issued to Entergy Nuclear Operations, Inc. for the operator leaving the controls. The document has inspection report number 05000255/2011015:
January 25, 2012 EA-11-214 (Accession No. ML12026A383)
 
==SUBJECT:==
CONFIRMATORY ORDER (EFFECTIVE IMMEDIATELY)
(NRC INSPECTION REPORT NO. 05000255/2011015 AND NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2011-003)
PALISADES NUCLEAR PLANT On pages 30-31 of the transcript, reference is made to the auxiliary feedwater pump WHITE finding documented in inspection report 05000255/2011017:
January 3,2012 EA-11-227 (Accession No. ML120030406)
 
==SUBJECT:==
FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 05000255/2011017 PALISADES NUCLEAR PLANT On pages 31 ~32 of the transcript, reference is made to the spent fuel pool WHITE finding issued in inspection report 05000255/2010007:
January 20, 2010 EA-09-269 (Accession No. ML100200720)
 
==SUBJECT:==
FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING; NOTIFICATION OF FOLLOW-UP ASSESSMENT; AND NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000255/2010007; PALISADES NUCLEAR PLANT On pages 32 of the transcript, reference is made to the radiological exposure WHITE finding in inspection report numbered 05000255/2008011:
January 30, 2009 EA-08-322 (Accession No. ML090300334)
 
==SUBJECT:==
FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING AND NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000255/2008011; PALISADES NUCLEAR PLANT Enclosure 2
 
                                              -2 On pages 33-34 of the transcript, reference is made to the DC breaker YELLOW finding in inspection report numbered 05000255/2011020:
February 14, 2012 EA-11-241 EA-11-243 (Accession No. ML120450037)
 
==SUBJECT:==
FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE FINDINGS WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 05000255/2011019 AND 05000255/2011020 PALISADES NUCLEAR PLANT On pages 35-36 of the transcript, reference is made to the service water (SW) pump P-7C coupling WHITE finding in inspection report numbered 05000255/2011019 issued with 05000255/2011020:
February 14, 2012 EA-11-241 EA-11-243 (Accession No. ML120450037)
 
==SUBJECT:==
FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE FINDINGS WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 05000255/2011019 AND 05000255/2011020 PALISADES NUCLEAR PLANT On pages 35-38 of the transcript, reference is made to the significance determination process conclusions for both the SW pump P-7C coupling WHITE finding and the DC breaker Yellow finding in inspection reports numbered 050002011019 and 2011020 together.
On pages 39 of the transcript, reference is made to the DC breaker YELLOW finding in the inspection report numbered 050002011020 timeline or the special inspection team report of the event in inspection report 05000255/2011014:
November 29, 2011 EA-11-243 (Accession No. ML113330819)
SUB..IECT: PALISADES NUCLEAR PLANT - NRC SPECIAL INSPECTION TEAM (SIT)
REPORT 05000255/2011014 PRELIMINARY YELLOW FINDING October 4,2011
 
==SUBJECT:==
PALISADES NUCLEAR PLANT - NRC SPECIAL INSPECTION TEAM (SIT)
REPORT 05000255/2011012 (Accession No. ML112780190)
And, the preliminary SW coupling finding was issued in the following report November 29, 2011 EA-11-241 (Accession No. ML113330819)
 
