ML14233A488: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:North Anna Power Station Units 1 & 2 Independent Spent Fuel Storage Installation (ISFSI)
{{#Wiki_filter:North Anna Power Station Units 1 & 2 Independent Spent Fuel Storage Installation (ISFSI)
Safety Analysis Report Intentionally Blank Revision 8-06/14North Anna ISFSI SARRS-1REVISION
Safety Analysis Report
 
Intentionally Blank Revision 806/14                                          North Anna ISFSI SAR                RS-1 REVISION


==SUMMARY==
==SUMMARY==
Revision 8-06/14 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
 
Figure 1-1, Figure 1-2, 2.5.1, 2.5.1.5, 2.5.1.5.1, 2.5.1.6, 2.5.1.7, 2.5.1.9, 2.5.4, 2.5.5, 2.5.6 Refs, Figure 2-3, Figure 2-8, Figure 2-9, Figure 2-18 (new), Figure 2-19 (new), Appendix 2A, 4.1, 4.3.2, Figure 4-1, Figure 4-4, 5.1.1.1, 5.4
Revision 806/14 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
Figure 1-1, Figure 1-2, 2.5.1,       Update adds description of an alternate transport route to 2.5.1.5, 2.5.1.5.1, 2.5.1.6, 2.5.1.7, the Independent Spent Fuel storage Installation.
2.5.1.9, 2.5.4, 2.5.5, 2.5.6 Refs, Figure 2-3, Figure 2-8, Figure 2-9, Figure 2-18 (new), Figure 2-19 (new), Appendix 2A, 4.1, 4.3.2, Figure 4-1, Figure 4-4, 5.1.1.1, 5.4
[NAPS-ICR-2010-001]
[NAPS-ICR-2010-001]
Update adds description of an alternate transport route to the Independent Spent Fuel storage Installation.4.4.5.4 (new), 4.4.6 Refs
4.4.5.4 (new), 4.4.6 Refs            Update added section to reflect the installation of new
[NAPS-ICR-2012-001]Update added section to reflect the installation of new
[NAPS-ICR-2012-001]                  seismic instrumentation.
Revision 706/10 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
9.5                                  Revises description of Notification of Unusual Event to
[IN 2008-002]                        reflect new Emergency Action Level classification for damage to a loaded SSSC confinement boundary.
Revision 606/08 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
1.1, Figure 1-2                      Describes the addition and location of the second storage
[IN 2006-001]                        pad.
2.1.3, 2.1.4, 4.4.1.3                Editorial package.
[IN 2008-001]
 
Revision 806/14                                            North Anna ISFSI SAR              RS-2 Revision 506/06 Changes Made under the provisions of 10 CFR 72.48 except Section                                              where indicated in brackets.
1.5, 9.1.1, 11.1                      Incorporated references to the recently implemented
[IN 2004-001]                          Topical Report DOM-QA-1. The Dominion Nuclear Facility Quality Assurance Program Description is based on ANSI/ASME NQA-1-1994 and will be maintained as a separate, single document for Dominion facilities.
[10 CFR 50.54(a)]
7.6, 7.7                              Updated the description of the health physics program to
[IN 2004-002]                          include dosimetry placed on the ISFSI perimeter fence and clarified the description of the environmental monitoring program.
A.1.1                                  Deleted the description of the original TN-32 cask
[IN 2003-007]                          protective cover design.
Revision 406/04 Changes Made under the provisions of 10 CFR 72.48 except Section                                              where indicated in brackets.
Figures 2-9 & 4-4                     Removed the fence and gate symbols incorrectly shown
[IN 2000-002]                          around the service water pump house.
3.1.1, 3.1.1.1, 3.1.1.1.1, 3.1.1.1.2,  Updated the shielding, criticality, thermal, and accident 3.3.4, 3.3.4.1, 3.3.4.2, 3.3.4.3,      evaluations associated with the increased initial 3.3.5, 3.3.7, Tables 3-1 & 3-2,        enrichment of 4.30 weight percent U235 and the increased 4.2.3.3, 5.1.2, 5.1.3.1, 5.1.3.4,      assembly average burnup of 45,000 MWD/MTU.
Tables 5-3 & 5-4, Chapter 6, 7.2.1,    [10 CFR 72.56 License Amendment]
7.2.2, 7.2.3, 7.3.2, 7.3.2.1, 7.3.2.2, 7.3.4, 7.4, 7.4.1, 7.5, Tables 7-1, 7-2, 7-3, 7-4, 7-5, 7-6, 7-7, 7-8, 7-9, 7-10, 7-11, 7-12, 7-13, 7-14, 7-15, & 7-16, Figures 7-2, 7-3, 7-4, & 7-5, 8.2.10.2, 8.2.10.3, 8.2.11, Table 8-1, 9.1.1.4, 9.1.4, Table 10-2, A.1.1, A.1.2, A.1.3, A.1.3.1, A.1.4, A.1.8, A.1.8.1, A.1.9, A.1.10, Tables A.1-1, A.1-2, & A.1-3, Figures A.1-1, A.1-2, A.1-3, & A.1-4
[IN 2002-002 & IN 2003-002]
 
Revision 806/14                                      North Anna ISFSI SAR                RS-3 Revision 406/04 Changes Made under the provisions of 10 CFR 72.48 except Section                                        where indicated in brackets.
4.1, 7.1.1, 7.1.2, 7.3.1, 7.4,  Added locked security personnel access gates to the Figure 7-1                      ISFSI perimeter fence.
[IN 2003-001]
4.4.1.2, Figure 4-14            Placed a cask pedestal in the cask loading area of the
[IN 2003-005]                    spent fuel storage pool.
4.4.5.3, 5.2                    Revised organizational title of the Shift Manager.
[IN 2003-006]
11.1                            Made editorial correction to correctly refer to QA
[IN 2003-004]                    Program Topical Report Table 17.2-0.
A.1.1                            Identified the analyses in Chapters 4 & 6 of the TN-32
[IN 2002-004]                    FSAR, Rev. 0, that were added to the North Anna ISFSI SAR.
A.1.1                            Provided bolt torque ranges for the TN-32 casks.
[IN 2002-005]
A.1.1, Appendix A.1 Attachment 1 Added explanation of the use of TN-32 casks designed
[IN 2002-003]                    and fabricated to TN-32 Final Safety Analysis Report, Revision 0.
A.1.1, Appendix A.1 Attachment 4 Incorporated additional analyses regarding TN-32 cask
[IN 2002-006]                    gap between center basket rails.
A.1.2                            Added allowance for the storage of a fuel assembly with
[IN 2003-003]                    rod clips.
Revision 306/02 Changes Made under the provisions of 10 CFR 72.48 except Section                                        where indicated in brackets.
4.4.5.1, 8.2.5.1                Clarified the description of the placement of fire
[IN 2001-001]                    extinguishers at the ISFSI site as well as the availability of fire fighting equipment and personnel.
5.1.1.1                          Changed cask receipt procedure consistent with the
[IN 2001-005]                    North Anna Power Station Updated Final Safety Analysis Report.
9.2.2.1                          Deleted incorrect testing requirements for electrical and
[IN 2002-001]                    communications systems.
 
Revision 806/14                                        North Anna ISFSI SAR                RS-4 Revision 306/02 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
A.1.1, Appendix A.1 Attachment 1    Incorporated the modified TN-32 cask lid bolt analysis.
[IN 2001-003]
A.1.1, Appendix A.1 Attachment 3    Modified the TN-32 cask protective cover and
[IN 2001-002]                      overpressure system.
A.1.7, Appendix A.1 Attachment 2    Incorporated structural analyses for missile impacts on
[IN 2000-001]                      TN-32 casks.
Revision 2 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
3.1.1, A.1.2                        Added information on the storage of burnable poison rod
[IN 99-01]                          assemblies and thimble plug devices in TN-32 casks.
[10 CFR 72.56 License Amendment]
A.1.1                              Revised the description of the weld in the neutron shield
[IN 99-02]                          outer shell of TN-32 casks.
A.1.1                              Clarified the location of borated aluminum plates in the
[IN 99-03]                          fuel basket of TN-32 casks.
Revision 1 Changes Made under the provisions of 10 CFR 72.48 except Section                                            where indicated in brackets.
3.1.1, 3.3.6, 4.2.1, 4.4.4.1, 4.5,  Delete references to fuel insert components, clarify the Table 4-1, Chapter 6, 7.2.2, A.1.1, maximum capacity of the backup diesel generator fuel A.1.2, A.1.5, A.1.6, Appendix A.1  tank, update as-built parameters of the concrete pad, add Attachment 1                        120V circuit description, clarify the status of cask
[IN 98-03]                          handling equipment, delete statement that emergency actions are neither credible nor postulated to occur, discuss operational practices to prevent weather-driven spread of contamination, add I129 and Co60 inventories per assembly, incorporate TN-32 lid bolt analysis, add TN-32 Cask Sliding and Tip-over Analysis, and add Evaluation of Tornado Missiles.
A.1.1                              Include fillet weld as an alternative to the groove weld for
[IN 98-01]                          the fuel basket.
 
Revision 806/14                    North Anna ISFSI SAR              RS-5 Revision 1 (continued)
Changes Made under the provisions of 10 CFR 72.48 except Section                      where indicated in brackets.
A.1.3            Add discussion of dose rate and exposure estimates.
[IN 98-02]
 
Revision 806/14                  North Anna ISFSI SAR RS-6 Intentionally Blank
 
Revision 806/14                                                  North Anna ISFSI SAR                        i NORTH ANNA ISFSI SAR Table of Contents Section                                          Title                                                    Page Chapter 1  Introduction and General Description of Storage System . . . . .                                1-1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2 General      ........................................                                      1-2 1.3 General Storage System Description . . . . . . . . . . . . . . . . . . . .                  1-2 1.4 Identification Of Agents and Contractors . . . . . . . . . . . . . . . .                    1-2 1.5 Material Incorporated By Reference . . . . . . . . . . . . . . . . . . . .                  1-3 Chapter 2  Site Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1 Geography and Demography Of Site Selected . . . . . . . . . . . .                          2-1 2.1.1 Site Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      2-1 2.1.2 Site Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-1 2.1.3 Population Distribution and Trends . . . . . . . . . . . . . . .                    2-2 2.1.4 Use Of Nearby Land and Waters . . . . . . . . . . . . . . . . .                    2-2 2.2 Nearby Industrial, Transportation, and Military Facilities . . .                            2-3 2.2.1 Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      2-3 2.2.2 Effects of Potential Accidents . . . . . . . . . . . . . . . . . . .                2-3 2.3 Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.1 Regional Climatology . . . . . . . . . . . . . . . . . . . . . . . . .              2-4 2.3.2 Local Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . .            2-4 2.3.3 Onsite Meteorological Measurement Program . . . . . .                              2-5 2.3.4 Diffusion Estimates . . . . . . . . . . . . . . . . . . . . . . . . . . .          2-6 2.3.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      2-6


seismic instrumentation.Revision 7-06/10 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Revision 806/14                                                  North Anna ISFSI SAR                      ii NORTH ANNA ISFSI SAR Table of Contents (continued)
9.5[IN 2008-002]Revises description of Notification of Unusual Event to reflect new Emergency Action Level classification for damage to a loaded SSSC confinement boundary.Revision 6-06/08 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Section                                        Title                                                    Page 2.4 Hydrology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 2.4.1 Hydrologic Description . . . . . . . . . . . . . . . . . . . . . . . .              2-7 2.4.2 Floods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8 2.4.3 Probable Maximum Floods On Streams and Rivers . .                                  2-9 2.4.4 Potential Dam Failures (Seismically Induced) . . . . . .                            2-9 2.4.5 Probable Maximum Surge and Seiche Flooding . . . . .                                2-9 2.4.6 Probable Maximum Tsunami Flooding . . . . . . . . . . . .                          2-10 2.4.7 Ice Flooding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.8 Flooding Protection Requirements . . . . . . . . . . . . . . .                    2-10 2.4.9 Environmental . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      2-10 2.4.10 Subsurface Hydrology . . . . . . . . . . . . . . . . . . . . . . . . .            2-10 2.4.11 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2.5 Geology and Seismology . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          2-12 2.5.1 Basic Geologic and Seismic Information . . . . . . . . . .                        2-12 2.5.2 Vibratory Ground Motion . . . . . . . . . . . . . . . . . . . . . .                2-27 2.5.3 Surface Faulting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-31 2.5.4 Stability of Subsurface Materials. . . . . . . . . . . . . . . . .                2-31 2.5.5 Slope Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      2-32 2.5.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32 Appendix 2A    Boring Logs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2A-i Appendix 2B    Laboratory Tests. . . . . . . . . . . . . . . . . . . . . . . . . . .          2B-i Chapter 3  Principal SSSC Design Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . .            3-1 3.1  Purposes of SSSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      3-1 3.1.1 Spent Fuel to Be Stored . . . . . . . . . . . . . . . . . . . . . . . .             3-1 3.1.2 General Operating Functions . . . . . . . . . . . . . . . . . . . .                3-3 3.2 Design Criteria for Environmental Conditions and Natural Phenomena                        3-3 3.2.1 Tornado and Wind Loadings . . . . . . . . . . . . . . . . . . . .                  3-4 3.2.2 Water Level (Flood) Design . . . . . . . . . . . . . . . . . . . .                  3-5 3.2.3 Seismic Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          3-5 3.2.4 Snow and Ice Loadings . . . . . . . . . . . . . . . . . . . . . . . .              3-5 3.2.5 Combined Load Criteria . . . . . . . . . . . . . . . . . . . . . . .                3-5
1.1, Figure 1-2


[IN 2006-001]
Revision 806/14                                                  North Anna ISFSI SAR                      iii NORTH ANNA ISFSI SAR Table of Contents (continued)
Describes the addition and lo cation of the second storage pad.2.1.3, 2.1.4, 4.4.1.3
Section                                          Title                                                    Page 3.3 Safety Protection Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . .          3-5 3.3.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3.3.2 Protection By Multiple Confinement Barriers and Systems                              3-6 3.3.3 Protection By Equipment and Instrumentation Selection                                3-6 3.3.4 Nuclear Criticality Safety . . . . . . . . . . . . . . . . . . . . . .              3-7 3.3.5 Radiological Protection . . . . . . . . . . . . . . . . . . . . . . . .              3-7 3.3.6 Fire and Explosion Protection . . . . . . . . . . . . . . . . . . .                  3-8 3.3.7 Materials Handling and Storage . . . . . . . . . . . . . . . . .                    3-8 3.4 Summary of SSSC Design Criteria . . . . . . . . . . . . . . . . . . . . .                  3-8 Chapter 4  Storage System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.1  Location and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-1 4.2 Storage Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.2.1 Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4.2.2 Storage Site Layout . . . . . . . . . . . . . . . . . . . . . . . . . . .          4-10 4.2.3 SSSC Description . . . . . . . . . . . . . . . . . . . . . . . . . . . .            4-10 4.2.4 Instrumentation System Description . . . . . . . . . . . . . .                      4-12 4.2.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      4-12 4.3 Transport System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.1 Function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.2 Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-13 4.3.3 Design Bases and Safety Assurance . . . . . . . . . . . . . .                      4-15 4.3.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      4-16 4.4 Operating Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     4-16 4.4.1 Loading and Unloading System. . . . . . . . . . . . . . . . . .                    4-16 4.4.2 Decontamination System . . . . . . . . . . . . . . . . . . . . . . .                4-18 4.4.3 SSSC Repair and Maintenance . . . . . . . . . . . . . . . . . .                    4-18 4.4.4 Utility Supplies and Systems . . . . . . . . . . . . . . . . . . . .                4-18 4.4.5  Other Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-19 4.4.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      4-20 4.5 Classification of Structures, Systems and Components. . . . . .                            4-20 4.6 Decommissioning Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          4-21


[IN 2008-001]Editorial package.
Revision 806/14                                                North Anna ISFSI SAR                      iv NORTH ANNA ISFSI SAR Table of Contents (continued)
Revision 8-06/14North Anna ISFSI SARRS-2Revision 5-06/06 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Section                                      Title                                                    Page Chapter 5  STORAGE SYSTEM OPERATIONS . . . . . . . . . . . . . . . . . . . . .                          5-1 5.1 Operation Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      5-1 5.1.1 Narrative Description. . . . . . . . . . . . . . . . . . . . . . . . . .          5-1 5.1.2 Flowsheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 5.1.3 Identification of Subjects for Safety and Reliability Analysis                    5-3 5.2 Control Room and Control Areas . . . . . . . . . . . . . . . . . . . . . .              5-4 5.3 Spent Fuel Accountability Program. . . . . . . . . . . . . . . . . . . . .              5-4 5.4 Spent Fuel Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Chapter 6  Waste Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 Chapter 7  Radiation Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7.1 Ensuring That Occupational Radiation Exposures Are As Low As Reasonably Achievable (ALARA) . . . . . . . . . . . .                        7-1 7.1.1 Policy Considerations and Organization . . . . . . . . . . .                      7-1 7.1.2 Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . .           7-4 7.1.3 Operational Considerations . . . . . . . . . . . . . . . . . . . . .              7-5 7.2 Radiation Sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 7.2.1 Characterization of Sources . . . . . . . . . . . . . . . . . . . . .            7-6 7.2.2 Airborne Radioactive Material Sources. . . . . . . . . . . .                      7-6 7.2.3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 7.3 Radiation Protection Design Features . . . . . . . . . . . . . . . . . . .              7-6 7.3.1 Storage System Design Description . . . . . . . . . . . . . .                    7-6 7.3.2 Shielding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7 7.3.3 Area Radiation and Airborne Radioactivity Monitoring Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8 7.3.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9 7.4  Estimated Onsite Collective Dose Assessment . . . . . . . . . . . .                    7-9 7.4.1 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-10 7.5  Offsite Collective Dose Assessment . . . . . . . . . . . . . . . . . . . .            7-10 7.6  Health Physics Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      7-11 7.7 Environmental Monitoring Program . . . . . . . . . . . . . . . . . . . .                7-11
1.5, 9.1.1, 11.1
[IN 2004-001]
Incorporated references to the recently implemented


T opical Report DOM-QA-1. The Dominion Nuclear Facility Quality Assurance Pr ogram Description is based on ANSI/ASME NQA-1-1994 and will be maintained as a separate, single document for Dominion facilities.
Revision 806/14                                                    North Anna ISFSI SAR                      v NORTH ANNA ISFSI SAR Table of Contents (continued)
[10 CFR 50.54(a)]
Section                                          Title                                                    Page Chapter 8  Accident Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8.1 Off-Normal Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            8-1 8.1.1 Loss of Electric Power . . . . . . . . . . . . . . . . . . . . . . . . .              8-1 8.1.2  Radiological Impact from Off-Normal Operations . . .                                8-2 8.2 Accidents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2 8.2.1 Earthquake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        8-2 8.2.2 Extreme Wind . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            8-3 8.2.3 Flood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8.2.4 Explosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      8-4 8.2.5 Fire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4 8.2.6 Storage of an Unauthorized Fuel Assembly . . . . . . . .                              8-4 8.2.7 Loss of Neutron Shield . . . . . . . . . . . . . . . . . . . . . . . .                8-5 8.2.8 SSSC Seal Leakage . . . . . . . . . . . . . . . . . . . . . . . . . . .              8-6 8.2.9 SSSC Drops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          8-6 8.2.10 Loss of Confinement Barrier . . . . . . . . . . . . . . . . . . . .                  8-6 8.2.11 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      8-7 8.3 Site Characteristics Affecting Safety Analysis . . . . . . . . . . . .                      8-8 Chapter 9  Conduct of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        9-1 9.1 Organizational Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          9-1 9.1.1 Corporate Organization . . . . . . . . . . . . . . . . . . . . . . . .                9-1 9.1.2 Operation Organization, Management, and Administrative Control System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          9-1 9.1.3 Personnel Qualification Requirements . . . . . . . . . . . .                          9-2 9.1.4 Liaison with Outside Organizations . . . . . . . . . . . . . .                        9-2 9.2 Startup Testing and Operation . . . . . . . . . . . . . . . . . . . . . . . . .              9-2 9.2.1 Administrative Procedures for Conducting Test Program                                9-2 9.2.2 Test Program Description . . . . . . . . . . . . . . . . . . . . . .                  9-2 9.2.3 Test Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          9-3 9.3 Training Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      9-3
7.6, 7.7[IN 2004-002]Updated the description of the health physics program to
 
Revision 806/14                                                North Anna ISFSI SAR                              vi NORTH ANNA ISFSI SAR Table of Contents (continued)
Section                                        Title                                                          Page 9.4 Normal Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .              9-4 9.4.1 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            9-4 9.4.2 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            9-6 9.5 Emergency Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                9-6 9.6 Physical Security Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .             9-6 Chapter 10  Operating Controls and Limits . . . . . . . . . . . . . . . . . . . . . . . . . . .                10-1 10.1 Proposed Operating Controls and Limits. . . . . . . . . . . . . . . . .                        10-1 10.1.1 Content of Operating Controls and Limits . . . . . . . . .                              10-1 10.1.2 Bases for Operating Controls and Limits . . . . . . . . . .                            10-1 10.2 Development of Operating Controls and Limits . . . . . . . . . . .                            10-1 10.2.1 Functional and Operating Limits . . . . . . . . . . . . . . . . .                      10-1 10.2.2 Limiting Conditions for Operation . . . . . . . . . . . . . . .                        10-1 10.2.3 Surveillance Requirements . . . . . . . . . . . . . . . . . . . . .                    10-2 10.2.4 Design Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            10-2 10.2.5 Administrative Controls. . . . . . . . . . . . . . . . . . . . . . . .                  10-2 Chapter 11  Quality Assurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        11-1 11.1 Quality Assurance Program Description . . . . . . . . . . . . . . . . .                        11-1 Appendix A.1 TN-32 DRY STORAGE CASK. . . . . . . . . . . . . . .                                  A.1-1 Appendix A.1,Attachment 1 . . . . . . . . . . . . . . . . . . . . . . . . . .          A.1 Att. 1-1 Appendix A.1,Attachment 2 . . . . . . . . . . . . . . . . . . . . . . . . . .          A.1 Att. 2-1 Appendix A.1,Attachment 3 . . . . . . . . . . . . . . . . . . . . . . . . . .          A.1 Att. 3-1 Appendix A.1,Attachment 4 . . . . . . . . . . . . . . . . . . . . . . . . . .          A.1 Att. 4-1


include dosimetry placed on the ISFSI perimeter fence and clarified the description of the environmental monitoring program.
Revision 806/14                                                    North Anna ISFSI SAR                                              vii NORTH ANNA ISFSI SAR List of Tables Table                                                                                                                          Page Table 2-1    Dispersion Factors (/Q) in Accordance with Regulatory Guide 1.145. . . . . . 2-35 Table 2-2    Summary of Usgs Gauging Station Records and Estimated Stream Flow Data for the North Anna Dam . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-36 Table 2-3    Floods on the North Anna River. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37 Table 2-4   Recovery and RQD Values of Borings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38 Table 2-5    Earthquakes Within 200 Miles of North Anna Site Events Listed Chronologically . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-40 Table 3-1    Characteristics of Fuel Used at the North Anna Power Stationa . . . . . . . . . . . . 3-9 Table 3-2   Design Criteria for Dry Sealed Surface Storage Casks . . . . . . . . . . . . . . . . . . 3-10 Table 4-1    Compliance with General Design Criteria (Subpart F, 10 CFR 72) . . . . . . . . . 4-23 Table 4-2   Codes and Standards for Transporter Design and Fabrication . . . . . . . . . . . . . 4-25 Table 5-1    General Sequence of Loading Operationsa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 Table 5-2   General Sequence of Unloading Operationsa . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 Table 7-1    Maximum Design Basis Dose Rates Along ISFSI Perimeter Fence (mrem/hr) 7-12 Table 7-2    Estimated Occupational Exposures for Cask Loading, Transport, and Emplacementa (One Time Exposure). . . . . . . . . . . . . . . . . . . . 7-13 Table 7-3    North Anna ISFSI Maintenance Operationsa Annual Occupational Exposures 7-14 Table 7-4    Total Annual Occupational Exposures During ISFSI Loading Operationsa . . 7-14 Table 10-1  Functional and Operating Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3 Table 10-2   Limiting Conditions for Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3 Table A-1   Topical Safety Analysis Reports for SSSCs Approved for Use at the North Anna ISFSI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Table A.1-1 TN-32 ASME Code Exceptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.1-16 Table 3C.3-1 Summary of Stresses and Interaction Equation Evaluation . . . . . . . . . A.1 Att. 4-8
A.1.1[IN 2003-007]
Deleted the description of the origin al TN-32 cask protective cover design.Revision 4-06/04 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Figures 2-9 & 4-4[IN 2000-002]Removed the fence and gate symbols incorrectly shown around the service water pump house.
3.1.1, 3.1.1.1, 3.1.1.1.1, 3.1.1.1.2, 3.3.4, 3.3.4.1, 3.3.4.2, 3.3.4.3, 3.3.5, 3.3.7, Tables 3-1 & 3-2, 4.2.3.3, 5.1.2, 5.1.3.1, 5.1.3.4, Tables 5-3 & 5-4, Chapter 6, 7.2.1, 7.2.2, 7.2.3, 7.3.2, 7.3.2.1, 7.3.2.2, 7.3.4, 7.4, 7.4.1, 7.5, Tables 7-1, 7-2, 7-3, 7-4, 7-5, 7-6, 7-7, 7-8, 7-9, 7-10, 7-11, 7-12, 7-13, 7-14, 7-15, & 7-16, Figures 7-2, 7-3, 7-4, & 7-5, 8.2.10.2, 8.2.10.3, 8.2.11, Table 8-1, 9.1.1.4, 9.1.4, Table 10-2, A.1.1, A.1.2, A.1.3, A.1.3.1, A.1.4, A.1.8, A.1.8.1, A.1.9, A.1.10, Tables A.1-1, A.1-2, & A.1-3, Figures A.1-1, A.1-2, A.1-3, &
A.1-4[IN 2002-002 & IN 2 003-002]Updated the shielding, critical ity , thermal, and accident evaluations associated with the increased initial enrichment of 4.30 weight percent U 235 and the increased assembly average burnup of 45,000 MWD/MTU. [10 CFR 72.56 License Amendment]
Revision 8-06/14North Anna ISFSI SARRS-3 4.1, 7.1.1, 7.1.2, 7.3.1, 7.4, Figure 7-1[IN 2003-001]Added locked security pers onnel access gates to the ISFSI perimeter fence.
4.4.1.2, Figure 4-14[IN 2003-005]Placed a cask pedestal in the cask loading area of the


spent fuel storage pool.
Revision 806/14                                                    North Anna ISFSI SAR                          viii NORTH ANNA ISFSI SAR List of Figures Figure                                                                                                          Page Figure 1-1      ISFSI Location on North Anna Site . . . . . . . . . . . . . . . . . . . . . . . .                  1-4 Figure 1-2      ISFSI General Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .               1-5 Figure 2-1      Area Map (0-10 Miles) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          2-46 Figure 2-2      Regional Map (0-50 Miles) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           2-47 Figure 2-3     North Anna Site Boundary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            2-48 Figure 2-4      Daily Average Temperatures for Richmond, Virginia (1951-1980)                                      2-49 Figure 2-5     Daily Extreme Temperatures for Richmond, Virginia (1898-1991)                                      2-50 Figure 2-6      Extreme 1-Mile wind Passage at Richmond, Virginia . . . . . . . . . .                              2-51 Figure 2-7      Regional Topography and Characteristics . . . . . . . . . . . . . . . . . . .                      2-52 Figure 2-8      ISFSI Local Topography and Grading Plan . . . . . . . . . . . . . . . . . .                       2-53 Figure 2-9      Hydrologic Characteristics of the ISFSI Site . . . . . . . . . . . . . . . . .                    2-54 Figure 2-10    Site Geological Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-55 Figure 2-11    ISFSI Boring Locations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          2-56 Figure 2-12    ISFSI Subsurface Cross Section . . . . . . . . . . . . . . . . . . . . . . . . . . .              2-57 Figure 2-13    Regional Geologic Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          2-58 Figure 2-14    Pad #1 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-59 Figure 2-15    Pad #2 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-60 Figure 2-16    Pad #3 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-61 Figure 2-17    Earthquake Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        2-62 Figure 2-18    Alternate Transport Route Boring Locations . . . . . . . . . . . . . . . . .                      2-63 Figure 2-19    Alternate Transport Route Subsurface Cross Sections . . . . . . . . . .                            2-64 Figure 4-1      ISFSI Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-26 Figure 4-2      ISFSI Electrical Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      4-27 Figure 4-3      ISFSI Electrical Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      4-28 Figure 4-4      Transport Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-29 Figure 4-5      ISFSI Storage Pad Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          4-30 Figure 4-6      IMAGES-3D Model of Storage Pad Geometry . . . . . . . . . . . . . . .                              4-31 Figure 4-7      SASSI Model of Storage Pad Geometry . . . . . . . . . . . . . . . . . . . . .                      4-32 Figure 4-8      SASSI Cask Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-33 Figure 4-9      SASSI Pad Plate Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            4-34 Figure 4-10    Sliding Factors of Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-35
4.4.5.3, 5.2


[IN 2003-006]Revised organizational titl e of the Shift Manager
Revision 806/14                                                    North Anna ISFSI SAR                            ix NORTH ANNA ISFSI SAR List of Figures (continued)
.11.1
Figure                                                                                                          Page Figure 4-11    Overturning Factors of Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            4-36 Figure 4-12    Transporter Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        4-37 Figure 4-13    Fuel and Decontamination Buildings Plan View . . . . . . . . . . . . . .                            4-38 Figure 4-14    Fuel and Decontamination Buildings Side View . . . . . . . . . . . . . .                            4-39 Figure 5-1      Plan and Profile of ISFSI Site Access Road . . . . . . . . . . . . . . . . . .                      5-8 Figure 7-1      ISFSI Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-15 Figure 7-2      Dose Rate for 84 Base Case Casks Versus Distance. . . . . . . . . . . .                            7-16 Figure A.1-1    TN-32 Surface Dose Rate Measurement Locations . . . . . . . . . . . .                            A.1-23 Figure 3C.3-14  Finite Element Model - Bottom Support Rail . . . . . . . . . . . . . . . . . A.1 Att. 4-9 Figure 3C.3-15  Finite Element Model - Loading and Boundary Conditions . . . . . .A.1 Att. 4-10 Figure 3C.3-16  Finite Element Model - Deformed Shape, 0.24 Distance . . . . . . .A.1 Att. 4-11 Figure 3C.3-17  Finite Element Model - Deformed Shape, 0.5663 Distance . . . . .A.1 Att. 4-12 Figure 3C.3-18  Finite Element Model - Deformed Shape, 0.0 Distance . . . . . . . .A.1 Att. 4-13
[IN 2003-004]
Made editorial correction to correctly refer to QA


Program Topical Report Table 17.2-0.A.1.1
Revision 806/14                  North Anna ISFSI SAR x Intentionally Blank
[IN 2002-004]Identified the analyses in Chapters 4 & 6 of the TN-32 FSAR, Rev. 0, that were added to the North Anna ISFSI SAR.A.1.1[IN 2002-005]Provided bolt torque ranges for the TN-32 casks.
A.1.1, Appendix A.1 Attachment 1[IN 2002-003]Added explanation of the use of TN-32 casks designed


and fabricated to TN-32 Final Safety Analysis Report, Revision 0.A.1.1, Appendix A.1 Attachment 4[IN 2002-006]
Revision 806/14                          North Anna ISFSI SAR LEP-1 LIST OF EFFECTIVE PAGES Table of Contents First Page  Last Page  Revision i            x          Revision 806/14 List of Effective Pages First Page  Last Page  Revision LEP-1        LEP-2      Revision 806/14 Chapter 1 First Page  Last Page  Revision 1-1         1-6        Revision 806/14 Chapter 2 First Page  Last Page  Revision 2-1         2-64        Revision 806/14 2A-i        2A-ii      Revision 806/14 2A-1        2A-44      Revision 806/14 2B-i        2B-ii      Revision 806/14 2B-1        2B-72      Revision 806/14 Chapter 3 First Page  Last Page  Revision 3-1          3-10        Revision 806/14 Chapter 4 First Page  Last Page  Revision 4-1          4-40        Revision 806/14 Chapter 5 First Page  Last Page  Revision 5-1         5-8         Revision 806/14 Chapter 6 First Page  Last Page  Revision 6-1          6-2         Revision 806/14 Chapter 7 First Page  Last Page  Revision 7-1         7-16        Revision 806/14
Incorporated additional anal yses re garding TN-32 cask gap between center basket rails.
A.1.2[IN 2003-003]Added allowance for the storag e of a fuel assembly with rod clips.Revision 3-06/02 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
4.4.5.1, 8.2.5.1


[IN 2001-001]Clarified the description of the placement of fire extinguishers at the ISFSI site as well as the availability of fire fighting equipment and personnel.
Revision 806/14                              North Anna ISFSI SAR LEP-2 LIST OF EFFECTIVE PAGES (CONTINUED)
5.1.1.1[IN 2001-005]
Chapter 8 First Page  Last Page    Revision 8-1         8-8          Revision 806/14 Chapter 9 First Page  Last Page    Revision 9-1         9-6          Revision 806/14 Chapter 10 First Page  Last Page    Revision 10-1        10-4         Revision 806/14 Chapter 11 First Page  Last Page    Revision 11-1        11-2          Revision 806/14 Appendix A First Page  Last Page      Revision A-1          A-2            Revision 806/14 A.1-1        A.1-24        Revision 806/14 A.1 Att. 1-1 A.1 Att. 1-22  Revision 806/14 A.1 Att. 2-1 A.1 Att. 2-6  Revision 806/14 A.1 Att. 3-1 A.1 Att. 3-6  Revision 806/14 A.1 Att. 4-1 A.1 Att. 4-14  Revision 806/14
Changed cask receipt proce dure consistent with the North Anna Power Station Updated Final Safety Analysis Report.9.2.2.1[IN 2002-001]Deleted incorrect testing re quirements for electrical and communications systems.Revision 4-06/04 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Revision 8-06/14North Anna ISFSI SARRS-4 A.1.1, Appendix A.1 Attachment 1[IN 2001-003]Incorporated the modified TN-32 cask lid bolt analysis.
A.1.1, Appendix A.1 Attachment 3[IN 2001-002]Modified the TN-32 cas k protective cover and overpressure system.
A.1.7, Appendix A.1 Attachment 2[IN 2000-001]
Incorporated structural anal yses for missile impacts on TN-32 casks.Revision 2 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
3.1.1, A.1.2
[IN 99-01]Added information on the storage of burnable poison rod


assemblies and thimble plug devices in TN-32 casks.
Revision 806/14                                       North Anna ISFSI SAR                       1-1 Chapter 1       INTRODUCTION AND GENERAL DESCRIPTION OF STORAGE SYSTEM
[10 CFR 72.56 License Amendment]
A.1.1[IN 99-02]Revised the description of the weld in the neutron shield outer shell of TN-32 casks.
A.1.1
[IN 99-03]Clarified the location of borat ed aluminum plates in the fuel bask et of TN-32 casks.Revision 1 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
3.1.1, 3.3.6, 4.2.1, 4.4.4.1, 4.5, Table 4-1, Chapter 6, 7.2.2, A.1.1, A.1.2, A.1.5, A.1.6, Appendix A.1 Attachment 1[IN 98-03]
Delete references to fuel in sert components, clarify the maximum capacity of the backup diesel generator fuel tank, update as-b uilt parameters of the concrete pad, add 120V circuit description, clar ify the status of cask handling equipment, delete statement that emergency actions are neither credible nor postulated to occur, discuss operational practices to prevent weather-driven spread of contamination, add I 129 and Co 60 inventories per assembly, incorporate TN-32 lid bolt analysis, add TN-32 Cask Sliding and Tip-over Analysis, and add Evaluation of Tornado Missiles.
A.1.1[IN 98-01]Include fillet weld as an alte rnative to the groove weld for the fuel basket.Revision 3-06/02 Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Revision 8-06/14North Anna ISFSI SARRS-5 A.1.3[IN 98-02]
Add discussion of dose rate and e xposure estimates.Revision 1 (continued)
Section ChangesMade under the provisions of 10 CFR 72.48 except where indicated in brackets.
Revision 8-06/14North Anna ISFSI SARRS-6 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR iChapter 1Introduction and General Description of Storage System . . . . . 1-11.1Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11.2General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-21.3General Storage System Description. . . . . . . . . . . . . . . . . . . . 1-21.4Identification Of Agents and Contractors . . . . . . . . . . . . . . . . 1-21.5Material Incorporated By Reference . . . . . . . . . . . . . . . . . . . . 1-3Chapter 2Site Characteristics. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.1Geography and Demography Of Site Selected . . . . . . . . . . . . 2-12.1.1Site Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1.2Site Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.1.3Population Distribution and Trends. . . . . . . . . . . . . . . 2-22.1.4Use Of Nearby Land and Waters. . . . . . . . . . . . . . . . . 2-22.2Nearby Industrial, Transportation, and Military Facilities . . . 2-32.2.1Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32.2.2Effects of Potential Accidents . . . . . . . . . . . . . . . . . . . 2-32.3Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-42.3.1Regional Climatology . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.2Local Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.3Onsite Meteorological Measurement Program . . . . . . 2-52.3.4Diffusion Estimates . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-62.3.5References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6NORTHANNA ISFSI SARTable of ContentsSectionTitlePage NORTH ANNA ISFSI SARTable of Contents (continued)SectionTitlePage Revision 8-06/14 North Anna ISFSI SARii2.4Hydrology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-72.4.1Hydrologic Description . . . . . . . . . . . . . . . . . . . . . . . . 2-72.4.2Floods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-82.4.3Probable Maximum Floods On Streams and Rivers . . 2-92.4.4Potential Dam Failures (Seismically Induced) . . . . . . 2-92.4.5Probable Maximum Surge and Seiche Flooding. . . . . 2-92.4.6Probable Maximum Tsunami Flooding. . . . . . . . . . . . 2-10 2.4.7Ice Flooding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.8Flooding Protection Requirements . . . . . . . . . . . . . . . 2-102.4.9Environmental . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.10Subsurface Hydrology. . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.11References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-112.5Geology and Seismology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-122.5.1Basic Geologic and Seismic Information . . . . . . . . . . 2-122.5.2Vibratory Ground Motion . . . . . . . . . . . . . . . . . . . . . . 2-272.5.3Surface Faulting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-312.5.4Stability of Subsurface Materials. . . . . . . . . . . . . . . . . 2-31 2.5.5Slope Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-322.5.6References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32Appendix2ABoring Logs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2A-iAppendix2BLaboratory Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . 2B-iChapter 3Principal SSSC Design Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13.1Purposes of SSSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13.1.1Spent Fuel to Be Stored. . . . . . . . . . . . . . . . . . . . . . . . 3-1 3.1.2General Operating Functions. . . . . . . . . . . . . . . . . . . . 3-33.2Design Criteria for Environmental Conditions and Natural Phenomena3-33.2.1Tornado and Wind Loadings. . . . . . . . . . . . . . . . . . . . 3-43.2.2Water Level (Flood) Design . . . . . . . . . . . . . . . . . . . . 3-53.2.3Seismic Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53.2.4Snow and Ice Loadings . . . . . . . . . . . . . . . . . . . . . . . . 3-53.2.5Combined Load Criteria . . . . . . . . . . . . . . . . . . . . . . . 3-5 NORTH ANNA ISFSI SARTable of Contents (continued)SectionTitlePage Revision 8-06/14 North Anna ISFSI SARiii3.3Safety Protection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53.3.1General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53.3.2Protection By Multiple Confinement Barriers and Systems3-63.3.3Protection By Equipment and Instrumentation Selection3-6 3.3.4Nuclear Criticality Safety . . . . . . . . . . . . . . . . . . . . . . 3-7 3.3.5Radiological Protection . . . . . . . . . . . . . . . . . . . . . . . . 3-73.3.6Fire and Explosion Protection . . . . . . . . . . . . . . . . . . . 3-8 3.3.7Materials Handling and Storage . . . . . . . . . . . . . . . . . 3-83.4Summary of SSSC Design Criteria . . . . . . . . . . . . . . . . . . . . . 3-8Chapter 4Storage System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14.1Location and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14.2Storage Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14.2.1Structures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-24.2.2Storage Site Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-104.2.3SSSC Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-104.2.4Instrumentation System Description . . . . . . . . . . . . . . 4-124.2.5References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-124.3Transport System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-134.3.1Function. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.2Components. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-134.3.3Design Bases and Safety Assurance . . . . . . . . . . . . . . 4-154.3.4References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-164.4Operating Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-164.4.1Loading and Unloading System. . . . . . . . . . . . . . . . . . 4-16 4.4.2Decontamination System. . . . . . . . . . . . . . . . . . . . . . . 4-184.4.3SSSC Repair and Maintenance . . . . . . . . . . . . . . . . . . 4-18 4.4.4Utility Supplies and Systems. . . . . . . . . . . . . . . . . . . . 4-184.4.5Other Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4.4.6References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-204.5Classification of Structures, Systems and Components. . . . . . 4-204.6Decommissioning Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21 NORTH ANNA ISFSI SARTable of Contents (continued)SectionTitlePage Revision 8-06/14 North Anna ISFSI SARivChapter 5STORAGE SYSTEM OPERATIONS . . . . . . . . . . . . . . . . . . . . . 5-15.1Operation Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15.1.1Narrative Description. . . . . . . . . . . . . . . . . . . . . . . . . . 5-15.1.2Flowsheets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-35.1.3Identification of Subjects for Safety and Reliability Analysis5-35.2Control Room and Control Areas . . . . . . . . . . . . . . . . . . . . . . 5-45.3Spent Fuel Accountability Program. . . . . . . . . . . . . . . . . . . . . 5-4 5.4Spent Fuel Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5Chapter 6Waste Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1Chapter 7Radiation Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-17.1Ensuring That Occupational Radiation Exposures Are As Low As Reasonably Achievable (ALARA). . . . . . . . . . . . 7-17.1.1Policy Considerations and Organization . . . . . . . . . . . 7-17.1.2Design Considerations. . . . . . . . . . . . . . . . . . . . . . . . . 7-47.1.3Operational Considerations . . . . . . . . . . . . . . . . . . . . . 7-57.2Radiation Sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-67.2.1Characterization of Sources. . . . . . . . . . . . . . . . . . . . . 7-67.2.2Airborne Radioactive Material Sources. . . . . . . . . . . . 7-67.2.3References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-67.3Radiation Protection Design Features . . . . . . . . . . . . . . . . . . . 7-67.3.1Storage System Design Description . . . . . . . . . . . . . . 7-6 7.3.2Shielding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-77.3.3Area Radiation and Airborne Radioactivity Monitoring Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-87.3.4References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-97.4Estimated Onsite Collective Dose Assessment. . . . . . . . . . . . 7-97.4.1References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-107.5Offsite Collective Dose Assessment . . . . . . . . . . . . . . . . . . . . 7-107.6Health Physics Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-11 7.7Environmental Monitoring Program . . . . . . . . . . . . . . . . . . . . 7-11 NORTH ANNA ISFSI SARTable of Contents (continued)SectionTitlePage Revision 8-06/14 North Anna ISFSI SAR vChapter 8Accident Analyses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18.1Off-Normal Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18.1.1Loss of Electric Power. . . . . . . . . . . . . . . . . . . . . . . . . 8-18.1.2Radiological Impact from Off-Normal Operations. . . 8-28.2Accidents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-28.2.1Earthquake. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2 8.2.2Extreme Wind . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-38.2.3Flood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8.2.4Explosion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-48.2.5Fire. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-48.2.6Storage of an Unauthorized Fuel Assembly . . . . . . . . 8-4 8.2.7Loss of Neutron Shield . . . . . . . . . . . . . . . . . . . . . . . . 8-58.2.8SSSC Seal Leakage . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-68.2.9SSSC Drops. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6 8.2.10Loss of Confinement Barrier. . . . . . . . . . . . . . . . . . . . 8-68.2.11References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-78.3Site Characteristics Affecting Safety Analysis . . . . . . . . . . . . 8-8Chapter 9Conduct of Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-19.1Organizational Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-19.1.1Corporate Organization . . . . . . . . . . . . . . . . . . . . . . . . 9-19.1.2Operation Organization, Mana gement, and Administrative Control System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-19.1.3Personnel Qualification Requirements . . . . . . . . . . . . 9-29.1.4Liaison with Outside Organizations . . . . . . . . . . . . . . 9-29.2Startup Testing and Operation. . . . . . . . . . . . . . . . . . . . . . . . . 9-29.2.1Administrative Procedures for Conducting Test Program9-29.2.2Test Program Description . . . . . . . . . . . . . . . . . . . . . . 9-2 9.2.3Test Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-39.3Training Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3 NORTH ANNA ISFSI SARTable of Contents (continued)SectionTitlePage Revision 8-06/14 North Anna ISFSI SAR vi9.4Normal Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-49.4.1Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-49.4.2Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-69.5Emergency Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 9.6Physical Security Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6Chapter 10Operating Controls and Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . 10-110.1Proposed Operating Controls and Limits. . . . . . . . . . . . . . . . . 10-110.1.1Content of Operating Controls and Limits . . . . . . . . . 10-110.1.2Bases for Operating Controls and Limits . . . . . . . . . . 10-110.2Development of Operating Controls and Limits . . . . . . . . . . . 10-110.2.1Functional and Operating Limits. . . . . . . . . . . . . . . . . 10-1 10.2.2Limiting Conditions for Operation . . . . . . . . . . . . . . . 10-110.2.3Surveillance Requirements . . . . . . . . . . . . . . . . . . . . . 10-2 10.2.4Design Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-210.2.5Administrative Controls. . . . . . . . . . . . . . . . . . . . . . . . 10-2Chapter 11Quality Assurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-111.1Quality Assurance Program Description. . . . . . . . . . . . . . . . . 11-1Appendix A.1TN-32 DRY STORAGE CASK. . . . . . . . . . . . . . . A.1-1Appendix A.1,Attachment 1 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 1-1Appendix A.1,Attachment2 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 2-1Appendix A.1,Attachment3 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 3-1Appendix A.1,Attachment4 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 4-1 Revision 8-06/14 North Anna ISFSI SAR vii Table 2-1Dispersion Factors (/Q) in Accordance with Regulatory Guide 1.145. . . . . . 2-35 Table 2-2Summary of Usgs Gauging Station Records and Estimated Stream Flow Data for the North Anna Dam. . . . . . . . . . . . . . . . . . . . . . . . . . . 2-36 Table 2-3Floods on the North Anna River. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37 Table 2-4Recovery and RQD Values of Borings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-38 Table 2-5Earthquakes Within 200 Miles of North Anna Site Events Listed Chronologically . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-40 Table 3-1Characteristics of Fuel Used at the North Anna Power Station a . . . . . . . . . . . .
3-9 Table 3-2Design Criteria for Dry Sealed Surface Storag e Casks . . . . . . . . . . . . . . . . . . 3-10 Table 4-1Compliance with Genera l Design Criteria (Subpart F, 10 CFR 72). . . . . . . . . 4-23 Table 4-2Codes and Standards for Transporter Design and Fabrication. . . . . . . . . . . . . 4-25 Table 5-1General Sequence of Loading Operations
: a. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-6 Table 5-2General Sequence of Unloading Operations
: a. . . . . . . . . . . . . . . . . . . . . . . . . . .
5-7 Table 7-1Maximum Design Basis Dose Rates Along ISFSI Perimeter Fence (mrem/hr) 7-12 Table 7-2Estimated Occupational Exposures for Cask Loading,  Transport, and Emplacement a (One Time Exposure). . . . . . . . . . . . . . . . . . . . 7-13 Table 7-3North Anna ISFSI Maintenance Operations a Annual Occupational Exposures7-14 Table 7-4Total Annual Occupational Exposur es During ISFSI Loading Operations a . . 7-14 Table 10-1Functional and Operating Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10-3 Table 10-2Limiting Conditions for Operation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10-3 Table A-1Topical Safety Analysis Reports fo r SSSCs Approved for Use at the North Anna ISFSI. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2 Table A.1-1TN-32 ASME Code Exceptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.1-16 Table 3C.3-1Summary of Stresses and Interacti on Equation Evaluation . . . . . . . . .
A.1 Att. 4-8NORTH ANNA ISFSI SARList of TablesTablePage Revision 8-06/14 North Anna ISFSI SAR viiiFigure 1-1ISFSI Location on North Anna Site . . . . . . . . . . . . . . . . . . . . . . . .1-4Figure 1-2ISFSI General Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5Figure 2-1Area Map (0-10 Miles) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-46Figure 2-2Regional Map (0-50 Miles). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-47Figure 2-3North Anna Site Boundary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-48 Figure 2-4Daily Average Temperatures for Richmond, Virginia (1951-1980)2-49Figure 2-5Daily Extreme Temperatur es for Richmond, Virginia (1898-1991)2-50Figure 2-6Extreme 1-Mile wind Passage at Richmond, Virginia . . . . . . . . . .2-51Figure 2-7Regional Topography and Characteristics . . . . . . . . . . . . . . . . . . .2-52Figure 2-8ISFSI Local Topography and Grading Plan . . . . . . . . . . . . . . . . . .2-53Figure 2-9Hydrologic Characteristics of the ISFSI Site . . . . . . . . . . . . . . . . .2-54Figure 2-10Site Geological Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-55Figure 2-11ISFSI Boring Locations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-56Figure 2-12ISFSI Subsurface Cross Section . . . . . . . . . . . . . . . . . . . . . . . . . . .2-57Figure 2-13Regional Geologic Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-58Figure 2-14Pad #1 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-59Figure 2-15Pad #2 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-60 Figure 2-16Pad #3 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-61Figure 2-17Earthquake Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-62Figure 2-18Alternate Transport Route Boring Locations . . . . . . . . . . . . . . . . .2-63Figure 2-19Alternate Transport Route Subsurface Cross Sections . . . . . . . . . .2-64Figure 4-1ISFSI Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-26Figure 4-2ISFSI Electrical Details. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-27 Figure 4-3ISFSI Electrical Details. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-28Figure 4-4Transport Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-29Figure 4-5ISFSI Storage Pad Details. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-30Figure 4-6IMAGES-3D Model of Storage Pad Geometry . . . . . . . . . . . . . . .4-31 Figure 4-7SASSI Model of Storage Pad Geometry. . . . . . . . . . . . . . . . . . . . .4-32Figure 4-8SASSI Cask Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-33 Figure 4-9SASSI Pad Plate Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-34 Figure 4-10Sliding Factors of Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-35NORTH ANNA ISFSI SARList of Figures FigurePage Revision 8-06/14 North Anna ISFSI SARixNORTH ANNA ISFSI SARList of Figures (continued)
FigurePageFigure 4-11Overturning Factors of Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-36Figure 4-12Transporter Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-37 Figure 4-13Fuel and Decontamination Buildings Plan View . . . . . . . . . . . . . .4-38Figure 4-14Fuel and Decontamination Buildings Side View . . . . . . . . . . . . . .4-39Figure 5-1Plan and Profile of ISFSI Site Access Road . . . . . . . . . . . . . . . . . .5-8Figure 7-1ISFSI Layout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-15Figure 7-2Dose Rate for 84 Base Case Casks Versus Distance. . . . . . . . . . . .7-16Figure A.1-1TN-32 Surface Dose Rate Measurement Locations . . . . . . . . . . . .A.1-23 Figure 3C.3-14Finite Element Model - Bottom Support Rail. . . . . . . . . . . . . . . . .A.1 Att. 4-9Figure 3C.3-15Finite Element Model - Loading and Boundary Conditions. . . . . .A.1 Att. 4-10Figure 3C.3-16Finite Element Model - Deformed Shape, 0.24" Distance . . . . . . .A.1 Att. 4-11Figure 3C.3-17Finite Element Model - Deformed Shape, 0.5663" Distance . . . . .A.1 Att. 4-12Figure 3C.3-18Finite Element Model - Deformed Shape, 0.0" Distance . . . . . . . .A.1 Att. 4-13 Revision 8-06/14 North Anna ISFSI SAR x Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR LEP-1Table of ContentsFirst PageLast PageRevision i xRevision 8-06/14List of Effective PagesFirst PageLast PageRevision LEP-1 LEP-2Revision 8-06/14 Chapter 1 First PageLast PageRevision 1-1 1-6Revision 8-06/14 Chapter 2 First PageLast PageRevision 2-1 2-64Revision 8-06/14 2A-i 2A-iiRevision 8-06/14 2A-1 2A-44Revision 8-06/14 2B-i 2B-iiRevision 8-06/14 2B-1 2B-72Revision 8-06/14 Chapter 3 First PageLast PageRevision 3-1 3-10Revision 8-06/14 Chapter 4 First PageLast PageRevision 4-1 4-40Revision 8-06/14 Chapter 5 First PageLast PageRevision 5-1 5-8Revision 8-06/14 Chapter 6 First PageLast PageRevision 6-1 6-2Revision 8-06/14 Chapter 7 First PageLast PageRevision 7-1 7-16Revision 8-06/14LIST OF EFFECTIVE PAGES Revision 8-06/14 North Anna ISFSI SAR LEP-2LIST OF EFFECTIVE PAGES (CONTINUED)
Chapter 8 First PageLast PageRevision 8-1 8-8Revision 8-06/14 Chapter 9 First PageLast PageRevision 9-1 9-6Revision 8-06/14 Chapter 10 First PageLast PageRevision 10-1 10-4Revision 8-06/14 Chapter 11 First PageLast PageRevision 11-1 11-2Revision 8-06/14Appendix A First PageLast PageRevision A-1 A-2Revision 8-06/14 A.1-1 A.1-24Revision 8-06/14 A.1 Att. 1-1 A.1 Att. 1-22Revision 8-06/14 A.1 Att. 2-1 A.1 Att. 2-6Revision 8-06/14 A.1 Att. 3-1 A.1 Att. 3-6Revision 8-06/14 A.1 Att. 4-1 A.1 Att. 4-14Revision 8-06/14 Revision 8-06/14 North Anna ISFSI SAR 1-1Chapter 1INTRODUCTION AND GENERAL DESCRIPTION OF STORAGE SYSTEM


==1.1 INTRODUCTION==
==1.1 INTRODUCTION==
Discharged spent fuel asse mblies from the North Anna Power Station, Units 1 and 2 are currently stored in a sp ent fuel pool common to bo th Units. The spent fuel pool provides for interim storage of 1737 fuel assemblies in high density storage racks. Typically, 64 spent fuel assemblies are dischar ged from each Unit about every 18 months. Section 3.1.1 provides a description of the spent fuel. Additional information on the fuel design is available in Section 4.2 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).Based on the current fuel management strategy and refueling outage schedule, the spent fuel pool will lose the capacity for si ngle unit full core di schar ge in late 1998. St orage capacity in the pool will be completely exhauste d in 2000, therefore, additional spent fuel storage capacity is needed. To support this need, sealed surface storage casks (SSSCs) have been chosen for use at an Independent Spent Fuel Storage Installation (ISFSI) at the North Anna site.
 
The North Anna ISFSI is designed to st ore all the anticipated spen t fuel resulting from the operation of the North Anna Power Station Units 1 and 2 in excess of that which can be stored in the spent fuel pool, or approximately 1824 fuel assemblies. Construction of the North Anna ISFSI is scheduled to be gin in June 1997 and the first SSSC should be placed at the ISFSI in August 1998.The North Anna ISFSI is located within the site boundary of the North Anna Power Station, which is owned 88.4% by Virginia Electric and Power Company (Virginia Power) and 11.6% by the Old Dominion Electric Cooperative. Virginia Power is respon sible for operations at the Station.This SAR is primarily directed towards analyzing the sa fety aspects of SSSC handling and storage once the SSSCs have been lifted by the cask transporter, and how the safety requirements in 10 CFR 72 are satisfied. Handling of th e SSSCs inside the Fuel a nd Decontamination Buildings and cask crane bay is performed in accordan ce with the operating license for the North Anna Po wer Station under 10 CFR 50, however, these operations are also described in this SAR.
Discharged spent fuel assemblies from the North Anna Power Station, Units 1 and 2 are currently stored in a spent fuel pool common to both Units. The spent fuel pool provides for interim storage of 1737 fuel assemblies in high density storage racks. Typically, 64 spent fuel assemblies are discharged from each Unit about every 18 months. Section 3.1.1 provides a description of the spent fuel. Additional information on the fuel design is available in Section 4.2 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).
This SAR indicates that up to th ree concrete storage pads could be used at the North Anna ISFSI and were intended to stor e vertical, metal SSSCs. An addi tional pad, to be used under a 10 CFR 72, Subpart L general license, wa s installed in place of the original Pad 2. The ISFSI site plans described in this SAR have been updated to reflect the new configuration of the ISFSI site with this additional pad.
Based on the current fuel management strategy and refueling outage schedule, the spent fuel pool will lose the capacity for single unit full core discharge in late 1998. Storage capacity in the pool will be completely exhausted in 2000, therefore, additional spent fuel storage capacity is needed. To support this need, sealed surface storage casks (SSSCs) have been chosen for use at an Independent Spent Fuel Storage Installation (ISFSI) at the North Anna site.
Revision 8-06/14 North Anna ISFSI SAR 1-2 1.2 GENERAL The North Anna site comprises approximately 1043 acres in Louisa County, Virginia. The ISFSI is located near the cente r of the site, approximately 2000 feet southwest of the protected area for North Anna Units 1 and 2. Figure 1-1 shows a general layout of the North Anna site.
The North Anna ISFSI is designed to store all the anticipated spent fuel resulting from the operation of the North Anna Power Station Units 1 and 2 in excess of that which can be stored in the spent fuel pool, or approximately 1824 fuel assemblies. Construction of the North Anna ISFSI is scheduled to begin in June 1997 and the first SSSC should be placed at the ISFSI in August 1998.
North Anna Power Station Units 1 and 2 consist of two closed-cycle pressurized water reactors (PWR) provided by Westinghouse. Operating licenses were issued by the NRC in April 1978 and August 1980 for Units 1 and 2, respectively. Unit 1 started commercial operation in June 1978 and Unit 2 in December 1980. A complete description of the po wer station is provided in the North Anna Power Station UFSAR, NRC dockets 50-338/339.
The North Anna ISFSI is located within the site boundary of the North Anna Power Station, which is owned 88.4% by Virginia Electric and Power Company (Virginia Power) and 11.6% by the Old Dominion Electric Cooperative. Virginia Power is responsible for operations at the Station.
The North Anna ISFSI consists of th ree concrete storage pads on which the loaded SSSCs are placed. The storage pads will be built in sequence, as needed, and in an order which minimizes radiation exposures. The storage pads will be su rrounded by a security fenc e and a nuisance fence.
This SAR is primarily directed towards analyzing the safety aspects of SSSC handling and storage once the SSSCs have been lifted by the cask transporter, and how the safety requirements in 10 CFR 72 are satisfied. Handling of the SSSCs inside the Fuel and Decontamination Buildings and cask crane bay is performed in accordance with the operating license for the North Anna Power Station under 10 CFR 50, however, these operations are also described in this SAR.
This SAR indicates that up to three concrete storage pads could be used at the North Anna ISFSI and were intended to store vertical, metal SSSCs. An additional pad, to be used under a 10 CFR 72, Subpart L general license, was installed in place of the original Pad 2. The ISFSI site plans described in this SAR have been updated to reflect the new configuration of the ISFSI site with this additional pad.
 
Revision 806/14                                     North Anna ISFSI SAR                       1-2 1.2 GENERAL The North Anna site comprises approximately 1043 acres in Louisa County, Virginia. The ISFSI is located near the center of the site, approximately 2000 feet southwest of the protected area for North Anna Units 1 and 2. Figure 1-1 shows a general layout of the North Anna site.
North Anna Power Station Units 1 and 2 consist of two closed-cycle pressurized water reactors (PWR) provided by Westinghouse. Operating licenses were issued by the NRC in April 1978 and August 1980 for Units 1 and 2, respectively. Unit 1 started commercial operation in June 1978 and Unit 2 in December 1980. A complete description of the power station is provided in the North Anna Power Station UFSAR, NRC dockets 50-338/339.
The North Anna ISFSI consists of three concrete storage pads on which the loaded SSSCs are placed. The storage pads will be built in sequence, as needed, and in an order which minimizes radiation exposures. The storage pads will be surrounded by a security fence and a nuisance fence.
Another fence will enclose the perimeter of the ISFSI site (hereinafter referred to as the ISFSI perimeter fence).
Another fence will enclose the perimeter of the ISFSI site (hereinafter referred to as the ISFSI perimeter fence).
1.3 GENERAL STORAGE SYSTEM DESCRIPTION The North Anna ISFSI uses SSSCs to store fuel irradiated at the North Anna Power Station.
1.3 GENERAL STORAGE SYSTEM DESCRIPTION The North Anna ISFSI uses SSSCs to store fuel irradiated at the North Anna Power Station.
Typically, the SSSCs are large cylindrical vessels capable of storing up to 32 unconsolidated PWR fuel assemblies. The SSSCs are made of carbon steel, stai nless steel, or cast iron. The y are about 16 feet long and 8 feet in diameter, have walls severa l inches thick and weigh 100 to 125 tons fully loaded. The fuel is stored in a helium at mosphere and held in place by a bask et or rack.
Typically, the SSSCs are large cylindrical vessels capable of storing up to 32 unconsolidated PWR fuel assemblies. The SSSCs are made of carbon steel, stainless steel, or cast iron. They are about 16 feet long and 8 feet in diameter, have walls several inches thick and weigh 100 to 125 tons fully loaded. The fuel is stored in a helium atmosphere and held in place by a basket or rack.
Figure 1-2 shows the general arrangement of the North Anna ISFSI.The loading and preparation of an SSSC take s place within the Fuel and Decontamination Buildings of the North Anna Power Station. The SSSC is lo aded under water in the spent fuel pool where a lid is positi oned on the SSSC prior to lifting it out of the water. Water in the SSSC is removed, the interior is further dried under vacuum and then filled with helium. Following decontamination of the outer surface, the SSSC is placed in a transporter outside the Decontamination Building. The SSSC is then transferred to the ISFSI, where it is emplaced on one of the three storage pads.The SSSCs are totally passive sy stems, with natural convec tion cooling sufficient to maintain safe fuel clad temperatures. The SSSC walls prov ide adequate shielding, and no radioactive products are released under any credible conditions.
Figure 1-2 shows the general arrangement of the North Anna ISFSI.
1.4 IDENTIFICATION OF AG ENTS AND CONTRACTORS SSSCs to be used in the North Anna ISFSI are designed and fabricated by other organizations and will be purchased by Virginia Power. The SSSC supplie rs are responsible for SSSC fabrication, testing, and delineation of specific SSSC requirements, if any. Information Revision 8-06/14 North Anna ISFSI SAR 1-3related to the qualifications of the SSSC suppliers is contained in the T opical Safety Analysis Reports referenced in Section 1.5.Site preparation and necessary construction will be performed by Virginia Power's Site Services Department, using spec ialty subcontractors, as required.
The loading and preparation of an SSSC takes place within the Fuel and Decontamination Buildings of the North Anna Power Station. The SSSC is loaded under water in the spent fuel pool where a lid is positioned on the SSSC prior to lifting it out of the water. Water in the SSSC is removed, the interior is further dried under vacuum and then filled with helium. Following decontamination of the outer surface, the SSSC is placed in a transporter outside the Decontamination Building. The SSSC is then transferred to the ISFSI, where it is emplaced on one of the three storage pads.
1.5 MATERIAL INCORPORA TED BY REFERENCE Detailed information describing the SSSCs is provided in the SSSC Topical Safety Analysis Reports referenc ed in Appendix A, Table A-1 of this Safety Analysis Report (SAR). General references to the SSSC Topical Sa fety Analysis Reports are made in sections of this SAR, as needed, to supplement information contained in the SAR. Ea ch SSS C type is described in a sub-appendix of Appendix A. Also, the sub-appendices provid e SSSC-specific information not contained in the SSSC Topical Safety Analysis Reports. The combination of this SAR, including appendices, and an y one of the re ports describing the SSSCs (one per type of SSSC) provides all the information described in Regulatory Guide 3.62 (February 1989), Standard Format and Content for the Safety Analysis Report for Onsite Storage of Spent Fuel Storage Casks.The following documents, which are already on f ile with the NRC, are referenced throughout this SAR:
The SSSCs are totally passive systems, with natural convection cooling sufficient to maintain safe fuel clad temperatures. The SSSC walls provide adequate shielding, and no radioactive products are released under any credible conditions.
1.North Anna Power Station Units 1 and 2, Updated Final Safety Analysis Report, NRC dockets 50-338 and 50-339.2.North Anna Power Station Units 1, 2, 3 and 4, Environmental Report, submitted March 15, 1972.3.North Anna Power Station, Emergency Plan
1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS SSSCs to be used in the North Anna ISFSI are designed and fabricated by other organizations and will be purchased by Virginia Power. The SSSC suppliers are responsible for SSSC fabrication, testing, and delineation of specific SSSC requirements, if any. Information
.4.Dominion Nuclear Facility Quality As surance Program Description, T opical Report DOM-QA-1.5.Surry Power Station, Independent Spent Fuel Storage Installation, Safety Analysis Report
 
.
Revision 806/14                                     North Anna ISFSI SAR                   1-3 related to the qualifications of the SSSC suppliers is contained in the Topical Safety Analysis Reports referenced in Section 1.5.
Site preparation and necessary construction will be performed by Virginia Powers Site Services Department, using specialty subcontractors, as required.
1.5 MATERIAL INCORPORATED BY REFERENCE Detailed information describing the SSSCs is provided in the SSSC Topical Safety Analysis Reports referenced in Appendix A, Table A-1 of this Safety Analysis Report (SAR). General references to the SSSC Topical Safety Analysis Reports are made in sections of this SAR, as needed, to supplement information contained in the SAR. Each SSSC type is described in a sub-appendix of Appendix A. Also, the sub-appendices provide SSSC-specific information not contained in the SSSC Topical Safety Analysis Reports. The combination of this SAR, including appendices, and any one of the reports describing the SSSCs (one per type of SSSC) provides all the information described in Regulatory Guide 3.62 (February 1989), Standard Format and Content for the Safety Analysis Report for Onsite Storage of Spent Fuel Storage Casks.
The following documents, which are already on file with the NRC, are referenced throughout this SAR:
: 1. North Anna Power Station Units 1 and 2, Updated Final Safety Analysis Report, NRC dockets 50-338 and 50-339.
: 2. North Anna Power Station Units 1, 2, 3 and 4, Environmental Report, submitted March 15, 1972.
: 3. North Anna Power Station, Emergency Plan.
: 4. Dominion Nuclear         Facility Quality   Assurance    Program     Description, Topical Report DOM-QA-1.
: 5. Surry Power Station, Independent Spent Fuel Storage Installation, Safety Analysis Report.
 
Revision 806/14                    North Anna ISFSI SAR 1-5 Figure 1-2 ISFSI GENERAL ARRANGEMENT


Revision 8-06/14 North Anna ISFSI SAR 1-5 Figure 1-2 ISFSI GENERAL ARRANGEMENT Revision 8-06/14 North Anna ISFSI SAR 1-6 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 2-1Chapter 2SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGR APHY OF SITE SELECTED 2.1.1 Site Location The location of the Independent Spent Fuel Storag e Installation (ISFSI) is approximately 2000 feet southwest of the North Anna Power Station Units 1 and 2 protected area and within the boundaries of the North Anna site (see Figure 1-1). The ISFSI occupies approximately 11 acres.The North Anna site is located in the north-centra l portion of Virginia in Louisa County.
Revision 806/14               North Anna ISFSI SAR 1-6 Intentionally Blank
The site is on a peninsula on th e southern shore of Lake Anna at the end of State Route 700. The earth dam that creates the lake is approxima tely 5 miles southeast of the site. The North Anna River flows southeasterly, joining the South Anna River to form the Pamunkey River approximately 27 miles southeast of the site.The largest community within 10 miles of the site is the Town of Mineral (Louisa County), which had a 1990 population of 452 persons, and is approximately 6 miles west-southwest of the site. The community of Louisa, which had a 1990 population of 1088 persons, is approximately 12 miles to the west of the site.
 
Figure 2-1 shows the general location of the site and the surrounding localities within 10 miles.Regionally, as indicated in Figure 2-2 , the site is approximately 40 miles north-northwest of Richmond; 36 miles east of Charlottesville; 22 miles southwest of Fredericksburg; and 70 miles southwest of Washington, D.C. Interstate highways 95 and 64, the two principal highways serving Richmond, pass within 16 miles east and 16 miles southwest of the site, respectively.
Revision 806/14                                       North Anna ISFSI SAR                   2-1 Chapter 2        SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY OF SITE SELECTED 2.1.1 Site Location The location of the Independent Spent Fuel Storage Installation (ISFSI) is approximately 2000 feet southwest of the North Anna Power Station Units 1 and 2 protected area and within the boundaries of the North Anna site (see Figure 1-1). The ISFSI occupies approximately 11 acres.
The North Anna site is located in the north-central portion of Virginia in Louisa County.
The site is on a peninsula on the southern shore of Lake Anna at the end of State Route 700. The earth dam that creates the lake is approximately 5 miles southeast of the site. The North Anna River flows southeasterly, joining the South Anna River to form the Pamunkey River approximately 27 miles southeast of the site.
The largest community within 10 miles of the site is the Town of Mineral (Louisa County),
which had a 1990 population of 452 persons, and is approximately 6 miles west-southwest of the site. The community of Louisa, which had a 1990 population of 1088 persons, is approximately 12 miles to the west of the site. Figure 2-1 shows the general location of the site and the surrounding localities within 10 miles.
Regionally, as indicated in Figure 2-2, the site is approximately 40 miles north-northwest of Richmond; 36 miles east of Charlottesville; 22 miles southwest of Fredericksburg; and 70 miles southwest of Washington, D.C. Interstate highways 95 and 64, the two principal highways serving Richmond, pass within 16 miles east and 16 miles southwest of the site, respectively.
The approximate coordinates of the ISFSI are:
The approximate coordinates of the ISFSI are:
Latitude-LongitudeUniversal Transverse Mercator 38° 3.8' N - 77° 47.5' W 4,215,900 mN - 255,100 mE; Zone 18S 2.1.2 Site Description The North Anna site property comprises 1803 acres, of which approximately 760 acres are covered by water. The site boundary is shown in Figure 2-3. Virginia Power owns, in fee simple, all of the land within the site boundary, both above and beneath the surfaces, including those portions of the reservoir and waste heat treatment facilities (cooling lagoons) that lie within the site boundary. The controlled area is all of the area within the site boundary. Virginia Power also owns, in fee simple, all land outside the site boundary that forms the reservoir and the cooling lagoons up to their expected high-water marks. The Station and all supporting facilities including the reservoir, cooling lagoons, earthen dam, dikes, railroad spur, and roads constitute approximately 13,775 acres.The site plan for the North Anna ISFSI and its relati ve location to the North Anna Power Station are presented on Figure 2-3. Consistent with Section 2.1.2.1 of the North Anna Power Revision 8-06/14 North Anna ISFSI SAR 2-2 Station UFSAR, the restricted area for the ISFSI is the North Anna site boundary. The controlled area boundary is also the site boundary. As shown on Figure 2-3 , the minimum distance to the controlled area boundary from th e ISFSI is approximately 2500 feet and occurs in the southwest sector relative to the ISFSI.Since the controlled area for the North Anna ISFSI is wholly with in the property lines for the North Anna site, Virginia Power has full author ity to determin e all activities including the exclusion and the removal of personnel and property. No activities unrelated to operation of the North Anna Power Station or the ISFSI are pe rmitted within the controlled area.The topography in the site region is character istic of the central Pi edmont Plateau with a gently undulating surf ace varying from 200 to 500 feet above sea level (see Figure 2-7). The surrounding region is covered with forest and brushw ood interspersed with an occasional farm. The land adjacent to the reservoir is becoming in creasingly residential as the land is developed.
Latitude-Longitude                      Universal Transverse Mercator 38° 3.8' N - 77° 47.5' W               4,215,900 mN - 255,100 mE; Zone 18S 2.1.2 Site Description The North Anna site property comprises 1803 acres, of which approximately 760 acres are covered by water. The site boundary is shown in Figure 2-3. Virginia Power owns, in fee simple, all of the land within the site boundary, both above and beneath the surfaces, including those portions of the reservoir and waste heat treatment facilities (cooling lagoons) that lie within the site boundary. The controlled area is all of the area within the site boundary. Virginia Power also owns, in fee simple, all land outside the site boundary that forms the reservoir and the cooling lagoons up to their expected high-water marks. The Station and all supporting facilities including the reservoir, cooling lagoons, earthen dam, dikes, railroad spur, and roads constitute approximately 13,775 acres.
Figure 2-8 shows the topography in the vicinity of the ISFSI. Drainage of surface water at the ISFSI will be provided by channels to a small creek to the south and west. The area inside the IS FSI perimeter fence will be graded level. Areas not needed for ISFSI operations will be seeded with grass, while areas needed for ISFSI operations will be covered with course gravel. The areas surrounding the west, south and east sides of the ISFSI perimete r fence will remain forested. Based on this description, the potential for erosion at the ISFSI is small, and the potential for forest fires exists only outside the ISFSI perimeter fence.
The site plan for the North Anna ISFSI and its relative location to the North Anna Power Station are presented on Figure 2-3. Consistent with Section 2.1.2.1 of the North Anna Power
2.1.3 Population Distribution and TrendsCities within 50 miles of the site are shown on Figure 2-2. Section 2.1.2 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides detailed information on population projections.


2.1.4 Use Of Nearby Land and Waters The North Anna site is located in a predominantly rural area of L ouisa County, Virginia. In Louisa County and the four adjacent counties of Spotsylvania, Orange, Hanover and Caroline, an average 42.5% of the total county acreage is used fo r agriculture.
Revision 806/14                                      North Anna ISFSI SAR                      2-2 Station UFSAR, the restricted area for the ISFSI is the North Anna site boundary. The controlled area boundary is also the site boundary. As shown on Figure 2-3, the minimum distance to the controlled area boundary from the ISFSI is approximately 2500 feet and occurs in the southwest sector relative to the ISFSI.
Approximately 38% of the 508,443 agricultural acres in these five counties is cropland, 15% is pastureland, and the balance is woodland. Principal crops are barley, tobacco, corn, wheat, hay and soybeans. Poultry, livestock and dairy products are also major agricultural products of the area and represent the greatest share of the area's cash farm income.
Since the controlled area for the North Anna ISFSI is wholly within the property lines for the North Anna site, Virginia Power has full authority to determine all activities including the exclusion and the removal of personnel and property. No activities unrelated to operation of the North Anna Power Station or the ISFSI are permitted within the controlled area.
Section 2.1.2.3 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides information on recreational activities on Lake Anna. Section 2.2.1 that follows provides informati on on industrial acti vities in the area.
The topography in the site region is characteristic of the central Piedmont Plateau with a gently undulating surface varying from 200 to 500 feet above sea level (see Figure 2-7). The surrounding region is covered with forest and brushwood interspersed with an occasional farm.
Revision 8-06/14 North Anna ISFSI SAR 2-3 2.2 NEARBY INDUSTRIAL, TRANSPORTATI ON, AND MILITARY F ACILITIES 2.2.1 DescriptionCurrently, there are none of the following facilities within 5 miles of the North Anna site:
The land adjacent to the reservoir is becoming increasingly residential as the land is developed.
military bases, manuf acturing plants, chemical plants and storage facilities, airports, major railroad lines, major water transportation routes or oil and gas pipelines.
Figure 2-8 shows the topography in the vicinity of the ISFSI. Drainage of surface water at the ISFSI will be provided by channels to a small creek to the south and west. The area inside the ISFSI perimeter fence will be graded level. Areas not needed for ISFSI operations will be seeded with grass, while areas needed for ISFSI operations will be covered with course gravel. The areas surrounding the west, south and east sides of the ISFSI perimeter fence will remain forested.
Also, there are no mining activities within 5 miles of the site.There are no significant indu strial acti vities within 5 miles of the site. Based on trends of industrial growth and projected population figures, it is not expected that any major i ndustrial expansion will occur in this area.
Based on this description, the potential for erosion at the ISFSI is small, and the potential for forest fires exists only outside the ISFSI perimeter fence.
Roads within 10 miles of the site are shown on Figure 2-1. Virginia Route 208 and US Route 522 are the major transportation routes serving the site area th at pass within 5 miles of the site, however, there are no specific data on the types and qua ntities of products and materials transported on these roads.
2.1.3 Population Distribution and Trends Cities within 50 miles of the site are shown on Figure 2-2. Section 2.1.2 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides detailed information on population projections.
State Route 700, east from State Route 652, is the only land access to the North Anna site. It ends at the site west boundary. No chemicals or cargo are expect ed to be transported on this portion of Route 700 unless the chemicals or cargo are used by the North Anna Power Station.
2.1.4 Use Of Nearby Land and Waters The North Anna site is located in a predominantly rural area of Louisa County, Virginia. In Louisa County and the four adjacent counties of Spotsylvania, Orange, Hanover and Caroline, an average 42.5% of the total county acreage is used for agriculture. Approximately 38% of the 508,443 agricultural acres in these five counties is cropland, 15% is pastureland, and the balance is woodland. Principal crops are barley, tobacco, corn, wheat, hay and soybeans. Poultry, livestock and dairy products are also major agricultural products of the area and represent the greatest share of the areas cash farm income.
The railroad line closest to the site is the line owned by CSXT. It passes through the towns of Louisa, Mineral, Fredericks Hall and Bumpass; its closest approach to the site is approximately 5.5 miles southwest. A spur line conn ects the site with this line.There are only two airports within 10 miles of the site: Lake A nna (Rest-A-While) Airport and Cub Field. The Louisa County Airport is located 11 miles west-southwest of the site. Operations at these airports involve light aircraft. None of these airports are expected to grow significantly in the foreseeable future. Section 2.2.1.6.2 of the North Anna Power Station UFSAR includes a discussion of airways over the site.
Section 2.1.2.3 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides information on recreational activities on Lake Anna.
2.2.2 Effects of Potential AccidentsThe only sources of explosion and formation of flammable vapor clouds are explosive materials/chemicals carried by truck traffic.The largest possible explosive load routinely transported contains 8500 gallons of gasoline (set by highway weight limits). Based on an analysis in Section 2.2.2.1.1 of the North Anna Power Station UFSAR, if this amount of gasoline were to e xplode at the closes t point to the site, 1.5 miles on State Route 652, a peak overpressure of 1 psi would be experienced approximately 1900 feet away from the point of explosion. The overpressure experienced by the SSSCs 1.5 miles away from the explosion would be significantly less than 1 psi.
Section 2.2.1 that follows provides information on industrial activities in the area.
Revision 8-06/14 North Anna ISFSI SAR 2-4 2.3 METEOROLOGY Meteorology at the North Anna Power Station is described in Section 2.3 of the North Anna Power Station UFSAR. Information from the UF SAR concerning meteorol ogy is summarized and supplemented below.2.3.1 Regional Climatology The climate of the site is basically modified continental. The summers are warm and humid while winters are generally mild.
 
