BYRON 2013-0141, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 23: Line 23:
During this period there were no radioactive effluents released from the Byron Nuclear Station Independent Spent Fuel Storage Installation.
During this period there were no radioactive effluents released from the Byron Nuclear Station Independent Spent Fuel Storage Installation.
Should you have any questions concerning this letter, please contact Mr. Steven A. Gackstetter, Regulatory Assurance Manager, at (815) 406-2800.
Should you have any questions concerning this letter, please contact Mr. Steven A. Gackstetter, Regulatory Assurance Manager, at (815) 406-2800.
Respecifully, Site Vice President Byron Generating Station cc:      Regional Administrator NRC Region III
Respecifully, Site Vice President Byron Generating Station cc:      Regional Administrator NRC Region III Senior NRC Resdent Inspector Byron Generating Station}}
 
Senior NRC Resdent Inspector Byron Generating Station}}

Latest revision as of 01:03, 6 February 2020

Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
ML13324A481
Person / Time
Site: Byron, Quad Cities  Constellation icon.png
Issue date: 11/20/2013
From: Kearney F
Exelon Generation Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
BYRON 2013-0141
Download: ML13324A481 (1)


Text

Byron Generating Station I--I-- 4450 North German Church Road Exeton Generation Byron, [61010-9794 www.exebncorp.com November 20, 2013 10 CFR 72.44 (d)(3)

LTR: BYRON 2013-0141 File: 1.10.0101 2.12.1522.01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Byron Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report In accordance with 10 CFR 72.44 (d)(3) this letter provides the annual radioactive effluent release report for Byron Generating Station Independent Spent Fuel Storage Installation (ISFSI) for the period September 9, 2012 through September 9, 2013.

During this period there were no radioactive effluents released from the Byron Nuclear Station Independent Spent Fuel Storage Installation.

Should you have any questions concerning this letter, please contact Mr. Steven A. Gackstetter, Regulatory Assurance Manager, at (815) 406-2800.

Respecifully, Site Vice President Byron Generating Station cc: Regional Administrator NRC Region III Senior NRC Resdent Inspector Byron Generating Station