==SUBJECT:==
PALISADES NUCLEAR PLANT, NRC INSPECTION REPORT 05000255/2011016; PRELIMINARY WHITE FINDING
 
T. Saporito                                     -4 Thank you for bringing these issues to the attention of the NRC.
Sincerely, IRAI Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 CC:   Distribution via Listserv Enclosure 1: Summary of Issues and PRB Disposition Enclosure 2: List of Inspection Reports DISTRIBUTION:           G20120149/EDATS: OEDO-2012-0127 PUBLIC           LPL3-1 R/F           RidsNrrDorlLpl3-1 Resource         RidsNrrPMPalisades Resource RidsNrrDorl Resource                   RidsNrrOd Resource                 RidsNrrLABTully Resource RidsNrrMailCenter Resource             RidsOiMailCenter Resource           RidsEdoMailCenter RidsOeMailCenter Resource             RidsRgn3MailCenter Resource         RidsOgcRp Resource RidsOcaMailCenter Resource             JJandovitz, R3                     RidsOpaMaii Resource MBanic, NRR                           MLemoncelli, OGC                   AZoulis, NRR DAiley, NRR                           KRoche, NRR                         SSheng, NRR DMuller, NRR                           VGoel. NRR                         MKeefe, NRR RidsNrrAcrsAcnwMailCTR                 RLerch, R3                         JGiessner, R3 Pack age: ML12181A245        ncommg: ML12065A1430                  Response: ML12173A481       *vaema i     II OFFICE LPL3-1/PM       LPL3-1/LA     DElEEEB/BC         DRAlAPLNBC     DE/EVIB/BC       DE/EPNB/BC(A)   DRAlAHPB/BC NAME   MChawla         BTully       JAndersen         SWeerakkody'   SRosenberg       DAiley          UShoop ICFairbanks for DATE   6/25/12         6/25/12       6/25/12           6/27112        6/28/12          6/28/12 OFFICE OIRSIIOLB/BC    OIRSIIPAB/BC  OPR/PM            RGNIII          OGC *NLv                l/BC(A)
NAME  JMcHaie          RFranovich    MBanic            RLerch*        MLemoncelii      IFrankl        AHowe IDAlIsopp       IRFrahm for DATE   6/29/12         6/28/12       6/29/12           6/25/12         7/11/12           6/29/12         7/26/12 OFFICIAL RECORD COPY}}

Latest revision as of 14:16, 6 February 2020

G20120149/EDATS: OEDO-2012-0127 - Response to Thomas Saporito Ltr. & 2.206 Petition & Email 2.206 - Palisades Nuclear Power Plant
ML12173A481
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/29/2012
From: Howe A
Division of Operating Reactor Licensing
To: Saporito T
Saprodani Associates
Chawla M
Shared Package
ML12181A245 List:
References
TAC ME8112, G20120149, OEDO-2012-0127
Download: ML12173A481 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 2012 Mr. Thomas Saporito Saprodani Associates 177 US Hwy 1N, Unit 212 Tequesta, Florida 33469

Dear Mr. Saporito:

In your letter to the Executive Director for Operations (EDO) of the Nuclear Regulatory Commission (NRC), dated March 1,2012, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 of the NRC's regulations, you made the following request for enforcement related action:

"Petitioner respectfully requests that the NRC: (1) take escalated enforcement action against the above-captioned licensee(s) and suspend, or revoke the NRC license(s) granted to the licensee for operation of the licensees' Palisades Nuclear Plant in the USA; (2) that the NRC issue a notice of violation with a proposed civil penalty against the licensee in the total amount of $1,000,000.00 (One-Million) dollars; and (3) that the NRC issue a Confirmatory Order requiring the licensee (to take certain and specific actions) and to bring the Palisades Nuclear Plant to a "cold-shutdown" mode of operation until such time as:

1. The licensee completes an lIindependent" Safety Culture Assessment (SCA) to more fully understand and correct the "root-cause" of multiple violations of NRC safety 2

regulations and requirements at the Palisades Nuclear Plant ; and

2. The licensee completes a comprehensive training program of all station maintenance personnel (including supervision) to ensure the all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and
3. The licensee completes a comprehensive training program of all station operations personnel (including supervision) to ensure that all licensed activities at the Palisades Nuclear Plant comply with the NRC safety regulations and requirements; and
4. The licensee completes an lIindependent" safety-assessment thorough [through] a 3rd party contractor to review all Palisades Nuclear Plant operation and maintenance procedures to ascertain whether the procedures require IIrisk assessment" by licensed operations personnel prior to execution; and
5. The licensee completes IIdestructive" testing and analysis to determine: (1) the extent of embrittlement of the Palisades Nuclear Plant reactor vessel; and (2) whether the nuclear reactor vessel remains in full compliance with NRC safety regulations and requirements under 10 C.F.R. §50; and under other NRC authority."

2 See, NRC February 14. 2012 - Final Significance Determination of Yellow and White Findings with Assessment Follow up and Notice of Violation NRC Inspection Report Nos. 05000255/2011019 and 05000255/2011020 Palisades Nuclear Plant."