The Blue Ridge Mountains to the west act as partial barriers to winter storms, modifying their intensity as they move across the rolling Piedmont to the Tidewater region adjacent to the Atlantic Ocean.
Revision 806/14                                        North Anna ISFSI SAR                    2-3 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.2.1 Description Currently, there are none of the following facilities within 5 miles of the North Anna site:
Climatic characteristic s are illustrated in Figure 2-4 through Figure 2-6 which show daily average temperatures, daily extreme temperatures, and the probabili ty of an extreme l-mile wind passage for Richmond, Virginia. Temperatures in the site region rarely exceed 95°F or fall below 10°F.Rainfall averages approximately 44 inches per year around the site region and is fairly well distributed throughout the year, with the exception of the m onths of July and August, when thunderstorm activity raises the mo nthly totals to approximately 5 inches. Tropical storms may also contribute significantly to precipitation during the late summer and fall. Records indicate that the maximum rainfall during a 24-hour period was 8.79 inches, which occurred in August 1955.Snowfalls of 4 inches or more occur an average of on ce per year. Snow us ually only remains on the ground from 1 to 4 days at a time. Richmond averages 14.6 inches of snow per year.Tornadoes are infrequent in Virginia. In the period from 1916 through 1987, only 65 tornadoes were reported within a 50-mile radius of the North Anna site (Reference 1). This averages to less than one tornado per year with in this radius. Based on statistical methods proposed by Thom (Reference 2) and as described in detail in Section 2.3.1.3.2 of the North Anna Power Station UFSAR, the probability of a torna do striking a point within the 50-mile radius is 3.25 x 10-5 per year, or a recurrence interval of 30,800 years.Richmond averages 37 thunderstorm days per year with a quarter of th ese typically occurring in July. Cloud-to-ground lightning strike data within an approximate 10-kilometer radius of the site region was an alyzed for the ten year period of 1984 to 1993. Results indicate a minimum yearly strike frequency of 1.1 strikes per square kilomete r in 1992 and a maximum yearly strike frequency of 3.9 strikes per square kilometer in 1988.
military bases, manufacturing plants, chemical plants and storage facilities, airports, major railroad lines, major water transportation routes or oil and gas pipelines. Also, there are no mining activities within 5 miles of the site.
2.3.2 Local Meteorology 2.3.2.1 Data Sources Meteorology in the North Anna Power Station site area wa s evaluated as part of its Operating License application review. Data acquired by the National Weather Service and Revision 8-06/14 North Anna ISFSI SAR 2-5summarized by the Environm ental Data Service (Reference 3) were used to determine the normals, means, and extremes of temperature and precipitation appl icable to the North Anna site re gion.Temperature extremes for Rich mond, Virginia are shown in Figure 2-5. In August 1918 a record high of 107°F was recorded and in January 1940 a record low of -12°F was recorded. The extreme temperatures used as the design criteria for the SSSCs, -20°F and 115°F, were selected because they exceed the recorded temperature extremes.The design solar insolation values for casks stored at the ISFSI are adapted from 10 CFR 71.71(c). The insolation values are 800 gm-cal/cm2 for fl at surf aces and 400 m-cal/cm2 for curved surfaces applied over a 12-hour daylight period. These insolation values may be averaged over a 24-hour period fo r long-term thermal analyses.Joint frequency distributions of wind speed and horizontal atmospheric stability for both the lower and upper tower levels are presented in Tables 2.3-9 and 2.3-10 of the North Anna Power Station UFSAR. In addition, th e joint frequency distribution of lower level wind speed and vertical atmospheric st ability are presented in Table 2.3-11 of the North Anna Power Station UFSAR. The distributions are for Stability Classes A through G as defined in Regulatory Guide 1.23.2.3.2.2 Topography The North Anna Power Station site and exclusi on area consist of approximately 1043 acres located in the north-central port ion of Virginia in Louisa County beside Lake Anna. The site region is characterized by gently rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is cut by the North Anna River. The topography in the site re gion is characteristic of the Ce ntral Piedmont Plateau, wh ich has a gently undulating surface that varies from 200 to 500 feet above sea level.
There are no significant industrial activities within 5 miles of the site. Based on trends of industrial growth and projected population figures, it is not expected that any major industrial expansion will occur in this area.
Figure 2.3-24 of the North Anna Power Station UFSAR is a map showing detailed topographic features with in an 8-kilometer (5 mile) radius centered on the site area.
Roads within 10 miles of the site are shown on Figure 2-1. Virginia Route 208 and US Route 522 are the major transportation routes serving the site area that pass within 5 miles of the site, however, there are no specific data on the types and quantities of products and materials transported on these roads.
2.3.3 Onsite Meteorological Measurement Program The North Anna Power Station will al so pro vide meteorological monitoring for the ISFSI.
State Route 700, east from State Route 652, is the only land access to the North Anna site. It ends at the site west boundary. No chemicals or cargo are expected to be transported on this portion of Route 700 unless the chemicals or cargo are used by the North Anna Power Station.
A detailed description of th e meteorological monitoring program is provided in Section 2.3.3 of the North Anna Power Station UFSAR. Data from this program, however, w ill not be used to estimate offsite concentrations of airborne effluents from the ISFSI, as no credible mechanism for the release of airborne ef fluents has been postulated.As illustrated in Figure 2.3-25 of the North Anna Power Station UF SAR, the ISFSI is located approximately 3500 feet from the primary meteorologic al tower, with the service water reservoir and the Units 1 and 2 discharge canal between the ISFSI and the tower. Based on the analysis in Section 2.3.3.6 of the Surry Power Station ISFS I SAR, the separation between the Revision 8-06/14 North Anna ISFSI SAR 2-6North Anna ISFSI and the meteorological tower, an d the intervening topography and other heat sources, no effect is expected on the tower fro m the heat source represented by a fully loaded ISFSI.2.3.4 Diffusion Estimates 2.3.4.1 Basis No routine or accidental releases are planned or postulated as a result of ISFSI operation.
The railroad line closest to the site is the line owned by CSXT. It passes through the towns of Louisa, Mineral, Fredericks Hall and Bumpass; its closest approach to the site is approximately 5.5 miles southwest. A spur line connects the site with this line.
Nevertheless, /Q values have been calculated which can be used to estimat e radiological doses from the accidental release analyzed in Section 8.2.10.2.3.4.2 CalculationsFive years of meteorological data from 1989 through 1993 were used to calculate dispersion f actors (/Q) for use in the dose assessment of accident airborne releases. Wind speed, direction, distance from the ISFSI to the North Anna Power Station site boundary , and atmosphe ric stability class (based on the temperatur e gradient determined from instrumentation at the 10 meter and the 158.9 foot elevations) serve as inputs to the dispersion model desc ribed in Re gulatory Guide 1.145 (Reference 4).Table 2-1 provides the /Q values at the site boundary fo r an instantaneous accidental release from the ISFSI. Time-dependent /Q values are not provided since routine releases are neither planned nor anticipated. The /Q values provided in Table 2-1 represent the most limiting /Q values to members of the public with the SE sector having the greatest /Q at 1100 meters from the ISFSI to the site boundary. According to the dispersion mo del, the topographical features surrounding the North Anna site are such that the /Q v alues monotonically decrease with distance from the site boundary. Therefore, the li miting dose to members of the public will occur at the site boundary in the SE sector and dose to members of the public will decrease as the distance from the s ite boundary increases.
There are only two airports within 10 miles of the site: Lake Anna (Rest-A-While) Airport and Cub Field. The Louisa County Airport is located 11 miles west-southwest of the site.
2.3.5 References1.Storm Data, National Oceani c and Atmospheric Administra tion, National W eather Records Center, Environmental Data Service, Asheville, North Carolina.2.H. C. S. Thom, "Tornado Probabilities,"
Operations at these airports involve light aircraft. None of these airports are expected to grow significantly in the foreseeable future. Section 2.2.1.6.2 of the North Anna Power Station UFSAR includes a discussion of airways over the site.
Monthly Weather Review, Vol. 91, Nos. 10-12, pp. 730-736.3.Richmond, Virginia 1987 Local Climatologica l Data, Annual Summary With Comparative Data, National Oceanic and Atmospheric Administration, National Weather Records Center, Environmental Data Service, Asheville, North Carolina.4.U. S. NRC Regulatory Guide 1.145, Atmospheric Dispersion Models for Post Accident Consequence Assessments at Nuclear Power Plants, Revision 1, November 1982, Reissued February 1983.
2.2.2 Effects of Potential Accidents The only sources of explosion and formation of flammable vapor clouds are explosive materials/chemicals carried by truck traffic.
Revision 8-06/14 North Anna ISFSI SAR 2-7 2.4 HYDROLOGY The data and analys es in this section were obtaine d from the material presented in Section 2.4 of the North Anna Power Station UFSAR (References 1 & 2). In addition, hydrologic data for the period from 1971 to 1993 were also reviewed. No severe event occurred from 1973 to the present which exceeded the maximum flood on record that has occurred on the North Anna River. The subsurface hydrology section includes site specific data produced as a result of the ISFSI site soils investigation, and follow-up monitoring.
The largest possible explosive load routinely transported contains 8500 gallons of gasoline (set by highway weight limits). Based on an analysis in Section 2.2.2.1.1 of the North Anna Power Station UFSAR, if this amount of gasoline were to explode at the closest point to the site, 1.5 miles on State Route 652, a peak overpressure of 1 psi would be experienced approximately 1900 feet away from the point of explosion. The overpressure experienced by the SSSCs 1.5 miles away from the explosion would be significantly less than 1 psi.
2.4.1 Hydrologic Description 2.4.1.1 Site and StructuresThe general site grade for th e ISFSI is at Elevation 311 feet msl. This grade varies some what to permit proper drainage. The top elevation of the storage pads will be at 311.5 feet msl. Areas outside of the ISFSI generally sl ope to the south, towards Lake Anna. There is an ISFSI access road to the west of the ISFSI which is graded from Elevation 332 feet msl to Elevation 311 feet msl into the site. Site grade is above the probable maximum flood level, as discussed in Section 2.4.2.2. There are no above-ground enclosed structures associated with this facility.2.4.1.2 HydrosphereRegional topography and char acteristics are shown on Figure 2-7. The region surrounding the North Anna Power Station site is characterized by ge ntly rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is bisected by the North Anna River. The topography in the site re gion is characteristic of the Central Pied mont Plateau, which has a gently undulating surface that varies from 200 to 500 feet above sea level.An earth dam approximately five miles southeast of the site forms Lake Anna, which extends approximately 17 miles along the old North Anna river bed. The lake and waste heat treatment facility cover a surface area of 13,000 acres and contain approximately 100 billion gallons of water.The ISFSI site is located more than 60 feet above normal lake level elevation, and 45 feet above the flood elevation assumed to occur due to the Probabl e Maximum Flood postulated to occur on Lake Anna. The terrain near the ISFSI site varies from Elevation 336 feet msl northwest of the ISFSI to Elevation 250 feet msl near the lake.
 
The North Anna River rises in the eastern slopes of the southwestern mountains in the Appalachian Range near Gordonsvil le, Virginia, flows into the Lake, and then continues along a southeasterly course to its confluence with the South Anna River 5 miles northeast of Ashland, Virginia, where the Pamunkey River is formed. The Pamunkey River continues on a general southeasterly course to West Point, Virginia, wher e it is joined by the Mattaponi to form the York River. The York River flows into the Chesapeake Bay approximately 15 miles north of Hampton, Virginia.
Revision 806/14                                      North Anna ISFSI SAR                      2-4 2.3 METEOROLOGY Meteorology at the North Anna Power Station is described in Section 2.3 of the North Anna Power Station UFSAR. Information from the UFSAR concerning meteorology is summarized and supplemented below.
Revision 8-06/14 North Anna ISFSI SAR 2-8 The North Anna River drains a watershed of 343 square miles above the dam. The dam is located approximately 4 miles north of Bumpass, Vi r ginia and approximately 0.5 mile upstream of Virginia Route 601. The nearest United States Geologi cal Survey (USGS) stream gauging station on the North Anna River was at the br idge at Virginia Route 601. This stream gauge had been operating from October 1978 to January 1997. There have also been gauges located at Doswell and Hart Corner, Virginia, approximately 15 miles downstream from the dam. These gauges have provided coverage since 1929. The current USGS gauge at Hart Corner monitors flow over a watershed of approximately 463 square miles. Table 2-2 summarizes the records at these gauging stations and tabula tes basic stream flow data for the dam site, which have been estimated using the gauge records as a guide for years prior to 1971, and the Partlow gauge data for years after 1977.No river control structures exist on the North Anna River other than the dam described above.There is one industrial u ser of water on the North Anna River downstream of the dam, Bear Island Paper Company, and this facility is located approximately 26 miles from the North Anna Po wer Station. There are no known industrial users of water on the Pamunkey River until it reaches the York River some 60 miles downstream at West Point, where a large pulp and paper manuf acturing plant is located. There is one known potable water withdrawal on the North Anna River, the Hanover County Treatment Plant near Doswell. This plant is located approximately 24 miles downstream from the po wer station.
2.3.1 Regional Climatology The climate of the site is basically modified continental. The summers are warm and humid while winters are generally mild. The Blue Ridge Mountains to the west act as partial barriers to winter storms, modifying their intensity as they move across the rolling Piedmont to the Tidewater region adjacent to the Atlantic Ocean.
2.4.2 Floods The North Anna ISFSI is a flood-dry site due to the elevation of the site with respect to Lake Anna and the conservative design of storm drainage facilities within the local site area. Local intense precipitation is the controlling case for storm drainage design.
Climatic characteristics are illustrated in Figure 2-4 through Figure 2-6 which show daily average temperatures, daily extreme temperatures, and the probability of an extreme l-mile wind passage for Richmond, Virginia. Temperatures in the site region rarely exceed 95°F or fall below 10°F.
2.4.2.1 Flood History Floods due to precipitation on the watershed of the North Anna River are the only flooding conditions applicable to historical consideration. Sur ges due to tropical systems, or tsunamis are not applicable to this site. The site is also not influenced by tidal effects. Gauge records have been available since the late 1920s at the USGS gauge near Doswell and in later years at Hart Corner (Reference 3). In this time the most serious flooding on the North Anna River that occurred took place in 1969 due to the remnants of Hurricane Camille (Reference 4). The second largest event on gauged record was in 1972 with the passing of th e remnants of Hurricane Agnes through the watershed. Two smaller events occurred in 1928 and 1937 (Reference 5). The largest twelve floods on gauged record are listed in Table 2-3.The average annual flood on the North Anna River near Doswell is approximately 7000 cfs.
Rainfall averages approximately 44 inches per year around the site region and is fairly well distributed throughout the year, with the exception of the months of July and August, when thunderstorm activity raises the monthly totals to approximately 5 inches. Tropical storms may also contribute significantly to precipitation during the late summer and fall. Records indicate that the maximum rainfall during a 24-hour period was 8.79 inches, which occurred in August 1955.
Revision 8-06/14 North Anna ISFSI SAR 2-9 2.4.2.2 Flood Design ConsiderationsA discussion of flood elevation levels comp ared to the ISFSI site is provided in Section 2.4.1.2. A discussion of the analysis of the Probable Maximum Flood and its basis is contained in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR. The effects of local intense precipitation have been tak en into account in the design of the storm drainage system for the ISFSI site. Detailed discussion of this item is contained in Section 2.4.2.3.2.4.2.3 Effects of Local Intense PrecipitationThe ISFSI site is at a higher elevatio n than the surrounding area as shown on Figure 2-8. The site is drained by gradual fine grading away from the storage pads, and a combination of earthen, and concrete channels to the exterior of the site. The southern eight acres of the site are drained by a system of earthen and concrete trapezo idal channels, and the re mainder of the site is drained via concrete culverts. This is shown on Figure 2-8. The drainage system was designed using a 10-year storm rainfall in tensity. Storm drainage channels were checked and provided with additional depth to accommodate the 100-year st orm (References 6 , 7 & 8). These channels were checked to confirm that adequate hydraulic capacity existed in the storm drain system, and that the hydraulic grade line elevations were less than the top elevations of the storage pads. Since the storage pads are located at the highest part of the ISFSI, severe floodi ng or hydrodynamic loading due to floodwater is not credible based on the 100-year storm.
Snowfalls of 4 inches or more occur an average of once per year. Snow usually only remains on the ground from 1 to 4 days at a time. Richmond averages 14.6 inches of snow per year.
Tornadoes are infrequent in Virginia. In the period from 1916 through 1987, only 65 tornadoes were reported within a 50-mile radius of the North Anna site (Reference 1). This averages to less than one tornado per year within this radius. Based on statistical methods proposed by Thom (Reference 2) and as described in detail in Section 2.3.1.3.2 of the North Anna Power Station UFSAR, the probability of a tornado striking a point within the 50-mile radius is 3.25 x 10-5 per year, or a recurrence interval of 30,800 years.
Richmond averages 37 thunderstorm days per year with a quarter of these typically occurring in July. Cloud-to-ground lightning strike data within an approximate 10-kilometer radius of the site region was analyzed for the ten year period of 1984 to 1993. Results indicate a minimum yearly strike frequency of 1.1 strikes per square kilometer in 1992 and a maximum yearly strike frequency of 3.9 strikes per square kilometer in 1988.
2.3.2 Local Meteorology 2.3.2.1 Data Sources Meteorology in the North Anna Power Station site area was evaluated as part of its Operating License application review. Data acquired by the National Weather Service and
 
Revision 806/14                                      North Anna ISFSI SAR                      2-5 summarized by the Environmental Data Service (Reference 3) were used to determine the normals, means, and extremes of temperature and precipitation applicable to the North Anna site region.
Temperature extremes for Richmond, Virginia are shown in Figure 2-5. In August 1918 a record high of 107°F was recorded and in January 1940 a record low of -12°F was recorded. The extreme temperatures used as the design criteria for the SSSCs, -20°F and 115°F, were selected because they exceed the recorded temperature extremes.
The design solar insolation values for casks stored at the ISFSI are adapted from 10 CFR 71.71(c). The insolation values are 800 gm-cal/cm2 for flat surfaces and 400 m-cal/cm2 for curved surfaces applied over a 12-hour daylight period. These insolation values may be averaged over a 24-hour period for long-term thermal analyses.
Joint frequency distributions of wind speed and horizontal atmospheric stability for both the lower and upper tower levels are presented in Tables 2.3-9 and 2.3-10 of the North Anna Power Station UFSAR. In addition, the joint frequency distribution of lower level wind speed and vertical atmospheric stability are presented in Table 2.3-11 of the North Anna Power Station UFSAR. The distributions are for Stability Classes A through G as defined in Regulatory Guide 1.23.
2.3.2.2 Topography The North Anna Power Station site and exclusion area consist of approximately 1043 acres located in the north-central portion of Virginia in Louisa County beside Lake Anna. The site region is characterized by gently rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is cut by the North Anna River. The topography in the site region is characteristic of the Central Piedmont Plateau, which has a gently undulating surface that varies from 200 to 500 feet above sea level.
Figure 2.3-24 of the North Anna Power Station UFSAR is a map showing detailed topographic features within an 8-kilometer (5 mile) radius centered on the site area.
2.3.3 Onsite Meteorological Measurement Program The North Anna Power Station will also provide meteorological monitoring for the ISFSI.
A detailed description of the meteorological monitoring program is provided in Section 2.3.3 of the North Anna Power Station UFSAR. Data from this program, however, will not be used to estimate offsite concentrations of airborne effluents from the ISFSI, as no credible mechanism for the release of airborne effluents has been postulated.
As illustrated in Figure 2.3-25 of the North Anna Power Station UFSAR, the ISFSI is located approximately 3500 feet from the primary meteorological tower, with the service water reservoir and the Units 1 and 2 discharge canal between the ISFSI and the tower. Based on the analysis in Section 2.3.3.6 of the Surry Power Station ISFSI SAR, the separation between the
 
Revision 806/14                                    North Anna ISFSI SAR                      2-6 North Anna ISFSI and the meteorological tower, and the intervening topography and other heat sources, no effect is expected on the tower from the heat source represented by a fully loaded ISFSI.
2.3.4 Diffusion Estimates 2.3.4.1 Basis No routine or accidental releases are planned or postulated as a result of ISFSI operation.
Nevertheless, /Q values have been calculated which can be used to estimate radiological doses from the accidental release analyzed in Section 8.2.10.
2.3.4.2 Calculations Five years of meteorological data from 1989 through 1993 were used to calculate dispersion factors (/Q) for use in the dose assessment of accident airborne releases. Wind speed, direction, distance from the ISFSI to the North Anna Power Station site boundary, and atmospheric stability class (based on the temperature gradient determined from instrumentation at the 10 meter and the 158.9 foot elevations) serve as inputs to the dispersion model described in Regulatory Guide 1.145 (Reference 4).
Table 2-1 provides the /Q values at the site boundary for an instantaneous accidental release from the ISFSI. Time-dependent /Q values are not provided since routine releases are neither planned nor anticipated. The /Q values provided in Table 2-1 represent the most limiting
/Q values to members of the public with the SE sector having the greatest /Q at 1100 meters from the ISFSI to the site boundary. According to the dispersion model, the topographical features surrounding the North Anna site are such that the /Q values monotonically decrease with distance from the site boundary. Therefore, the limiting dose to members of the public will occur at the site boundary in the SE sector and dose to members of the public will decrease as the distance from the site boundary increases.
2.3.5 References
: 1. Storm Data, National Oceanic and Atmospheric Administration, National Weather Records Center, Environmental Data Service, Asheville, North Carolina.
: 2. H. C. S. Thom, Tornado Probabilities, Monthly Weather Review, Vol. 91, Nos. 10-12, pp. 730-736.
: 3. Richmond, Virginia 1987 Local Climatological Data, Annual Summary With Comparative Data, National Oceanic and Atmospheric Administration, National Weather Records Center, Environmental Data Service, Asheville, North Carolina.
: 4. U. S. NRC Regulatory Guide 1.145, Atmospheric Dispersion Models for Post Accident Consequence Assessments at Nuclear Power Plants, Revision 1, November 1982, Reissued February 1983.
 
Revision 806/14                                      North Anna ISFSI SAR                      2-7 2.4 HYDROLOGY The data and analyses in this section were obtained from the material presented in Section 2.4 of the North Anna Power Station UFSAR (References 1 & 2). In addition, hydrologic data for the period from 1971 to 1993 were also reviewed. No severe event occurred from 1973 to the present which exceeded the maximum flood on record that has occurred on the North Anna River. The subsurface hydrology section includes site specific data produced as a result of the ISFSI site soils investigation, and follow-up monitoring.
2.4.1 Hydrologic Description 2.4.1.1 Site and Structures The general site grade for the ISFSI is at Elevation 311 feet msl. This grade varies somewhat to permit proper drainage. The top elevation of the storage pads will be at 311.5 feet msl. Areas outside of the ISFSI generally slope to the south, towards Lake Anna. There is an ISFSI access road to the west of the ISFSI which is graded from Elevation 332 feet msl to Elevation 311 feet msl into the site. Site grade is above the probable maximum flood level, as discussed in Section 2.4.2.2. There are no above-ground enclosed structures associated with this facility.
2.4.1.2 Hydrosphere Regional topography and characteristics are shown on Figure 2-7. The region surrounding the North Anna Power Station site is characterized by gently rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is bisected by the North Anna River. The topography in the site region is characteristic of the Central Piedmont Plateau, which has a gently undulating surface that varies from 200 to 500 feet above sea level.
An earth dam approximately five miles southeast of the site forms Lake Anna, which extends approximately 17 miles along the old North Anna river bed. The lake and waste heat treatment facility cover a surface area of 13,000 acres and contain approximately 100 billion gallons of water.
The ISFSI site is located more than 60 feet above normal lake level elevation, and 45 feet above the flood elevation assumed to occur due to the Probable Maximum Flood postulated to occur on Lake Anna. The terrain near the ISFSI site varies from Elevation 336 feet msl northwest of the ISFSI to Elevation 250 feet msl near the lake.
The North Anna River rises in the eastern slopes of the southwestern mountains in the Appalachian Range near Gordonsville, Virginia, flows into the Lake, and then continues along a southeasterly course to its confluence with the South Anna River 5 miles northeast of Ashland, Virginia, where the Pamunkey River is formed. The Pamunkey River continues on a general southeasterly course to West Point, Virginia, where it is joined by the Mattaponi to form the York River. The York River flows into the Chesapeake Bay approximately 15 miles north of Hampton, Virginia.
 
Revision 806/14                                         North Anna ISFSI SAR                     2-8 The North Anna River drains a watershed of 343 square miles above the dam. The dam is located approximately 4 miles north of Bumpass, Virginia and approximately 0.5 mile upstream of Virginia Route 601. The nearest United States Geological Survey (USGS) stream gauging station on the North Anna River was at the bridge at Virginia Route 601. This stream gauge had been operating from October 1978 to January 1997. There have also been gauges located at Doswell and Hart Corner, Virginia, approximately 15 miles downstream from the dam. These gauges have provided coverage since 1929. The current USGS gauge at Hart Corner monitors flow over a watershed of approximately 463 square miles. Table 2-2 summarizes the records at these gauging stations and tabulates basic stream flow data for the dam site, which have been estimated using the gauge records as a guide for years prior to 1971, and the Partlow gauge data for years after 1977.
No river control structures exist on the North Anna River other than the dam described above.
There is one industrial user of water on the North Anna River downstream of the dam, Bear Island Paper Company, and this facility is located approximately 26 miles from the North Anna Power Station. There are no known industrial users of water on the Pamunkey River until it reaches the York River some 60 miles downstream at West Point, where a large pulp and paper manufacturing plant is located. There is one known potable water withdrawal on the North Anna River, the Hanover County Treatment Plant near Doswell. This plant is located approximately 24 miles downstream from the power station.
2.4.2 Floods The North Anna ISFSI is a flood-dry site due to the elevation of the site with respect to Lake Anna and the conservative design of storm drainage facilities within the local site area.
Local intense precipitation is the controlling case for storm drainage design.
2.4.2.1 Flood History Floods due to precipitation on the watershed of the North Anna River are the only flooding conditions applicable to historical consideration. Surges due to tropical systems, or tsunamis are not applicable to this site. The site is also not influenced by tidal effects. Gauge records have been available since the late 1920s at the USGS gauge near Doswell and in later years at Hart Corner (Reference 3). In this time the most serious flooding on the North Anna River that occurred took place in 1969 due to the remnants of Hurricane Camille (Reference 4). The second largest event on gauged record was in 1972 with the passing of the remnants of Hurricane Agnes through the watershed. Two smaller events occurred in 1928 and 1937 (Reference 5). The largest twelve floods on gauged record are listed in Table 2-3.
The average annual flood on the North Anna River near Doswell is approximately 7000 cfs.
 
Revision 806/14                                       North Anna ISFSI SAR                     2-9 2.4.2.2 Flood Design Considerations A discussion of flood elevation levels compared to the ISFSI site is provided in Section 2.4.1.2. A discussion of the analysis of the Probable Maximum Flood and its basis is contained in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR. The effects of local intense precipitation have been taken into account in the design of the storm drainage system for the ISFSI site. Detailed discussion of this item is contained in Section 2.4.2.3.
2.4.2.3 Effects of Local Intense Precipitation The ISFSI site is at a higher elevation than the surrounding area as shown on Figure 2-8.
The site is drained by gradual fine grading away from the storage pads, and a combination of earthen, and concrete channels to the exterior of the site. The southern eight acres of the site are drained by a system of earthen and concrete trapezoidal channels, and the remainder of the site is drained via concrete culverts. This is shown on Figure 2-8. The drainage system was designed using a 10-year storm rainfall intensity. Storm drainage channels were checked and provided with additional depth to accommodate the 100-year storm (References 6, 7 & 8). These channels were checked to confirm that adequate hydraulic capacity existed in the storm drain system, and that the hydraulic grade line elevations were less than the top elevations of the storage pads. Since the storage pads are located at the highest part of the ISFSI, severe flooding or hydrodynamic loading due to floodwater is not credible based on the 100-year storm.
2.4.3 Probable Maximum Floods On Streams and Rivers Based on information presented in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR, the probable maximum flood on Lake Anna would result in a lake level of 264.2 feet msl at the Main Dam. The water level at the Power Station site was calculated to be 267.3 feet msl, including possible wave effects. The effects in the Sedges creek area of the Waste Heat Treatment facility would be similar to that in the main lake, however, the wave effects would be less due to decreased fetch. The ISFSI is sited at an elevation approximately 45 feet above the postulated PMF lake elevation.
2.4.3 Probable Maximum Floods On Streams and Rivers Based on information presented in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR, the probable maximum flood on Lake Anna would result in a lake level of 264.2 feet msl at the Main Dam. The water level at the Power Station site was calculated to be 267.3 feet msl, including possible wave effects. The effects in the Sedges creek area of the Waste Heat Treatment facility would be similar to that in the main lake, however, the wave effects would be less due to decreased fetch. The ISFSI is sited at an elevation approximately 45 feet above the postulated PMF lake elevation.
2.4.4 Potential Dam Failures (Seismically Induced)
2.4.4 Potential Dam Failures (Seismically Induced)
As stated in Section 2.4.4 of the North Anna Power Station UFSAR, there are no dams in existence on the North Anna River, other than the Lake Anna dam, either up stream or downstream. The only impoundments in the area would be small farm ponds whose failure would not produce any measurable effect on Lake Anna, the Lake Anna dam, or any safety-related systems. Thus, because the ISFSI
As stated in Section 2.4.4 of the North Anna Power Station UFSAR, there are no dams in existence on the North Anna River, other than the Lake Anna dam, either upstream or downstream. The only impoundments in the area would be small farm ponds whose failure would not produce any measurable effect on Lake Anna, the Lake Anna dam, or any safety-related systems. Thus, because the ISFSI is at a higher elevation than the station, the ISFSI is unaffected by flood levels due to seismically induced dam failures.
2.4.5 Probable Maximum Surge and Seiche Flooding Surge and seiche flooding effects are considered in coastal or tidal areas where cyclonic activity results in increased water levels. These increased levels are due to the momentum of the storm event and the reduction in volumetric flow area near the coast (References 9 & 10). The
 
Revision 806/14                                        North Anna ISFSI SAR                    2-10 North Anna Power Station is approximately forty miles upstream from the confluence of the North Anna river with the South Anna near Doswell. The Pamunkey River becomes tidal in the region of the US 360 bridge approximately thirty-six miles downstream of this confluence. Surge effects would dissipate with distance from the coast, available storage of floodwater, elevation above sea level, etc.


==SUMMARY==
==SUMMARY==
OF USGS GAUGING STA TION RECORDS AND ESTIMATED STREAM FLOW DATA FOR THE NORTH ANNA DAMRiver Location Drainage Area (sq.mi.)Period of Record aDischarge (cfs)Average Minimum MaximumUSGS gauge at Doswell 439 1929-1971 382 b 1 c 24,800 dUSGS gauge at Doswell 439 1972-1992 399 e 35.5 f 23,300 g North Anna Dam 343 1929-1971 300 h l h 19,500 h North Anna Dam 343 1978-1999 288 i 25 j 11,700 ka.Dam was closed January 1972.b.Average discharge for 41-year period.c.Date of discharge: September 30 to October 2, 1932.d.Date of discharge: August 21, 1969.e.Average discharge for 21-year-period since 1971.f.Date of Discharge: October 8, 1991.g.Date of Discharge: June 22, 1972.h.Estimated.
OF USGS GAUGING STATION RECORDS AND ESTIMATED STREAM FLOW DATA FOR THE NORTH ANNA DAM River          Drainage Area         Period of                Discharge (cfs)
i.Average Discharge since Partlow gauge has been in operation.
Location            (sq.mi.)           Record a      Average     Minimum Maximum USGS gauge                 439           1929-1971         382 b       1c          24,800 d at Doswell USGS gauge                439           1972-1992         399 e       35.5 f       23,300 g at Doswell North Anna                 343           1929-1971         300 h         lh        19,500 h Dam North Anna                 343           1978-1999         288 i       25 j       11,700 k Dam
j.Date of Discharge: August 1, 1988.k.Date of Discharge: February 26, 1979.References 3 , 4 and 5 Revision 8-06/14 North Anna ISFSI SAR 2-37Table 2-3 FLOODS ON THE NORTH ANNA RIVER Flood PeriodPeak Flow at Doswell (cfs)Volume of Direct Runoff at Doswell (acre-feet)
: a. Dam was closed January 1972.
August 12, 1928 18,400-April 24-29, 1937 18,300 81,400 October 17, 1943 11,600-August 12-25, 1955 12,400 54,700 August 20-23, 1969 24,800 141,000 June 20-22, 1972 23,300 107,200 Sept. 21-30, 1975 11,600 77,870Feb. 22-March 3, 1979 11,700 73,131March 27-April 3, 1984 11,700 78,229Nov. 1-11, 1985 10,700 55,625March 27-April 2, 1994 12,000 85,600 Sept. 5-13, 1996 11,600 61,380l.References 3 , 4 and 5 Revision 8-06/14 North Anna ISFSI SAR 2-38Table 2-4 RECOVERY AND RQD VALUES OF BORINGS Boring No.Run No.From (F eet)To (Feet)Inches RecoveredRecovery Percent Percent RQD F-4 1 49.1 54.1 13 21.6 0 2 54.1 59.1 47 78.3 40 F-5 1 64.5 69.5 0 0 0 2 69.5 74.5 8 13.3 0 3 74.5 79.5 2 3.3 0 4 79.5 84.5 0 0 0 5 84.5 89.5 4 6.6 0 6 89.5 94.5 0 0 0 7 94.5 99.5 0 0 0 8 99.5 104.5 0 0 0 9 104.5 109.5 30 50 0 10 109.5 114.5 48 80 0 F-6 1 44.0 49.0 0 0 0 2 49.0 54.0 0 0 0 3 54.0 59.0 42 70 18.3 F-7 1 75.0 80.0 0 0 0 2 80.0 85.0 0 0 0 3 85.0 90.0 0 0 0 4 90.0 95.0 2 3.3 0 5 95.0 100.0 0 0 0 6 100.0 105.0 38 63 0 F-8 1 64.2 69.2 48 80 0 F-9 1 59.1 64.1 0 0 0 2 64.1 69.1 0 0 0 3 69.1 74.1 7.5 12.5 0 4 75.0 80.0 28.5 47 7.5 5 80.0 85.0 12 20 6.6 6 85.0 90.0 0 0 0 7 90.0 95.0 8 13 0 8 95.0 100.0 19 31 6.6 9 100.0 105.0 36 60 17.5 F-10 1 69.0 74.0 57 95 35.8 Revision 8-06/14 North Anna ISFSI SAR 2-39 F-11 1 39.0 44.0 6 10 0 2 44.0 49.0 8 13.3 0 3 49.0 54.0 14 23 0 4 54.0 59.0 42 70 0 5 59.0 64.0 35 58 28 6 64.0 69.0 42 70 22.5Table 2-4 (CONTINUED)
: b. Average discharge for 41-year period.
RECOVERY AND RQD VALUES OF BORINGS Boring No.Run No.From(Feet)To (Feet)InchesRecoveredRecovery Percent Percent RQD Revision 8-06/14 North Anna ISFSI SAR 2-40Table 2-5 EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EV ENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude Apr 25, 1758 38.900 N 76.500 W V 4.20 Feb 21, 1774 37.200 N 77.400 W VI 4.54 Feb 22, 1774 37.200 N 77.400 W IV 3.61 Mar 16, 1775 37.700 N 78.800 W IV 3.61 Aug 30, 1775 37.700 N 78.800 W IIINov 19, 1798 38.300 N 77.500 W III Jan 13, 1791 37.700 N 78.800 W IV 3.61 Jan 15, 1791 37.500 N 77.500 W IV 3.61 Feb 11, 1795 37.800 N 77.300 W III Feb 12, 1795 38.300 N 77.500 W III Mar 29, 1800 39.800 N 75.200 W 3.00 Feb 11, 1801 37.400 N 79.200 W III Aug 23, 1802 37.400 N 79.100 W V 4.20 May 1, 1807 37.400 N 79.100 W V 4.20Nov 27, 1811 36.100 N 80.200 W IV 3.61 Feb 2, 1812 37.600 N 77.400 W IV 3.61 Apr 22, 1812 37.500 N 77.500 W IV 3.61 Jan 8, 1817 36.000 N 80.200 W V 5.04 Jul 15, 1824 39.700 N 80.500 W IV 3.61 Mar 9, 1828 37.000 N 80.000 W V 5.04 Aug 27, 1833 37.700 N 78.000 W VI 5.04Nov 11, 1840 39.800 N 75.200 W V 4.20 Oct 19, 1846 39.300 N 77.900 W III Mar 30, 1850 35.400 N 78.000 W V 4.20 Oct 17, 1850 37.300 N 78.400 W IV 3.61 Oct 18, 1850 37.400 N 78.400 W IVNov 2, 1852 37.500 N 78.600 W VI 4.34 Jan 30, 1853 38.900 N 78.500 W III May 2, 1853 38.500 N 79.500 W V 4.64 Jan 3, 1855 39.200 N 77.500 W V Feb 2, 1855 37.00 N 78.600 W V 4.04 Jan 16, 1856 39.200 N 78.20 W IV 3.61 Mar 21, 1856 37.700 N 78.900 W III Apr 21, 1871 36.400 N 78.600 W III Oct 9, 1871 39.700 N 75.500 W VII 4.59 Mar 1, 1872 36.800 N 79.400 W III Jun 5, 1872 37.700 N 78.000 W IV 3.61 Revision 8-06/14 North Anna ISFSI SAR 2-41 Oct 3, 1873 37.200 N 78.200 W IV 3.61 Dec 23, 1875 37.600 N 78.500 W VII 4.54 Jan 3, 1876 37.600 N 77.900 W III Apr 10, 1876 38.500 N 76.600 W III Dec 23, 1876 37.400 N 77.500 W IV 3.61 Sep 1, 1877 38.700 N 76.800 W III Jan 3, 1878 37.900 N 77.700 W III Mar 26, 1879 39.200 N 75.500 W V 4.20 Apr 2, 1882 38.600 N 78.700 W IV Mar 11, 1883 39.500 N 76.400 W IV 3.61 Mar 12, 1883 39.500 N 76.400 W IV 3.61 Sep 21, 1883 36.100 N 79.800 W V 4.20 Jan 3, 1885 39.200 N 77.500 W V 4.06 Jan 15, 1885 4.300 N 76.300 W III 3.02 Feb 2, 1885 36.900 N 81.100 W IV 3.61 Oct 10, 1885 37.700 N 78.800 W VI 4.24 Mar 8, 1889 40.000 N 76.000 W V 4.11 Oct 7, 1895 35.900 N 77.500 W V 4.20 Feb 11, 1896 36.300 N 78.600 W IV 3.61 May 3, 1897 37.100 N 80.700 W VII 4.34 May 31, 1897 37.300 N 80.700 W VII 5.84 Jun 28, 1897 37.300 N 80.700 W V 4.04 Sep 3, 1897 37.300 N 80.700 W IV 3.61 Oct 22, 1897 36.900 N 81.100 W V 4.20Nov 27, 1897 37.700 N 77.500 W IV 3.61 Dec 18, 1897 37.700 N 77.500 W V 4.04 Feb 5, 1898 37.000 N 81.000 W VI 4.34Nov 25, 1898 37.000 N 81.000 W V 4.64 Feb 13, 1899 37.000 N 81.000 W V 4.74 Mar 3, 1899 36.900 N 76.300 W IV 3.61 Mar 11, 1902 39.600 N 77.100 W III May 18, 1902 37.300 N 80.600 W V 4.20 Jan 1, 1903 39.600 N 77.200 W III Apr 29, 1905 37.300 N 79.500 W III May 8, 1906 38.700 N 75.700 W IV 3.40 Oct 13, 1906 39.200 N 76.700 W III Feb 11, 1907 37.700 N 78.300 W VI 4.79Table 2-5 (CONTINUED)
: c. Date of discharge: September 30 to October 2, 1932.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITEEVENTS LISTED CHRONOLOGICALLYDateLatitudeLongitudeMMIMagnitude Revision 8-06/14 North Anna ISFSI SAR 2-42 Aug 23, 1908 37.500 N 77.900 W V 4.20 Apr 2, 1909 39.400 N 78.000 W V 4.20 Feb 8, 1910 38.800 N 78.700 W IV 3.64 Apr 24, 1910 39.200 N 76.700 W III May 8, 1910 37.700 N 78.400 W IV 3.61 Feb 10, 1911 36.600 N 79.400 W IV 3.61 Apr 8, 1911 38.300 N 75.500 W IV 3.61 Aug 7, 1912 37.700 N 78.400 W IV 3.61 Aug 8, 1912 37.700 N 78.400 W IV 3.61 Apr 10, 1918 38.700 N 78.400 W VI 4.93 Apr 16, 1918 38.700 N 78.400 W IV 3.61 Apr 19, 1918 36.800 N 76.300 W III Sep 6, 1919 38.800 N 78.200 W VI 4.79 Jul 24, 1920 38.700 N 78.400 W IV 3.61 Aug 7, 1921 37.800 N 78.400 W VI 4.79 Dec 31, 1923 39.200 N 78.000 W V Jan 1, 1924 39.100 N 78.100 W IV Jan 5, 1924 39.100 N 78.100 W IV 3.61 Dec 26, 1924 37.300 N 79.900 W V 4.20 May 16, 1925 37.300 N 77.500 W V 4.20 Jul 14, 1925 37.600 N 77.500 W IV 3.61 Jun 10, 1927 38.000 N 79.000 W V 4.20 Oct 27, 1927 36.300 N 76.200 W IV 3.61 Oct 15, 1928 38.300 N 75.100 W IV 3.61 Oct 30, 1928 37.500 N 77.500 W IV 3.61 Dec 26, 1929 38.100 N 78.500 W VI 4.79 Sep 15, 1930 37.500 N 77.500 W IIINov 1, 1930 39.100 N 76.500 W IV 3.61 Oct 6, 1931 37.700 N 78.300 W III Jan 5, 1932 37.600 N 78.400 W IV 3.61 Jan 27, 1933 37.200 N 77.400 W IV 3.61 Jul 23, 1933 37.700 N 78.300 W III Apr 3, 1934 37.200 N 77.400 W III Feb 10, 1935 37.200 N 77.400 W IV 3.61Nov 1, 1935 38.900 N 78.900 W IV 3.61 Feb 3, 1937 37.700 N 78.700 W IV 3.611 Mar 25, 1937 40.900 N 78.200 W III 3.02Table 2-5 (CONTINUED)
: d. Date of discharge: August 21, 1969.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITEEVENTS LISTED CHRONOLOGICALLYDateLatitudeLongitudeMMIMagnitude Revision 8-06/14 North Anna ISFSI SAR 2-43 Jul 15, 1938 40.680 N 78.430 W VI 3.34Nov 15, 1939 39.580 N 75.050 W V 4.04Nov 18, 1939 39.500 N 76.600 W IV 3.61Nov 26, 1939 39.500 N 76.600 W V 4.20 Mar 26, 1940 38.800 N 78.500 W V 4.20 Jan 3, 1942 37.400 N 79.100 W III Oct 7, 1942 37.600 N 78.400 W IV 3.61 Jan 8, 1944 39.800 N 75.500 W 4.25 Oct 10, 1945 37.700 N 78.300 W III Oct 12, 1945 37.500 N 78.500 W IV 3.61 Oct 30, 1945 37.500 N 78.500 W IV 3.61 May 24, 1946 38.000 N 78.600 W III Jan 4, 1948 37.600 N 78.600 W IV 3.61 Jan 5, 1948 37.500 N 78.500 W V 4.20 Mar 26, 1948 38.100 N 78.500 W III May 8, 1949 37.600 N 77.600 W V 4.20Nov 26, 1950 37.700 N 78.300 W V 4.20 Mar 9, 1951 37.600 N 77.600 W V 4.20 Sep 11, 1952 38.100 N 78.500 W IV Feb 7, 1953 37.700 N 78.100 W IV 3.61 Jan 7, 1954 40.300 N 76.000 W VI 4.79 Aug 11, 1954 40.30 N 76.000 W IV 3.61 Jan 17, 1955 37.300 N 78.400 W IV 3.61 Jan 20, 1955 40.300 N 76.000 W IV 3.61 Apr 23, 1959 37.380 N 80.680 W VI 3.84 Jul 7, 1959 37.300 N 80.700 W IV 3.61 Aug 21, 1959 37.300 N 80.700 W IV 3.61 Sep 4, 1960 37.400 N 79.300 W IV 3.61 Sep 4, 1962 39.500 N 77.700 W IV 3.61 Sep 7, 1962 39.700 N 78.200 W IV 3.61 Jan 17, 1963 37.300 N 80.100 W IV 3.61 Oct 10, 1963 39.800 N 78.200 W 3.60 Feb 13, 1964 40.380 N 77.960 W VI 3.29 May 12, 1964 40.300 N 76.410 W VI 3.19 Jul 15, 1965 37.310 N 74.390 W 5.30 Sep 16, 1965 37.250 N 74.360 W 5.00 Oct 8, 1965 40.080 N 79.750 W 3.60Table 2-5 (CONTINUED)
: e. Average discharge for 21-year-period since 1971.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITEEVENTS LISTED CHRONOLOGICALLYDateLatitudeLongitudeMMIMagnitude Revision 8-06/14 North Anna ISFSI SAR 2-44 May 31, 1966 37.660 N 78.130 W V 3.69 Sep 28, 1966 39.300 N 80.300 W IV 3.61 Mar 8, 1968 37.280 N 80.770 W IV 4.09 May 22, 1969 39.610 N 78.250 W 3.10Nov 20, 1969 37.450 N 80.930 W VI 4.69 Dec 11, 1969 37.840 N 77.670 W V 3.39 May 27, 1970 39.620 N 78.280 W 3.20 Jul 14, 1971 39.700 N 75.600 W IV 3.61 Sep 12, 1971 38.150 N 77.590 W V 3.60 Dec 29, 1971 39.70 N 75.600 W IV 3.61 Jan 2, 1972 39.700 N 75.600 W IV 3.61 Jan 3, 1972 39.700 N 75.600 W IV 3.61 Jan 7, 1972 39.700 N 75.600 W IV 3.61 Jan 22, 1972 39.700 N 75.600 W IV 3.61 Jan 23, 1972 39.700 N 75.600 W IV 3.61 Feb 11, 1972 39.700 N 75.600 W V 4.20 Aug 14, 1972 39.700 N 75.600 W IV 3.61 Sep 5, 1972 37.600 N 77.700 W IV 3.39 Sep 12, 1972 39.600 N 79.900 W III 3.02 Dec 8, 1972 40.140 N 76.240 W V 3.52 Feb 28, 1973 39.690 N 75.430 W V 3.79 Apr 9, 1973 37.300 N 77.700 W IV 3.61 Jul 10, 1973 39.700 N 75.700 W IV 3.61 Mar 23, 1974 38.700 N 77.800 W 3.80 Apr 28, 1974 39.800 N 75.600 W IV 3.61 May 30, 1974 37.460 N 80.540 W V 3.59 May 31, 1974 37.400 N 80.400 W 3.80 Mar 7, 1975 37.320 N 80.480 W II 3.04Nov 11, 1975 37.220 N 80.890 W IV 3.19 May 6, 1976 39.600 N 79.900 W IV 3.61 Sep 13, 1976 36.620 N 80.770 W VI 3.29 Apr 26, 1978 39.700 N 78.240 W 3.10 Jul 16, 1978 39.900 N 76.220 W V 3.09 Oct 6, 1978 40.080 N 76.150 W 3.00 Aug 30, 1980 39.800 N 74.900 W 3.00Nov 5, 1980 38.180 N 79.900 W 3.00 Feb 11, 1981 37.720 N 78.440 W IV 3.39Table 2-5 (CONTINUED)
: f. Date of Discharge: October 8, 1991.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITEEVENTS LISTED CHRONOLOGICALLYDateLatitudeLongitudeMMIMagnitude Revision 8-06/14 North Anna ISFSI SAR 2-45 May 12, 1982 40.410 N 77.960 W 3.00 Apr 19, 1984 40.131 N 76.037 W 3.00 Apr 23, 1984 39.950 N 76.370 W V 4.46 Aug 17, 1984 37.868 N 78.324 W 4.20 Jun 10, 1985 37.248 N 80.485 W 3.20 Mar 15, 1991 37.746 N 77.916 W V 3.80 Apr 22, 1991 37.996 N 80.266 W 3.40 Jun 28, 1991 38.231 N 81.335 W 3.00 Aug 15, 1991 40.786 N 77.657 W V 3.00 Mar 16, 1993 39.190 N 76.870 W IIINov 17, 1993 39.190 N 76.870 W III Jan 16, 1994 40.330 N 76.037 W V 4.60Table 2-5 (CONTINUED)
: g. Date of Discharge: June 22, 1972.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITEEVENTS LISTED CHRONOLOGICALLYDateLatitudeLongitudeMMIMagnitude Revision 8-06/14 North Anna ISFSI SAR 2-46 Figure 2-1AREA MAP (0-10 MILES)
: h. Estimated.
Revision 8-06/14 North Anna ISFSI SAR 2-47 Figure 2-2REGIONAL MAP (0-50 MILES)
: i. Average Discharge since Partlow gauge has been in operation.
Revision 8-06/14 North Anna ISFSI SAR 2-48 Figure 2-3 NORTH ANNA SITE BOUNDARY N
: j. Date of Discharge: August 1, 1988.
Revision 8-06/14 North Anna ISFSI SAR 2-49 Figure 2-4DAILY AVERAGE TEMPERATURES FOR RICHMOND, VIRGINIA (1951-1980)
: k. Date of Discharge: February 26, 1979.
Revision 8-06/14 North Anna ISFSI SAR 2-50 Figure 2-5DAILY EXTREME TEMPERATURES FOR RICHMOND, VIRGINIA (1898-1991)
References 3, 4 and 5
Revision 8-06/14 North Anna ISFSI SAR 2-51 Figure 2-6EXTREME 1-MILE WIND PASSAGE AT RICHMOND, VIRGINIA Revision 8-06/14 North Anna ISFSI SAR 2-52 Figure 2-7REGIONAL TOPOGRAPHY AND CHARACTERISTICS Revision 8-06/14 North Anna ISFSI SAR 2-53 Figure 2-8ISFSI LOCAL TOPOGRAPHY AND GRADING PLAN


Revision 8-06/14 North Anna ISFSI SAR 2-55 Figure 2-10SITE GEOLOGICAL MAP Revision 8-06/14 North Anna ISFSI SAR 2-56 Figure 2-11 ISFSI BORING LOCATIONS Revision 8-06/14 North Anna ISFSI SAR 2-57 Figure 2-12ISFSI SUBSURFACE CROSS SECTION Revision 8-06/14 North Anna ISFSI SAR 2-58 Figure 2-13REGIONAL GEOLOGIC MAP Revision 8-06/14 North Anna ISFSI SAR 2-59 Figure 2-14PAD #1 SURFACE PROFILE Revision 8-06/14 North Anna ISFSI SAR 2-60 Figure 2-15PAD #2 SURFACE PROFILE Revision 8-06/14 North Anna ISFSI SAR 2-61 Figure 2-16PAD #3 SURFACE PROFILE Revision 8-06/14 North Anna ISFSI SAR 2-62 Figure 2-17EARTHQUAKE LOCATIONS
Revision 806/14                                 North Anna ISFSI SAR       2-37 Table 2-3 FLOODS ON THE NORTH ANNA RIVER Volume of Direct Peak Flow at  Runoff at Doswell Flood Period                    Doswell (cfs) (acre-feet)
August 12, 1928                    18,400 April 24-29, 1937                  18,300          81,400 October 17, 1943                    11,600 August 12-25, 1955                  12,400          54,700 August 20-23, 1969                  24,800        141,000 June 20-22, 1972                    23,300        107,200 Sept. 21-30, 1975                  11,600          77,870 Feb. 22-March 3, 1979              11,700          73,131 March 27-April 3, 1984              11,700          78,229 Nov. 1-11, 1985                    10,700          55,625 March 27-April 2, 1994              12,000          85,600 Sept. 5-13, 1996                    11,600          61,380
: l. References 3, 4 and 5


Revision 8-06/14 North Anna ISFSI SAR 2-64 Figure 2-19ALTERNATE TRANSPORT ROUTE SUBSURFACE CROSS SECTIONS Revision 8-06/14 North Anna ISFSI SAR 2A-iAppendix 2A Boring Logs Revision 8-06/14 North Anna ISFSI SAR 2A-ii Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 2A-1 (1994 BORINGS)FIELD EXPLORATION PROCEDURES Disturbed SamplingSoil test borings were drilled and tested in accordance with ASTM D 1452 and ASTM D 1586 procedures with a CME-55 truck m ounted drill rig, by mechanically advancing hollow stem auger flights into the ground. At regular intervals, the plug was removed from the auge r head, and soil samples were obtained with a standard 1.4"I.D., 2"O.D., 20" long split tube sampler. The sampler was attached to the end of "A" size drill rods and lowered th rough the augers to sampling elevation. The sampler was first seated to pene tration loose cuttings and disturbed soil, then driven an additional foot with blows of a 140 lb. hammer falling 30".
Revision 806/14                           North Anna ISFSI SAR         2-38 Table 2-4 RECOVERY AND RQD VALUES OF BORINGS Boring Run    From      To        Inches    Recovery Percent No. No.  (Feet)  (Feet)    Recovered    Percent  RQD F-4      1    49.1    54.1         13        21.6      0 2    54.1    59.1          47        78.3    40 F-5      1    64.5    69.5          0          0      0 2    69.5    74.5          8        13.3      0 3    74.5    79.5          2         3.3      0 4    79.5    84.5          0          0      0 5    84.5    89.5          4          6.6      0 6    89.5    94.5          0          0      0 7    94.5    99.5          0          0      0 8    99.5  104.5          0          0      0 9    104.5  109.5          30          50      0 10    109.5  114.5          48          80      0 F-6      1      44.0    49.0          0          0      0 2      49.0    54.0          0          0      0 3      54.0    59.0          42          70    18.3 F-7      1      75.0    80.0          0          0      0 2      80.0    85.0          0          0      0 3      85.0    90.0          0          0      0 4      90.0    95.0          2          3.3      0 5      95.0  100.0          0          0      0 6    100.0  105.0          38          63      0 F-8      1    64.2    69.2         48          80      0 F-9      1    59.1    64.1          0          0      0 2    64.1    69.1          0          0      0 3    69.1    74.1          7.5        12.5      0 4    75.0    80.0        28.5        47      7.5 5    80.0    85.0          12         20      6.6 6    85.0    90.0          0          0      0 7    90.0    95.0          8          13      0 8    95.0  100.0          19          31      6.6 9    100.0  105.0          36          60    17.5 F-10     1    69.0    74.0          57          95    35.8
The sampler was then extracted from the soil, the plug reinserted into the auger head, and the auger advanced to the next sampling elevation. The number of blows required to drive the sampler each 6" increment of penetration was recorded and is shown on the bor ing logs. The number of blows required to drive the sampler the final foot is termed the "penet ration resistance". Penetration resistance, when properly evaluated, is an index to soil density, strength, and foundation support capacity.
 
Undisturbed SamplingSplit tube samples are suitable for visual examination and classification tests but are not sufficiently intact for quantitative laboratory testing. Relatively undisturbed samples were obtained by forcing sections of 3"O.D., 16 gauge, steel tubing into the soil at the desired sampling levels. This sampling procedure is described by ASTM Specification D-1587. Each tube, together with the encased soil, was carefully removed from the ground, made airtight , and transported to the laboratory. Locations and de pths of undisturbed samples are shown on the test boring records.
Revision 806/14                            North Anna ISFSI SAR        2-39 Table 2-4 (CONTINUED)
Revision 8-06/14 North Anna ISFSI SAR 2A-2ROCK CORING PROCEDURESRock coring procedures are used to evaluate subsurface conditions below the depth of auger refusal. Auger refusal typical ly reflects the presence of obs tructions (e.g., boulders) or the presence of bedrock.Water is used to drill a diamon d studded drill bit through bedroc k or obstructions. The drill pipe at the bottom of the boring cont ains a steel sleeve, or core barrel , that accepts the drill core as the bit is advanced. Typically, the core barrel can accommodate 5 or 10 feet of core. When bedrock is encountered, a run numbe r is designated each time the core barrel is filled with sample and removed from the boring.The percent of recovery is calc ulated for every run. Percent recovery is the ratio of the recovered length of core to the length of the core run.
RECOVERY AND RQD VALUES OF BORINGS Boring Run    From        To      Inches    Recovery Percent No. No.  (Feet)      (Feet)  Recovered    Percent  RQD F-11    1    39.0        44.0        6          10      0 2    44.0        49.0        8         13.3      0 3    49.0        54.0        14         23      0 4     54.0        59.0        42          70      0 5    59.0        64.0        35          58      28 6    64.0        69.0        42          70    22.5
The rock quality designation (RQD) is calculated for each co re run when N-sized core sampling procedures are used. N-si zed core is approximately 2-in ches in diameter. The RQD is the ratio of the cumulative length of core greate r than 4-inches long and the length of core run. The RQD is often used to evaluate the engineering properties of bedrock.
 
Revision 8-06/14 North Anna ISFSI SAR 2A-3KEY TO BORING LOG SOIL CLASSIFICATIONSSoils IdentificationASTM SOIL CLASSIFICATION IS BASED ON THE DISTRIBUTION OF THE SAND AND GRAVEL SEED PARTICLES, THE PLASTICITY (E.G. ATTE RBERG LIMITS) OF THE FINE SAND, SILT AND CLAY FRACTION, AND THE RELATIVE DENSITY/CONSISTENCY AS DETERMINED FROM THE STANDARD PENETRATION TEST N-VALUE.NOTE: Particle Size is Designated by U.S. Standard Sieve Sizes.Relative Density or ConsistencyTHE STANDARD PENETRATION TEST N-VALUES ARE USED TO EVALUATE THE RELATIVE DENSITY OF COARSE-GRAINED SOILS OR THE CONSISTENCY OF FINE-GRAINED SOILS.Soil TypeParticle Size Boulder 12 in.Cobble 3 - 12 in.Gravel-Coarse 3/4 - 3 in.-Fine#4 - 3/4 in.Sand-Coarse
Revision 806/14                             North Anna ISFSI SAR         2-40 Table 2-5 EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude      Longitude      MMI    Magnitude Apr 25, 1758    38.900  N    76.500 W        V      4.20 Feb 21, 1774    37.200  N    77.400 W        VI      4.54 Feb 22, 1774    37.200  N    77.400 W        IV      3.61 Mar 16, 1775    37.700  N    78.800 W        IV      3.61 Aug 30, 1775    37.700  N    78.800 W        III Nov 19, 1798    38.300  N    77.500 W        III Jan 13, 1791    37.700  N    78.800 W        IV      3.61 Jan 15, 1791    37.500  N    77.500 W        IV      3.61 Feb 11, 1795    37.800  N    77.300 W        III Feb 12, 1795    38.300  N    77.500 W        III Mar 29, 1800    39.800  N    75.200 W                3.00 Feb 11, 1801    37.400  N    79.200 W        III Aug 23, 1802    37.400  N    79.100 W        V      4.20 May 1, 1807    37.400  N    79.100 W        V      4.20 Nov 27, 1811    36.100  N    80.200 W        IV      3.61 Feb 2, 1812    37.600  N    77.400 W        IV      3.61 Apr 22, 1812    37.500  N    77.500 W        IV      3.61 Jan 8, 1817    36.000  N    80.200 W        V      5.04 Jul 15, 1824    39.700  N    80.500 W        IV      3.61 Mar 9, 1828    37.000  N    80.000 W        V      5.04 Aug 27, 1833    37.700  N    78.000 W        VI      5.04 Nov 11, 1840    39.800  N    75.200 W        V      4.20 Oct 19, 1846    39.300  N    77.900 W        III Mar 30, 1850    35.400  N    78.000 W        V      4.20 Oct 17, 1850    37.300  N    78.400 W        IV      3.61 Oct 18, 1850    37.400  N    78.400 W        IV Nov 2, 1852    37.500  N    78.600 W        VI      4.34 Jan 30, 1853    38.900  N    78.500 W        III May 2, 1853    38.500  N    79.500 W        V      4.64 Jan 3, 1855    39.200  N    77.500 W        V Feb 2, 1855      37.00  N    78.600 W        V      4.04 Jan 16, 1856    39.200  N      78.20 W      IV      3.61 Mar 21, 1856    37.700  N    78.900 W        III Apr 21, 1871    36.400  N    78.600 W        III Oct 9, 1871    39.700  N    75.500 W        VII      4.59 Mar 1, 1872    36.800  N    79.400 W        III Jun 5, 1872    37.700  N    78.000 W        IV      3.61
#10 - #4-Medium#40 - #10-Fine#200 - #40Silt (non-cohesive)
 
<#200Clay (cohesive)
Revision 806/14                               North Anna ISFSI SAR         2-41 Table 2-5 (CONTINUED)
<#200RELATIVE DENSITYCONSISTENCYTermN-ValueTermN-ValueVery Loose 0-4Very Soft 0-1 Loose 5-9 Soft 2-4 Medium Dense10-30 Firm 5-8 Dense31-50Stiff 9-16Very DenseOver 50Very Stiff17-30 Hard31-50Very HardOver 50 Revision 8-06/14 North Anna ISFSI SAR 2A-4 Revision 8-06/14 North Anna ISFSI SAR 2A-5 Revision 8-06/14 North Anna ISFSI SAR 2A-6 Revision 8-06/14 North Anna ISFSI SAR 2A-7 Revision 8-06/14 North Anna ISFSI SAR 2A-8 Revision 8-06/14 North Anna ISFSI SAR 2A-9 Revision 8-06/14 North Anna ISFSI SAR 2A-10 Revision 8-06/14 North Anna ISFSI SAR 2A-11 Revision 8-06/14 North Anna ISFSI SAR 2A-12 Revision 8-06/14 North Anna ISFSI SAR 2A-13 Revision 8-06/14 North Anna ISFSI SAR 2A-14 Revision 8-06/14 North Anna ISFSI SAR 2A-15 Revision 8-06/14 North Anna ISFSI SAR 2A-16 Revision 8-06/14 North Anna ISFSI SAR 2A-17 Revision 8-06/14 North Anna ISFSI SAR 2A-18 Revision 8-06/14 North Anna ISFSI SAR 2A-19 Revision 8-06/14 North Anna ISFSI SAR 2A-20 Revision 8-06/14 North Anna ISFSI SAR 2A-21 Revision 8-06/14 North Anna ISFSI SAR 2A-22 Revision 8-06/14 North Anna ISFSI SAR 2A-23 Revision 8-06/14 North Anna ISFSI SAR 2A-24 Revision 8-06/14 North Anna ISFSI SAR 2A-25 Revision 8-06/14 North Anna ISFSI SAR 2A-26 Revision 8-06/14 North Anna ISFSI SAR 2A-27 Revision 8-06/14 North Anna ISFSI SAR 2A-28 Revision 8-06/14 North Anna ISFSI SAR 2A-29 Revision 8-06/14 North Anna ISFSI SAR 2A-30 Revision 8-06/14 North Anna ISFSI SAR 2A-31 Revision 8-06/14 North Anna ISFSI SAR 2A-32 Revision 8-06/14 North Anna ISFSI SAR 2A-33 Revision 8-06/14 North Anna ISFSI SAR 2A-34 Revision 8-06/14 North Anna ISFSI SAR 2A-35 Revision 8-06/14 North Anna ISFSI SAR 2A-36 Revision 8-06/14 North Anna ISFSI SAR 2A-37 Revision 8-06/14 North Anna ISFSI SAR 2A-38 Revision 8-06/14 North Anna ISFSI SAR 2A-39 Revision 8-06/14 North Anna ISFSI SAR 2A-40 Revision 8-06/14 North Anna ISFSI SAR 2A-41 2008 BORINGS Revision 8-06/14 North Anna ISFSI SAR 2A-42 Revision 8-06/14 North Anna ISFSI SAR 2A-43 Revision 8-06/14 North Anna ISFSI SAR 2A-44 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 2B-iAppendix 2BLaboratory Tests Revision 8-06/14 North Anna ISFSI SAR 2B-ii Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 2B-1 PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA PO WER F&R #V60-073LABORATORY TEST RESULTSBoringF-5A F-5 F-6 F-6F-6F-7A F-7ASample No.
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude        Longitude      MMI    Magnitude Oct 3, 1873    37.200  N      78.200 W        IV      3.61 Dec 23, 1875    37.600  N      78.500 W        VII      4.54 Jan 3, 1876    37.600  N      77.900 W        III Apr 10, 1876    38.500  N      76.600 W        III Dec 23, 1876    37.400  N      77.500 W        IV      3.61 Sep 1, 1877    38.700  N      76.800 W        III Jan 3, 1878    37.900  N      77.700 W        III Mar 26, 1879    39.200  N      75.500 W        V      4.20 Apr 2, 1882    38.600  N      78.700 W        IV Mar 11, 1883    39.500  N      76.400 W        IV      3.61 Mar 12, 1883    39.500  N      76.400 W        IV      3.61 Sep 21, 1883    36.100  N      79.800 W        V      4.20 Jan 3, 1885    39.200  N      77.500 W        V      4.06 Jan 15, 1885    4.300  N      76.300 W        III      3.02 Feb 2, 1885    36.900  N      81.100 W        IV      3.61 Oct 10, 1885    37.700  N      78.800 W        VI      4.24 Mar 8, 1889    40.000  N      76.000 W        V      4.11 Oct 7, 1895    35.900  N      77.500 W        V      4.20 Feb 11, 1896    36.300  N      78.600 W        IV      3.61 May 3, 1897    37.100  N      80.700 W        VII      4.34 May 31, 1897    37.300  N      80.700 W        VII      5.84 Jun 28, 1897    37.300  N      80.700 W        V      4.04 Sep 3, 1897    37.300  N      80.700 W        IV      3.61 Oct 22, 1897    36.900  N      81.100 W        V      4.20 Nov 27, 1897    37.700  N      77.500 W        IV      3.61 Dec 18, 1897    37.700  N      77.500 W        V      4.04 Feb 5, 1898    37.000  N      81.000 W        VI      4.34 Nov 25, 1898    37.000  N      81.000 W        V      4.64 Feb 13, 1899    37.000  N      81.000 W        V      4.74 Mar 3, 1899    36.900  N      76.300 W        IV      3.61 Mar 11, 1902    39.600  N      77.100 W        III May 18, 1902    37.300  N      80.600 W        V      4.20 Jan 1, 1903    39.600  N      77.200 W        III Apr 29, 1905    37.300  N      79.500 W        III May 8, 1906    38.700  N      75.700 W        IV      3.40 Oct 13, 1906    39.200  N      76.700 W        III Feb 11, 1907    37.700  N      78.300 W        VI      4.79
UD-1 S-7 S-2 S-5S-9 UD-l UD-2 Depth (ft.)
 
18.0-20.0 19.0-20.5 1.5-3.0 9.0-10.5 29.0-30.5 4.0-6.0 16.0-18.0Gradation % Passing Sieve No. 4............100 100....100 No. 10 100 100 100 97.9 99.9 100 99.8 No. 40 92.5 96.1 96.6 84.4 77.8 96.8 83.1 No. 100 67.7 79.5 90.3 61.7 35.9 77.9 50.8 No. 200 53.9 70.2 87.9 54.3 24.8 72.0 38.0 Liquid Limit (%)
Revision 806/14                              North Anna ISFSI SAR        2-42 Table 2-5 (CONTINUED)
...65 85 62...84...Plasticity Index
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude        Longitude      MMI    Magnitude Aug 23, 1908    37.500  N      77.900 W        V        4.20 Apr 2, 1909    39.400  N      78.000 W        V        4.20 Feb 8, 1910    38.800  N      78.700 W        IV        3.64 Apr 24, 1910    39.200  N      76.700 W        III May 8, 1910    37.700  N      78.400 W        IV        3.61 Feb 10, 1911    36.600  N      79.400 W        IV        3.61 Apr 8, 1911    38.300  N      75.500 W        IV        3.61 Aug 7, 1912    37.700  N      78.400 W        IV        3.61 Aug 8, 1912    37.700  N      78.400 W        IV        3.61 Apr 10, 1918    38.700  N      78.400 W        VI        4.93 Apr 16, 1918    38.700  N      78.400 W        IV        3.61 Apr 19, 1918    36.800  N      76.300 W        III Sep 6, 1919    38.800  N      78.200 W        VI        4.79 Jul 24, 1920    38.700  N      78.400 W        IV        3.61 Aug 7, 1921    37.800  N      78.400 W        VI        4.79 Dec 31, 1923    39.200  N      78.000 W        V Jan 1, 1924    39.100  N      78.100 W        IV Jan 5, 1924    39.100  N      78.100 W        IV        3.61 Dec 26, 1924    37.300  N      79.900 W        V        4.20 May 16, 1925    37.300  N      77.500 W        V        4.20 Jul 14, 1925    37.600  N      77.500 W        IV        3.61 Jun 10, 1927    38.000  N      79.000 W        V        4.20 Oct 27, 1927    36.300  N      76.200 W        IV        3.61 Oct 15, 1928    38.300  N      75.100 W        IV        3.61 Oct 30, 1928    37.500  N      77.500 W        IV        3.61 Dec 26, 1929    38.100  N      78.500 W        VI        4.79 Sep 15, 1930    37.500  N      77.500 W        III Nov 1, 1930    39.100  N      76.500 W        IV        3.61 Oct 6, 1931    37.700  N      78.300 W        III Jan 5, 1932    37.600  N      78.400 W        IV        3.61 Jan 27, 1933    37.200  N      77.400 W        IV        3.61 Jul 23, 1933    37.700  N      78.300 W        III Apr 3, 1934    37.200  N      77.400 W        III Feb 10, 1935    37.200  N      77.400 W        IV        3.61 Nov 1, 1935    38.900  N      78.900 W        IV        3.61 Feb 3, 1937    37.700  N      78.700 W        IV      3.611 Mar 25, 1937    40.900  N      78.200 W        III      3.02
...19 31 19...30...Natural Moisture (%)
 
53.3 55.7 37.4 29.0 29.3 34.1 31.8ASTM Classification
Revision 806/14                              North Anna ISFSI SAR        2-43 Table 2-5 (CONTINUED)
...MH MH MH...MH...
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude        Longitude      MMI    Magnitude Jul 15, 1938    40.680  N      78.430 W        VI      3.34 Nov 15, 1939    39.580  N      75.050 W        V      4.04 Nov 18, 1939    39.500  N      76.600 W        IV      3.61 Nov 26, 1939    39.500  N      76.600 W        V      4.20 Mar 26, 1940    38.800  N      78.500 W        V      4.20 Jan 3, 1942    37.400  N      79.100 W        III Oct 7, 1942    37.600  N      78.400 W        IV      3.61 Jan 8, 1944    39.800  N      75.500 W                4.25 Oct 10, 1945    37.700  N      78.300 W        III Oct 12, 1945    37.500  N      78.500 W        IV      3.61 Oct 30, 1945    37.500  N      78.500 W        IV      3.61 May 24, 1946    38.000  N      78.600 W        III Jan 4, 1948    37.600  N      78.600 W        IV      3.61 Jan 5, 1948    37.500  N      78.500 W        V      4.20 Mar 26, 1948    38.100  N      78.500 W        III May 8, 1949    37.600  N      77.600 W        V      4.20 Nov 26, 1950    37.700  N      78.300 W        V      4.20 Mar 9, 1951    37.600  N      77.600 W        V      4.20 Sep 11, 1952    38.100  N      78.500 W        IV Feb 7, 1953    37.700  N      78.100 W        IV      3.61 Jan 7, 1954    40.300  N      76.000 W        VI      4.79 Aug 11, 1954    40.30  N      76.000 W        IV      3.61 Jan 17, 1955    37.300  N      78.400 W        IV      3.61 Jan 20, 1955    40.300  N      76.000 W        IV      3.61 Apr 23, 1959    37.380  N      80.680 W        VI      3.84 Jul 7, 1959    37.300  N      80.700 W        IV      3.61 Aug 21, 1959    37.300  N      80.700 W        IV      3.61 Sep 4, 1960    37.400  N      79.300 W        IV      3.61 Sep 4, 1962    39.500  N      77.700 W        IV      3.61 Sep 7, 1962    39.700  N      78.200 W        IV      3.61 Jan 17, 1963    37.300  N      80.100 W        IV      3.61 Oct 10, 1963    39.800  N      78.200 W                3.60 Feb 13, 1964    40.380  N      77.960 W        VI      3.29 May 12, 1964    40.300  N      76.410 W        VI      3.19 Jul 15, 1965    37.310  N      74.390 W                5.30 Sep 16, 1965    37.250  N      74.360 W                5.00 Oct 8, 1965    40.080  N      79.750 W                3.60
Revision 8-06/14 North Anna ISFSI SAR 2B-2 PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA PO WER F&R #V60-073LABORATORY TEST RESULTSBoring F-7 F-7 F-8 F-8 F-9A F-9 F-10Sample No.
 
S-7 S-18 S-4 S-7 UD-1 S-13 S-3 Depth (ft.)
Revision 806/14                              North Anna ISFSI SAR        2-44 Table 2-5 (CONTINUED)
19.0-20.5 74.0-74.8 9.0-10.5 19.0-20.5 4.0-6.0 49.0-50.5 3.0-4.5Gradation % Passing Sieve 3/8 inch.....................No. 4 100 100 100 100 100 100 100 No. 10 98.6 97.6 99.9 99.9 99.8 97.7 99.7 No. 40 80.7 70.7 93.1 84.9 84.3 78.8 69.0 No. 100 60.8 47.2 81.3 64.4 52.3 39.3 44.5 No. 200 53.1 34.2 76.3 51.2 44.9 26.2 36.8 Liquid Limit (%)
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude        Longitude      MMI    Magnitude May 31, 1966    37.660  N      78.130 W        V      3.69 Sep 28, 1966    39.300  N      80.300 W        IV      3.61 Mar 8, 1968    37.280  N      80.770 W        IV      4.09 May 22, 1969    39.610  N      78.250 W                3.10 Nov 20, 1969    37.450  N      80.930 W        VI      4.69 Dec 11, 1969    37.840  N      77.670 W        V      3.39 May 27, 1970    39.620  N      78.280 W                3.20 Jul 14, 1971    39.700  N      75.600 W        IV      3.61 Sep 12, 1971    38.150  N      77.590 W        V      3.60 Dec 29, 1971    39.70  N      75.600 W        IV      3.61 Jan 2, 1972    39.700  N      75.600 W        IV      3.61 Jan 3, 1972    39.700  N      75.600 W        IV      3.61 Jan 7, 1972    39.700  N      75.600 W        IV      3.61 Jan 22, 1972    39.700  N      75.600 W        IV      3.61 Jan 23, 1972    39.700  N      75.600 W        IV      3.61 Feb 11, 1972    39.700  N      75.600 W        V      4.20 Aug 14, 1972    39.700  N      75.600 W        IV      3.61 Sep 5, 1972    37.600  N      77.700 W        IV      3.39 Sep 12, 1972    39.600  N      79.900 W        III      3.02 Dec 8, 1972    40.140  N      76.240 W        V      3.52 Feb 28, 1973    39.690  N      75.430 W        V      3.79 Apr 9, 1973    37.300  N      77.700 W        IV      3.61 Jul 10, 1973    39.700  N      75.700 W        IV      3.61 Mar 23, 1974    38.700  N      77.800 W                3.80 Apr 28, 1974    39.800  N      75.600 W        IV      3.61 May 30, 1974    37.460  N      80.540 W        V      3.59 May 31, 1974    37.400  N      80.400 W                3.80 Mar 7, 1975    37.320  N      80.480 W        II      3.04 Nov 11, 1975    37.220  N      80.890 W        IV      3.19 May 6, 1976    39.600  N      79.900 W        IV      3.61 Sep 13, 1976    36.620  N      80.770 W        VI      3.29 Apr 26, 1978    39.700  N      78.240 W                3.10 Jul 16, 1978    39.900  N      76.220 W        V      3.09 Oct 6, 1978    40.080  N      76.150 W                3.00 Aug 30, 1980    39.800  N      74.900 W                3.00 Nov 5, 1980    38.180  N      79.900 W                3.00 Feb 11, 1981    37.720  N      78.440 W        IV      3.39
60 40 58...64...46Plasticity Index 16 6 26...18...15Natural Moisture (%)
 
30.3 25.4 34.7 27.0 27.1 22.7 13.6ASTM Classification MH SM MH...SM...SM Revision 8-06/14 North Anna ISFSI SAR 2B-3 PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA PO WER F&R #V60-073LABORATORY TEST RESULTSBoring F-10 F-10 P-2 P-3P-4Sample No.
Revision 806/14                              North Anna ISFSI SAR        2-45 Table 2-5 (CONTINUED)
S-5 S-10 BAG BAG BAG Depth (ft.)
EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date      Latitude        Longitude      MMI    Magnitude May 12, 1982    40.410  N      77.960 W                3.00 Apr 19, 1984    40.131  N      76.037 W                3.00 Apr 23, 1984    39.950  N      76.370 W        V      4.46 Aug 17, 1984    37.868  N      78.324 W                4.20 Jun 10, 1985    37.248  N      80.485 W                3.20 Mar 15, 1991    37.746  N      77.916 W        V      3.80 Apr 22, 1991    37.996  N      80.266 W                3.40 Jun 28, 1991    38.231  N      81.335 W                3.00 Aug 15, 1991    40.786  N      77.657 W        V      3.00 Mar 16, 1993    39.190  N      76.870 W        III Nov 17, 1993    39.190  N      76.870 W        III Jan 16, 1994    40.330  N      76.037 W        V      4.60
9.0-10.5 34.0-35.5 0.0-5.0 0.0-5.0 0.0-5.0Gradation % Passing Sieve 3/8 inch...100 100......No. 4 100 99.2 98.7 100 100 No. 10 99.4 90.9 94.8 99.4 99.1 No. 40 65.4 55.4 81.1 83.5 90.9 No. 100 41.5 33.9 57.8 67.7 64.9 No. 200 31.6 24.8 49.5 62.1 55.7 Liquid Limit (%)
 
41...41 60 48Plasticity Index 12...20 30 19Natural Moisture (%)
Revision 806/14        North Anna ISFSI SAR  2-46 Figure 2-1 AREA MAP (0-10 MILES)
14.9 22.1 8.5 15.0 8.5ASTM Classification SM...SC CH ML Revision 8-06/14 North Anna ISFSI SAR 2B-4*Sample was molded at natural moisture content and unit weight.
 
PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA PO WER F&R #V60-073CBR TEST RESULTS Boring P-2 P-3 F-7A Sample No.
Revision 806/14            North Anna ISFSI SAR  2-47 Figure 2-2 REGIONAL MAP (0-50 MILES)
BulkBulkComposite Depth (ft.)
 
0.0-5.0 0.0-5.0 16.0-22.0ASTM Classification SC CH SMMoisture-Density Relationship Test Maximum Dry Density (pcf) 117.5 111.2 109.0*Optimum Moisture (%)
Revision 806/14                                      North Anna ISFSI SAR                            2-48 Figure 2-3 NORTH ANNA SITE BOUNDARY N
12.4 16.6 35.0*CBR (Unsoaked)
                                                                  ,AKE !NNA 3ECURITY
CBR (Soaked) 39.2 7.6 38.9 7.3 6.4 NA Revision 8-06/14 North Anna ISFSI SAR 2B-5 Revision 8-06/14 North Anna ISFSI SAR 2B-6PARTICLE SIZE ANALYSIS TESTObjective:The grain size data are used to aid in the classification of soils and in the estimation of soil behavior.
                                              &ENCE
Procedure:The test can be divided into two part s, the determinati on of the size and distribution of the coarse fr action and the determination of the size and distribution of the fine fraction. The division between the coarse and fine fr action is the No. 200 sieve. The coarse fraction is tested using the sieve method; the fine fraction is tested using the hydrometer method. If both tests are performed, th e test is referred to as the combined analysis.For the analysis of the coarse fraction, th e dried soil is soak ed and then washed through a #200 sieve. The sand and gravel remaining on the sieve is oven dried. The dried sand and gravel is then passed through a series of sieves, and the weight retained on each sieve is determined. The distribution of weights is then computed and the percent passing each sieve is plotted as a curve.
                                                                          -ETEOROLOGICAL 4OWER 5NIT 
In the hydrometer method, the particle size is determined by Stoke's equation. The soil is mixed with water to form a heavy slurry. The rate of sedimentation is measured using a hydrometer. Hydrometer data can be reduced to develop the weight percent distribution curve for the fine grained soil fraction.
                                                          #ONT
References
5NIT 
:ASTM Specification D-422, "Particle Size Analysis of Soils." Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army , Appendix V.
                                          #ONT
Revision 8-06/14 North Anna ISFSI SAR 2B-7 Revision 8-06/14 North Anna ISFSI SAR 2B-8 Revision 8-06/14 North Anna ISFSI SAR 2B-9 Revision 8-06/14 North Anna ISFSI SAR 2B-10 Revision 8-06/14 North Anna ISFSI SAR 2B-11ATTERBERG LIMITS Purpose:Dr. Atterberg (1911) defined the liquid limit of a soil as the water content, expressed as a percentage of th e dry weight of the soil, at the boundary between the liquid and plastic states. The plastic limit is the water content expressed as a percentage of the dry we ight of the soil, at the boun dary between the plastic and semisolid states. The difference between these two values is the Plasticity Index (PI).Liquid and Plastic limits are performed to determine the soil classification and plasticity properties of the soil specimen. Atterberg limi ts can be correlated with approximate values for comp ressibility and strength.
                                  )3&3) 3ITE "OUNDARY
Procedure:The liquid limit is the water content when a soil will flow under a specific dynamic force. The soil is wetted, placed in a special liquid limit device, and grooved into two halves. The water c ontent is measured when the two halves flow together over a specified distance.
                %XCLUSION !REA
The plastic limit is determined, as desc ribed by ASTM Specification D-4318, by obtaining the water content when a soil can be rolled by hand into thin threads on a surface of ground glass. The plastic limit is defined as the moisture content at which the soil can not be rolled into threads smaller than 1/8 inch in diameter.
                                                                                      'RAPHICS .O 36+
 
Figure 2-4 DAILY AVERAGE TEMPERATURES FOR RICHMOND, VIRGINIA (1951-1980)
Revision 806/14 North Anna ISFSI SAR 2-49
 
Figure 2-5 DAILY EXTREME TEMPERATURES FOR RICHMOND, VIRGINIA (1898-1991)
Revision 806/14 North Anna ISFSI SAR 2-50
 
Revision 806/14                        North Anna ISFSI SAR 2-51 Figure 2-6 EXTREME 1-MILE WIND PASSAGE AT RICHMOND, VIRGINIA
 
Figure 2-7 REGIONAL TOPOGRAPHY AND CHARACTERISTICS Revision 806/14 North Anna ISFSI SAR 2-52
 
Figure 2-8 ISFSI LOCAL TOPOGRAPHY AND GRADING PLAN Revision 806/14 North Anna ISFSI SAR 2-53
 
Revision 806/14                North Anna ISFSI SAR 2-55 Figure 2-10 SITE GEOLOGICAL MAP
 
Revision 806/14        North Anna ISFSI SAR  2-56 Figure 2-11 ISFSI BORING LOCATIONS
 
Figure 2-12 ISFSI SUBSURFACE CROSS SECTION Revision 806/14 North Anna ISFSI SAR 2-57
 
Revision 806/14        North Anna ISFSI SAR  2-58 Figure 2-13 REGIONAL GEOLOGIC MAP
 
Revision 806/14        North Anna ISFSI SAR  2-59 Figure 2-14 PAD #1 SURFACE PROFILE
 
Revision 806/14        North Anna ISFSI SAR  2-60 Figure 2-15 PAD #2 SURFACE PROFILE
 
Revision 806/14        North Anna ISFSI SAR  2-61 Figure 2-16 PAD #3 SURFACE PROFILE
 
Revision 806/14      North Anna ISFSI SAR  2-62 Figure 2-17 EARTHQUAKE LOCATIONS
 
Figure 2-19 ALTERNATE TRANSPORT ROUTE SUBSURFACE CROSS SECTIONS Revision 806/14 North Anna ISFSI SAR 2-64
 
Revision 806/14        North Anna ISFSI SAR 2A-i Appendix 2A Boring Logs
 
Revision 806/14              North Anna ISFSI SAR 2A-ii Intentionally Blank
 
Revision 806/14                                      North Anna ISFSI SAR                    2A-1 (1994 BORINGS)
FIELD EXPLORATION PROCEDURES Disturbed Sampling Soil test borings were drilled and tested in accordance with ASTM D 1452 and ASTM D 1586 procedures with a CME-55 truck mounted drill rig, by mechanically advancing hollow stem auger flights into the ground. At regular intervals, the plug was removed from the auger head, and soil samples were obtained with a standard 1.4"I.D., 2"O.D., 20" long split tube sampler. The sampler was attached to the end of A size drill rods and lowered through the augers to sampling elevation. The sampler was first seated to penetration loose cuttings and disturbed soil, then driven an additional foot with blows of a 140 lb. hammer falling 30". The sampler was then extracted from the soil, the plug reinserted into the auger head, and the auger advanced to the next sampling elevation. The number of blows required to drive the sampler each 6" increment of penetration was recorded and is shown on the boring logs. The number of blows required to drive the sampler the final foot is termed the penetration resistance. Penetration resistance, when properly evaluated, is an index to soil density, strength, and foundation support capacity.
Undisturbed Sampling Split tube samples are suitable for visual examination and classification tests but are not sufficiently intact for quantitative laboratory testing. Relatively undisturbed samples were obtained by forcing sections of 3"O.D., 16 gauge, steel tubing into the soil at the desired sampling levels. This sampling procedure is described by ASTM Specification D-1587. Each tube, together with the encased soil, was carefully removed from the ground, made airtight, and transported to the laboratory. Locations and depths of undisturbed samples are shown on the test boring records.
 
Revision 806/14                                      North Anna ISFSI SAR                        2A-2 ROCK CORING PROCEDURES Rock coring procedures are used to evaluate subsurface conditions below the depth of auger refusal. Auger refusal typically reflects the presence of obstructions (e.g., boulders) or the presence of bedrock.
Water is used to drill a diamond studded drill bit through bedrock or obstructions. The drill pipe at the bottom of the boring contains a steel sleeve, or core barrel, that accepts the drill core as the bit is advanced. Typically, the core barrel can accommodate 5 or 10 feet of core. When bedrock is encountered, a run number is designated each time the core barrel is filled with sample and removed from the boring.
The percent of recovery is calculated for every run. Percent recovery is the ratio of the recovered length of core to the length of the core run.
The rock quality designation (RQD) is calculated for each core run when N-sized core sampling procedures are used. N-sized core is approximately 2-inches in diameter. The RQD is the ratio of the cumulative length of core greater than 4-inches long and the length of core run.
The RQD is often used to evaluate the engineering properties of bedrock.
 
Revision 806/14                                    North Anna ISFSI SAR      2A-3 KEY TO BORING LOG SOIL CLASSIFICATIONS Soils Identification ASTM SOIL CLASSIFICATION IS BASED ON THE DISTRIBUTION OF THE SAND AND GRAVEL SEED PARTICLES, THE PLASTICITY (E.G. ATTERBERG LIMITS) OF THE F I N E S A N D , S I LT A N D C L AY F R AC T I O N , A N D T H E R E L AT I V E DENSITY/CONSISTENCY AS DETERMINED FROM THE STANDARD PENETRATION TEST N-VALUE.
Soil Type              Particle Size Boulder                      12 in.
Cobble                      3 - 12 in.
Gravel - Coarse            3/4 - 3 in.
        - Fine            #4 - 3/4 in.
Sand - Coarse                #10 - #4
        - Medium            #40 - #10
        - Fine            #200 - #40 Silt (non-cohesive)          <#200 Clay (cohesive)              <#200 NOTE: Particle Size is Designated by U.S. Standard Sieve Sizes.
Relative Density or Consistency THE STANDARD PENETRATION TEST N-VALUES ARE USED TO EVALUATE THE RELATIVE DENSITY OF COARSE-GRAINED SOILS OR THE CONSISTENCY OF FINE-GRAINED SOILS.
RELATIVE DENSITY                                  CONSISTENCY Term                    N-Value                Term                  N-Value Very Loose              0 - 4                  Very Soft              0 - 1 Loose                    5 - 9                  Soft                  2 - 4 Medium Dense            10 - 30                Firm                  5 - 8 Dense                  31 - 50                Stiff                  9 - 16 Very Dense              Over 50                Very Stiff            17 - 30 Hard                  31 - 50 Very Hard            Over 50
 
Revision 806/14 North Anna ISFSI SAR 2A-4 Revision 806/14 North Anna ISFSI SAR 2A-5 Revision 806/14 North Anna ISFSI SAR 2A-6 Revision 806/14 North Anna ISFSI SAR 2A-7 Revision 806/14 North Anna ISFSI SAR 2A-8 Revision 806/14 North Anna ISFSI SAR 2A-9 Revision 806/14 North Anna ISFSI SAR 2A-10 Revision 806/14 North Anna ISFSI SAR 2A-11 Revision 806/14 North Anna ISFSI SAR 2A-12 Revision 806/14 North Anna ISFSI SAR 2A-13 Revision 806/14 North Anna ISFSI SAR 2A-14 Revision 806/14 North Anna ISFSI SAR 2A-15 Revision 806/14 North Anna ISFSI SAR 2A-16 Revision 806/14 North Anna ISFSI SAR 2A-17 Revision 806/14 North Anna ISFSI SAR 2A-18 Revision 806/14 North Anna ISFSI SAR 2A-19 Revision 806/14 North Anna ISFSI SAR 2A-20 Revision 806/14 North Anna ISFSI SAR 2A-21 Revision 806/14 North Anna ISFSI SAR 2A-22 Revision 806/14 North Anna ISFSI SAR 2A-23 Revision 806/14 North Anna ISFSI SAR 2A-24 Revision 806/14 North Anna ISFSI SAR 2A-25 Revision 806/14 North Anna ISFSI SAR 2A-26 Revision 806/14 North Anna ISFSI SAR 2A-27 Revision 806/14 North Anna ISFSI SAR 2A-28 Revision 806/14 North Anna ISFSI SAR 2A-29 Revision 806/14 North Anna ISFSI SAR 2A-30 Revision 806/14 North Anna ISFSI SAR 2A-31 Revision 806/14 North Anna ISFSI SAR 2A-32 Revision 806/14 North Anna ISFSI SAR 2A-33 Revision 806/14 North Anna ISFSI SAR 2A-34 Revision 806/14 North Anna ISFSI SAR 2A-35 Revision 806/14 North Anna ISFSI SAR 2A-36 Revision 806/14 North Anna ISFSI SAR 2A-37 Revision 806/14 North Anna ISFSI SAR 2A-38 Revision 806/14 North Anna ISFSI SAR 2A-39 Revision 806/14 North Anna ISFSI SAR 2A-40 Revision 806/14  North Anna ISFSI SAR  2A-41 2008 BORINGS
 
Revision 806/14 North Anna ISFSI SAR 2A-42 Revision 806/14 North Anna ISFSI SAR 2A-43 Revision 806/14              North Anna ISFSI SAR 2A-44 Intentionally Blank
 
Revision 806/14          North Anna ISFSI SAR 2B-i Appendix 2B Laboratory Tests
 
Revision 806/14              North Anna ISFSI SAR 2B-ii Intentionally Blank
 
PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring                  F-5A            F-5            F-6        F-6        F-6      F-7A        F-7A Sample No.              UD-1            S-7            S-2        S-5        S-9      UD-l      UD-2 Depth (ft.)            18.0-20.0      19.0-20.5      1.5-3.0  9.0-10.5  29.0-30.5  4.0-6.0  16.0-18.0 Gradation
% Passing Sieve No. 4                  ....            ....          ....      100        100        ....      100 No. 10                100            100            100      97.9        99.9      100        99.8 No. 40                92.5            96.1          96.6      84.4        77.8      96.8      83.1 No. 100              67.7            79.5          90.3      61.7        35.9      77.9      50.8 No. 200              53.9            70.2          87.9      54.3        24.8      72.0      38.0 Liquid Limit (%)          ...            65            85        62          ...        84        ...
Plasticity Index          ...            19            31        19          ...        30        ...
Natural Moisture (%)    53.3            55.7          37.4      29.0        29.3      34.1      31.8 North Anna ISFSI SAR ASTM Classification      ...            MH            MH        MH          ...      MH          ...
2B-1
 
PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring                  F-7            F-7            F-8        F-8      F-9A        F-9        F-10 Sample No.              S-7            S-18          S-4        S-7      UD-1        S-13      S-3 Depth (ft.)            19.0-20.5      74.0-74.8      9.0-10.5  19.0-20.5  4.0-6.0  49.0-50.5  3.0-4.5 Gradation
% Passing Sieve 3/8 inch              ...            ...            ...        ...        ...        ...        ...
No. 4                100            100            100        100        100        100        100 No. 10                98.6            97.6          99.9        99.9      99.8      97.7      99.7 No. 40                80.7            70.7          93.1        84.9      84.3      78.8      69.0 No. 100              60.8            47.2          81.3        64.4      52.3      39.3      44.5 No. 200              53.1            34.2          76.3        51.2      44.9      26.2      36.8 Liquid Limit (%)          60              40            58          ...        64        ...        46 Plasticity Index          16              6            26          ...        18        ...        15 North Anna ISFSI SAR Natural Moisture (%)    30.3            25.4          34.7        27.0      27.1      22.7      13.6 ASTM Classification      MH              SM            MH          ...      SM          ...      SM 2B-2
 
PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring                  F-10            F-10        P-2              P-3      P-4 Sample No.              S-5            S-10        BAG            BAG      BAG Depth (ft.)            9.0-10.5        34.0-35.5    0.0-5.0          0.0-5.0  0.0-5.0 Gradation
% Passing Sieve 3/8 inch              ...            100          100              ...      ...
No. 4                100            99.2        98.7            100      100 No. 10              99.4            90.9        94.8            99.4      99.1 No. 40              65.4            55.4        81.1            83.5      90.9 No. 100              41.5            33.9        57.8            67.7      64.9 No. 200              31.6            24.8        49.5            62.1      55.7 Liquid Limit (%)        41              ...          41              60        48 Plasticity Index        12              ...          20              30        19 North Anna ISFSI SAR Natural Moisture (%)    14.9            22.1          8.5            15.0      8.5 ASTM Classification      SM              ...          SC              CH        ML 2B-3
 
PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 CBR TEST RESULTS Revision 806/14 Boring                                                P-2          P-3        F-7A Sample No.                                            Bulk          Bulk    Composite Depth (ft.)                                        0.0-5.0        0.0-5.0  16.0-22.0 ASTM Classification                                    SC          CH          SM Moisture-Density Relationship Test Maximum Dry Density (pcf)                        117.5        111.2      109.0*
Optimum Moisture (%)                              12.4          16.6      35.0*
CBR (Unsoaked)                                        39.2          38.9        6.4 CBR (Soaked)                                          7.6          7.3        NA
*Sample was molded at natural moisture content and unit weight.
North Anna ISFSI SAR 2B-4
 
Revision 806/14 North Anna ISFSI SAR 2B-5 Revision 806/14                              North Anna ISFSI SAR                2B-6 PARTICLE SIZE ANALYSIS TEST Objective: The grain size data are used to aid in the classification of soils and in the estimation of soil behavior.
Procedure: The test can be divided into two parts, the determination of the size and distribution of the coarse fraction and the determination of the size and distribution of the fine fraction. The division between the coarse and fine fraction is the No. 200 sieve. The coarse fraction is tested using the sieve method; the fine fraction is tested using the hydrometer method. If both tests are performed, the test is referred to as the combined analysis.
For the analysis of the coarse fraction, the dried soil is soaked and then washed through a #200 sieve. The sand and gravel remaining on the sieve is oven dried. The dried sand and gravel is then passed through a series of sieves, and the weight retained on each sieve is determined. The distribution of weights is then computed and the percent passing each sieve is plotted as a curve.
In the hydrometer method, the particle size is determined by Stoke's equation.
The soil is mixed with water to form a heavy slurry. The rate of sedimentation is measured using a hydrometer. Hydrometer data can be reduced to develop the weight percent distribution curve for the fine grained soil fraction.
 
==References:==
ASTM Specification D-422, Particle Size Analysis of Soils.
Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army, Appendix V.
 
Revision 806/14 North Anna ISFSI SAR 2B-7 Revision 806/14 North Anna ISFSI SAR 2B-8 Revision 806/14 North Anna ISFSI SAR 2B-9 Revision 806/14 North Anna ISFSI SAR 2B-10 Revision 806/14                                 North Anna ISFSI SAR             2B-11 ATTERBERG LIMITS
 
==Purpose:==
Dr. Atterberg (1911) defined the liquid limit of a soil as the water content, expressed as a percentage of the dry weight of the soil, at the boundary between the liquid and plastic states. The plastic limit is the water content expressed as a percentage of the dry weight of the soil, at the boundary between the plastic and semisolid states. The difference between these two values is the Plasticity Index (PI).
Liquid and Plastic limits are performed to determine the soil classification and plasticity properties of the soil specimen. Atterberg limits can be correlated with approximate values for compressibility and strength.
Procedure: The liquid limit is the water content when a soil will flow under a specific dynamic force. The soil is wetted, placed in a special liquid limit device, and grooved into two halves. The water content is measured when the two halves flow together over a specified distance.
The plastic limit is determined, as described by ASTM Specification D-4318, by obtaining the water content when a soil can be rolled by hand into thin threads on a surface of ground glass. The plastic limit is defined as the moisture content at which the soil can not be rolled into threads smaller than 1/8 inch in diameter.


==References:==
==References:==
ASTM Specification D4318 "Stand ard Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils."
ASTM Specification D4318 Standard Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
Revision 8-06/14 North Anna ISFSI SAR 2B-12 Revision 8-06/14 North Anna ISFSI SAR 2B-13MOISTURE CONTENT TESTObjective:To determine the ratio between the moisture contained in the soil and the weight of the solid soil grains, expre ssed as a percentage.
 
The in-situ moisture content with other index properties are used to evaluate anticipated soil behavior. For controlled fill placement, the moisture content is critical in achieving maximum compaction.
Revision 806/14 North Anna ISFSI SAR 2B-12 Revision 806/14                               North Anna ISFSI SAR               2B-13 MOISTURE CONTENT TEST Objective: To determine the ratio between the moisture contained in the soil and the weight of the solid soil grains, expressed as a percentage. The in-situ moisture content with other index properties are used to evaluate anticipated soil behavior.
Procedure:
For controlled fill placement, the moisture content is critical in achieving maximum compaction.
A moist sample is weighed and then oven dried. The dry sample is then weighed. The moist sample weight minus the dry sample weight is used to determine the weight of water removed. The weight of the sample remaining after oven-drying is used as the weight of the so lid soil grains. The moisture content, in percent, is the ratio of the weight of mois ture to the weight of dry soil multiplied by 100.
Procedure: A moist sample is weighed and then oven dried. The dry sample is then weighed. The moist sample weight minus the dry sample weight is used to determine the weight of water removed. The weight of the sample remaining after oven-drying is used as the weight of the solid soil grains. The moisture content, in percent, is the ratio of the weight of moisture to the weight of dry soil multiplied by 100.


==References:==
==References:==
ASTM Specification D-2216 "Standard Method of Laboratory Determination of Moisture Content of Soil."Laboratory Soils Testings, EM 1110-2-1906 by the Department of the Army , Appendix I.
ASTM Specification D-2216 Standard Method of Laboratory Determination of Moisture Content of Soil.
Revision 8-06/14 North Anna ISFSI SAR 2B-14UNIT WEIGHT TESTObjective:
Laboratory Soils Testings, EM 1110-2-1906 by the Department of the Army, Appendix I.
The unit weight test is performed to determine the density of moist soil, expressed in terms of weight per volume. The dry unit weight is calculated from the moist unit weight and the natural mo isture content. The unit weight is used in soils engineering calculations.
Procedure:The volumetric method consists of computing the total volume of a regular-shaped sample. The weight and vo lume of the sample is measured. The moist unit weight equals the weight of sample divided by the volume of the sample. To determine the dry unit weight, the moistu re content of the sample needs to be determined. The moist unit weight divided by the moisture content plus one equals


the dry unit weight.
Revision 806/14                            North Anna ISFSI SAR              2B-14 UNIT WEIGHT TEST Objective: The unit weight test is performed to determine the density of moist soil, expressed in terms of weight per volume. The dry unit weight is calculated from the moist unit weight and the natural moisture content. The unit weight is used in soils engineering calculations.
The displacement method consists of dete rmining the total volume of a soil by measuring the volume or weight of water displaced by th e soil mass. The sample is placed in a wire cage and submerged in water. The volume of the displaced water is measured. The weight of the sample is determined. The moist unit weight is estimated by dividing the sample weight by the volume of water displaced.
Procedure: The volumetric method consists of computing the total volume of a regular-shaped sample. The weight and volume of the sample is measured. The moist unit weight equals the weight of sample divided by the volume of the sample.
To determine the dry unit weight, the moisture content of the sample needs to be determined. The moist unit weight divided by the moisture content plus one equals the dry unit weight.
The displacement method consists of determining the total volume of a soil by measuring the volume or weight of water displaced by the soil mass. The sample is placed in a wire cage and submerged in water. The volume of the displaced water is measured. The weight of the sample is determined. The moist unit weight is estimated by dividing the sample weight by the volume of water displaced.


==References:==
==References:==
Laboratory Soils Testing, EM 1110-2-1906, by the Department of the Army, Appendix II.
Laboratory Soils Testing, EM 1110-2-1906, by the Department of the Army, Appendix II.
Revision 8-06/14 North Anna ISFSI SAR 2B-15MOISTURE-DENSITY (MODIFIED)
 
Purpose:The moisture-density relationship of a given soil is determined to provide an index unit weight that can be compared to the field compacted unit weight. The maximum dry unit weight determ ined using this test method is termed 100 percent of Modified Proctor.
Revision 806/14                             North Anna ISFSI SAR             2B-15 MOISTURE-DENSITY (MODIFIED)
Procedure:The Modified Proctor Test is performed on a bulk soil sample. Gravel (plus No. 4 or plus 3/4 inch, depending on the test method) is removed from the bulk sample. The prepared bulk sample is split to form four to five test specimens.
 
==Purpose:==
The moisture-density relationship of a given soil is determined to provide an index unit weight that can be compared to the field compacted unit weight. The maximum dry unit weight determined using this test method is termed 100 percent of Modified Proctor.
Procedure: The Modified Proctor Test is performed on a bulk soil sample. Gravel (plus No. 4 or plus 3/4 inch, depending on the test method) is removed from the bulk sample. The prepared bulk sample is split to form four to five test specimens.
The moisture content of each prepared specimen is adjusted in the laboratory to vary by 1-1/2 to 2 percent from the other prepared specimens.
The moisture content of each prepared specimen is adjusted in the laboratory to vary by 1-1/2 to 2 percent from the other prepared specimens.
The prepared soil specimens are compacted in a cylindrical mold in five equal layers to give a total compacted depth of about 5 inches. Each la yer is compacted by uniformly distributed blows using a 10 pound, sliding weight hammer and a 18-inch drop. The number of blows used for comp action (25 or 56) de pends on the test method. The dry density and compaction moisture conten t is determined for each compacted test specimen and plotted to provide the moisture-density curve. The maximum dry density and the optimum comp action moisture content for the sample with the gravel removed is determined from the moisture-density curve. The maximum dry density for the bulk sample with gravel is determined using the gravel correction factor as outlined in ASTM Procedures D-4718.
The prepared soil specimens are compacted in a cylindrical mold in five equal layers to give a total compacted depth of about 5 inches. Each layer is compacted by uniformly distributed blows using a 10 pound, sliding weight hammer and a 18-inch drop. The number of blows used for compaction (25 or 56) depends on the test method. The dry density and compaction moisture content is determined for each compacted test specimen and plotted to provide the moisture-density curve. The maximum dry density and the optimum compaction moisture content for the sample with the gravel removed is determined from the moisture-density curve. The maximum dry density for the bulk sample with gravel is determined using the gravel correction factor as outlined in ASTM Procedures D-4718.


==References:==
==References:==
ASTM Specification D-1557, "Standard Methods of Test for  
ASTM Specification D-1557, Standard Methods of Test for Moisture-Density Relations of Soils using 10.0 lb. (4.5 Kg) Rammer and 18-inch (457 mm) Drop.


Moisture-Density Relatio ns of Soils using 10.0 lb. (4.5 Kg) Rammer and 18-inch (457 mm) Drop".
Revision 806/14 North Anna ISFSI SAR 2B-16 Revision 806/14 North Anna ISFSI SAR 2B-17 Revision 806/14                             North Anna ISFSI SAR             2B-18 CALIFORNIA BEARING RATIO
Revision 8-06/14 North Anna ISFSI SAR 2B-16 Revision 8-06/14 North Anna ISFSI SAR 2B-17 Revision 8-06/14 North Anna ISFSI SAR 2B-18CALIFORNIA BEARING RATIO Purpose: The California Bearing Ratio test is performed on subgrade, subbase and base course materials to provide supporting values of various roadway materials which can be used as a basis for pavement design.
 
Procedure:
==Purpose:==
A sample of the subgrade soil is compacted in a cylindrical mold to the density and moisture anticipa ted in actual construction. Cohesive soils are allowed to soak, immersed in water for 96 hours. By means of a hydraulic jack, a penetration "needle" is forced into samp le at a controlled rate. Load values and corresponding strain or deformation are noted. The ratios of the load values in pounds per square inch at 0.1 inch and 0.2 inch penetration, respectively, ar e compared to the standard loads of 1000 and 1500 pounds per square inch respectively. (The latter are those loads required to produce th e same penetration in a co mpacted limestone sample.)
The California Bearing Ratio test is performed on subgrade, subbase and base course materials to provide supporting values of various roadway materials which can be used as a basis for pavement design.
The CBR in percent is the ratio of the loads at 0.1 pene tration multiplied by 100.
Procedure: A sample of the subgrade soil is compacted in a cylindrical mold to the density and moisture anticipated in actual construction. Cohesive soils are allowed to soak, immersed in water for 96 hours. By means of a hydraulic jack, a penetration needle is forced into sample at a controlled rate. Load values and corresponding strain or deformation are noted. The ratios of the load values in pounds per square inch at 0.1 inch and 0.2 inch penetration, respectively, are compared to the standard loads of 1000 and 1500 pounds per square inch respectively. (The latter are those loads required to produce the same penetration in a compacted limestone sample.)
The CBR in percent is the ratio of the loads at 0.1 penetration multiplied by 100.


==References:==
==References:==
ASTM Specification D-1883-67", Standard Method of Test for Bearing Ratio of Laboratory-Compacted Soils."
ASTM Specification D-1883-67, Standard Method of Test for Bearing Ratio of Laboratory-Compacted Soils.
Revision 8-06/14 North Anna ISFSI SAR 2B-19 Revision 8-06/14 North Anna ISFSI SAR 2B-20 Revision 8-06/14 North Anna ISFSI SAR 2B-21 Revision 8-06/14 North Anna ISFSI SAR 2B-22 Revision 8-06/14 North Anna ISFSI SAR 2B-23 Revision 8-06/14 North Anna ISFSI SAR 2B-24CONSOLIDATION TESTObjective:Consolidation tests are performed on undisturbed soil samples in order to estimate the settlement resulting from imposed loads. The time required for consolidation and the amount of consolidation settleme nt can be predicted from this test data.
 
Procedure:An undisturbed sample is trimmed to fit a consolidometer ring. The trimmed sample has a diameter of 2.5 inch es and a height of 1.0 inch. The soil sample is sandwiched between porous stones. A seating pressure is applied and the micrometer dial gauge is adju sted to zero. Load incremen ts are placed on the soil sample at regular intervals (e.g. every 24 hours.) Load incremen ts are determined from anticipated f ield loadin g conditions and project requ irements. The test results are presented in the form of a void ratio, or an axial strain versus applied pressure curve on a semilogrithmitic graph.
Revision 806/14 North Anna ISFSI SAR 2B-19 Revision 806/14 North Anna ISFSI SAR 2B-20 Revision 806/14 North Anna ISFSI SAR 2B-21 Revision 806/14 North Anna ISFSI SAR 2B-22 Revision 806/14 North Anna ISFSI SAR 2B-23 Revision 806/14                             North Anna ISFSI SAR             2B-24 CONSOLIDATION TEST Objective: Consolidation tests are performed on undisturbed soil samples in order to estimate the settlement resulting from imposed loads. The time required for consolidation and the amount of consolidation settlement can be predicted from this test data.
Procedure: An undisturbed sample is trimmed to fit a consolidometer ring. The trimmed sample has a diameter of 2.5 inches and a height of 1.0 inch. The soil sample is sandwiched between porous stones. A seating pressure is applied and the micrometer dial gauge is adjusted to zero. Load increments are placed on the soil sample at regular intervals (e.g. every 24 hours.) Load increments are determined from anticipated field loading conditions and project requirements. The test results are presented in the form of a void ratio, or an axial strain versus applied pressure curve on a semilogrithmitic graph.


==References:==
==References:==
ASTM Specification D-2435, "One-Dimensional Consolidation Properties of Soils".Engineering Properties of Soil &
ASTM Specification D-2435, One-Dimensional Consolidation Properties of Soils.
Their Measurements by Joseph E.
Engineering Properties of Soil & Their Measurements by Joseph E.
Bowles, McGraw-Hill, Inc., "Consolidation Test".Laboratory Soils Testing, EM-1110-2-1906 by The Department of the Army, Appendix VIII.
Bowles, McGraw-Hill, Inc., Consolidation Test.
Revision 8-06/14 North Anna ISFSI SAR 2B-25 Revision 8-06/14 North Anna ISFSI SAR 2B-26 Revision 8-06/14 North Anna ISFSI SAR 2B-27 Revision 8-06/14 North Anna ISFSI SAR 2B-28 Revision 8-06/14 North Anna ISFSI SAR 2B-29 Revision 8-06/14 North Anna ISFSI SAR 2B-30 Revision 8-06/14 North Anna ISFSI SAR 2B-31TRIAXIAL COMPRESSION TESTObjective:
Laboratory Soils Testing, EM-1110-2-1906 by The Department of the Army, Appendix VIII.
The triaxial compression test is performed to estimate the shear strength of a soil under co ntrolled drainage conditions. Sheer strength is expressed in terms of the angle of internal friction (O) and the cohesion intercept (c).
 
Procedure:Triaxial tests on undisturbed soil samples may be: (1) unconsolidated undrained, "UU"; (2) consolidated undrained, "CU"; or (3) consolidated drained, "CD". The type of test is selected to best represent the field and loading conditions.
Revision 806/14 North Anna ISFSI SAR 2B-25 Revision 806/14 North Anna ISFSI SAR 2B-26 Revision 806/14 North Anna ISFSI SAR 2B-27 Revision 806/14 North Anna ISFSI SAR 2B-28 Revision 806/14 North Anna ISFSI SAR 2B-29 Revision 806/14 North Anna ISFSI SAR 2B-30 Revision 806/14                                 North Anna ISFSI SAR             2B-31 TRIAXIAL COMPRESSION TEST Objective: The triaxial compression test is performed to estimate the shear strength of a soil under controlled drainage conditions. Sheer strength is expressed in terms of the angle of internal friction (O) and the cohesion intercept (c).
Back pressure is often applied to facilitate complete saturation. Pore water pressure readings may also be taken to determine the effective stresses and defective angle of internal friction.In the triaxial test, a cylin drical specimen of soil, encased in a rubber membrane, is placed in a compression chamber, subjected to a confining fluid pressure and then loaded axially to failure.
Procedure: Triaxial tests on undisturbed soil samples may be: (1) unconsolidated undrained, UU; (2) consolidated undrained, CU; or (3) consolidated drained, CD. The type of test is selected to best represent the field and loading conditions.
Connections at the ends of the specimen permit controlled drainage of pore water from the specimen. Also, pore pressure read ings can be recorded as the axial load is applied. In general, a minimum of three specimens, each under a different confining pressure, are tested to establish the relation between shear stress and norm al stress. The test results are represented by a plot of shear versus axial stress (Mohr Circle Diagram).
Back pressure is often applied to facilitate complete saturation. Pore water pressure readings may also be taken to determine the effective stresses and defective angle of internal friction.
In the triaxial test, a cylindrical specimen of soil, encased in a rubber membrane, is placed in a compression chamber, subjected to a confining fluid pressure and then loaded axially to failure. Connections at the ends of the specimen permit controlled drainage of pore water from the specimen. Also, pore pressure readings can be recorded as the axial load is applied. In general, a minimum of three specimens, each under a different confining pressure, are tested to establish the relation between shear stress and normal stress. The test results are represented by a plot of shear versus axial stress (Mohr Circle Diagram).


==References:==
==References:==
ASTM Specification D-2850, "Standard Method of Test for Unconsolidated Undrained Strength of Cohesive Soils in Triaxial Compression."Laboratory Soils Testing, EM 1110 1906, by The De partment of the Army, Appendixes X, XA, & XBEngineering Properties of Soils &
ASTM Specification D-2850, Standard Method of Test for Unconsolidated Undrained Strength of Cohesive Soils in Triaxial Compression.
Their Measurements, by Joseph E.
Laboratory Soils Testing, EM 1110-2-1906,by The Department of the Army, Appendixes X, XA, & XB Engineering Properties of Soils & Their Measurements, by Joseph E.
Bowles, McGraw-Hill Book CompanyThe Measurement of Soil Properties in the Triaxial Test, by Bishop & Henkel, 2nd Edition 1962, Edward Arnold Publishers, LTD.
Bowles, McGraw-Hill Book Company The Measurement of Soil Properties in the Triaxial Test, by Bishop &
Revision 8-06/14 North Anna ISFSI SAR 2B-32 Revision 8-06/14 North Anna ISFSI SAR 2B-33 Revision 8-06/14 North Anna ISFSI SAR 2B-34 Revision 8-06/14 North Anna ISFSI SAR 2B-35 Revision 8-06/14 North Anna ISFSI SAR 2B-36 Revision 8-06/14 North Anna ISFSI SAR 2B-37 Revision 8-06/14 North Anna ISFSI SAR 2B-38 Revision 8-06/14 North Anna ISFSI SAR 2B-39 Revision 8-06/14 North Anna ISFSI SAR 2B-40 Revision 8-06/14 North Anna ISFSI SAR 2B-41 Revision 8-06/14 North Anna ISFSI SAR 2B-42 Revision 8-06/14 North Anna ISFSI SAR 2B-43 Revision 8-06/14 North Anna ISFSI SAR 2B-44 Revision 8-06/14 North Anna ISFSI SAR 2B-45 Revision 8-06/14 North Anna ISFSI SAR 2B-46 Revision 8-06/14 North Anna ISFSI SAR 2B-47 Revision 8-06/14 North Anna ISFSI SAR 2B-48 Revision 8-06/14 North Anna ISFSI SAR 2B-49 Revision 8-06/14 North Anna ISFSI SAR 2B-50 Revision 8-06/14 North Anna ISFSI SAR 2B-51 Revision 8-06/14 North Anna ISFSI SAR 2B-52 Revision 8-06/14 North Anna ISFSI SAR 2B-53 Revision 8-06/14 North Anna ISFSI SAR 2B-54 Revision 8-06/14 North Anna ISFSI SAR 2B-55 Revision 8-06/14 North Anna ISFSI SAR 2B-56UNCONFINED COMPRESSION TESTObjective:To estimate the load per unit area (compressive strength) that an unconfined, cohesive soil will fail in a simple compression test. The compressive strength is taken as the maximum load (e.g. load at failure) per un it area or the load per unit area at 20% axial strain, whichever occurs first.
Henkel, 2nd Edition 1962, Edward Arnold Publishers, LTD.
Procedure:A cylinder of soil having a height of 1.5 to 2 times the average diameter is loaded to failure, in simple compression, quickly enough that the water content of the soil does not change. The test load is app lied using a strain-controlled method. Simultaneous observations are made of the applied load and of the axial strain. The failure load or the load required to produce 20 percent axial strain is expressed as the load per unit of cross-sectional area, in KIPS per square foot.
 
Revision 806/14 North Anna ISFSI SAR 2B-32 Revision 806/14 North Anna ISFSI SAR 2B-33 Revision 806/14 North Anna ISFSI SAR 2B-34 Revision 806/14 North Anna ISFSI SAR 2B-35 Revision 806/14 North Anna ISFSI SAR 2B-36 Revision 806/14 North Anna ISFSI SAR 2B-37 Revision 806/14 North Anna ISFSI SAR 2B-38 Revision 806/14 North Anna ISFSI SAR 2B-39 Revision 806/14 North Anna ISFSI SAR 2B-40 Revision 806/14 North Anna ISFSI SAR 2B-41 Revision 806/14 North Anna ISFSI SAR 2B-42 Revision 806/14 North Anna ISFSI SAR 2B-43 Revision 806/14 North Anna ISFSI SAR 2B-44 Revision 806/14 North Anna ISFSI SAR 2B-45 Revision 806/14 North Anna ISFSI SAR 2B-46 Revision 806/14 North Anna ISFSI SAR 2B-47 Revision 806/14 North Anna ISFSI SAR 2B-48 Revision 806/14 North Anna ISFSI SAR 2B-49 Revision 806/14 North Anna ISFSI SAR 2B-50 Revision 806/14 North Anna ISFSI SAR 2B-51 Revision 806/14 North Anna ISFSI SAR 2B-52 Revision 806/14 North Anna ISFSI SAR 2B-53 Revision 806/14 North Anna ISFSI SAR 2B-54 Revision 806/14 North Anna ISFSI SAR 2B-55 Revision 806/14                               North Anna ISFSI SAR               2B-56 UNCONFINED COMPRESSION TEST Objective: To estimate the load per unit area (compressive strength) that an unconfined, cohesive soil will fail in a simple compression test. The compressive strength is taken as the maximum load (e.g. load at failure) per unit area or the load per unit area at 20% axial strain, whichever occurs first.
Procedure: A cylinder of soil having a height of 1.5 to 2 times the average diameter is loaded to failure, in simple compression, quickly enough that the water content of the soil does not change. The test load is applied using a strain-controlled method. Simultaneous observations are made of the applied load and of the axial strain. The failure load or the load required to produce 20 percent axial strain is expressed as the load per unit of cross-sectional area, in KIPS per square foot.


==References:==
==References:==
ASTM SPECIFICATION D-2166, "Standard Methods of Test for Unconfined Compressive Strength of Cohesive Soil".Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army , Appendix XI.
ASTM SPECIFICATION D-2166, Standard Methods of Test for Unconfined Compressive Strength of Cohesive Soil.
Revision 8-06/14 North Anna ISFSI SAR 2B-57 Revision 8-06/14 North Anna ISFSI SAR 2B-58 Revision 8-06/14 North Anna ISFSI SAR 2B-59 Revision 8-06/14 North Anna ISFSI SAR 2B-60 Revision 8-06/14 North Anna ISFSI SAR 2B-61 Revision 8-06/14 North Anna ISFSI SAR 2B-62 Revision 8-06/14 North Anna ISFSI SAR 2B-63 Revision 8-06/14 North Anna ISFSI SAR 2B-64 Revision 8-06/14 North Anna ISFSI SAR 2B-65 Revision 8-06/14 North Anna ISFSI SAR 2B-66 Revision 8-06/14 North Anna ISFSI SAR 2B-67 Revision 8-06/14 North Anna ISFSI SAR 2B-68 Revision 8-06/14 North Anna ISFSI SAR 2B-69 Revision 8-06/14 North Anna ISFSI SAR 2B-70 Revision 8-06/14 North Anna ISFSI SAR 2B-71 Revision 8-06/14 North Anna ISFSI SAR 2B-72 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 3-1Chapter 3PRINCIPAL S SSC DESIGN CRITERIA This chapter describe s the design criteria to be met by the SSSCs to be used in the North Anna ISFSI. Compliance with thes e criteria ensures that the North Anna ISFSI complies with the requirements of 10 CFR 72.3.1 PURPOSES OF SSSC A summary description of each SSSC approved for use at the North Anna ISFSI is provided in Appendix A. A detailed description of the approved SS SCs is provided in the Topical Safety Analysis Reports (TSAR) listed in Table A-1 of Appendix A.3.1.1 Spent Fuel to Be Stored The ISFSI is designed to accommodate a total of 84 SSSCs. However, the licensed spent fuel storage design capacity of the facility is 839.04 MTU. At approximately 0.46 metric tons of uranium (MTU) per fuel assembly, the facility can accommodate 1824 fuel assemblies under the current licen se.The physical characteristics of th e fuel to be stored in the I SFSI are described in detail in Section 4.2 of the North Anna Power Station UFSAR and are summarized in Table 3-1. An evaluation of the storage of bu rnable poison rod assem blies (BPRAs) and/or thimble plug de vices (TPDs) with the fuel assemblies placed in SSSCs is provided in Appendix A for each cask design.The fuel used during the first years of North Anna Power Station Units 1 and 2 operation had initial enrichments not exceeding 3.5 weight percent U235 and discharge burnup not exceeding 35,800 MWD/MTU. The North Anna Power Station has been authorized to operate with fuel with higher initial enrichment and hi gher b urnup. The design basi s fuel characteristics used in the analyses included in Chapters 7 and 8 include initial enrichment of 4.3 weight percent U 235, burnup of 45,000 MWD/MTU and a cooling time of 7 years. The radioactive characteristics of the design basis fuel are discussed in Section 7.2.3.1.1.1 Spent Fuel CharacteristicsThe following fuel assembly char acteristics constitute limiting parameters for storage of fuel assemblies at the ISFSI:Initial Fuel EnrichmentFuel BurnupHeat GenerationDecay timeSpent Fuel Physical Conf iguration/Condition Revision 8-06/14 North Anna ISFSI SAR 3-2 3.1.1.1.1 Allowable LimitsThe allowable limits for each of the se characteristics are discussed below.1.Initial Fuel Enrichment The initial fuel en richment of an y fuel th at is stored in a SSSC will be limited to the maximum enrichment specified in the ISFSI Technical Specifications.2.Fuel BurnupThe burnup of any fuel that is st ored in a SSSC will be limited to that specified in the ISFSI Technical Specifications.3.Heat Generation The heat generation rate by an indi vidual fuel assembly is dependent on three factors: the initial fuel enrichment, the fuel burnup, and the amount of decay time after discharge. The maximum allowable heat generation rate for a particular SSSC is specified in the ISFSI Technical Specifications.4.Decay Time The decay time of an y fuel that is stored in a SSSC will be at least gr eater than that specified in the ISFSI Technical Specifications.5.Spent Fuel Physical Conf iguration/Condition Only spent fuel irradiated at North Anna Power Station Units 1 and 2 with the physical configuration as listed in items 1, 2, and 3 of Table 3-1 will be stored in the ISFSI. The fuel stored shall be intact, shall not have gross cladding defects, and shall not have visible physical damage which would inhibit insertion or removal from the SSSC basket.
Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army, Appendix XI.
3.1.1.1.2 VerificationThe method of verification for each of th ese characteristics is discussed below:1.Initial Fuel Enrichment, Fuel Burnup and Decay TimeFuel management records shall be utilized to verify that the initial fuel enrichment, fuel burnup and decay time meet the specified limits. Each fuel assembly is engraved with a unique identification num ber (based on ANSI/ANS 57.8) and a vendor identification, which is unique to the site fo r which the fuel assemblies were fabricated. This will allow visual confirmation of the identity of the fuel assemblies placed in the SSSC.2.Heat Generation The heat generation rate of a fuel assembly is base d primarily on the fuel enrichment, burnup, operating history, and cooling time after discharge.
 
Fuel management records will be used to obtain the parameters. A decay heat an alysis using a computer code such as ORIGEN or the method described in NU REG/CR-5625 will be used to ensure that the heat generation per fuel assembly is less than that specified in the ISFSI Technical Specifications.
Revision 806/14 North Anna ISFSI SAR 2B-57 Revision 806/14 North Anna ISFSI SAR 2B-58 Revision 806/14 North Anna ISFSI SAR 2B-59 Revision 806/14 North Anna ISFSI SAR 2B-60 Revision 806/14 North Anna ISFSI SAR 2B-61 Revision 806/14 North Anna ISFSI SAR 2B-62 Revision 806/14 North Anna ISFSI SAR 2B-63 Revision 806/14 North Anna ISFSI SAR 2B-64 Revision 806/14 North Anna ISFSI SAR 2B-65 Revision 806/14 North Anna ISFSI SAR 2B-66 Revision 806/14 North Anna ISFSI SAR 2B-67 Revision 806/14 North Anna ISFSI SAR 2B-68 Revision 806/14 North Anna ISFSI SAR 2B-69 Revision 806/14 North Anna ISFSI SAR 2B-70 Revision 806/14 North Anna ISFSI SAR 2B-71 Revision 806/14               North Anna ISFSI SAR 2B-72 Intentionally Blank
Revision 8-06/14 North Anna ISFSI SAR 3-33.Spent Fuel Physical Conf iguration/ConditionFuel management records will be reviewed to ensure that the assemb lies to be put in the SSSC have not been previously identified as having gross cladding defects. The fuel assemblies shall also be visual ly inspected (e.g., using closed-circuit television cameras) for physical damage which could potentially cause problems during insertion and/or removal from the SSSC.
 
3.1.2 General Operating Functions The fuel assemblies will be stored unconsolid ated and dry in SSSCs.
Revision 806/14                                       North Anna ISFSI SAR                     3-1 Chapter 3        PRINCIPAL SSSC DESIGN CRITERIA This chapter describes the design criteria to be met by the SSSCs to be used in the North Anna ISFSI. Compliance with these criteria ensures that the North Anna ISFSI complies with the requirements of 10 CFR 72.
The SSSCs will rest on a reinforced concrete storage pad, and pro vid e safe storage by ensuring a reliable decay heat path from the spent fuel to the environment and by providing appr opriate shielding and containment of the fission product inventory.
3.1 PURPOSES OF SSSC A summary description of each SSSC approved for use at the North Anna ISFSI is provided in Appendix A. A detailed description of the approved SSSCs is provided in the Topical Safety Analysis Reports (TSAR) listed in Table A-1 of Appendix A.
3.1.1 Spent Fuel to Be Stored The ISFSI is designed to accommodate a total of 84 SSSCs. However, the licensed spent fuel storage design capacity of the facility is 839.04 MTU. At approximately 0.46 metric tons of uranium (MTU) per fuel assembly, the facility can accommodate 1824 fuel assemblies under the current license.
The physical characteristics of the fuel to be stored in the ISFSI are described in detail in Section 4.2 of the North Anna Power Station UFSAR and are summarized in Table 3-1. An evaluation of the storage of burnable poison rod assemblies (BPRAs) and/or thimble plug devices (TPDs) with the fuel assemblies placed in SSSCs is provided in Appendix A for each cask design.
The fuel used during the first years of North Anna Power Station Units 1 and 2 operation had initial enrichments not exceeding 3.5 weight percent U 235 and discharge burnup not exceeding 35,800 MWD/MTU. The North Anna Power Station has been authorized to operate with fuel with higher initial enrichment and higher burnup. The design basis fuel characteristics used in the analyses included in Chapters 7 and 8 include initial enrichment of 4.3 weight percent U235, burnup of 45,000 MWD/MTU and a cooling time of 7 years. The radioactive characteristics of the design basis fuel are discussed in Section 7.2.
3.1.1.1 Spent Fuel Characteristics The following fuel assembly characteristics constitute limiting parameters for storage of fuel assemblies at the ISFSI:
* Initial Fuel Enrichment
* Fuel Burnup
* Heat Generation
* Decay time
* Spent Fuel Physical Configuration/Condition
 
Revision 806/14                                       North Anna ISFSI SAR                     3-2 3.1.1.1.1 Allowable Limits The allowable limits for each of these characteristics are discussed below.
: 1. Initial Fuel Enrichment The initial fuel enrichment of any fuel that is stored in a SSSC will be limited to the maximum enrichment specified in the ISFSI Technical Specifications.
: 2. Fuel Burnup The burnup of any fuel that is stored in a SSSC will be limited to that specified in the ISFSI Technical Specifications.
: 3. Heat Generation The heat generation rate by an individual fuel assembly is dependent on three factors: the initial fuel enrichment, the fuel burnup, and the amount of decay time after discharge. The maximum allowable heat generation rate for a particular SSSC is specified in the ISFSI Technical Specifications.
: 4. Decay Time The decay time of any fuel that is stored in a SSSC will be at least greater than that specified in the ISFSI Technical Specifications.
: 5. Spent Fuel Physical Configuration/Condition Only spent fuel irradiated at North Anna Power Station Units 1 and 2 with the physical configuration as listed in items 1, 2, and 3 of Table 3-1 will be stored in the ISFSI. The fuel stored shall be intact, shall not have gross cladding defects, and shall not have visible physical damage which would inhibit insertion or removal from the SSSC basket.
3.1.1.1.2 Verification The method of verification for each of these characteristics is discussed below:
: 1. Initial Fuel Enrichment, Fuel Burnup and Decay Time Fuel management records shall be utilized to verify that the initial fuel enrichment, fuel burnup and decay time meet the specified limits. Each fuel assembly is engraved with a unique identification number (based on ANSI/ANS 57.8) and a vendor identification, which is unique to the site for which the fuel assemblies were fabricated. This will allow visual confirmation of the identity of the fuel assemblies placed in the SSSC.
: 2. Heat Generation The heat generation rate of a fuel assembly is based primarily on the fuel enrichment, burnup, operating history, and cooling time after discharge. Fuel management records will be used to obtain the parameters. A decay heat analysis using a computer code such as ORIGEN or the method described in NUREG/CR-5625 will be used to ensure that the heat generation per fuel assembly is less than that specified in the ISFSI Technical Specifications.
 
Revision 806/14                                       North Anna ISFSI SAR                     3-3
: 3. Spent Fuel Physical Configuration/Condition Fuel management records will be reviewed to ensure that the assemblies to be put in the SSSC have not been previously identified as having gross cladding defects. The fuel assemblies shall also be visually inspected (e.g., using closed-circuit television cameras) for physical damage which could potentially cause problems during insertion and/or removal from the SSSC.
3.1.2 General Operating Functions The fuel assemblies will be stored unconsolidated and dry in SSSCs. The SSSCs will rest on a reinforced concrete storage pad, and provide safe storage by ensuring a reliable decay heat path from the spent fuel to the environment and by providing appropriate shielding and containment of the fission product inventory.
Storage of spent fuel in SSSCs is a totally passive function, with no active systems required to function. Cooling of the SSSCs is accomplished by convective cooling.
Storage of spent fuel in SSSCs is a totally passive function, with no active systems required to function. Cooling of the SSSCs is accomplished by convective cooling.
The SSSCs are to be handled with a lifting yok e, the Fuel Bu ilding cask handling crane, a transporter, or other appropriate equipment. The Fuel Building crane places the loaded SSSC on the ground outside the Decontamination Building. The SSSC is then lifted by the transporter which is moved to the ISFSI by a tow vehicle. After the transporter has been maneuvered to locate the SSSC in its storage position, the SSSC is set down by the transporter.The equipment in the Fuel a nd Decontamination Buildings is capable of handling S SSCs weighing up to 125 tons fully loaded and measuring approximately 16 feet in length with the top  
The SSSCs are to be handled with a lifting yoke, the Fuel Building cask handling crane, a transporter, or other appropriate equipment. The Fuel Building crane places the loaded SSSC on the ground outside the Decontamination Building. The SSSC is then lifted by the transporter which is moved to the ISFSI by a tow vehicle. After the transporter has been maneuvered to locate the SSSC in its storage position, the SSSC is set down by the transporter.
The equipment in the Fuel and Decontamination Buildings is capable of handling SSSCs weighing up to 125 tons fully loaded and measuring approximately 16 feet in length with the top cover removed.
All the handling equipment to be used will be sized to handle SSSCs measuring up to the above specifications, as needed. This equipment will be designed according to appropriate commercial codes and standards, and will be operated, maintained, and inspected in accordance with the suppliers recommendations. Documentation will be maintained to substantiate conformance with all applicable standards.
3.2 DESIGN CRITERIA FOR ENVIRONMENTAL CONDITIONS AND NATURAL PHENOMENA The SSSCs are designed with the objectives of ensuring that fuel criticality is prevented, SSSC integrity is maintained, and fuel is not damaged so as to preclude its removal from the SSSC. The conditions under which these objectives must be met are described below.
The safe storage of the spent fuel assemblies depends on the capability of the SSSCs to fulfill their design functions. The SSSCs are self-contained, independent, passive systems, which do not rely on any other systems or components for their operation. Therefore, the SSSCs are the only components at the North Anna ISFSI which are safety-related. The criteria used in the design of the SSSCs ensure that exposure of the SSSCs to credible site hazards will not impair their
 
Revision 806/14                                        North Anna ISFSI SAR                      3-4 safety functions. Because the North Anna ISFSI is located on the North Anna site, all ISFSI design criteria for environmental conditions and natural phenomena are the same as the plant design bases, as found in Chapter 3 of the North Anna Power Station UFSAR.
The design criteria satisfy the requirements of 10 CFR 72. They consider the effects of normal operation, natural phenomena and postulated man-made accidents. The criteria are defined in terms of loading conditions imposed on the SSSCs. The loading conditions are evaluated to determine the type and magnitude of loads induced on the SSSC. The combination of these loads are then established based on the number of conditions that can be superimposed.
3.2.1 Tornado and Wind Loadings The SSSC manufacturers will be required to meet either the design basis tornado and extreme wind used for the Class 1 (safe shutdown) systems and structures of the North Anna Power Station, as described in Sections 3.3.1 and 3.3.2 of the North Anna Power Station UFSAR or alternately, those prescribed by Regulatory Guide 1.76, Design Basis Tornado for Nuclear Power Plants, April 1976.
3.2.1.1 Applicable Design Parameters The design basis tornado for the North Anna Power Station has a rotational wind velocity of 300 mph, a translational velocity of 60 mph, and a pressure drop of 3 psi in 3 seconds, as described in Section 3.3.2 of the North Anna Power Station UFSAR.
The design basis extreme wind is 80 mph as described in Section 2.3.1 of this SAR.
The design basis tornado and wind loadings for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.
3.2.1.2 Determination of Forces on Structures The description of the methods used to convert the tornado and wind loading into forces on the SSSCs is addressed in the SSSC Topical Safety Analysis Reports.
The safety function of the SSSCs is not dependent on any other structures or systems. In addition, there are no structures in the vicinity of the ISFSI, which, if failed under tornado loads, could damage the SSSCs.
3.2.1.3 Tornado Missiles The design basis tornado missiles listed in Section 3.3.2 of the North Anna Power Station UFSAR are the following:
* A wooden utility pole 40 feet long, 12 inches in diameter, with a density of 50 lb/ft3, and traveling in a vertical or horizontal direction at 150 mph
* A 1-ton automobile traveling at 150 mph not more than 25 feet above ground and with a contact area of 30 ft2
 
Revision 806/14                                        North Anna ISFSI SAR                    3-5
* A 1-inch solid steel rod, three feet long, with a density of 490 lb/ft3
* A 6-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft3
* A 12-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft3 Analysis of the potential effects of tornado missiles on the SSSCs is addressed in the SSSC Topical Safety Analysis Reports and in Appendix A.
3.2.2 Water Level (Flood) Design The design finished grade elevation of the ISFSI is approximately 311 feet msl, leaving a margin of approximately 45 feet above the maximum flood. Therefore, the ISFSI site is flood-free. See Section 2.4.2 for additional details.
3.2.3 Seismic Design Section 2.5.2 describes the vibratory ground motions experienced in the region of the North Anna site and defines design earthquake ground acceleration values of 0.18g horizontal and 0.12g vertical for the ISFSI, which are also the values used for the design basis earthquake (DBE) for North Anna Units 1 and 2 for Seismic Class I structures founded on saprolite more than 15 feet thick.
3.2.4 Snow and Ice Loadings The rain and snow falls experienced at the North Anna site are described in Section 2.3.1 of this SAR.
Snow and ice would melt soon after contacting the surface of the SSSC due to the decay heat generated by the stored fuel. These phenomena are not considered credible challenges to the SSSCs. Therefore, snow and ice loadings are not identified among the design criteria for the SSSCs.
3.2.5 Combined Load Criteria The loads postulated as design criteria for the SSSCs have been described in this chapter.
The methods and assumptions made in analyzing the mechanical and structural behavior of the SSSCs are described in the SSSC Topical Safety Analysis Reports and in Appendix A.
3.3 SAFETY PROTECTION SYSTEMS 3.3.1 General The handling of the SSSCs while they are being placed in the ISFSI requires that they be lifted by a transporter. Technical Specifications for the North Anna ISFSI limit the height the SSSCs may be lifted while being transported and while being emplaced at the ISFSI. The SSSCs are able to withstand drops onto the storage pad without compromising their integrity and without resulting in physical damage to the fuel.
 
Revision 806/14                                        North Anna ISFSI SAR                      3-6 Because of the passive nature of the North Anna ISFSI and the absence of support systems, no other items requiring special design consideration have been identified.
3.3.2 Protection By Multiple Confinement Barriers and Systems 3.3.2.1 Confinement Barriers and Systems Confinement of radioactivity during the storage of spent fuel is achieved by (1) the uranium dioxide fuel pellet matrix, (2) the metallic tubes (cladding) in which the pellets are contained, and (3) the SSSC in which the assemblies are stored.
The confinement function of the SSSCs is achieved by totally enclosing the spent fuel assemblies within a double-seal rigid metal vessel. The SSSCs are fabricated, delivered to the North Anna site, loaded, sealed, and emplaced at the ISFSI in a manner that ensures their integrity, the capability to perform their safety functions, and compliance with all applicable rules and regulations.
Once the SSSCs are sealed, there are no credible events which could result in a release of radioactive material to the environment. Similarly, there are no credible scenarios which could result in contamination of the outside surface of the SSSCs or in the generation of radioactive waste products.
More detailed information on SSSC confinement barriers is provided in the SSSC Topical Safety Analysis Reports.
3.3.2.2 SSSC Cooling Natural air flow around the SSSCs provides sufficient cooling. No forced ventilation is required.
3.3.3 Protection By Equipment and Instrumentation Selection 3.3.3.1 Equipment As discussed in Section 3.2, the SSSCs represent the only components of the ISFSI which are important to safety. Design criteria for the SSSCs are described in this section and summarized in Table 3-2.
3.3.3.2 Instrumentation Due to the totally passive and inherently safe nature of the SSSCs, safety-related instrumentation is not necessary.
High quality commercial grade instrumentation will be provided to monitor the SSSCs functional performance. Instrumentation to monitor SSSC parameters such as pressure will be furnished as recommended by the specific SSSC designs. The appropriate capabilities to check these monitors will also be provided. The SSSCs are provided with pressure monitoring systems as described in the SSSC Topical Safety Analysis Reports.


cover removed.
Revision 806/14                                       North Anna ISFSI SAR                     3-7 3.3.4 Nuclear Criticality Safety The criterion for ensuring that the fuel remains subcritical at all times is that the effective neutron multiplication factor keff be less than 0.95 (including two standard deviations), assuming a single active or passive failure, and that an infinite number of SSSCs can be stored in close proximity.
All the handling equipment to be used will be sized to handle SSSCs measuring up to the above specifications, as needed. This equipmen t will be designed according to appropriate commercial codes and standards, and will be operated, maintain ed, and inspected in accordance with the supplier's recommenda tions. Documentation will be ma intained to substantiate conformance with all applicable standards.
3.3.4.1 Control Methods for Prevention of Criticality Methods to be used to ensure that subcriticality is maintained at all times in the SSSCs are addressed in the SSSC Topical Safety Analysis Reports or Appendix A.
3.2 DESIGN CRITERIA FOR ENVIRONME NTAL CONDITIONS AND NATURAL PHENOMENAThe SSSCs are designed with the objectives of ensuring that fuel criticality is prevented, SSSC integrity is mainta ined, and fuel is not damaged so as to preclude its removal from the SSSC. The conditions under which these objectives must be met are described below.
3.3.4.2 Error Contingency Criteria Error contingency criteria for the SSSCs are presented in the SSSC Topical Safety Analysis Reports or Appendix A.
The safe storage of the spen t fuel assemblies depends on th e capability of the SSSCs to fulf ill their design functions. The SSSCs are self-contained, independent, passive systems, which do not rely on any other systems or components for their operation. Therefore, the SSSCs are the only components at the North Anna ISFSI which are safety-related. The criteria used in the design of the SSSCs ensure that exposur e of the SSSCs to credible s ite hazards will not impair their Revision 8-06/14 North Anna ISFSI SAR 3-4 safety functions. Because the North Anna ISFSI is located on the North Anna site, all ISFSI design criteria for en vironmental conditions and natural phenomena are the same as the plant design bases, as found in Chapter 3 of the North Anna Power Station UFSAR.The design criteria satisfy the requirements of 10 CFR 72. They consider the effects of normal operation, natural phenomena and postulated man-made accidents. The criteria are defined in terms of loading conditions imposed on the SSSCs. The loading conditions are evaluated to determine the type and magnitude of loads induced on the SSSC. The combination of these loads are then established based on the num ber of conditions that can be superimposed.
3.3.4.3 Verification Analyses The criteria for establishing verification of the models and programs used in the criticality calculations for the SSSCs are presented in the SSSC Topical Safety Analysis Reports or Appendix A.
3.2.1 Tornado and Wind LoadingsThe SSSC manufacturers will be required to meet either the design basis tornado and extreme wind used for the Class 1 (safe shutdown) systems an d structures of the North Anna Power Station, as described in Sections 3.3.1 and 3.3.2 of the North Anna Power Station UFSAR or alternately, those prescr ibed by Re gulatory Guide 1.76, Design Basis Tornado for Nuclear Power Plants, April 1976.3.2.1.1 Applicable Design Parameters The design basis tornado for the North Anna Power Station has a ro tational wind velocity of 300 mph, a translational velocity of 60 mph, and a pressure drop of 3 psi in 3 seconds, as described in Section 3.3.2 of the North Anna Power Station UFSAR.The design basis extreme wind is 80 mph as described in Section 2.3.1 of this SAR.
3.3.5 Radiological Protection Provisions for radiological protection by confinement barriers and systems are described in Section 3.3.2.1. No additional radiological protection design criteria are considered to be necessary.
The design basis tornado and wi nd loadings for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.
The North Anna ISFSI does not require the continuous presence of operators or maintenance personnel. Access to the ISFSI perimeter fence is limited to personnel needed during operations at the ISFSI, e.g., periodic inspection of the facility, emplacement of SSSCs, and security checks. These activities will be defined and controlled by the Health Physics and Security procedures covering the North Anna ISFSI. Because personnel are seldom at the ISFSI and only for short periods of time, further reduction of collective occupational doses is not practical.
3.2.1.2 Determination of Forces on StructuresThe description of the methods used to conver t the tornado and wind loading into forces on the SSSCs is addressed in the SSSC T opical Safety An alysis Reports.
Estimates of the collective occupational doses (in person-rem) per year for SSSC operation, maintenance and repair are included in Section 7.4. No occupational dose is expected for decommissioning of the ISFSI facility, since the facility will not be contaminated. The occupational dose to unload SSSCs will be similar to that for SSSC loading shown in Table 7-2.
The safety function of the SSSCs is not depe ndent on an y other struct ures or systems. In addition, there are no structures in the vicinity of the ISFSI, which, if failed under tornado loads, could damage the SSSCs.
The occupational dose to dispose of SSSC components as radioactive waste is expected to be very small, as discussed in Section 4.6. Occupational exposures will be kept as-low-as-reasonably-achievable as discussed in Sections 7.1 and 7.3.
3.2.1.3 Tornado Missiles The design basis tornado missiles listed in Section 3.3.2 of the North Anna Power Station UFSAR are the following:A wooden utility pole 40 feet long, 12 inches in diameter, wi th a density of 50 lb/ft 3 , and traveling in a vertical or horizontal direction at 150 mphA 1-ton automobile traveling at 150 mph not more than 25 feet above ground and with a contact area of 30 ft 2 Revision 8-06/14 North Anna ISFSI SAR 3-5A 1-inch solid steel rod, three feet long, with a density of 490 lb/ft 3A 6-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft 3A 12-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft 3Analysis of the potential effects of tornado missiles on the SSSCs is addressed in the SSSC Topical Safety Analys is Reports and in Appendix A.3.2.2 Water Level (Flood) DesignThe design finished grade elevation of the ISFSI is approximately 311 feet msl, leaving a margin of approximately 45 feet above the maximum flood. Th erefore, the I SFSI site is flood-free. See Section 2.4.2 for additional details.
 
3.2.3 Seismic DesignSection 2.5.2 describes the vibratory ground motions experienced in the region of the North Anna site and defines design earthquake gr ound acceleration values of 0.18g horizontal and 0.12g vertical for the ISFSI, which are also the va lues used for the design basis earthquake (DBE) for North Anna Units 1 and 2 for Seismic Class I structures founded on sa prolite more than 15 feet thick.
Revision 806/14                                     North Anna ISFSI SAR                     3-8 3.3.6 Fire and Explosion Protection A backup diesel generator and its associated fuel tank are located within the ISFSI security fence. To prevent a postulated fire associated with a leaking fuel tank a monitored, double-walled diesel fuel tank with a maximum capacity of 200 gallons is provided. There are no other significant combustible sources within the ISFSI security fence.
3.2.4 Snow and Ice LoadingsThe rain and snow falls experienced at the North Anna site are described in Section 2.3.1 of this SAR.Snow and ice would melt soon after contacting the surf ace of the SSSC due to the decay heat generated by the stored fuel. These phenomena are not consider ed credible challenges to the SSSCs. Therefore, snow and ice lo adings are not identified among the design criteria for the SSSCs.3.2.5 Combined Load CriteriaThe loads postulated as design criteria for the SSSCs have been described in this chapter.
As indicated in Section 2.2.2, overpressure of much less than 1 psi can be conservatively postulated to occur at the North Anna ISFSI as a result of accidents involving explosive materials which are transported near the site. The SSSCs are designed to withstand a 1 psi external overpressure without any impairment of their safety functions.
The methods and assumptions made in analyzing the m echanical and struct ural beha vior of the SSSCs are described in the SSSC Topi cal Safety Analysis Reports and in Appendix A.3.3 SAFETY PROTECTION SYSTEMS 3.3.1 GeneralThe handling of the SSSCs while they are being placed in the ISFSI requires that they be lifted by a transporter. Technical Specifications for the North Anna ISFSI limit the height the SSSCs may be lifted while being transported and while being emplaced at the ISFSI. The SSSCs are able to withstand drops onto the storage pad without compromising their inte grity and without resulting in physical damage to the fuel.
Revision 8-06/14 North Anna ISFSI SAR 3-6Because of the passive nature of the North Anna ISFSI and the absence of support systems, no other items requiring special design consideration have been identified.
3.3.2 Protection By Multiple Conf inement Barriers and Systems 3.3.2.1 Confinement Barriers and SystemsConfinement of radioactivity during the st orage of spent fuel is achieved by (1) the uranium dioxide fuel pe llet matrix, (2) the metallic tubes (cladding) in wh ich the pellets are contained, and (3) the SSSC in which the assemblies are stored.The confinement function of th e SSSCs is achieved by totally enclosing the spent fuel assemblies within a double-seal rigid metal vessel. The SSSCs are fabricated, delivered to the North Anna site, loaded, seal ed, and emplaced at the ISFSI in a manner that ensures their integrity, the capability to perfor m their safety functions, and compliance with all applicable rules and regulations.
Once the SSSCs are sealed, there ar e no credible events which co uld result in a release of radioactive material to the environment. Similarly, there are no credible scenarios which could result in contamination of the outside surface of the SSSCs or in the generation of radioactive waste products.
More detailed informat ion on SSSC conf inement barriers is provided in the SSSC Topical Safety Analysis Reports.
3.3.2.2 SSSC CoolingNatural air flow around the SSSCs provides sufficient cooling. No forced ventilation is required.3.3.3 Protection By Equipment and Instrumentation Selection 3.3.3.1 Equipment As discussed in Section 3.2 , the SSSCs represent the only co mponents of the ISFSI which are important to safety. Desi gn criteria for the SSSCs are de scribed in this section and summarized in Table 3-2.3.3.3.2 InstrumentationDue to the totally passive and inherently safe nature of the SSSCs, safety-related instrumentation is not necessary
.High quality commercial grade instrumentation will be pro vided to monitor the SSSC's functional performance. Instrumentation to monitor SSSC parameters such as pressure will be furnished as recommended by the specific SSSC designs. The appropriate capabilities to check these monitors will also be provided. The SSSCs are provided w ith pressure monitoring systems as described in the SSSC Topical Safety Analysis Reports.
Revision 8-06/14 North Anna ISFSI SAR 3-7 3.3.4 Nuclear Criticality SafetyThe criterion for ensuring that the fuel remains s ubcritical at all times is that the effective neutron multiplication factor keff be less than 0.95 (including two standard deviations), assuming a single active or passive failure, and that an infinite number of SSSCs can be stored in close proximity.
3.3.4.1 Control Methods for Prevention of Criticality Methods to be used to ensure that subcriticality is maintained at all times in the SSSCs are addressed in the SSSC T opical Safety Analysis Reports or Appendix A.3.3.4.2 Error Contingency CriteriaError contingency criteria for the SSSCs are pr esented in the SSSC T opi cal Safety Analysis Reports or Appendix A.3.3.4.3 Verification AnalysesThe criteria for establishing ve rification of the models and pr ograms used in the criticality calculations for the SSSCs are presented in the SSSC Topical Safety Analysis Reports or Appendix A.3.3.5 Radiological ProtectionProvisions for radiological prot ection by conf inement barriers and systems are described in Section 3.3.2.1. No additional radiological protection design criteria are considered to be necessary.
The North Anna ISFSI does not require the c ontinuous presence of operators or maintenance personnel. Access to the ISFSI perimet er fence is limited to personnel needed during operations at the ISFSI, e.g., periodic inspec tion of the facility, emplacement of SSSCs, and security checks. These activities will be defined and controlled by the Health Physics and Security procedures covering the North Anna ISFSI. Because personnel are seldom at the ISFSI and only for short periods of time, further reduction of collective occupational dos es is not practical.Estimates of the collective o ccupational doses (in person-rem) per year for SSSC operation, maintenance and repair are included in Section 7.4. No occupational dose is expected for decommissioning of the ISFSI facility, since the facility will not be contaminated. The occupational dose to unload SSSC s will be similar to that for SSSC loading shown in Table 7-2. The occupational dose to dispose of SSSC components as radioactive waste is expected to be very small, as discussed in Section 4.6. Occupational exposures will be kept as-low-as- reasonably-achievable as discussed in Sections 7.1 and 7.3.
Revision 8-06/14 North Anna ISFSI SAR 3-8 3.3.6 Fire and Explosion Protection A backup diesel generator and it s associated fuel tank are locat ed within the ISFSI security fence. To prevent a postulated fi re associated with a leaking fu el tank a monitored, double-walled diesel fuel tank with a maximum capacity of 200 gallons is provide
: d. There are no other significant combustible sources wi thin the ISFSI security fence.
As indicated in Section 2.2.2, overpressure of much less than 1 psi can be conservatively postulated to occur at the North Anna ISFSI as a result of accidents involving explosive materials which are transported near the site. The SSSCs are d esigned to withstand a 1 psi external overpressure without any impairme nt of their safety functions.
3.3.7 Materials Handling and Storage The handling of spent fuel within the North Anna Power Station will be conducted in accordance with existing fuel handling procedures. Spent fuel that may be damaged to the extent of losing its cooling geometry or reasonable cladding integrity will be kept at the spent fuel pool and not considered for storage at the ISFSI.
3.3.7 Materials Handling and Storage The handling of spent fuel within the North Anna Power Station will be conducted in accordance with existing fuel handling procedures. Spent fuel that may be damaged to the extent of losing its cooling geometry or reasonable cladding integrity will be kept at the spent fuel pool and not considered for storage at the ISFSI.
The design criteria for SSSCs rela ted to cooling requirements, criticality and contamination control are pro vided in the SSSC Topical Safety Analysis Reports or Appendix A. The detection and handling of breached fuel rods is discussed in Section 3.1.1.1.2.3.4  
The design criteria for SSSCs related to cooling requirements, criticality and contamination control are provided in the SSSC Topical Safety Analysis Reports or Appendix A. The detection and handling of breached fuel rods is discussed in Section 3.1.1.1.2.
3.4  


==SUMMARY==
==SUMMARY==
OF SSSC DESIGN CRITERIA The principal design criteria for SSSCs used at the North Anna ISFSI are presented in Table 3-2.
OF SSSC DESIGN CRITERIA The principal design criteria for SSSCs used at the North Anna ISFSI are presented in Table 3-2.
Revision 8-06/14 North Anna ISFSI SAR 3-9Table 3-1 CHARACTERISTICS OF FU EL USED AT THE NORTH ANNA POWER STATION a1.Fuel Assembliesa.ManufacturerWestinghouseb.Type PWRc.Rod array 17 x 17d.Rods per assembly264 (25 fuel rods are omitted to provide passage for control rods and in-core in strumentation)e.Assembly length 161.80 in.f.Rod pitch 0.496 in.g.Overall assembly dimensions 8.426 in. x 8.426 in.h.Total assembly weight 1533 lb (with heaviest insert component)i.Active fuel length 144 in.2.Fuel Rodsa.Outside diameter 0.374 in.b.Clad thickness 0.0225 in.c.Clad materialZircaloy-4 and Zirlo3.Fuel Pelletsa.Material UO 2 Sinteredb.Length 0.530 or 0.387 in. c4.Fuel Condition for Storage in SSSCsa.Maximum initial enrichment bb.Maximum burnup bc.Maximum heat generation for each fuel assembly at th e time of storage bd.Minimum decay time ba.From North Anna Power Station UFSAR. All dimensions are for cold conditions.b.Specified in the North Anna ISFSI Technical Specifications.c.Reload batches starting with North Anna Unit 1, Batch 9 and North Anna 2, Batch 8 changed fuel pellet length from 0.530 in. to 0.387 in.
Revision 8-06/14 North Anna ISFSI SAR 3-10Table 3-2 DESIGN CRITERIA FOR DRY SEA LED SURFACE STORAGE CASKSThe SSSCs must meet the following criteria, assuming that the y are loaded with the fuel described in Table 3-1.1.Maximum weight with yoke 125 tons2.Criticality with singl e active or credible passive failure keff < 0.953.Ambient temperature
-20&deg;F to 115&deg;F4.Direct exposure to sunlight 800 gm-cal/cm 2 for flat surfaces a 400 gm-cal/cm 2 for curved surfaces a5.Tornado winds 300 mph rotational velocity, 60 mph translational velocity6.Tornado pressure drop 3 psi in 3 seconds7.Maximum winds (V) 80 mph8.Explosive peak overpressure 1 psi9.Design Earthquake peak acceleration 0.18g horizontal 0.12g vertical10.Adequate provisions to monitor performance of SSSC leak tightness11.15-inch drop onto concrete pad without compromi sing SSSC integrity and without physical damage to fuel or loss of subcriticality12.Capable of tipping over and rolling without compromising SSSC integrity and without physical damage to fu el or loss of subcriticality13.Leak tightness to be maintained under al l operating conditions and credible eventsa.These values are adapted from 10 CFR 71.71(c) and apply to a 12-hour daylight period. These values may be averaged over a 24-hour period for long-term thermal analyses.
Revision 8-06/14 North Anna ISFSI SAR 4-1Chapter 4STORAGE SYSTEMThis chapter provides descriptive information on the North Anna ISFSI structures, systems and components. It also provides the bases for the design criteria presented in Chapter 3.4.1 LOCATION AND LAYOUT The location of the North Anna ISFSI and the main and al ternate transport route of the SSSCs from the Decontamination Build ing to the ISFSI are shown in Figure 4-4. In addition, this figure shows other facilities in the vicinity of the ISFSI site, such as roadways and buildings. However, none of these other facilities are rela ted to the ISFSI. The ISFSI and both transport routes are within the North Anna Power Station exclusion area.
The only components with a safety function ar e the SSSCs. The SSSCs are stored on three nonsafety-related concrete stor age pads, 224-by-32-feet , to be built one at a time, as needed, within the ISFSI perimeter fence. Each storage pad is designed to accommodate 28 SSSCs. Each SSSC is approximately 8 feet in diameter and weighs no more than 125 tons. There is approximately 8 feet surface-to-surface distance between SSSCs when they are stored in the vertical position.
The North Anna ISFSI perimeter fence is approximately 750-by-660 feet with a vehicle entrance on the northwest side and seven personnel entrances spaced around the perimeter. A security fence and a nuisance fence are also provided ar ound the storage pads. The layout of the ISFSI site is shown on Figure 4-1.The only utility associa ted with the North Anna ISFSI is electrical power for lights, communications, and monitoring in strumentation as shown on Figures 4-2 and 4-3. The source of this power is described in Section 4.4.4.Loading and unloading of the SSSCs takes place in the Fuel and Decontamination Buildings of the North Anna Power Station. These facili ties are described in Sectio ns 9.1 and 9.5 , respectively, of the North Anna Power Station UFSAR.
Figure 4-4 shows the route for transport of the SSSCs from the Decontam ination Building to the ISFSI.
4.2 STORAGE SITE The North Anna ISFSI is designed in accordance with the General Design Criteria set forth in 10 CFR 72, Subpart F. Table 4-1 summarizes compliance with these criteria, and additional details are provided below.The North Anna ISFSI will consist of three concre te storage pads on which the loaded SSSCs are placed. The storage pads will be construc ted one at a time as th e need for storage space arises. The storage pads will be surrounded by a security fence and a nuisance fence which are surrounded by an ISFSI perimeter fe nce. In addition, the ISFSI stor age area will include lighting, monitors, alarms, and a diesel generator. The ISFSI site plan is shown on Figure 4-1.
Revision 8-06/14 North Anna ISFSI SAR 4-2 The SSSCs are self-contained, inde pendent, passive systems, which do not rely on any other systems or components for their operation, and are classified as safety-related. Th e storage pads and other systems and components at the storage site are classifi ed as nonsafety-related.
4.2.1 StructuresThe operational areas of the North Anna ISFSI are the three st orage pads an d the areas immediately around them. The storage pads pr ovide a uniform level surface for storing the SSSCs. The compacted gravel areas around the storage pads allow movement and positioning of SSSC handling equipment.
These storage pads will be built in accordance with the BOCA Basic Bu ilding Code (Reference 1) and applicable American Concrete In stitute codes and standards. The area surrounding the storage pads will be compacted to properly support the tow vehicle and transporter needed for th e handling of the SSSCs.
The primary function of the conc rete storage pads is to pro vide a uniform level surface for storing the SSSCs. Each pad will be a reinforced concrete slab on grade with nominal dimensions of 32 feet by 224 feet by 2 feet thick. Nominal fort y-foot long concrete ramps are required on each end of the storage pads to enable the SSSC transporter to gain access to the storage pad. The nominal overall length of th e storage pad will be 304 feet. Each storage pad is designed to support a total of 28 SSSCs arranged in fourteen rows of tw o SSSCs with a nomina l center-to-center spacing of 16 feet in both direct ions. SSSCs will be placed on the storage pad starting in the center and moving to the ends in a symmetrical manner. The soil subgrade modulus of elasticity has a nominal value of 30,000 psi. The concrete has a minimu m design compressive strength of 3000 psi in 28 days. Reinforcing steel shall be nominally No.
10 bars at 12 inches-on-center, each way, top and bottom, with a minimum yield strength of 60,000 psi. The as-built soil and concrete parameters of the ISFSI storage pad have been verified to ensure that the final storage pad is robust enough to withstand the maximum loads associated with all cask load conditions, yet "soft" enough to limit the decele ration of the cask during design accident cases. Th e engineering drawing of the plan, sections and details of the storage pads is provided in Figure 4-5. Specifications will be produced so that cons truction of the storage pads will meet the requirements of ACI 301, Specifications for Structural Concrete for Buildings (Reference 2).The storage pads are de signed to support generic SSSCs that are c ylindrical in shape and are each approximately 8 feet in diameter by 16 feet high.Load combinations and design limits for th e reinforced concrete structures are in accordance with ANSI/ANS 57.9 (Reference 3). The available strength of the concrete storage pads was calculated in acc ordance with the requirements and assumptions of ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures (Reference 4).
Revision 8-06/14 North Anna ISFSI SAR 4-3 Structural design of the concre te storage pads included the following loads identified in Section 6.17 of ANSI/ANS 57.9. The following loads were evaluated:DDead load of the structure and attach ments including permanent equipment and piping. The weight of th e storage pads at 150 pounds per cubic foot was included for the pad design.LLive loads include snow, rain, operational lo ads including impact, and vibratory loads due to operating equipment.
For the storage pad desi gn, the SSSC weight of 250 kips was conservatively treated as a live load. The SSSC transporter was also included as live load. The transporter will be moved at very slow speeds and no impact loads need be applied. Also, the SSSC will be lowered from the transporter at a very slow speed and no impact loads will be applied - the SSSC is designed to survive an accidental drop; if the storage pad is damaged it will be repaired. Snow , rain and/or ice loads that could develop are minor in comparison to the weight of the SSSCs. Also, any accumulation of these loads on the storage pad between the SSSCs would reduce the flexural stress in the storage pad and were, therefore, not included.TThermal loads during operation. The SSSCs will be stored on the e xterior storage pads and will not be enclosed by an additional structure. The st orage pad is not restrained except by the foundation soil. No th ermal loads need be considered.HLateral soil pressure. The st orage pad is a slab-on-grade and there are no differential soil pressures to consider.ELoads generated by the Design Earthquake. The North Anna Power Station design basis earthquake (DBE) described in Section 2.5.2.6 of the UFSAR and Section 2.5.2.3 of this SAR was used as the Design Earthquake.WLoads generated by the Design Wi nd. ANSI/ANS-57.9 refe rences ANSI/ANS 2.19 for guidance for determining the Design Wind. ANSI/ANS 2.19 identifies the 100-year recurrence interv al wind that shall be used. Design Wind was determined at a 100-year recurrence level in accordance with ASCE 7-88 (Reference 6).T a Loads due to a temperature rise resulting from loss of cooling air for an extended period of time or loads resulting from th e maximum anticipated heat load. The SSSCs will be stored on the exterior storage pads and will not be enclosed by an additional structure. The storage pads are not restrained except by the foundation soil. Thermal


loads need not be considered.ALoads due to a drop of a heavy load. Th e SSSCs are designed to survive impact as a result of tornado missile impact (see Section 3.2.1.3) and also survive an accidental drop (see Section 8.2.9). Loads due to a drop of a heavy load need not be considered for the concrete storage pad; if the stor age pad is damaged it will be repaired.
Revision 806/14                                            North Anna ISFSI SAR                        3-9 Table 3-1 CHARACTERISTICS OF FUEL USED AT THE NORTH ANNA POWER STATIONa
Revision 8-06/14 North Anna ISFSI SAR 4-4 Although not identi fied in ANSI/ANS 57.9, the following extreme environmental loads were also investigated and conservatively incl uded in the design of the concrete storage pad:
: 1. Fuel Assemblies
W TWind loads generated by a tornado. The same maximum tornado wind speed of 360 mph as used for the North Anna Power Station was used to determine loads on the SSSCs, sliding and overturning, and ef fect on the concrete storage pad.FLoads resulting from maxi mum hypothetical flood incl uding buoyancy and dynamic pressure. As stated in Section 2.4.2.3 , flood loading need not be considered.The design of the concrete storage pads included the following load combinations:
: a. Manufacturer                                Westinghouse
: b. Type                                        PWR
: c. Rod array                                    17 x 17
: d. Rods per assembly                            264 (25 fuel rods are omitted to provide passage for control rods and in-core instrumentation)
: e. Assembly length                              161.80 in.
: f. Rod pitch                                    0.496 in.
: g. Overall assembly dimensions                  8.426 in. x 8.426 in.
: h. Total assembly weight                        1533 lb (with heaviest insert component)
: i. Active fuel length                          144 in.
: 2. Fuel Rods
: a. Outside diameter                            0.374 in.
: b. Clad thickness                              0.0225 in.
: c. Clad material                                Zircaloy-4 and Zirlo
: 3. Fuel Pellets
: a. Material                                    UO2 Sintered
: b. Length                                      0.530 or 0.387 in. c
: 4. Fuel Condition for Storage in SSSCs
: a. Maximum initial enrichment                  b
: b. Maximum burnup                              b
: c. Maximum heat generation for each            b fuel assembly at the time of storage
: d. Minimum decay time                          b
: a. From North Anna Power Station UFSAR. All dimensions are for cold conditions.
: b. Specified in the North Anna ISFSI Technical Specifications.
: c. Reload batches starting with North Anna Unit 1, Batch 9 and North Anna 2, Batch 8 changed fuel pellet length from 0.530 in. to 0.387 in.
 
Revision 806/14                                            North Anna ISFSI SAR                      3-10 Table 3-2 DESIGN CRITERIA FOR DRY SEALED SURFACE STORAGE CASKS The SSSCs must meet the following criteria, assuming that they are loaded with the fuel described in Table 3-1.
: 1. Maximum weight with yoke                              125 tons
: 2. Criticality with single active or credible keff < 0.95 passive failure
: 3. Ambient temperature                                  -20&deg;F to 115&deg;F
: 4. Direct exposure to sunlight                          800 gm-cal/cm2 for flat surfacesa 400 gm-cal/cm2 for curved surfacesa
: 5. Tornado winds                                        300 mph rotational velocity, 60 mph translational velocity
: 6. Tornado pressure drop                                3 psi in 3 seconds
: 7. Maximum winds (V)                                    80 mph
: 8. Explosive peak overpressure                          1 psi
: 9. Design Earthquake peak acceleration                  0.18g horizontal 0.12g vertical
: 10. Adequate provisions to monitor performance of SSSC leak tightness
: 11. 15-inch drop onto concrete pad without compromising SSSC integrity and without physical damage to fuel or loss of subcriticality
: 12. Capable of tipping over and rolling without compromising SSSC integrity and without physical damage to fuel or loss of subcriticality
: 13. Leak tightness to be maintained under all operating conditions and credible events
: a. These values are adapted from 10 CFR 71.71(c) and apply to a 12-hour daylight period. These values may be averaged over a 24-hour period for long-term thermal analyses.
 
Revision 806/14                                      North Anna ISFSI SAR                    4-1 Chapter 4      STORAGE SYSTEM This chapter provides descriptive information on the North Anna ISFSI structures, systems and components. It also provides the bases for the design criteria presented in Chapter 3.
4.1 LOCATION AND LAYOUT The location of the North Anna ISFSI and the main and alternate transport route of the SSSCs from the Decontamination Building to the ISFSI are shown in Figure 4-4. In addition, this figure shows other facilities in the vicinity of the ISFSI site, such as roadways and buildings.
However, none of these other facilities are related to the ISFSI. The ISFSI and both transport routes are within the North Anna Power Station exclusion area.
The only components with a safety function are the SSSCs. The SSSCs are stored on three nonsafety-related concrete storage pads, 224-by-32-feet, to be built one at a time, as needed, within the ISFSI perimeter fence. Each storage pad is designed to accommodate 28 SSSCs. Each SSSC is approximately 8 feet in diameter and weighs no more than 125 tons. There is approximately 8 feet surface-to-surface distance between SSSCs when they are stored in the vertical position.
The North Anna ISFSI perimeter fence is approximately 750-by-660 feet with a vehicle entrance on the northwest side and seven personnel entrances spaced around the perimeter. A security fence and a nuisance fence are also provided around the storage pads. The layout of the ISFSI site is shown on Figure 4-1.
The only utility associated with the North Anna ISFSI is electrical power for lights, communications, and monitoring instrumentation as shown on Figures 4-2 and 4-3. The source of this power is described in Section 4.4.4.
Loading and unloading of the SSSCs takes place in the Fuel and Decontamination Buildings of the North Anna Power Station. These facilities are described in Sections 9.1 and 9.5, respectively, of the North Anna Power Station UFSAR. Figure 4-4 shows the route for transport of the SSSCs from the Decontamination Building to the ISFSI.
4.2 STORAGE SITE The North Anna ISFSI is designed in accordance with the General Design Criteria set forth in 10 CFR 72, Subpart F. Table 4-1 summarizes compliance with these criteria, and additional details are provided below.
The North Anna ISFSI will consist of three concrete storage pads on which the loaded SSSCs are placed. The storage pads will be constructed one at a time as the need for storage space arises. The storage pads will be surrounded by a security fence and a nuisance fence which are surrounded by an ISFSI perimeter fence. In addition, the ISFSI storage area will include lighting, monitors, alarms, and a diesel generator. The ISFSI site plan is shown on Figure 4-1.
 