T. Saporito -2 As the basis for this request, you referenced the NRC Inspection Report Nos.

05000255/2011019 and 05000255/2011020 for Palisades Nuclear Plant (PNP). You cite various plant events such as direct current (DC) bus event which occurred on September 25, 2011, and the failure of Service Water pump couplings which occurred in 2007. You contend that the NRC's Notice of Violation issued on February 14, 2012, does not adequately serve to protect public health and safety in these circumstances where, according to your petition, there exists a pervasive and problematic Safety Conscience Work Environment (SCWE) at the PNP.

Your petition further states that during a recent NRC hosted public meeting, the NRC admitted andlor acknowledged that the reactor vessel at the PNP was one of the most brittle nuclear reactor vessels in the USA.

On March 12, 2012, the petition manager contacted you via e-mail to describe the petition process under Section 2.206 of Title 10 of the Code of Federal Regulations and also requested confirmation for processing your request under 2.206 process. You were also provided the opportunity to address the Petition Review Board (PRB).

On March 15, 2012, you provided the petition manager an acknowledgement via e-mail and also requested the teleconference details to enable you to address the PRB.

On March 16, 2012, the PRB met internally to discuss the request for immediate action. The PRB denied the petition request for immediate action on the basis that there was no immediate safety concern to the plant, or to the health and safety of the public. You did not provide any additional information beyond reference to these events which have been the subject of previous NRC inspection activities for which a resolution has been achieved. In general all the requested actions in the petition do not have sufficient basis for the NRC to take the escalated enforcement. Therefore, the request to require the escalated enforcement action to shutdown PNP and the requested civil penalty were denied.

On March 20, 2012, the petition manager contacted you via e-mail to inform you about the PRB decision on your immediate action request. The petition manager also confirmed the date of the teleconference to address the PRB by phone and provided the necessary details. On April 2, 2012, you addressed the PRB regarding the Palisades issues listed in your petition. Prior to the teleconference, you provided five additional exhibits (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120930709) for consideration as supplemental information to the petition.

The transcript for this teleconference is publicly available (ADAMS Accession No. ML120970603). During the teleconference, you provided your concerns with regard to the Reactor Oversight Process (ROP) process and also requested additional actions which are described in the table in Enclosure 1. The PRB reviewed your petition, including the transcript and supplements, and found that each of the events described in the petition was previously identified in various NRC inspection reports for which a resolution had already been achieved.

This list is provided in Enclosure 2.

On May 3, 2012, the PRB met internally and recommended rejecting the petition. The decision to reject the petition was based on the following discussion:

T. Saporito -3 The petitioner does not provide any additional information beyond reference to events which have been the subject of the previous NRC inspection activities (see Enclosure 2) for which a resolution has been achieved. In addition, the petitioner does not provide any additional basis for assessing a violation and civil penalty.

Additionally, the issue of embrittlement of the PNP reactor vessel has also been reviewed by the NRC staff. On December 7, 2011, the NRC issued an evaluation (ADAMS Accession No. ML112870050) concluding that the pressurized thermal shock (PTS) screening criteria will not be reached until April 2017. The licensee has options available to address the PTS issue beyond April 2017. Thus, the NRC considers these issues resolved; the petitioner has not provided any additional basis to support his requested actions.

In general all the requested actions in the petition do not have sufficient basis for the NRC to take the escalated enforcement because the NRC is already aware of, and has resolved, the issues identified. Therefore, your request to take escalated enforcement action to shutdown PNP and the requested civil penalty is denied.

On May 17, 2012, the petition manager informed you via e-mail regarding the initial recommendation of the PRB to reject the petition, and also offered you a second opportunity to address the PRB. On May 17, 2012, you requested written explanation describing in "great detail" about the exact language and the specific reasons for the PRB's initial recommendation.

You also requested to address the PRB "in person", with attendance by the full NRC Commission at this meeting.

On May 24, 2012, the petition manager provided you the summary of the basis for rejection of the petition and also provided you with the possible date for the second opportunity to address the PRB in person at the NRC headquarters. On May 25, 2012, you provided your availability for a meeting on July 19,2012, which was later confirmed by the petition manager. On June 2, 2012, however, you provided us with your decision to decline a second meeting with the PRB on July 19, 2012. On June 6, 2012, the petition manager acknowledged your withdrawal of this request.

The PRB's final determination is to reject your petition for review under the 10 CFR 2.206 process because it does not meet the criteria for review. The table in Enclosure 1 provides the details for rejecting this petition. There are some issues that are outside the 10 CFR 2.206 process, and other issues identified in your petition that have already been the subject of NRC review, for which resolution has been achieved as stated in NRC MD 8.11, Review Process for 10 CFR 2.206 petitions.

T. Saporito - 4 Thank you for bringing these issues to the attention of the NRC.

Sincerely, d&n~~

Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via Listserv : Summary of Issues and PRB Disposition : List of Inspection Reports

Summary of Issues and Petition Review Board Disposition Specific Issue Reference PRB Disposition Raised

1. Escalated Petition The PRB rejected this request, since all the issues raised in enforcement action Page 3/8 support of the requested action have been the subject of against Palisades NRC staff review and evaluation. Therefore it meets the Nuclear Plant (PNP) criteria for rejection as discussed in Management Directive to suspend or (MD) 8.11.

! revoke the NRC

, license granted to the licensee for operation of PNP in USA

2. NRC to issue a Petition The PRB rejected this request, since all the issues raised in notice of violation Page 3/8 support of the requested action have been the subject of with a proposed civil NRC staff review and evaluation. Therefore it meets the
  • penalty against the . Transcript- criteria for rejection as discussed in MD 8 11 licensee in the total 4/2/12 amount of One Page 42 Million dollars
3. NRC to issue a Petition The PRB rejected this request, since all the issues raised in Confirmatory Order Page 3/8 support of the requested action have been the subject of requiring the NRC staff review and evaluation. Therefore it meets the licensee to take criteria for rejection as discussed in MD 8.11.

specific actions and bring PNP down to a "cold-shutdown" mode of operation until a number of requested actions specified in the

~etition take place.

4. The licensee to Petition The PRB rejected this request, since all the issues raised in complete an Page 3/8 support of the requested action have been the subject of Independent Safety NRC staff review and evaluation. Therefore it meets the Culture Assessment. criteria for rejection as discussed in MD 8.11.

On January 11, 2012, at the regulatory conference for the DC breaker event the licensee stated that a third party safety culture assessment was initiated. A 95002 Supplemental inspection will consider any safety culture contribution to this event.

5. The licensee to Petition The PRB rejected this request, since all the issues raised in complete a Page 3/8 support of the requested action have been the subject of comprehensive NRC staff review and evaluation (see enclosure 2).

training program of

  • Therefore it meets the criteria for rejection as discussed in all station MD 8.11.

maintenance


~----------~------------------------------------------~

Enclosure 1

- 2 Specific Issue

  • Reference I PRB Disposition Raised personnel.
6. The licensee to Petition The PRB rejected this request, since all the issues raised in complete a Page 3/8
  • support of the requested action have been the subject of comprehensive NRC staff review and evaluation (see enclosure 2).

training program of Therefore it meets the criteria for rejection as discussed in all station operations

personnel.

7. The licensee to Petition The PRB rejected this request, since all the issues raised in complete an Page 3/8 support of the requested action have been the subject of independent safety
  • NRC staff review and evaluation (see enclosure 2).

assessment. Therefore it meets the criteria for rejection as discussed in MD 8.11.

8. The licensee to  ! Petition The PRB rejected this request for not meeting the criterion complete Page 3/8 in IVID 8.11. The facts provided are not sufficient to support "destructive" testing the statement that the sustained embrittlement is not in and analysis of the
  • compliance with NRC regulations of 10 CFR, Part 50.

reactor vessel.

9. The petitioner is Petition The PRB rejected this request because it is not a request concerned that the Page 5/8 for enforcement action against the licensee. Therefore, it NRC's Notice of does not meet the first criteria for reviewing petitions under Violation issued on 10 CFR 2.206.

February 14th, 2012, does not adequately serve to protect public health and safety at the Palisades Nuclear

  • Plant.
10. The petitioner's Transcript The PRB rejected this request because it is not a request concerns were that 4/2/12 for enforcement action against the licensee. Therefore, it his teleconference Page 15 & does not meet the first criteria for reviewing petitions under with PRB was not 16 10 CFR 2.206.

noticed and also NRC actions do not The PRB notes that you were advised via e-mail on April 2, protect public health 2012, that page 10 of MD 8.11, "Review Process for 10 and safety. CFR 2.206 Petitions," states: "If the petitioner chooses to address PRB by telephone, it is not considered a meeting and no public notice is necessary."