Revision 806/14                                    North Anna ISFSI SAR                      4-2 The SSSCs are self-contained, independent, passive systems, which do not rely on any other systems or components for their operation, and are classified as safety-related. The storage pads and other systems and components at the storage site are classified as nonsafety-related.
4.2.1 Structures The operational areas of the North Anna ISFSI are the three storage pads and the areas immediately around them. The storage pads provide a uniform level surface for storing the SSSCs. The compacted gravel areas around the storage pads allow movement and positioning of SSSC handling equipment.
These storage pads will be built in accordance with the BOCA Basic Building Code (Reference 1) and applicable American Concrete Institute codes and standards. The area surrounding the storage pads will be compacted to properly support the tow vehicle and transporter needed for the handling of the SSSCs.
The primary function of the concrete storage pads is to provide a uniform level surface for storing the SSSCs. Each pad will be a reinforced concrete slab on grade with nominal dimensions of 32 feet by 224 feet by 2 feet thick. Nominal forty-foot long concrete ramps are required on each end of the storage pads to enable the SSSC transporter to gain access to the storage pad. The nominal overall length of the storage pad will be 304 feet. Each storage pad is designed to support a total of 28 SSSCs arranged in fourteen rows of two SSSCs with a nominal center-to-center spacing of 16 feet in both directions. SSSCs will be placed on the storage pad starting in the center and moving to the ends in a symmetrical manner. The soil subgrade modulus of elasticity has a nominal value of 30,000 psi. The concrete has a minimum design compressive strength of 3000 psi in 28 days. Reinforcing steel shall be nominally No. 10 bars at 12 inches-on-center, each way, top and bottom, with a minimum yield strength of 60,000 psi. The as-built soil and concrete parameters of the ISFSI storage pad have been verified to ensure that the final storage pad is robust enough to withstand the maximum loads associated with all cask load conditions, yet soft enough to limit the deceleration of the cask during design accident cases. The engineering drawing of the plan, sections and details of the storage pads is provided in Figure 4-5.
Specifications will be produced so that construction of the storage pads will meet the requirements of ACI 301, Specifications for Structural Concrete for Buildings (Reference 2).
The storage pads are designed to support generic SSSCs that are cylindrical in shape and are each approximately 8 feet in diameter by 16 feet high.
Load combinations and design limits for the reinforced concrete structures are in accordance with ANSI/ANS 57.9 (Reference 3). The available strength of the concrete storage pads was calculated in accordance with the requirements and assumptions of ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures (Reference 4).
 
Revision 806/14                                      North Anna ISFSI SAR                      4-3 Structural design of the concrete storage pads included the following loads identified in Section 6.17 of ANSI/ANS 57.9. The following loads were evaluated:
D    Dead load of the structure and attachments including permanent equipment and piping. The weight of the storage pads at 150 pounds per cubic foot was included for the pad design.
L    Live loads include snow, rain, operational loads including impact, and vibratory loads due to operating equipment. For the storage pad design, the SSSC weight of 250 kips was conservatively treated as a live load. The SSSC transporter was also included as live load. The transporter will be moved at very slow speeds and no impact loads need be applied. Also, the SSSC will be lowered from the transporter at a very slow speed and no impact loads will be applied - the SSSC is designed to survive an accidental drop; if the storage pad is damaged it will be repaired. Snow, rain and/or ice loads that could develop are minor in comparison to the weight of the SSSCs. Also, any accumulation of these loads on the storage pad between the SSSCs would reduce the flexural stress in the storage pad and were, therefore, not included.
T    Thermal loads during operation. The SSSCs will be stored on the exterior storage pads and will not be enclosed by an additional structure. The storage pad is not restrained except by the foundation soil. No thermal loads need be considered.
H    Lateral soil pressure. The storage pad is a slab-on-grade and there are no differential soil pressures to consider.
E    Loads generated by the Design Earthquake. The North Anna Power Station design basis earthquake (DBE) described in Section 2.5.2.6 of the UFSAR and Section 2.5.2.3 of this SAR was used as the Design Earthquake.
W    Loads generated by the Design Wind. ANSI/ANS-57.9 references ANSI/ANS 2.19 for guidance for determining the Design Wind. ANSI/ANS 2.19 identifies the 100-year recurrence interval wind that shall be used. Design Wind was determined at a 100-year recurrence level in accordance with ASCE 7-88 (Reference 6).
Ta  Loads due to a temperature rise resulting from loss of cooling air for an extended period of time or loads resulting from the maximum anticipated heat load. The SSSCs will be stored on the exterior storage pads and will not be enclosed by an additional structure. The storage pads are not restrained except by the foundation soil. Thermal loads need not be considered.
A    Loads due to a drop of a heavy load. The SSSCs are designed to survive impact as a result of tornado missile impact (see Section 3.2.1.3) and also survive an accidental drop (see Section 8.2.9). Loads due to a drop of a heavy load need not be considered for the concrete storage pad; if the storage pad is damaged it will be repaired.
 
Revision 806/14                                       North Anna ISFSI SAR                     4-4 Although not identified in ANSI/ANS 57.9, the following extreme environmental loads were also investigated and conservatively included in the design of the concrete storage pad:
WT Wind loads generated by a tornado. The same maximum tornado wind speed of 360 mph as used for the North Anna Power Station was used to determine loads on the SSSCs, sliding and overturning, and effect on the concrete storage pad.
F      Loads resulting from maximum hypothetical flood including buoyancy and dynamic pressure. As stated in Section 2.4.2.3, flood loading need not be considered.
The design of the concrete storage pads included the following load combinations:
U = 1.4D + 1.7L U = 0.75(1.4D + 1.7L + 1.7W)
U = 1.4D + 1.7L U = 0.75(1.4D + 1.7L + 1.7W)
U = D+L+W T U = D+L+E where U = required concrete strength.The factor of safety against overturn ing and sliding is based on Section 6.17.4.1 of ANSI/ANS 57.9 as modified below and is conservatively applied to each SSSC:
U = D+L+WT U = D+L+E where U = required concrete strength.
4.2.1.1 Static AnalysisThe concrete storage pad design was analyz ed using the IMAGES-3D finite element computer program (Reference 7). The analysis was performed to verify that the strength of the storage pad was adequate. Since the ramps are connected to the main portion of the storage pad, the y were included in the storage pad model. A 9 x 77 array of 693 nodes and 608 plate elements w as used for the model. Nodes were spaced at 4 feet spacing in both directions (See Figure 4-6).Vertical translational springs were used to model the soil stif fness. These springs were placed at each node of the model based on the tributary area of the node. A conservative modulus of subgrade reaction of 200 kips per cubic foot (115 pci) was used to calculate the spring stiffness (see Section 2.5.1.11 for discussion on soil parameters). Th e model was restrained at the corners from lateral and rotational displ acements for stability but these restraints received no loads from vertical static loading.
The factor of safety against overturning and sliding is based on Section 6.17.4.1 of ANSI/ANS 57.9 as modified below and is conservatively applied to each SSSC:
The weight of each 250-ki p SSSC w as modeled as a 50 kip load at the node directly beneath the centerline of the SSSC and 50 kips each at the four adjacent nodes (one on either side of the Load CombinationsMinimum Safety FactorsOverturning Sliding D + L + E 1.1 1.1 D + L + W 1.1 1.1 D + L + W T 1.1 1.1 Revision 8-06/14 North Anna ISFSI SAR 4-5center node, in both directions). The SSSCs were conservatively treated as a live load and a 1.7 load factor was applied for the ultimate strength evaluation. The five nodal loads were therefore:
Minimum Safety Factors Load Combinations        Overturning      Sliding D+L+E                    1.1              1.1 D+L+W                    1.1              1.1 D + L + WT              1.1              1.1 4.2.1.1 Static Analysis The concrete storage pad design was analyzed using the IMAGES-3D finite element computer program (Reference 7). The analysis was performed to verify that the strength of the storage pad was adequate. Since the ramps are connected to the main portion of the storage pad, they were included in the storage pad model. A 9 x 77 array of 693 nodes and 608 plate elements was used for the model. Nodes were spaced at 4 feet spacing in both directions (See Figure 4-6).
50 kips x 1.7 = 85 kipsThe storage pad was analyzed for several SSSC loading patterns to determine the maximum stress in the concrete pad. Since the SSSCs will be located starting at the center of the storage pad and will proceed toward s both ends in a symmetrical pattern, the following loading cases were considered:One center SSSCTwo center SSSCsFour center SSSCs Eight center SSSCsAll 28 SSSCsThe weight of the concrete storage pad was included as dead load in all cases.As expected, the bending stresses in the storage pad are less with a mo re uniform lo ading of all SSSCs and are higher with the less uniform loads of the other cases. The maximum concrete bending stress for the above loading pattern occurs with two center SSSCs.Also, the effect of the SSSC transporter was evaluated. The transporter was assumed to have a total loaded weight of 310 kips and a wheel load at each of the eight wheels of 38.75 kips per wheel. With the 1.7 load factor , the wheel load becomes 65.88 kips. Several transporter locations with and without other SSSCs were ch ecked. The following cases were evaluated:Transporter at edge of storage padTransporter over one center SSSCTransporter over one center SSSC plus one additional center SSSCTransporter over one center SSSC pl us three additional center SSSCsFor these cases, the maximum storag e pad stress occurred with th e transporter at the edge of the storage pad.
Vertical translational springs were used to model the soil stiffness. These springs were placed at each node of the model based on the tributary area of the node. A conservative modulus of subgrade reaction of 200 kips per cubic foot (115 pci) was used to calculate the spring stiffness (see Section 2.5.1.11 for discussion on soil parameters). The model was restrained at the corners from lateral and rotational displacements for stability but these restraints received no loads from vertical static loading.
4.2.1.2 Design WindDesign Wind loads on the SSSC s were determined using ASCE 7-88 for a 100-year recurrence interval. From Table 4, design wind forces, F, for structures other than buildings:
The weight of each 250-kip SSSC was modeled as a 50 kip load at the node directly beneath the centerline of the SSSC and 50 kips each at the four adjacent nodes (one on either side of the
F = q z G h C f A f or p = F/A f , where: q z = velocity pressure evaluated at height z above ground G h = gust response factor evaluated at height z = h
 
Revision 806/14                                       North Anna ISFSI SAR                       4-5 center node, in both directions). The SSSCs were conservatively treated as a live load and a 1.7 load factor was applied for the ultimate strength evaluation. The five nodal loads were therefore:
50 kips x 1.7 = 85 kips The storage pad was analyzed for several SSSC loading patterns to determine the maximum stress in the concrete pad. Since the SSSCs will be located starting at the center of the storage pad and will proceed towards both ends in a symmetrical pattern, the following loading cases were considered:
* One center SSSC
* Two center SSSCs
* Four center SSSCs
* Eight center SSSCs
* All 28 SSSCs The weight of the concrete storage pad was included as dead load in all cases.
As expected, the bending stresses in the storage pad are less with a more uniform loading of all SSSCs and are higher with the less uniform loads of the other cases. The maximum concrete bending stress for the above loading pattern occurs with two center SSSCs.
Also, the effect of the SSSC transporter was evaluated. The transporter was assumed to have a total loaded weight of 310 kips and a wheel load at each of the eight wheels of 38.75 kips per wheel. With the 1.7 load factor, the wheel load becomes 65.88 kips. Several transporter locations with and without other SSSCs were checked. The following cases were evaluated:
* Transporter at edge of storage pad
* Transporter over one center SSSC
* Transporter over one center SSSC plus one additional center SSSC
* Transporter over one center SSSC plus three additional center SSSCs For these cases, the maximum storage pad stress occurred with the transporter at the edge of the storage pad.
4.2.1.2 Design Wind Design Wind loads on the SSSCs were determined using ASCE 7-88 for a 100-year recurrence interval. From Table 4, design wind forces, F, for structures other than buildings:
F = qzGhCfAf or p = F/Af, where:
qz = velocity pressure evaluated at height z above ground Gh = gust response factor evaluated at height z = h


Revision 8-06/14 North Anna ISFSI SAR 4-6 C f = force coefficient A f = area of structure projected on a plane normal to wind direction h = height of structure above ground ASCE 7-88 takes into account characteristics of ground surf ace irregularities for a particular site and establishes four exposure categories. For the North Anna site, Exposure C was conservatively chosen which desc ribes the site area as open terra in with scattered obstructions having heights generally less than 30 feet and includes flat open count ry and grasslands. With a SSSC height of 16 feet and storage pad thickness of 2 feet, z and h were con servatively selected as 20 feet.From Equation 3, q z = 0.00256K z (IV)2 , where: K z = velocity pressure exposure coefficient at height zI = Importance factorV= basic wind speed From the map on Figure 1, V = 70 mph.From Table 5, with essential structure classification Category III, and location 100 miles from hurricane oceanline and other areas, I = 1.07. Th is adjusts the design wind speed to a mean recurrence interv al of 100 years, therefore:
Revision 806/14                                       North Anna ISFSI SAR                       4-6 Cf = force coefficient Af = area of structure projected on a plane normal to wind direction h = height of structure above ground ASCE 7-88 takes into account characteristics of ground surface irregularities for a particular site and establishes four exposure categories. For the North Anna site, Exposure C was conservatively chosen which describes the site area as open terrain with scattered obstructions having heights generally less than 30 feet and includes flat open country and grasslands. With a SSSC height of 16 feet and storage pad thickness of 2 feet, z and h were conservatively selected as 20 feet.
IV = 1.07(70) = 74.9 mph In Section 2.3.1 , a 100-year design wind speed of 80 mph was identified and will be used in this analysis, as it bounds 74.9 mph calculated above.From Table 6, with z = 20 feet and Exposure C, K z = 0.87.Therefore, q z = 0.00256(0.87)(80) 2 = 14.25 psf.From Table 8, with z = 20 feet and Exposure C, G h = 1.29.From Table 12, with round shape and D(q z)0.5 > 2.5, moderately smooth surface, and interpolating for h/d = 2, C f = 0.52.Therefore, p = 14.25(1.29)(0.52) = 9.6 psf < 10 psf minimum.
From Equation 3, qz = 0.00256Kz(IV)2, where:
A f = 8.0(16.0) = 128 sf Therefore, F = 10(128) = 1280 lb, or 1.3 kips.This lateral force will tend to cause the SSSC to slide or tip over. Slid ing is resisted by the static friction force between the SSSC and the concrete storage pad surface. In order to slide, the lateral force must overcome a friction force equal to the SSSC weight times the coefficient of friction of the surface:
Kz = velocity pressure exposure coefficient at height z I = Importance factor V= basic wind speed From the map on Figure 1, V = 70 mph.
F f = uW Revision 8-06/14 North Anna ISFSI SAR 4-7The coefficient of static fric tion for metal on co ncrete is approxim ately 0.30 to 0.70 (Reference 8). With a 250-kip SSSC, the mi nimum resistance w ould be: F f = 0.30(250) = 75 kipswhich is over 57 times greater than the calculated Design Wind load, therefore, the SSSC will not slide.
From Table 5, with essential structure classification Category III, and location 100 miles from hurricane oceanline and other areas, I = 1.07. This adjusts the design wind speed to a mean recurrence interval of 100 years, therefore:
IV = 1.07(70) = 74.9 mph In Section 2.3.1, a 100-year design wind speed of 80 mph was identified and will be used in this analysis, as it bounds 74.9 mph calculated above.
From Table 6, with z = 20 feet and Exposure C, Kz = 0.87.
Therefore, qz = 0.00256(0.87)(80)2 = 14.25 psf.
From Table 8, with z = 20 feet and Exposure C, Gh = 1.29.
From Table 12, with round shape and D(qz)0.5 > 2.5, moderately smooth surface, and interpolating for h/d = 2, Cf = 0.52.
Therefore, p = 14.25(1.29)(0.52) = 9.6 psf < 10 psf minimum.
Af = 8.0(16.0) = 128 sf Therefore, F = 10(128) = 1280 lb, or 1.3 kips.
This lateral force will tend to cause the SSSC to slide or tip over. Sliding is resisted by the static friction force between the SSSC and the concrete storage pad surface. In order to slide, the lateral force must overcome a friction force equal to the SSSC weight times the coefficient of friction of the surface:
Ff = uW
 
Revision 806/14                                       North Anna ISFSI SAR                     4-7 The coefficient of static friction for metal on concrete is approximately 0.30 to 0.70 (Reference 8). With a 250-kip SSSC, the minimum resistance would be:
Ff = 0.30(250) = 75 kips which is over 57 times greater than the calculated Design Wind load, therefore, the SSSC will not slide.
The SSSC will start to tip if the overturning moment about the outside edge of the base is greater than the resisting moment about that same point.
The SSSC will start to tip if the overturning moment about the outside edge of the base is greater than the resisting moment about that same point.
M O = F(h/2) = 1.3(8) = 10.4 ft-kips M R = Weight(7.0/2) = 250(3.5) = 875 ft-kipsThe factor of safety agains t the start of tipping is:
MO = F(h/2) = 1.3(8) = 10.4 ft-kips MR = Weight(7.0/2) = 250(3.5) = 875 ft-kips The factor of safety against the start of tipping is:
F S = M R/M O = 875/10.4 = 84.1The effect of the Design Wind lo ads w as included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.
FS = MR/MO = 875/10.4 = 84.1 The effect of the Design Wind loads was included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.
R = M O/(diameter of base) = 10.4/7.0 = +/-
R = MO/(diameter of base) = 10.4/7.0 = +/- 1.5 kips RU = 1.7R = 1.7(1.5) = +/- 2.55 kips Therefore, the outside two vertical nodal ultimate loads are:
1.5 kips R U = 1.7R = 1.7(1.5) = +/-
PU = 0.75(85.0 +/- 2.55) = 61.8 kips to 65.6 kips 4.2.1.3 Tornado Wind Loads Wind loads due to a tornado were similarly determined using ASCE 7-88, except gust and velocity pressure coefficients need not be applied. Using the same maximum tornado wind velocity as used for the North Anna Power Station, V = 360 mph.
2.55 kipsTherefore, the outside two ve rtical nodal ultim ate loads are:
q = 0.00256V2 = 0.00256(360)2 = 332 psf = 0.332 ksf F = qCfAf = 0.332(0.52)(128) = 22.1 kips As demonstrated with the Design Wind, a lateral force of 75 kips would be necessary to overcome the static frictional resistance, therefore, the SSSCs will not slide under the tornado wind. The Factor of Safety against sliding is 75.0/22.1 = 3.4.
P U = 0.75(85.0 +/- 2.55) = 61.8 kips to 65.6 kips 4.2.1.3 Tornado Wind LoadsWind loads due to a tornado were similarly determined using ASCE 7-88, except gust and velocity pressure coefficients need not be applied. Using the same maximum tornado wind velocity as used for the North Anna Power Station, V = 360 mph.q = 0.00256V 2 = 0.00256(360) 2 = 332 psf = 0.332 ksf F = qC f A f = 0.332(0.52)(128) = 22.1 kips As demonstrated with the Design Wind, a lateral force of 75 kips would be necessary to overcome the static frictional resistance, theref ore, the SSSCs will not slide under the tornado wind. The Factor of Safety against sliding is 75.0/22.1 = 3.4.
Checking tipping under tornado wind conditions, MO = 22.1(8.0) = 176.8 ft-kips MR = 250(3.5) = 875 ft-kips FS = 875/176.8 = 4.95 Therefore, the SSSCs will not start to tip due to tornado winds.
Checking tipping under to rnado wind conditions, M O = 22.1(8.0) = 176.8 ft-kips M R = 250(3.5) = 875 ft-kips F S = 875/176.8 = 4.95 Therefore, the SSSCs will not start to tip due to tornado winds.
 
Revision 8-06/14 North Anna ISFSI SAR 4-8The effect of the tornado wind lo ads was included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.
Revision 806/14                                         North Anna ISFSI SAR                     4-8 The effect of the tornado wind loads was included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.
R = M O/(diameter of b ase) = 176.8/7.0 = +/-
R = MO/(diameter of base) = 176.8/7.0 = +/- 25.3 kips With tornado winds, the load factors are 1.0, and the outside two vertical nodal ultimate loads are:
25.3 kipsWith tornado winds, th e load factors are 1.0, and the outside two vertical nodal ultimate loads are:
PU = p = 50.0 +/- 25.3 = 24.7 kips to 75.3 kips 4.2.1.4 Dynamic Analysis A dynamic analysis was performed to determine the effect of the Design Earthquake on the SSSCs and concrete storage pad. A finite element model was developed using the computer code SASSI (Reference 9). For the dynamic analysis a weight of 230 kips was used for each SSSC. The SSSCs were modeled as a rigid beam 8 feet long connected to the mid elevation of the pad by an ensemble of rigid elements. The translational and rotary weights of the SSSC were lumped at the top of the 8-foot rigid beam.
P U = p = 50.0 +/- 25.3 = 24.7 kips to 75.3 kips 4.2.1.4 Dynamic AnalysisA dynamic analysis was performe d to determine the ef fect of the Design Earthquake on the SSSCs and concrete storage pad. A finite element model was devel oped using the computer code SASSI (Reference 9). For the dynamic anal ysis a weight of 230 kips was used for each SSSC. The SSSCs were modeled as a rigid beam 8 feet long connected to the mid elevation of the pad by an ensemble of rigid elements. The translational and rotary weights of the SSSC were lumped at the top of the 8-foot rigid beam.
Due to the symmetry of the pad, a quarter of the pad was modeled. The pad was modeled by 4-foot x 4-foot plate elements, 2-foot thick, and a unit weight of 0.15 kcf. The elastic properties for reinforced concrete were used based on a design compressive strength, f'c = 3000 psi. The slab geometry and elements for the SSSCs and pad plate elements are shown on Figures 4-7, 4-8 and 4-9.
Due to the symmetry of the pad, a quarter of the pad was modeled. The pad was modeled by 4-foot x 4-foot plate elements, 2-foot thick, and a unit weight of 0.15 kcf. The elastic properties for reinforced concrete were used based on a design compressive strength, f'c = 3000 psi. The slab geometry and elements for the SSSCs and pad plate elements are shown on Figures 4-7 , 4-8 and 4-9.The analysis for the soil-structure interacti on was based on the soil boring logs shown in Appendix 2A for the Design Earthquake.
The analysis for the soil-structure interaction was based on the soil boring logs shown in Appendix 2A for the Design Earthquake.
Input motion acceleration time histories for soil conditions were used which envelop the design basis earthquake (DBE) Res ponse Spectra for the Seismic Class I structures for the North Anna Power Station.
Input motion acceleration time histories for soil conditions were used which envelop the design basis earthquake (DBE) Response Spectra for the Seismic Class I structures for the North Anna Power Station.
Accelerations were calculated at the SSSCs in order to determ ine the f actor of safety for sliding and overturning and the gl obal forces and moments at the b ase of the SSSCs. These results consider the three components of the input applied simultaneously. For calculating the factor of safety for sliding, a friction coefficient of 0.3 was assumed between the SSSCs and the supporting concrete slab.When combining responses as id entified in Regulatory Guide 1.92 (Reference 10), the lowest factor of safety for sliding is slightly hi gher than one. Th e lowest factor of safety for overturning is about 1.6. Figures 4-10 and 4-11 show the time plot of th e inverse of the sliding and overturning factors of sa fety (1/FS), respectively. However, it should be note d that the ground motions in the x and y directions (two horizontal directions) have an extreme peak occurring at the same time at 3.71 seconds even though these motions are statis tically independent. This situation is very unrealistic and overly conservative due to the coincidence of two extreme peaks Revision 8-06/14 North Anna ISFSI SAR 4-9 in the horizontal input motions. It is due to the f act that these motions correspond to artificially generated time histories. At any other time, the next lowest factor of safety for sliding during the duration of the earthquake is about 1.25 and for overturning it is approximately 2.0.The analysis confirmed that the responses due to the 3 components of the input are uncoupled. A better estimate of th e factors of safety for sliding and overturning can be obtained by calculating them using the ma ximum responses for each direc tion and then combining them using the 100%, 40%, 40% combination rule recommended in ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Structures and Commentary on Standard for Seismic Analysis of Safety-Relat ed Nuclear Structures (Reference 11). Using 100% of the maximum response due to the X input, 40% of the maximum response due to the Y input, and 40% of the maximum response due to the Z i nput, the f actor of safety for sliding is approximately 1.17. The same value results if 40% of X and 100% of Y are used. For the case when 40% of the horizontal cases and 100% of the vert ical case are used, then the sliding factor of safety is a pproximately 2.04.Also performed was a verification of the pers onal computer v ersion of the computer code SASSI. A model formed by plates and beams was analyzed using the personal computer version of SASSI and EQE International's QA-verified version of the computer code CLASSI (Reference 12). For comparison purposes, in-structure a cceleration response spectra at various elevations and plate stress time histories were calculated using both programs and then plotted together. It was concluded that the personal computer version of SASSI gives results similar to CLASSI for soil-structure interaction analysis.
Accelerations were calculated at the SSSCs in order to determine the factor of safety for sliding and overturning and the global forces and moments at the base of the SSSCs. These results consider the three components of the input applied simultaneously. For calculating the factor of safety for sliding, a friction coefficient of 0.3 was assumed between the SSSCs and the supporting concrete slab.
4.2.1.5 Storage Pad DesignSeveral SSSC loading patterns we re investigated during the sta tic analysis to determine the maximum stress in the concrete storage pad:One center SSSCTwo center SSSCsFour center SSSCsEight center SSSCsAll 28 SSSCsIt was determined that the maximum stress occurred with two center SSSCs. Wind and seismic loads were then applied to the two cen ter SSSCs using the load factors previously described to determine the critical condition for the concrete storage pad.The storage pad was also analyzed using the SAFE (Reference 13) finite element computer program and designed using the SAFERC reinforced concrete design comput er program which is a post processor for SAFE. The model for the SAFE runs was similar to the IMAGES run except a finer 2.0-foot x 2.0-foot mesh and a shorter model was used for the SAFE runs concentrating on Revision 8-06/14 North Anna ISFSI SAR 4-10the critical condition of two cent er SSSCs. Several runs were made with varying design strip widths. A 48-inch design strip was conservatively selected which resulted in number 10 rebar with 12-inch spacing. This provides an area of 1.27 square inches per linear foot. The numbe r 10 rebar will be placed at 12-inch spacing in both directions, and in both the top and bottom of the storage pad and used for the entire pad area. This exceeds th e minimum spacing requirements for primary flexural reinforcement and exceeds the minimum reinforcement requirement of AC1 349. The minimum concrete cover will be three inches on the bottom and two inches on the top in accordance with the concrete protection requirements of AC1 349.4.2.2 Storage Site LayoutThe overall layout of the North Anna ISFSI is described in Section 4.1, and is shown in Figure 1-2.The SSSCs are the only co mponent of the North Anna ISFSI vital to th e fulf illment of its safety function. All other struct ures and components are of a s upport nature and do not perform safety functions.
When combining responses as identified in Regulatory Guide 1.92 (Reference 10), the lowest factor of safety for sliding is slightly higher than one. The lowest factor of safety for overturning is about 1.6. Figures 4-10 and 4-11 show the time plot of the inverse of the sliding and overturning factors of safety (1/FS), respectively. However, it should be noted that the ground motions in the x and y directions (two horizontal directions) have an extreme peak occurring at the same time at 3.71 seconds even though these motions are statistically independent. This situation is very unrealistic and overly conservative due to the coincidence of two extreme peaks
The most important of these s upport systems are the concrete storage pads, which pro vide a uniform level surface, slightly above grade elevation, for the SSSCs.
 
These are de scribed in Section 4.2.1. Engineering drawings showing section and de tails of the storage pads are provided in Figure 4-5.4.2.3 SSSC DescriptionThe bases and engineering design specifications for the SSSCs are d escribed in the SSSC T opical Safety Analysis Reports. These reports also provide assura nce that the applicable design criteria described in Chapter 3 are met.Compliance with the design criteria ensur es that the General Design Criteria in 10 CFR 72, Subpart F are satisfied. This is illustrated in Table 4-1 which shows a correspondence between each of the General Desi gn Criteria and the design criteria of specif icati ons that the SSSCs must meet as identified in Chapter 3.The specific codes and standards to which the SSSCs are fabricated, delivered to the site, and sealed are addressed in the SSSC Topical Safety Anal ysis Reports.
Revision 806/14                                       North Anna ISFSI SAR                     4-9 in the horizontal input motions. It is due to the fact that these motions correspond to artificially generated time histories. At any other time, the next lowest factor of safety for sliding during the duration of the earthquake is about 1.25 and for overturning it is approximately 2.0.
Compliance with applicable current nationally recognized codes and standards is expected. Codes and standards representing an acceptable level of design are:American Welding Society (AWS)
The analysis confirmed that the responses due to the 3 components of the input are uncoupled. A better estimate of the factors of safety for sliding and overturning can be obtained by calculating them using the maximum responses for each direction and then combining them using the 100%, 40%, 40% combination rule recommended in ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Structures and Commentary on Standard for Seismic Analysis of Safety-Related Nuclear Structures (Reference 11). Using 100% of the maximum response due to the X input, 40% of the maximum response due to the Y input, and 40% of the maximum response due to the Z input, the factor of safety for sliding is approximately 1.17. The same value results if 40% of X and 100% of Y are used. For the case when 40% of the horizontal cases and 100% of the vertical case are used, then the sliding factor of safety is approximately 2.04.
The Structural Welding Code (AWS Dl.l-1980)American Iron and Steel Institute (AISI)
Also performed was a verification of the personal computer version of the computer code SASSI. A model formed by plates and beams was analyzed using the personal computer version of SASSI and EQE Internationals QA-verified version of the computer code CLASSI (Reference 12). For comparison purposes, in-structure acceleration response spectra at various elevations and plate stress time histories were calculated using both programs and then plotted together. It was concluded that the personal computer version of SASSI gives results similar to CLASSI for soil-structure interaction analysis.
Steel Pr oducts ManualAmerican Society of Mecha nical Engineers (ASME)
4.2.1.5 Storage Pad Design Several SSSC loading patterns were investigated during the static analysis to determine the maximum stress in the concrete storage pad:
Boiler and Pressure Vessel CodeAmerican Society of Testing an d Materials (ASTM) Standards Revision 8-06/14 North Anna ISFSI SAR 4-11As described in Chapter 11, the SSSC manufacturers will be required to maintain the necessary documentation to substantiate confor mance with the specified codes and standards.Construction materials are compatible with each other and with the expected radiation levels. In addition, the baskets holding the fuel assemblies within the SSSCs are typical of those currently used in spent fuel pools throughout the industry, and ar e designed to protect the spent fuel assemblies from mechanical damage during insertion and removal operations and as a result of all credible events. Damage resulting from postulated accidents is limited to the extent that normal removal of the fuel assemblies is not precluded.
* One center SSSC
4.2.3.1 Function Descriptions of the fuel loading, SSSC prep aration, and SSSC pla cement operations are provided in Chapter 5.The performance objectives duri ng fuel loading are to transfer the selected fuel assemblies from their storage location in the spent fuel pool to the SSSC without damaging the fuel. All operations within and outside th e Fuel Building will be conduc ted in a manner that does not jeopardize the safe operation of the North Anna Power Station, does not present a hazard to the stored fuel, and does not result in releases of radioactive gases in excess of the guidelines in 10 CFR 100.The performance objectives for the post-loading activities are to ensure that the SSSCs can fulfill all of their design functio ns, and in particular that the SSSCs will confine the radioactive products under all credible conditions.The performance objectives for SSSC transfer and emplacement operations are to ensure that the design criteria are not e xcee ded, and that the safety of the North Anna Power Station is not impaired.The performance objectives for SSSC unloading operations are to ensure that all operations within and outside the Fuel Building will be conducted in a manner that does not jeopardize the safe operation of the North Anna Power Station, that there is no ha zard to the stored fuel, and that there are no releases of radioactive gases in excess of the guidelines in 10 CFR 100.4.2.3.2 DescriptionA description of the SSSC components is provided in the SSSC Topical Safety Analysis Reports.4.2.3.3 Design Bases and Safety Assurance The ability of the SSSCs to pe rform their design function is demons trated in the SSSC T opical Safety Analys is Reports and in Appendix A.Loading and handling of the SSSCs will be done according to the app licable procedures.
* Two center SSSCs
Revision 8-06/14 North Anna ISFSI SAR 4-12 As described in Chapter 8 , the design and operation of the North Anna ISFSI ensures that a single failure does not result in the re lease of significant radioactive material.
* Four center SSSCs
The only interactions betw een the ISFSI and the North Anna Power Stat ion are those concerning the loading and hand ling of the SSSCs in the Fuel and Decontamination Buildings.
* Eight center SSSCs
These are discussed in Chapter 5.Radiation protection of operati ng personnel is addressed in Chapter 7.Nuclear criticality safety for th e SSSCs is addressed in the SSS C T opical Safety Analysis Reports or Appendix A.4.2.4 Instrumentation System DescriptionDue to the passive natu re of the SSSCs, no safety-related instrumentatio n is required. A description of the nonsafety-related SSSC pre ssure monitoring system is provided in Section 4.4.5.3.4.2.5 References1.BOCA Basic Building Code, Building Officials and Code Administrations International, Inc., 1993.2.American Concrete Institute, ACI 301, Specifications for Structural Concrete for Buildings, 1989.3.American Nuclear Society, ANSI/ANS 57.9, Design Criteria for an I ndependent Spent Fuel Storage Installation (Dry Storage Type), 1984.4.American Concrete Institute, ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures, 1985.5.American Nuclear Society, ANSI/ANS 2.19, Guidelines for Establishing Site-Related Parameters for Site Selecti on and Design of an Independent Spent Fuel Storage Installation (Water Pool Type), 1981.6.American Society of Civil Engineers, ASCE 7-88, Minimum Design Loads for Buildings and other Structur es, 1988.7.Celestial Software, IMAGES-3D, Version 3.0, 1993.8.Beer, F. P., Johnston, E. R. Jr., Vector Mechanics for Engineers: Statics and Dynamics,McGraw-Hill Book Company, 1962.9.Stevenson & Associates, Inc., SUPER SA SSI/PC Complete Dynamic Soil-Structure Analysis System on Personal Computers, May 1996.10.Regulatory Guide 1.92, Combining Modal Responses and Spatial Components In Seismic Response Analysis, Re vision 1, dated February 1976.
* All 28 SSSCs It was determined that the maximum stress occurred with two center SSSCs. Wind and seismic loads were then applied to the two center SSSCs using the load factors previously described to determine the critical condition for the concrete storage pad.
Revision 8-06/14 North Anna ISFSI SAR 4-1311.ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Stru ctures and Commentary on Standard for Seismic Analysis of Safety-Related Nuclear Structures, September 1986.12.H. L. Wong and J. E. Luco, Soil-Structure Interaction: A Conti nuum Mechanics Approach (CLASSI), Report No. CE 79-03, Department of Civil Engine ering, University of Southern California, in publication.13.Computers and Structures, Inc., SAFE, Slab Analysis by the Finite Element Method, 1988.4.3 TRANSPORT SYSTEM 4.3.1 FunctionThe function of the transporter is to move the loaded SSSCs between the Decontamination Building and the ISFSI storage pads. The transporter shall be capab le of being towed over several different types of ground surfaces, including compacted gravel, and concrete and asphalt paving. The performance objectives of the transporter are to move the loaded SSSC in a vertical position in a manner that will preclude damage to the SSSC body and its internal components, and to any other safety or security related system or component which could be affected by SSSC transport.
The storage pad was also analyzed using the SAFE (Reference 13) finite element computer program and designed using the SAFERC reinforced concrete design computer program which is a post processor for SAFE. The model for the SAFE runs was similar to the IMAGES run except a finer 2.0-foot x 2.0-foot mesh and a shorter model was used for the SAFE runs concentrating on
4.3.2 ComponentsThe transporter is a gantry lift system on a "U" shaped trailer which carries the SSSC in a vertical position. It is approximately 16 feet wide, 21 feet long, 20 feet high and weighs approximately 30 tons. It has a tow bar pivo t and four steerable wheel s as well as four fixed wheels with solid tires to ensure maximum stability, maneuverability, and even-load distribution. A tow vehicle will be used to move the transporter. Side and plan views of the transporter are provided in Figure 4-12.The hydraulic cylinders used fo r SSSC lifting are a hea vy duty de sign and made of steel. No load bearing member of the hydrau lic unit is made of cast iron or any other brittle material. There are flow control valves at the downside of the cylinders in order to restrict the flow of hydraulic fluid from the cylinders, thus preventing the load from dropping too fast. There are lift cylinder locking valves to assure that the SSSC will not be accidently lowered.The power unit used for SSSC lift ing is diesel po wered and is placed at the front of the transporter. The backup power unit is a 480V, three phase motor coupled to a heavy duty pump.
 
The pumping unit contains suction and return line filters, pressure relief valves, pressure gauges, and check valves.The transporter is equipped with disc brakes designed for normal, park, and emergency functions. Normal and park brake operations are controlled by a lever mounted on the side of the transporter, easily accessible to an operator walking alongside.
Revision 806/14                                     North Anna ISFSI SAR                     4-10 the critical condition of two center SSSCs. Several runs were made with varying design strip widths. A 48-inch design strip was conservatively selected which resulted in number 10 rebar with 12-inch spacing. This provides an area of 1.27 square inches per linear foot. The number 10 rebar will be placed at 12-inch spacing in both directions, and in both the top and bottom of the storage pad and used for the entire pad area. This exceeds the minimum spacing requirements for primary flexural reinforcement and exceeds the minimum reinforcement requirement of AC1 349.
Revision 8-06/14 North Anna ISFSI SAR 4-14The emergency brake has a separate control and will control brak e appl ication to minimize dynamic braking effects and yet bring the transporter to a stop quickly.
The minimum concrete cover will be three inches on the bottom and two inches on the top in accordance with the concrete protection requirements of AC1 349.
The transporter tires are designe d to distrib ute the load and provide adequate mobility. Solid tires are used to assure reliability. The transporter, lo aded with a SSSC, is designed for a nominal towing speed of 5 miles per hour.
4.2.2 Storage Site Layout The overall layout of the North Anna ISFSI is described in Section 4.1, and is shown in Figure 1-2.
None of the features or components of the tran sporter are important to the safety function of the SSSCs and will not be covered by the Quality Assurance program described in Chapter 11.The location of the transfer rout es from the Decontamination Bu ilding to the ISFSl is shown in Figure 4-4. The main route runs west from the Decontamination Building toward the West End Security Access Facility and south to the ISFSI, while an alternate transfer route runs east from the Decontamination Facility, south to the South East Security Access Faci lity and then west to the ISFSI. Both routes consist of asphalt roadways. The portions of the routes within the North Anna Power Station are asphalt and lines for several safety-related systems for North Anna Po wer Station Units 1 and 2 are located beneath the transfer routes. The po rtion of the transfer route in and to the west of the Station has also been used for the trans port of replace ment steam generators, otherwise, only personnel and maintenance vehicles use portions of the transfer route.
The SSSCs are the only component of the North Anna ISFSI vital to the fulfillment of its safety function. All other structures and components are of a support nature and do not perform safety functions.
Safety-related and nonsafety related with sp ecial quality re gulatory requirements utilities located beneath the main transfer route include an electrical ductbank, service water lines, fuel oil lines and fire protection lines.
The most important of these support systems are the concrete storage pads, which provide a uniform level surface, slightly above grade elevation, for the SSSCs. These are described in Section 4.2.1. Engineering drawings showing section and details of the storage pads are provided in Figure 4-5.
All of these utilities are located within the protected area for North Anna Units 1 and 2. Based on a combined trans porter and cask weight of 315,000 lb and a load of 39,400 lb/wheel, none of these utilities will be af fected by movement of the loaded transporter over them.
4.2.3 SSSC Description The bases and engineering design specifications for the SSSCs are described in the SSSC Topical Safety Analysis Reports. These reports also provide assurance that the applicable design criteria described in Chapter 3 are met.
The electrical ductbank is approximately 5.5 feet below grade and would be subject to approximately 1000 psf surcharge loading. Th is duc tbank is founded on rock and requires no protection due to the depth of burial and its reinforcement design. The service water lines are approximately 6.7 feet below grade and would be subject to a surchar ge loading of approximately 900 psf, which is negligible. The ten l-1/2-inch di ameter fuel oil lines ar e en cased in concrete on top of the electrical ductbank discussed above, and, for th e same reasons, they require no protection. There are two fire lines crossing under the tr ansport path that are 6.0 feet below grade.
Compliance with the design criteria ensures that the General Design Criteria in 10 CFR 72, Subpart F are satisfied. This is illustrated in Table 4-1 which shows a correspondence between each of the General Design Criteria and the design criteria of specifications that the SSSCs must meet as identified in Chapter 3.
The specific codes and standards to which the SSSCs are fabricated, delivered to the site, and sealed are addressed in the SSSC Topical Safety Analysis Reports. Compliance with applicable current nationally recognized codes and standards is expected. Codes and standards representing an acceptable level of design are:
* American Welding Society (AWS) The Structural Welding Code (AWS Dl.l-1980)
* American Iron and Steel Institute (AISI) Steel Products Manual
* American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code
* American Society of Testing and Materials (ASTM) Standards
 
Revision 806/14                                       North Anna ISFSI SAR                   4-11 As described in Chapter 11, the SSSC manufacturers will be required to maintain the necessary documentation to substantiate conformance with the specified codes and standards.
Construction materials are compatible with each other and with the expected radiation levels. In addition, the baskets holding the fuel assemblies within the SSSCs are typical of those currently used in spent fuel pools throughout the industry, and are designed to protect the spent fuel assemblies from mechanical damage during insertion and removal operations and as a result of all credible events. Damage resulting from postulated accidents is limited to the extent that normal removal of the fuel assemblies is not precluded.
4.2.3.1 Function Descriptions of the fuel loading, SSSC preparation, and SSSC placement operations are provided in Chapter 5.
The performance objectives during fuel loading are to transfer the selected fuel assemblies from their storage location in the spent fuel pool to the SSSC without damaging the fuel. All operations within and outside the Fuel Building will be conducted in a manner that does not jeopardize the safe operation of the North Anna Power Station, does not present a hazard to the stored fuel, and does not result in releases of radioactive gases in excess of the guidelines in 10 CFR 100.
The performance objectives for the post-loading activities are to ensure that the SSSCs can fulfill all of their design functions, and in particular that the SSSCs will confine the radioactive products under all credible conditions.
The performance objectives for SSSC transfer and emplacement operations are to ensure that the design criteria are not exceeded, and that the safety of the North Anna Power Station is not impaired.
The performance objectives for SSSC unloading operations are to ensure that all operations within and outside the Fuel Building will be conducted in a manner that does not jeopardize the safe operation of the North Anna Power Station, that there is no hazard to the stored fuel, and that there are no releases of radioactive gases in excess of the guidelines in 10 CFR 100.
4.2.3.2 Description A description of the SSSC components is provided in the SSSC Topical Safety Analysis Reports.
4.2.3.3 Design Bases and Safety Assurance The ability of the SSSCs to perform their design function is demonstrated in the SSSC Topical Safety Analysis Reports and in Appendix A.
Loading and handling of the SSSCs will be done according to the applicable procedures.
 
Revision 806/14                                         North Anna ISFSI SAR             4-12 As described in Chapter 8, the design and operation of the North Anna ISFSI ensures that a single failure does not result in the release of significant radioactive material.
The only interactions between the ISFSI and the North Anna Power Station are those concerning the loading and handling of the SSSCs in the Fuel and Decontamination Buildings.
These are discussed in Chapter 5.
Radiation protection of operating personnel is addressed in Chapter 7.
Nuclear criticality safety for the SSSCs is addressed in the SSSC Topical Safety Analysis Reports or Appendix A.
4.2.4 Instrumentation System Description Due to the passive nature of the SSSCs, no safety-related instrumentation is required. A description of the nonsafety-related SSSC pressure monitoring system is provided in Section 4.4.5.3.
4.2.5 References
: 1. BOCA Basic Building Code, Building Officials and Code Administrations International, Inc., 1993.
: 2. American Concrete Institute, ACI 301, Specifications for Structural Concrete for Buildings, 1989.
: 3. American Nuclear Society, ANSI/ANS 57.9, Design Criteria for an Independent Spent Fuel Storage Installation (Dry Storage Type), 1984.
: 4. American Concrete Institute, ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures, 1985.
: 5. American Nuclear Society, ANSI/ANS 2.19, Guidelines for Establishing Site-Related Parameters for Site Selection and Design of an Independent Spent Fuel Storage Installation (Water Pool Type), 1981.
: 6. American Society of Civil Engineers, ASCE 7-88, Minimum Design Loads for Buildings and other Structures, 1988.
: 7. Celestial Software, IMAGES-3D, Version 3.0, 1993.
: 8. Beer, F. P., Johnston, E. R. Jr., Vector Mechanics for Engineers: Statics and Dynamics, McGraw-Hill Book Company, 1962.
: 9. Stevenson & Associates, Inc., SUPER SASSI/PC Complete Dynamic Soil-Structure Analysis System on Personal Computers, May 1996.
: 10. Regulatory Guide 1.92, Combining Modal Responses and Spatial Components In Seismic Response Analysis, Revision 1, dated February 1976.
 
Revision 806/14                                     North Anna ISFSI SAR                     4-13
: 11. ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Structures and Commentary on Standard for Seismic Analysis of Safety-Related Nuclear Structures, September 1986.
: 12. H. L. Wong and J. E. Luco, Soil-Structure Interaction: A Continuum Mechanics Approach (CLASSI), Report No. CE 79-03, Department of Civil Engineering, University of Southern California, in publication.
: 13. Computers and Structures, Inc., SAFE, Slab Analysis by the Finite Element Method, 1988.
4.3 TRANSPORT SYSTEM 4.3.1 Function The function of the transporter is to move the loaded SSSCs between the Decontamination Building and the ISFSI storage pads. The transporter shall be capable of being towed over several different types of ground surfaces, including compacted gravel, and concrete and asphalt paving.
The performance objectives of the transporter are to move the loaded SSSC in a vertical position in a manner that will preclude damage to the SSSC body and its internal components, and to any other safety or security related system or component which could be affected by SSSC transport.
4.3.2 Components The transporter is a gantry lift system on a U shaped trailer which carries the SSSC in a vertical position. It is approximately 16 feet wide, 21 feet long, 20 feet high and weighs approximately 30 tons. It has a tow bar pivot and four steerable wheels as well as four fixed wheels with solid tires to ensure maximum stability, maneuverability, and even-load distribution.
A tow vehicle will be used to move the transporter. Side and plan views of the transporter are provided in Figure 4-12.
The hydraulic cylinders used for SSSC lifting are a heavy duty design and made of steel. No load bearing member of the hydraulic unit is made of cast iron or any other brittle material. There are flow control valves at the downside of the cylinders in order to restrict the flow of hydraulic fluid from the cylinders, thus preventing the load from dropping too fast. There are lift cylinder locking valves to assure that the SSSC will not be accidently lowered.
The power unit used for SSSC lifting is diesel powered and is placed at the front of the transporter. The backup power unit is a 480V, three phase motor coupled to a heavy duty pump.
The pumping unit contains suction and return line filters, pressure relief valves, pressure gauges, and check valves.
The transporter is equipped with disc brakes designed for normal, park, and emergency functions. Normal and park brake operations are controlled by a lever mounted on the side of the transporter, easily accessible to an operator walking alongside.
 
Revision 806/14                                         North Anna ISFSI SAR                   4-14 The emergency brake has a separate control and will control brake application to minimize dynamic braking effects and yet bring the transporter to a stop quickly.
The transporter tires are designed to distribute the load and provide adequate mobility. Solid tires are used to assure reliability. The transporter, loaded with a SSSC, is designed for a nominal towing speed of 5 miles per hour.
None of the features or components of the transporter are important to the safety function of the SSSCs and will not be covered by the Quality Assurance program described in Chapter 11.
The location of the transfer routes from the Decontamination Building to the ISFSl is shown in Figure 4-4. The main route runs west from the Decontamination Building toward the West End Security Access Facility and south to the ISFSI, while an alternate transfer route runs east from the Decontamination Facility, south to the South East Security Access Facility and then west to the ISFSI. Both routes consist of asphalt roadways. The portions of the routes within the North Anna Power Station are asphalt and lines for several safety-related systems for North Anna Power Station Units 1 and 2 are located beneath the transfer routes. The portion of the transfer route in and to the west of the Station has also been used for the transport of replacement steam generators, otherwise, only personnel and maintenance vehicles use portions of the transfer route.
Safety-related and nonsafety related with special quality regulatory requirements utilities located beneath the main transfer route include an electrical ductbank, service water lines, fuel oil lines and fire protection lines. All of these utilities are located within the protected area for North Anna Units 1 and 2. Based on a combined transporter and cask weight of 315,000 lb and a load of 39,400 lb/wheel, none of these utilities will be affected by movement of the loaded transporter over them.
The electrical ductbank is approximately 5.5 feet below grade and would be subject to approximately 1000 psf surcharge loading. This ductbank is founded on rock and requires no protection due to the depth of burial and its reinforcement design. The service water lines are approximately 6.7 feet below grade and would be subject to a surcharge loading of approximately 900 psf, which is negligible. The ten l-1/2-inch diameter fuel oil lines are encased in concrete on top of the electrical ductbank discussed above, and, for the same reasons, they require no protection. There are two fire lines crossing under the transport path that are 6.0 feet below grade.
These pipes are not encased, however, they are not overstressed by the additional 1000 psf surcharge pressure.
These pipes are not encased, however, they are not overstressed by the additional 1000 psf surcharge pressure.
Nonsafety-related utilities passing under the ma in transport route in the protected area include domestic water lines, a well water line, a 42-inch diameter storm drain and a security duct bank. The water lines do not lie di rectly under the transport route, are relatively deep and have a small diameter. The storm drain is protected by a 2.5-foot thick concrete slab that will distribute loads evenly, and is approximately 5.0 feet below grade.
Nonsafety-related utilities passing under the main transport route in the protected area include domestic water lines, a well water line, a 42-inch diameter storm drain and a security duct bank. The water lines do not lie directly under the transport route, are relatively deep and have a small diameter. The storm drain is protected by a 2.5-foot thick concrete slab that will distribute loads evenly, and is approximately 5.0 feet below grade.
Revision 8-06/14 North Anna ISFSI SAR 4-15A 24-inch diameter surface drain culvert passes beneath the main transport route approximately 900 feet west of the protected area gate. Th e top of this culv ert is approximately three feet below surface grade, and steel plates or concrete will be used to protect this culvert from damage.There are no portions of safety-r elated systems located beneath the alternate transfer route. Within the protected area, there is a single buried section of' fire protection pipe beneath this route. This pipe is located a minimum of 6 feet below grade. Based on a combined transporter and cask weight of 315,000 lb, this results in a load of 39,400 lb/wheel and a co rresponding surchar ge loading of 1000 psf at 6 feet below grade. The pipe is not overstressed by the loaded transporter movement.The portions of nonsafety-relate d systems located beneath the alternate transfer route and within the protected area include duct banks, a domestic water pipe, storm drain pipes, a waterline, a well waterline, mat sump pump lines, a pipe tunnel, manholes, and a diesel fuel pipe.
These nonsafety-related systems, with the exception of a 12 foot wide security ductbank and a 9 foot wide pipe tunnel, are either located at accep table depth or constructed of materials able to withstand the stresses generated from loaded transporter movement.An East-West running security duct bank and a North-South running reinforced concrete pipe tunnel each have top-of-concrete elevations located at 2.3 feet and 2 feet below grade, respectively. Both the duct bank and tunnel are located directly beneath the alternate transport route. Reinforced concrete protective slabs are installed over th e duct bank and tunnel to bridge each structure and divert transporter surcharge loads so that the duct bank and tunnel are not adversely impacted by stresses generated by loaded transporter movement 4.3.3 Design Bases and Safety Assurance The transporter is designed to limit SSSC lift height to less than 15 inches by the use of internal mechanical stops. Lifting system integrity is main tained during transport by means of a hydraulic lock valve. The trans porter is equipped with a SSSC restraint system which prevents SSSC sway during road movement.
The transporter design includes static and dynamic evaluations for strength, fatigue resistance, buckling resistance, joint design and the use of stiffeners. These evaluations included a minimum factor of sa fety of 1.67 in accordance with CMAA (Reference 1) and the AISC Manual of Steel Construction (Reference 2).In order to minimize the weight of the transporter , no radiation shielding is provided in the transporter design. However, operation of the transporter can be done by one person, thereby minimizing radi ation dose to operating pe rsonnel. Other personnel accompanying transport of SSSCs may do so at a distance from the transporter that minimizes their exposure to radiation. Section 7.4 includes an evaluation of the occupational exposure during transport.
Revision 8-06/14 North Anna ISFSI SAR 4-16 The transporter is designed for independent ope ration, however, the electrical system may be powered from an external source. The transporter has no other backup provisions and no interfaces with SSSC or ISFSI systems. The codes and standards used in the design and fabrication of the transporter are listed in Table 4-2.4.3.4 References1.Crane Manufacturer's Association of America, Specification No.
70, Specification for Electric Overhead Traveling Cranes.2.American Institute of Steel Construction, Manual of Steel Construction , Ninth Edition.
4.4 OPERATING SYSTEMS 4.4.1 Loading and Unloading System 4.4.1.1 Function The functions of the loading systems are to tran sfer the spent fuel from the spent fuel pool to the SSSC and move the SSSC from the spen t fuel pool to the transporter outside the Decontamination Building. The same systems would be used to unload the SSSCs.The performance objectives are to load the spent fuel into the SSSCs in such a manner as to preclude damage to the fuel and en sure that subcriticality is maintained, and to move the loaded SSSC in a manner which will precl ude damage to the SSSC and to any other safety-related system or component in the load path. The same objectives apply to unloading the SSSCs.The ISFSI, SSSCs and related support equipment will be designed to interface with existing and planned equipment a nd systems at the North Anna Power Station. An amendment to the North Anna Power Station UFSAR wi ll pro vide a description of the systems and equipment.
4.4.1.2 Major Components and Operating Characteristics The fuel storage area at the North Anna Power Station is loca ted in the Fuel Building between the tw o reactor containments, and consists of a new fuel storage area, a pool for storing spent fuel, a cask loading area, and two canals for transfer of fuel assemblies betwee n the reactors and the pool. The spent fuel pool is 72 feet 6 inches long, 26 feet 9 inches wide at the east end, 21 feet 4 inches wide at the west end and nor mal water depth is approximately 40 feet. The cask loading area at the west end of the spent fuel pool is separated from the sp ent fuel storage racks by a concrete w all that is 3 feet 6 inches thick and has a gate to al lo w spent fuel assemblies to be moved from the rack area. The cask loading area has two locations for casks, one that is 12 feet by 12 feet with a fl oor elevation 2 ft. 6 in. lower than the spent fuel st orage area, and a second that is 12 feet by 9 feet 4 inches with a floor elevation 19 ft. 8 in. above the spent fuel storage area. A 32-inch high pedestal has been placed in the deep end of th e cask loading area to allo w the fuel assemblies in the spent fuel cask to be at approximately the same elevation as the assemblies in the spent fuel racks.
Revision 8-06/14 North Anna ISFSI SAR 4-17The Fuel Building walls consist of blow-off siding attached to the steel superstructure. Access to the Fuel Building for the 125-ton cask crane and SSSCs is provided by a roll-up door. Movement of the cask crane in th e Fuel Building is limited to the cask loading area and adjacent areas north and south, so that casks cannot pass over the fuel storage area.
Figure 4-13 shows the layout of the Fuel and Dec ontamination Buildings and th e load path for the SSSCs.
Figure 4-14 is a section view of the load path in the Fuel and Decontamination Buildings.
The Decontamination Building is used for pr eparation of empty SSSCs and for v acuum drying, helium backfill, leak test ing and decontamination of loaded SSSCs. Preparation of loaded SSSCs for unloading also takes pl ace in the Decontamin ation Building, includi ng testing of the helium backfill for indications of fuel failure.
The north bay of the Dec ontamination Building will be used specifically for SSSCs, a nd is equipped with a platform to allow easy access to all areas of the SSSC surface, vacuum pumps, helium leak detector equipmen t and a system control panel. Helium bottles are placed outside the Decontamination Building, for e asy access during bottle replenishment, and are connected by piping to the north bay.
Station systems and other components used during the loading and unloading of SSSCs include the 125-ton cask handling crane and 10-ton auxiliary cran e that service the Fuel and Decontamination Buildings. Other components incl ude a cask lift beam and special tools for lifting SSSC lids and covers. A vacuum drying system (vacuum pumps, water collection bottle, piping and hoses) is used in the Decontamination Building to remove any water remaining in the cask cavity after pumping water from the cavity ba ck to the spent fuel pool. Specialized leak detection equipment is used for seal testing.
Fuel assembly crud is controlled during unloa ding of the SSSCs thr ough the slow addition of water to the SSSC cavity. Once the SSSC cavity is filled with wate r and the SSSC has been placed in the spent fuel pool, slow removal of the lid will also help prevent the spread of crud into the spent fuel pool.
4.4.1.3 Safety Considerations and ControlsFuel handling activities in th e spent fuel p ool are subject to limiting conditions for operations as set forth in Section 3.9, Refueling Operations , of the North Anna Units 1 and 2 Technical Specifications. A 125-ton trolle y cr ane with a 10-ton auxiliary crane serve the Decontamination Building and Fuel Building. This crane and the fu el loading and SSSC handling will be subject to conditions as set forth in the North Anna Units 1 and 2 Technical Specifications and Operating License.
A lift beam d esigned to ANSI N14.6 (Reference 1) is used for SSSC handling. The lift beam and the SSSC lifting trunnions are designed such that stresses from li fting three times the weight of the SSSC will not e xceed the yield strength of the lift beam materials and five times the weight will not exceed the ultimate strength. The arms of the lift b eam open as the lift beam is attached to the SSSC. The arms are hydraulically locked in the clos ed position for lifting the SSSC.
Revision 8-06/14 North Anna ISFSI SAR 4-18 4.4.2 Decontamination System Standard decontaminatio n methods will be used to remove surface contamination from the SSSCs resulting from their submersion in the spent fuel pool during loadi ng. Decontamination of the SSSCs will be performed in the north bay of the Decontamination Building. Decontamination will typically be done manually, using water detergents and wiping cloths.
4.4.3 SSSC Repair and MaintenanceIncidental mechanical operations involvi ng the SSSCs include receiving the new SSSCs from the supplier, their temporary (empty) storage, and transf er to the Fuel Building. During these operations, the SSSCs will be inspected in detail and corrections made as needed. The facilities and machine shops of the North Anna Power Station will be available in the event repair operations become ne cessary. Repairs made to SSSCs mu st be done in or outside the Decontamination Building where the crane capacity exists fo r lifting the SSSC. Occupational exposures during repair operations will be kept as-low-as-reasonably-achievable (ALARA) under the North Anna Power Station ALARA program.
No maintenance or repair operati ons are anticipated once the SSSCs are placed in to storage. Periodic maintenance is not required beyond instrument adjustments and other similar evolutions of a minor nature, such as touchi ng up defects in outer decontamination coati ngs. These can all be performed within the ISFSI area, without need to move the SSSCs.Degradation of a SSSC primary seal is consider ed extremely unlikely. Nevertheless, in the event that this were to occur, the pressure sensor would activate an alarm. Upon identification of the affected SSSC, a series of actions identified in the ISFSI procedures will be taken. Depending on the exact circumstances, these may include monitoring the SSSC pr essure with a time recorder in order to ascertain whether th e malfunction is a progressing one, and checkin g for possible instrumentation failure. If a failu re of a seal is ascerta ined, arrangements will be made to repair the SSSC in place, to transfer th e SSSC to the Decontamination Building for repair work, if necessary, or any other action recommended by the manufacturer and in cluded in the North Anna ISFSI operating procedures.Because SSSCs have double seals, se al failure hypothesized in this section would not result in release of radioactive material.
The ISFSI operating procedures will be prepared to provide step-by-step actions to be taken for all alarms. These will be prepared according to the specific SSSC manufacturers' designs and recommendations.
4.4.4 Utility Supplies and SystemsThe SSSCs are passive devices and no utilit y services are necessary for their operation.
Revision 8-06/14 North Anna ISFSI SAR 4-19 4.4.4.1 Electrical SystemsElectric power is not required to support f unctions of the North Anna ISFSI important to safety. Power for ISFSI security equipment is prov ided by normal station power. A discussion of emergency power for security equipment is provided in the Physical Security Program.Nonsafety-related electric powe r is supplied to the ISFSI fo r purposes of lighting, general utility , and instrumentation with which SSSC seal integrity is monitored. These support systems are not needed for effective SSSC function.The source of electric power is obtained from three ne w pole-mounted transformers inside the ISFSI perimeter fence. The 34.5 kV line providing service to th ese transformers comes from the plant's electrical switchya rd. The transformers provide power to ISFSI loads through a separate feeder and disconnect and distribution panel which are lo cated at the diesel generator pad. This distribution panel will provide normal power to loads for all three storage pads. Service power for lighting and welding receptacles is 480V, 60 Hz, single or three phase. A 120V circuit is also pro vided.Since the SSSCs are the only com ponents important to safety a nd since the y do not require electric power to perform their fu nctions, loss of electricity will not jeopardi ze the safety of the facility. A backup diesel generator will be provided to powe r security-related and SSSC monitoring equipment on the loss of normal power.The ISFSI is a passive insta llation. There are no motorized fans, dampers, louvers, or valves, and no electrically operated cranes or lifts. Electricity is required only for monitoring equipment, lighting and security-related equipment.
4.4.5 Other Systems 4.4.5.1 Fire Protection System As described in Section 8.2.5.1, no fires other than small el ectrical fires are considered credible at the North Anna ISFSI.
Therefore, the North Anna ISFSI does not in clude a fire protecti on system, other than portable fire extinguishers which will be available within the ISFSI perimeter fence. In addition, the fire fighting equi pment and personnel present at the North Anna Power Station would be available if needed.
4.4.5.2 Sewage Treatment SystemNeither sanitary nor chemical se wage is produced at the North Anna ISFSI. During the infrequent periods of ma nning for SSSC transfer operations or construction of the second and third storage pads, portable sanitary facilities may be provided in the vicinity of, but not directly within, the ISFSI. Chemical wastes, such as small amounts of ethylene glycol (antifreeze) or drips of lubricating fluid from transport vehicles c ould be cleaned up manuall y and disposed of at Revision 8-06/14 North Anna ISFSI SAR 4-20appropriate facilities of the North Anna Power Station. No permanent sewage treatment system is required or provided.
4.4.5.3 Alarm Systems The ISFSI is not manned on a cont inuous basis. All of the SSSC s will be pro vided with a pressure sensing device to monitor their seal tightness.The monitoring devices w ill actuate a pressur e switch at a preset alarm level. Specific recommendations for monitoring the SSSCs are provided in the SSSC Topical Safety Analysis Reports. Each of the SSSC alarms (maximum of tw o per SSSC) will initiate an annunciator alarm in the local annunciator panel at the ISFSI. Th e alarm panel will indicate the specific SSSC and will remain lit until reset. Actu ation of the pressure monitoring alar m will also cause an alarm in the Station Security Central Alarm Station (C AS) and the Secondary Alarm Station (SAS).
Security personnel continuously monitor these stations and they will notify the Shift Manager. This instrumentation is not required for safe operation of the ISFSI and therefore will not be safety-related.


4.4.5.4 Seismic Recording Instrumentation On August 23, 2011, an earthquake occurr ed approximately 5 miles from Mineral, Virginia.
Revision 806/14                                      North Anna ISFSI SAR                      4-15 A 24-inch diameter surface drain culvert passes beneath the main transport route approximately 900 feet west of the protected area gate. The top of this culvert is approximately three feet below surface grade, and steel plates or concrete will be used to protect this culvert from damage.
In response to this event, Domi nion committed to install seismic recording instrumentation at the ISFSI (Reference 2). This instrumentation consists of a triaxial time-history accelerograph and a motion recorder, and is located in the north-west section of the ISFSI adjacent to the alarm panel pad. The motion recorder is e quipped with seismically qualif ied battery backup that permits continuous operation of the instru mentation upon loss of e xternal power. The instrumentation is designed to detect the occurrence of an earthquake and provide records on intensity and duration. The data collected can be used to evaluate the potential degradation of equipment and structures at the ISFSI due to an earthquake. This instrumentation is not required for safe operation of the ISFSI and therefore is not classified safety-related.
There are no portions of safety-related systems located beneath the alternate transfer route.
4.4.6 References1.ANSI N14.6-1993, Special Lifting De vices for Shipping Containers Weighing 10,000 Pounds (4,500 kg) or More for Nuclear Materials, American National Standards Institute.2.Grecheck, E. S., Virginia Electric and Power Compan y (Dominion), Letter to U.S. Nuclear Regulatory Commission, Virginia Electric and Powe r Company (Dominion), North Anna Power Station Units 1 and 2, Independent Spent Fuel Storage Installation, Revised Long-Term Actions Commitment List, Serial No. 11-520D, dated November 7, 2011.4.5 CLASSIFICATION OF STRUCTURES , SYS TEMS AND COMPONENTS The SSSCs are the only co mponents of the North Anna ISFSI which are important to safety. None of the other systems and structures comprising the North Anna ISFSI (stora ge pads, fence, monitors, wiring, and lights) perform a safety func tion. The SSSC transporter is not considered Revision 8-06/14 North Anna ISFSI SAR 4-21 important to safety because the SSSCs are designed to withstand its failure without jeopardizing the health and safe ty of the public. The SSSC handling equipment (cask lift beam and cask lid lifting tools) used during loading and unloading operations is also considered important to safety because the SSSCs are not designed to withstand their failur
Within the protected area, there is a single buried section of' fire protection pipe beneath this route. This pipe is located a minimum of 6 feet below grade. Based on a combined transporter and cask weight of 315,000 lb, this results in a load of 39,400 lb/wheel and a corresponding surcharge loading of 1000 psf at 6 feet below grade. The pipe is not overstressed by the loaded transporter movement.
: e. The cask hand ling and auxiliary cranes are included in the Station NUREG-0612 Heavy Loads program in order to provide programmatic control. A cask dr op analysis has been conducted which evaluated potential Station structural damage and offsite dose conseq uences. This analysis is included in Appendix 15A of the North Anna Power Station UFSAR.The specific portions of the SSSCs that are important to safe ty and a defini tion of the specific safety function are provided in the SSSC Topical Safety Analysis Reports.
The portions of nonsafety-related systems located beneath the alternate transfer route and within the protected area include duct banks, a domestic water pipe, storm drain pipes, a waterline, a well waterline, mat sump pump lines, a pipe tunnel, manholes, and a diesel fuel pipe.
4.6 DECOMMISSIONING PLANThe SSSC design concept utilized at the North Anna ISFSI features inherent ease and simplicity for decommissioning. At the end of its service life time, SSSC decommissioning could be accomplished by on e of the options described below.
These nonsafety-related systems, with the exception of a 12 foot wide security ductbank and a 9 foot wide pipe tunnel, are either located at acceptable depth or constructed of materials able to withstand the stresses generated from loaded transporter movement.
The SSSC, including the spent fuel stored inside , could be shipped to a fuel repository for permanent disposal. Depending on licensing requirements e xisting at the time of shipment offsite, placement of the entire SSSC inside a supplemental shipping container or overpack would be considered.Alternately, the spent fuel could be removed from the SSSC and shipped in a licensed shipping container to a fuel repository. If n eeded, SSSC decontamination could be accomplished through the use of conventional high pressure wate r sprays to reduce cont amination on the SSSC interior. The sources of contamin ation on the interior of the SSSC would be crud from the outside of the fuel rods and the crud left by the spent fuel pool water. The expected low levels of contamination from these sources could be easily removed with a high pressure water spray. After decontamination, the SSSC could either be cut-up for scrap or partially scrapped and any remaining contaminated or activated portions shipped as low-level radioactive waste to a disposal facility.The volume of waste material produced inci dental to ISFSI deco mmissioning will be limited to that n ecessary to accomplish surf ace decontamination of the SSSCs once the spent fuel assemblies are removed.SSSC activation analyses have been performed to quantify specific activity levels of SSSC materials after years of storing spent fuel. These activation calculations and the assumptions under which they were performed are described in the SSSC Topical Safety An alysis Reports. Based on the results of the analyses, the SSSC materials will be only slightly activated by the low level neutron flux emanating from the stored spent fuel. Consequently, after application of the surface decontamination process described above, the radiation level due to activation products will be Revision 8-06/14 North Anna ISFSI SAR 4-22negligible, and the SSSCs may be ab le to be scrapped. A detailed e v aluation will be performed at the time of decommissioning to deter mine the appropriate mode of disposal.
An East-West running security duct bank and a North-South running reinforced concrete pipe tunnel each have top-of-concrete elevations located at 2.3 feet and 2 feet below grade, respectively. Both the duct bank and tunnel are located directly beneath the alternate transport route. Reinforced concrete protective slabs are installed over the duct bank and tunnel to bridge each structure and divert transporter surcharge loads so that the duct bank and tunnel are not adversely impacted by stresses generated by loaded transporter movement 4.3.3 Design Bases and Safety Assurance The transporter is designed to limit SSSC lift height to less than 15 inches by the use of internal mechanical stops. Lifting system integrity is maintained during transport by means of a hydraulic lock valve. The transporter is equipped with a SSSC restraint system which prevents SSSC sway during road movement.
Due to the leak tight design of the SSSCs, no residual contaminat ion is e xpected to be left behind on the storage pads. The storage pad, fen ce, and peripheral utility structures require no decontamination or special handling after the last SSSC has been removed.
The transporter design includes static and dynamic evaluations for strength, fatigue resistance, buckling resistance, joint design and the use of stiffeners. These evaluations included a minimum factor of safety of 1.67 in accordance with CMAA (Reference 1) and the AISC Manual of Steel Construction (Reference 2).
The spent fuel pool at the North Anna Power Station will rema in functional until the ISFSI is decommissioned. This will allow the pool to be utilized to transfer fuel from the SSSCs to licensed shipping containers for shipment offsit e if the SSSCs cannot be utilized for transport.Virginia Power presently owns and operates f our nuclear po wer gene rating units. The cost to decommission the ISFSI is expected to be a small fraction of the to tal decommissioning costs for the North Anna Power Station. Nuclear decommissi oning trusts have been established to accumulate the funds needed to cover the costs of decommissioning.
In order to minimize the weight of the transporter, no radiation shielding is provided in the transporter design. However, operation of the transporter can be done by one person, thereby minimizing radiation dose to operating personnel. Other personnel accompanying transport of SSSCs may do so at a distance from the transporter that minimizes their exposure to radiation.
Revision 8-06/14 North Anna ISFSI SAR 4-23Table 4-1COMPLIANCE WITH GENERAL DESIGN CRITERIA (SUBPART F, 10 CFR 72)72.122(a)Quality standardsThe design criteria require that the SSSCs be designed, fabricated, delivered to the site, and sealed according to recognized commercial codes and standards and in accordance with Virginia Power's quality assurance (QA) program for safety-related equipment.72.122(b)Protection against environmen tal conditions and natural phenomenaExtreme environmental conditions are defined in Chapter 2. The design criteria require that the SSSCs be designed to withstan d the Design Earthquake, high ambient temperature, exposure to sunlight, and extreme winds.72.122(c)Protection against fire and explosionsNo large fire within the North Anna ISFSI is considered credible. The design criteria require that SSSCs be designed to withst and extreme ambient temperatures and peak overpressure resulting from postulated nearby explosions.72.122(d)Sharing of structures, systems, and componentsThe ISFSI activities will be do ne without jeopardizing the safe shutdown capability of the North Anna Power Station Units 1 and 2.72.122(e)Proximity of sitesThe design and operation of the North Anna ISFSI result in minima l additions of risk to the health and safety of the public.72.122(f)Testing and maintenance of systems and componentsThe SSSCs require minimum maintenance. The design criteria require that the SSSCs be capable of being inspected and monitored.72.122(g)Emergency CapabilityAll emergency facilities at the North Anna Power Station will be available if needed.72.122(h)Confinement barriers and systemsThe design of the SSSCs will ensu re that the stored fuel is maintained in a safe condition. No paths for the release of radioactive material are considered credible. No ventilation or off gas systems are needed. Continuous monitoring of SSSC confinement barriers is provided.72.122(i)Instrumentation and control systemsNo instrumentation or control systems are ne eded for the SSSCs to perform their safety functions, however, continuous monitoring of SSSC confinement barriers is provided.72.122(j)Control room or control areas The North Anna ISFSI is a passive installation, w ith no need for operator actions. No control room or cont rol area is needed.72.122(k)Utility servicesThe SSSCs are the only safety-rel ated components at the North Anna ISFSI. There are no utility or emergency systems required to perform any safety functions or to meet emergency conditions at the North Anna ISFSI.
Section 7.4 includes an evaluation of the occupational exposure during transport.
Revision 8-06/14 North Anna ISFSI SAR 4-24Table 4-1 (CONTINUED)
COMPLIANCE WITH GENERAL DESIGN CRITERIA(SUBPART F, 10 CFR 72)72.122(l)RetrievabilityThe design of the SSSCs will enable subsequent removal of the stored fuel in the North Anna spent fuel pool and repackaging of the spent fuel into shipping casks. The spent fuel pool will remain operational as needed for spent fuel transfer.72.124(a)Design for criticality safetyThe design criteria require that the SSSCs be designed to maintai n subcriticality at all times, assuming a single active or credible passive failure.72.124(b)Methods of criticality controlDifferent SSSC designs may use different meth ods of critical ity control. All designs use conservative analyses and specified error contingency criteria. Since criticality control is provided entirely within the SSSC design, additional design features for criticality control at the ISFSI are not needed.72.124(c)Criticality monitoring Not required72.126(a)Exposure control Operations at the North Anna ISFSI will be done acco rding to ALARA procedures. Minimal maintenance operations are needed following SSSC emplacement at the ISFSI. SSSC loading, transport and unloading are done in accordance with health physics procedures in effect for the North Anna Power Station.72.126(b)Radiological alarm systemsNo radioactive releases are cons idered credible at the North Anna ISFSI. No safety-related alarm syst ems are needed at the ISFSI. Radiological alarm systems are provided for operations in the Fuel Building at the North Anna Power Station.72.126(c)Effluent and direct radiation monitoringOperation of the North Anna ISFSI does not result in any radioactive effluents. No safety-related monitors are need ed. Direct radiation monitors will be installed around the ISFSI.72.126(d)Effluent controlNo radioactive releases are considered credible at the North Anna ISFSI.72.128(a)Spent fuel and radioactive waste storage and handling systems The design criteria require that the SSSCs ha ve adequate provisions to monitor the SSSC performance, provide sufficient shielding to restrict surface dose rates to below prescribed levels, maintain leak tightness under all operating and credible accident conditions, and maintain the spent fuel in a safe condition. Only minimal amounts of radioactive waste are generated in the decontamination of the SSSCs.72.128(b)Waste treatmentRadioactive wastes generated in the decont amination of the SSSCs are processed by the North Anna Power Station waste processing systems.72.130DecommissioningOperation of the North Anna ISFSI does not result in cont amination of the outside surface of the SSSCs or any other ISFSI components. Therefore, there is no need for additional provisions to facilitate decommissioning.
Revision 8-06/14 North Anna ISFSI SAR 4-25Table 4-2CODES AND STANDARDS FOR TRANSPORTER DESIGN AND FABRICATION1.American National Standards Institute (ANSI)a.B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)b.B30.9, Slingsc.B30.10, Hooks2.American Institute of St eel Construction (AISC) -
Manual of Steel Construction , Ninth Edition, 19893.American Welding Society (AWS)a.D1.1, Structural Welding Codeb.D14.1, Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment4.Crane Manufacturer's Association of America, Specification No.
70, Specification for Electric Overhead Traveling Cranes5.American Society of Non-Destru ctive Testing - SNT-TC-1A (1980), Recommended Practice for Non-Destructive Testing, Personnel Qualification and Certification6.American Society for Te stin g and Materials (ASTM)a.A36, Specification for Carbon Structural Steelb.A48, Standard Specification for Gray Iron Castingsc.A108, Specification for Steel Bars, Carbon, Cold-Finished, Standard Qualityd.A148, Specification for Steel Castings, High-Strength for Structural Purposese.A325, Specification for Structural Bolts, Steel, Heat Treated for Structural Steel Jointsf.A434, Specification for Steel Bars, Alloy, Hot-Wrought or Cold-Finished, Quenched and Temperedg.A490, Specification for Heat Treated Steel Structural Boltsh.A514, Specification for High Yield Strength Quench and Tempered Alloy Steel Plate Suitable for Weldingi.A576, Specification for Steel Bars, Carbon, Hot-Wrought Special Qualityj.A668, Specification for Steel Forgings, Carbon and Alloy for General Industrial Usek.A730, Specification for Forgings, Carbon and Alloy, for Railway Usel.E709, Standard Guide for Magnetic Particle Examination7.Code of Federal Regulations, Title 29, Part 1910, Occupational Safety and Health Standar ds Revision 8-06/14 North Anna ISFSI SAR 4-26 Figure 4-1 ISFSI SITE PLAN


Revision 8-06/14 North Anna ISFSI SAR 4-30 Figure 4-5ISFSI STORAGE PAD DETAILS Revision 8-06/14 North Anna ISFSI SAR 4-31 Figure 4-6IMAGES-3D MODEL OF STORAGE PAD GEOMETRY Revision 8-06/14 North Anna ISFSI SAR 4-32 Figure 4-7SASSI MODEL OF STORAGE PAD GEOMETRY Revision 8-06/14 North Anna ISFSI SAR 4-33 Figure 4-8 SASSI CASK MODEL Revision 8-06/14 North Anna ISFSI SAR 4-34 Figure 4-9SASSI PAD PLATE ELEMENTS Revision 8-06/14 North Anna ISFSI SAR 4-35 Figure 4-10SLIDING FACTORS OF SAFETY Revision 8-06/14 North Anna ISFSI SAR 4-36 Figure 4-11OVERTURNING FACTORS OF SAFETY Revision 8-06/14 North Anna ISFSI SAR 4-37 Figure 4-12TRANSPORTER DESIGN
Revision 806/14                                       North Anna ISFSI SAR                     4-16 The transporter is designed for independent operation, however, the electrical system may be powered from an external source. The transporter has no other backup provisions and no interfaces with SSSC or ISFSI systems. The codes and standards used in the design and fabrication of the transporter are listed in Table 4-2.
4.3.4 References
: 1. Crane Manufacturers Association of America, Specification No. 70, Specification for Electric Overhead Traveling Cranes.
: 2. American Institute of Steel Construction, Manual of Steel Construction, Ninth Edition.
4.4 OPERATING SYSTEMS 4.4.1 Loading and Unloading System 4.4.1.1 Function The functions of the loading systems are to transfer the spent fuel from the spent fuel pool to the SSSC and move the SSSC from the spent fuel pool to the transporter outside the Decontamination Building. The same systems would be used to unload the SSSCs.
The performance objectives are to load the spent fuel into the SSSCs in such a manner as to preclude damage to the fuel and ensure that subcriticality is maintained, and to move the loaded SSSC in a manner which will preclude damage to the SSSC and to any other safety-related system or component in the load path. The same objectives apply to unloading the SSSCs.
The ISFSI, SSSCs and related support equipment will be designed to interface with existing and planned equipment and systems at the North Anna Power Station. An amendment to the North Anna Power Station UFSAR will provide a description of the systems and equipment.
4.4.1.2 Major Components and Operating Characteristics The fuel storage area at the North Anna Power Station is located in the Fuel Building between the two reactor containments, and consists of a new fuel storage area, a pool for storing spent fuel, a cask loading area, and two canals for transfer of fuel assemblies between the reactors and the pool. The spent fuel pool is 72 feet 6 inches long, 26 feet 9 inches wide at the east end, 21 feet 4 inches wide at the west end and normal water depth is approximately 40 feet. The cask loading area at the west end of the spent fuel pool is separated from the spent fuel storage racks by a concrete wall that is 3 feet 6 inches thick and has a gate to allow spent fuel assemblies to be moved from the rack area. The cask loading area has two locations for casks, one that is 12 feet by 12 feet with a floor elevation 2 ft. 6 in. lower than the spent fuel storage area, and a second that is 12 feet by 9 feet 4 inches with a floor elevation 19 ft. 8 in. above the spent fuel storage area. A 32-inch high pedestal has been placed in the deep end of the cask loading area to allow the fuel assemblies in the spent fuel cask to be at approximately the same elevation as the assemblies in the spent fuel racks.