I 11. The petitioner's Transcript - I The PRB rejected this request because it is not a request concern is with 4/2/12 -

  • for enforcement action against the licensee. Therefore, it Reactor Oversight I Pages 17 & does not meet the first criteria for reviewing petitions under Process (ROP) 43 10 CFR 2.206. However, the PRB referred this to the I which he believes to Office of the Ins ector General OIG.

- 3 Specific Issue Reference PRB Disposition Raised be a reactive process, rather than a proactive process and that it is because of failure of NRC's regulatory framework for ROP that resulted at least in part to the serious nuclear safety violations at the Palisades Nuclear Plant.

12. The petitioner Transcript The PRB rejected this request because it is not a request would like the PRB 4/2/12 for enforcement action against the licensee. Therefore, it and IG to make a Page 21 does not meet the first criteria for reviewing petitions under special note of Mr. 10 CFR 2.206. However, the PRB referred this to the Mcintyre's Office of the Inspector General.

comments referenced in the transcript.

13. The petitioner Transcript The PRB rejected this request because it is not a request made the statement 4/2/12 for enforcement action against the licensee. Therefore, it that regulators and Page 26 does not meet the first criteria for reviewing petitions under reactor operators 10 CFR 2.206. However, the PRB referred this to the have loosened or Office of the Inspector General.

bent the rules. The petitioner further states, 'They're just trying to get more and more out of these plants."

14. The petitioner Transcript The PRB rejected this request because the Reactor requests that the 4/2/12 Oversight Process provides for licensee performance NRC must review Page 40 assessment on a continuing basis through mid-cycle and the entirety of the end-of-cycle assessments and an Action Matrix of licensee's history of responses from the NRC. An assessment of safety culture violations over the is provided through crosscutting issues defined in Chapter years, significant 0310 of the NRC Inspection Manual. In addition, past and serious performance is a consideration in determining traditional violations of NRC escalated enforcement actions.

regulations and requirements during

-4 Specific Issue Reference PRB Disposition Raised licensed operations

. at the Palisades

  • Nuclear Plant.
15. The petitioner is Transcript The PRB rejected this request because it is not a request not satisfied with the 4/2/12 for enforcement action against the licensee. Therefore, it enforcement of Page 41 does not meet the first criteria for reviewing petitions under fines. He feels that 10 CFR 2.206.

in comparison to other sites, Palisades was not given the stiff i monetary fines.

16. The petitioner is Transcript The PRB rejected this request because the petitioner does requesting profiling 4/2/12 not provide sufficient facts that constitute bases for this of each licensee Page 42 action as required by the criteria under 10 CFR 2.206.

employee.

17. The petitioner is Transcript The PRB rejected this request because the petitioner's also stressing that 4/2/12 request is not a process established by regulation that NRC should think Page 47 would lead to an enforcement action against the licensee.

outside of the box in Therefore, it does not meet the criteria for reviewing the light of the petitions under 10 CFR 2.206.

Fukushima event.

List of Inspection Reports In the teleconference with the PRB the petitioner cited various plant events (see transcript dated April 2, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120930709).

Following is the list of inspection reports associated with the events:

On Page 30 of the transcript, reference is made to the order issued to Entergy Nuclear Operations, Inc. for the operator leaving the controls. The document has inspection report number 05000255/2011015:

January 25, 2012 EA-11-214 (Accession No. ML12026A383)

SUBJECT:

CONFIRMATORY ORDER (EFFECTIVE IMMEDIATELY)

(NRC INSPECTION REPORT NO. 05000255/2011015 AND NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2011-003)

PALISADES NUCLEAR PLANT On pages 30-31 of the transcript, reference is made to the auxiliary feedwater pump WHITE finding documented in inspection report 05000255/2011017:

January 3,2012 EA-11-227 (Accession No. ML120030406)

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 05000255/2011017 PALISADES NUCLEAR PLANT On pages 31 ~32 of the transcript, reference is made to the spent fuel pool WHITE finding issued in inspection report 05000255/2010007:

January 20, 2010 EA-09-269 (Accession No. ML100200720)