Revision 8-06/14 North Anna ISFSI SAR 4-39 Figure 4-14FUEL AND DECONTAMINATION BUILDINGS SIDE VIEW Revision 8-06/14 North Anna ISFSI SAR 4-40 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 5-1Chapter 5STORAGE SYSTEM OPERATIONSThis chapter describes the operations associated with the North Anna ISFSI. As indicated in pre vious chapters, the North Anna ISFSI is a totally passive installation, requiri ng no actions or maintenance for its proper functi oning. The operations described in this chapter relate to the loading and preparation of the SSSCs and their transfer to the ISFSI. Also described is the transfer of the SSSCs from the ISFSI and unloading operations.
Revision 806/14                                       North Anna ISFSI SAR                     4-17 The Fuel Building walls consist of blow-off siding attached to the steel superstructure.
5.1 OPERATION DESCRIPTION 5.1.1 Narrative Description 5.1.1.1 Loading OperationsThe loading of the SSSCs take s place within the North Anna Power Stat ion Fuel and Decontamination Buildings. These operations are similar to the loading of transport casks, as described in Section 9.1 of the North Anna Power Station Updated Fi nal Safety Analysis Report (UFSAR). An update to the North Anna Power Station UFSAR will address the loading and unloading of the SSSCs in the Fuel and Decontamination Bu ildings. These operations are conducted in a manner that ensures that the capabilit y to safely operate Units 1 and 2 is not jeopardized. Handling of the SSSCs inside the Fuel and Decontam ination Building is performed in accordance with the operating license fo r the North Anna Power Station under 10 CFR 50.The cask loading operation begins with th e receipt and inspecti on of an empty SSSC outside the Decontam ination Building. A tw o-point lift beam is attached to the 125-ton crane and placed on the upper trunnions of the SSSC. The SSSC is rotated to a vertical pos ition, lifted from the shipping frame, moved over the Decontamination Building and through a roll-up door, and lowered into the preparation ar ea in the north bay of the Dec ontamination Building. The SSSC lid is removed and inspected. The fuel basket is also visually inspected for foreign material. The lid is attached to the 10-ton auxiliary crane and all seal s are replaced.
Access to the Fuel Building for the 125-ton cask crane and SSSCs is provided by a roll-up door.
Once prepared, the SSSC is lifted from the nor th bay and moved to the cask loading area, with the lid still attached to the 10-ton crane. The SSSC is lowered into the deep end of the cask loading area and the lift beam detached. Fuel assemblies are load ed into the SSSC using a long handling tool suspended from the sp ent fuel bridge crane hoist. An underwater camera is used to verify the proper pl acement of the fuel assem blies in the SSSC. After the SSSC is loaded with spent fuel, the lid is placed on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface, the lid bolts are installed and water is pumped from the fuel cavity.
Movement of the cask crane in the Fuel Building is limited to the cask loading area and adjacent areas north and south, so that casks cannot pass over the fuel storage area. Figure 4-13 shows the layout of the Fuel and Decontamination Buildings and the load path for the SSSCs. Figure 4-14 is a section view of the load path in the Fuel and Decontamination Buildings.
The SSSC is lifted from the cask loading area, m oved to the north bay, and is lowered into the bay.In the north bay, the lid bolts ar e tightened according to vendor specifications. Vacuum drying of the fuel cavity is completed and tested. The cavity is backfilled with helium to design pressure, and the lid seals are tested. All exterior surfaces of the SSSC are decontaminated.
The Decontamination Building is used for preparation of empty SSSCs and for vacuum drying, helium backfill, leak testing and decontamination of loaded SSSCs. Preparation of loaded SSSCs for unloading also takes place in the Decontamination Building, including testing of the helium backfill for indications of fuel failure. The north bay of the Decontamination Building will be used specifically for SSSCs, and is equipped with a platform to allow easy access to all areas of the SSSC surface, vacuum pumps, helium leak detector equipment and a system control panel.
Revision 8-06/14 North Anna ISFSI SAR 5-2Additional lids, if any, are instal led and the pressure mon itoring system is installed and tested. If appropriate, the weather cover is installed. Surface radia tion dose measurements are then completed. When all preparations have been comple ted, the SSSC is lifted from the north bay and placed on the concrete surface outside of the Decontamination Building.The SSSC is lifted by the transp orter for transfer to the ISFSI. The routes followed by the transporter from the Decontamination Building to the ISFSI are shown on Figure 4-4. This figure also shows the location of all nearby systems an d structures needed for the safe shutdown of Units 1 and 2. Drop of an SSSC while in tr ansit to the ISFSI will not r esult in damage to an y of these systems and structures, nor in radioactive releases in excess of the guidelines in 10 CFR 100. As indicated in Section 3.3.1, the design criteria require that the SSSC maintain its integrity, preclude physical damage to the fuel , and ensure sub-critical ity follo wing a 15-inch drop. Operating procedures will limit the lifting heights to less than 15 inches once the SSSC is lifted by the transporter
Helium bottles are placed outside the Decontamination Building, for easy access during bottle replenishment, and are connected by piping to the north bay.
.The pressure monitoring device on the SSSC must be connect ed to the monitoring panel after the SSSC is placed on the ISFSI pad.
Station systems and other components used during the loading and unloading of SSSCs include the 125-ton cask handling crane and 10-ton auxiliary crane that service the Fuel and Decontamination Buildings. Other components include a cask lift beam and special tools for lifting SSSC lids and covers. A vacuum drying system (vacuum pumps, water collection bottle, piping and hoses) is used in the Decontamination Building to remove any water remaining in the cask cavity after pumping water from the cavity back to the spent fuel pool. Specialized leak detection equipment is used for seal testing.
5.1.1.2 Unloading OperationsUnloading of an SSSC begins with disconnecting the press ure monitoring de vice on the SSSC from the monitoring pane l and transporting the SSSC along the same r oute used for its placement at the ISFSI. Once the tr ansporter and SSSC are outside the Decontamination Building, the SSSC is lowered to the concrete surface beneath the 125-ton crane. The SSSC is lifted using the lift beam and moved to the north bay of th e Decontamination Building. A sample of the helium in the fuel cavity is tested for indications of fuel failure (Kr 85). If this test indicates that failed fuel is present in the SSSC, the fuel cavity is evacuat ed to the Decontamination Building ventilation system described in Chapter 6, and refilled with helium.
Fuel assembly crud is controlled during unloading of the SSSCs through the slow addition of water to the SSSC cavity. Once the SSSC cavity is filled with water and the SSSC has been placed in the spent fuel pool, slow removal of the lid will also help prevent the spread of crud into the spent fuel pool.
This process of sampling, evacuating and refilling is continued unt il heliu m sample tests are acceptable.
4.4.1.3 Safety Considerations and Controls Fuel handling activities in the spent fuel pool are subject to limiting conditions for operations as set forth in Section 3.9, Refueling Operations, of the North Anna Units 1 and 2 Technical Specifications. A 125-ton trolley crane with a 10-ton auxiliary crane serve the Decontamination Building and Fuel Building. This crane and the fuel loading and SSSC handling will be subject to conditions as set forth in the North Anna Units 1 and 2 Technical Specifications and Operating License.
The lid bolts are then loosened and the SSSC is lifted from the north bay and moved to the cask loading area. The SSSC is lowered into the deep end of the cask loading area until the top of the cask is level with the spent fuel bridge crane platform. A water supply, with flow indicator, is attached to the SSSC reflood valve and water is slowly added to the fuel cavity. Flooding of the cask cavity takes at least 3 hours. When the cavity is full, the lid bolts are removed, the SSSC is lowered to the bottom of the cask loading area, and the lift beam is detached. The lid is slowly removed from the SSSC, lifted from the pool and placed at its designated laydown area. Fuel assemblies are then removed from the SSSC using a l ong handling tool suspended from the spent fuel bridge crane hoist.
A lift beam designed to ANSI N14.6 (Reference 1) is used for SSSC handling. The lift beam and the SSSC lifting trunnions are designed such that stresses from lifting three times the weight of the SSSC will not exceed the yield strength of the lift beam materials and five times the weight will not exceed the ultimate strength. The arms of the lift beam open as the lift beam is attached to the SSSC. The arms are hydraulically locked in the closed position for lifting the SSSC.
After the SSSC is unloaded, the lid is placed back on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface and water is pumped from the fuel cavity.
 
Revision 806/14                                      North Anna ISFSI SAR                    4-18 4.4.2 Decontamination System Standard decontamination methods will be used to remove surface contamination from the SSSCs resulting from their submersion in the spent fuel pool during loading. Decontamination of the SSSCs will be performed in the north bay of the Decontamination Building. Decontamination will typically be done manually, using water detergents and wiping cloths.
4.4.3 SSSC Repair and Maintenance Incidental mechanical operations involving the SSSCs include receiving the new SSSCs from the supplier, their temporary (empty) storage, and transfer to the Fuel Building. During these operations, the SSSCs will be inspected in detail and corrections made as needed. The facilities and machine shops of the North Anna Power Station will be available in the event repair operations become necessary. Repairs made to SSSCs must be done in or outside the Decontamination Building where the crane capacity exists for lifting the SSSC. Occupational exposures during repair operations will be kept as-low-as-reasonably-achievable (ALARA) under the North Anna Power Station ALARA program.
No maintenance or repair operations are anticipated once the SSSCs are placed into storage.
Periodic maintenance is not required beyond instrument adjustments and other similar evolutions of a minor nature, such as touching up defects in outer decontamination coatings. These can all be performed within the ISFSI area, without need to move the SSSCs.
Degradation of a SSSC primary seal is considered extremely unlikely. Nevertheless, in the event that this were to occur, the pressure sensor would activate an alarm. Upon identification of the affected SSSC, a series of actions identified in the ISFSI procedures will be taken. Depending on the exact circumstances, these may include monitoring the SSSC pressure with a time recorder in order to ascertain whether the malfunction is a progressing one, and checking for possible instrumentation failure. If a failure of a seal is ascertained, arrangements will be made to repair the SSSC in place, to transfer the SSSC to the Decontamination Building for repair work, if necessary, or any other action recommended by the manufacturer and included in the North Anna ISFSI operating procedures.
Because SSSCs have double seals, seal failure hypothesized in this section would not result in release of radioactive material.
The ISFSI operating procedures will be prepared to provide step-by-step actions to be taken for all alarms. These will be prepared according to the specific SSSC manufacturers designs and recommendations.
4.4.4 Utility Supplies and Systems The SSSCs are passive devices and no utility services are necessary for their operation.
 
Revision 806/14                                      North Anna ISFSI SAR                      4-19 4.4.4.1 Electrical Systems Electric power is not required to support functions of the North Anna ISFSI important to safety. Power for ISFSI security equipment is provided by normal station power. A discussion of emergency power for security equipment is provided in the Physical Security Program.
Nonsafety-related electric power is supplied to the ISFSI for purposes of lighting, general utility, and instrumentation with which SSSC seal integrity is monitored. These support systems are not needed for effective SSSC function.
The source of electric power is obtained from three new pole-mounted transformers inside the ISFSI perimeter fence. The 34.5 kV line providing service to these transformers comes from the plants electrical switchyard. The transformers provide power to ISFSI loads through a separate feeder and disconnect and distribution panel which are located at the diesel generator pad. This distribution panel will provide normal power to loads for all three storage pads. Service power for lighting and welding receptacles is 480V, 60 Hz, single or three phase. A 120V circuit is also provided.
Since the SSSCs are the only components important to safety and since they do not require electric power to perform their functions, loss of electricity will not jeopardize the safety of the facility. A backup diesel generator will be provided to power security-related and SSSC monitoring equipment on the loss of normal power.
The ISFSI is a passive installation. There are no motorized fans, dampers, louvers, or valves, and no electrically operated cranes or lifts. Electricity is required only for monitoring equipment, lighting and security-related equipment.
4.4.5 Other Systems 4.4.5.1 Fire Protection System As described in Section 8.2.5.1, no fires other than small electrical fires are considered credible at the North Anna ISFSI.
Therefore, the North Anna ISFSI does not include a fire protection system, other than portable fire extinguishers which will be available within the ISFSI perimeter fence. In addition, the fire fighting equipment and personnel present at the North Anna Power Station would be available if needed.
4.4.5.2 Sewage Treatment System Neither sanitary nor chemical sewage is produced at the North Anna ISFSI. During the infrequent periods of manning for SSSC transfer operations or construction of the second and third storage pads, portable sanitary facilities may be provided in the vicinity of, but not directly within, the ISFSI. Chemical wastes, such as small amounts of ethylene glycol (antifreeze) or drips of lubricating fluid from transport vehicles could be cleaned up manually and disposed of at
 
Revision 806/14                                      North Anna ISFSI SAR                    4-20 appropriate facilities of the North Anna Power Station. No permanent sewage treatment system is required or provided.
4.4.5.3 Alarm Systems The ISFSI is not manned on a continuous basis. All of the SSSCs will be provided with a pressure sensing device to monitor their seal tightness.
The monitoring devices will actuate a pressure switch at a preset alarm level. Specific recommendations for monitoring the SSSCs are provided in the SSSC Topical Safety Analysis Reports. Each of the SSSC alarms (maximum of two per SSSC) will initiate an annunciator alarm in the local annunciator panel at the ISFSI. The alarm panel will indicate the specific SSSC and will remain lit until reset. Actuation of the pressure monitoring alarm will also cause an alarm in the Station Security Central Alarm Station (CAS) and the Secondary Alarm Station (SAS).
Security personnel continuously monitor these stations and they will notify the Shift Manager.
This instrumentation is not required for safe operation of the ISFSI and therefore will not be safety-related.
4.4.5.4 Seismic Recording Instrumentation On August 23, 2011, an earthquake occurred approximately 5 miles from Mineral, Virginia.
In response to this event, Dominion committed to install seismic recording instrumentation at the ISFSI (Reference 2). This instrumentation consists of a triaxial time-history accelerograph and a motion recorder, and is located in the north-west section of the ISFSI adjacent to the alarm panel pad. The motion recorder is equipped with seismically qualified battery backup that permits continuous operation of the instrumentation upon loss of external power. The instrumentation is designed to detect the occurrence of an earthquake and provide records on intensity and duration.
The data collected can be used to evaluate the potential degradation of equipment and structures at the ISFSI due to an earthquake. This instrumentation is not required for safe operation of the ISFSI and therefore is not classified safety-related.
4.4.6 References
: 1. ANSI N14.6-1993, Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4,500 kg) or More for Nuclear Materials, American National Standards Institute.
: 2. Grecheck, E. S., Virginia Electric and Power Company (Dominion), Letter to U.S. Nuclear Regulatory Commission, Virginia Electric and Power Company (Dominion), North Anna Power Station Units 1 and 2, Independent Spent Fuel Storage Installation, Revised Long-Term Actions Commitment List, Serial No. 11-520D, dated November 7, 2011.
4.5 CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS The SSSCs are the only components of the North Anna ISFSI which are important to safety.
None of the other systems and structures comprising the North Anna ISFSI (storage pads, fence, monitors, wiring, and lights) perform a safety function. The SSSC transporter is not considered
 
Revision 806/14                                        North Anna ISFSI SAR                    4-21 important to safety because the SSSCs are designed to withstand its failure without jeopardizing the health and safety of the public. The SSSC handling equipment (cask lift beam and cask lid lifting tools) used during loading and unloading operations is also considered important to safety because the SSSCs are not designed to withstand their failure. The cask handling and auxiliary cranes are included in the Station NUREG-0612 Heavy Loads program in order to provide programmatic control. A cask drop analysis has been conducted which evaluated potential Station structural damage and offsite dose consequences. This analysis is included in Appendix 15A of the North Anna Power Station UFSAR.
The specific portions of the SSSCs that are important to safety and a definition of the specific safety function are provided in the SSSC Topical Safety Analysis Reports.
4.6 DECOMMISSIONING PLAN The SSSC design concept utilized at the North Anna ISFSI features inherent ease and simplicity for decommissioning. At the end of its service lifetime, SSSC decommissioning could be accomplished by one of the options described below.
The SSSC, including the spent fuel stored inside, could be shipped to a fuel repository for permanent disposal. Depending on licensing requirements existing at the time of shipment offsite, placement of the entire SSSC inside a supplemental shipping container or overpack would be considered.
Alternately, the spent fuel could be removed from the SSSC and shipped in a licensed shipping container to a fuel repository. If needed, SSSC decontamination could be accomplished through the use of conventional high pressure water sprays to reduce contamination on the SSSC interior. The sources of contamination on the interior of the SSSC would be crud from the outside of the fuel rods and the crud left by the spent fuel pool water. The expected low levels of contamination from these sources could be easily removed with a high pressure water spray. After decontamination, the SSSC could either be cut-up for scrap or partially scrapped and any remaining contaminated or activated portions shipped as low-level radioactive waste to a disposal facility.
The volume of waste material produced incidental to ISFSI decommissioning will be limited to that necessary to accomplish surface decontamination of the SSSCs once the spent fuel assemblies are removed.
SSSC activation analyses have been performed to quantify specific activity levels of SSSC materials after years of storing spent fuel. These activation calculations and the assumptions under which they were performed are described in the SSSC Topical Safety Analysis Reports. Based on the results of the analyses, the SSSC materials will be only slightly activated by the low level neutron flux emanating from the stored spent fuel. Consequently, after application of the surface decontamination process described above, the radiation level due to activation products will be
 
Revision 806/14                                      North Anna ISFSI SAR                    4-22 negligible, and the SSSCs may be able to be scrapped. A detailed evaluation will be performed at the time of decommissioning to determine the appropriate mode of disposal.
Due to the leak tight design of the SSSCs, no residual contamination is expected to be left behind on the storage pads. The storage pad, fence, and peripheral utility structures require no decontamination or special handling after the last SSSC has been removed.
The spent fuel pool at the North Anna Power Station will remain functional until the ISFSI is decommissioned. This will allow the pool to be utilized to transfer fuel from the SSSCs to licensed shipping containers for shipment offsite if the SSSCs cannot be utilized for transport.
Virginia Power presently owns and operates four nuclear power generating units. The cost to decommission the ISFSI is expected to be a small fraction of the total decommissioning costs for the North Anna Power Station. Nuclear decommissioning trusts have been established to accumulate the funds needed to cover the costs of decommissioning.
 
Revision 806/14                                    North Anna ISFSI SAR                          4-23 Table 4-1 COMPLIANCE WITH GENERAL DESIGN CRITERIA (SUBPART F, 10 CFR 72) 72.122(a)  Quality standards The design criteria require that the SSSCs be designed, fabricated, delivered to the site, and sealed according to recognized commercial codes and standards and in accordance with Virginia Powers quality assurance (QA) program for safety-related equipment.
72.122(b)  Protection against environmental conditions and natural phenomena Extreme environmental conditions are defined in Chapter 2. The design criteria require that the SSSCs be designed to withstand the Design Earthquake, high ambient temperature, exposure to sunlight, and extreme winds.
72.122(c)  Protection against fire and explosions No large fire within the North Anna ISFSI is considered credible. The design criteria require that SSSCs be designed to withstand extreme ambient temperatures and peak overpressure resulting from postulated nearby explosions.
72.122(d)  Sharing of structures, systems, and components The ISFSI activities will be done without jeopardizing the safe shutdown capability of the North Anna Power Station Units 1 and 2.
72.122(e)  Proximity of sites The design and operation of the North Anna ISFSI result in minimal additions of risk to the health and safety of the public.
72.122(f)  Testing and maintenance of systems and components The SSSCs require minimum maintenance. The design criteria require that the SSSCs be capable of being inspected and monitored.
72.122(g)  Emergency Capability All emergency facilities at the North Anna Power Station will be available if needed.
72.122(h)  Confinement barriers and systems The design of the SSSCs will ensure that the stored fuel is maintained in a safe condition.
No paths for the release of radioactive material are considered credible. No ventilation or off gas systems are needed. Continuous monitoring of SSSC confinement barriers is provided.
72.122(i)  Instrumentation and control systems No instrumentation or control systems are needed for the SSSCs to perform their safety functions, however, continuous monitoring of SSSC confinement barriers is provided.
72.122(j)  Control room or control areas The North Anna ISFSI is a passive installation, with no need for operator actions. No control room or control area is needed.
72.122(k)  Utility services The SSSCs are the only safety-related components at the North Anna ISFSI. There are no utility or emergency systems required to perform any safety functions or to meet emergency conditions at the North Anna ISFSI.
 
Revision 806/14                                      North Anna ISFSI SAR                        4-24 Table 4-1 (CONTINUED)
COMPLIANCE WITH GENERAL DESIGN CRITERIA (SUBPART F, 10 CFR 72) 72.122(l)  Retrievability The design of the SSSCs will enable subsequent removal of the stored fuel in the North Anna spent fuel pool and repackaging of the spent fuel into shipping casks. The spent fuel pool will remain operational as needed for spent fuel transfer.
72.124(a)  Design for criticality safety The design criteria require that the SSSCs be designed to maintain subcriticality at all times, assuming a single active or credible passive failure.
72.124(b)  Methods of criticality control Different SSSC designs may use different methods of criticality control. All designs use conservative analyses and specified error contingency criteria. Since criticality control is provided entirely within the SSSC design, additional design features for criticality control at the ISFSI are not needed.
72.124(c)  Criticality monitoring Not required 72.126(a)  Exposure control Operations at the North Anna ISFSI will be done according to ALARA procedures.
Minimal maintenance operations are needed following SSSC emplacement at the ISFSI.
SSSC loading, transport and unloading are done in accordance with health physics procedures in effect for the North Anna Power Station.
72.126(b)  Radiological alarm systems No radioactive releases are considered credible at the North Anna ISFSI. No safety-related alarm systems are needed at the ISFSI. Radiological alarm systems are provided for operations in the Fuel Building at the North Anna Power Station.
72.126(c)  Effluent and direct radiation monitoring Operation of the North Anna ISFSI does not result in any radioactive effluents. No safety-related monitors are needed. Direct radiation monitors will be installed around the ISFSI.
72.126(d)  Effluent control No radioactive releases are considered credible at the North Anna ISFSI.
72.128(a)  Spent fuel and radioactive waste storage and handling systems The design criteria require that the SSSCs have adequate provisions to monitor the SSSC performance, provide sufficient shielding to restrict surface dose rates to below prescribed levels, maintain leak tightness under all operating and credible accident conditions, and maintain the spent fuel in a safe condition. Only minimal amounts of radioactive waste are generated in the decontamination of the SSSCs.
72.128(b)  Waste treatment Radioactive wastes generated in the decontamination of the SSSCs are processed by the North Anna Power Station waste processing systems.
72.130    Decommissioning Operation of the North Anna ISFSI does not result in contamination of the outside surface of the SSSCs or any other ISFSI components. Therefore, there is no need for additional provisions to facilitate decommissioning.
 
Revision 806/14                                    North Anna ISFSI SAR                      4-25 Table 4-2 CODES AND STANDARDS FOR TRANSPORTER DESIGN AND FABRICATION
: 1. American National Standards Institute (ANSI)
: a. B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)
: b. B30.9, Slings
: c. B30.10, Hooks
: 2. American Institute of Steel Construction (AISC) - Manual of Steel Construction, Ninth Edition, 1989
: 3. American Welding Society (AWS)
: a. D1.1, Structural Welding Code
: b. D14.1, Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment
: 4. Crane Manufacturers Association of America, Specification No. 70, Specification for Electric Overhead Traveling Cranes
: 5. American Society of Non-Destructive Testing - SNT-TC-1A (1980), Recommended Practice for Non-Destructive Testing, Personnel Qualification and Certification
: 6. American Society for Testing and Materials (ASTM)
: a. A36, Specification for Carbon Structural Steel
: b. A48, Standard Specification for Gray Iron Castings
: c. A108, Specification for Steel Bars, Carbon, Cold-Finished, Standard Quality
: d. A148, Specification for Steel Castings, High-Strength for Structural Purposes
: e. A325, Specification for Structural Bolts, Steel, Heat Treated for Structural Steel Joints
: f. A434, Specification for Steel Bars, Alloy, Hot-Wrought or Cold-Finished, Quenched and Tempered
: g. A490, Specification for Heat Treated Steel Structural Bolts
: h. A514, Specification for High Yield Strength Quench and Tempered Alloy Steel Plate Suitable for Welding
: i. A576, Specification for Steel Bars, Carbon, Hot-Wrought Special Quality
: j. A668, Specification for Steel Forgings, Carbon and Alloy for General Industrial Use
: k. A730, Specification for Forgings, Carbon and Alloy, for Railway Use
: l. E709, Standard Guide for Magnetic Particle Examination
: 7. Code of Federal Regulations, Title 29, Part 1910, Occupational Safety and Health Standards
 
Revision 806/14  North Anna ISFSI SAR  4-26 Figure 4-1 ISFSI SITE PLAN
 
Revision 806/14            North Anna ISFSI SAR  4-30 Figure 4-5 ISFSI STORAGE PAD DETAILS
 
Revision 806/14                          North Anna ISFSI SAR 4-31 Figure 4-6 IMAGES-3D MODEL OF STORAGE PAD GEOMETRY
 
Revision 806/14                        North Anna ISFSI SAR 4-32 Figure 4-7 SASSI MODEL OF STORAGE PAD GEOMETRY
 
Revision 806/14  North Anna ISFSI SAR  4-33 Figure 4-8 SASSI CASK MODEL
 
Revision 806/14          North Anna ISFSI SAR  4-34 Figure 4-9 SASSI PAD PLATE ELEMENTS
 
Revision 806/14            North Anna ISFSI SAR  4-35 Figure 4-10 SLIDING FACTORS OF SAFETY
 
Revision 806/14                North Anna ISFSI SAR  4-36 Figure 4-11 OVERTURNING FACTORS OF SAFETY
 
Revision 806/14              North Anna ISFSI SAR 4-37 Figure 4-12 TRANSPORTER DESIGN
 
Figure 4-14 FUEL AND DECONTAMINATION BUILDINGS SIDE VIEW Revision 806/14 North Anna ISFSI SAR 4-39
 
Revision 806/14              North Anna ISFSI SAR 4-40 Intentionally Blank
 
Revision 806/14                                      North Anna ISFSI SAR                      5-1 Chapter 5        STORAGE SYSTEM OPERATIONS This chapter describes the operations associated with the North Anna ISFSI. As indicated in previous chapters, the North Anna ISFSI is a totally passive installation, requiring no actions or maintenance for its proper functioning. The operations described in this chapter relate to the loading and preparation of the SSSCs and their transfer to the ISFSI. Also described is the transfer of the SSSCs from the ISFSI and unloading operations.
5.1 OPERATION DESCRIPTION 5.1.1 Narrative Description 5.1.1.1 Loading Operations The loading of the SSSCs takes place within the North Anna Power Station Fuel and Decontamination Buildings. These operations are similar to the loading of transport casks, as described in Section 9.1 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR). An update to the North Anna Power Station UFSAR will address the loading and unloading of the SSSCs in the Fuel and Decontamination Buildings. These operations are conducted in a manner that ensures that the capability to safely operate Units 1 and 2 is not jeopardized. Handling of the SSSCs inside the Fuel and Decontamination Building is performed in accordance with the operating license for the North Anna Power Station under 10 CFR 50.
The cask loading operation begins with the receipt and inspection of an empty SSSC outside the Decontamination Building. A two-point lift beam is attached to the 125-ton crane and placed on the upper trunnions of the SSSC. The SSSC is rotated to a vertical position, lifted from the shipping frame, moved over the Decontamination Building and through a roll-up door, and lowered into the preparation area in the north bay of the Decontamination Building. The SSSC lid is removed and inspected. The fuel basket is also visually inspected for foreign material. The lid is attached to the 10-ton auxiliary crane and all seals are replaced.
Once prepared, the SSSC is lifted from the north bay and moved to the cask loading area, with the lid still attached to the 10-ton crane. The SSSC is lowered into the deep end of the cask loading area and the lift beam detached. Fuel assemblies are loaded into the SSSC using a long handling tool suspended from the spent fuel bridge crane hoist. An underwater camera is used to verify the proper placement of the fuel assemblies in the SSSC. After the SSSC is loaded with spent fuel, the lid is placed on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface, the lid bolts are installed and water is pumped from the fuel cavity.
The SSSC is lifted from the cask loading area, moved to the north bay, and is lowered into the bay.
In the north bay, the lid bolts are tightened according to vendor specifications. Vacuum drying of the fuel cavity is completed and tested. The cavity is backfilled with helium to design pressure, and the lid seals are tested. All exterior surfaces of the SSSC are decontaminated.
 
Revision 806/14                                      North Anna ISFSI SAR                        5-2 Additional lids, if any, are installed and the pressure monitoring system is installed and tested. If appropriate, the weather cover is installed. Surface radiation dose measurements are then completed. When all preparations have been completed, the SSSC is lifted from the north bay and placed on the concrete surface outside of the Decontamination Building.
The SSSC is lifted by the transporter for transfer to the ISFSI. The routes followed by the transporter from the Decontamination Building to the ISFSI are shown on Figure 4-4. This figure also shows the location of all nearby systems and structures needed for the safe shutdown of Units 1 and 2. Drop of an SSSC while in transit to the ISFSI will not result in damage to any of these systems and structures, nor in radioactive releases in excess of the guidelines in 10 CFR 100. As indicated in Section 3.3.1, the design criteria require that the SSSC maintain its integrity, preclude physical damage to the fuel, and ensure sub-criticality following a 15-inch drop. Operating procedures will limit the lifting heights to less than 15 inches once the SSSC is lifted by the transporter.
The pressure monitoring device on the SSSC must be connected to the monitoring panel after the SSSC is placed on the ISFSI pad.
5.1.1.2 Unloading Operations Unloading of an SSSC begins with disconnecting the pressure monitoring device on the SSSC from the monitoring panel and transporting the SSSC along the same route used for its placement at the ISFSI. Once the transporter and SSSC are outside the Decontamination Building, the SSSC is lowered to the concrete surface beneath the 125-ton crane. The SSSC is lifted using the lift beam and moved to the north bay of the Decontamination Building. A sample of the helium in the fuel cavity is tested for indications of fuel failure (Kr85). If this test indicates that failed fuel is present in the SSSC, the fuel cavity is evacuated to the Decontamination Building ventilation system described in Chapter 6, and refilled with helium. This process of sampling, evacuating and refilling is continued until helium sample tests are acceptable.
The lid bolts are then loosened and the SSSC is lifted from the north bay and moved to the cask loading area. The SSSC is lowered into the deep end of the cask loading area until the top of the cask is level with the spent fuel bridge crane platform. A water supply, with flow indicator, is attached to the SSSC reflood valve and water is slowly added to the fuel cavity. Flooding of the cask cavity takes at least 3 hours. When the cavity is full, the lid bolts are removed, the SSSC is lowered to the bottom of the cask loading area, and the lift beam is detached. The lid is slowly removed from the SSSC, lifted from the pool and placed at its designated laydown area. Fuel assemblies are then removed from the SSSC using a long handling tool suspended from the spent fuel bridge crane hoist. After the SSSC is unloaded, the lid is placed back on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface and water is pumped from the fuel cavity.
The SSSC is then returned to the north bay for decontamination of the inner and outer surfaces.
The SSSC is then returned to the north bay for decontamination of the inner and outer surfaces.
Revision 8-06/14 North Anna ISFSI SAR 5-3None of the operations needed to lo ad or unload the SSSCs at the North Anna ISFSI will result in unacceptable damage to the North Anna Power Station Units 1 and 2, or to the stored spent fuel.
5.1.2 FlowsheetsTable 5-1 shows a general sequence of operations to load and transport an SSSC to the ISFSI. Table 5-2 shows the general sequence of operati ons for unloading an SSSC. Operations more specific to a particular ve ndor's SSSCs are outlined in the vendor's SSSC Topical Safety Analysis Report.
These operations are performed in accordance with procedures addressing health physics and handling of the SS SCs. They also fulfill the surveillance requirements specified in Chapter 10.5.1.3 Identification of Subjects for Sa fety and Reliability Analysis 5.1.3.1 Criticality PreventionThe design criteria specified in Section 3.3.4 require that spent fuel stored at the North Anna ISFSI be maintained subcritical at al l times. The specific means by which the SSSCs comply with this criterion ar e described in the SSSC Topical Safety An alysis Reports or Appendix A.5.1.3.2 InstrumentationDue to the totally passive and inherently safe nature of the SSSCs, there is no need for an y instrumentation to perform safety functions. It is desirable, however, to monitor the performance of some or all of the SSSCs. Accordingly, the design criteria described in Section 3.3.3 require that the SSSCs have adequate provisions for the installation and testing of monitors.
The parameters to be monito red will be selected based on recommendations made by the SSSC manufacturers, experience gained with specific SSSC desi gns, and other engineering and health physics considerations. Instrumentation provisions for the SSSC s are described in the SSSC Topical Safety Analysis Reports.Although these instruments are not safety related, commitments for their installation, inspection, and replacement (i f needed) are proposed in Section 10.2.Actions to be taken when moni tored parameters exceed preset levels are described in Section 4.4.5.3.5.1.3.3 Maintenance TechniquesBecause of their passive nature, the SSSCs re quire little, if any, maintenance over the lifetime of the ISFSI. No majo r maintenance tasks are required. Typical maintenance tasks would involve occasional replacement of monitoring instrumentation, recoating of some SSSCs with Revision 8-06/14 North Anna ISFSI SAR 5-4 corrosion-inhibiting coatings, minor road and drainage ditch repairs, and minor maintenance of security systems. No special ma intenance techniques are necessary
.Specific maintenance recommendations for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.
In addition to ISFSI maintenance and SSSC mainte nance, a visual surv ei llance of the ISFSI will be performed on a pe riodic basis to determine that no significant accumulation of debris on or near SSSC surfaces has occurred.
5.2 CONTROL ROOM AND CONTROL AREAS The North Anna ISFSI does not require continuous surv eillance by the operations staff or operator actions, even during postula ted accidents. Therefore, a contro l room or control area is not considered necessary.Local panels at the ISFSI site provide an an nunciator alarm if the value of a monitored parameter exceeds an alarm setpoint. The local panels indicate the SSSC that requires operator attention. Provisions have been made to allow for two alarms per SSSC at the local panels.If an alarm signal is received at the alarm panel, an alarm is also transmitted to the Station Security Central Alarm and Secondary Alarm Stat ions. Security personnel continuously monitor these stations and they would notify the Shift Man ager for a response. Personnel first determine that an electronic fault at the al arm panel is not causing the alarm. If no electronic fault is found and an alarm signal is being received from an SSSC, the pressure switch for this SSSC is checked for proper function. If the pressure switch has fa iled, it is replaced. If the pressure switch is functioning properly, a seal leak is occurring, and the SS SC is returned to the Decontamination Building for repairs.


5.3 SPENT FUEL ACCOUNTABILITY PROGRAM Accountability and control of sp ecial nuclear materials will be maintained at all times during the loading, transport, an d storage of spent fuel assemblie
Revision 806/14                                      North Anna ISFSI SAR                      5-3 None of the operations needed to load or unload the SSSCs at the North Anna ISFSI will result in unacceptable damage to the North Anna Power Station Units 1 and 2, or to the stored spent fuel.
: s. Accountability records for all fuel assemblies transfe rred to, stored in or rem oved from the ISFSI will be maintained for as long as the fuel assemblies are stored on the North Anna site.Material status reports shall be complete d and subm itted to the NRC, as specified in 10 CFR 72.76. Nuclear material stored at the ISFSI will not be transferr ed from Virginia Power to other ownership, therefore, Nuclear Material Transaction Reports (DOE/NRC Form-741) required by 10 CFR 72.78 will not be needed. The North Anna ISFSI will be treated as a separate material balance area of the North Anna Power Station.Records showing the transfer of spent fuel between the sp ent fuel storage pool and the ISFSI shall be maintained in accordance with the administrative procedure that provides for control of nuclear material.
5.1.2 Flowsheets Table 5-1 shows a general sequence of operations to load and transport an SSSC to the ISFSI. Table 5-2 shows the general sequence of operations for unloading an SSSC. Operations more specific to a particular vendors SSSCs are outlined in the vendors SSSC Topical Safety Analysis Report.
Revision 8-06/14 North Anna ISFSI SAR 5-5 5.4 SPENT FUEL TRANSPORTThe transporter to be used to move the SSSCs between the Decont amination Building and the ISFS I is described in Section 4.3. A tow vehicle, such as a diesel tr actor, will be used to move the transporter.Each SSSC will be lifted by the transporter outside the Decontam ination Building. The transporter will then be to wed to either the west gate or the south east gate of the protected area fence. Beyond each gate, an asphalt road is used to the ISFSI site.The plan and profile of the ISFSI site access road is shown in Figure 5-1.
These operations are performed in accordance with procedures addressing health physics and handling of the SSSCs. They also fulfill the surveillance requirements specified in Chapter 10.
Revision 8-06/14 North Anna ISFSI SAR 5-6Table 5-1GENERAL SEQUENCE OF LOADING OPERATIONS a1.Unload empty SSSC from rail car.2.Move SSSC inside Decontamination Building.3.Remove weather cover and inspect for shipping damage.4.Remove lid(s) and inspect the following for damage: exterior surfaces, sealing surfaces, trunnions, accessible interior surfaces and basket assembly, bolts, and bolt holes and threads.5.Replace lid seals.6.Move SSSC to cask loading area.7.Lower SSSC into cask loading area.
5.1.3 Identification of Subjects for Safety and Reliability Analysis 5.1.3.1 Criticality Prevention The design criteria specified in Section 3.3.4 require that spent fuel stored at the North Anna ISFSI be maintained subcritical at all times. The specific means by which the SSSCs comply with this criterion are described in the SSSC Topical Safety Analysis Reports or Appendix A.
8.Load SSSC with preselected spent fuel assemblies using spent fuel handling crane.9.Verify inventory of fuel assemblies loaded into SSSC.10.Place lid on SSSC.
5.1.3.2 Instrumentation Due to the totally passive and inherently safe nature of the SSSCs, there is no need for any instrumentation to perform safety functions. It is desirable, however, to monitor the performance of some or all of the SSSCs. Accordingly, the design criteria described in Section 3.3.3 require that the SSSCs have adequate provisions for the installation and testing of monitors.
11.Lift SSSC to surface and install lid bolts.12.Pump water from the SSSC fuel cavity into cask loading area.13.Raise SSSC from cask loading area and spray exterior with water.14.Return SSSC to Decontamination Building.15.Begin to decontaminate exterior surfaces of SSSC.16.Secure lid with bolts.
The parameters to be monitored will be selected based on recommendations made by the SSSC manufacturers, experience gained with specific SSSC designs, and other engineering and health physics considerations. Instrumentation provisions for the SSSCs are described in the SSSC Topical Safety Analysis Reports.
17.Vacuum dry SSSC cavity and test.18.Fill SSSC cavity with helium and test seals.19.Install pressure monitoring device and test.20.Perform SSSC surface radiation measurements.21.Lift SSSC from Decontamination Buil ding and place on concrete surf ace.22.Lift SSSC with transporter.23.Transport SSSC to ISFSI.24.Connect pressure monitoring de vice to monitoring panel. a.Some steps indicated on this flowsheet may be performed in parallel with other steps.
Although these instruments are not safety related, commitments for their installation, inspection, and replacement (if needed) are proposed in Section 10.2.
Revision 8-06/14 North Anna ISFSI SAR 5-7Table 5-2GENERAL SEQUENCE OF UNLOADING OPERATIONS a1.Disconnect pressure monitoring device.2.Transport SSSC to Decontamination Building.3.Release SSSC from transporter.4.Lift SSSC to Decontamination Building.5.Sample and test helium in fuel cavity.6.Purge helium in fuel cavity, if necessary.7.Loosen lid bolts.8.Lift SSSC from north bay and move to fuel loading area in Fuel Building.9.Lower SSSC into cask loading area and install reflood water supply.10.Reflood fuel cavity with water and remove lid bolts.11.Lower SSSC into cask loading area.12.Remove lid from SSSC and store.
Actions to be taken when monitored parameters exceed preset levels are described in Section 4.4.5.3.
13.Remove fuel assemblies from SSSC.14.Place lid on SSSC.15.Lift SSSC to surface of cask loading area.
5.1.3.3 Maintenance Techniques Because of their passive nature, the SSSCs require little, if any, maintenance over the lifetime of the ISFSI. No major maintenance tasks are required. Typical maintenance tasks would involve occasional replacement of monitoring instrumentation, recoating of some SSSCs with
16.Pump water from the SSSC fuel ca vity into the cask loading area.17.Raise SSSC from cask loading area and spray exterior with water.18.Return SSSC to Decontamination Building.
 
19.Decontaminate interior and exterior surfaces of SSSC.a.Some steps indicated on this flowsheet may be performed in parallel with other steps.  
Revision 806/14                                      North Anna ISFSI SAR                        5-4 corrosion-inhibiting coatings, minor road and drainage ditch repairs, and minor maintenance of security systems. No special maintenance techniques are necessary.
Specific maintenance recommendations for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.
In addition to ISFSI maintenance and SSSC maintenance, a visual surveillance of the ISFSI will be performed on a periodic basis to determine that no significant accumulation of debris on or near SSSC surfaces has occurred.
5.2 CONTROL ROOM AND CONTROL AREAS The North Anna ISFSI does not require continuous surveillance by the operations staff or operator actions, even during postulated accidents. Therefore, a control room or control area is not considered necessary.
Local panels at the ISFSI site provide an annunciator alarm if the value of a monitored parameter exceeds an alarm setpoint. The local panels indicate the SSSC that requires operator attention. Provisions have been made to allow for two alarms per SSSC at the local panels.
If an alarm signal is received at the alarm panel, an alarm is also transmitted to the Station Security Central Alarm and Secondary Alarm Stations. Security personnel continuously monitor these stations and they would notify the Shift Manager for a response. Personnel first determine that an electronic fault at the alarm panel is not causing the alarm. If no electronic fault is found and an alarm signal is being received from an SSSC, the pressure switch for this SSSC is checked for proper function. If the pressure switch has failed, it is replaced. If the pressure switch is functioning properly, a seal leak is occurring, and the SSSC is returned to the Decontamination Building for repairs.
5.3 SPENT FUEL ACCOUNTABILITY PROGRAM Accountability and control of special nuclear materials will be maintained at all times during the loading, transport, and storage of spent fuel assemblies. Accountability records for all fuel assemblies transferred to, stored in or removed from the ISFSI will be maintained for as long as the fuel assemblies are stored on the North Anna site.
Material status reports shall be completed and submitted to the NRC, as specified in 10 CFR 72.76. Nuclear material stored at the ISFSI will not be transferred from Virginia Power to other ownership, therefore, Nuclear Material Transaction Reports (DOE/NRC Form-741) required by 10 CFR 72.78 will not be needed. The North Anna ISFSI will be treated as a separate material balance area of the North Anna Power Station.
Records showing the transfer of spent fuel between the spent fuel storage pool and the ISFSI shall be maintained in accordance with the administrative procedure that provides for control of nuclear material.
 
Revision 806/14                                       North Anna ISFSI SAR                     5-5 5.4 SPENT FUEL TRANSPORT The transporter to be used to move the SSSCs between the Decontamination Building and the ISFSI is described in Section 4.3. A tow vehicle, such as a diesel tractor, will be used to move the transporter.
Each SSSC will be lifted by the transporter outside the Decontamination Building. The transporter will then be towed to either the west gate or the south east gate of the protected area fence. Beyond each gate, an asphalt road is used to the ISFSI site.
The plan and profile of the ISFSI site access road is shown in Figure 5-1.
 
Revision 806/14                                           North Anna ISFSI SAR                 5-6 Table 5-1 GENERAL SEQUENCE OF LOADING OPERATIONSa
: 1. Unload empty SSSC from rail car.
: 2. Move SSSC inside Decontamination Building.
: 3. Remove weather cover and inspect for shipping damage.
: 4. Remove lid(s) and inspect the following for damage: exterior surfaces, sealing surfaces, trunnions, accessible interior surfaces and basket assembly, bolts, and bolt holes and threads.
: 5. Replace lid seals.
: 6. Move SSSC to cask loading area.
: 7. Lower SSSC into cask loading area.
: 8. Load SSSC with preselected spent fuel assemblies using spent fuel handling crane.
: 9. Verify inventory of fuel assemblies loaded into SSSC.
: 10. Place lid on SSSC.
: 11. Lift SSSC to surface and install lid bolts.
: 12. Pump water from the SSSC fuel cavity into cask loading area.
: 13. Raise SSSC from cask loading area and spray exterior with water.
: 14. Return SSSC to Decontamination Building.
: 15. Begin to decontaminate exterior surfaces of SSSC.
: 16. Secure lid with bolts.
: 17. Vacuum dry SSSC cavity and test.
: 18. Fill SSSC cavity with helium and test seals.
: 19. Install pressure monitoring device and test.
: 20. Perform SSSC surface radiation measurements.
: 21. Lift SSSC from Decontamination Building and place on concrete surface.
: 22. Lift SSSC with transporter.
: 23. Transport SSSC to ISFSI.
: 24. Connect pressure monitoring device to monitoring panel.
: a. Some steps indicated on this flowsheet may be performed in parallel with other steps.
 
Revision 806/14                                           North Anna ISFSI SAR             5-7 Table 5-2 GENERAL SEQUENCE OF UNLOADING OPERATIONSa
: 1. Disconnect pressure monitoring device.
: 2. Transport SSSC to Decontamination Building.
: 3. Release SSSC from transporter.
: 4. Lift SSSC to Decontamination Building.
: 5. Sample and test helium in fuel cavity.
: 6. Purge helium in fuel cavity, if necessary.
: 7. Loosen lid bolts.
: 8. Lift SSSC from north bay and move to fuel loading area in Fuel Building.
: 9. Lower SSSC into cask loading area and install reflood water supply.
: 10. Reflood fuel cavity with water and remove lid bolts.
: 11. Lower SSSC into cask loading area.
: 12. Remove lid from SSSC and store.
: 13. Remove fuel assemblies from SSSC.
: 14. Place lid on SSSC.
: 15. Lift SSSC to surface of cask loading area.
: 16. Pump water from the SSSC fuel cavity into the cask loading area.
: 17. Raise SSSC from cask loading area and spray exterior with water.
: 18. Return SSSC to Decontamination Building.
: 19. Decontaminate interior and exterior surfaces of SSSC.
: a. Some steps indicated on this flowsheet may be performed in parallel with other steps.


Revision 8-06/14 North Anna ISFSI SAR 6-1Chapter 6WASTE MANAGEMENTNo radioactive wastes will be generated during storage of th e SSSCs at the ISFSI or during transport to/from the ISFSI. Radioactive wastes generated during loading operations in the Fuel and Decontamination Buildings will be treated using existing North Anna Power Station radioactive waste control systems as described in Chapter 11 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).Contaminated water from loaded SSSCs will no rmally be drained back into the spent fuel pool with no additional processi ng. A small amount of liquid w aste will result from SSSC decontamination. The decontamination procedure may result in a small amount of detergent/demineralized water mixture being co llected in the Decontamination Building. Liquid wastes in this building are directed to the Fluid Waste Treatment Tank for transfer to the liquid waste disposal system.
Revision 806/14                                   North Anna ISFSI SAR                     6-1 Chapter 6      WASTE MANAGEMENT No radioactive wastes will be generated during storage of the SSSCs at the ISFSI or during transport to/from the ISFSI. Radioactive wastes generated during loading operations in the Fuel and Decontamination Buildings will be treated using existing North Anna Power Station radioactive waste control systems as described in Chapter 11 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).
Potentially contaminated air and helium pu rged from the SSSCs during loading and unloading will be handled by the Fuel and Decontamination Building ventilation systems, as described in Sections 9.4.3 and 9.4.4 of the North Anna Power Station UFSAR. Ventilation air from these buildings may be exhausted through f ilter banks consisting of roughing, particulate and charcoal filters in series.A small quantity of low-le vel solid waste may be ge nerated during SSSC loading operations. This solid waste ma y include disposable anti-contamination garments and plastic sheeting, tape, and ra gs, and will be proc essed as described in Section 11.5 of the North Anna Power Station UFSAR.
Contaminated water from loaded SSSCs will normally be drained back into the spent fuel pool with no additional processing. A small amount of liquid waste will result from SSSC decontamination. The decontamination procedure may result in a small amount of detergent/demineralized water mixture being collected in the Decontamination Building. Liquid wastes in this building are directed to the Fluid Waste Treatment Tank for transfer to the liquid waste disposal system.
Revision 8-06/14 North Anna ISFSI SAR 6-2 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 7-1Chapter 7RADIATION PROTECTION 7.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA)7.1.1Policy Considerations and Organization A radiological protectio n program will be impl emented at th e North Anna ISFSI in accordance with the requirements of 10 CFR 72.126. The program will be based on policies in existence at the North Anna Power Station, which are described below.The management policies, organizational stru cture and program criteria for maintaining e xposures ALARA at the North Anna ISFSI are the same as for the North Anna Power Station, and are collectively referred to as the Virginia Power ALARA Program. The Virginia Power ALARA Program is an impor tant part of the North Anna Power Station ra diation protection program. The basic principles of the Virginia Power ALARA Program are described in Virginia Power administrative procedures and are implemented by health physics technical procedures.
Potentially contaminated air and helium purged from the SSSCs during loading and unloading will be handled by the Fuel and Decontamination Building ventilation systems, as described in Sections 9.4.3 and 9.4.4 of the North Anna Power Station UFSAR. Ventilation air from these buildings may be exhausted through filter banks consisting of roughing, particulate and charcoal filters in series.
The North Anna Power Station ALARA program complies with 10 CFR 20.1101, Radiation Protection Programs, and is consistent with the guidance of Regulatory Guide 8.8 (June 1978), Information Relevant to Ensuring That Occupational Radiation Exposures at Nuclear Power Stations Will Be As Low As Reasonably Achievable.
A small quantity of low-level solid waste may be generated during SSSC loading operations. This solid waste may include disposable anti-contamination garments and plastic sheeting, tape, and rags, and will be processed as described in Section 11.5 of the North Anna Power Station UFSAR.
The station ALARA program includes the following aspects:Specific individuals are assigne d responsibility for, and authority to implement the station ALARA Program consistent with Virginia Power policy. These individuals include the station ALARA coordinator and de partment ALARA coordinators.A Station ALARA Committee ha s been established with th e responsibility for overall coordination of the station ALARA Program and for advising the Station Management on matters relating to ALARA. A member of station management chairs the Committee.Pre-job measures are required to implement the station ALARA philosophy. These include ALARA evaluations of proposed work, pre-job meetings, and tiered levels of review based on projected expended person-rem.Monitoring and control of ongoing work is accomplished by the es tablishment of an exposure tracking system, ALARA hold points, and ALARA Radiation Work Permit (RWP) re-evaluation meetings.Completed work is evaluated via post-job reviews, maintena nce of job history files and periodic process reviews of selected work evolutions.A temporary shielding program has been established.An ALARA suggestion system is maintained to solicit, evaluate, and reward employee ideas that save person-rem.
 
Revision 8-06/14 North Anna ISFSI SAR 7-2Engineering design change packages receive an ALARA review prior to implementation.A system has been established to actively in volve, guide, and monito r the performance of the station and individual departments toward meeting ALARA objectives.
Revision 806/14               North Anna ISFSI SAR 6-2 Intentionally Blank
The location of the ISFSI within the North Anna Power Station site allows the health physics facilities, equipment and personnel to be readily available at a ll times to ensure that ALARA considerations are met. The ISFSI is located a sufficient distance from buildings and occupied spaces to minimize total personnel exposure.Regulatory Guide 8.10 (May 1977), Operating Philosophy for Maintaining Occupational Radiation Exposures As Low As Reasonably Achievable, Regulatory Position 1, concerning management commitment to minimizing exposures, is addressed by Virginia Power administrative procedures. Regulatory Position 2, concerning radiation pr otection staf f vigilance in ALARA matters, is addressed and implemented by Virginia Power administrative procedures and health physics t echnical procedures.The health physics organization is describ ed in an administrat ive procedure. The organization to maintain exposures ALARA is also described in Virginia Power administrative procedures. The Station ALARA Committee is a major part of that organization. An administrative procedure also lists North Anna Power Station health physics administrative procedures by functional grouping. These proce dures are also applicable to the North Anna ISFSI.The guidance of Re gulatory Position 2 of Regulatory Guide 8.8 (June 1978) is followed as described in Section 7.1.2. The guidance of Regulatory Guide 8.10 (May 1977) is followed as described in this section.Virginia Power personnel qualifications and experi ence are considered more than sufficient for operation of the North Anna ISFSI since these personnel have gained considerable e xperience at the North Anna Power Station. An ad ministrative procedure provides the functional responsibilities and reporting relationships of the members of the health physics organization and the personnel qualification requirements for positions in the station health physics organization.
 
Health physics equipmen t, instrumentation, and f acilities for the North Anna ISFSI will be those of the North Anna Power Station. Radiation survey s with portable instruments will be performed during surv eillance of the SSSCs and other activities at the ISFSI. Portable instruments required for measuring dose rates and radiation characteristics are maintained in accordance with approved health physics procedures.
Revision 806/14                                     North Anna ISFSI SAR                       7-1 Chapter 7        RADIATION PROTECTION 7.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 7.1.1 Policy Considerations and Organization A radiological protection program will be implemented at the North Anna ISFSI in accordance with the requirements of 10 CFR 72.126. The program will be based on policies in existence at the North Anna Power Station, which are described below.
As indicated in Section 7.2.2 , respiratory protection equipment will not be needed at the North Anna ISFSI.Radiation protection facilities, instrumentation, and equipment available at the North Anna Po wer Station are similar to that described by Regu latory Position 4 of Regulatory Guide 8.8 Revision 8-06/14 North Anna ISFSI SAR 7-3 (June 1978). These include count room equipment, portable instruments, personnel monitoring instruments, protective equipment, and their associated support facilities.
The management policies, organizational structure and program criteria for maintaining exposures ALARA at the North Anna ISFSI are the same as for the North Anna Power Station, and are collectively referred to as the Virginia Power ALARA Program. The Virginia Power ALARA Program is an important part of the North Anna Power Station radiation protection program. The basic principles of the Virginia Power ALARA Program are described in Virginia Power administrative procedures and are implemented by health physics technical procedures.
The North Anna Power Station ALARA program complies with 10 CFR 20.1101, Radiation Protection Programs, and is consistent with the guidance of Regulatory Guide 8.8 (June 1978), Information Relevant to Ensuring That Occupational Radiation Exposures at Nuclear Power Stations Will Be As Low As Reasonably Achievable. The station ALARA program includes the following aspects:
* Specific individuals are assigned responsibility for, and authority to implement the station ALARA Program consistent with Virginia Power policy. These individuals include the station ALARA coordinator and department ALARA coordinators.
* A Station ALARA Committee has been established with the responsibility for overall coordination of the station ALARA Program and for advising the Station Management on matters relating to ALARA. A member of station management chairs the Committee.
* Pre-job measures are required to implement the station ALARA philosophy. These include ALARA evaluations of proposed work, pre-job meetings, and tiered levels of review based on projected expended person-rem.
* Monitoring and control of ongoing work is accomplished by the establishment of an exposure tracking system, ALARA hold points, and ALARA Radiation Work Permit (RWP) re-evaluation meetings.
* Completed work is evaluated via post-job reviews, maintenance of job history files and periodic process reviews of selected work evolutions.
* A temporary shielding program has been established.
* An ALARA suggestion system is maintained to solicit, evaluate, and reward employee ideas that save person-rem.
 
Revision 806/14                                     North Anna ISFSI SAR                     7-2
* Engineering design change packages receive an ALARA review prior to implementation.
* A system has been established to actively involve, guide, and monitor the performance of the station and individual departments toward meeting ALARA objectives.
The location of the ISFSI within the North Anna Power Station site allows the health physics facilities, equipment and personnel to be readily available at all times to ensure that ALARA considerations are met. The ISFSI is located a sufficient distance from buildings and occupied spaces to minimize total personnel exposure.
Regulatory Guide 8.10 (May 1977), Operating Philosophy for Maintaining Occupational Radiation Exposures As Low As Reasonably Achievable, Regulatory Position 1, concerning management commitment to minimizing exposures, is addressed by Virginia Power administrative procedures. Regulatory Position 2, concerning radiation protection staff vigilance in ALARA matters, is addressed and implemented by Virginia Power administrative procedures and health physics technical procedures.
The health physics organization is described in an administrative procedure. The organization to maintain exposures ALARA is also described in Virginia Power administrative procedures. The Station ALARA Committee is a major part of that organization. An administrative procedure also lists North Anna Power Station health physics administrative procedures by functional grouping. These procedures are also applicable to the North Anna ISFSI.
The guidance of Regulatory Position 2 of Regulatory Guide 8.8 (June 1978) is followed as described in Section 7.1.2. The guidance of Regulatory Guide 8.10 (May 1977) is followed as described in this section.
Virginia Power personnel qualifications and experience are considered more than sufficient for operation of the North Anna ISFSI since these personnel have gained considerable experience at the North Anna Power Station. An administrative procedure provides the functional responsibilities and reporting relationships of the members of the health physics organization and the personnel qualification requirements for positions in the station health physics organization.
Health physics equipment, instrumentation, and facilities for the North Anna ISFSI will be those of the North Anna Power Station. Radiation surveys with portable instruments will be performed during surveillance of the SSSCs and other activities at the ISFSI. Portable instruments required for measuring dose rates and radiation characteristics are maintained in accordance with approved health physics procedures.
As indicated in Section 7.2.2, respiratory protection equipment will not be needed at the North Anna ISFSI.
Radiation protection facilities, instrumentation, and equipment available at the North Anna Power Station are similar to that described by Regulatory Position 4 of Regulatory Guide 8.8
 
Revision 806/14                                       North Anna ISFSI SAR                     7-3 (June 1978). These include count room equipment, portable instruments, personnel monitoring instruments, protective equipment, and their associated support facilities.
The guidance for testing, rejection criteria, and use in mixed radiation fields being followed for the dosimeters at the North Anna Power Station will be used at the North Anna ISFSI.
The guidance for testing, rejection criteria, and use in mixed radiation fields being followed for the dosimeters at the North Anna Power Station will be used at the North Anna ISFSI.
The bioassay program in us e for personnel at the North Anna Power Station will also apply to the North Anna ISFSI.
The bioassay program in use for personnel at the North Anna Power Station will also apply to the North Anna ISFSI.
The methods and procedures for conduc ting radiation surveys at the North Anna ISFSI will comply with the approved he alth physics procedures in effect at the North Anna Power Station.This section describes the health physics and ALARA procedures and planning for the No rth Anna Power Station which will be used at the ISFSI. The complete details are in the applicable Virginia Power station and departmental administrative procedures and health physics technical procedures.The radiological respirato ry protection program is outlined in Virginia Power administrative procedures and implemented by health physics technical procedures.
The methods and procedures for conducting radiation surveys at the North Anna ISFSI will comply with the approved health physics procedures in effect at the North Anna Power Station.
Access control will be accompl ished by means of a perimeter fence with locked gates surrounding the North Anna ISFSI. Control of the keys w ill be in accordance with security and health physics polic ies and procedures.
This section describes the health physics and ALARA procedures and planning for the North Anna Power Station which will be used at the ISFSI. The complete details are in the applicable Virginia Power station and departmental administrative procedures and health physics technical procedures.
The bases and methods for monitoring and co ntrolling personnel, equipment and surf ace contamination control, and radiat ion protection training program content are described in Virginia Power administrative procedures and health physics technical procedures.The guidance provided by Re gulatory Guide 8.10 (May 1977) will be foll owed as described in this section and Section 7.1.3. The guidance of Regulatory Guide 8.15 (October 1976), Acceptable Programs for Respiratory Protection, will be followed as d escribed in this Section. There should be no need for bioassay of personnel after surveillance activities at the North Anna ISFSI. There should also be no need for ra diological respiratory protection equipment.
The radiological respiratory protection program is outlined in Virginia Power administrative procedures and implemented by health physics technical procedures.
Personnel dosimetry used at the North Anna ISFSI will be co ntrolled by the external dosimetry program approved for the North Anna Power Station.
Access control will be accomplished by means of a perimeter fence with locked gates surrounding the North Anna ISFSI. Control of the keys will be in accordance with security and health physics policies and procedures.
An ALARA feedback mechanism using dosimeter results for preplanning future tasks is included in Virginia Power administrative procedures and their implementing documents.
The bases and methods for monitoring and controlling personnel, equipment and surface contamination control, and radiation protection training program content are described in Virginia Power administrative procedures and health physics technical procedures.
The criteria for performing routine and non-routine whole-body counting and bioassay are contained in Virginia Power administrative pro cedures and health physi cs technical procedures for the North Anna Power Station. Methods and proced ures for evaluating and controlling airborne radioactive material are also given in these procedures.Respiratory protection program requirements, equipment use and maintenance guidance, and fit testing protocol are delineated in Virginia Power administrative procedures and health Revision 8-06/14 North Anna ISFSI SAR 7-4physics technical procedures. Ra diological respiratory protect ion training is conducted in accordance with Nuclear Trai ning Department procedures.7.1.2Design Considerations The North Anna ISFSI has been located in an area adjacent to the Stati on main access road.
The guidance provided by Regulatory Guide 8.10 (May 1977) will be followed as described in this section and Section 7.1.3. The guidance of Regulatory Guide 8.15 (October 1976),
This location was chosen based on several considerations, including ALARA, as follows:1.The ISFSI is centrally located within the North Anna Power Station site boundary, thus minimizing off-site exposures.2.The ISFSI is sufficiently distant from buil dings and occupied spa ces to minimize dose to station personnel.The layout of the ISFSI is designed to min imize personnel exposures. The SSSCs will be stored with sufficient separation between them to allow adeq uate personnel access between the SSSCs for surveillance and handling operations.
Acceptable Programs for Respiratory Protection, will be followed as described in this Section.
The equipment design considerations are ALARA since the fuel will be stored dry , inside heavily-shielded SSSCs. The heavy shielding will minimize personnel e xposures. The required maintenance and surveillance of the SSSCs will be minimal and therefore ALARA. Additionally, the SSSCs will not be opened nor will fuel be removed from the SSSCs while at the ISFSI.
There should be no need for bioassay of personnel after surveillance activities at the North Anna ISFSI. There should also be no need for radiological respiratory protection equipment.
Storage of the fuel in dry SSSCs eliminates the possibility for re lease of contaminated liquids.
Personnel dosimetry used at the North Anna ISFSI will be controlled by the external dosimetry program approved for the North Anna Power Station. An ALARA feedback mechanism using dosimeter results for preplanning future tasks is included in Virginia Power administrative procedures and their implementing documents.
Gaseous releases are also not considered credible. The exte rior of the SSSCs will be decontaminated before being plac ed at the ISFSI. There will be no contaminated equipment at the ISFSI, so there will be no potential fo r personnel contamination at the ISFSI.Guidance provided by Regulatory Guide 8.8 (June 1978), Regulatory Position 2, which concerns design considerations, is being addressed as follows:1.Regulatory Position 2.a concerning access control is met by use of a perimeter fence with locked gates that surrounds the ISFSI and prevents unauthorized access.2.Regulatory Position 2.b concerning radiation shielding is met by the hea vy shielding of the SSSCs which minimizes personnel exposures.3.Regulatory Position 2.c concerning process instrumentation and controls is not applicable since there are no radioactive sy stems at the ISFSI. No process controls are re quired at the ISFSI. However, there may be minor exposure attributed to monitoring instrument testing and replacement.4.Regulatory Position 2.d concerning control of airborne contaminants is not applicable because no gaseous releases are expected. No significant surface contamination is expected because the exterior of the SSSCs will be d econtaminated before being placed at the ISFSI.5.Regulatory Position 2.e concerning crud control is not appl icable to th e ISFSI because there are no radioactive systems at the ISFSI that could transport crud.
The criteria for performing routine and non-routine whole-body counting and bioassay are contained in Virginia Power administrative procedures and health physics technical procedures for the North Anna Power Station. Methods and procedures for evaluating and controlling airborne radioactive material are also given in these procedures.
Revision 8-06/14 North Anna ISFSI SAR 7-56.Regulatory Position 2.f concerning decontamination is met because the exteriors of the SSSCs are decontaminated before being placed at the ISFSI.7.Regulatory Position 2.g concerning radiation monitori ng is met because the SSSCs are sealed. There is no need for airborne radioactive material monitoring since no airborne radioactive material is anticipa ted. Area radiation monitors wi ll not be requi red because the ISFSI will not normally be occupied; however, thermoluminescent devices will be installed along the ISFSI perimeter fence. Portable survey meters will normally be used for work performed near or on the storag e pads. Personnel dosimetry will be used at all times. An RWP will be required for any entry into the ISFSI.8.Regulatory Position 2.h concerning resin and sludge treatment systems is not applicable to the ISFSI because there will not be an y radioactive systems contai ning resins or sludges.9.Regulatory Position 2.i concerning other miscellaneous ALARA items is not applicable because these items refer to radioactive systems not present at the North Anna ISFSI.7.1.3Operational ConsiderationsThe ALARA procedures for the IS FSI will be the same as those used in the health physics program for the North Anna Power Station.
Respiratory protection program requirements, equipment use and maintenance guidance, and fit testing protocol are delineated in Virginia Power administrative procedures and health
Section 7.1.1 describes the policy and procedures that ensure that ALARA occupational exposures and contamination le vels are achieved.
 
Section 7.1.2 describes how the design considerations are ALARA.Storage of spent fuel in SSSCs is expected to involve lower exposures than other methods or designs for onsite storage. For example, storage in a fuel pool would involve the use of contaminated water cooling and cleanup systems, and filtered heating, ventilation and air conditioning. There would be higher operator exposures due to pump, valve, and motor maintenance of these systems, and fi lter and resin replacement. This alternative would also lead to additional airborne and liquid releases that will not occur at the North Anna ISFSI.
Revision 806/14                                     North Anna ISFSI SAR                   7-4 physics technical procedures. Radiological respiratory protection training is conducted in accordance with Nuclear Training Department procedures.
The count room, portable instruments, pers onnel monitoring ins truments, protective equipment, and support fac ilities similar to those described in Regulatory Position 4 of Re gulatory Guide 8.8 (June 1978) will be provided by the heal th physics facilities and personnel at the North Anna Power Station. Section 7.1.1 provides additional details.
7.1.2 Design Considerations The North Anna ISFSI has been located in an area adjacent to the Station main access road.
Operational requirements for su rveillance are incorporated in to the design considerations described in Section 7.1.2 in that the SSSCs are stored with adequate spacing to allo w ease of surveillance. The operational requirements are inco rporated into the radiation protection design features described in Section 7.3 since the SSSCs are heavily shielded to minimize occupational exposure.The criteria and conditions under which certain ALARA t echniques are implemented to ensure ALARA e xposures and contamination levels are described in Section 7.1.1. ALARA techniques will be implemented at all times.
This location was chosen based on several considerations, including ALARA, as follows:
Revision 8-06/14 North Anna ISFSI SAR 7-6As the potential person-rem per task incre ases, the ALARA techniques emplo yed become more stringent as described in Virginia Power administrative procedures.The ISFSI does not contain any systems that process liquids or g ases or contain, collect, store, or transport radioactive liquids or solids, other than the SSSCs. Th erefore, the ISFSI is ALARA since there are no such systems to be main tained, or repaired, or be a source of leaks.
: 1. The ISFSI is centrally located within the North Anna Power Station site boundary, thus minimizing off-site exposures.
7.2 RADIATION SOURCES7.2.1Characterization of SourcesThe physical characteristics of the fuel used at the North Anna Power Station are summarized in Table 3-1. Typical fuel assembly source data for the fuel used at North Anna is provided in the TN-32 Fina l Safety Anal ysis Report (Reference 1). Descriptions of the fuel which the SSSCs are designed to store are provided in the SSSC T opical Safety Analysis Reports and Appendix A. The exterior surfaces of the SSSCs will be decontaminated prior to transfer to the ISFSI. The fuel will not be removed from the SSSC s nor will the SSSCs be opened while at the ISFSI. There are no radioactive syst ems at the ISFSI. Therefore, the only source of radioactivity will be the direct radiation from the fuel stored inside the SSSCs.7.2.2Airborne Radioactive Material Sources Under normal operation, the radioact ive material sources are safely confined both within the fuel cladding and within the SSSC containment during storage. Surface contamination from the spent fuel pool will be removed prior to storage at the ISFSI. Therefore, provisions for personnel protection measures against airborne sources are not required. A loss of confinement barrier event and subsequent airborne radiation impact is discussed in Section 8.2.10.7.2.3References 1.TN-32 Dry Storage Cask Fi nal Safety Analysis Report, Revision 0, Transnuclear, Inc., January 2000.7.3 RADIATION PROTECTION DESIGN FEATURES7.3.1Storage System Design Description A description of the North Anna ISFSI, including layout and characteristics is pro vided in Section 4.1. Figure 7-1 depicts the ISFSI showing the storag e pads numbered to correspond with the order in which they will be filled.
: 2. The ISFSI is sufficiently distant from buildings and occupied spaces to minimize dose to station personnel.
The ISFSI has a number of d esign features which ensure that e xposures are ALARA:There are no radioactive systems in the ISFSI other than the SSSCsThe SSSCs are loaded, sealed, and decontam inated prior to tr ansfer to the ISFSIThe fuel is not unloaded nor are the SSSCs opened at the ISFSI Revision 8-06/14 North Anna ISFSI SAR 7-7The fuel is stored dry insi de the SSSCs, so that no radio active liquid is available for leakageThe SSSCs are sealed airtightThe SSSCs are heavily shielded to minimize external dose ratesA perimeter fence with locked gates surr ounds the ISFSI to limit access near the SSSCsTypically, the ISFSI will not be occupied, therefore, no personnel areas, equipment decontamination areas, cont amin ation control areas, or health physics facilitie s need to be located at the ISFSI. These types of facilities are available at the North Anna Power Station.7.3.2ShieldingThe SSSC shielding designs are provided in th e SSSC T opical Safety Analysis Re ports. An earth berm was constructed inside the north and east perimeter fe nces of the ISFSI to reduce direct radiation. No other shielding is required.
The layout of the ISFSI is designed to minimize personnel exposures. The SSSCs will be stored with sufficient separation between them to allow adequate personnel access between the SSSCs for surveillance and handling operations.
7.3.2.1 SSSC Surface Dose Rates The gamma and neutron dose ra tes on the SSSC surf ace and their associated energy spectra are dependent on the SSSC design. These dose rates are also dependent on the burnup and initial enrichment of the fuel stored in the SSSCs. Therefore, SSSC-specific analyses have been performed for representative North Anna Power Station fuel. The assumptions used in the SSSC-specific analyses for SSSC surface dose rates and energy spectra are provided in the SSSC Topical Safety Analysis Reports.
The equipment design considerations are ALARA since the fuel will be stored dry, inside heavily-shielded SSSCs. The heavy shielding will minimize personnel exposures. The required maintenance and surveillance of the SSSCs will be minimal and therefore ALARA. Additionally, the SSSCs will not be opened nor will fuel be removed from the SSSCs while at the ISFSI.
The TN-32 SSSC loaded with fuel with an enrichment of 3.50 weight percent U-235, burnup of 45,000 MWD/MTU and cooling time of 7 years has been chosen as the base case for analysis purposes. Using an en richment lo wer than the 4.30 weight percent U-235 approved for the TN-32 yields a bounding isotope inventory, and is in accordance with NUREG-1536 and NRC Interim Staff Guidance.
Storage of the fuel in dry SSSCs eliminates the possibility for release of contaminated liquids.
Source terms for the fuel were calcula ted using the SAS2H/ORIGEN-s module of SCALE4.3 as described in Section 5.1 of Reference 1. These source terms are then passed through a SAS2H cask shield ing model for a 1-dimensional dose assessment. Section 5.2 (Reference 1) describes the source sp ecification and Section 5.3 (Reference 1) describes the shielding analyses performed for the TN-32 cask.In addition to the spent fuel, the TN-32 is ca pable of storing b urnable poison rod assemblies (BPRA) and thimble plug assemblies (TPA). BPRAs and TPAs with combinations of cumulative exposures and cooling times are permissible for storage in the TN-32 cask. The source evaluation of the BPRAs and TPAs is described in Section 5.2 (Reference 1).Dominion conducted an indepe ndent analysis of the TN-3 2 surf ace dose rate using the MCNP Monte Carlo transport code (Reference 2). This analysis was used to form the basis for the Revision 8-06/14 North Anna ISFSI SAR 7-8average cask surface dose rate li mit in the ISFSI Technical Specifications. The average surface dose rates calculated for the TN-32 base case SSSC were 218 mrem/hr (neutron and gamma) for the side surf ace and 58 mrem/hr (neutron and gamma) for the top surface.
Gaseous releases are also not considered credible. The exterior of the SSSCs will be decontaminated before being placed at the ISFSI. There will be no contaminated equipment at the ISFSI, so there will be no potential for personnel contamination at the ISFSI.
7.3.2.2 Dose Rate Versus DistanceAnalyses have been completed to determine do se rates at the IS FSI perimeter fence, the site boundary and the nearest permanent resident.
Guidance provided by Regulatory Guide 8.8 (June 1978), Regulatory Position 2, which concerns design considerations, is being addressed as follows:
These analyses were performed using the MCNP Monte Carlo transport code (Reference 2) and the following conservative inputs.1.Isotope inventories were based on 32 fuel assemblies with enrichment of 3.5 weight percent U-235 and b urnup of 45,000 MWD/MTU.2.The three storage pads are filled with 84 TN-32 SSSCs, each pad having 28 SSSCs. Assuming 84 TN-32 SSSCs results in an amount of fu el stored on the pads which exceeds the current licensed limit of 839.04 TeU (approximately 57 TN-32 SSSCs), providing additional conservatism to the analysis.3.The inventory of SSSCs stored in the ISFSI will increase by four SSSCs per year. This average rate of inventory change was used to determine the age of the spent fuel (years after discharge) and the subseque nt reduction in dose rates.4.The effects of irradiated insert com ponents are included in the MCNP analyses.
: 1. Regulatory Position 2.a concerning access control is met by use of a perimeter fence with locked gates that surrounds the ISFSI and prevents unauthorized access.
Figure 7-1 shows the layout of the ISFSI. The MCNP analysis of the dose rate at the ISFSI perimeter fence using base case TN-32 SSSCs resulted in peak dose rates that range from 0.3 to 1.9 mrem/hr when all three pads we re full. The specif ic dose rates for the various points on Figure 7-1 are provided in Table 7-1. Dose rate measurements at the ISFSI perimeter fence will be used to ensure that the requirements of 10 CFR 20 are met.
: 2. Regulatory Position 2.b concerning radiation shielding is met by the heavy shielding of the SSSCs which minimizes personnel exposures.
The MCNP analysis for the nearest site bounda ry indicated that the maximum dose rate at this location was less than 100 mrem/yr, which meets the requirements of 10 CFR 20.1301.The MCNP analysis for the nearest permanent re sident indicated that the contrib ution to the maximum dose rate from the operation of the ISFSI was 2.1 mrem/yr. When combined with the contrib utions from th e operations of North Anna Power Station Units 1 and 2, the result is well belo w the 25 mrem/yr imposed by 10 CFR 72.104(a).7.3.3Area Radiation and Airborne Radioactivity Monitoring Instrumentation As indicated in Section 3.3.5, area radiation and airborne radioactivity monitors are not needed at the North Anna ISFSI. However, thermoluminescen t de vices will be used to record gamma radiation doses at appropriate intervals along the ISFSI peri meter fence. Neutron radiation detection devices may also be used on the ISFSI perimeter fence if they are available and reliable.
: 3. Regulatory Position 2.c concerning process instrumentation and controls is not applicable since there are no radioactive systems at the ISFSI. No process controls are required at the ISFSI. However, there may be minor exposure attributed to monitoring instrument testing and replacement.
Revision 8-06/14 North Anna ISFSI SAR 7-97.3.4References 1.TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear Inc., January 2000.2.Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel for use at the North Anna Power Station Inde pendent Spent Fuel Storage Installation, Dominion Technical Report NE-1311, Revision 0, January 2002.3.MCNP4C, Monte Carlo N-Particle Transport Code System, CCC-700, J. W. Briesmeister, LANL, December 2000.7.4 ESTIMATED ONSITE COLLECTIVE DOSE ASSESSMENTTable 7-2 provides the estimated occupational e xposures to ISFSI personnel during the loading, transport, and em placement of one SSSC. These results are based on the design basis surface dose rates discussed in Section 7.3.2.1. Our experience at the Surry Po wer Station ISFSI indicates that these estimated occupational exposures are very conservative, and that actual occupational exposures for loading, transport and emplacement activiti es are approximately 0.250 person-rem (Reference 1).Table 7-3 provides the estimated annual occupational exposure for ISFSI surveillance and maintenance activities. The design basis surf ace dose rates were uti lized, and it w as assumed that all storage pads were filled with SSSCs. To estimate the dose rates for operab ility tests and calibration, the worker was assu med to be located at the control panel at the perimeter fence vehicle gate entrance. Visual surveillance was based on a walkdown of each of the three storage pads at a distance no closer than 2 meters to the SSSCs. During surface defect repairs, the worker was assumed to be positioned next to an SSSC. The two surrounding SSSCs (all within 16 feet of the worker) are the predominant dose contributors during repair work.To evaluate the additional dose to station pe rsonnel from ISFSI operations, a conservative analysis has been performed using the assumptions given in Section 7.3.2.2 , including annual decay. The dose calculation consid ers all workers at the North Anna Power Station to be in offices, non-shielded buildings, or in the plant yard. This population includes a normal work force of utility and contractor personnel as well as the increased staffing required during outages. As a bounding estimate, the total number of workers assumed was 750 spending a total of 1,560,000 person-hours/year in the North Anna yard area and in offices.The minimum distance between the North Anna Units 1 and 2 protected area fence and the nearest SSSC is approximately 2000 feet. The dose rate from the full y-loaded ISFSI to a location 2000 feet away is 1.83E-03 mrem/hr. The annual dose for station workers due to the fully-loaded ISFSI is calculated to be 3.66 mrem/person or a total annual dose to Station personnel of 2.75 person-rem. The maximu m annual dose of 3.66 mrem/person represents less than 0.1% of the 5 rem annual occupational exposure limit.
: 4. Regulatory Position 2.d concerning control of airborne contaminants is not applicable because no gaseous releases are expected. No significant surface contamination is expected because the exterior of the SSSCs will be decontaminated before being placed at the ISFSI.
Revision 8-06/14 North Anna ISFSI SAR 7-10The total annual occupational exposure during ISFSI loading operations is 14.39 person-rem (see Table 7-4), and represents the maximum e xpected. As indicated previously, the actual occupational exposures for loadi ng, transport, and emplacem ent of an SSSC are approximately 0.25 to 0.5 person-rem per loading. This combined with the North Anna Power Station annual occupational e xposure during ISFSI loading operations (Table 7-4) results in a total annual occupational exposure during ISFSI operations of approximately 4 person-rem. This e xposure represents approximately 5% of the average annual occupational exposure from all operations at the North Anna Power Station.7.4.1References1.C. J. Hostick, J. C. Lavender and B. H. Wakeman, Time and Dose Assessment of Barge Shipment and At-Reactor Handling of a CASTOR V/21 Spent Fuel Storage Cask, Pacific Northwest Laboratory, PNL-7205, April 1992.7.5 OFFSITE COLLECTIVE DOSE ASSESSMENT The site plan for the North Anna ISFSI and its relati ve location to the North Anna Power Station are pro vided in Figure 2-3. The North Anna site within the boundary is the controlled area as defined in 10 CFR 72.Based on projections for year 2000, 354 permanent residents are located within a 2-mile radius of the North Anna site boundary. The nearest perm anent resident is located at 2860 feet from the ISFSI. The maximum annual dose to the nearest resident is 2.10 mrem. Using the conservative assumption that all of the residents within two miles are locate d at the same distance from the ISFSI as the nearest resident, their maximum annual collective dose from the ISFSI would be: 0.00210 rem/year x 354 persons = 0.74 person-rem/year The annual dose to the maxima lly exposed individual from all significant sources at the North Anna Power Station ha s been estimated in Appendix 11B of the North Anna Power Station Updated Final Safety Anal ysis Report (UFSAR) as 3 mrem/yr. Therefore, the maximum combined radiation contrib ution to the nearest permanent resident from the operation of the ISFSI (2.10 mrem/yr) and North Anna Power Station Units 1 and 2 (3.00 mrem/yr) is 5.10 mrem/yr. This is well below the 25 mrem/yr limit imposed by 10 CFR 72.104(a).
: 5. Regulatory Position 2.e concerning crud control is not applicable to the ISFSI because there are no radioactive systems at the ISFSI that could transport crud.
The North Anna ISFSI has no gaseous or liquid ef fluents, therefore, these do not contribute to the dose of nearby residents.Considering the conservatisms in the above ca lculation and the rapid attenuation of neutron and gamma dose rates with distance, the dose fo r the more distant population is ne gligible.
 
Revision 8-06/14 North Anna ISFSI SAR 7-11 7.6 HEALTH PHYSICS PROGRAMThe health physics organizati on and the health physics equi pment associated with operation of the North Anna Power Station are cons idered sufficient for the operation of the ISFSI. The health physics technical proc edures directing routine surveys include ISFSI activities. Thermoluminescent devices are in place along the ISFSI fence for routine monitoring of onsite dose.7.7 ENVIRONMENTAL MONITORING PROGRAM The North Anna Power Station environmental monito ring program is utilized for the ISFSI.
Revision 806/14                                       North Anna ISFSI SAR                   7-5
: 6. Regulatory Position 2.f concerning decontamination is met because the exteriors of the SSSCs are decontaminated before being placed at the ISFSI.
: 7. Regulatory Position 2.g concerning radiation monitoring is met because the SSSCs are sealed. There is no need for airborne radioactive material monitoring since no airborne radioactive material is anticipated. Area radiation monitors will not be required because the ISFSI will not normally be occupied; however, thermoluminescent devices will be installed along the ISFSI perimeter fence. Portable survey meters will normally be used for work performed near or on the storage pads. Personnel dosimetry will be used at all times. An RWP will be required for any entry into the ISFSI.
: 8. Regulatory Position 2.h concerning resin and sludge treatment systems is not applicable to the ISFSI because there will not be any radioactive systems containing resins or sludges.
: 9. Regulatory Position 2.i concerning other miscellaneous ALARA items is not applicable because these items refer to radioactive systems not present at the North Anna ISFSI.
7.1.3 Operational Considerations The ALARA procedures for the ISFSI will be the same as those used in the health physics program for the North Anna Power Station. Section 7.1.1 describes the policy and procedures that ensure that ALARA occupational exposures and contamination levels are achieved. Section 7.1.2 describes how the design considerations are ALARA.
Storage of spent fuel in SSSCs is expected to involve lower exposures than other methods or designs for onsite storage. For example, storage in a fuel pool would involve the use of contaminated water cooling and cleanup systems, and filtered heating, ventilation and air conditioning. There would be higher operator exposures due to pump, valve, and motor maintenance of these systems, and filter and resin replacement. This alternative would also lead to additional airborne and liquid releases that will not occur at the North Anna ISFSI.
The count room, portable instruments, personnel monitoring instruments, protective equipment, and support facilities similar to those described in Regulatory Position 4 of Regulatory Guide 8.8 (June 1978) will be provided by the health physics facilities and personnel at the North Anna Power Station. Section 7.1.1 provides additional details.
Operational requirements for surveillance are incorporated into the design considerations described in Section 7.1.2 in that the SSSCs are stored with adequate spacing to allow ease of surveillance. The operational requirements are incorporated into the radiation protection design features described in Section 7.3 since the SSSCs are heavily shielded to minimize occupational exposure.
The criteria and conditions under which certain ALARA techniques are implemented to ensure ALARA exposures and contamination levels are described in Section 7.1.1. ALARA techniques will be implemented at all times.
 
Revision 806/14                                       North Anna ISFSI SAR                   7-6 As the potential person-rem per task increases, the ALARA techniques employed become more stringent as described in Virginia Power administrative procedures.
The ISFSI does not contain any systems that process liquids or gases or contain, collect, store, or transport radioactive liquids or solids, other than the SSSCs. Therefore, the ISFSI is ALARA since there are no such systems to be maintained, or repaired, or be a source of leaks.
7.2 RADIATION SOURCES 7.2.1 Characterization of Sources The physical characteristics of the fuel used at the North Anna Power Station are summarized in Table 3-1. Typical fuel assembly source data for the fuel used at North Anna is provided in the TN-32 Final Safety Analysis Report (Reference 1). Descriptions of the fuel which the SSSCs are designed to store are provided in the SSSC Topical Safety Analysis Reports and Appendix A. The exterior surfaces of the SSSCs will be decontaminated prior to transfer to the ISFSI. The fuel will not be removed from the SSSCs nor will the SSSCs be opened while at the ISFSI. There are no radioactive systems at the ISFSI. Therefore, the only source of radioactivity will be the direct radiation from the fuel stored inside the SSSCs.
7.2.2 Airborne Radioactive Material Sources Under normal operation, the radioactive material sources are safely confined both within the fuel cladding and within the SSSC containment during storage. Surface contamination from the spent fuel pool will be removed prior to storage at the ISFSI. Therefore, provisions for personnel protection measures against airborne sources are not required. A loss of confinement barrier event and subsequent airborne radiation impact is discussed in Section 8.2.10.
7.2.3 References
: 1. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear, Inc.,
January 2000.
7.3 RADIATION PROTECTION DESIGN FEATURES 7.3.1 Storage System Design Description A description of the North Anna ISFSI, including layout and characteristics is provided in Section 4.1. Figure 7-1 depicts the ISFSI showing the storage pads numbered to correspond with the order in which they will be filled.
The ISFSI has a number of design features which ensure that exposures are ALARA:
* There are no radioactive systems in the ISFSI other than the SSSCs
* The SSSCs are loaded, sealed, and decontaminated prior to transfer to the ISFSI
* The fuel is not unloaded nor are the SSSCs opened at the ISFSI
 
Revision 806/14                                       North Anna ISFSI SAR                   7-7
* The fuel is stored dry inside the SSSCs, so that no radioactive liquid is available for leakage
* The SSSCs are sealed airtight
* The SSSCs are heavily shielded to minimize external dose rates
* A perimeter fence with locked gates surrounds the ISFSI to limit access near the SSSCs Typically, the ISFSI will not be occupied, therefore, no personnel areas, equipment decontamination areas, contamination control areas, or health physics facilities need to be located at the ISFSI. These types of facilities are available at the North Anna Power Station.
7.3.2 Shielding The SSSC shielding designs are provided in the SSSC Topical Safety Analysis Reports. An earth berm was constructed inside the north and east perimeter fences of the ISFSI to reduce direct radiation. No other shielding is required.
7.3.2.1 SSSC Surface Dose Rates The gamma and neutron dose rates on the SSSC surface and their associated energy spectra are dependent on the SSSC design. These dose rates are also dependent on the burnup and initial enrichment of the fuel stored in the SSSCs. Therefore, SSSC-specific analyses have been performed for representative North Anna Power Station fuel. The assumptions used in the SSSC-specific analyses for SSSC surface dose rates and energy spectra are provided in the SSSC Topical Safety Analysis Reports.
The TN-32 SSSC loaded with fuel with an enrichment of 3.50 weight percent U-235, burnup of 45,000 MWD/MTU and cooling time of 7 years has been chosen as the base case for analysis purposes. Using an enrichment lower than the 4.30 weight percent U-235 approved for the TN-32 yields a bounding isotope inventory, and is in accordance with NUREG-1536 and NRC Interim Staff Guidance.
Source terms for the fuel were calculated using the SAS2H/ORIGEN-s module of SCALE4.3 as described in Section 5.1 of Reference 1. These source terms are then passed through a SAS2H cask shielding model for a 1-dimensional dose assessment. Section 5.2 (Reference 1) describes the source specification and Section 5.3 (Reference 1) describes the shielding analyses performed for the TN-32 cask.
In addition to the spent fuel, the TN-32 is capable of storing burnable poison rod assemblies (BPRA) and thimble plug assemblies (TPA). BPRAs and TPAs with combinations of cumulative exposures and cooling times are permissible for storage in the TN-32 cask. The source evaluation of the BPRAs and TPAs is described in Section 5.2 (Reference 1).
Dominion conducted an independent analysis of the TN-32 surface dose rate using the MCNP Monte Carlo transport code (Reference 2). This analysis was used to form the basis for the
 
Revision 806/14                                     North Anna ISFSI SAR                     7-8 average cask surface dose rate limit in the ISFSI Technical Specifications. The average surface dose rates calculated for the TN-32 base case SSSC were 218 mrem/hr (neutron and gamma) for the side surface and 58 mrem/hr (neutron and gamma) for the top surface.
7.3.2.2 Dose Rate Versus Distance Analyses have been completed to determine dose rates at the ISFSI perimeter fence, the site boundary and the nearest permanent resident. These analyses were performed using the MCNP Monte Carlo transport code (Reference 2) and the following conservative inputs.
: 1. Isotope inventories were based on 32 fuel assemblies with enrichment of 3.5 weight percent U-235 and burnup of 45,000 MWD/MTU.
: 2. The three storage pads are filled with 84 TN-32 SSSCs, each pad having 28 SSSCs.
Assuming 84 TN-32 SSSCs results in an amount of fuel stored on the pads which exceeds the current licensed limit of 839.04 TeU (approximately 57 TN-32 SSSCs), providing additional conservatism to the analysis.
: 3. The inventory of SSSCs stored in the ISFSI will increase by four SSSCs per year. This average rate of inventory change was used to determine the age of the spent fuel (years after discharge) and the subsequent reduction in dose rates.
: 4. The effects of irradiated insert components are included in the MCNP analyses.
Figure 7-1 shows the layout of the ISFSI. The MCNP analysis of the dose rate at the ISFSI perimeter fence using base case TN-32 SSSCs resulted in peak dose rates that range from 0.3 to 1.9 mrem/hr when all three pads were full. The specific dose rates for the various points on Figure 7-1 are provided in Table 7-1. Dose rate measurements at the ISFSI perimeter fence will be used to ensure that the requirements of 10 CFR 20 are met.
The MCNP analysis for the nearest site boundary indicated that the maximum dose rate at this location was less than 100 mrem/yr, which meets the requirements of 10 CFR 20.1301.
The MCNP analysis for the nearest permanent resident indicated that the contribution to the maximum dose rate from the operation of the ISFSI was 2.1 mrem/yr. When combined with the contributions from the operations of North Anna Power Station Units 1 and 2, the result is well below the 25 mrem/yr imposed by 10 CFR 72.104(a).
7.3.3 Area Radiation and Airborne Radioactivity Monitoring Instrumentation As indicated in Section 3.3.5, area radiation and airborne radioactivity monitors are not needed at the North Anna ISFSI. However, thermoluminescent devices will be used to record gamma radiation doses at appropriate intervals along the ISFSI perimeter fence. Neutron radiation detection devices may also be used on the ISFSI perimeter fence if they are available and reliable.
 
Revision 806/14                                       North Anna ISFSI SAR                     7-9 7.3.4 References
: 1. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear Inc.,
January 2000.
: 2. Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel for use at the North Anna Power Station Independent Spent Fuel Storage Installation, Dominion Technical Report NE-1311, Revision 0, January 2002.
: 3. MCNP4C, Monte Carlo N-Particle Transport Code System, CCC-700, J. W. Briesmeister, LANL, December 2000.
7.4 ESTIMATED ONSITE COLLECTIVE DOSE ASSESSMENT Table 7-2 provides the estimated occupational exposures to ISFSI personnel during the loading, transport, and emplacement of one SSSC. These results are based on the design basis surface dose rates discussed in Section 7.3.2.1. Our experience at the Surry Power Station ISFSI indicates that these estimated occupational exposures are very conservative, and that actual occupational exposures for loading, transport and emplacement activities are approximately 0.250 person-rem (Reference 1).
Table 7-3 provides the estimated annual occupational exposure for ISFSI surveillance and maintenance activities. The design basis surface dose rates were utilized, and it was assumed that all storage pads were filled with SSSCs. To estimate the dose rates for operability tests and calibration, the worker was assumed to be located at the control panel at the perimeter fence vehicle gate entrance. Visual surveillance was based on a walkdown of each of the three storage pads at a distance no closer than 2 meters to the SSSCs. During surface defect repairs, the worker was assumed to be positioned next to an SSSC. The two surrounding SSSCs (all within 16 feet of the worker) are the predominant dose contributors during repair work.
To evaluate the additional dose to station personnel from ISFSI operations, a conservative analysis has been performed using the assumptions given in Section 7.3.2.2, including annual decay. The dose calculation considers all workers at the North Anna Power Station to be in offices, non-shielded buildings, or in the plant yard. This population includes a normal work force of utility and contractor personnel as well as the increased staffing required during outages. As a bounding estimate, the total number of workers assumed was 750 spending a total of 1,560,000 person-hours/year in the North Anna yard area and in offices.
The minimum distance between the North Anna Units 1 and 2 protected area fence and the nearest SSSC is approximately 2000 feet. The dose rate from the fully-loaded ISFSI to a location 2000 feet away is 1.83E-03 mrem/hr. The annual dose for station workers due to the fully-loaded ISFSI is calculated to be 3.66 mrem/person or a total annual dose to Station personnel of 2.75 person-rem. The maximum annual dose of 3.66 mrem/person represents less than 0.1% of the 5 rem annual occupational exposure limit.
 
Revision 806/14                                     North Anna ISFSI SAR                     7-10 The total annual occupational exposure during ISFSI loading operations is 14.39 person-rem (see Table 7-4), and represents the maximum expected. As indicated previously, the actual occupational exposures for loading, transport, and emplacement of an SSSC are approximately 0.25 to 0.5 person-rem per loading. This combined with the North Anna Power Station annual occupational exposure during ISFSI loading operations (Table 7-4) results in a total annual occupational exposure during ISFSI operations of approximately 4 person-rem. This exposure represents approximately 5% of the average annual occupational exposure from all operations at the North Anna Power Station.
7.4.1 References
: 1. C. J. Hostick, J. C. Lavender and B. H. Wakeman, Time and Dose Assessment of Barge Shipment and At-Reactor Handling of a CASTOR V/21 Spent Fuel Storage Cask, Pacific Northwest Laboratory, PNL-7205, April 1992.
7.5 OFFSITE COLLECTIVE DOSE ASSESSMENT The site plan for the North Anna ISFSI and its relative location to the North Anna Power Station are provided in Figure 2-3. The North Anna site within the boundary is the controlled area as defined in 10 CFR 72.
Based on projections for year 2000, 354 permanent residents are located within a 2-mile radius of the North Anna site boundary. The nearest permanent resident is located at 2860 feet from the ISFSI. The maximum annual dose to the nearest resident is 2.10 mrem. Using the conservative assumption that all of the residents within two miles are located at the same distance from the ISFSI as the nearest resident, their maximum annual collective dose from the ISFSI would be:
0.00210 rem/year x 354 persons = 0.74 person-rem/year The annual dose to the maximally exposed individual from all significant sources at the North Anna Power Station has been estimated in Appendix 11B of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR) as 3 mrem/yr. Therefore, the maximum combined radiation contribution to the nearest permanent resident from the operation of the ISFSI (2.10 mrem/yr) and North Anna Power Station Units 1 and 2 (3.00 mrem/yr) is 5.10 mrem/yr.
This is well below the 25 mrem/yr limit imposed by 10 CFR 72.104(a).
The North Anna ISFSI has no gaseous or liquid effluents, therefore, these do not contribute to the dose of nearby residents.
Considering the conservatisms in the above calculation and the rapid attenuation of neutron and gamma dose rates with distance, the dose for the more distant population is negligible.
 
Revision 806/14                                   North Anna ISFSI SAR                   7-11 7.6 HEALTH PHYSICS PROGRAM The health physics organization and the health physics equipment associated with operation of the North Anna Power Station are considered sufficient for the operation of the ISFSI. The health physics technical procedures directing routine surveys include ISFSI activities.
Thermoluminescent devices are in place along the ISFSI fence for routine monitoring of onsite dose.
7.7 ENVIRONMENTAL MONITORING PROGRAM The North Anna Power Station environmental monitoring program is utilized for the ISFSI.
Since there are no effluents from the ISFSI, no changes are required for the environmental monitoring program.
Since there are no effluents from the ISFSI, no changes are required for the environmental monitoring program.
Revision 8-06/14 North Anna ISFSI SAR 7-12Table 7-1MAXIMUM DESIGN BASIS DOSE RATES ALONG ISFSI PERIMETER FENCE (MREM/HR)Years aStatus A B C D E F G H 14Pads 1 and 2 Full 0.318 b 0.556 b 0.736 b 21Pads 1, 2, and 3 Full 1.933 0.365 0.974 0.302 0.397 0.630 0.974 0.813a.14 years corresponds to the first two pads being filled assuming 4 SSSCs stored per year. Fuel stored would have minimum of additional 7 years of decay.b.Due to location of pad 2, maximum dose rates at th ese locations occur after pad 2 is filled.
Revision 8-06/14 North Anna ISFSI SAR 7-13Table 7-2ESTIMATED OCCUPATIONAL EXPOSURES FOR CASK LOADING, T RANSPORT, AND EMPLACEMENT a (ONE TIME EXPOSURE)TaskTime Required (hr)No. of PersonsDose Rate (rem/hr)Person-Rem1.Unload empty SSSC from rail car 2.00 5 0.00E+00 0.00E+002.Move SSSC inside Decon Bldg 0.25 2 0.00E+00 0.00E+003.Remove cover; inspect 2.00 2 0.00E+00 0.00E+004.Remove lid(s); inspect 2.00 2 0.00E+00 0.00E+005.Replace lid seals 0.50 2 0.00E+00 0.00E+006.Move SSSC to loading area 1.00 3 1.70E-03 5.10E-037.Lower SSSC into loading area 0.25 3 1.70E-03 1.28E-038.Load SSSC with spent fuel 3.00 3 1.70E-03 1.53E-029.Verify fuel inventory 0.50 1 1.70E-03 8.50E-0410.Place lid on SSSC 1.00 2 1.70E-03 3.40E-0311.Lift SSSC; install lid bolts 0.50 2 2.86E-02 2.86E-0212.Remove water in fuel cavity 1.00 2 2.86E-02 5.72E-0213.Raise SSSC from loading area 0.25 2 8.39E-02 4.20E-0214.Return SSSC to Decon Building 0.33 2 8.39E-02 5.54E-0215.Decontaminate SSSC 2.00 2 8.39E-02 3.36E-0116.Secure Lid 1.00 2 8.39E-02 1.68E-0217.Vacuum dry cavity and test 4.00 2 8.39E-02 6.71E-0118.Fill cavity with helium and test 3.00 2 8.39E-02 5.04E-0119.Install pressure device and test 3.00 2 8.39E-02 5.04E-0120.Perform radiation measurements 0.50 1 8.39E-02 4.20E-0221.Lift SSSC; place outside of Decon Building 0.50 2 5.88E-02 5.88E-0222.Lift SSSC with transporter 1.00 2 3.36E-02 6.72E-0223.Transport SSSC to ISFSI 0.50 3 3.36E-02 5.20E-0224.Connect pressure monitoring device; install weather cover 1.00 2 8.39E-02 1.68E-01Total 2.78E+00a.Dose rates are from the base TN-32 cask.
Revision 8-06/14 North Anna ISFSI SAR 7-14Table 7-3NORTH ANNA ISFSI MAINTENANCE OPERATIONS a ANNUAL OCCUPATIONAL EXPOSURESTaskTime Required (hr)No. of Persons Dose Rate (rem/hr)Person-RemVisual Surveillance of Casks b 1.00 2 8.39E-02 1.68E-01 Instrumentationa.Operability Tests c 1.00 2 1.90E-03 3.80E-03b.Calibration d 2.00 2 1.90E-03 7.60E-03c.Repair e 1.00 2 8.39E-02 1.68E-01Surface defect repairs f 1.00 2 8.39E-02 1.68E-01 5.15E-01a.Dose rates are from the base case TN-32 cask. Assumes ISFSI is full.b.Based on four surveys per year, 15 minutes each.c.Based on two tests per year, 30 minutes each.d.Based on recalibration of the instruments every two years. Total time required is four hours every two years.e.Based on repair of one instrument every year, one hour per repair.f.Based on repair of three SCCCs per year, 20 minutes each.Table 7-4TOTAL ANNUAL OCCUPATIONAL EX POSURES DURING ISFSI LOADING OPERATIONS a Person-Rem North Anna Power Station b 2.75E+00 ISFSI Operations SSSC Preparation and Placement c 11.12E+00Maintenance and Surveillance b 5.15E-01Total 14.39E+00a.Utilizes design basis SSSC surface dose rates.b.Assumes full ISFSI (84 SSSCs).c.Assumes four SSSCs every year.
Revision 8-06/14 North Anna ISFSI SAR 7-15 Figure 7-1ISFSI LAYOUT Note: Only the vehicle gate is shown. Personnel gates are not shown but exist at the top right and bottom two corners and in the center of each side.Data for points A-H in Table 7-1 Revision 8-06/14 North Anna ISFSI SAR 7-16 Figure 7-2 DOSE RATE FOR 84 BASE CASE CASKS VERSUS DISTANCE Revision 8-06/14 North Anna ISFSI SAR 8-1Chapter 8ACCIDENT ANALYSESAn evaluation of the safety of the North Anna ISFSI with respect to postulated accident events is presented in this chapter. The facility response is analyzed in terms of event causes and precursors, recognition and quantification, and cons equence mitigation fo r the spectrum of postulated occurrences.Four categories of design events have been considered, as defined in ANSI/ANS 57.9-1984.
Design event categories are designated as:IEvents that are expected to occur regular ly or frequently in the course of normal operationIIEvents which can be expected to occur wi th moderate frequenc y as on the order of once per yearIIIEvents anticipated to occur infrequently or , at most, once during the lifetime of the installationIVEvents which are not considered credible, but nevertheless are postulated in order to bound the consequences.
8.1 OFF-NORMAL OPERATIONS The design and operation of the North Anna ISFSI include feat ures intended to minimize or preclude the compromise of safet y functions due to of f-norma l conditions. These features are described in Chapters 4 and 5. Nevertheless, design events have been postulated and analyzed to demonstrate the inherent safety of the facility.Design events in Category I (normal operations) have be en previously discussed in Chapters 4 , 5 , and 6 and are not presented furth er here. A loss of electric power design event has been included as a Category II event and is discussed in th e following section. The SSSC Topical Safety Analysis Reports postulate additional off-normal events for the SSSCs. The Topical Safety Analysis Reports analyze the effects of these additional events and identify the corrective actions.
8.1.1 Loss of Electric PowerA total loss of ac power is postulated to occu r in the feeder cabling which supplies po wer to the ISFSI. The failure could be ei ther an open or a short to ground circuit, or any other mechanism capable of producing an interruption of power.
8.1.1.1 Postulated Cause of EventA loss of power to the ISFSI may occur as a r esult of natural phenom ena, such as lightning or e xtreme wind, or as a result of undefined disturbances in th e nonsafety-related portion of the electric power system of the North Anna Power Station.
Revision 8-06/14 North Anna ISFSI SAR 8-2If electric power is lost, the following syst ems would be powered from the ISFSI diesel:Area lightingArea receptaclesSSSC pressure monito ring instrumentationMicrowave Camera System 8.1.1.2 Detection of EventA loss of ac power at the Nort h Anna site w ould be indicated in the CAS. If the loss of power were localized solely at the ISFSI, this would be indicated at the local annunciator.
8.1.1.3 Analysis of Effects and ConsequencesThis event has no safety or ra diological consequences. None of the systems whose failure could be caused by this event are required for the accomplishment of th e safety function of the ISFSI. The lighting system functions merely for convenience and visual monitoring, and the instrumentation monitors the long-term performance of the SSSCs with respect to seal integrity. Seal integrity is not expected to change rapidly and its status is not dependent upon electric power.
8.1.1.4 Corrective ActionsFollowing a loss of electric power to the ISFSI, plant maintena nce personnel will be informed, and will isolate the f a ult and restore electrical service by conventional means. Such an operation is straightforward and routine for the maintenance crews of an electric utility.
8.1.2 Radiological Impact from Off-Normal Op erationsA loss of power will not affect the integrity of the SSSCs, jeopardize the safe storage of the fuel, nor result in radiological releases.
8.2 ACCIDENTSThis section addresses more seriou s occurrences which are expected to happen on an extremely infrequent basis, if ever, during the lifetime of the facility (Event Category III). In addition, a maximum h ypothetical accident, which is not considered credible (Event Category IV), is identified and analyzed.


====8.2.1 Earthquake====
Revision 806/14                                              North Anna ISFSI SAR                          7-12 Table 7-1 MAXIMUM DESIGN BASIS DOSE RATES ALONG ISFSI PERIMETER FENCE (MREM/HR)
8.2.1.1 Cause of AccidentThe design earthquake (DE) as described in Sections 2.5.2 and 3.2.3 , is postulated to occur as a design basis extreme natural phenomenon.
Yearsa  Status                        A        B        C        D        E          F          G      H 14      Pads 1 and 2 Full                                        0.318b    0.556b    0.736b 21      Pads 1, 2, and 3 Full 1.933          0.365    0.974      0.302    0.397    0.630        0.974  0.813
Revision 8-06/14 North Anna ISFSI SAR 8-3 8.2.1.2 Accident Analysis Analyses of the storage pads for the DE is pro vided in Section 4.2.1.4. The results of these analyses show that the storage pads remain inta ct and that the SSSCs will not slide or tip over.The seismic response characteristics of the SSSC s are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that SSSC leak-tight integrity is not compromised and that no damage will be sustained by the SSSC or the spent fuel.
: a. 14 years corresponds to the first two pads being filled assuming 4 SSSCs stored per year. Fuel stored would have minimum of additional 7 years of decay.
8.2.1.3 Accident Dose Calculations As demonstrated in Section 4.2.1.4 , the DE is not capable of damaging the storage pads or causing SSSC sliding or tipover.
: b. Due to location of pad 2, maximum dose rates at these locations occur after pad 2 is filled.
As demonstrated in the SSSC T opical Safety Analysis Reports, the DE is not capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.
 
8.2.2 Extreme Wind 8.2.2.1 Cause of AccidentThe extreme winds due to passage of the desi gn basis wind and tornado as defined in Section 3.2.1 are postulated to occur as a design basi s e xtreme natural phe nomenon. As described in Section 2.3.1 , the design basis torna do is e xpected to occu r less than once in 30,800 years, and the design basis wind is expected to occur less than once in 100 years.8.2.2.2 Accident AnalysisThe effect of the design basis wind on the storage pads is pro vided in Section 4.2.1.2. The effect of the design basis tornado on the storage pads is provided in Section 4.2.1.3. Both analyses demonstrate that the storage pads are not damaged and the SSSCs will not sl ide or tip over during the design basis extreme wind events.The effects and consequences of extreme wind s on the SSSCs are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that minor damage to the SSSC may be sustained from tornado missiles, but SSSC leak-tight integrity is not compromised.
Revision 806/14                                          North Anna ISFSI SAR              7-13 Table 7-2 ESTIMATED OCCUPATIONAL EXPOSURES FOR CASK LOADING, TRANSPORT, AND EMPLACEMENTa (ONE TIME EXPOSURE)
8.2.2.3 Accident Dose Calculations As demonstrated in Sections 4.2.1.2 and 4.2.1.3 and the SSSC Topical Safety Analysis Reports, design basis extreme winds are not capabl e of damaging the storag e pads or tipping over or sliding an SSSC, and that the damage sustained from the torna do missiles will not compromise seal integrity. No radioactive material is released, and there are no dose consequences associated with these events.
Time Required    No. of   Dose Rate Task                                                  (hr)    Persons  (rem/hr)  Person-Rem
8.2.3 Flood As discussed in Section 3.2.2 , the North Anna ISFSI is cons idered flood-dry. Flooding is not considered as a design basis event.
: 1. Unload empty SSSC from rail car                2.00        5    0.00E+00  0.00E+00
Revision 8-06/14 North Anna ISFSI SAR 8-4 8.2.4 Explosion 8.2.4.1 Cause of AccidentAn explosion is postulated to occur as a result of a vehi cular accident at a point approximately 1.5 miles from the ISFSI. The evaluation of this event is described in detail inSection 2.2.2. A pressure wave of less than 1 psi is estimated to reach the ISFSI.
: 2. Move SSSC inside Decon Bldg                    0.25        2   0.00E+00  0.00E+00
8.2.4.2 Accident AnalysisAs described in the SSSC Topical Safety Analysis Reports, a pressure wave of the magnitude associated with this event will not damage the SSSCs or cause tip-over.
: 3. Remove cover; inspect                          2.00        2   0.00E+00  0.00E+00
8.2.4.3 Accident Dose CalculationsThe postulated event will not damage the SSSC exterior nor cause SSSC tip-over. This event is not capable of producing leakage from the SSSC. No radioactive ma terial is released, and there are no dose consequences associated with this event.
: 4. Remove lid(s); inspect                        2.00        2    0.00E+00  0.00E+00
8.2.5 Fire 8.2.5.1 Cause of AccidentThe only combustible materials at the ISFSI st orage pads are in the form of insulation on instrumentation wiring, and coating of the outside surf ace of the SSSCs. No other combustible or explosive materials are allowed to be stor ed on the storage pads. As described in Section 2.1.2 , the ISFSI area will be cleared of tre es and seeded with grass. In addi tion, other equipment in the area has adequate separation from the storage pads. Ther efore, no fires other than small electrical fires are considered credible at the storage pads.The fire protection capabilities availa ble at the ISFSI are described in Section 4.4.5.1. These include portable fire extinguishers within the ISFSI peri meter fence. In addi tion, the fire fighting equipment and personnel present at the North Anna Power Station would be available if needed.
: 5. Replace lid seals                              0.50        2    0.00E+00  0.00E+00
8.2.5.2 Accident AnalysisThe ability of the SSSCs to withstand postula ted fires and the consequence of postulated fires are addressed in the SSSC Topical Safety Analysis Reports. Result s of these analyses indicate that the postulated fires are not capable of compromising seal integrity.
: 6. Move SSSC to loading area                      1.00        3    1.70E-03  5.10E-03
8.2.5.3 Accident Dose CalculationsThe damage to an SSSC due to fire is no t capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.
: 7. Lower SSSC into loading area                  0.25        3    1.70E-03  1.28E-03
8.2.6 Storage of an Unauthorized Fuel AssemblyThe ISFSI Technical Specifications specify limiting values for th e initial enrichment, average burnup, decay heat, and cooling time after reactor discharge for the fuel assemblies to be Revision 8-06/14 North Anna ISFSI SAR 8-5placed in SSSCs. The Technical Speci fications also specify required structural attributes for those fuel assemblies. The pos sibility of storing a fu el assembly that does not meet the Technical Specification requirements has been considered.
: 8. Load SSSC with spent fuel                      3.00        3    1.70E-03  1.53E-02
8.2.6.1 Cause of AccidentThe cause of this event is postulated to be an error during the loading operations, e.g., the wrong fuel assembly is selected by the fuel hand ling operator, or a failure in the administrative controls governing the fuel handling operations.
: 9. Verify fuel inventory                          0.50        1    1.70E-03  8.50E-04
8.2.6.2 Accident AnalysisThe loading of an unauthorized fuel assembl y has no consequence while the SSSC remains in the spent fuel pool. The borated water in the spent fuel pool provides adequate protection against a criticality event, and also provides shielding and heat removal. Loading of an unirradiated fuel assembly will not cause a criticality event beca use SSSC criticality analyses must show subcritical conditions assuming all fuel assemblies are unirradiated. Loading of an unauthorized fuel assembly with gross cladding defects will not cause further damage to the cladding or result in the release of radioactive ma terial. Loading of an una uthorized fuel assembly with structural defects will likely be detected during placem ent of the assembly in the SSSC. In order to preclude this event from going undetected, however, a nd to ensure that appropriate corrective actions can take plac e prior to placing the lid on an SSSC, a final verification of the identity and location of the fuel assemblies loaded into the SSSCs is performed with an underwater video camera to ensure that the correct fuel assemblies have been loaded into the SSSC.These administrative controls an d the records associated with them are included in the procedures de scribed in Chapter 9 and in the proposed license requirements described in Chapter 10, and will comply with the applicable re quirements of the Qua lity Assurance Program described in Chapter 11.Appropriate and sufficient actions will be taken to ensure that a fuel assembly loading error does not remain undetected. In particular, the storage of an una uthorized fuel assembly is not considered credible in view of the multiple administrative controls.
: 10. Place lid on SSSC                              1.00        2   1.70E-03  3.40E-03
8.2.6.3 Accident Dose CalculationsThe storage of an unauthorized fuel assembly is not considered to be a credible event. No radioactive material is released, and there are no dose consequences associated with this event.
: 11. Lift SSSC; install lid bolts                  0.50        2    2.86E-02  2.86E-02
8.2.7 Loss of Neutron Shield The design of the SSSCs includes neutron absorbing material eith er internal or e xternal to the SSSC body. As applicable to the particular SSSC design, the SSSC Topi cal Safety Analysis Reports discuss a postulated loss of neutron shield. As concluded in these documents, a total loss of neutron shield is not a credible event for the North Anna ISFSI.
: 12. Remove water in fuel cavity                    1.00        2    2.86E-02  5.72E-02
Revision 8-06/14 North Anna ISFSI SAR 8-6 8.2.8 SSSC Seal Leakage The SSSCs feature redundant seals in conjunc tion with extremely rugged body designs. Additional barriers to the release of radioactive material are provided by th e sintered fuel pellet matrix and the zircaloy cladding. Furthermore, the fuel cavity helium pressure is substantially less than the helium pressure-of the volume monito red by the pressure monitoring device. The pressure monitoring device provides an early warning of a decrease in the pressure of this monitored volume. No credible me chanisms that could result in leakage of radioactive material have been identified.
: 13. Raise SSSC from loading area                  0.25        2   8.39E-02  4.20E-02
8.2.9 SSSC DropsSSSC handling and drop events postulated to occur in the Fuel and Decontamination Buildings are addressed in Appendices 9B and 15A of the North Anna Power Station UFSAR.
: 14. Return SSSC to Decon Building                  0.33        2    8.39E-02  5.54E-02
The SSSCs are designed to with stand drops of at least 15 inches without compromising SSSC integrity. SSSC drops in excess of these heights at the ISFS I, or during transport, are not considered credible because of procedures that preclude the lifting of the SSSCs any higher. Analyses of SSSC drop events are presented in the SSSC Topical Safety Analysis Reports.
: 15. Decontaminate SSSC                            2.00        2    8.39E-02  3.36E-01
8.2.10 Loss of Confinement BarrierThe following postulated event scenario is not c onsidered to be credib le. It is hypothesized solely to demonstrate the inhere nt safety of the North Anna IS FSI by subjecting it to a set of simultaneous multiple failures, any one of which is far be yond the capability of natural phenomena or man-made hazards to produce.
: 16. Secure Lid                                    1.00        2   8.39E-02  1.68E-02
8.2.10.1 Cause of AccidentA simultaneous failure of all protective laye rs of radioactive material confinement is postulated to occur by unspecified nonm echanistic means for a single SSSC.
: 17. Vacuum dry cavity and test                    4.00        2   8.39E-02  6.71E-01
8.2.10.2 Accident AnalysisIn this event, the SSSC confinement function is nonmechanistically removed. Heat removal and radiation shielding functions are assumed to continue to operate in the normal passive manner.This event was analyzed for a TN-32 cask based on the requi rements of NUREG-1536 (Reference 1), Interim Staff Guidance-5 (ISG-5), Revision 1 (Reference 2), and the following inputs:1.Isotope inventories are based on 32 fuel assemblies with an enrichmen t of 3.30 weight percent U-235, burnup of 45,000 MWD/MTU and seven years d ecay. This enrichment was selected after reviewing the enrichment and burnup of all North Anna spent fuel to ensure that this enrichment is bounding. Using a lower enrichment yields a bounding isotope inventory, and is in accordance with NRC ISG-6 (Reference 3).
: 18. Fill cavity with helium and test              3.00        2    8.39E-02  5.04E-01
Revision 8-06/14 North Anna ISFSI SAR 8-72.The Co-60 source is calculated based on the surf ac e area of a 17 x 17 fuel assembly and a seven year decay time from discharge.3.The cask seal leak rate calculated in Reference 4 was increased by 50 percent.4.The maximum boundary dispersion factor (X/Q) calculated for the North Anna site (see Table 2-1).5.The breathing rate identified in Reference 4.6.The bounding dose conversion factors in EPA Guidance Report No.
: 19. Install pressure device and test              3.00        2   8.39E-02  5.04E-01
11 (Reference 5) are used to calculate the whole body, critical or gan, and thyroid dose from inhalation.7.The bounding dose conversion factors in EPA Guidance Report No.
: 20. Perform radiation measurements                0.50        1    8.39E-02  4.20E-02
12 (Reference 6) are used to calculate the whole body, critical or gan, thyroid, and skin dose from immersion.
: 21. Lift SSSC; place outside of Decon              0.50        2   5.88E-02  5.88E-02 Building
The isotopes used in the anal ysis were based on the selec tion criteria in ISG-5, Revision 1, including Co-60 in the fuel rod crud, iodine-129, tritium, metastable tellurium-125, fission products that contribute greater than 0.1% of activity, and actinides that contribute greater than 0.01% of activity. The isotope concentrations we re used with the release fractions, the free volume in the cavity of the TN-32 cask (5.39 cubic meters), and the cask seal leak rate to calculate the isotope release rate (&#xb5;Ci/sec) from the cask. The isotope release rate is used over a 30-day period to calculate a release inventory in curies.Using this release inventory, the bounding dose conversion factors from EPA Guidance Report No.
: 22. Lift SSSC with transporter                      1.00        2   3.36E-02  6.72E-02
11, the maximum dispersion factor (X/Q), and the breathing rate from Reference 3 , the site boundary inhalation dose for each isotope w as calculated. Similarly, using this release inventory, the bounding dose conversion factors from EPA Guidance Report No.
: 23. Transport SSSC to ISFSI                         0.50        3    3.36E-02  5.20E-02
12, and the maximum bounding dispersion factor (X/Q), the site boundary immersion dose for each isotope was calculated.
: 24. Connect pressure monitoring device;            1.00        2    8.39E-02  1.68E-01 install weather cover Total      2.78E+00
8.2.10.3 Accident Dose CalculationsThis accident evaluation, perfo rmed to determine the radiologi cal consequences of a release of the inventory in an SSSC, resu lted in a deep dose plus committed dose equivalent to the worst organ (bone marrow) of 13 mrem at the nearest site boundary. This dose is well within the criteria of 10 CFR 72.106(b).
: a. Dose rates are from the base TN-32 cask.
8.2.11 References1.NUREG-1536, Standard Review Plan for Dry Cask Storage Systems, US NRC, Spent Fuel Project Office.2.Interim Staff Guidance-5, Revision 1, Confinement Evaluation, US NRC Spent Fuel Project Office.3.Interim Staff Guidance-6, Minimum Enrichment for Design Basis, US NRC Spent Fuel Project Office.
 
Revision 8-06/14 North Anna ISFSI SAR 8-8 4.TN-32 Final Safety Analysis Report, Revision 0, Transnuclear Inc., January 2000.5.U. S. Environmental Protection Ag ency, Federal Guidance Report No.
Revision 806/14                                              North Anna ISFSI SAR                        7-14 Table 7-3 NORTH ANNA ISFSI MAINTENANCE OPERATIONSa ANNUAL OCCUPATIONAL EXPOSURES Time Required      No. of        Dose Rate Task                                            (hr)      Persons        (rem/hr)        Person-Rem Visual Surveillance of Casks b              1.00          2             8.39E-02        1.68E-01 Instrumentation
11, Limiting V alues of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion, EPA 520/1-88-020, 1988.6.U. S. Environmental Protection Ag ency, Federal Guidance Report No.
: a. Operability Tests c              1.00          2            1.90E-03        3.80E-03
12, External Exposur e to Radionuclides in Air, Water, and Soil, EPA 402-R-93-081, September 1993.8.3 SITE CHARACTERISTIC S AFFECTING SA F ETY ANALYSISSite characteristics have been considered in the formation of th e bases for these safety analyses. Conditions of meteorology we re used in the determination of /Q values as well as the characteristics of extreme winds and their contribution to maximum flood level. Regional and site seismology and geology were used to help define the design earthquake acceleration value. Regional population distribution and other demogr aphic data were used to determine radiation doses.
: b. Calibration d                    2.00          2             1.90E-03        7.60E-03
Revision 8-06/14 North Anna ISFSI SAR 9-1Chapter 9CONDUCT OF OPERATIONS 9.1 ORGANIZATIONAL STRUCTURE9.1.1Corporate Organization The ISFSI will be operated unde r the same corporate manageme nt or ganization responsible for operation of the North Anna Power Station. This organiza tion is depicted in the Dominion Nuclear Facility Qualit y Assurance Program Description, Topical Report DOM-QA-1 (Q A Program Topical Report).
: c. Repair e                          1.00          2            8.39E-02        1.68E-01 Surface defect repairs f                    1.00          2             8.39E-02        1.68E-01 5.15E-01
9.1.1.1 Corporate Functions, Responsibilities, and Authorities Corporate functions, re sponsibilities and author ities for the North Anna ISFSI are discussed in the QA Program T opical Report.
: a. Dose rates are from the base case TN-32 cask. Assumes ISFSI is full.
9.1.1.2 Applicant's In-House OrganizationA discussion of Virginia Power's in-house or ganization is provided in the QA Program Topical Report.
: b. Based on four surveys per year, 15 minutes each.
9.1.1.3 Relationships with Contractors and SuppliersThe SSSC suppliers are responsible for the fa brication and testing of the SSSCs, and for recommending SSSC handling proc edures. The Nuclear Analysis and Fuel Department is the primary interf ace with the SSSC supplier and other equipment vendors.
: c. Based on two tests per year, 30 minutes each.
Site preparation and construc tion will be perfo rmed by Virginia Power, using specialty subcontractors, as required.
: d. Based on recalibration of the instruments every two years. Total time required is four hours every two years.
: e. Based on repair of one instrument every year, one hour per repair.
: f. Based on repair of three SCCCs per year, 20 minutes each.
Table 7-4 TOTAL ANNUAL OCCUPATIONAL EXPOSURES DURING ISFSI LOADING OPERATIONSa Person-Rem North Anna Power Station b                              2.75E+00 ISFSI Operations SSSC Preparation and Placement c                  11.12E+00 Maintenance and Surveillance b                      5.15E-01 Total                                                  14.39E+00
: a. Utilizes design basis SSSC surface dose rates.
: b. Assumes full ISFSI (84 SSSCs).
: c. Assumes four SSSCs every year.
 
Revision 806/14                                    North Anna ISFSI SAR                      7-15 Figure 7-1 ISFSI LAYOUT Data for points A-H in Table 7-1 Note: Only the vehicle gate is shown. Personnel gates are not shown but exist at the top right and bottom two corners and in the center of each side.
 
Revision 806/14                          North Anna ISFSI SAR 7-16 Figure 7-2 DOSE RATE FOR 84 BASE CASE CASKS VERSUS DISTANCE
 
Revision 806/14                                      North Anna ISFSI SAR                      8-1 Chapter 8        ACCIDENT ANALYSES An evaluation of the safety of the North Anna ISFSI with respect to postulated accident events is presented in this chapter. The facility response is analyzed in terms of event causes and precursors, recognition and quantification, and consequence mitigation for the spectrum of postulated occurrences.
Four categories of design events have been considered, as defined in ANSI/ANS 57.9-1984.
Design event categories are designated as:
I    Events that are expected to occur regularly or frequently in the course of normal operation II  Events which can be expected to occur with moderate frequency as on the order of once per year III  Events anticipated to occur infrequently or, at most, once during the lifetime of the installation IV  Events which are not considered credible, but nevertheless are postulated in order to bound the consequences.
8.1 OFF-NORMAL OPERATIONS The design and operation of the North Anna ISFSI include features intended to minimize or preclude the compromise of safety functions due to off-normal conditions. These features are described in Chapters 4 and 5. Nevertheless, design events have been postulated and analyzed to demonstrate the inherent safety of the facility.
Design events in Category I (normal operations) have been previously discussed in Chapters 4, 5, and 6 and are not presented further here. A loss of electric power design event has been included as a Category II event and is discussed in the following section. The SSSC Topical Safety Analysis Reports postulate additional off-normal events for the SSSCs. The Topical Safety Analysis Reports analyze the effects of these additional events and identify the corrective actions.
8.1.1 Loss of Electric Power A total loss of ac power is postulated to occur in the feeder cabling which supplies power to the ISFSI. The failure could be either an open or a short to ground circuit, or any other mechanism capable of producing an interruption of power.
8.1.1.1 Postulated Cause of Event A loss of power to the ISFSI may occur as a result of natural phenomena, such as lightning or extreme wind, or as a result of undefined disturbances in the nonsafety-related portion of the electric power system of the North Anna Power Station.
 
Revision 806/14                                        North Anna ISFSI SAR                      8-2 If electric power is lost, the following systems would be powered from the ISFSI diesel:
* Area lighting
* Area receptacles
* SSSC pressure monitoring instrumentation
* Microwave
* Camera System 8.1.1.2 Detection of Event A loss of ac power at the North Anna site would be indicated in the CAS. If the loss of power were localized solely at the ISFSI, this would be indicated at the local annunciator.
8.1.1.3 Analysis of Effects and Consequences This event has no safety or radiological consequences. None of the systems whose failure could be caused by this event are required for the accomplishment of the safety function of the ISFSI. The lighting system functions merely for convenience and visual monitoring, and the instrumentation monitors the long-term performance of the SSSCs with respect to seal integrity.
Seal integrity is not expected to change rapidly and its status is not dependent upon electric power.
8.1.1.4 Corrective Actions Following a loss of electric power to the ISFSI, plant maintenance personnel will be informed, and will isolate the fault and restore electrical service by conventional means. Such an operation is straightforward and routine for the maintenance crews of an electric utility.
8.1.2 Radiological Impact from Off-Normal Operations A loss of power will not affect the integrity of the SSSCs, jeopardize the safe storage of the fuel, nor result in radiological releases.
8.2 ACCIDENTS This section addresses more serious occurrences which are expected to happen on an extremely infrequent basis, if ever, during the lifetime of the facility (Event Category III). In addition, a maximum hypothetical accident, which is not considered credible (Event Category IV), is identified and analyzed.
8.2.1 Earthquake 8.2.1.1 Cause of Accident The design earthquake (DE) as described in Sections 2.5.2 and 3.2.3, is postulated to occur as a design basis extreme natural phenomenon.
 
Revision 806/14                                      North Anna ISFSI SAR                      8-3 8.2.1.2 Accident Analysis Analyses of the storage pads for the DE is provided in Section 4.2.1.4. The results of these analyses show that the storage pads remain intact and that the SSSCs will not slide or tip over.
The seismic response characteristics of the SSSCs are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that SSSC leak-tight integrity is not compromised and that no damage will be sustained by the SSSC or the spent fuel.
8.2.1.3 Accident Dose Calculations As demonstrated in Section 4.2.1.4, the DE is not capable of damaging the storage pads or causing SSSC sliding or tipover. As demonstrated in the SSSC Topical Safety Analysis Reports, the DE is not capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.
8.2.2 Extreme Wind 8.2.2.1 Cause of Accident The extreme winds due to passage of the design basis wind and tornado as defined in Section 3.2.1 are postulated to occur as a design basis extreme natural phenomenon. As described in Section 2.3.1, the design basis tornado is expected to occur less than once in 30,800 years, and the design basis wind is expected to occur less than once in 100 years.
8.2.2.2 Accident Analysis The effect of the design basis wind on the storage pads is provided in Section 4.2.1.2. The effect of the design basis tornado on the storage pads is provided in Section 4.2.1.3. Both analyses demonstrate that the storage pads are not damaged and the SSSCs will not slide or tip over during the design basis extreme wind events.
The effects and consequences of extreme winds on the SSSCs are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that minor damage to the SSSC may be sustained from tornado missiles, but SSSC leak-tight integrity is not compromised.
8.2.2.3 Accident Dose Calculations As demonstrated in Sections 4.2.1.2 and 4.2.1.3 and the SSSC Topical Safety Analysis Reports, design basis extreme winds are not capable of damaging the storage pads or tipping over or sliding an SSSC, and that the damage sustained from the tornado missiles will not compromise seal integrity. No radioactive material is released, and there are no dose consequences associated with these events.
8.2.3 Flood As discussed in Section 3.2.2, the North Anna ISFSI is considered flood-dry. Flooding is not considered as a design basis event.
 
Revision 806/14                                        North Anna ISFSI SAR                      8-4 8.2.4 Explosion 8.2.4.1 Cause of Accident An explosion is postulated to occur as a result of a vehicular accident at a point approximately 1.5 miles from the ISFSI. The evaluation of this event is described in detail in Section 2.2.2. A pressure wave of less than 1 psi is estimated to reach the ISFSI.
8.2.4.2 Accident Analysis As described in the SSSC Topical Safety Analysis Reports, a pressure wave of the magnitude associated with this event will not damage the SSSCs or cause tip-over.
8.2.4.3 Accident Dose Calculations The postulated event will not damage the SSSC exterior nor cause SSSC tip-over. This event is not capable of producing leakage from the SSSC. No radioactive material is released, and there are no dose consequences associated with this event.
8.2.5 Fire 8.2.5.1 Cause of Accident The only combustible materials at the ISFSI storage pads are in the form of insulation on instrumentation wiring, and coating of the outside surface of the SSSCs. No other combustible or explosive materials are allowed to be stored on the storage pads. As described in Section 2.1.2, the ISFSI area will be cleared of trees and seeded with grass. In addition, other equipment in the area has adequate separation from the storage pads. Therefore, no fires other than small electrical fires are considered credible at the storage pads.
The fire protection capabilities available at the ISFSI are described in Section 4.4.5.1. These include portable fire extinguishers within the ISFSI perimeter fence. In addition, the fire fighting equipment and personnel present at the North Anna Power Station would be available if needed.
8.2.5.2 Accident Analysis The ability of the SSSCs to withstand postulated fires and the consequence of postulated fires are addressed in the SSSC Topical Safety Analysis Reports. Results of these analyses indicate that the postulated fires are not capable of compromising seal integrity.
8.2.5.3 Accident Dose Calculations The damage to an SSSC due to fire is not capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.
8.2.6 Storage of an Unauthorized Fuel Assembly The ISFSI Technical Specifications specify limiting values for the initial enrichment, average burnup, decay heat, and cooling time after reactor discharge for the fuel assemblies to be
 
Revision 806/14                                       North Anna ISFSI SAR                     8-5 placed in SSSCs. The Technical Specifications also specify required structural attributes for those fuel assemblies. The possibility of storing a fuel assembly that does not meet the Technical Specification requirements has been considered.
8.2.6.1 Cause of Accident The cause of this event is postulated to be an error during the loading operations, e.g., the wrong fuel assembly is selected by the fuel handling operator, or a failure in the administrative controls governing the fuel handling operations.
8.2.6.2 Accident Analysis The loading of an unauthorized fuel assembly has no consequence while the SSSC remains in the spent fuel pool. The borated water in the spent fuel pool provides adequate protection against a criticality event, and also provides shielding and heat removal. Loading of an unirradiated fuel assembly will not cause a criticality event because SSSC criticality analyses must show subcritical conditions assuming all fuel assemblies are unirradiated. Loading of an unauthorized fuel assembly with gross cladding defects will not cause further damage to the cladding or result in the release of radioactive material. Loading of an unauthorized fuel assembly with structural defects will likely be detected during placement of the assembly in the SSSC. In order to preclude this event from going undetected, however, and to ensure that appropriate corrective actions can take place prior to placing the lid on an SSSC, a final verification of the identity and location of the fuel assemblies loaded into the SSSCs is performed with an underwater video camera to ensure that the correct fuel assemblies have been loaded into the SSSC.
These administrative controls and the records associated with them are included in the procedures described in Chapter 9 and in the proposed license requirements described in Chapter 10, and will comply with the applicable requirements of the Quality Assurance Program described in Chapter 11.
Appropriate and sufficient actions will be taken to ensure that a fuel assembly loading error does not remain undetected. In particular, the storage of an unauthorized fuel assembly is not considered credible in view of the multiple administrative controls.
8.2.6.3 Accident Dose Calculations The storage of an unauthorized fuel assembly is not considered to be a credible event. No radioactive material is released, and there are no dose consequences associated with this event.
8.2.7 Loss of Neutron Shield The design of the SSSCs includes neutron absorbing material either internal or external to the SSSC body. As applicable to the particular SSSC design, the SSSC Topical Safety Analysis Reports discuss a postulated loss of neutron shield. As concluded in these documents, a total loss of neutron shield is not a credible event for the North Anna ISFSI.
 
Revision 806/14                                    North Anna ISFSI SAR                        8-6 8.2.8 SSSC Seal Leakage The SSSCs feature redundant seals in conjunction with extremely rugged body designs.
Additional barriers to the release of radioactive material are provided by the sintered fuel pellet matrix and the zircaloy cladding. Furthermore, the fuel cavity helium pressure is substantially less than the helium pressure-of the volume monitored by the pressure monitoring device. The pressure monitoring device provides an early warning of a decrease in the pressure of this monitored volume. No credible mechanisms that could result in leakage of radioactive material have been identified.
8.2.9 SSSC Drops SSSC handling and drop events postulated to occur in the Fuel and Decontamination Buildings are addressed in Appendices 9B and 15A of the North Anna Power Station UFSAR.
The SSSCs are designed to withstand drops of at least 15 inches without compromising SSSC integrity. SSSC drops in excess of these heights at the ISFSI, or during transport, are not considered credible because of procedures that preclude the lifting of the SSSCs any higher.
Analyses of SSSC drop events are presented in the SSSC Topical Safety Analysis Reports.
8.2.10 Loss of Confinement Barrier The following postulated event scenario is not considered to be credible. It is hypothesized solely to demonstrate the inherent safety of the North Anna ISFSI by subjecting it to a set of simultaneous multiple failures, any one of which is far beyond the capability of natural phenomena or man-made hazards to produce.
8.2.10.1 Cause of Accident A simultaneous failure of all protective layers of radioactive material confinement is postulated to occur by unspecified nonmechanistic means for a single SSSC.
8.2.10.2 Accident Analysis In this event, the SSSC confinement function is nonmechanistically removed. Heat removal and radiation shielding functions are assumed to continue to operate in the normal passive manner.
This event was analyzed for a TN-32 cask based on the requirements of NUREG-1536 (Reference 1), Interim Staff Guidance-5 (ISG-5), Revision 1 (Reference 2), and the following inputs:
: 1. Isotope inventories are based on 32 fuel assemblies with an enrichment of 3.30 weight percent U-235, burnup of 45,000 MWD/MTU and seven years decay. This enrichment was selected after reviewing the enrichment and burnup of all North Anna spent fuel to ensure that this enrichment is bounding. Using a lower enrichment yields a bounding isotope inventory, and is in accordance with NRC ISG-6 (Reference 3).
 
Revision 806/14                                      North Anna ISFSI SAR                      8-7
: 2. The Co-60 source is calculated based on the surface area of a 17 x 17 fuel assembly and a seven year decay time from discharge.
: 3. The cask seal leak rate calculated in Reference 4 was increased by 50 percent.
: 4. The maximum boundary dispersion factor (X/Q) calculated for the North Anna site (see Table 2-1).
: 5. The breathing rate identified in Reference 4.
: 6. The bounding dose conversion factors in EPA Guidance Report No. 11 (Reference 5) are used to calculate the whole body, critical organ, and thyroid dose from inhalation.
: 7. The bounding dose conversion factors in EPA Guidance Report No. 12 (Reference 6) are used to calculate the whole body, critical organ, thyroid, and skin dose from immersion.
The isotopes used in the analysis were based on the selection criteria in ISG-5, Revision 1, including Co-60 in the fuel rod crud, iodine-129, tritium, metastable tellurium-125, fission products that contribute greater than 0.1% of activity, and actinides that contribute greater than 0.01% of activity. The isotope concentrations were used with the release fractions, the free volume in the cavity of the TN-32 cask (5.39 cubic meters), and the cask seal leak rate to calculate the isotope release rate (Ci/sec) from the cask. The isotope release rate is used over a 30-day period to calculate a release inventory in curies.
Using this release inventory, the bounding dose conversion factors from EPA Guidance Report No. 11, the maximum dispersion factor (X/Q), and the breathing rate from Reference 3, the site boundary inhalation dose for each isotope was calculated. Similarly, using this release inventory, the bounding dose conversion factors from EPA Guidance Report No. 12, and the maximum bounding dispersion factor (X/Q), the site boundary immersion dose for each isotope was calculated.
8.2.10.3 Accident Dose Calculations This accident evaluation, performed to determine the radiological consequences of a release of the inventory in an SSSC, resulted in a deep dose plus committed dose equivalent to the worst organ (bone marrow) of 13 mrem at the nearest site boundary. This dose is well within the criteria of 10 CFR 72.106(b).
8.2.11 References
: 1. NUREG-1536, Standard Review Plan for Dry Cask Storage Systems, US NRC, Spent Fuel Project Office.
: 2. Interim Staff Guidance-5, Revision 1, Confinement Evaluation, US NRC Spent Fuel Project Office.
: 3. Interim Staff Guidance-6, Minimum Enrichment for Design Basis, US NRC Spent Fuel Project Office.
 
Revision 806/14                                    North Anna ISFSI SAR                    8-8
: 4. TN-32 Final Safety Analysis Report, Revision 0, Transnuclear Inc., January 2000.
: 5. U. S. Environmental Protection Agency, Federal Guidance Report No. 11, Limiting Values of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion, EPA 520/1-88-020, 1988.
: 6. U. S. Environmental Protection Agency, Federal Guidance Report No. 12, External Exposure to Radionuclides in Air, Water, and Soil, EPA 402-R-93-081, September 1993.
8.3 SITE CHARACTERISTICS AFFECTING SAFETY ANALYSIS Site characteristics have been considered in the formation of the bases for these safety analyses. Conditions of meteorology were used in the determination of /Q values as well as the characteristics of extreme winds and their contribution to maximum flood level. Regional and site seismology and geology were used to help define the design earthquake acceleration value.
Regional population distribution and other demographic data were used to determine radiation doses.
 
Revision 806/14                                      North Anna ISFSI SAR                    9-1 Chapter 9        CONDUCT OF OPERATIONS 9.1 ORGANIZATIONAL STRUCTURE 9.1.1 Corporate Organization The ISFSI will be operated under the same corporate management organization responsible for operation of the North Anna Power Station. This organization is depicted in the Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1 (QA Program Topical Report).
9.1.1.1 Corporate Functions, Responsibilities, and Authorities Corporate functions, responsibilities and authorities for the North Anna ISFSI are discussed in the QA Program Topical Report.
9.1.1.2 Applicants In-House Organization A discussion of Virginia Powers in-house organization is provided in the QA Program Topical Report.
9.1.1.3 Relationships with Contractors and Suppliers The SSSC suppliers are responsible for the fabrication and testing of the SSSCs, and for recommending SSSC handling procedures. The Nuclear Analysis and Fuel Department is the primary interface with the SSSC supplier and other equipment vendors.
Site preparation and construction will be performed by Virginia Power, using specialty subcontractors, as required.
9.1.1.4 Applicants Technical Staff Virginia Powers technical staff is described in the QA Program Topical Report.
9.1.2  Operation Organization, Management, and Administrative Control System 9.1.2.1 Onsite Organization The North Anna Power Station onsite organization is described in the QA Program Topical Report.
9.1.2.2 Personnel Functions, Responsibilities, and Authorities Personnel functions, responsibilities and authorities are described in the QA Program Topical Report.
 
Revision 806/14                                    North Anna ISFSI SAR                        9-2 9.1.3  Personnel Qualification Requirements 9.1.3.1 Minimum Qualification Requirements Each member of the North Anna Power Station staff is required to meet or exceed the minimum qualifications specified in the QA Program Topical Report.
9.1.3.2 Qualifications of Personnel The qualification requirements for the managerial and technical positions are described in the QA Program Topical Report.
9.1.4 Liaison with Outside Organizations Dames & Moore provided geotechnical expertise initially required to evaluate site conditions and to design the ISFSI structures and foundations. SSSC vendors provide technical expertise in the design, fabrication and use of the SSSCs. Bechtel Power Corporation provided expertise in the development of computer models to initially assess radiation doses.
9.2 STARTUP TESTING AND OPERATION 9.2.1  Administrative Procedures for Conducting Test Program The administrative procedures and instructions for the North Anna ISFSI are the same as those used for the North Anna Power Station. Any changes to, or deviations from, these procedures and instructions are reviewed and approved in accordance with the QA Program Topical Report.
9.2.2 Test Program Description The objectives of the pre-operational testing program are to ensure that the SSSCs perform their safety functions as intended and that the means to fulfill the commitments made in Chapter 10 are available.
9.2.2.1 Physical Facilities Before operation of the ISFSI, the SSSC monitoring instrumentation, the electrical system, the communications system and the security system are tested to ensure their proper functioning.
The ISFSI security system is tested after completion of its installation. Details on security system testing are provided in the Security Plan.
The SSSC monitoring instrumentation alarms are tested to ensure that individual alarm signals annunciate at the local annunciator enclosure at the ISFSI location.
The electrical system is tested to ensure that power is available for the SSSC monitoring instrumentation and the local annunciator. The lighting and service receptacles are also tested for proper operation.


9.1.1.4 Applicant's Technical StaffVirginia Power's technical staff is descr ibed in the QA Program Topical Report.9.1.2Operation Organization, Man agement, and Administrative  Control System 9.1.2.1 Onsite Organization The North Anna Power Station onsite or ganization is described in the QA Program Topical Report.
Revision 806/14                                     North Anna ISFSI SAR                     9-3 The communications system is tested to ensure that the telephone at the local annunciator is properly connected into the station phone system.
9.1.2.2 Personnel Functions, Responsibilities, and Authorities Personnel functions, responsi bilities and authorities are de scribed in the QA Program T opical Report.
9.2.2.2 Operations Testing of SSSC operations, i.e., loading, drying, sealing and unloading, shall be conducted prior to the first use of each SSSC design. This simulation shall include all SSSC loading and unloading operations, with the exception of loading actual fuel assemblies into the SSSC. SSSC loading will instead be tested with a dummy fuel assembly to ensure that fuel assemblies will fit properly into the SSSC. All SSSCs are tested for fuel assembly fit by the vendor at the fabrication facility. The SSSCs are also tested by the vendor to ensure that they seal properly. New seals are installed prior to and tested following fuel loading.
Revision 8-06/14 North Anna ISFSI SAR 9-29.1.3Personnel Qualification Requirements 9.1.3.1 Minimum Qualification RequirementsEach member of the North Anna Power Station staff is re quired to meet or exceed the minimum qualifications specified in the QA Program Topical Report.
The function of the transporter is tested prior to its first use with each new SSSC design using an empty SSSC for a transport simulation to and from the ISFSI, including placement of the SSSC at a storage location.
9.1.3.2 Qualifications of PersonnelThe qualification requirements fo r the managerial and technica l positions are described in the QA Program T opical Report.9.1.4Liaison with Outside OrganizationsDames & Moore provided geotechnical expert ise initially required to evaluate site conditions and to d esign the ISFSI structures and foundations. SSSC vendors provide technical expertise in the design, fabric ation and use of the SSSCs. Bechtel Power Corporation provided expertise in the development of computer models to initially assess radiation doses.
9.2.3 Test Discussion The pre-operational test purposes, responses, acceptance criteria, margins, and corrective actions are discussed in Section 9.2.2. Instrumentation, electrical, and communications equipment shall be functionally tested to confirm operability. Acceptance criteria for SSSC seal testing shall be as specified in Section 3.3.
9.2 STARTUP TESTING AND OPERATION9.2.1Administrative Procedures for Conducting Test ProgramThe administrative procedures and instructions for the North Anna ISFSI are the same as those used for the North Anna Power Station. Any changes to, or de viations from, these procedures and instructions are reviewed and approved in accordance with the QA Program Topical Report.9.2.2Test Program DescriptionThe objectives of the pre-operat ional testing program are to ensure that the SSSCs perform their safety functions as inte nded and that the means to fulfill the commitments made in Chapter 10 are available.
9.3 TRAINING PROGRAM The training program has the objective of providing and maintaining a well qualified work force for safe and efficient operation of the ISFSI. All personnel working in the fuel storage area receive radiation and safety training. Those personnel actually performing SSSC and fuel handling functions are given additional training in specific areas as required by the radiological protection program in effect at the North Anna Power Station.
9.2.2.1 Physical Facilities Before operation of the ISFSI, the SSSC monitoring instrument ation, the electrical system, the communications system and the security system are tested to ensure their proper functioning.
All personnel working at the North Anna ISFSI receive training and indoctrination geared toward providing and maintaining a well-qualified work force for safe and efficient operation of the ISFSI. The existing North Anna training programs are INPO accredited and are directly applicable to the North Anna ISFSI, and provide this training and indoctrination. Additional training requirements specific to the ISFSI will address the following subjects:
The ISFSI security system is test ed after completion of its installation. Deta ils on security system testing are pro vided in the Security Plan.
* ISFSI Licensing Basis and Technical Specifications
The SSSC monitoring instrumentat ion alarms are tested to en sure that indi vidual alarm signals annunciate at the local annuncia tor enclosure at the ISFSI location.
* ISFSI Layout and Function
The electrical system is tested to ensure that power is available for the SSSC monitoring instrumentation and the local annunciator. The light ing and service receptacle s are also tested for proper operation.
* ISFSI Security
Revision 8-06/14 North Anna ISFSI SAR 9-3 The communications system is tested to ensure that the telephone at the local annunciator is properly connected into the station phone system.
* ISFSI Communications Systems
9.2.2.2 OperationsTesting of SSSC operations, i.
* ISFSI Operation, Emergency, Maintenance, and Administrative Procedures
e., loading, drying, sealing and unloading, shall be conducted prior to the f irst use of each SSSC design. This simulation shall includ e all SSSC loading and unloading operations, with the exception of loading actual fuel assemblies into the SSSC. SSSC loading will instead be tested with a dummy fuel assembly to ensure that fuel assemblies will fit properly into the SSSC. All SSSCs are tested for fuel assembly fit by the vendor at the fabrication facility. The SSSCs are also tested by the vendor to ensure that they seal properly. New seals are installed prior to and tested following fuel loading.
 
The function of the transporter is tested prio r to its first use with each new SSSC design using an empty SSSC for a trans port simulation to and from the ISFSI, including placement of the SSSC at a storage location.9.2.3Test Discussion The pre-operational test purpo ses, responses, acceptance criter ia, margins, and corrective actions are discussed in Section 9.2.2. Instrumentation, electrical, and communications equipment shall be functionally tested to c onfirm operability. Acceptance crit eria for SSSC seal testing shall be as specified in Section 3.3.9.3 TRAINING PROGRAMThe training program has the objective of prov iding and maintaining a well qualified work force for safe and efficient operation of the ISFSI. All personnel wo rking in the fuel storage area receive radiation and safety training. Those personnel actuall y performing SSSC and fuel handling functions are given additional training in specific areas as required by the radiological protection program in effect at the North Anna Power Station.All personnel working at the North Anna ISFSI receive training and indoctrination geared toward providing and maintaining a well-qualified work force for safe and efficient operation of the ISFSI. The existing North Anna training programs are INPO accredited and are directly applicable to the North Anna ISFSI, and provide this train ing and indoctrina tion. Additional training requirements specific to the ISFSI will address the following subjects:ISFSI Licensing Basis and Technical SpecificationsISFSI Layout and FunctionISFSI SecurityISFSI Communications SystemsISFSI Operation, Emergency, Mainten ance, and Administrative Procedures Revision 8-06/14 North Anna ISFSI SAR 9-4SSSC Loading and Unloading, Handl ing and Onsite TransportationSSSC Decontamination TechniquesFollowing completion of the I SFSI training program, trainees are given a written and practical exam to ensure they understand the important aspects of th e information described above. Retention of training records and certifications of proficiency is consistent with that for personnel involved in fuel handling operations.
Revision 806/14                                       North Anna ISFSI SAR                   9-4
ISFSI retraining is consistent with the retraining requireme nts in ef fect at the North Anna Power Station for personnel involved in fuel handling operations.Training records are maintained for in accord ance with the QA Prog ram Topical Report. Such records include dates and hours of training and other documentation on training subjects, information on physical requirements, job pe rformance statements, copies of written examinations, information pertaining to walk-through examinations, and retesting particulars.
* SSSC Loading and Unloading, Handling and Onsite Transportation
9.4 NORMAL OPERATIONS9.4.1Procedures Written procedures for all nor mal operating, maintenance, and testing at the ISFSI will be prepared and will be in ef fect prior to operati on of the North Anna ISFSI. These procedures are briefly described in Sections 9.4.1.1 through 9.4.1.8.These procedures, and any subsequent revisions, will be reviewed and approved in accordance with the QA Program Topical Report. All procedure revisions shall be documented.The Nuclear Oversight Department periodically audits (on a sam pling basis) the procedures to ensure re visions are made promptly and that obsolete material is deleted.
* SSSC Decontamination Techniques Following completion of the ISFSI training program, trainees are given a written and practical exam to ensure they understand the important aspects of the information described above. Retention of training records and certifications of proficiency is consistent with that for personnel involved in fuel handling operations.
9.4.1.1 Administrative ProceduresAdministrative procedures wi ll provide a clear understandi ng of operating philosophy and management policies to all ISFSI personnel. These proce dures include instruct ions pertaining to personnel conduct and contro l, including consideration of job-related factors which influence the effectiveness of operating and maintenance personnel, e.g., work hours, entering and exiting the ISFSI, organization, and responsibility, etc.
ISFSI retraining is consistent with the retraining requirements in effect at the North Anna Power Station for personnel involved in fuel handling operations.
9.4.1.2 Annunciator ProceduresAnnunciator procedures will provide informat ion relative to each alarm annunciator which monitors SSSC parameters. The procedures will provide alarm set points and appropriate corrective action.
Training records are maintained for in accordance with the QA Program Topical Report.
Revision 8-06/14 North Anna ISFSI SAR 9-5 9.4.1.3 Health Physics ProceduresHealth physics procedures are used to imp lement the radiation protection plan. The radiation protection plan involves the acquisition of data and prov ision of equipment to perform necessary radiation surveys, measurements, and evaluations for the assessm ent and control of radiation hazards associated with the operation of the ISFSI. Procedures have been developed and implemented for monitoring exposures of employ ees, utilizing accepted techniques, radiation surveys of work areas, radi ation monitoring of maintenance activiti es, and for records maintenance demonstrating the adequacy of measures taken to control radiation exposures of employees and others within prescribed limits and as low as practicable. These procedures will be revised as needed to address ISFSI operations prior to operation of the ISFSI. The revised procedures will ensure the safety of personnel performing loading, transport, and unloading operations, and surveillance and maintenance at the ISFSI. Entrance to the ISFSI and all work performed inside will require a radiation work permit and will be controlled by health physics and security personnel.
Such records include dates and hours of training and other documentation on training subjects, information on physical requirements, job performance statements, copies of written examinations, information pertaining to walk-through examinations, and retesting particulars.
9.4.1.4 Maintenance Procedures Maintenance procedures will be established fo r performing preventative and corrective maintenance on ISFSI equipment and the SCCSs. Preventative main tenance will be performed on a periodic basis to preclude the degradation of ISFSI systems, equipment, and components. Corrective maintenance will be performed to rectify any unexpected sy stem, equipment, or component malfunction, as the need arises.
9.4 NORMAL OPERATIONS 9.4.1 Procedures Written procedures for all normal operating, maintenance, and testing at the ISFSI will be prepared and will be in effect prior to operation of the North Anna ISFSI. These procedures are briefly described in Sections 9.4.1.1 through 9.4.1.8.
9.4.1.5 Operating Procedures The operating procedures will pro vide the instru ctions for handli ng, loading, sealing, transporting, storing and unloading the SSSCs.
These procedures, and any subsequent revisions, will be reviewed and approved in accordance with the QA Program Topical Report. All procedure revisions shall be documented.
The Nuclear Oversight Department periodically audits (on a sampling basis) the procedures to ensure revisions are made promptly and that obsolete material is deleted.
9.4.1.1 Administrative Procedures Administrative procedures will provide a clear understanding of operating philosophy and management policies to all ISFSI personnel. These procedures include instructions pertaining to personnel conduct and control, including consideration of job-related factors which influence the effectiveness of operating and maintenance personnel, e.g., work hours, entering and exiting the ISFSI, organization, and responsibility, etc.
9.4.1.2 Annunciator Procedures Annunciator procedures will provide information relative to each alarm annunciator which monitors SSSC parameters. The procedures will provide alarm set points and appropriate corrective action.
 
Revision 806/14                                     North Anna ISFSI SAR                     9-5 9.4.1.3 Health Physics Procedures Health physics procedures are used to implement the radiation protection plan. The radiation protection plan involves the acquisition of data and provision of equipment to perform necessary radiation surveys, measurements, and evaluations for the assessment and control of radiation hazards associated with the operation of the ISFSI. Procedures have been developed and implemented for monitoring exposures of employees, utilizing accepted techniques, radiation surveys of work areas, radiation monitoring of maintenance activities, and for records maintenance demonstrating the adequacy of measures taken to control radiation exposures of employees and others within prescribed limits and as low as practicable. These procedures will be revised as needed to address ISFSI operations prior to operation of the ISFSI. The revised procedures will ensure the safety of personnel performing loading, transport, and unloading operations, and surveillance and maintenance at the ISFSI. Entrance to the ISFSI and all work performed inside will require a radiation work permit and will be controlled by health physics and security personnel.
9.4.1.4 Maintenance Procedures Maintenance procedures will be established for performing preventative and corrective maintenance on ISFSI equipment and the SCCSs. Preventative maintenance will be performed on a periodic basis to preclude the degradation of ISFSI systems, equipment, and components.
Corrective maintenance will be performed to rectify any unexpected system, equipment, or component malfunction, as the need arises.
9.4.1.5 Operating Procedures The operating procedures will provide the instructions for handling, loading, sealing, transporting, storing and unloading the SSSCs.
9.4.1.6 Test Procedures Periodic test procedures will be established to verify operability of the ISFSI systems, equipment, and components on a routine basis.
9.4.1.6 Test Procedures Periodic test procedures will be established to verify operability of the ISFSI systems, equipment, and components on a routine basis.
9.4.1.7 Pre-operational Test Procedures Pre-operational test proce dures will be established to ensure that ISFSI structures, systems, and components satisfactorily perform their required functions. These test procedures will further ensure that the ISFSI has been properly designed and co nstructed and is rea dy to operate in a manner that will not endanger the health and safety of the public.
9.4.1.7 Pre-operational Test Procedures Pre-operational test procedures will be established to ensure that ISFSI structures, systems, and components satisfactorily perform their required functions. These test procedures will further ensure that the ISFSI has been properly designed and constructed and is ready to operate in a manner that will not endanger the health and safety of the public.
9.4.1.8 Procedures Implemen ting the QA Pr ogram Procedures will be establi shed to ensure that the operati on and maintenance of the ISFSI is performed in accordance with the QA program described in Chapter 11.
9.4.1.8 Procedures Implementing the QA Program Procedures will be established to ensure that the operation and maintenance of the ISFSI is performed in accordance with the QA program described in Chapter 11.
Revision 8-06/14 North Anna ISFSI SAR 9-69.4.2RecordsIn accordance with the requirements of 10 CFR 72.72, records on the identity of each fuel assembly will be maintained wi th SSSC loading procedures, and shall include the following:Fuel manufacturerDate of deliveryReactor exposure historyBurnupCalculated special nuclear material content Inventory control numberPertinent data on discharge and storage at the reactor , transfer to the I SFSI and storage at the ISFSI All records related to the ISFSI, including those for qu ality assurance, operations, accountability, off-normal occurrences, events associated with radioactive releases and environmental surveys shall be maintained by the North Anna Power Station document management system.
 
9.5 EMERGENCY PLANNING The North Anna Emergency Plan (NAEP) describes the or ganization, assessment actions, conditions for activation of the emergency organization, notification procedures, emergency facilities and equipment, training, provisions for maintaining emergency preparedness, and recovery criteria used at the North Anna Power Station. This emergenc y plan will also be used for any radiological emergencies th at may arise at the North Anna ISFSI.
Revision 806/14                                     North Anna ISFSI SAR                       9-6 9.4.2    Records In accordance with the requirements of 10 CFR 72.72, records on the identity of each fuel assembly will be maintained with SSSC loading procedures, and shall include the following:
Portions of Section 4 of the NAEP and applicable imp lementing procedures reflect the conditions and indications that require entry in to the Emergency Plan. Appropriate response actions and notifications have been established in the Emergency Plan. Damage to a loaded SSSC confinement boundary requires declaration of a Notification of Unusual Event.
* Fuel manufacturer
9.6 PHYSICAL SECURITY PLAN The purpose of a security program for the ISFSI is to est ablish and maintain a ph ysical security capability for the protection of the spen t fuel stored in the SSSC
* Date of delivery
: s. The physical security program for the North Anna ISFSI is provided in the Ph ysical Security Plan, Safe guards Contingency Plan and the Nuclear Security Personnel Training and Qualification Plan for the North Anna Power Station.Additional information regard ing the security program for th e ISFSI is contained in a separate enclosure, that is withheld from public disclosure in accordance with 10 CFR 2.790(d) and 10 CFR 73.21.
* Reactor exposure history
Revision 8-06/14 North Anna ISFSI SAR 10-1Chapter 10OPERATING CONTROLS AND LIMITS 10.1 PROPOSED OPERATING CONTROLS AND LIMITS The proposed operating controls and limits for the North Anna ISFSI are pr o vided in the North Anna ISFSI Technical Specifications. The Te chnical Specifications contain definitions, functional and operating limits, li miting conditions for operation, the applicability for the limiting conditions, action statements, surveillance requ irements, design features, and administrative controls. Functional and operating limits are utilized to protect the integrity of the stored fuel or SSSC, and to guard against the uncontrolled release of radioactive materials. The items addressed by the functional and operating limits are provided in Table 10-1. The limiting conditions for operation specify the lowest functional capability or performance levels for equipment required for safe operation. The items addr essed by the limiting conditions for operation are provided in Table 10-2.10.1.1 Content of Operating Controls and Limits The functional and operating lim its, and the limiting conditi ons for operation specify the required technical limits and operating status for the variables, techni cal characteristics and conditions, and equipment addressed by the Technical Specifications. The applicability specifies the equipment, time period, or operational condi tion to which the operati ng controls and limits apply. The action statements provide the corrective action instructions that must be followed if the technical limits or operating status requirements are not met. The surveillance requirements specify the verification needed to assure that the func tional and operating limits, and the limiting conditions for operation are being met.
* Burnup
10.1.2 Bases for Operating Controls and LimitsA basis is provided with each functional and operating limit, and each limiting condition for operation in the North Anna ISFSI Technical Specifications. E ach basis describes the significance to safety of the required technical limits and operating status established for the variables, technical characteristics and conditions, and equipment addressed by the Technical Specifications.
* Calculated special nuclear material content
10.2 DEVELOPMENT OF OPERATI NG CONTR OLS AND LIMITS 10.2.1 Functional and Operating Limits Functional and operating limits have been established in order to define the requirements for the fuel to be stored at the ISFSI. The functional and operating limits for the parameters listed in Table 10-1 are provided in Chapter 2.0 of the North Anna ISFSI Technical Specifications.
* Inventory control number
10.2.2 Limiting Conditions for OperationLimiting conditions for operat ion have been established to control the equipment, and technical conditions and charac teristics of the ISFSI necessary for continued operation. The Revision 8-06/14 North Anna ISFSI SAR 10-2 limiting conditions for operation of equipment address the lo west acceptable level of performance for a system or component, and the minimum portion of the syst em or the minimum number of components that should be available. The limiting conditions for oper ation for technical conditions and characteristics address allowable qu antities during loading, transport, storage, and unloading operations. The limiting conditions for operation for the equipment, and technical conditions and characteristics listed in Table 10-2 are provided in Chapter 3.0 of the North Anna ISFSI Technical Specifications.
* Pertinent data on discharge and storage at the reactor, transfer to the ISFSI and storage at the ISFSI All records related to the ISFSI, including those for quality assurance, operations, accountability, off-normal occurrences, events associated with radioactive releases and environmental surveys shall be maintained by the North Anna Power Station document management system.
10.2.3 Surveillance RequirementsSurveillance requirements have been established in order to confirm that the limiting conditions for safe storage are met. Surveillance requirements have been established for each functional and operating limit, a nd limiting conditi on for operation, and are provided with them in Chapter 3.0 of the North Anna ISFSI Technical Specifications.
9.5 EMERGENCY PLANNING The North Anna Emergency Plan (NAEP) describes the organization, assessment actions, conditions for activation of the emergency organization, notification procedures, emergency facilities and equipment, training, provisions for maintaining emergency preparedness, and recovery criteria used at the North Anna Power Station. This emergency plan will also be used for any radiological emergencies that may arise at the North Anna ISFSI.
10.2.4 Design Features The design features d escribe ISFSI design ch aracteristics of im portance. The design features are provided in Chapter 4.0 of the North Anna ISFSI Technical Specifications.
Portions of Section 4 of the NAEP and applicable implementing procedures reflect the conditions and indications that require entry into the Emergency Plan. Appropriate response actions and notifications have been established in the Emergency Plan. Damage to a loaded SSSC confinement boundary requires declaration of a Notification of Unusual Event.
10.2.5 Administrative ControlsThe administrative controls include the organization and management procedures, recordkeeping, review and audit, and reporting necessary to assure that the operations involved in the storage of spent fuel at the North Anna ISFSI is performed in a safe manner. The administrative controls are provided in Chapter 5.0 of the North Anna ISFSI Technical Specifications.
9.6 PHYSICAL SECURITY PLAN The purpose of a security program for the ISFSI is to establish and maintain a physical security capability for the protection of the spent fuel stored in the SSSCs. The physical security program for the North Anna ISFSI is provided in the Physical Security Plan, Safeguards Contingency Plan and the Nuclear Security Personnel Training and Qualification Plan for the North Anna Power Station.
Revision 8-06/14 North Anna ISFSI SAR 10-3Table 10-1FUNCTIONAL AND O PERATING LIMITSFuel To Be Stored At The ISFSITable 10-2LIMITING CONDITIONS FOR OPERATIONSSSC Cavity Vacuum Drying PressureSSSC Helium Backfill PressureSSSC Combined Helium Leak Rate SSSC Internal PressureSSSC Maximum Lifting HeightDissolved Boron Concentration SSSC Average Surface Dose RatesSSSC Surface ContaminationHelium Purity SSSC SpacingUranium Content per Assembly Revision 8-06/14 North Anna ISFSI SAR 10-4 Intentionally Blank Revision 8-06/14 North Anna ISFSI SAR 11-1Chapter 11QUALITY ASSURANCE 11.1 QUALITY ASSURANCE PROGRAM DESCRIPTION 10 CFR 72.140 requires that a quality assurance pr ogram be established and implemented for the structures, systems, and components of an ISFSI that are important to safety, commensurate with their importance to safety. However, 10 CFR 72.140 provides for the use of previously approved programs.Since Virginia Power is currently licensed under 10 CFR 50 to operate nuclear power facilities, a quality assurance (QA) program me eting the requirements of 10 CFR 50, Appendix B is already in place. The govern ing document for this program is the Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1 (QA Program Topical Report), which has been reviewed and approved by the NRC. (See Section 1.5.) The document is updated in accordance with 10 CFR 50.54(a). The NRC is periodically notif ied of changes to the document. This program is implemented through the Virginia Power administrative and technical procedures. The objective of the company Quality Assurance Program for operating nuclear power stations is to comply with the criteria expressed in 10 CFR 50, Appendix B, as amended, and with the quality assurance program requirements for nuclear powe r plants as referenced in the Regulatory Guides and ANSI standards referenced in the QA Program Topical Report. This program will be applied to those activities associated with the North Anna ISFSI that are important to safety. No changes to this program are required for the ISFSI activities.As indicated in previous chapters, the SSSCs are the onl y components with a safety function. As such, Virginia Power procedures delinea te the requirements for the engineering, procurement, fabrication, an d inspection of this equipment. The procurement documents (specifications, requisitions, etc.) are reviewed technically prior to use to ensure that the proper criteria have been specified. During the SSSC design phase, vendor information (drawings, specifications, procedures, etc.) are reviewed to ensure compliance with Virginia Power's technical requirements. During SSSC fabrication, Virginia Power's Vendor Surveillance Representative will visit the vendor's shop to ensure compliance with Virginia Power's requirements and to witness parts of the SSSC fabrication and testing.
Additional information regarding the security program for the ISFSI is contained in a separate enclosure, that is withheld from public disclosure in accordance with 10 CFR 2.790(d) and 10 CFR 73.21.
Revision 8-06/14 North Anna ISFSI SAR 11-2 Intentionally Blank Revision 8-06/14 North Anna ISFSI SARA-1Appendix ASSSC Specific InformationThis appendix provides:A list of the Topical Safe ty Analysis Reports for SSSCs approved by the USNRC for use at the North Anna ISFSI (see Table A-1).A subappendix for each SSSC type that prov ides specific references to the SSSC Topical Safety Analysis Reports, and supplements the information contained in the SSSC Topical Safety Analysis Reports.
 