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING; NOTIFICATION OF FOLLOW-UP ASSESSMENT; AND NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000255/2010007; PALISADES NUCLEAR PLANT On pages 32 of the transcript, reference is made to the radiological exposure WHITE finding in inspection report numbered 05000255/2008011:

January 30, 2009 EA-08-322 (Accession No. ML090300334)

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING AND NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000255/2008011; PALISADES NUCLEAR PLANT Enclosure 2

-2 On pages 33-34 of the transcript, reference is made to the DC breaker YELLOW finding in inspection report numbered 05000255/2011020:

February 14, 2012 EA-11-241 EA-11-243 (Accession No. ML120450037)

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE FINDINGS WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 05000255/2011019 AND 05000255/2011020 PALISADES NUCLEAR PLANT On pages 35-36 of the transcript, reference is made to the service water (SW) pump P-7C coupling WHITE finding in inspection report numbered 05000255/2011019 issued with 05000255/2011020:

February 14, 2012 EA-11-241 EA-11-243 (Accession No. ML120450037)

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION OF YELLOW AND WHITE FINDINGS WITH ASSESSMENT FOLLOWUP AND NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 05000255/2011019 AND 05000255/2011020 PALISADES NUCLEAR PLANT On pages 35-38 of the transcript, reference is made to the significance determination process conclusions for both the SW pump P-7C coupling WHITE finding and the DC breaker Yellow finding in inspection reports numbered 050002011019 and 2011020 together.

On pages 39 of the transcript, reference is made to the DC breaker YELLOW finding in the inspection report numbered 050002011020 timeline or the special inspection team report of the event in inspection report 05000255/2011014:

November 29, 2011 EA-11-243 (Accession No. ML113330819)

SUB..IECT: PALISADES NUCLEAR PLANT - NRC SPECIAL INSPECTION TEAM (SIT)

REPORT 05000255/2011014 PRELIMINARY YELLOW FINDING October 4,2011

SUBJECT:

PALISADES NUCLEAR PLANT - NRC SPECIAL INSPECTION TEAM (SIT)

REPORT 05000255/2011012 (Accession No. ML112780190)

And, the preliminary SW coupling finding was issued in the following report November 29, 2011 EA-11-241 (Accession No. ML113330819)

SUBJECT:

PALISADES NUCLEAR PLANT, NRC INSPECTION REPORT 05000255/2011016; PRELIMINARY WHITE FINDING

T. Saporito -4 Thank you for bringing these issues to the attention of the NRC.

Sincerely, IRAI Allen Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 CC: Distribution via Listserv Enclosure 1: Summary of Issues and PRB Disposition Enclosure 2: List of Inspection Reports DISTRIBUTION: G20120149/EDATS: OEDO-2012-0127 PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 Resource RidsNrrPMPalisades Resource RidsNrrDorl Resource RidsNrrOd Resource RidsNrrLABTully Resource RidsNrrMailCenter Resource RidsOiMailCenter Resource RidsEdoMailCenter RidsOeMailCenter Resource RidsRgn3MailCenter Resource RidsOgcRp Resource RidsOcaMailCenter Resource JJandovitz, R3 RidsOpaMaii Resource MBanic, NRR MLemoncelli, OGC AZoulis, NRR DAiley, NRR KRoche, NRR SSheng, NRR DMuller, NRR VGoel. NRR MKeefe, NRR RidsNrrAcrsAcnwMailCTR RLerch, R3 JGiessner, R3 Pack age: ML12181A245 ncommg: ML12065A1430 Response: ML12173A481 *vaema i II OFFICE LPL3-1/PM LPL3-1/LA DElEEEB/BC DRAlAPLNBC DE/EVIB/BC DE/EPNB/BC(A) DRAlAHPB/BC NAME MChawla BTully JAndersen SWeerakkody' SRosenberg DAiley UShoop ICFairbanks for DATE 6/25/12 6/25/12 6/25/12 6/27112 6/28/12 6/28/12 OFFICE OIRSIIOLB/BC OIRSIIPAB/BC OPR/PM RGNIII OGC *NLv l/BC(A)

NAME JMcHaie RFranovich MBanic RLerch* MLemoncelii IFrankl AHowe IDAlIsopp IRFrahm for DATE 6/29/12 6/28/12 6/29/12 6/25/12 7/11/12 6/29/12 7/26/12 OFFICIAL RECORD COPY