Revision 8-06/14 North Anna ISFSI SARA-2Table A-1TOPICAL SAFETY ANALYSIS REPORTS F OR SSSCs APPROVED FOR USE AT THE NORTH ANNA ISFSI A.1.TN-32 Dry Storage Cask Topi cal Safety Analysis Report, Revision 9A, Transnuclear, Inc., December 1996.
Revision 806/14                                       North Anna ISFSI SAR                     10-1 Chapter 10 OPERATING CONTROLS AND LIMITS 10.1 PROPOSED OPERATING CONTROLS AND LIMITS The proposed operating controls and limits for the North Anna ISFSI are provided in the North Anna ISFSI Technical Specifications. The Technical Specifications contain definitions, functional and operating limits, limiting conditions for operation, the applicability for the limiting conditions, action statements, surveillance requirements, design features, and administrative controls. Functional and operating limits are utilized to protect the integrity of the stored fuel or SSSC, and to guard against the uncontrolled release of radioactive materials. The items addressed by the functional and operating limits are provided in Table 10-1. The limiting conditions for operation specify the lowest functional capability or performance levels for equipment required for safe operation. The items addressed by the limiting conditions for operation are provided in Table 10-2.
Revision 8-06/14 North Anna ISFSI SARA.1-1Appendix A.1TN-32 DRY STORAGE CASK A.1.1 General Description The TN-32 cask is a smooth right circular cylinder of multi-wall construction that is approximately 16.8 feet high, 8.1 feet in diameter and weighs (empty) approximately 91.0 tons. The cask inner shell and contai nment vessel is a welded, carbon steel cylinder that is 1.5 inches thick and has a spraye d metallic aluminum co ating for corrosion prot ection. Surrounding the outside of the containment vessel wall is a steel gamma shield with a wall thickness of 8.0 inches. The bottom end of the gamma sh ield has a thickness of 8.75 inches. The cask ha s a cylindrical cavity which holds a fuel bask et designed to accommodate 32 PWR fuel assemblies. The loaded weight of the cask is approximately 115.5 tons. Four trunnions are weld ed on, tw o at the top end and two at the bottom end of the body.During fabrication of the TN-32 cask, the inner containment vessel and the gamma shielding are fit together by a shrink-fit procedure. The gamma shielding is heated so that the inner containment vessel, with the flange attached, can be inserted into the outer gamma shielding vessel. This allows a close fit between the two cy lindrical shells for good heat transfer. During the shrink fit operation, a small circumferential gap between the flange of the inner vessel and the gamma shielding forms as the heated gamma shield cools. Prior to welding the flange to the gamma shield, the gap is filled w ith shims made of one of the materials specified in the TN-32 TSAR for the gamma shield shell.The cask is sealed with one carbon steel lid bolted to the top flange of the containment vessel. The lid is 10.5 inches thick and is secured to the cask body with 48 bolts. The lid and lid penetration covers are sealed with metallic O-ring seals.Neutron shielding is provided by a 4.5-inch thick resi n compound enclosed in long aluminum box es that surround the gamma shield. The neutron shield boxes are enclosed by a painted carbon steel shell that is 0.50 inches thick.In Chapter 1 of the TN-32 Topical Safe ty Analysis Report (Rev.
10.1.1 Content of Operating Controls and Limits The functional and operating limits, and the limiting conditions for operation specify the required technical limits and operating status for the variables, technical characteristics and conditions, and equipment addressed by the Technical Specifications. The applicability specifies the equipment, time period, or operational condition to which the operating controls and limits apply. The action statements provide the corrective action instructions that must be followed if the technical limits or operating status requirements are not met. The surveillance requirements specify the verification needed to assure that the functional and operating limits, and the limiting conditions for operation are being met.
9A, 12/96), drawing 1049-70-2, Rev. 2, includes a view of a cask trunnion (item 6). The back side of the trunnion (weld prep) is shown at a 30 degree angle. This angle shoul d actually be shown as 45 to 50 degrees.Sections 3.1.1, Paragraph 3 of the TN-32 Topical Safe ty Analysis Report (Rev. 9A, 12/96) states that "Other structural a nd stru ctural attachment welds are examined by the liquid penetrant or the magnetic particle met hod in accordance with Section V, Article 6 of the ASME Code.
10.1.2 Bases for Operating Controls and Limits A basis is provided with each functional and operating limit, and each limiting condition for operation in the North Anna ISFSI Technical Specifications. Each basis describes the significance to safety of the required technical limits and operating status established for the variables, technical characteristics and conditions, and equipment addressed by the Technical Specifications.
Accept ance standards are in accordance with Section III, Subsection NF, Paragraph NF-5350."
10.2 DEVELOPMENT OF OPERATING CONTROLS AND LIMITS 10.2.1 Functional and Operating Limits Functional and operating limits have been established in order to define the requirements for the fuel to be stored at the ISFSI. The functional and operating limits for the parameters listed in Table 10-1 are provided in Chapter 2.0 of the North Anna ISFSI Technical Specifications.
However, Paragraph NF-5350 only pertains to liquid penetrant inspec tion. Paragraph NF-5340 pertains to magnetic particle inspection. Se ction 3.1.1, Paragraph 3 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96) should read "Other structur al and structural attachment welds Revision 8-06/14 North Anna ISFSI SARA.1-2are examined by the liquid penetrant or the magnetic particle method in accordance with Sec tion V, Article 6 of the ASME Code. Accep tance standards are in accordance with Section III, Subsection NF, Paragraph NF-5340 and NF-5350."The weld between the aluminum plates separating the fuel storage tubes and the outer aluminum plates at twenty-four locations around the periphery of the fuel basket is shown on TN-32 TSAR drawing 1049-70-6, Rev.
10.2.2 Limiting Conditions for Operation Limiting conditions for operation have been established to control the equipment, and technical conditions and characteristics of the ISFSI necessary for continued operation. The
3 as a 0.25-inch groove we ld. In order to provide consistency with as-built conditions, this weld may alternatively be a 0.25-inch fillet weld.
 
The weld creating the longitudinal seam of the neutron shield outer sh ell is shown on TN-32 TSAR drawing 1049-70-2, Revision 2 as a full penetration weld.
Revision 806/14                                     North Anna ISFSI SAR                     10-2 limiting conditions for operation of equipment address the lowest acceptable level of performance for a system or component, and the minimum portion of the system or the minimum number of components that should be available. The limiting conditions for operation for technical conditions and characteristics address allowable quantities during loading, transport, storage, and unloading operations. The limiting conditions for operation for the equipment, and technical conditions and characteristics listed in Table 10-2 are provided in Chapter 3.0 of the North Anna ISFSI Technical Specifications.
In order to provide improved heat transfer between the outer sh ell and the neutron shield tubes, this weld may alternatively be a partial penetration weld.TN-32 TSAR Revision 9A drawing 1049-70-5 specifies that the top of borated aluminum plates in the fuel basket be placed nominally 11.88 inches from the top of the basket assembly.
10.2.3 Surveillance Requirements Surveillance requirements have been established in order to confirm that the limiting conditions for safe storage are met. Surveillance requirements have been established for each functional and operating limit, and limiting condition for operation, and are provided with them in Chapter 3.0 of the North Anna ISFSI Technical Specifications.
Revision 0 of the TN-32 FSAR, which contains analyses to support loading of fuel with higher burnup and enrichment, specifies that the top of the borated alum inum plates be placed nominally 12.00 inches from the top of the bask et assembly. Since Revision 9A is the TN-32 TSAR of record for the North Anna ISFSI, the dimensions must be reconciled in or der to facilitate future loading of TN-32 casks with North Anna fuel of higher burnup a nd enrichment. Therefore, the nominal dimension may be either 11.88 inches or 12.00 inches without any impact to cask criticality evaluations.
10.2.4 Design Features The design features describe ISFSI design characteristics of importance. The design features are provided in Chapter 4.0 of the North Anna ISFSI Technical Specifications.
The lid bolt analysis presented in Appendix 3A.3 of the TN-32 TSAR has been updated to allo w for torque in the range of 880 ft-lb to 1230 ft-lb, to incorporate High Purity Loctite N-5000 Antiseize lubricant, and to allo w the use of silver-jacketed O-rin gs. In addition, the summary of bolt stresses presented in Table 3.4-7 of the TN-32 TSAR has be en corrected. The updated analysis, figures, and tables are included as   to this appendix. The revised analysis concludes that the code allowable stresses on the bolts are not exceeded for both normal and accident conditions. Pages 3A.3-1 through 3A.3-13, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7 in the TN-32 TSAR Revision 9A are replaced by the attached pages 3A.3-1 through 3A.3-15, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7.In addition to the sections above, Section 7.1.4 of the TN-32 TSAR, Revision 9A, states that the bolt torque for the main lid bolts is 930
10.2.5 Administrative Controls The administrative controls include the organization and management procedures, recordkeeping, review and audit, and reporting necessary to assure that the operations involved in the storage of spent fuel at the North Anna ISFSI is performed in a safe manner. The administrative controls are provided in Chapter 5.0 of the North Anna ISFSI Technical Specifications.
+/- 50 ft-lb and for the penetration port covers the torque is 60
 
+/- 10 ft-lb. In accordance with the lid bolt anal ysis update, the required torque for the main lid bolts is 880 ft-lb to 1230 ft-lb. The required torque for th e penetration cover bolts ranges from 60 ft-lb to 100 ft-lb depending on the bolt material supplied by the vendor.The protective covers at the North Anna ISFSI have been modifi ed from the cover described in TN-32 TSAR Revision 9A to the cover described in the drawings in Attachment
Revision 806/14                               North Anna ISFSI SAR 10-3 Table 10-1 FUNCTIONAL AND OPERATING LIMITS
: 3. The modified protective cover includ es a sealable bolt-on access plate that is both airtight and Revision 8-06/14 North Anna ISFSI SARA.1-3watertight. The access plate has a through-wall fitting that connect s to the OP system on the inside of the protective cover and conn ects to tubing on the outside of the protective cover. This tubing runs down the side of the cask to an instrumentation box in which the pressure switches/transducers are located. In addition, a nother connection is loca ted at the access plate which openly communicates to the atmosphere within the protective cover. The external connection to this fitting will connect to tubing th at also is mounted along the side of the cask.Drawing SK-VP-SAR-1 in Attachment 3 shows the cask with the modified protective cover and pressure switches. Figures VP1.2-1 and VP2.3-1 contained in Attachment 3 illustrate the confinement boundary components and pressure monitoring system. The conf inement boundary components shown in Figures 1.2-1 and VP1.2-1 are:1.Inner shell and bottom closure2.Flanged and bolted lid3.Flange4.Vent cover 5.Drain cover The containment boundary components are not changed with the alternate design.
* Fuel To Be Stored At The ISFSI Table 10-2 LIMITING CONDITIONS FOR OPERATION
The plastic structural anal ysis presented in Section 3C.3-1 of the TN-3 2 TSAR utilizes a value of 0.48" for the gap between center basket rails. The actual gap can range from 0.0" to 1.1326" while maintaining the required opening betw een opposite rails.
* SSSC Cavity Vacuum Drying Pressure
Therefore, additional analyses have been performed to demonstrate that the structural integrity of the basket and rails is maintained for the full range of possible gap sizes. The additional analyses are included as Attachment 4 to this appendix.Table 8.1-1 of the TN-32 TSAR Revision 9A describes the sequence of operations associated with the TN-32 cas
* SSSC Helium Backfill Pressure
: k. F or installation of the modified protective cover, Step 13 will be performed prior to Step 11 in order to check the function of the overpressure sy stem transducers or pressure switches. Step 11 will also be modified not to include specif ic instructions for checking the function of the transducers or switches before the protective cover is installed.
* SSSC Combined Helium Leak Rate
TN-32 casks used at the North Anna ISFSI are fabricated to the requirements of the TN-32 Topical Safety Analysis Report (TSAR), Revision 9A, or the TN-32 Final Safety Analysis Report (FSAR), Re vision 0. TN-32 casks fabricated to the requi rements of the TN-32 FSAR, Re vision 0, have been evaluated with respect to the design bases for the TN-32 TSAR, Revision 9A, and have been found to be acceptabl
* SSSC Internal Pressure
: e. Analyses included in the TN-32 FSAR, Re vision 0, may not be credited in the use of TN-32 casks unless they have been added to the ISFSI SAR.The only physical difference between TN-32 TSAR, Rev.
* SSSC Maximum Lifting Height
9A, casks and TN-32 FSAR, Rev. 0, casks is the design of the nonsafety rela ted overpressure system. TN-32 TSAR, Rev.
* Dissolved Boron Concentration
9A, casks use an overpressure system with two pressure switches located under the protective cover Revision 8-06/14 North Anna ISFSI SARA.1-4and wiring through the protective cover that conn ects to the f acility ala rm panel. TN-32 FSAR, Rev. 0, casks use tubing through the pr otective cover to the pressure switches/transducers in a box on the side of the cask near ground level. An evaluation has shown that either overpressure system configuration is acceptabl e for use at the North Anna ISFSI.The fabrication of TN-32 FSAR, Rev.
* SSSC Average Surface Dose Rates
0, casks differs in the following two ways from the fabrication of TN-32 TSAR, Rev.
* SSSC Surface Contamination
9A, casks.1.The nil ductility transition temp erature (NDTT) required for c ontainment material is minus 80&deg;F. The TN-32 TSAR, Rev.
* Helium Purity
9A, cask containment material s have a specified NDTT of no more than minus 40&deg;F2.Progressive PT and MT inspecti ons are required of th e bottom to g amma sh ield weld and the lid to lid shield weld. Progressive inspec tions were not require d in the TN-32 TSAR, Rev. 9A.These two changes provide additio nal margin in the structural evaluation performed for the TN-32 FSAR, Rev.
* SSSC Spacing
0, cask; however, this evaluation is not approved for use at the North Anna ISFSI. The TN-32 FSAR, Rev. 0, cask meets the structural design criteria for casks to be used at the North Anna ISFSI. The design and fabr ication changes described above will be in effect for TN-32 casks number TN-32.32 and higher.The US NRC has approved the gene ric use of TN-32 casks by 10 CFR Part 50 licensees.
* Uranium Content per Assembly
The TN-32 FSAR, Rev. 0, provides the licensing basis for this use and includes generic Technical Specifications. The North Anna ISFSI Technical Specif ications, and the TSAR, Rev. 9A, however will govern the use of TN-32, Rev.
 
0, casks at the North Anna ISFSI, except to the extent that specif ic analyses (e.g., criticality or thermal performance) from the FSAR, Rev.
Revision 806/14               North Anna ISFSI SAR 10-4 Intentionally Blank
0, have been added to the ISFSI SAR.
 
The analyses in Chapters 4 and 6 of the TN-32 FSAR, Rev.
Revision 806/14                                     North Anna ISFSI SAR                     11-1 Chapter 11 QUALITY ASSURANCE 11.1 QUALITY ASSURANCE PROGRAM DESCRIPTION 10 CFR 72.140 requires that a quality assurance program be established and implemented for the structures, systems, and components of an ISFSI that are important to safety, commensurate with their importance to safety. However, 10 CFR 72.140 provides for the use of previously approved programs.
0, have been added to this Appendix A.1.A.1.2 Spent Fuel to Be StoredTwo types of burnable poison rod assemblies (BPRAs) exist at North Anna. One type, manufactured by Westinghouse Electric, contains an annular section of borosilicate glass contained within a stainless steel tube. The inside annular region of the glass also contains a stainless steel tube. The glass and tube regi on is plugged and seal-w elded at both ends, and remains dry during operation, and forms one burnable poison (BP) r od. One end of the BP rod is attached to a flat baseplate, wh ich is used to join other BP rods to form a single BPRA. One BPRA can have as many as twenty BP rods.
Since Virginia Power is currently licensed under 10 CFR 50 to operate nuclear power facilities, a quality assurance (QA) program meeting the requirements of 10 CFR 50, Appendix B is already in place. The governing document for this program is the Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1 (QA Program Topical Report), which has been reviewed and approved by the NRC. (See Section 1.5.) The document is updated in accordance with 10 CFR 50.54(a). The NRC is periodically notified of changes to the document. This program is implemented through the Virginia Power administrative and technical procedures. The objective of the company Quality Assurance Program for operating nuclear power stations is to comply with the criteria expressed in 10 CFR 50, Appendix B, as amended, and with the quality assurance program requirements for nuclear power plants as referenced in the Regulatory Guides and ANSI standards referenced in the QA Program Topical Report. This program will be applied to those activities associated with the North Anna ISFSI that are important to safety. No changes to this program are required for the ISFSI activities.
Framatome Cogema Fuels (FCF) manuf actures the other type of BPRA used at North Anna. An FCF BP rod uses AL 2 O 3 - B 4 C (boron carbide in an alumina matrix) pellets encapsulated within a Zircaloy cladding. The cladding is plugged and seal-welded at both ends and remains dry during operation. A small gas plenum region is provided at the top of the pellet stack to accommodate helium off-gas. One end of the BP rod is attached to a flat baseplate, which is used Revision 8-06/14 North Anna ISFSI SARA.1-5 to join other BP rods to form a single BPRA. One FCF BPRA can have as many as twenty-four individual rods; one for each of the thimble tubes in a Westinghouse 17 x 17 fuel assembly.The Westinghouse and FCF BPRA baseplates are simi lar in design and manuf actured from stainless steel.The thimble plug devices (TPDs) used at North Anna were manufactured by Westinghouse.
As indicated in previous chapters, the SSSCs are the only components with a safety function. As such, Virginia Power procedures delineate the requirements for the engineering, procurement, fabrication, and inspection of this equipment. The procurement documents (specifications, requisitions, etc.) are reviewed technically prior to use to ensure that the proper criteria have been specified. During the SSSC design phase, vendor information (drawings, specifications, procedures, etc.) are reviewed to ensure compliance with Virginia Powers technical requirements. During SSSC fabrication, Virginia Powers Vendor Surveillance Representative will visit the vendors shop to ensure compliance with Virginia Powers requirements and to witness parts of the SSSC fabrication and testing.
The purpose of the device was to restrict (plug) reactor coolant flow in the thimble tubes in fuel assemblies that contained no insert components (i.e., control rods, BPRAs, source assemblies, etc.). TPDs are no longer used in either Unit 1 or Unit 2 at North Anna. A TPD uses the same baseplate as a W estinghouse BPRA to attach twenty-four rodlets, each approximately 8 inches long. Each TPD rodlet is manuf actured of solid stainless steel.The structural evaluations of the TN-32 cask ar e pro vided in Chapters 3 and 11 of the Rev. 9A TN-32 Topical Report. These evalua tions used a fuel weight of 1533 lb, which bounds all possible combinations of North Anna Units 1 and 2 fuel assemblies containing a BPRA or TPD.An evaluation has also been performed on the effe ct to the cask surf ace dose rates as a result of placing BPRAs and/or TPDs in the fuel stored in the TN-32. If BPRAs or TPDs have at least one-year decay time after discharge from the reactor, the cask surface dose rates for the TN-32 remain less than the design basis dose rates used to calculate doses at the ISFSI perimeter fence and to the nearest resident.An evaluation has been perform ed on the ef fect on criticality control from the storage of BPRAs and/or TPDs in the fuel st ored in the TN-32. The criticality control analysis assumes that water borated to 2500 ppm is present in the cask cavity. This analysis w as performed assuming that the borated water in the fuel assembly guide tubes was replaced with aluminum rods, which have lower neutron cross sections than a fully depleted BPRA. The results show a slight increase in reactivity which is well within the subcritical limit. TPDs are short and do not displace water in the guide tubes, therefore, their use will not affect reactivity.
 
The TN-32 is designed for a maximum inte rnal pressure under normal and accident conditions, and helium buildup of pre-pressurization in BPRAs will affect this analysis. The confinement analysis for the TN-32 has been reanalyzed conservatively for thirty-two BPRAs, and this reanalysis shows that the maximum pressure under accident conditions would be 69.4 psig, when the design ba sis for this cask is 100 psig. This analysis bounds the storage of an y type of Westinghouse or FCF 17 x 17 BPRA. The impact of TPDs on the conf in ement analysis is bounded by the impact of BPRAs.To account for the additional d ecay heat from BPRAs and/or TPDs, fuel assembly decay heat estimates must include an estimate for the decay heat from the actual comp onent in each fuel assembly. Therefore, the combined decay heat from the fuel assem bly and its component must be less than the limit for a fuel assembly in the TN-32.
Revision 806/14               North Anna ISFSI SAR 11-2 Intentionally Blank
Revision 8-06/14 North Anna ISFSI SARA.1-6Based on these evaluations, the storage of fuel assemblies with BPRAs and/or TPDs is acceptable for the TN-32.Rod clips have been attached to some fuel assemblies at North Anna. Rod clips resemble a fuel assembly grid strap, but are shorter in length and do not span the full row of rods as grid straps do. Rod clips are physically attached to the fuel r ods mid-span between grids for the purpose of reducing rod vibration and ultimately eliminating baffle-jetting fuel rod failures, which occurred in North Anna Unit 1 prior to vessel upflow conversi on. Rod clips may e xist on one or two faces of a fuel assembly.An evaluation has been performe d on the ef fect on the TN-32 shie lding analysis of rod clips on fuel assemblies stored in TN-32 casks. Th e analysis determined that the total actual Inconel-718 in the fuel zone regi on for an assembly with rod clips is less than the design basis value of 5.9 kilograms, which is the bounding analysis value from the TN-32 Topical and Final Safety Analysis Reports. Therefore, it is acceptable to load a fu el assembly with rod clips in a TN-32 cask.
 
A.1.3 Criticality EvaluationThe criticality evalua tion from Chapter 6 of the TN-32 FSAR Revision 0 (Reference 2) includes an evaluation of the storage of the Westinghouse 17 x 17 Standard Fuel design. This evaluation is summarized below.Criticality control in the TN-32 is provided by the bask et structur al components, which maintain the relative position of the spent fu el assemblies under normal and accident conditions, by the neutron absorbing plates between the bask et compartments, and by dissolved boron in the spent fuel pool water.Transnuclear evaluated five Westinghouse fuel de signs to determine the most reactive fuel configuration. The five were the Westinghouse 14 x 14 Standard, 14 x 14 OFA, 15 x 15 Standard, 17 x 17 Standard, and 17 x 17 OFA designs. Of these fi ve designs, the Westinghouse 17 x 17 Standard design with BPRA w as de termined to be the most reactive, and this fuel design was used for the criticality evaluation.
Revision 806/14                                   North Anna ISFSI SAR                  A-1 Appendix A SSSC Specific Information This appendix provides:
The contents of a TN
* A list of the Topical Safety Analysis Reports for SSSCs approved by the USNRC for use at the North Anna ISFSI (see Table A-1).
-32 cask at the North Anna ISFSI are limited to the Westinghouse 17 x 17 Standard Fuel and North Anna Improved Fuel (NAIF) designs. The NAIF design envelope has dimensions identical to the Standard Fuel design, but several structural elements are made of different materials. These material differences do not af fect the criticality analyses, however, and so the criticality evaluations for these fuel types are equivalent.The fuel assemblies were ev aluated with and without burnable poison rod assemblies (BPRA). BPRA were modeled using aluminum rods containing no boron. This displaces the borated water and bounds the effect of depleted BPRA. The criticality evaluations did not rely on any special loading patterns or o rientation of the fuel assemblies for criticality control. However, a Revision 8-06/14 North Anna ISFSI SARA.1-7 boron concentration of 2300 ppm in the water used in the cask was assumed in the TN-32 FSAR Rev. 0 analysis.The evaluations assumed that each fuel assembly design cont ained a certain amo unt of uranium. In the case of the Westinghouse 17 x 17 Standard Fuel design, this content was 467.1 kgU per fuel assembly.The criticality evaluations we re performed by Transnuclear using the CSAS25 sequence from the SCALE-4.4 code system and the SCALE 27-group ENDF/B-lV cross section library. Within this sequence, resonan ce correction based on the fuel pin cell description is provided by NITAWL using the Nordheim Integral method, and keff was determined by the KENO-Va code. A sufficiently large number of neutron histories were run so that the standard deviation was below 0.0020 for all calculations.The TN-32 was evaluated for a variety of configurations in tended to bound all normal, off-normal, and accident conditions. The following conditions were evaluated individually.1.Baseline: Most reactive TN-32 fuel configur ation, 100% borated water density. The fuel assemblies are shifted toward the cask vertical axis until the outer pin cells contact the basket compartment wall. This condition bounds all possibilities of fuel as semblies positioned off-center in the compartment.2.The neutron absorber plates and the active fuel zone are of fset by two inches axially. This condition might occur due to fuel design differences in the dist ance from the bottom of the fuel assembly to the beginning of the active fuel, or due to fuel pins slipping in the spacer grids during handling.3.The inside dimension of the compar tment is increased and decreased by 0.06 inches. All compartments move correspondingl y further apart or closer together. This condition bounds the dimensional tolerance on the basket tubes.4.The width of the neutron poison plate is reduced by 0.06 inches, corresponding to its dimensional tolerance. It is not necessary to evaluate the tolerance in le ngth because it is bounded by the two-inch axial offset condition above.5.Fresh water is placed in the ga p of all fuel rods. Al though a fuel rod that develops a cladding breach during reactor operations could be saturated with unborated wa ter at the end of its operating cycle, it is unlikely that the water in the fuel rod would remain unborated after years of storage in borated water.6.The borated water density is varied, except in the homogenized basket rail/borated water zone, to simulate the reduction in density that might occur during unloading operations.7.Borated water is drained down to the top of th e active fuel, except in the basket rail zone. This is the most reactive configuration exp ected during loading and unloading operations, because it reduces the boron capt ure of reflected neutrons.
* A subappendix for each SSSC type that provides specific references to the SSSC Topical Safety Analysis Reports, and supplements the information contained in the SSSC Topical Safety Analysis Reports.
Revision 8-06/14 North Anna ISFSI SARA.1-8As expected, reduction of the neutron absorber plate width, reduction of compartment size, borated water drain-down, and inclusion of fresh water in the fuel rod gap all cause a slight increase in keff. The optimal borated water density was found at about 95%.These conditions were combined for a worst case normal condition and the borated w ater density was varied from 85% to 100%. This resulted in a maximum keff = 0.9264 +/- 0.0009 at 90% borated water density.To evaluate accident conditions, the worst ca se normal model w as re-run with a single fuel assembly of 5 weight percent U-235 enrichment. This fuel assembly w as placed in one of the four center basket locations. This case demonstr ated compliance with the requirement of 10 CFR 72.124 by combining at least two unlikely, independent, and concurrent changes in the conditions essential to nuclear criticality safety; worst case geomet ry and accidental loading of a fuel assembly with enrichment greater than assumed in the analysis. This resulted in a keff = 0.9315 +/- 0.0009.Transnuclear performed additional analyses to determine what initial enrichment could be stored if the water in the spent fu el pool had a boron c oncentration of 2500 ppm. These analyses assumed that the most reactive fuel design and worst-normal configuration remained the same even with the boron increase.
 
The same criticality model as before was used, howeve r the CSAS25 sequence from SCALE-4.4 was used to determine the keff using KENO-Va and th e 44-group ENDF/V cross section library. The worst normal case from before with th e enrichment changed to 4.30 weight percent U-235 and the soluble bo ron concentration changed to 2500 ppm was analyzed. As before, the water density was varied to simulate the reduction in density that might occur during unloading operations. Similarly, the accident conditio n (assembly misload), was simulated as before but with a loading of 4.30 weight percent assemb lies and a mi sloaded 5 weight percent U-235 assembly in an interior cell. A ne w upper subcritical limit (USL) was determined using SCALE-4.4 for comparison to the calculated keff s for the analyzed cond itions. These analyses verified that under normal, off-normal, and acci dent conditions, that the maximum value of keff + 2 is less than the USL of 0.9419. The worst case which combines the two independent conditions of a misloaded single fuel assembly with the "worst-normal" configuration at reduced (optimum, 92.5% density) water moderation has a keff + 2 = 0.9404.
Revision 806/14                               North Anna ISFSI SAR                    A-2 Table A-1 TOPICAL SAFETY ANALYSIS REPORTS FOR SSSCs APPROVED FOR USE AT THE NORTH ANNA ISFSI A.1. TN-32 Dry Storage Cask Topical Safety Analysis Report, Revision 9A, Transnuclear, Inc.,
The TN-32 cask is designed to be substantiall y subcritical under all cr edible conditions. The criticality design is based on favorable geometry, fixed neutron poisons, and soluble poisons in the spent fuel pool, with unirradiated fuel havi ng an initial enrichme nt, up to and including, 4.30 weight percent U-235. An appraisal of the fixed neutron poisons has shown that they will remain effective for the 20-year storage period, and there is no credible way to lose them. The analysis and evaluation of the crit icality design and performance have demonstrated that the cask will provide for the safe storage of spent fuel for a minimum of 20 years with an adequate subcritical margin.
December 1996.
Revision 8-06/14 North Anna ISFSI SARA.1-9The criticality design features for th e TN-32 are in compliance with 10 CFR 72 and the applicable design and acceptance cr iteria have been satisfied. The evaluation of the criticality design provides reasonable assurance that the TN-32 will allow the safe storage of spent fuel.
 
A.1.3.1 Neutron Absorber TestsAs allowed by NUREG/CR-5661 (Reference 3), the criticality evaluation performed in the TN-32 FSAR Revision 0 takes credit for 90% of the boron-10 in the borated aluminum absorber plates rather than the maximum value of 75% used in prior evaluations. Testing to verify the presence and uniformity of the neutron absorber are discussed below.Effective boron-10 content of the borated alumi num fuel basket neutron absorber sheets is verified by neutron transmission testing of coupons taken from each sheet. The transmission through the coupons is compared with transmission through calibra ted standards composed of a homogeneous boron compound without other significant neutron absorbers, for example zirconium diboride or titanium diboride. These standards are paired with aluminum shims sized to match the scattering by al uminum in the neutron absorber sheets. The effective boron-10 content of each c oupon, minus 3 based on the neutron counting stat istics for that co upon, must be  10 mg boron-10/cm 2.In the event that a coupon fails the singl e neutron transmission measurement, four additional measurements may be made on the coupon, and the average of the 5 measurements, less 3 based on the counting statistics, must be  10 mg boron-10/cm 2.Macroscopic uniformit y of boron-10 distri bution is verified by neutron radioscopy or radiography of the coupons. Th e acceptance criterion is that there be uniform luminance across the coupon. This inspection shall cover the entire coupon.
Revision 806/14                                     North Anna ISFSI SAR                    A.1-1 Appendix A.1 TN-32 DRY STORAGE CASK A.1.1 General Description The TN-32 cask is a smooth right circular cylinder of multi-wall construction that is approximately 16.8 feet high, 8.1 feet in diameter and weighs (empty) approximately 91.0 tons.
Normal sampling of co upons for neutron transmis sion measurements and radiography/radioscopy shall be 100%. Rejection of a given coupon shal l result in rejection of the associated sheet. Reduced sampling (50% - ever y other coupon) may be introduced based upon acceptance of all coupons in the fi rst 25% of the lot. A rejecti on during reduced inspection will require a return to 100% inspection of the lot. A lot is defined as all the sheets rolled from a single casting.A.1.4 Thermal Evaluation Chapter 4 of the TN-32 Final Safety Analysis Report, Re vision 0 (Reference 2) includes a thermal evaluation for normal conditions that was based on the following inputs.1.A maximum heat load of 32.7 kilowatts from 32 fuel assemblies with BPRAs or TPDs, or 1.02 kilowatt/fuel assembly.2.An ambient temperature range of -30 to 115&deg;F. The temperature range was averaged over 24 hours and a maximum daily averaged ambien t temperature of 100&deg;F w as used for the maximum cask temperature evaluation.
The cask inner shell and containment vessel is a welded, carbon steel cylinder that is 1.5 inches thick and has a sprayed metallic aluminum coating for corrosion protection. Surrounding the outside of the containment vessel wall is a steel gamma shield with a wall thickness of 8.0 inches.
Revision 8-06/14 North Anna ISFSI SARA.1-103.A total solar heat load for a 12-hour period of 1475 Btu/ft 2 for curved surfaces and 2950 Btu/ft 2 for flat surfaces, per 10 CFR 71.71(c). Since the cask has a large thermal inertia, the total insolation was averaged over a 24-hour period.
The bottom end of the gamma shield has a thickness of 8.75 inches. The cask has a cylindrical cavity which holds a fuel basket designed to accommodate 32 PWR fuel assemblies. The loaded weight of the cask is approximately 115.5 tons. Four trunnions are welded on, two at the top end and two at the bottom end of the body.
The thermal analysis for normal storage concluded that the TN-32 design meets all applicable requirements. The maximum temperature of any confinement structure component was less than 315&deg;F, which has an insignificant effect on the mechanical properties of the confinement materials used. The predicted maximum fuel cladding temperature was 565&deg;F, which is well below the allowable fuel claddi ng temperature limit of 752&deg;F (400&deg;C) for loading, unloading, and normal operating conditions.
During fabrication of the TN-32 cask, the inner containment vessel and the gamma shielding are fit together by a shrink-fit procedure. The gamma shielding is heated so that the inner containment vessel, with the flange attached, can be inserted into the outer gamma shielding vessel. This allows a close fit between the two cylindrical shells for good heat transfer. During the shrink fit operation, a small circumferential gap between the flange of the inner vessel and the gamma shielding forms as the heated gamma shield cools. Prior to welding the flange to the gamma shield, the gap is filled with shims made of one of the materials specified in the TN-32 TSAR for the gamma shield shell.
All fuel transfer operati ons occur when the cask is in th e spent fuel pool with the cask lid removed. The fuel is always submerged in free-flowing water, pe rmitting heat di ssipation. After fuel loading is complete, the cask is removed from the pool, drained and the cavity is dried.The loading condition evaluated for the TN-32 is the heatup of th e cask before its ca vity can be backfilled with helium. This occurs during the vacuum drying operation of the cask cavity. Transient thermal analys es were performed to pr edict the heatup time history for the cask components assuming air is in the cask cavity.
The cask is sealed with one carbon steel lid bolted to the top flange of the containment vessel. The lid is 10.5 inches thick and is secured to the cask body with 48 bolts. The lid and lid penetration covers are sealed with metallic O-ring seals.
The results of the transien t thermal analysis for the maximum heat load of 32.7 kw showed that in order to prevent cask component peak temperatures from exceeding their analyzed temperature range, in particular the basket, the time before backfilling the cask with helium must be limited to less than 36 hours. Backfilling the cask with helium within 36 hours of the completion of draining also pro vides assurance that the fuel pin cladding temperature does not exceed 400&deg;C.Unloading of a cask would require the flooding of the cask prior to the removal of the fuel.
Neutron shielding is provided by a 4.5-inch thick resin compound enclosed in long aluminum boxes that surround the gamma shield. The neutron shield boxes are enclosed by a painted carbon steel shell that is 0.50 inches thick.
A quench analysis of the fuel concluded that the total stress on the fuel cladding was below the cladding material's minimum yield stress. In addition, by limiting the water flow rate into the cask and monitoring the pressure of the air/steam outflow mixture, the buildup of steam pressure in the cavity was limited to less than the cask design pressure.
In Chapter 1 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96), drawing 1049-70-2, Rev. 2, includes a view of a cask trunnion (item 6). The back side of the trunnion (weld prep) is shown at a 30 degree angle. This angle should actually be shown as 45 to 50 degrees.
The temperatures determined by the evaluation of the cask systems, structures and components important to safety w ill remain within their operati ng temperature ranges, and cask internal pressures under normal conditions were acceptable. The TN-32 cask provides adequate heat removal capacity without active cooling sy stems. The TN-32 cask is designed with a heat removal capability having testability and reliability consistent with its importance to safety. Spent fuel cladding will be protected against degradation that leads to significant fuel failures by maintaining the clad temperature below maximum allowable limits and by providing an inert environment in the cask cavity.
Sections 3.1.1, Paragraph 3 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96) states that Other structural and structural attachment welds are examined by the liquid penetrant or the magnetic particle method in accordance with Section V, Article 6 of the ASME Code.
Revision 8-06/14 North Anna ISFSI SARA.1-11 The thermal design of the TN-32 cask is in compliance with 10 CFR 72 and applicable design and acceptance criteria have been satisfied. The evaluation of the thermal design provides reasonable assurance that the TN-32 will allow the safe st orage of spent fuel for 20 years.A.1.5 Cask Sliding and Tip-over AnalysisAnalysis demonstrates that the casks will not sl ide or tip-over as a result of the ISFSI design earthquake (Section 4.2.1.4). The analysis utilized a dynamic, soil-structure interaction analysis to determine the effect of the design earthquake on the casks and concrete st orage pad. A "generic" cask, 16 feet high x 8 feet diameter, was used for the analys is. Since cask sliding w as the major concern of the analysis effort, the generic cask approach is considered acceptably bounding and produces more conservative factors of safety fo r sliding. A comparison with the generic cask modeled and the TN-32 is shown below:A finite element model was us ed to perform the dynamic anal ysis. The casks were modeled as a rigid beam from the top of the concrete pad to the cen ter of gra vity of th e generic casks and the transitional and rotary weights of the casks were lumped at the top of the 96-inch rigid beams. This is more conservative than using the 92-inch vertical distance of the TN-32 cask and will result in slightly higher accelerations for the casks and a higher moment arm for those accelerations.The difference in weight betw een the generic cask and the TN-32 cask is negligible.The factor of safety against sliding is determined as:
Acceptance standards are in accordance with Section III, Subsection NF, Paragraph NF-5350.
FS = R/H where: R = Resistance to sliding = &#xb5; x W x (1 - A z)&#xb5; = Coefficient of friction = 0.3W = Weight of cask on pad A z = Vertical acceleration of cask at cask center of gravityPROPERTY GENERIC CASK TN-32TN-32-STABILITY ANALYSIS TSAR SECTION 2.2.3.2Weight 230 kips 230.99 kips 228 kipsVertical Distance to Center of Gravity, I v 96 inches 92.09 inches 92 inches Base Radial Distance to Center of Gravity, I r 48 inches 43.875 inches 43.875 inches Revision 8-06/14 North Anna ISFSI SARA.1-12 H = Horizontal sliding force = (S x 2 + S y 2)0.5 S x ,S y = Horizontal cask forces at the cask center of gravit y in x,y directions
However, Paragraph NF-5350 only pertains to liquid penetrant inspection. Paragraph NF-5340 pertains to magnetic particle inspection. Section 3.1.1, Paragraph 3 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96) should read Other structural and structural attachment welds
= W x A i , i = x,y; A i = horizontal accelerations Thus, FS = 0.3(1 - A z)/(A x 2 + A y 2)0.5Higher accelerations will result in a lower factor of safety against sliding, therefore using the higher center of gravity of the generic casks is conservative and envelops the TN-32 cask. It should also be noted that the weight of the cask is not involved in the final calculation for the factor of safety against sliding.
 
Using the methodology of TSAR Section 2.2.3.2, the g value necessary to tip the cask is calculated belo w: Mtip = gWI v + (2/3)gWI r andM stab = WI r Where: M tip = Moment necessary to tip the cask M stab = Stabilizing moment on the caskg = Acceleration value necessary to tip the caskW = Weight of cask on pad
Revision 806/14                                       North Anna ISFSI SAR                    A.1-2 are examined by the liquid penetrant or the magnetic particle method in accordance with Section V, Article 6 of the ASME Code. Acceptance standards are in accordance with Section III, Subsection NF, Paragraph NF-5340 and NF-5350.
The weld between the aluminum plates separating the fuel storage tubes and the outer aluminum plates at twenty-four locations around the periphery of the fuel basket is shown on TN-32 TSAR drawing 1049-70-6, Rev. 3 as a 0.25-inch groove weld. In order to provide consistency with as-built conditions, this weld may alternatively be a 0.25-inch fillet weld.
The weld creating the longitudinal seam of the neutron shield outer shell is shown on TN-32 TSAR drawing 1049-70-2, Revision 2 as a full penetration weld. In order to provide improved heat transfer between the outer shell and the neutron shield tubes, this weld may alternatively be a partial penetration weld.
TN-32 TSAR Revision 9A drawing 1049-70-5 specifies that the top of borated aluminum plates in the fuel basket be placed nominally 11.88 inches from the top of the basket assembly.
Revision 0 of the TN-32 FSAR, which contains analyses to support loading of fuel with higher burnup and enrichment, specifies that the top of the borated aluminum plates be placed nominally 12.00 inches from the top of the basket assembly. Since Revision 9A is the TN-32 TSAR of record for the North Anna ISFSI, the dimensions must be reconciled in order to facilitate future loading of TN-32 casks with North Anna fuel of higher burnup and enrichment. Therefore, the nominal dimension may be either 11.88 inches or 12.00 inches without any impact to cask criticality evaluations.
The lid bolt analysis presented in Appendix 3A.3 of the TN-32 TSAR has been updated to allow for torque in the range of 880 ft-lb to 1230 ft-lb, to incorporate High Purity Loctite N-5000 Antiseize lubricant, and to allow the use of silver-jacketed O-rings. In addition, the summary of bolt stresses presented in Table 3.4-7 of the TN-32 TSAR has been corrected. The updated analysis, figures, and tables are included as Attachment 1 to this appendix. The revised analysis concludes that the code allowable stresses on the bolts are not exceeded for both normal and accident conditions. Pages 3A.3-1 through 3A.3-13, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7 in the TN-32 TSAR Revision 9A are replaced by the attached pages 3A.3-1 through 3A.3-15, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7.
In addition to the sections above, Section 7.1.4 of the TN-32 TSAR, Revision 9A, states that the bolt torque for the main lid bolts is 930 +/- 50 ft-lb and for the penetration port covers the torque is 60 +/- 10 ft-lb. In accordance with the lid bolt analysis update, the required torque for the main lid bolts is 880 ft-lb to 1230 ft-lb. The required torque for the penetration cover bolts ranges from 60 ft-lb to 100 ft-lb depending on the bolt material supplied by the vendor.
The protective covers at the North Anna ISFSI have been modified from the cover described in TN-32 TSAR Revision 9A to the cover described in the drawings in Attachment 3. The modified protective cover includes a sealable bolt-on access plate that is both airtight and


I v = Vertical distance to cask center of gravity I r = Radial distance to cask center of gravityTherefore, the g value necessary to tip the cask is found by equating Mtip to M stab: (gWI v) + (2/3)gWI r = WI r g = (I r)/(I v + 0.67 x I r)Solving for the TN-32 cask, g = 0.36.Solving for the generic cask, g = 0.37 which is virtually the same as for the TN-32 cask.
Revision 806/14                                        North Anna ISFSI SAR                  A.1-3 watertight. The access plate has a through-wall fitting that connects to the OP system on the inside of the protective cover and connects to tubing on the outside of the protective cover. This tubing runs down the side of the cask to an instrumentation box in which the pressure switches/transducers are located. In addition, another connection is located at the access plate which openly communicates to the atmosphere within the protective cover. The external connection to this fitting will connect to tubing that also is mounted along the side of the cask.
Using the higher center of gravity of the gene ric casks will resu lt in higher cask accelerations and higher overturning moments which will result in a lower factor of safety against overturning and is therefore conservative.
Drawing SK-VP-SAR-1 in Attachment 3 shows the cask with the modified protective cover and pressure switches. Figures VP1.2-1 and VP2.3-1 contained in Attachment 3 illustrate the confinement boundary components and pressure monitoring system. The confinement boundary components shown in Figures 1.2-1 and VP1.2-1 are:
Revision 8-06/14 North Anna ISFSI SARA.1-13 It is concluded that the generic cask used in the analysis is mo re conservative than using the TN-32 cask for the criti cal sliding analysis and is essentially equivalent to the TN-32 cask for overturning which shows significant margin to the minimum 1.1 safety factor. The lowest factor of safety for overturning is about 1.6.
: 1. Inner shell and bottom closure
A.1.6 Evaluation of Tornado MissilesAn evaluation of the TN-32 cask using the North Anna ISFSI design b asis tornado missiles w as performed. The results are compared below with results provided for the design basis tornado missiles evaluated in TN-32 TSAR Sections 2.2.1.2 and 2.2.1.3. The effects from the design basis tornado missiles evaluated in the TN-32 TSAR bound the effects from the North Anna ISFSI design basis tornado missiles.The evaluation for cask sliding w as performed after determining that the worst case was the 1-ton automobile traveling at 150 mph impacting the c ask below the center of gravity. The evaluation for tipping also used the automobile, but with impact near the top of the cask. Five missiles were evaluated for pe netration of the cask body, and the worst cask penetration was 1.65 inches for the 6-inch diameter steel pipe. Other sc enarios mentioned in the SAR are bounded by these three conditions.
: 2. Flanged and bolted lid
A.1.7 Revised Type B and C Tornado Missile Analyses The structural analyses for missile types B and C, contained in Sections 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR, include the protective cover. Transnuclear has performed revised analyses which no longer credit the protective cover fo r missile protection. The revised analyses conclude that the code allowable stresses on the lid are not exceeded during a missile impact event. Section 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR are supplanted by the following sections providing a description of the revised analyses. The revised TSAR pages are included as Attachment 2 to this appendix.
: 3. Flange
A.1.8 SSSC Average Surface Dose Rate The North Anna ISFSI design ba sis dose rates in Chapter 7 were determine d based upon the use of TN-32 SSSCs utilizing design basis fuel loadings with no a dditional conservatisms applied other than those described in the calculational methodology.PARAMETER TN-32 TSAR TORNADO MISSILESNAPS ISFSI TORNADO MISSILES Cask Sliding 7.6 inches 2.7 inchesCask Tipping 8.9 degrees 2.8 degrees Cask Penetration 2.03 inches 1.65 inches Revision 8-06/14 North Anna ISFSI SARA.1-14 A.1.8.1 SSSC Average Surface Dose Rate MeasurementIn order to determine the av erage surface dose rates of TN-32 casks to compare with Technical Specifications limits the following method is applied.Average Side Surface Dose RateThe side surface dose rates shal l be measured at approximately the following locations (see Figure A.1-1). Obtain separate measurements for gamma and neutron dose rates.1.Above the Radial Neutron Shield (Map location A)Obtain four measurements, equa lly spaced circumferentially, midway between the top of the cask body flange and the top of the radial neutron shield. Do not obtain measurements over or in the immediate vicinity of the cask trunnions.
: 4. Vent cover
Add the measurements together and di vide by the number of measurements obtained in this area. The result is the dose rate above the neutron shield.2.Sides of Radial Neutro n Shield (Map locations B, C, and D)Obtain four measurements, e qually spaced circumferentially , at each of the following approximate elevations: one sixth, one half and five sixths along the axial span of the radial neutron shield. Do not obtain measurements ov er or in the immediate vicinity of the cask trunnions.Add the measurements together and divide by the number of measuremen ts obtained over the neutron shield. The result is the dose rate over the radial neutron shield.3.Below Radial Neutron Shield (Map location E)Obtain four measurements, equa lly spaced circumferentially , midway between the bottom of the radial neutron shield and the bottom of the cask. Do not obtain measurements over or in the immediate vicinity of the cask trunnions. Also, it may not be possible for a neutron dose rate meter to access the surface at location E. If so, the neutron dose rate meter may be located as much as one foot away from the cask surface to obtain measurements.
: 5. Drain cover The containment boundary components are not changed with the alternate design.
Add the measurements together and di vide by the number of measurements obtained in this area. The result is the dose rate below the neutron shield.Average Top Surface Dose Rate4.Top of Cask (Map locations F, G, and H)Obtain one measurement at the ce nter of the protective cover (F). Obtain four measurements equally spaced circumferentially half way between the center and the knuckle (G). Obtain four measurements equally spaced circumferentially at the knuckle (H).Add the measurements together and divide by the number of measuremen ts obtained over the protective cover. The result is the dose rate over the top surface of the cask.
The plastic structural analysis presented in Section 3C.3-1 of the TN-32 TSAR utilizes a value of 0.48" for the gap between center basket rails. The actual gap can range from 0.0" to 1.1326" while maintaining the required opening between opposite rails. Therefore, additional analyses have been performed to demonstrate that the structural integrity of the basket and rails is maintained for the full range of possible gap sizes. The additional analyses are included as to this appendix.
Revision 8-06/14 North Anna ISFSI SARA.1-15 Final Surface Dose RateThe average surface gamma and ne utron dose rates shall be de termined by the following formulae. Note that A, B, C, and D refer to the values obtained in steps 1, 2, 3, and 4 above, respectively. The 0.1 and 0.8 multipliers are area weighting factors.Average Side Surface Gamma Dose Rate = (0.1 x A) + (0.8 x B) + (0.1 x C)Average Side Surface Neutron Dose Rate = (0.1 x A n) + (0.8 x B n) + (0.1 x C n)Average Top Surface Gamma Dose Rate = DAverage Top Surface Neutron Dose Rate = D n A.1.9 Codes and StandardsThe TN-32 cask is designe d and fabricated in accordance with Section III of the 1992 edition of the ASME Code. Exceptions to the Code are listed in Table A.1-1.Changes to Table A.1-1 or ASME Code exceptions not in cluded in the Table shall be reviewed in accordance with 10 CFR 72.48. This review should demonstrate that:1.The changes or exceptions would provide an acceptable level of quality and safety, or2.Compliance with the specified requirements of Section III of the 1992 edition of the ASME Code w ould result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Table 8.1-1 of the TN-32 TSAR Revision 9A describes the sequence of operations associated with the TN-32 cask. For installation of the modified protective cover, Step 13 will be performed prior to Step 11 in order to check the function of the overpressure system transducers or pressure switches. Step 11 will also be modified not to include specific instructions for checking the function of the transducers or switches before the protective cover is installed.
A.1.10 References 1.TN-32 Dry Storage Cask Topical Safety Analysis Report, Revision 9A, Transnuclear, Inc., December 1996.2.TN-32 Dry Storage Cask Fi nal Safety Analysis Report, Revision 0, Transnuclear, Inc., January 2000.3.NUREG/CR-5661, Recommendations for Pr epari ng the Criticality Saf ety Evaluation of Transportation Packages, 1997.
TN-32 casks used at the North Anna ISFSI are fabricated to the requirements of the TN-32 Topical Safety Analysis Report (TSAR), Revision 9A, or the TN-32 Final Safety Analysis Report (FSAR), Revision 0. TN-32 casks fabricated to the requirements of the TN-32 FSAR, Revision 0, have been evaluated with respect to the design bases for the TN-32 TSAR, Revision 9A, and have been found to be acceptable. Analyses included in the TN-32 FSAR, Revision 0, may not be credited in the use of TN-32 casks unless they have been added to the ISFSI SAR.
Revision 8-06/14 North Anna ISFSI SARA.1-16Table A.1-1TN-32 ASME CODE EXCEPTIONS List of ASME Code Exceptions for TN-32 Dry Stor age Cask Confinement Boundary/Gamma Shielding/BasketThe cask confinement boundary is designed in accordance with the 1992 edition of the ASME Code, Section III, Subsection NB. The basket was designed in accordance with the 1992 edition of the ASME Code, Section III, Subsection NF. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during drop accidents, was analyzed i n accordance with Subsection NB. Inspections of the gamma shielding are performed in accordance with the 1992 edition of the ASME Code as detailed in the TN-32 Topical Safety Analysis Report, Rev.
The only physical difference between TN-32 TSAR, Rev. 9A, casks and TN-32 FSAR, Rev. 0, casks is the design of the nonsafety related overpressure system. TN-32 TSAR, Rev. 9A, casks use an overpressure system with two pressure switches located under the protective cover
9A, December 1996 (the TSAR).
ComponentReference ASME Code/Section Code RequirementException, Justification & Compensatory Measures TN-32 Cask NB-1100 Stamping and preparation of reports by the Certificate Holder The TN-32 cask is not N stamped, nor is there a code design specification generated. A design criteria document was generated in accordance with TN's QA Program and the design and analysis is provided in the TSAR.
TN-32 Cask NCA-3800 Quality Assurance


Requirements The Quality assurance requirements of NQA-1 or 10 CFR 72 Subpart G are imposed in lieu of NCA-3800 requirements.
Revision 806/14                                      North Anna ISFSI SAR                    A.1-4 and wiring through the protective cover that connects to the facility alarm panel. TN-32 FSAR, Rev. 0, casks use tubing through the protective cover to the pressure switches/transducers in a box on the side of the cask near ground level. An evaluation has shown that either overpressure system configuration is acceptable for use at the North Anna ISFSI.
Lid Bolts NB-3232.3Fatigue analysis of boltsA fatigue analysis of the bolts is not performed fo r storage, since the bolts are not subject to significant cyclical loads.
The fabrication of TN-32 FSAR, Rev. 0, casks differs in the following two ways from the fabrication of TN-32 TSAR, Rev. 9A, casks.
Gamma Shielding NB-1132.2Non-pressure retaining
: 1. The nil ductility transition temperature (NDTT) required for containment material is minus 80&deg;F. The TN-32 TSAR, Rev. 9A, cask containment materials have a specified NDTT of no more than minus 40&deg;F
: 2. Progressive PT and MT inspections are required of the bottom to gamma shield weld and the lid to lid shield weld. Progressive inspections were not required in the TN-32 TSAR, Rev. 9A.
These two changes provide additional margin in the structural evaluation performed for the TN-32 FSAR, Rev. 0, cask; however, this evaluation is not approved for use at the North Anna ISFSI. The TN-32 FSAR, Rev. 0, cask meets the structural design criteria for casks to be used at the North Anna ISFSI. The design and fabrication changes described above will be in effect for TN-32 casks number TN-32.32 and higher.
The US NRC has approved the generic use of TN-32 casks by 10 CFR Part 50 licensees.
The TN-32 FSAR, Rev. 0, provides the licensing basis for this use and includes generic Technical Specifications. The North Anna ISFSI Technical Specifications, and the TSAR, Rev. 9A, however will govern the use of TN-32, Rev. 0, casks at the North Anna ISFSI, except to the extent that specific analyses (e.g., criticality or thermal performance) from the FSAR, Rev. 0, have been added to the ISFSI SAR. The analyses in Chapters 4 and 6 of the TN-32 FSAR, Rev. 0, have been added to this Appendix A.1.
A.1.2 Spent Fuel to Be Stored Two types of burnable poison rod assemblies (BPRAs) exist at North Anna. One type, manufactured by Westinghouse Electric, contains an annular section of borosilicate glass contained within a stainless steel tube. The inside annular region of the glass also contains a stainless steel tube. The glass and tube region is plugged and seal-welded at both ends, and remains dry during operation, and forms one burnable poison (BP) rod. One end of the BP rod is attached to a flat baseplate, which is used to join other BP rods to form a single BPRA. One BPRA can have as many as twenty BP rods.
Framatome Cogema Fuels (FCF) manufactures the other type of BPRA used at North Anna.
An FCF BP rod uses AL2O3 - B4C (boron carbide in an alumina matrix) pellets encapsulated within a Zircaloy cladding. The cladding is plugged and seal-welded at both ends and remains dry during operation. A small gas plenum region is provided at the top of the pellet stack to accommodate helium off-gas. One end of the BP rod is attached to a flat baseplate, which is used


structural attachments shall conform to Subsection NF The primary function of the gamm a shield is shielding, although credit is taken for the gamma shie lding in the structural analysis. A surface examination of the we lds is performed in accordance
Revision 806/14                                        North Anna ISFSI SAR                  A.1-5 to join other BP rods to form a single BPRA. One FCF BPRA can have as many as twenty-four individual rods; one for each of the thimble tubes in a Westinghouse 17 x 17 fuel assembly.
The Westinghouse and FCF BPRA baseplates are similar in design and manufactured from stainless steel.
The thimble plug devices (TPDs) used at North Anna were manufactured by Westinghouse.
The purpose of the device was to restrict (plug) reactor coolant flow in the thimble tubes in fuel assemblies that contained no insert components (i.e., control rods, BPRAs, source assemblies, etc.). TPDs are no longer used in either Unit 1 or Unit 2 at North Anna. A TPD uses the same baseplate as a Westinghouse BPRA to attach twenty-four rodlets, each approximately 8 inches long. Each TPD rodlet is manufactured of solid stainless steel.
The structural evaluations of the TN-32 cask are provided in Chapters 3 and 11 of the Rev. 9A TN-32 Topical Report. These evaluations used a fuel weight of 1533 lb, which bounds all possible combinations of North Anna Units 1 and 2 fuel assemblies containing a BPRA or TPD.
An evaluation has also been performed on the effect to the cask surface dose rates as a result of placing BPRAs and/or TPDs in the fuel stored in the TN-32. If BPRAs or TPDs have at least one-year decay time after discharge from the reactor, the cask surface dose rates for the TN-32 remain less than the design basis dose rates used to calculate doses at the ISFSI perimeter fence and to the nearest resident.
An evaluation has been performed on the effect on criticality control from the storage of BPRAs and/or TPDs in the fuel stored in the TN-32. The criticality control analysis assumes that water borated to 2500 ppm is present in the cask cavity. This analysis was performed assuming that the borated water in the fuel assembly guide tubes was replaced with aluminum rods, which have lower neutron cross sections than a fully depleted BPRA. The results show a slight increase in reactivity which is well within the subcritical limit. TPDs are short and do not displace water in the guide tubes, therefore, their use will not affect reactivity.
The TN-32 is designed for a maximum internal pressure under normal and accident conditions, and helium buildup of pre-pressurization in BPRAs will affect this analysis. The confinement analysis for the TN-32 has been reanalyzed conservatively for thirty-two BPRAs, and this reanalysis shows that the maximum pressure under accident conditions would be 69.4 psig, when the design basis for this cask is 100 psig. This analysis bounds the storage of any type of Westinghouse or FCF 17 x 17 BPRA. The impact of TPDs on the confinement analysis is bounded by the impact of BPRAs.
To account for the additional decay heat from BPRAs and/or TPDs, fuel assembly decay heat estimates must include an estimate for the decay heat from the actual component in each fuel assembly. Therefore, the combined decay heat from the fuel assembly and its component must be less than the limit for a fuel assembly in the TN-32.


with the requirements of Subsection NF.
Revision 806/14                                      North Anna ISFSI SAR                    A.1-6 Based on these evaluations, the storage of fuel assemblies with BPRAs and/or TPDs is acceptable for the TN-32.
Revision 8-06/14 North Anna ISFSI SARA.1-17Table A.1-1 (CONTINUED)TN-32 ASME CODE EXCEPTIONS ComponentReference ASME Code/Section Code RequirementException, Justification & Compensatory Measures Pressure test of the confinement boundary NB-6110All pressure retaining
Rod clips have been attached to some fuel assemblies at North Anna. Rod clips resemble a fuel assembly grid strap, but are shorter in length and do not span the full row of rods as grid straps do. Rod clips are physically attached to the fuel rods mid-span between grids for the purpose of reducing rod vibration and ultimately eliminating baffle-jetting fuel rod failures, which occurred in North Anna Unit 1 prior to vessel upflow conversion. Rod clips may exist on one or two faces of a fuel assembly.
An evaluation has been performed on the effect on the TN-32 shielding analysis of rod clips on fuel assemblies stored in TN-32 casks. The analysis determined that the total actual Inconel-718 in the fuel zone region for an assembly with rod clips is less than the design basis value of 5.9 kilograms, which is the bounding analysis value from the TN-32 Topical and Final Safety Analysis Reports. Therefore, it is acceptable to load a fuel assembly with rod clips in a TN-32 cask.
A.1.3 Criticality Evaluation The criticality evaluation from Chapter 6 of the TN-32 FSAR Revision 0 (Reference 2) includes an evaluation of the storage of the Westinghouse 17 x 17 Standard Fuel design. This evaluation is summarized below.
Criticality control in the TN-32 is provided by the basket structural components, which maintain the relative position of the spent fuel assemblies under normal and accident conditions, by the neutron absorbing plates between the basket compartments, and by dissolved boron in the spent fuel pool water.
Transnuclear evaluated five Westinghouse fuel designs to determine the most reactive fuel configuration. The five were the Westinghouse 14 x 14 Standard, 14 x 14 OFA, 15 x 15 Standard, 17 x 17 Standard, and 17 x 17 OFA designs. Of these five designs, the Westinghouse 17 x 17 Standard design with BPRA was determined to be the most reactive, and this fuel design was used for the criticality evaluation.
The contents of a TN-32 cask at the North Anna ISFSI are limited to the Westinghouse 17 x 17 Standard Fuel and North Anna Improved Fuel (NAIF) designs. The NAIF design envelope has dimensions identical to the Standard Fuel design, but several structural elements are made of different materials. These material differences do not affect the criticality analyses, however, and so the criticality evaluations for these fuel types are equivalent.
The fuel assemblies were evaluated with and without burnable poison rod assemblies (BPRA). BPRA were modeled using aluminum rods containing no boron. This displaces the borated water and bounds the effect of depleted BPRA. The criticality evaluations did not rely on any special loading patterns or orientation of the fuel assemblies for criticality control. However, a


components shall be pressure tested.
Revision 806/14                                      North Anna ISFSI SAR                    A.1-7 boron concentration of 2300 ppm in the water used in the cask was assumed in the TN-32 FSAR Rev. 0 analysis.
The TN-32 cask is not pressure li mited. All conf inement welds are fully radiographed. In addition, the gamma shielding supports the confinement boundary under all condi tions, so a pressure test of the confinement vessel separately will not simulate actual loading conditions. If the pressure test is performed with the confinement vessel inside the gamma shield, the confinement boundary welds cannot be examined.
The evaluations assumed that each fuel assembly design contained a certain amount of uranium. In the case of the Westinghouse 17 x 17 Standard Fuel design, this content was 467.1 kgU per fuel assembly.
Revision 8-06/14 North Anna ISFSI SARA.1-18Confinement Vessel Material NB-2120 Required materials to be
The criticality evaluations were performed by Transnuclear using the CSAS25 sequence from the SCALE-4.4 code system and the SCALE 27-group ENDF/B-lV cross section library.
Within this sequence, resonance correction based on the fuel pin cell description is provided by NITAWL using the Nordheim Integral method, and keff was determined by the KENOVa code.
A sufficiently large number of neutron histories were run so that the standard deviation was below 0.0020 for all calculations.
The TN-32 was evaluated for a variety of configurations intended to bound all normal, off-normal, and accident conditions. The following conditions were evaluated individually.
: 1. Baseline: Most reactive TN-32 fuel configuration, 100% borated water density. The fuel assemblies are shifted toward the cask vertical axis until the outer pin cells contact the basket compartment wall. This condition bounds all possibilities of fuel assemblies positioned off-center in the compartment.
: 2. The neutron absorber plates and the active fuel zone are offset by two inches axially. This condition might occur due to fuel design differences in the distance from the bottom of the fuel assembly to the beginning of the active fuel, or due to fuel pins slipping in the spacer grids during handling.
: 3. The inside dimension of the compartment is increased and decreased by 0.06 inches. All compartments move correspondingly further apart or closer together. This condition bounds the dimensional tolerance on the basket tubes.
: 4. The width of the neutron poison plate is reduced by 0.06 inches, corresponding to its dimensional tolerance. It is not necessary to evaluate the tolerance in length because it is bounded by the two-inch axial offset condition above.
: 5. Fresh water is placed in the gap of all fuel rods. Although a fuel rod that develops a cladding breach during reactor operations could be saturated with unborated water at the end of its operating cycle, it is unlikely that the water in the fuel rod would remain unborated after years of storage in borated water.
: 6. The borated water density is varied, except in the homogenized basket rail/borated water zone, to simulate the reduction in density that might occur during unloading operations.
: 7. Borated water is drained down to the top of the active fuel, except in the basket rail zone.
This is the most reactive configuration expected during loading and unloading operations, because it reduces the boron capture of reflected neutrons.


ASME Class 1 materialsStandard Review Plan, NUREG-1536 has accepted the use of  
Revision 806/14                                      North Anna ISFSI SAR                  A.1-8 As expected, reduction of the neutron absorber plate width, reduction of compartment size, borated water drain-down, and inclusion of fresh water in the fuel rod gap all cause a slight increase in keff. The optimal borated water density was found at about 95%.
These conditions were combined for a worst case normal condition and the borated water density was varied from 85% to 100%. This resulted in a maximum keff = 0.9264 +/- 0.0009 at 90%
borated water density.
To evaluate accident conditions, the worst case normal model was re-run with a single fuel assembly of 5 weight percent U-235 enrichment. This fuel assembly was placed in one of the four center basket locations. This case demonstrated compliance with the requirement of 10 CFR 72.124 by combining at least two unlikely, independent, and concurrent changes in the conditions essential to nuclear criticality safety; worst case geometry and accidental loading of a fuel assembly with enrichment greater than assumed in the analysis. This resulted in a keff = 0.9315 +/- 0.0009.
Transnuclear performed additional analyses to determine what initial enrichment could be stored if the water in the spent fuel pool had a boron concentration of 2500 ppm. These analyses assumed that the most reactive fuel design and worst-normal configuration remained the same even with the boron increase.
The same criticality model as before was used, however the CSAS25 sequence from SCALE-4.4 was used to determine the keff using KENOVa and the 44-group ENDF/V cross section library. The worst normal case from before with the enrichment changed to 4.30 weight percent U-235 and the soluble boron concentration changed to 2500 ppm was analyzed. As before, the water density was varied to simulate the reduction in density that might occur during unloading operations. Similarly, the accident condition (assembly misload), was simulated as before but with a loading of 4.30 weight percent assemblies and a misloaded 5 weight percent U-235 assembly in an interior cell. A new upper subcritical limit (USL) was determined using SCALE-4.4 for comparison to the calculated keffs for the analyzed conditions. These analyses verified that under normal, off-normal, and accident conditions, that the maximum value of keff + 2 is less than the USL of 0.9419. The worst case which combines the two independent conditions of a misloaded single fuel assembly with the worst-normal configuration at reduced (optimum, 92.5% density) water moderation has a keff + 2 = 0.9404.
The TN-32 cask is designed to be substantially subcritical under all credible conditions. The criticality design is based on favorable geometry, fixed neutron poisons, and soluble poisons in the spent fuel pool, with unirradiated fuel having an initial enrichment, up to and including, 4.30 weight percent U-235. An appraisal of the fixed neutron poisons has shown that they will remain effective for the 20-year storage period, and there is no credible way to lose them. The analysis and evaluation of the criticality design and performance have demonstrated that the cask will provide for the safe storage of spent fuel for a minimum of 20 years with an adequate subcritical margin.


either Subsection NB (Class 1) or NC (Class 2 or 3) of the Code for the confinement. SA-203 Gr.
Revision 806/14                                      North Anna ISFSI SAR                      A.1-9 The criticality design features for the TN-32 are in compliance with 10 CFR 72 and the applicable design and acceptance criteria have been satisfied. The evaluation of the criticality design provides reasonable assurance that the TN-32 will allow the safe storage of spent fuel.
D is similar to SA-203 Gr.
A.1.3.1 Neutron Absorber Tests As allowed by NUREG/CR-5661 (Reference 3), the criticality evaluation performed in the TN-32 FSAR Revision 0 takes credit for 90% of the boron-10 in the borated aluminum absorber plates rather than the maximum value of 75% used in prior evaluations. Testing to verify the presence and uniformity of the neutron absorber are discussed below.
E, which is a Class 1 material. The chemical content of the tw o grades are identical, except that Gr.
Effective boron-10 content of the borated aluminum fuel basket neutron absorber sheets is verified by neutron transmission testing of coupons taken from each sheet. The transmission through the coupons is compared with transmission through calibrated standards composed of a homogeneous boron compound without other significant neutron absorbers, for example zirconium diboride or titanium diboride. These standards are paired with aluminum shims sized to match the scattering by aluminum in the neutron absorber sheets. The effective boron-10 content of each coupon, minus 3 based on the neutron counting statistics for that coupon, must be 10 mg boron-10/cm2.
E restricts the carbon to 0.20 max., while Gr.
In the event that a coupon fails the single neutron transmission measurement, four additional measurements may be made on the coupon, and the average of the 5 measurements, less 3 based on the counting statistics, must be  10 mg boron-10/cm2.
D further restricts the carbon content to 0.17 max. Gr. D is acceptable as a Class 2 material up to 500&deg;F.
Macroscopic uniformity of boron-10 distribution is verified by neutron radioscopy or radiography of the coupons. The acceptance criterion is that there be uniform luminance across the coupon. This inspection shall cover the entire coupon.
SA-350, Gr
Normal sampling of coupons for neutron transmission measurements and radiography/radioscopy shall be 100%. Rejection of a given coupon shall result in rejection of the associated sheet. Reduced sampling (50% - every other coupon) may be introduced based upon acceptance of all coupons in the first 25% of the lot. A rejection during reduced inspection will require a return to 100% inspection of the lot. A lot is defined as all the sheets rolled from a single casting.
. LF3 is the same material as the SA-203, Gr.
A.1.4 Thermal Evaluation Chapter 4 of the TN-32 Final Safety Analysis Report, Revision 0 (Reference 2) includes a thermal evaluation for normal conditions that was based on the following inputs.
D, except in a forged condition. SA-350, Gr.
: 1. A maximum heat load of 32.7 kilowatts from 32 fuel assemblies with BPRAs or TPDs, or 1.02 kilowatt/fuel assembly.
LF3 is a Class 1 material in the 1995 edition of the ASME Code, and a Class 2 material in the 1992 Code.Gr. D was selected because of it s ductility , since the higher strength is not required. SA-203 Gr.
: 2. An ambient temperature range of -30 to 115&deg;F. The temperature range was averaged over 24 hours and a maximum daily averaged ambient temperature of 100&deg;F was used for the maximum cask temperature evaluation.
D has better elongation than Gr. E and due to its lowe r strength is more likely to have the good fracture toughness at low temperatures.In selecting materials for storage and transport casks, one of the major selection criteria is fracture toughness at lo w temperatures. SA-203, Gr.
D and SA-350, Gr.
LF3 were selected on this basis.
There is no similar requirement fo r pressure vessels, as they are used at much higher temperatures. For the SA-203 Gr.
D and SA-350, Gr
. LF3 materials, the allowable stress was based on S, the allowable stress for Class 2 components. This is conservative, since NB is based on S m , which is 1/3 the tensile strength, while S is 1/4 the tensile strength. Thus there is additional margin over and above the margin required by the code for Class I materials.Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS ComponentReference ASMECode/SectionCode RequirementException, Justification & Compensatory Measures Revision 8-06/14 North Anna ISFSI SARA.1-19Weld of lid Shield Plate to Lid NB-4335 Impact testing of weld and


heat af fected zone of lid to shield plateIf two different materials are joined, the fracture toughness
Revision 806/14                                      North Anna ISFSI SAR                  A.1-10
: 3. A total solar heat load for a 12-hour period of 1475 Btu/ft2 for curved surfaces and 2950 Btu/ft2 for flat surfaces, per 10 CFR 71.71(c). Since the cask has a large thermal inertia, the total insolation was averaged over a 24-hour period.
The thermal analysis for normal storage concluded that the TN-32 design meets all applicable requirements. The maximum temperature of any confinement structure component was less than 315&deg;F, which has an insignificant effect on the mechanical properties of the confinement materials used. The predicted maximum fuel cladding temperature was 565&deg;F, which is well below the allowable fuel cladding temperature limit of 752&deg;F (400&deg;C) for loading, unloading, and normal operating conditions.
All fuel transfer operations occur when the cask is in the spent fuel pool with the cask lid removed. The fuel is always submerged in free-flowing water, permitting heat dissipation. After fuel loading is complete, the cask is removed from the pool, drained and the cavity is dried.
The loading condition evaluated for the TN-32 is the heatup of the cask before its cavity can be backfilled with helium. This occurs during the vacuum drying operation of the cask cavity.
Transient thermal analyses were performed to predict the heatup time history for the cask components assuming air is in the cask cavity.
The results of the transient thermal analysis for the maximum heat load of 32.7 kw showed that in order to prevent cask component peak temperatures from exceeding their analyzed temperature range, in particular the basket, the time before backfilling the cask with helium must be limited to less than 36 hours. Backfilling the cask with helium within 36 hours of the completion of draining also provides assurance that the fuel pin cladding temperature does not exceed 400&deg;C.
Unloading of a cask would require the flooding of the cask prior to the removal of the fuel.
A quench analysis of the fuel concluded that the total stress on the fuel cladding was below the cladding materials minimum yield stress. In addition, by limiting the water flow rate into the cask and monitoring the pressure of the air/steam outflow mixture, the buildup of steam pressure in the cavity was limited to less than the cask design pressure.
The temperatures determined by the evaluation of the cask systems, structures and components important to safety will remain within their operating temperature ranges, and cask internal pressures under normal conditions were acceptable. The TN-32 cask provides adequate heat removal capacity without active cooling systems. The TN-32 cask is designed with a heat removal capability having testability and reliability consistent with its importance to safety. Spent fuel cladding will be protected against degradation that leads to significant fuel failures by maintaining the clad temperature below maximum allowable limits and by providing an inert environment in the cask cavity.


requirements of either may be used for the weld metal. There are no fracture toughness requirements on the shield plate, and therefore none are performed on the base metal or the heat affected zones. This weld is not subject to low temperatures, as it is inside the cask cavity. An evaluation of this weld at low temperatures is presented in Appendix 3E of the TN-32 FSAR.
Revision 806/14                                      North Anna ISFSI SAR                    A.1-11 The thermal design of the TN-32 cask is in compliance with 10 CFR 72 and applicable design and acceptance criteria have been satisfied. The evaluation of the thermal design provides reasonable assurance that the TN-32 will allow the safe storage of spent fuel for 20 years.
Gamma Shielding NB-2190 Material in the component support load path and not performing a pressure retaining function welded to pressure retaining material shall meet the requirements of NF-2000The gamma shielding materials were procured to ASTM or ASME material specifications. Mate rials testing is performed in accordance with the applicable specification. Im pact testing is not performed on the gamma shieldi ng materials (including welding materials). An evaluation of the gamma shielding due to impact at low temperatures is presented in Appendix 3E of the TN-32 FSAR.Confinement Vessel NB-7000Vessels are required to have
A.1.5 Cask Sliding and Tip-over Analysis Analysis demonstrates that the casks will not slide or tip-over as a result of the ISFSI design earthquake (Section 4.2.1.4). The analysis utilized a dynamic, soil-structure interaction analysis to determine the effect of the design earthquake on the casks and concrete storage pad. A generic cask, 16 feet high x 8 feet diameter, was used for the analysis. Since cask sliding was the major concern of the analysis effort, the generic cask approach is considered acceptably bounding and produces more conservative factors of safety for sliding. A comparison with the generic cask modeled and the TN-32 is shown below:
TN-32STABILITY ANALYSIS TSAR PROPERTY            GENERIC CASK              TN-32          SECTION 2.2.3.2 Weight                          230 kips        230.99 kips              228 kips Vertical Distance to           96 inches        92.09 inches            92 inches Center of Gravity, Iv Base Radial Distance to         48 inches        43.875 inches        43.875 inches Center of Gravity, Ir A finite element model was used to perform the dynamic analysis. The casks were modeled as a rigid beam from the top of the concrete pad to the center of gravity of the generic casks and the transitional and rotary weights of the casks were lumped at the top of the 96-inch rigid beams.
This is more conservative than using the 92-inch vertical distance of the TN-32 cask and will result in slightly higher accelerations for the casks and a higher moment arm for those accelerations.
The difference in weight between the generic cask and the TN-32 cask is negligible.
The factor of safety against sliding is determined as:
FS = R/H where:
R = Resistance to sliding = &#xb5; x W x (1 - Az)
      &#xb5; = Coefficient of friction = 0.3 W = Weight of cask on pad Az = Vertical acceleration of cask at cask center of gravity


overpressure protectionNo overpressure protection is provided. Function of confinement
Revision 806/14                                      North Anna ISFSI SAR                  A.1-12 H = Horizontal sliding force = (Sx2 + Sy2)0.5 Sx,Sy = Horizontal cask forces at the cask center of gravity in x,y directions
            = W x Ai, i = x,y; Ai = horizontal accelerations Thus, FS = 0.3(1 - Az)/(Ax2 + Ay2)0.5 Higher accelerations will result in a lower factor of safety against sliding, therefore using the higher center of gravity of the generic casks is conservative and envelops the TN-32 cask. It should also be noted that the weight of the cask is not involved in the final calculation for the factor of safety against sliding.
Using the methodology of TSAR Section 2.2.3.2, the g value necessary to tip the cask is calculated below:
Mtip = gWIv + (2/3)gWIr and            Mstab = WIr Where:
Mtip = Moment necessary to tip the cask Mstab = Stabilizing moment on the cask g = Acceleration value necessary to tip the cask W = Weight of cask on pad Iv = Vertical distance to cask center of gravity Ir = Radial distance to cask center of gravity Therefore, the g value necessary to tip the cask is found by equating Mtip to Mstab:
(gWIv) + (2/3)gWIr = WIr g = (Ir)/(Iv + 0.67 x Ir)
Solving for the TN-32 cask, g = 0.36.
Solving for the generic cask, g = 0.37 which is virtually the same as for the TN-32 cask.
Using the higher center of gravity of the generic casks will result in higher cask accelerations and higher overturning moments which will result in a lower factor of safety against overturning and is therefore conservative.


vessel is to contain radioactive contents under normal, off normal, and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maxi mum accident temperatures.Confinement Vessel NB-8000 State requirements for
Revision 806/14                                      North Anna ISFSI SAR                  A.1-13 It is concluded that the generic cask used in the analysis is more conservative than using the TN-32 cask for the critical sliding analysis and is essentially equivalent to the TN-32 cask for overturning which shows significant margin to the minimum 1.1 safety factor. The lowest factor of safety for overturning is about 1.6.
A.1.6 Evaluation of Tornado Missiles An evaluation of the TN-32 cask using the North Anna ISFSI design basis tornado missiles was performed. The results are compared below with results provided for the design basis tornado missiles evaluated in TN-32 TSAR Sections 2.2.1.2 and 2.2.1.3. The effects from the design basis tornado missiles evaluated in the TN-32 TSAR bound the effects from the North Anna ISFSI design basis tornado missiles.
TN-32 TSAR                  NAPS ISFSI PARAMETER          TORNADO MISSILES            TORNADO MISSILES Cask Sliding                7.6 inches                  2.7 inches Cask Tipping                8.9 degrees                  2.8 degrees Cask Penetration            2.03 inches                  1.65 inches The evaluation for cask sliding was performed after determining that the worst case was the 1-ton automobile traveling at 150 mph impacting the cask below the center of gravity. The evaluation for tipping also used the automobile, but with impact near the top of the cask. Five missiles were evaluated for penetration of the cask body, and the worst cask penetration was 1.65 inches for the 6-inch diameter steel pipe. Other scenarios mentioned in the SAR are bounded by these three conditions.
A.1.7 Revised Type B and C Tornado Missile Analyses The structural analyses for missile types B and C, contained in Sections 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR, include the protective cover. Transnuclear has performed revised analyses which no longer credit the protective cover for missile protection. The revised analyses conclude that the code allowable stresses on the lid are not exceeded during a missile impact event. Section 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR are supplanted by the following sections providing a description of the revised analyses. The revised TSAR pages are included as Attachment 2 to this appendix.
A.1.8 SSSC Average Surface Dose Rate The North Anna ISFSI design basis dose rates in Chapter 7 were determined based upon the use of TN-32 SSSCs utilizing design basis fuel loadings with no additional conservatisms applied other than those described in the calculational methodology.


nameplates, stamping and reports per NCA-8000TN-32 cask to be marked and identified in accordance with 10 CFR 72 requirements. Code stampi ng is not required. QA data package to be in accordance with Transnuclear approved QA program.Table A.1-1 (CONTINUED)
Revision 806/14                                      North Anna ISFSI SAR                A.1-14 A.1.8.1 SSSC Average Surface Dose Rate Measurement In order to determine the average surface dose rates of TN-32 casks to compare with Technical Specifications limits the following method is applied.
TN-32 ASME CODE EXCEPTIONS ComponentReference ASMECode/SectionCode RequirementException, Justification & Compensatory Measures Revision 8-06/14 North Anna ISFSI SARA.1-20Confinement Vessel material NB-2000 Requires materials to be
Average Side Surface Dose Rate The side surface dose rates shall be measured at approximately the following locations (see Figure A.1-1). Obtain separate measurements for gamma and neutron dose rates.
: 1. Above the Radial Neutron Shield (Map location A)
Obtain four measurements, equally spaced circumferentially, midway between the top of the cask body flange and the top of the radial neutron shield. Do not obtain measurements over or in the immediate vicinity of the cask trunnions.
Add the measurements together and divide by the number of measurements obtained in this area. The result is the dose rate above the neutron shield.
: 2. Sides of Radial Neutron Shield (Map locations B, C, and D)
Obtain four measurements, equally spaced circumferentially, at each of the following approximate elevations: one sixth, one half and five sixths along the axial span of the radial neutron shield. Do not obtain measurements over or in the immediate vicinity of the cask trunnions.
Add the measurements together and divide by the number of measurements obtained over the neutron shield. The result is the dose rate over the radial neutron shield.
: 3. Below Radial Neutron Shield (Map location E)
Obtain four measurements, equally spaced circumferentially, midway between the bottom of the radial neutron shield and the bottom of the cask. Do not obtain measurements over or in the immediate vicinity of the cask trunnions. Also, it may not be possible for a neutron dose rate meter to access the surface at location E. If so, the neutron dose rate meter may be located as much as one foot away from the cask surface to obtain measurements.
Add the measurements together and divide by the number of measurements obtained in this area. The result is the dose rate below the neutron shield.
Average Top Surface Dose Rate
: 4. Top of Cask (Map locations F, G, and H)
Obtain one measurement at the center of the protective cover (F). Obtain four measurements equally spaced circumferentially half way between the center and the knuckle (G). Obtain four measurements equally spaced circumferentially at the knuckle (H).
Add the measurements together and divide by the number of measurements obtained over the protective cover. The result is the dose rate over the top surface of the cask.


supplied by ASME  
Revision 806/14                                      North Anna ISFSI SAR                  A.1-15 Final Surface Dose Rate The average surface gamma and neutron dose rates shall be determined by the following formulae. Note that A, B, C, and D refer to the values obtained in steps 1, 2, 3, and 4 above, respectively. The 0.1 and 0.8 multipliers are area weighting factors.
Average Side Surface Gamma Dose Rate = (0.1 x A) + (0.8 x B) + (0.1 x C)
Average Side Surface Neutron Dose Rate = (0.1 x An) + (0.8 x Bn) + (0.1 x Cn)
Average Top Surface Gamma Dose Rate = D Average Top Surface Neutron Dose Rate = Dn A.1.9 Codes and Standards The TN-32 cask is designed and fabricated in accordance with Section III of the 1992 edition of the ASME Code. Exceptions to the Code are listed in Table A.1-1.
Changes to Table A.1-1 or ASME Code exceptions not included in the Table shall be reviewed in accordance with 10 CFR 72.48. This review should demonstrate that:
: 1. The changes or exceptions would provide an acceptable level of quality and safety, or
: 2. Compliance with the specified requirements of Section III of the 1992 edition of the ASME Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
A.1.10 References
: 1. TN-32 Dry Storage Cask Topical Safety Analysis Report, Revision 9A, Transnuclear, Inc.,
December 1996.
: 2. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear, Inc.,
January 2000.
: 3. NUREG/CR-5661, Recommendations for Preparing the Criticality Safety Evaluation of Transportation Packages, 1997.


approved material supplier; Quality assurance to meet
Table A.1-1 TN-32 ASME CODE EXCEPTIONS List of ASME Code Exceptions for TN-32 Dry Storage Cask Confinement Boundary/Gamma Shielding/Basket The cask confinement boundary is designed in accordance with the 1992 edition of the ASME Code, Section III, Subsection NB. The Revision 806/14 basket was designed in accordance with the 1992 edition of the ASME Code, Section III, Subsection NF. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during drop accidents, was analyzed in accordance with Subsection NB. Inspections of the gamma shielding are performed in accordance with the 1992 edition of the ASME Code as detailed in the TN-32 Topical Safety Analysis Report, Rev. 9A, December 1996 (the TSAR).
Reference ASME Component            Code/Section          Code Requirement                Exception, Justification & Compensatory Measures TN-32 Cask          NB-1100              Stamping and preparation        The TN-32 cask is not N stamped, nor is there a code design of reports by the Certificate  specification generated. A design criteria document was Holder                          generated in accordance with TNs QA Program and the design and analysis is provided in the TSAR.
TN-32 Cask          NCA-3800              Quality Assurance              The Quality assurance requirements of NQA-1 or 10 CFR 72 Requirements                    Subpart G are imposed in lieu of NCA-3800 requirements.
Lid Bolts            NB-3232.3            Fatigue analysis of bolts      A fatigue analysis of the bolts is not performed for storage, since the bolts are not subject to significant cyclical loads.
Gamma Shielding      NB-1132.2            Non-pressure retaining          The primary function of the gamma shield is shielding, although structural attachments shall    credit is taken for the gamma shielding in the structural analysis.
conform to Subsection NF        A surface examination of the welds is performed in accordance North Anna ISFSI SAR with the requirements of Subsection NF.
A.1-16


NCA requirementsMaterial will be supplied by Tran snuclear approved suppliers with Certified Material Test reports (CMTR) in accordance with  
Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS Reference ASME Component            Code/Section        Code Requirement    Exception, Justification & Compensatory Measures Pressure test of the NB-6110        All pressure retaining  The TN-32 cask is not pressure limited. All confinement welds are Revision 806/14 confinement                          components shall be      fully radiographed. In addition, the gamma shielding supports the boundary                            pressure tested.        confinement boundary under all conditions, so a pressure test of the confinement vessel separately will not simulate actual loading conditions. If the pressure test is performed with the confinement vessel inside the gamma shield, the confinement boundary welds cannot be examined.
North Anna ISFSI SAR A.1-17


NB-2000 requirements. The cask is not code stamped. The quality assurance requirements of NQA-1 or 10 CFR 72 Subpart G may be imposed in lieu of the requirements of NCA-3800.Corner Weld between bottom inner plate to inner shell NB-5231Full penetration corner welded joins require the fusion zone and the parent metal beneath the attachment surface to be UT inspected after weldingIn lieu of the UT inspection, the joint will be examined by RT and either PT or MT metho ds in accordance with ASME Subsection NB requirements.
Table A.1-1 (CONTINUED)
Boundary of
TN-32 ASME CODE EXCEPTIONS Reference ASME Component          Code/Section        Code Requirement      Exception, Justification & Compensatory Measures Confinement      NB-2120          Required materials to be  Standard Review Plan, NUREG-1536 has accepted the use of Revision 806/14 Vessel Material                    ASME Class 1 materials    either Subsection NB (Class 1) or NC (Class 2 or 3) of the Code for the confinement. SA-203 Gr. D is similar to SA-203 Gr. E, which is a Class 1 material. The chemical content of the two grades are identical, except that Gr. E restricts the carbon to 0.20 max., while Gr. D further restricts the carbon content to 0.17 max. Gr. D is acceptable as a Class 2 material up to 500&deg;F.
SA-350, Gr. LF3 is the same material as the SA-203, Gr. D, except in a forged condition. SA-350, Gr. LF3 is a Class 1 material in the 1995 edition of the ASME Code, and a Class 2 material in the 1992 Code.
Gr. D was selected because of its ductility, since the higher strength is not required. SA-203 Gr. D has better elongation than Gr. E and due to its lower strength is more likely to have the good fracture toughness at low temperatures.
In selecting materials for storage and transport casks, one of the major selection criteria is fracture toughness at low temperatures.
SA-203, Gr. D and SA-350, Gr. LF3 were selected on this basis.
There is no similar requirement for pressure vessels, as they are used at much higher temperatures. For the SA-203 Gr. D and North Anna ISFSI SAR SA-350, Gr. LF3 materials, the allowable stress was based on S, the allowable stress for Class 2 components. This is conservative, since NB is based on Sm, which is 1/3 the tensile strength, while S is 1/4 the tensile strength. Thus there is additional margin over and above the margin required by the code for Class I materials.
A.1-18


Jurisdiction NB-1131The design specification  
Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS Reference ASME Component          Code/Section        Code Requirement          Exception, Justification & Compensatory Measures Weld of lid Shield NB-4335        Impact testing of weld and    If two different materials are joined, the fracture toughness Revision 806/14 Plate to Lid                      heat affected zone of lid to  requirements of either may be used for the weld metal. There are shield plate                  no fracture toughness requirements on the shield plate, and therefore none are performed on the base metal or the heat affected zones. This weld is not subject to low temperatures, as it is inside the cask cavity. An evaluation of this weld at low temperatures is presented in Appendix 3E of the TN-32 FSAR.
Gamma Shielding  NB-2190          Material in the component      The gamma shielding materials were procured to ASTM or support load path and not      ASME material specifications. Materials testing is performed in performing a pressure          accordance with the applicable specification. Impact testing is not retaining function welded to  performed on the gamma shielding materials (including welding pressure retaining material    materials). An evaluation of the gamma shielding due to impact at shall meet the requirements    low temperatures is presented in Appendix 3E of the TN-32 of NF-2000                    FSAR.
Confinement      NB-7000          Vessels are required to have No overpressure protection is provided. Function of confinement Vessel                            overpressure protection      vessel is to contain radioactive contents under normal, off normal, and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maximum accident temperatures.
North Anna ISFSI SAR Confinement      NB-8000          State requirements for        TN-32 cask to be marked and identified in accordance with Vessel                            nameplates, stamping and      10 CFR 72 requirements. Code stamping is not required. QA data reports per NCA-8000          package to be in accordance with Transnuclear approved QA program.
A.1-19


shall define the boundary of a component to which another component is attached.A code design specification was not prepared for the TN-32 cask.  
Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS Reference ASME Component            Code/Section        Code Requirement          Exception, Justification & Compensatory Measures Confinement        NB-2000          Requires materials to be      Material will be supplied by Transnuclear approved suppliers with Revision 806/14 Vessel material                      supplied by ASME              Certified Material Test reports (CMTR) in accordance with approved material supplier;    NB-2000 requirements. The cask is not code stamped. The quality Quality assurance to meet      assurance requirements of NQA-1 or 10 CFR 72 Subpart G may NCA requirements              be imposed in lieu of the requirements of NCA-3800.
Corner Weld          NB-5231        Full penetration corner    In lieu of the UT inspection, the joint will be examined by RT and between bottom                      welded joins require the    either PT or MT methods in accordance with ASME Subsection inner plate to inner                fusion zone and the parent NB requirements.
shell                                metal beneath the attachment surface to be UT inspected after welding Boundary of        NB-1131          The design specification      A code design specification was not prepared for the TN-32 cask.
Jurisdiction                        shall define the boundary of  A TN design criteria was prepared in accordance with TNs QA a component to which          program. The containment boundary is specified in Chapter 1 of another component is          the TSAR.
attached.
North Anna ISFSI SAR A.1-20


A TN design criteria w as prepared in accordance with TN's QA program. The containment boundary is specified in Chapter 1 of the TS AR.Table A.1-1 (CONTINUED)
Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS ComponentReference ASMECode/SectionCode RequirementException, Justification & Compensatory Measures Revision 8-06/14 North Anna ISFSI SARA.1-21PT/MT inspection of plates NB-5130Weld preparations in plates
TN-32 ASME CODE EXCEPTIONS Reference ASME Component            Code/Section        Code Requirement          Exception, Justification & Compensatory Measures PT/MT inspection NB-5130            Weld preparations in plates  The final thickness of the shell is 1.5 inches, and therefore this Revision 806/14 of plates                            2 inches and over are        requirement was not imposed. However, the confinement shells required to be surface        may be made from shells with original thickness greater than examined by PT or MT.         1.5 inches. We interpret the code to mean the final thickness of the pressure vessel. The weld prep on one side of the wall is performed by back gouging after the opposite side is welded. An MT examination of this back gouged surface before welding is performed. A UT examination is performed on the plate material when purchased. This examination is intended to discover indications, both laminar and nonlaminar imperfections. Therefore the UT examination of the plate prior to welding can be expected to reveal any indications or imperfections that exist in the plate.
Surface            NB-4121.3        If more than 1/8 inch of      The containment flanges and the lids are procured with both a UT examination after                    material is removed, a        and MT examination. More than 1/8 inch of material may be machining                            surface examination is        removed during processing, and no additional surface required of components        examinations are performed.
which have been previously surface examined.
Aluminum basket    NF-2120          Materials to be ASME          The aluminum plate strength is not used for structural analysis plate and rail,                      Class 1 materials            under normal operating loads nor the 50g accident end drop load.
North Anna ISFSI SAR neutron absorber                                                  The aluminum plate strength is only assumed to be effective for plates                                                             the short duration dynamic loading from a tipover accident and for secondary thermal stress calculations. 6061-T6 is ASME code material (Class 2 or 3). The strength of the neutron absorber plates are not considered in any analysis.
A.1-21


2 inches and over are
Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS Reference ASME Component          Code/Section        Code Requirement      Exception, Justification & Compensatory Measures Basket          NF-4000/NF-5000  Welding/NDE Inspections  Basket welding procedures are qualified in accordance with Revision 806/14 ASME Section IX. Due to the unique nature of these welds, special inspections and tests were developed for these welds.
Components other Subsection NB                              The code does not apply to components other than the than the                                                    containment boundary and basket. The gamma shielding has been containment                                                  analyzed and inspected in accordance with Subsection NB as boundary and                                                defined at the beginning of this table.
basket Basket          NF-3000          Allowable Stresses        The ASME Code gives stress values up to 400&deg;F. Stress values above 400&deg;F are taken from Aluminum Standards and Data, 1990. The allowable stresses used for the aluminum basket plate and rail are based on S, the allowable stress for a Class 2 or 3 component. This is conservative, since the analyses of the basket and rail are performed in accordance with the rules of Subsection NF. Subsection NF allowables are based on Sm which is 1/3 the ultimate strength, while S is 1/4 the ultimate strength.
Thus there is additional margin built into the analysis of the basket and rail over and above the margin required by Subsection NF for class 1 materials.
North Anna ISFSI SAR A.1-22


required to be surf ace examined by PT or MT.The final thickness of the shell is 1.5 inches, and therefore this requirement was not imposed. However, the confinement shells may be made from shells with original thickness greater than 1.5 inches. We interpret the code to mean the final thickness of the
Revision 806/14                          North Anna ISFSI SAR A.1-23 Figure A.1-1 TN-32 SURFACE DOSE RATE MEASUREMENT LOCATIONS


pressure vessel. The weld prep on one side of the wall is performed by back gouging after th e opposite side is welded. An MT examination of this back gouged surface before welding is performed. A UT examination is performed on the plate material when purchased. This examination is intended to discover indications, both lamina r and nonlaminar impe rfections. Therefore the UT examination of the plate prior to welding can be expected to reveal any indications or imperfections that exist in the plate.Surface examination after machining NB-4121.3 If more than 1/8 inch of material is removed, a surface examination is required of components which have been previously surface examined.The containment flanges and the li ds are procured with both a UT and MT e xamination. More than 1/8 inch of material may be removed during processing, and no additional surface examinations are performed.Aluminum basket
Revision 806/14              North Anna ISFSI SAR A.1-24 Intentionally Blank


plate and rail, neutron absorber plates NF-2120 Materials to be ASME
Revision 806/14                              North Anna ISFSI SAR        A.1 Att. 1-1 Appendix A.1, Attachment 1 Revision of Lid Bolt Analysis Supplants the Analyses in TN-32 TSAR, Revision 9A, Section 3A.3 and TN-32 FSAR, Revision 0, Section 3A.3


Class 1 materials The aluminum plate strength is no t used for structural analysis under normal operating loads nor the 50g accident end drop load.
Revision 806/14               North Anna ISFSI SAR A.1 Att. 1-2 Intentionally Blank
The aluminum plate strength is only assumed to be effective for the short duration dynamic loading from a tipover accident and for secondary thermal stress calcula tions. 6061-T6 is ASME code material (Class 2 or 3). The strength of the neutron absorber plates are not considered in an y analysis.Table A.1-1 (CONTINUED)
TN-32 ASME CODE EXCEPTIONS ComponentReference ASMECode/SectionCode RequirementException, Justification & Compensatory Measures Revision 8-06/14 North Anna ISFSI SARA.1-22Basket NF-4000/NF-5000Welding/NDE InspectionsBasket welding procedures are qualified in accordance with ASME Section IX. Due to the unique nature of these welds, special inspections and tests were developed for these welds.
Components other


than the co ntainment boundary and basket Subsection NB The code does not apply to components other than the  
Revision 806/14                                          North Anna ISFSI SAR            A.1 Att. 1-3 3A.3 Lid Bolt Analyses The lid bolt analysis presented below is performed using the weight of the TN-32A lid (including top neutron shield) since it is slightly heavier than the standard TN-32 lid assembly (with top neutron shield). The use of either aluminum or silver metallic o-ring seals is discussed in the analysis below. Both are acceptable for use in a TN-32 cask lid system. O-ring parameters from either an aluminum or silver o-ring are used interchangeably in the following analyses, depending on which of the parameters from a particular o-ring provides the more limiting result.
3A.3.1      Normal Conditions 3A.3.1.1 Bolt Preload The lid is secured to the cask body by forty-eight 1.5-in. diameter bolts. The selected bolt preload is such that the metallic confinement seals are properly compressed and the lid is seated against the flange with sufficient force to resist the maximum cavity internal pressure and any dead weight loads acting to unseat the lid. The maximum corresponding tensile reload stress in the bolts at temperature is 51,930 psi (corresponding to a maximum applied torque during cask loading of 1230 ft-lb. with lubrication) which is less than the stress allowable for the bolt material for Normal (Level A) Conditions. The minimum tensile preload stress in the bolts at temperature is 37,150 psi (corresponding to a minimum applied torque of 880 ft-lb. with lubrication) The load per bolt is:
Maximum: FB              =    AB x 51,930
                                =    1.492 x 51,930 = 77,480 lb./bolt Minimum: FB              =    AB x 37,150
                                =    1.492 x 39,260 = 55,430 lb./bolt Since we have 48 bolts, the maximum total seating force of all 48 bolts is 48 FB =
3,719,000 lb. and the minimum total seating force is 2,661,000 lb.
The force required to seat the metallic O-rings (also referred to as seals), from Reference 1, is a line load of 1399 pounds per inch of seal circumference for aluminum seals, or 2284 pounds per inch of seal circumference for silver seals. The diameter of the outer seal is 72.65 in. and the diameter of the inner seal 71.05 in. The seal seating force is then:
Fseating = 1399 (72.65 + 71.05) = 631,570 lb. (aluminum)
Fseating = 2284 (72.65 + 71.05) =1,031,000 lb. (silver)
The maximum cask cavity internal pressure is the Design Pressure of 100 psi. The force required to react the pressure load (conservatively assuming the pressure is applied over the outer seal diameter) is:
FPressure = 100 ( - )(72.65)2 = 414,500 lbs.


containment boundary and bask et. The gamma shield ing has been analyzed and inspected in accordance with Subsection NB as defined at the beginning of this table.Basket NF-3000Allowable StressesThe ASME Code gives stress values up to 400&deg;F. Stress values above 400&deg;F are taken from "Aluminum Standards and Data," 1990. The allowable stresses used for the aluminum basket plate and rail are based on S, the allowable stress for a Class 2 or 3 component. This is conservative, since the analyses of the basket and rail are performed in acc ordance with the rules of Subsection NF. Subsection NF allowables are based on S m which is 1/3 the ultimate strength, whil e S is 1/4 the ultimate strength. Thus there is additional margin built into the analysis of the basket and rail over and above the marg in required by Subsection NF for class 1 materials.Table A.1-1 (CONTINUED)
Revision 806/14                                         North Anna ISFSI SAR              A.1 Att. 1-4 The TN-32 cask is always oriented vertical during loading, during transfer to the ISFSI and during storage on the pad. Dead weight of the lid and cask contents does not actually load the lid bolts. In fact the lid weight (and external pressure) helps to seat the lid. However, it is conservative to require that the bolt preload maintain lid seating in any cask orientation. The weights of the lid, fuel and basket are:
TN-32 ASME CODE EXCEPTIONS ComponentReference ASMECode/SectionCode RequirementException, Justification & Compensatory Measures Revision 8-06/14 North Anna ISFSI SARA.1-23 Figure A.1-1 TN-32 SURFACE DOSE RATE MEASUREMENT LOCATIONS Revision 8-06/14 North Anna ISFSI SARA.1-24 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-1Appendix A.1, Attachment 1 Revision of Lid Bolt Analysis Supplants the Analyses in TN-32 TSAR, Revision 9A, Section 3A.3 and TN-32 FSAR, Revision 0, Section 3A.3 Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-2 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-3 3A.3  Lid Bolt Analyses The lid bolt analysis presented below is performed using th e weight of the TN-32A lid (including top neutron shield) since it is slightly heavier than the standard TN-32 lid assembly (with top neutron shield).
Lid Assembly Weight               = 14,480 lb.
The use of either aluminum or silver metallic o-ring seals is discussed in the analysis below. Both are acceptable for use in a TN-32 cask li d system. O-ring parameters from either an aluminum or silver o-ring are used interchangeably in the following analyses, depending on which of the parameters from a particular o-ring provides the more limiting result.
Fuel Weight                       = 49,060 lb.
3A.3.1 Normal Conditions 3A.3.1.1 Bolt PreloadThe lid is secured to the cask body by forty-eight 1.5-in. diameter bolts. The selected bolt preload is such that the metallic confinement seals are properly compressed and the lid is seated against the flange with sufficient force to resist the maximum cavity internal pressure and any dead weight loads acting to unseat the lid. The maximum corresponding tensile reload stress in the bolts at temperature is 51,930 psi (corresponding to a maximum applied torque during cask loading of 1230 ft-lb. with lubrication) whic h is less than the stress al lo wable for the bolt material for Normal (Level A) Conditions. The minimum tens ile preload stress in th e bolts at temperature is 37,150 psi (corresponding to a mi nimum applied torque of 880 ft-lb. with lubrication) The load per bolt is:
Basket Weight                     = 16,900 lb.
Maximum: F B=A B x 51,930=1.492 x 51,930 = 77,480 lb./bolt Minimum: F B=A B x 37,150=1.492 x 39,260 = 55,430 lb./boltSince we have 48 bolts, the maximum total seating force of all 48 bolts is 48 F B = 3,719,000 lb. and the minimum total seating force is 2,661,000 lb.The force required to seat the metallic O-rings (also referred to as seals), from Reference 1, is a line load of 1399 pounds per inch of seal circumference for aluminum seals, or 2284 po unds per inch of seal circumference for silver seals. The diameter of the outer seal is 72.65 in. and the diameter of the inner seal 71.05 in. The seal seating force is then:
WTotal                               80,440 lb.
F seating = 1399 (72.65 + 71.05) = 631,570 lb. (aluminum)
The total of the seal seating force (conservatively assuming silver seals are used), pressure load and dead weight loads is:
F seating = 2284 (72.65 + 71.05) =1,031,000 lb. (silver)The maximum cask cavity internal pressure is the Design Pressure of 10 0 psi. The force required to react the pressure load (conservatively assuming the pressure is applied over the outer seal diameter) is:
Fseating                  =       1,031,000 lb.
F Pressure = 100 ()(72.65)2 = 414,500 lbs.4---
Fpressure                =         414,500 lb.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-4The TN-32 cask is always orie nted vertical during loading, during transfer to the ISFSI and during storage on the pad. Dead weight of the lid and cask cont ents does not actually load the lid bolts. In fact the lid weight (and external pressure) helps to seat the lid. However, it is conservative to require that the bolt preload ma intain lid seating in any cask orientation. The weights of the lid, fuel and basket are:Lid Assembly Weight = 14,480 lb.Fuel Weight  
WTotal                   =           80,440 lb.
= 49,060 lb.Basket Weight  
                                  =       1,525,940 lb.
= 16,900 lb.WTotal   80,440 lb.The total of the seal seating force (conservative ly assuming silv er seals are used), pressure load and dead weight loads is:
This force is less than the preload stresses achieved for the torque value range of 880 to 1230 ft-lbs. and shows that ample lid seating force is provided under Normal Conditions.
F seating =1,031,000 lb.F pressure =   414,500 lb.WTotal =     80,440 lb.=1,525,940 lb.This force is less than the preload stresses achieved for the torque value range of 880 to 1230 ft-lbs. and shows that ample lid seating force is provided under Normal Conditions.
Furthermore, the range of preload stresses is well below the limiting value of 2Sm (63,800 psi) for the bolt material at 300&deg;F.
Furthermore, the range of preload stresses is well below the limiting value of 2S m (63,800 psi) for the bolt material at 300&deg;F.
3A.3.1.2 Differential Thermal Expansion The 48 lid bolts preload the outer rim of the closure lid against the cask body flange. The 1.5 in. diameter bolts are installed through 1.56 in. diameter clearance holes in the 4.50 in. thick lid periphery. Preloading of the bolts against the lid is accomplished by tightening the bolts so that the shank portions of the bolts within the clearance holes are stretched elastically. The bolt loads will therefore change from the initial installed values if any thermal expansion differences should occur between the lid (through thickness direction) and the bolts.
3A.3.1.2Differential Thermal Expansion The 48 lid bolts preload the out er rim of the closure lid ag ainst the cask body flange. The 1.5 in. diameter bolts ar e installed through 1.56 in. diameter clearance holes in the 4.50 in. thick lid periphery. Preloading of the bolts ag ainst the lid is accomplished by tightening the bolts so that the shank portions of the bolts within the clearance holes are stretched elastically. The bolt loads will therefore change from the initial installed values if any thermal expansion differences should occur between the lid (through thickness direction) and the bolts.The bolt material is SA 320 Grade L43 (1 3/4 Ni 3/4 Cr 1/4 Mo). The lid and body flange are both SA 350 Grade LF3 (3 1/2 Ni). The Section III Co de Appendices specify the same coefficient of thermal expansion for these materials.
The bolt material is SA 320 Grade L43 (1 3/4 Ni 3/4 Cr 1/4 Mo). The lid and body flange are both SA 350 Grade LF3 (3 1/2 Ni). The Section III Code Appendices specify the same coefficient of thermal expansion for these materials. The bolts are in intimate contact with the lid and flange and will therefore operate at the same temperature as these components. Therefore there will be no thermal expansion differences between the lid and bolts, and the assembly preload will be maintained under all temperatures.
The bolts are in intimate contact with the lid and flange and will therefore opera te at the same temper ature as these compone nts. Therefore there will be no thermal expansion differences between the lid and bolts, and the assembly preload will be maintained under all temperatures.


Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-5 3A.3.1.3Bolt TorsionThe torque required to preload the bolt is:
Revision 806/14                                      North Anna ISFSI SAR            A.1 Att. 1-5 3A.3.1.3 Bolt Torsion The torque required to preload the bolt is:
T = K D N F a (Reference 2)Where T max = 0.127 (1.5) (77,480) = 14,760 in-lb. = 1,230 ft-lb.Tmin = 0.127 (1.5) (55,430) =10,560 in-lb. = 880 ft-lb.K = Nut Factor = 0.127 for N-5000 lubricant (as determined e xperimentally on a TN-32 cask)
T = K DN Fa              (Reference 2)
A B = Bolt stress area = 1.492 in.2 D N = Bolt nominal diameter = 1.5 in.F Bmax = 51,930 psi preload stress x A B = 77,480 lb.F Bmin = 37,150 psi preload stress x A B = 55,130 lb.The maximum residual torque in the bolt corr esponds to the maximum applied torque and is: T R = 0.5625T = 0.5625 x 14,760 = 8,303 in-lb.
Where Tmax = 0.127 (1.5) (77,480) = 14,760 in-lb. = 1,230 ft-lb.
The minimum residual torque in the bolt corr esponds to the minimum applied torque and is: T R = 0.5625T = 0.5625 x 10,560 = 5,940 in-lb.
Tmin = 0.127 (1.5) (55,430) =10,560 in-lb. = 880 ft-lb.
The shear stress in the bolt due to the residua l torque from the maximum preload given by Reference 3:torsion = where r and J are based on the bolt effective radius for the above stress area.
K = Nut Factor = 0.127 for N-5000 lubricant (as determined experimentally on a TN-32 cask)
r = 0.689 in. effective bolt radius J = torsional moment of inertia of threaded bolt J = = 0.354 inch 4 torsion = 8,303 (0.689) /0.354 = 16,160 psi (Torsional Shear Maximum)torsion = 5,940 (0.689)/0.354 = 11,560 psi (Torsional Shear Minimum)
AB = Bolt stress area = 1.492 in.2 DN = Bolt nominal diameter = 1.5 in.
T R r J---------r 4 2--------
FBmax = 51,930 psi preload stress x AB = 77,480 lb.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-6 3A.3.1.4 Bolt Bending It is assumed that bolt bendi ng does not occur during seating of the lid against the cask body during assembly. The bolts are rotated as they are torqued so any slight relative movements between lid and body flange during preloading will not result in a net offset between the bolt head and tapped flange holes. In addition, since the lid, flange and bolt materials have the same coefficient of thermal expansion and will operate at essentially the same temperature, differential expansion between components will not produce bolt bending.As internal pressure is applied to the cask cavi ty, the lid will bulge slightly and its edge will rotate. In addition, the body cylinder radius will increase slightly due to the internal pressure resulting in outward radial movement of th e tapped bolt holes in the body flange. Since no net membrane stress is developed in the lid, the lid bolt holes (at the mid surface) will remain at the original location. Rotation of the edge of the lid will, however, produce radial movement of the outer surface of the lid at the bolt head location.The hoop stress in the cask body cylinder is:
FBmin = 37,150 psi preload stress x AB = 55,130 lb.
S hoop = WhereP= 100 psi Design Pressure R i= 34.375 in. inside radiusT= 9.5 in. thickness S hoop =  = 361.8 psi The radial deflection at the bolt circle is:b.c. = R bc x R bc = 38.03 in. bolt circle radiusb.c. =  = 0.0004914 inches outward When pressure is applied to the lid, the edge rotatio n can be calculated assuming the lid is simply supported. From Reference 4, Table 24 Case 10: = Where= edge rotation, radians W = total applied load = 100 psi v = Poisson's ratio = 0.3
The maximum residual torque in the bolt corresponds to the maximum applied torque and is:
TR = 0.5625T = 0.5625 x 14,760 = 8,303 in-lb.
The minimum residual torque in the bolt corresponds to the minimum applied torque and is:
TR = 0.5625T = 0.5625 x 10,560 = 5,940 in-lb.
The shear stress in the bolt due to the residual torque from the maximum preload given by Reference 3:
TR r torsion = ---------
J where r and J are based on the bolt effective radius for the above stress area.
r = 0.689 in. effective bolt radius J = torsional moment of inertia of threaded bolt 4
r J = -------- = 0.354 inch4 2
torsion = 8,303 (0.689) /0.354 = 16,160 psi (Torsional Shear Maximum) torsion = 5,940 (0.689)/0.354 = 11,560 psi (Torsional Shear Minimum)


R = 36.35 in. outer seal radius PRi t---------10034.375x9.5-------------------------------
Revision 806/14                                                          North Anna ISFSI SAR  A.1 Att. 1-6 3A.3.1.4 Bolt Bending It is assumed that bolt bending does not occur during seating of the lid against the cask body during assembly. The bolts are rotated as they are torqued so any slight relative movements between lid and body flange during preloading will not result in a net offset between the bolt head and tapped flange holes. In addition, since the lid, flange and bolt materials have the same coefficient of thermal expansion and will operate at essentially the same temperature, differential expansion between components will not produce bolt bending.
Shoop E------------
As internal pressure is applied to the cask cavity, the lid will bulge slightly and its edge will rotate. In addition, the body cylinder radius will increase slightly due to the internal pressure resulting in outward radial movement of the tapped bolt holes in the body flange. Since no net membrane stress is developed in the lid, the lid bolt holes (at the mid surface) will remain at the original location. Rotation of the edge of the lid will, however, produce radial movement of the outer surface of the lid at the bolt head location.
-38.03361.8 x2810 6x---------------
The hoop stress in the cask body cylinder is:
-----------------
PRi Shoop = ---------
-3W1v-()R 3 2Et 3---------------
t Where                P      = 100 psi Design Pressure Ri    = 34.375 in. inside radius T      = 9.5 in. thickness 100 x 34.375 Shoop = ------------------------------- = 361.8 psi 9.5 The radial deflection at the bolt circle is:
-----------------
S hoop b.c. = Rbc x -------------
-
E Rbc = 38.03 in. bolt circle radius 38.03 x 361.8-b.c. = --------------------------------
Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-7 T = 4.5 in. lid thicknessE = Young's modulus = 28 x l0 6 = 0.00198 radians Figure 3A.3-1 shows the net movement of the threaded hole and the Point on the lid under the bolt head.
6
If it is assumed that the bolt head doesn't slid e on the lid surface, the head will be forced from position a to a' as the lid deflects. Point a' under the bolt head moves outward 0.00445 in. while the threaded hole moves only 0.0004914 in. outward. The bolt head wi ll be bent laterally by 0.00445 - 0.0004914 in. or 0.00396 in. from the threaded end.The bending model of the bolt is shown in Figure 3A.3-2. The moment on the bolt is calculated assuming the bo lt is subjected to affect bending with the head and threaded end prevented from rotating. For a cantilevered bolt free to rotate at the head, the bending moment would be reduced by one half. Therefore the assumption of fixed ends is the most conservative and results in the highest stress.The shear force, P, and bendi ng moment, M, for a beam subj ected to of fset bending with ends prevented from rotating are:
                                                                      = 0.0004914 inches outward 28 x 10 When pressure is applied to the lid, the edge rotation can be calculated assuming the lid is simply supported. From Reference 4, Table 24 Case 10:
P = M = WhereP = lateral load to deflect the bolt distance , lb. = lateral displacement
3 3W ( 1 - v )R -
  = 0.00396 in.E = Young's modulus, 28 x l0 6 psi @300&deg;F L = bolt length in bending
                              = --------------------------------
3 2Et Where                = edge rotation, radians W = total applied load = 100 psi v = Poisson's ratio = 0.3 R = 36.35 in. outer seal radius


  = 4.625 in. (including tapped hole chamfer)
Revision 806/14                                                                                North Anna ISFSI SAR        A.1 Att. 1-7 T = 4.5 in. lid thickness E = Young's modulus = 28 x l06 3
= r 4/4  = 0.177in.
3 x 100 x ( 1 - 0.3 )x ( 36.35 )
4 (r = 0.689 in. based on stress area of 1.492 in.2)Therefore M B = = 5,500 in-lb.310010.3-()x36.35 ()3xx228x6x10 4.5 ()3x-------------------------------------------------------------------
                                    = -------------------------------------------------------------------
-12EIL 3---------------
6                3
6EIL 2------------628x6x100.1770.00396xx4.625 2------------------------------------------------------------------------
                                                                                                        - = 0.00198 radians 2 x 28 x10 x ( 4.5 )
Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-8 P = = 2,380 lb.The bending stress in the bolt isb= 21,430 psiThe shear stress due to the lateral force isp = P/A = 2,380/1.492 = 1,595 psi 3A.3.1.5 Combined StressesThe total shear stress for the maximum preload stress (51,930 psi corresponding to a torque of 1230 ft-lbs.) is then equal to the residual tors ional shear stress plus that due to force P
Figure 3A.3-1 shows the net movement of the threaded hole and the Point on the lid under the bolt head.
.total = torsion + p= 16,160 + 1,595
If it is assumed that the bolt head doesn't slide on the lid surface, the head will be forced from position a to a' as the lid deflects. Point a' under the bolt head moves outward 0.00445 in.
= 17,755 psiThe total shear stress for the minimum preload (torque of 880 ft-lbs.) equals:total = 11,560 + 1,595 = 13,155The average tensile stress is the bolt pr eload stress:average= 51,930 psi The maximum tensile stress at tw o locations in the bolt is the preload stress plus the bending stress.max = 51,930 psi + 21,430 = 73,360 psiTherefore, the average combined stress intensity is:
while the threaded hole moves only 0.0004914 in. outward. The bolt head will be bent laterally by 0.00445 - 0.0004914 in. or 0.00396 in. from the threaded end.
The bending model of the bolt is shown in Figure 3A.3-2. The moment on the bolt is calculated assuming the bolt is subjected to affect bending with the head and threaded end prevented from rotating. For a cantilevered bolt free to rotate at the head, the bending moment would be reduced by one half. Therefore the assumption of fixed ends is the most conservative and results in the highest stress.
The shear force, P, and bending moment, M, for a beam subjected to offset bending with ends prevented from rotating are:
12EI-P = --------------  3 L
6EI-M = -----------       2 L
Where P = lateral load to deflect the bolt distance , lb.
                    = lateral displacement
                    = 0.00396 in.
E = Young's modulus, 28 x l06 psi @300&deg;F L = bolt length in bending
                    = 4.625 in. (including tapped hole chamfer)
I = r4/4
                    = 0.177in.4 (r = 0.689 in. based on stress area of 1.492 in.2)
Therefore 6
6 x 28 x10 x 0.177 x 0.00396 MB = ------------------------------------------------------------------------
2 4.625
                  = 5,500 in-lb.


SIaverage= (average 2 + 4 (total)2)1/2= (51,930 2 + 4 x 17,755 2)1/2= 62,910 psi (62.9 ksi) < 2S m = 63.8 ksi The maximum combined stress intensity is:
Revision 806/14                                                                                North Anna ISFSI SAR A.1 Att. 1-8 6
SI max= (max 2 + 4 (total)2)1/2= (73,360 2 + 4 x 17,755 2)1/21228x6x100.1770.00396xx4.625 2---------------------------------------------------------------------------
12 x 28 x10 x 0.177 x 0.00396 P = ---------------------------------------------------------------------------
Mr I-------5500 , 0.689x0.177----------------------------------
2 4.625
=
                = 2,380 lb.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 1-9
The bending stress in the bolt is Mr            5, 500 x 0.689 b ------- = ----------------------------------
= 81,500 psi - 81.5 ksi < 3S m = 95.7 ksiFor Level A conditions, the average bolt stress is limited to 2 S m or 2 x 31.9
I                     0.177
= 63.8 ksi. The maximum bolt stress is limited to 3 S m 95.7 ksi. The analyzed stresse s are within these limits as well as the yi eld strength of the bolt material (also 95.7 ksi).
                = 21,430 psi The shear stress due to the lateral force is p = P/A = 2,380/1.492 = 1,595 psi 3A.3.1.5 Combined Stresses The total shear stress for the maximum preload stress (51,930 psi corresponding to a torque of 1230 ft-lbs.) is then equal to the residual torsional shear stress plus that due to force P.
3A.3.2 Accident Conditions The lid bolts are analyzed in this section under the loadings sele cted to bound those for the hypothetical bottom end drop and tipover onto the concrete storage pad.
total  = torsion + p
3A.3.2.1 Bottom End Drop The bottom end drop fr om a height of 5 feet onto the concrete stor age pad is analyzed in Section 3A.2.3.2. That section indi cates that the cask deceleration may reach 42 g. This analysis conservatively examines the effects (if any) of a 50 g quasistatic loading on the lid bolts.
                = 16,160 + 1,595
During a bottom end drop, the rim of the lid is forced ag ainst the flange of the cask body.
                = 17,755 psi The total shear stress for the minimum preload (torque of 880 ft-lbs.) equals:
The lid is initially seated against the flange by preloading (torquing) th e bolts. The bolt preload will not be affected if compressive yielding of the contact bearing area does not occur.The contact force on the bearing area, conserva tively neglecting internal pressure, is the bolt preload force less the seal compression force plus the 50 g inerti al force of the lid system. The maximum preload force, from Section 3A.3.1, is 3,719,000 lb. The seal seating force is 631,570 lb. for the aluminum seal and 1,031,000 for th e silv er seal. The weight of the lid system (weight of lid plus weight of top neutron shield assembly, 11560 + 2960 = 14,480 lbs., the highest weight among TN-32, TN-32A and TN-32B casks) is 14,480 lb.Therefore, during a 50 g deceler ation in the axial directi on, and conservatively assuming an aluminum seal is used (i.e., an aluminum seal has a lower seating force compared to the silver seal thus resulting in a greater contact force), the contact fo rce between lid and cask body is:
total = 11,560 + 1,595 = 13,155 The average tensile stress is the bolt preload stress:
F contact = F Bolt Preload - F seal seating
average= 51,930 psi The maximum tensile stress at two locations in the bolt is the preload stress plus the bending stress.
+ 50 (Wlid system
max = 51,930 psi + 21,430 = 73,360 psi Therefore, the average combined stress intensity is:
)= 3,719,000 - 631,570 + 50 (14,480)
SIaverage                    = (average2 + 4 (total)2)1/2
= 3,811,000 lb.Figure 3A.3-3 illustrates the bearing interface between lid edge and body flange. The bearing area equals the area within th e diameter of the lid raised section (74.0 in.) less the outside of the body chamber (70.22 in.) less the area of the seal groove.A Bearing = (74 2 - 72.95 2 + 70.75 2 - 70.22 2) = 180 in 2 The bearing stress during impact is then equal to:
                                    = (51,9302 + 4 x 17,7552)1/2
S bearing = 3,811,000 / 180 = 21,170 psi (21.2 ksi)4---
                                    = 62,910 psi (62.9 ksi) < 2Sm = 63.8 ksi The maximum combined stress intensity is:
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-10This contact stress is below the 33.2 ksi yield strength of the li d and flange material at 300&deg;F. The bolt preload will not be affected by the bottom drop. Therefore, this hypothetical accident case will not affect the bolt stresses.
SImax = (max2 + 4 (total)2)1/2
3A.3.2.2TipoverThe tipover onto the concrete storage pad is analyzed in Appendix 3A.2.3.2 of Revision 9A of the TN-32 TSAR and Appendix 3D.2.5 of Revision 0 of the TN-32 FSAR. The tipover scenario is summarized in Figure 3A.3-4. The peak decele ration o ccurs at the top of the cask. The deceleration is much less at the center of grav ity and essentially zero at the bottom corner pivot point. For this analysis the lateral deceleration at the lid end of the body is conservatively taken as 67g and that at the pivot point is zero.There are two dynamic loadings acting on the lid tending to push or throw it off of the cask body (i-e. producing tensile forces in the lid bol ts). There is a small axial (parallel to cask longitudinal axis) centrifugal inertia load due to the internals acting on the lid and the lid weight itself while the cask is rotating.For the evaluation of the lid bolts it is assume d herein that the cask impacts on the corner at the lid end. There is no accident condition po stulated that would cause greater load on the lid bolts. The cask orientation for the analysis is shown in Figure 3A.3-5. The axis of the cask is 30&deg; from horizontal with the lid do wn. Note that this orientation is well beyond that predicted in the tipover analyses. If the lateral load, G L , is 67g, then the axial load used is 67 x tan 30&deg; or 38.7g.The loads acting on the cask are shown in Figure 3A.3-5. The loads ac ting on the lid are shown in Figure 3A.3-6. Also shown is the reaction load at the cask interface and the pivot point, O, for analysis of lid rotation. Figure 3A.3-7 shows the lid bolt loads resisting rotation of the lid about pivot point O. The increase in bolt load beyond the preload varies uniformly from pivot point, O, to the bolt farthest from O.The moment acting on the lid about pivot point, O, due to the inertia load is calculated as follows: M I = W I x 38.7 x R T + W L x 38.7 x R T + W L x 67 x a + P A x R TWhere M I = Total moment about pivot point, in-lb W I = Weight of internals
                = (73,3602 + 4 x 17,7552)1/2
= 16,900 + 49,060 = 65,950 lb.W L= Weight of lid system (includi ng shield plate and resin disk), 14,480 lb.and P A= Internal pressure load
 
= 414,500 lb.
Revision 806/14                                            North Anna ISFSI SAR          A.1 Att. 1-9
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-11 R T= Distance from center of lid to pivot point
                = 81,500 psi - 81.5 ksi < 3Sm = 95.7 ksi For Level A conditions, the average bolt stress is limited to 2 Sm or 2 x 31.9 = 63.8 ksi.
= 39.75 in.a= Moment arm of lid inertia loa d, W L , in.= 2.25 in. (very conservative since shield weight effect moves CG toward 0)
The maximum bolt stress is limited to 3 Sm 95.7 ksi. The analyzed stresses are within these limits as well as the yield strength of the bolt material (also 95.7 ksi).
3A.3.2      Accident Conditions The lid bolts are analyzed in this section under the loadings selected to bound those for the hypothetical bottom end drop and tipover onto the concrete storage pad.
3A.3.2.1 Bottom End Drop The bottom end drop from a height of 5 feet onto the concrete storage pad is analyzed in Section 3A.2.3.2. That section indicates that the cask deceleration may reach 42 g. This analysis conservatively examines the effects (if any) of a 50 g quasistatic loading on the lid bolts.
During a bottom end drop, the rim of the lid is forced against the flange of the cask body.
The lid is initially seated against the flange by preloading (torquing) the bolts. The bolt preload will not be affected if compressive yielding of the contact bearing area does not occur.
The contact force on the bearing area, conservatively neglecting internal pressure, is the bolt preload force less the seal compression force plus the 50 g inertial force of the lid system. The maximum preload force, from Section 3A.3.1, is 3,719,000 lb. The seal seating force is 631,570 lb.
for the aluminum seal and 1,031,000 for the silver seal. The weight of the lid system (weight of lid plus weight of top neutron shield assembly, 11560 + 2960 = 14,480 lbs., the highest weight among TN-32, TN-32A and TN-32B casks) is 14,480 lb.
Therefore, during a 50 g deceleration in the axial direction, and conservatively assuming an aluminum seal is used (i.e., an aluminum seal has a lower seating force compared to the silver seal thus resulting in a greater contact force), the contact force between lid and cask body is:
Fcontact            = FBolt Preload - Fseal seating + 50 (Wlid system)
                            = 3,719,000 - 631,570 + 50 (14,480)
                            = 3,811,000 lb.
Figure 3A.3-3 illustrates the bearing interface between lid edge and body flange. The bearing area equals the area within the diameter of the lid raised section (74.0 in.) less the outside of the body chamber (70.22 in.) less the area of the seal groove.
ABearing = --- (742 - 72.952 + 70.752 - 70.222) = 180 in2 4
The bearing stress during impact is then equal to:
Sbearing = 3,811,000 / 180 = 21,170 psi (21.2 ksi)
 
Revision 806/14                                          North Anna ISFSI SAR            A.1 Att. 1-10 This contact stress is below the 33.2 ksi yield strength of the lid and flange material at 300&deg;F. The bolt preload will not be affected by the bottom drop. Therefore, this hypothetical accident case will not affect the bolt stresses.
3A.3.2.2 Tipover The tipover onto the concrete storage pad is analyzed in Appendix 3A.2.3.2 of Revision 9A of the TN-32 TSAR and Appendix 3D.2.5 of Revision 0 of the TN-32 FSAR. The tipover scenario is summarized in Figure 3A.3-4. The peak deceleration occurs at the top of the cask. The deceleration is much less at the center of gravity and essentially zero at the bottom corner pivot point. For this analysis the lateral deceleration at the lid end of the body is conservatively taken as 67g and that at the pivot point is zero.
There are two dynamic loadings acting on the lid tending to push or throw it off of the cask body (i-e. producing tensile forces in the lid bolts). There is a small axial (parallel to cask longitudinal axis) centrifugal inertia load due to the internals acting on the lid and the lid weight itself while the cask is rotating.
For the evaluation of the lid bolts it is assumed herein that the cask impacts on the corner at the lid end. There is no accident condition postulated that would cause greater load on the lid bolts. The cask orientation for the analysis is shown in Figure 3A.3-5. The axis of the cask is 30&deg; from horizontal with the lid down. Note that this orientation is well beyond that predicted in the tipover analyses. If the lateral load, GL, is 67g, then the axial load used is 67 x tan 30&deg; or 38.7g.
The loads acting on the cask are shown in Figure 3A.3-5. The loads acting on the lid are shown in Figure 3A.3-6. Also shown is the reaction load at the cask interface and the pivot point, O, for analysis of lid rotation. Figure 3A.3-7 shows the lid bolt loads resisting rotation of the lid about pivot point O. The increase in bolt load beyond the preload varies uniformly from pivot point, O, to the bolt farthest from O.
The moment acting on the lid about pivot point, O, due to the inertia load is calculated as follows:
MI = WI x 38.7 x RT + WL x 38.7 x RT + WL x 67 x a + PA x RT Where              MI    = Total moment about pivot point, in-lb WI    = Weight of internals
                                  = 16,900 + 49,060 = 65,950 lb.
WL    = Weight of lid system (including shield plate and resin disk),
14,480 lb.
and PA    = Internal pressure load
                                  = 414,500 lb.
 
Revision 806/14                                        North Anna ISFSI SAR            A.1 Att. 1-11 RT    = Distance from center of lid to pivot point
                                  = 39.75 in.
a    = Moment arm of lid inertia load, WL, in.
                                  = 2.25 in. (very conservative since shield weight effect moves CG toward 0)
Therefore:
Therefore:
M I = (65,960 x 38.7 x 39.75) + (14,480 x 38.7 x 39.75)
MI    = (65,960 x 38.7 x 39.75) + (14,480 x 38.7 x 39.75)
                                  + (14,480 x 67 x 2.25) + (414,500 x 39.75)
                                  = 142.4 x 106 in-lb.
This moment is resisted by the effect of the preload on the lid bolts. The moment due to preload is calculated as follows:
MP = N x FB x RT Where              MP = moment due to bolt preload, in-lb.
N    = number of bolts, 48 FB = Preload per bolt
                                  = AB x preload stress
                                  = stress area bolt x preload stress
                                  = 1.492 in.2 x 51,930 psi = 77,480 lb. with 1230 ft-lbs. torque
                                  = 1.492 in.2 x 37,150 psi = 55,430 lb. with 880 ft-lbs. torque RT = distance from center of lid to pivot point, 39.75 in.
Therefore:
Torque = 1230 ft-lbs.:
MP = 48 x 77,480 x 39.75
                                  = 147.8 x l06 in-lb. > 142.4 x l06 in-lb.
Torque = 880 ft-lbs.:
MP = 48 x 55,430 x 39.75
                                  = 105.8 x l06 in-lb. < 142.4 x l06 in-lb.
Since the bolt preload moment, MP, corresponding to the maximum torque value is higher than the moment due to inertial load, MT, there will not be any additional load due to a tipover accident. However, the bolt preload moment corresponding to the minimum torque value is less than the moment due to inertial load. In this case, the inertial moment is partially resisted by the effect of the preload on the bolts. The increase in bolt load beyond the preload due to the inertia g loads created by the difference between MI and MP which is:
MT = M I - M P
 
Revision 806/14                                                                                      North Anna ISFSI SAR                          A.1 Att. 1-12 MT = 142.4 x 106 - 105.8 x 106 MT = 36.6 x 106 in-lbs.
The lid bolts resist the above moment which tends to unseat the lid. The increase in lid bolt load (FBO) beyond the preload is proportional to the distance from the pivot point O. The additional resisting moment, MR, applied by the bolts about point O is obtained from the following expressions. Refer to Figure 3A.3-8 of Revision 9A of the TN-32 TSAR for terminology.
R + R cos ( n ) B BoltForce = FBO x -----------------------------------------------
2R + B Moment for a given bolt = Bolt Force x [R + Rcos (n) + B]
Therefore, the additional moment, MR, can be expressed in general terms as follows:
n = 23 2          2                                                                      2 MR = F BO ( 2R + B ) + B + 2                                                        ( R + R cos ( n ) B )
n=1
( 2R + B )
R = 39.75 in.
B = 1.72 in.
        = 7.5&deg; Substituting yields:
MR = 1421.7 x FBO Therefore, FBO = 36.6 x 106 / 1421.7 = 25,740 lb.
The increase in tensile stress in the bolt beyond the preload is FBO / AB where:
AB = bolt area, 1.492 in.2 The increased stress is then:
FBO / AB = 25,740 / 1.492 = 17,250 psi.
The total tensile stress in Bolt 0 is 37,150 + 17,250 = 54,440 psi. Therefore, the total tensile stress for a bolt subjected to cask tipover is greater for a bolt torqued to 880 ft-lbs. than for a bolt torqued to 1230 ft-lbs. The remainder of this tipover analysis will evaluate both the 880 ft-lbs. torque and the 1230 ft-lbs. torque scenarios.
 
Revision 806/14                                                      North Anna ISFSI SAR A.1 Att. 1-13 When the tensile stress is combined with the bolt bending stress due to the lid edge rotation under internal pressure calculated in Section 3A.3.1, the maximum tensile plus bending stress is 54,450 psi plus 21,430 psi (bending) = 75,830 psi and the minimum is 51,930 psi + 21,430 psi = 73,360 psi. The total shear stress due to torquing and lid deformation from Section 3A.3.1.5 is 17,755 psi for the 1230 ft-lbs. case and 13,155 psi for 880 ft-lbs, The combined stress intensity is then:
The average combined stress intensity is:
SIaverage = (average2 + 4 (total)2)1/2) 1230 ft-lbs. torque:                    SIaverage = (51,9302 + 4 x 17,7552)1/2 SIaverage = 62,910 psi < Sy = 95,700 psi 880 ft-lbs. torque:                      SIaverage = (54,4002 + 4 x 13,1552)1/2 SIaverage = 60,430 psi < Sy = 95,700 psi The maximum combined stress intensity is:
SImax = (max2 + 4 (total)2)1/2 1230 ft-lbs. torque:                    SImax = (73,3602 + 4 x 17,7552)1/2 SImax = 81,500 psi < Su = 113,930 psi 880 ft-lbs. torque:                      SImax = (75,8302 + 4 x 13,1552)1/2 SImax = 80,260 psi < Su = 113,930 psi In addition to the above calculations, the lid bolts are evaluated based on the interaction formula from Appendix F of the ASME Code (Reference 5) for tension and shear:
2                  2
( ft )          ( fv )
            -------------- + -------------  1 2
( F tb )        ( F vb )
 
Revision 806/14                                                      North Anna ISFSI SAR        A.1 Att. 1-14 Where:
ft and fv are the applied tensile and shear stresses Ftb = allowable tensile stress, smaller of (0.7SU) or Sy (TSAR Table 3.l-3) = 0.7 x 113,930 = 79,750 psi Fvb = allowable shear stress, smaller of (0.42SU) or 0.6Sy (SAR Table 3.l-3) = 0.42 x 113,930 = 47,850 psi 1230 ft-lbs. torque:                          880 ft-lbs. torque:
2                  2                        2                    2 51    , 930 - + 17        , 755 - = 0.56 < 1  54    , 400 - + 13        , 155 - = 0.54 < 1 2                  2                        2                    2 79, 750            47, 850                  79, 750              47, 850 3A.3.3        Conclusions Based on the above evaluation, it is concluded that:
: 1. The maximum normal and accident condition stresses in the lid bolts are acceptable.
: 2. A positive (compressive) load is maintained on seals during normal and accident condition loads as bolt preload is higher than the applied loads.
 
Revision 806/14                                    North Anna ISFSI SAR        A.1 Att. 1-15 References
: 1. Resilient Metal Seals and Gaskets, Helicoflex Catalog H.001.002, Helicoflex Co., Boonton, N.J., 1983 pp.5-7.
: 2. NUREG/CR-6007, Stress Analysis of Closure Bolts for Shipping Casks, April 1992.
: 3. Hopper, A.G. and Thompson, G.V. Stress in Preloaded Bolts, Product Engineering, 1964.
: 4. Roark, R.J.: Formulas for Stress & Strain, 6th Edition, McGraw-Hill Book Co.
: 5. American Society of Mechanical Engineers; ASME Boiler and Pressure Vessel Code, Section III, Appendix F, 1992.
 
Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-16 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-17 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-18 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-19 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-20 Revision 806/14                            North Anna ISFSI SAR        A.1 Att. 1-21 Table 3.4-7 Summary of Maximum Stress Intensity and Allowable Stress Limits for Lid Bolts MAXIMUM STRESS        SERVICE                          ALLOWABLE          SAFETY CALCULATED CATEGORY        CONDITION                          STRESS (psi)      FACTOR STRESS (psi)
Tensile              Level A            51,930        63,800 (2Sm)        0.23 Level D            54,440        79,750 (0.7Su)      0.46 Tensile + Bending    Level A            73,360        95,700 (3 Sm)      0.30 Level D            75,830        113,930 (Su)        0.50 Shear                Level A            17,755        38,280 (0.4 Sy)      1.16 Level D            17,755        45,572 (0.4 Su)      1.57 Combined S.I.        Level A            62,910        95,700 (3 Sm)      0.52 Level D            81,500        113,930 (Su)        0.40
 
Revision 806/14              North Anna ISFSI SAR A.1 Att. 1-22 Intentionally Blank
 
Revision 806/14                        North Anna ISFSI SAR A.1 Att. 2-1 Appendix A.1, Attachment 2 Revision of Tornado Missile Analysis Excerpt from TN-32 TSAR (Rev. 9A, 12/96)
 
Revision 806/14              North Anna ISFSI SAR A.1 Att. 2-2 Intentionally Blank
 
Revision 806/14                                                North Anna ISFSI SAR A.1 Att. 2-3 2.2.1.3.2 Missile B Missile B (rigid) partially penetrates the cask wall. The loss in kinetic energy is dissipated as strain energy in the cask wall. The force Fb developed by an 8 in. diameter missile penetrating the cask body is calculated below. With a yield strength of 31,900 psi at 300&deg;F, used for the gamma shield material:
Fb = Sy( - )(8)2 = 1.603 x 106 lbs.
From conservation of energy:
Fbx = 1- mbv2o For a given puncture force Fb:
m b v o2 x=    -------------
2F b where x is the penetration distance.
The penetration distance is found to be 1.10 in. for a perpendicular impact of the missile.
When the impact angle is not 90 degrees, the missile will rotate during the impact limiting the energy available for penetration (conservatively neglected), since part of the energy will be transformed into rotational kinetic energy.
When hitting the weather protective cover, Missile B deforms the dished head before penetration begins. This will decrease the penetration distance from the above value.
If the missile were to impact the top of the cask in the vertical orientation, the missile velocity would be 88.2 mph (70% of the horizontal impact velocity of 126 mph). The kinetic energy would be:
KE = 0.5 x (276 lbs/32.2 ft/sec2) x (88.2 mph x 5280 ft/mi/3600 sec/hr)2 x 12 in/ft
    = 860, 440 in lbs.


+ (14,480 x 67 x 2.25) + (414,500 x 39.75)
Revision 806/14                                 North Anna ISFSI SAR        A.1 Att. 2-4 Ignoring the effect of the protective cover and the top neutron shield, the lid bending stresses under a top impact are evaluated. Reference 20 is used to evaluate the stresses two boundary conditions:
: 1. Modeling the lid as a simply supported plate.
: 2. Modeling the lid as a plate with the edges fixed.
For edges simply supported, Table X, Case 2 of Reference 20 is used. The maximum stresses occur at the center, where the plate thickness is t = 10.5 in. The impact force, Fb = 1.603 x106 lbs.
The maximum stress at the center is calculated below:
Sr = St = 3W/(2 mt2) x [m + (m + 1)ln(a/ro) - (m-1)ro2/4a2]
Where ro    =  uniform load radius = missile radius = 4 inches m  =  3.33 t  =  10.5 inches a  =  38.03 inches (effective radius for a simply supported lid at the bolt circle)
W = Fb = 1.603 x 106 lbs.
Therefore, Sr = St  28.5 ksi This is well below the Level D allowable stress of 63,000 psi.
For the second case, with the lid edges fixed. Table X, Case 7 of Reference 20 is used.
The maximum stress occurs at the edge, where the plate thickness, t = 4.5 inches.
Sr = 3W/(2 t2) (1 - ro2/2a2)
Where W = Fb = 1.603 x 106 lbs.
ro = uniform load radius = missile radius = 4 inches t = 4.5 inches a = 38.03 inches Sr  37.0 ksi This is also well below the allowable Level D stress of 63,000 psi.


= 142.4 x 10 6 in-lb.This moment is resisted by th e ef fect of the prel oad on the lid bolts.
Revision 806/14                                  North Anna ISFSI SAR          A.1 Att. 2-5 2.2.1.3.3  Missile C (steel sphere 1 diameter)
The moment due to preload is calculated as follows:
The impact of the steel sphere can result in a local dent by penetrating into the cask surface at the yield strength, Sy, for a penetration depth, d. The contact area on the cask surface is:
M P = N x F B x R TWhere M P = moment due to bolt preload, in-lb.N = number of bolts, 48
A =  (2Rd - d2)
Where:
R is the radius of the sphere, 0.5 inches, and d is the penetration depth The kinetic energy of the steel sphere is dissipated by displacing the cask surface material:
KE = 1/2(mcvo2) = Sy o d (2Rd-d2)  d Where mc = sphere mass KE = 0.5(4/3)()(0.5)3(0.28)(1/32.2)(126 x 5280/3600)2 = 933 in-lbs Sy o d (2Rd-d2)  d = Sy(Rd2 - d3/3) = KE = 933 in-lbs For a yield strength of 31,900 psi, by trial and error:
d = 0.14 in.
The area, A, is therefore 0.38 sq. inches. A maximum impact force of 12.1 x 103 lb. (A x Sy) will be developed. It can be concluded that only local denting of the cask will result.
If the impact is at the top of the cask (ignoring the protective cover and the neutron shielding), Reference 20, Table X, Case 4 is used to determine the stresses. The impact force is assumed to act at the center of the lid, where p = 0, ro = 0.353 in. and a =
38.03 inches.
The maximum stress is:
Sr = St = 3W/(2 mt2) x [m + (m+1)ln(a/ro) - (m-1)ro2/4a2]  1.1 ksi Since all penetrations are covered, the steel sphere will have a negligible effect on the cask.


F B= Preload per bolt
Revision 806/14              North Anna ISFSI SAR A.1 Att. 2-6 Intentionally Blank


= A B x preload stress= stress area bolt x preload stress
Revision 806/14                          North Anna ISFSI SAR A.1 Att. 3-1 Appendix A.1, Attachment 3 Modifications to the TN-32 Protective Cover Drawing SK-VP-SAR-1 Figure VP1.2-1 Figure VP2.3-1


= 1.492 in.2 x 51,930 psi = 77,480 lb. with 1230 ft-lbs. torque
Revision 806/14               North Anna ISFSI SAR A.1 Att. 3-2 Intentionally Blank
= 1.492 in.2 x 37,150 psi = 55,430 lb. with 880 ft-lbs. torque R T= distance from center of lid to pivot point, 39.75 in.Therefore:Torque = 1230 ft-lbs.: M P = 48 x 77,480 x 39.75
= 147.8 x l0 6 in-lb. > 142.4 x l0 6 in-lb.Torque = 880 ft-lbs.: M P = 48 x 55,430 x 39.75
= 105.8 x l0 6 in-lb. < 142.4 x l0 6 in-lb.Since the bolt preload moment, M P , corresponding to the maximum torque value is higher than the moment due to inertial load, M T, there will not be any additional load due to a tipover accident. However, the bolt preload moment corresponding to the minimum torque value is less than the moment due to inertial load. In this case, the inertial moment is partially resisted by the effect of the preload on the bolts. The increase in bolt load beyond the preload due to the inertia g loads created by the difference between M I and M P which is:
M T = M I - M P Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-12 M T = 142.4 x 10 6 - 105.8 x 10 6 M T = 36.6 x 10 6 in-lbs.The lid bolts resist the above moment which tends to unsea t the lid. The increase in lid bolt load (F BO) beyond the preload is proportional to the distance from the pivot point O. The additional resisting moment, M R , applied by the bolts about point O is obtained from the following expressions. Refer to Figure 3A.3-8 of Revision 9A of the TN-32 TSAR for terminology.BoltForce = F BO x Moment for a given bolt = Bolt Force x [R + Rcos (n) + B]Therefore, the additional moment, M R, can be expressed in general terms as follows:
M R =R = 39.75 in.B = 1.72 in. = 7.5&deg;Substituting yields:
M R = 1421.7 x F BO Therefore, F BO = 36.6 x 10 6 / 1421.7 = 25,740 lb.The increase in tensile stress in the bolt beyond the preload is F BO / A B where: A B = bolt area, 1.492 in.2The increased stress is then:F BO / A B = 25,740 / 1.492 = 17,250 psi.
The total tensile stress in Bolt 0 is 37,150 + 17,250 = 54,440 psi. Therefore, the total tensile stress for a bolt subjec ted to cask tipover is grea ter for a bolt torqued to 880 ft-lbs. than for a bolt torqued to 1230 ft-lbs. The remainder of this tipove r analysis will evaluate both the 880 ft-lbs. torque and the 1230 ft-lbs. torque scenarios.RRn()cos B+2RB+----------------------------------------------
-F BO2RB+()2 B 22RRn()cos B+()2 n1=n23=++2RB+()---------------------------------------------------------------------------------------------------------------
----------------
--
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-13When the tensile stress is combined with the bolt bending stress due to the lid edge rotation under internal pressure calculated in Section 3A.3.1, the maximum tensile plus bending stress is 54,450 psi plus 21,430 ps i (bending) = 75,830 psi and th e minimum is 51,930 psi + 21,430 psi = 73,360 psi. The total shear stress due to torquing and lid deformation from Section 3A.3.1.5 is 17,755 psi for the 1230 ft-lbs. case and 13,155 psi for 880 ft-lbs, The combined stress intensity is then:The average combined stress intensity is:
SIaverage = (average 2 + 4 (total)2)1/2)1230 ft-lbs. torque:SIaverage = (51,930 2 + 4 x 17,755 2)1/2 SIaverage = 62,910 psi < S y = 95,700 psi 880 ft-lbs. torque:SIaverage = (54,400 2 + 4 x 13,155 2)1/2 SIaverage = 60,430 psi < S y = 95,700 psi The maximum combined stress intensity is:
SI max = (max 2 + 4 (total)2)1/2 1230 ft-lbs. torque:SI max = (73,360 2 + 4 x 17,755 2)1/2 SI max = 81,500 psi < S u = 113,930 psi 880 ft-lbs. torque:SI max = (75,830 2 + 4 x 13,155 2)1/2 SI max = 80,260 psi < S u = 113,930 psiIn addition to the above calculations, the lid bolts are evaluated based on the interaction formula from Appendix F of the ASME Code (Reference 5) for tension and shear:
f t ()2 F tb ()2--------------
f v ()2 F vb ()2---------------
1+
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-14Where: f t and f v are the applied tensile and shear stresses F tb = allowable tensile st ress, smaller of (0.7S U) or          S y (TSAR Table 3.l-3) = 0.7 x 113,930 = 79,750 psi F vb = allowable shear stress, smaller of (0.42S U) or          0.6S y (SAR Table 3.l-3) = 0.42 x 113,930 = 47,850 psi 1230 ft-lbs. torque:
880 ft-lbs. torque:
3A.3.3 ConclusionsBased on the above evaluation, it is concluded that:1.The maximum normal and accident condition stresses in the lid bolts are acceptable.2.A positive (compressive) load is main tained on seals during normal and accident condition loads as bolt preload is higher than the applied loads.51930 2 ,79750 2 ,-------------------
-17755 2 ,47850 2 ,--------------------
+0.561<=54400 2 ,79750 2 ,-------------------
-13155 2 ,47850 2 ,--------------------
+0.541<=
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-15References1.Resilient Metal Seals and Gaskets, Helicoflex Catalog H.001.002, Helicoflex Co., Boonton, N.J., 1983 pp.5-7.2.NUREG/CR-6007, Stress Analysis of Closure Bolts for Shipping Casks , April 1992.3.Hopper, A.G. and Thompson, G.V. "Stress in Preloaded Bolts," Product Engineering, 1964.4.Roark, R.J.: "Formulas for Stress & Strain", 6th Edition, McG ra w-Hill Book Co.5.American Society of Mechanical Engineers; ASME Boiler and Pressure Vessel Code, Section III, Appendix F, 1992.
Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-16 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-17 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-18 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-19 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-20 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-21Table 3.4-7 Summary of Maximum Stress Intensity and Allowable Stress Limits for Lid Bolts STRESS CATEGORYSERVICE CONDITION MAXIMUM CALCULA TED STRESS (psi)ALLOWABLE STRESS (psi)SAFETY FACTORTensileLevel A 51,930 63,800 (2S m)0.23Level D 54,440 79,750 (0.7S u)0.46Tensile + BendingLevel A 73,360 95,700 (3 S m)0.30Level D 75,830 113,930 (S u)0.50 ShearLevel A 17,755 38,280 (0.4 S y)1.16Level D 17,755 45,572 (0.4 S u)1.57 Combined S.I.Level A 62,910 95,700 (3 S m)0.52Level D 81,500 113,930 (S u)0.40 Revision 8-06/14 North Anna ISFSI SARA.1 Att. 1-22 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-1Appendix A.1, Attachment 2Revision of Tornado Missile Analysis Excerpt from TN-32 TSAR (Rev.
9A, 12/96)
Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-2 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-3 2.2.1.3.2 Missile B Missile B (rigid) partially penetrates the cask wall. The loss in kinetic energy is dissipated as strain energy in the cask wall. The force F b developed by an 8 in. diameter missile penetrating the cask bod y is calculated below. With a yield strength of 31,900 psi at 300&deg;F, used for the gamma shield material:
F b = S y ()(8)2 = 1.603 x 10 6 lbs.From conservation of energy:
F b x = m b v 2 oFor a given puncture force F b: x = where x is the penetration distance.
The penetration distance is found to be 1.10 in. for a perpendicular impact of the missile.When the impact angle is not 90 degrees, the missile will rotate during the impact limiting the ener gy available for penetration (conservatively neglected), since part of the energy will be transformed into rotational kinetic energy.When hitting the weather protective cover, Missile B deforms the dished head before penetration begins. This will decrease the penetration distance from the above value.
If the missile were to impact the top of the cask in the ver tical orientatio n, the missile velocity would be 88.2 mph (70% of the horizontal impact velocity of 126 mph). The kinetic energy would be:
KE = 0.5 x (276 lbs/32.2 ft/sec 2) x (88.2 mph x 5280 ft/mi/3600 sec/hr)2 x 12 in/ft      = 860, 440 in lbs.4---1 2---m b v o 2 2F b------------
-
Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-4Ignoring the effect of the protective cover and the top neutron shield, the lid bending stresses under a top impact are evaluated. Reference 20 is used to evaluate the stresses two boundary conditions:1.Modeling the lid as a simply supported plate.2.Modeling the lid as a plate with the edges fixed.For edges simply supported, Ta ble X, Case 2 of Reference 20 is used. The maximum stresses occur at the center, where the plate thickness is t
= 10.5 in. The impact force, F b = 1.603 x10 6 lbs.The maximum stress at the center is calculated belo w: S r = S t = 3W/(2mt 2) x [m + (m + 1)ln(a/r o) - (m-1)r o 2/4a 2]Where r o=uniform load radius = missile radius = 4 inchesm=3.33t=10.5 inchesa=38.03 inches (effective radius fo r a simply supported lid at the bolt circle)W=F b = 1.603 x 10 6 lbs.Therefore, S r = S t  28.5 ksiThis is well below the Level D allowable stress of 63,000 psi.For the second case, with the lid edges fixed. Table X, Case 7 of Reference 20 is used.The maximum stress occurs at the edge, where the plate thickness, t = 4.5 inches.S r = 3W/(2t 2)  (1 - r o 2/2a 2)Where W=F b = 1.603 x 10 6 lbs.r o=uniform load radius = missile radius = 4 inchest =4.5 inchesa = 38.03 inches S r  37.0 ksiThis is also well below the allowable Level D stress of 63,000 psi.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-5 2.2.1.3.3 Missile C (steel sphere 1" diameter)
The impact of the steel sphere can result in a local dent by penetrating into the cask surface at the yield strength, S y, for a penetration depth, d.
The contact area on the cask surface is:
A = (2Rd - d 2)Where:R is the radius of th e sphere, 0.5 inches, and d is the pe netration depthThe kinetic energy of the st eel sphere is dissipated by displacing the cask surf ace material: KE = 1/2(m c v o 2) = S y o d(2Rd-d 2)d Where m c = sphere massKE = 0.5(4/3)()(0.5)3(0.28)(1/32.2)(126 x 5280/3600) 2 = 933 in-lbs S y o d(2Rd-d 2)d = S y(Rd 2 - d 3/3) = KE = 933 in-lbsFor a yield strength of 31,900 psi, by trial and error:
d = 0.14 in.The area, A, is therefore 0.38 sq. in ches. A maximum impact force of 12.1 x 10 3 lb. (A x S y) will be developed. It can be concluded that only local denting of the cask will result.If the impact is at the top of the cask (ignoring the protective cover and the neutron shielding), Reference 20, Table X, Case 4 is used to determine the stresses. The impact force is as sumed to act at the center of the lid, where p = 0, r o = 0.353 in. and a =
38.03 inches.The maximum stress is:
S r = S t = 3W/(2 mt 2) x [m + (m+1)ln(a/r o) - (m-1)r o 2/4a 2]  1.1 ksiSince all penetrations are cove red, the steel sphere will have a negligible effect on the cask.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 2-6 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 3-1Appendix A.1, Attachment 3Modifications to the TN
-32 Protective Cover Drawing SK-VP-SAR-1 Fi gure VP1.2-1 Fi gure VP2.3-1 Revision 8-06/14North Anna ISFSI SARA.1 Att. 3-2 Intentionally Blank  


Revision 8-06/14North Anna ISFSI SARA.1 Att. 3-4 Revision 8-06/14North Anna ISFSI SARA.1 Att. 3-5 Revision 8-06/14North Anna ISFSI SARA.1 Att. 3-6 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-1Appendix A.1, Attachment 4 Supplement to the Structural An alyses in TN-32 TSAR, Revision 9A, Section 3C.3-1 Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-2 Intentionally Blank Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-33C.3-1.1Additional Evaluation due to gap size variations occurring from Basket Rail fabrication and Installation TolerancesThis section evaluates the stru ctural effect of the gap size variation between two basket support railsThe buckling analysis of basket bottom ra il performed in Sectio n 3C.3-1 assumes a gap of 0.48 inches between the edge of two rails or 0.24 inches between the edge of the rail and centerline of the basket. However, due to fabrication and installation tolerances the gap between these two rails can vary from 0" to 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket).
Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-4 Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-5 Revision 806/14              North Anna ISFSI SAR A.1 Att. 3-6 Intentionally Blank
DiscussionIt is observed from Section 3C.3-1 that in the rail design the most critical locations are locations 1, 2, and 3 as shown on Figure 3C.3-4. Due to the gap changes, the loading and stress at these three locations are discussed as follows:1.The collapse load calculated in accordance with ASME B&PV Code, Sect ion III, NB-3213.25 and Appendix F, F-1341.3 at Lo cation 1 is 96g which is higher than the 88-g assumed for the tipover accident. The collapse load was calculated conservatively by assuming that the vertical load from the basket is directly applied at the center span of the two vertical rail support plates as shown on Figure 3C.3-2. This loading condition results in a maximum bending stress at the center of the rail horizontal plate. If the location of the rail is shif ted either toward or away from the centerline of the basket due to gap size change, then the applied vertical load will move closer to the rail vertical support plates and the bending stress at the rail horizontal plate will decrease. Theref ore, the gap changes will no t result in increasing the stress at Location 1.2.The stability of the vertical plates at Locations 2 a nd 3 is analyzed using the interaction equations 20 and 21 of Paragraph NF-332 2.1 (Equations 1 and 2 in Section 3C.3-1). Thes e equations utilize membra ne and bending stresses that were determined from thre e dimensional ANSYS calculations.For Location 2 and a gap of 0.24", equation (1) becomes, 0.0954 + 0.328 = 0.423  
 
< 1.0 Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-4 equation (2) becomes,0.440 + 0.483 = 0.923  
Revision 806/14                              North Anna ISFSI SAR        A.1 Att. 4-1 Appendix A.1, Attachment 4 Supplement to the Structural Analyses in TN-32 TSAR, Revision 9A, Section 3C.3-1
< 1.0 and for Location 3, equation (1) becomes, 0.06 + 0.31 = 0.37  
 
< 1.0 equation (2) becomes,0.369 + 0.477 = 0.846  
Revision 806/14              North Anna ISFSI SAR A.1 Att. 4-2 Intentionally Blank
< 1.0 Since the membrane and bending stresses at Lo cations 2 and 3 will e ither increase or decrease due to the g a p changes the interaction equation must be re-evaluated to insure that the structural integrity of the rail will be maintained.
 
AnalysisThe membrane and bending stre sses presented in Section 3C
Revision 806/14                                  North Anna ISFSI SAR          A.1 Att. 4-3 3C.3-1.1 Additional Evaluation due to gap size variations occurring from Basket Rail fabrication and Installation Tolerances This section evaluates the structural effect of the gap size variation between two basket support rails The buckling analysis of basket bottom rail performed in Section 3C.3-1 assumes a gap of 0.48 inches between the edge of two rails or 0.24 inches between the edge of the rail and centerline of the basket. However, due to fabrication and installation tolerances the gap between these two rails can vary from 0" to 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket).
.3-1 were calculated using a three dimensional ANSYS model. The purpos e of this analysis is to determine the sensitivity of the stress values to a range of rail-to-rail gap dimensions, then re-evaluate the interaction equations to properly reflect the full range of stress values. A two-dimensional ANSYS model is sufficient to calculate such sensitivity.
* Discussion It is observed from Section 3C.3-1 that in the rail design the most critical locations are locations 1, 2, and 3 as shown on Figure 3C.3-4. Due to the gap changes, the loading and stress at these three locations are discussed as follows:
Finite Element Model In order to calculate the member and bending stress changes due to the gap size variations, an ANSYS two-dimension beam (BEAM 3) finite element model is constructed. This finite element model includes the rail and a small portion of basket for better load transfer to the rail. Gap elements (CONTAC 12) are used between the basket and rail to accurately simulate the basket load transfer to bottom support rail. One-inch widths of rail and basket are used for loading and beam elements section properties. The finite element model is shown on Figure 3C.3-14.Material PropertiesFollowing data is used in this run (material properties are taken at 350&deg;F):
: 1.     The collapse load calculated in accordance with ASME B&PV Code, Section III, NB-3213.25 and Appendix F, F-1341.3 at Location 1 is 96g which is higher than the 88-g assumed for the tipover accident. The collapse load was calculated conservatively by assuming that the vertical load from the basket is directly applied at the center span of the two vertical rail support plates as shown on Figure 3C.3-2. This loading condition results in a maximum bending stress at the center of the rail horizontal plate. If the location of the rail is shifted either toward or away from the centerline of the basket due to gap size change, then the applied vertical load will move closer to the rail vertical support plates and the bending stress at the rail horizontal plate will decrease. Therefore, the gap changes will not result in increasing the stress at Location 1.
Material:Aluminum Rail E = 9.0 x10 6 psi (Section 3C.3-4)304SS BasketE = 26.75 x10 6 psi (from Table 3.3-5)
: 2.     The stability of the vertical plates at Locations 2 and 3 is analyzed using the interaction equations 20 and 21 of Paragraph NF-3322.1 (Equations 1 and 2 in Section 3C.3-1). These equations utilize membrane and bending stresses that were determined from three dimensional ANSYS calculations.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-5 Loading Conditions The membrane and bending st resses at locations 2 and 3 are computed by using unit loads F 1 , F 2 , F 3 and a distributed load w (for 1g). The locations of these loads and displacement boundary conditions are shown in Figure 3C.3-14.Fuel Assembly Weight, W = 1,533 lbs. (Table 3.2-1)
For Location 2 and a gap of 0.24",
equation (1) becomes, 0.0954 + 0.328 = 0.423 < 1.0
 
Revision 806/14                                    North Anna ISFSI SAR          A.1 Att. 4-4 equation (2) becomes, 0.440 + 0.483 = 0.923 < 1.0 and for Location 3, equation (1) becomes, 0.06 + 0.31 = 0.37 < 1.0 equation (2) becomes, 0.369 + 0.477 = 0.846 < 1.0 Since the membrane and bending stresses at Locations 2 and 3 will either increase or decrease due to the gap changes the interaction equation must be re-evaluated to insure that the structural integrity of the rail will be maintained.
* Analysis The membrane and bending stresses presented in Section 3C.3-1 were calculated using a three dimensional ANSYS model. The purpose of this analysis is to determine the sensitivity of the stress values to a range of rail-to-rail gap dimensions, then re-evaluate the interaction equations to properly reflect the full range of stress values. A two-dimensional ANSYS model is sufficient to calculate such sensitivity.
Finite Element Model In order to calculate the member and bending stress changes due to the gap size variations, an ANSYS two-dimension beam (BEAM 3) finite element model is constructed. This finite element model includes the rail and a small portion of basket for better load transfer to the rail. Gap elements (CONTAC 12) are used between the basket and rail to accurately simulate the basket load transfer to bottom support rail.
One-inch widths of rail and basket are used for loading and beam elements section properties. The finite element model is shown on Figure 3C.3-14.
Material Properties Following data is used in this run (material properties are taken at 350&deg;F):
Material:
Aluminum Rail         E = 9.0 x106 psi (Section 3C.3-4) 304SS Basket          E = 26.75 x106 psi (from Table 3.3-5)
 
Revision 806/14                              North Anna ISFSI SAR        A.1 Att. 4-5 Loading Conditions The membrane and bending stresses at locations 2 and 3 are computed by using unit loads F1, F2, F3 and a distributed load w (for 1g). The locations of these loads and displacement boundary conditions are shown in Figure 3C.3-14.
Fuel Assembly Weight, W = 1,533 lbs. (Table 3.2-1)
Rail Length, L = 159.75 in. (Drawing 1049-70-5)
Rail Length, L = 159.75 in. (Drawing 1049-70-5)
F 1 (at basket center line, x = 0.0)= 0.5 (No. of stacked fuel assemblies x W)/L
F1 (at basket center line, x = 0.0) = 0.5 (No. of stacked fuel assemblies x W)/L
= 0.5 x 5 x 1533/159.75 = 23.991 lb.F 3 (at basket centerline, x = 18.61")= 23.991 lb.F 2 (at basket middle, x = 8.
                                    = 0.5 x 5 x 1533/159.75 = 23.991 lb.
70 + 0.105 +.5 = 9.305") = (No. of stacked fuel assemblies x W)/L = 5 x 1533/159.75 = 47.981 lb.Distributed Load, w = Fuel Assembly Wei ght / (L x Basket Sp an) = 1533 / (159.75 x 9.301) = 1.03174 lb/inSection Properties:
F3 (at basket centerline, x = 18.61")   = 23.991 lb.
Rail: Section Area, A = 0.47 (d epth) x 1.0 (width) = 0.47 in 2 Moment of Inertia, I = 1.0 x 0.47 3/12 = 0.008652 in 4Basket:Steel - Aluminum Composite Section E s , Steel = 26.75 x l0 6 psi E a, aluminum = 9.0 x 10 6 psi I c, Composite Section = [1.0 (0.71 3/12 - 1.0 (0.5 3/12]+(l x 0.5 3/12) x (9.0 x 10 6/26.75 x 10
F2 (at basket middle, x = 8.70 + 0.105 +.5 = 9.305") = (No. of stacked fuel assemblies x W)/L = 5 x 1533/159.75 = 47.981 lb.
: 6) = 0.022914 in 4 Depth, d c = (12 x 0.022914) 1/3 = 0.65 in. A c = 0.65 x 1.0 = 0.65 in 2Contact Elements: K = 1.0 x 10 6Coefficient of friction = 0 Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-6 Load Case 1The analysis is performed to calculate the membrane and bendin g stresses by using the existing loading condition (0.48" gap or 0.24" gap for half model).An elastic non-linear run was made using th e above loads and section properties. The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-16.Load Case 2 The same model is run by shif ting the rail to the right to simulate the maximum gap of 1.1326" or 0.5663'' for the half model. In this run, al l loads and section properties are same as in 0.24 in. gap case. However the finite element model was revised by transferring the 'x - coordinates
Distributed Load, w = Fuel Assembly Weight / (L x Basket Span) = 1533 / (159.75 x 9.301) = 1.03174 lb/in Section Properties:
' of rail nodes by 0.56 63 0- 0.24 = 0.3263".The membrane and bending stre ss components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 1 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-17.Load Case 3 The same model is run by shif ting the rail to the left to simulate the minimum gap of 0.0" for the half model. In this run, all loads and sectio n properties are same as in 0.24 in. gap case. However the finite elemen t model was revised by transferring the  
Rail: Section Area, A = 0.47 (depth) x 1.0 (width) = 0.47 in2 Moment of Inertia, I = 1.0 x 0.473/12 = 0.008652 in4 Basket: Steel - Aluminum Composite Section Es, Steel = 26.75 x l06 psi Ea, aluminum = 9.0 x 106 psi Ic, Composite Section = [1.0 (0.713/12 - 1.0 (0.53/12]+(l x 0.53/12) x (9.0 x 106/26.75 x 106) = 0.022914 in4 Depth, dc = (12 x 0.022914)1/3 = 0.65 in.
'x - coordinates' of rail n odes by 0- 0.24 = -0.24".The membrane and bending stre ss components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 2 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-18.
Ac = 0.65 x 1.0 = 0.65 in2 Contact Elements: K = 1.0 x 106 Coefficient of friction = 0
Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-7Evaluation The interaction equation is re-evaluated by applying the results of the sensitivity analysis to the compression and bending co mponents of the equa tion. Since the result from the equation (2) bounds equation (1), therefore on ly result from equation (2) is re-evaluated. So, for Case 2, which reflects the maximum gap between the two rails, at location 2:
 
0.440(1.034) + 0.48 3(1.101) = 0.
Revision 806/14                                North Anna ISFSI SAR          A.1 Att. 4-6 Load Case 1 The analysis is performed to calculate the membrane and bending stresses by using the existing loading condition (0.48" gap or 0.24" gap for half model).
987 < 1.0and at Location 3:
An elastic non-linear run was made using the above loads and section properties. The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-16.
0.369(1.076)+ 0.477 (1.084) = 0.914  
Load Case 2 The same model is run by shifting the rail to the right to simulate the maximum gap of 1.1326" or 0.5663'' for the half model. In this run, all loads and section properties are same as in 0.24 in. gap case. However the finite element model was revised by transferring the 'x - coordinates' of rail nodes by 0.5663 0- 0.24 = 0.3263".
< 1.0For Case 3, which reflects the minimum ga p between the rails, th e interaction equation at Location 2 becomes 0.440(0.961) + 0.48 3(0.863) = 0.
The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 1 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-17.
840 < 1.0and at Location 3:
Load Case 3 The same model is run by shifting the rail to the left to simulate the minimum gap of 0.0" for the half model. In this run, all loads and section properties are same as in 0.24 in. gap case. However the finite element model was revised by transferring the
0.369(0.955)+ 0.477 (0.940) = 0.801  
'x - coordinates' of rail nodes by 0- 0.24 = -0.24".
< 1.0Conclusion The results of this analysis show the following conclusions:1.As the gap between these two rail de creases, the likelihood of buckling decreases.2.At the maximum possible rail gap of 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket), the buckling interaction equations indicate that the rail will not buckle.3.The stresses at Location 1 are not af fected by a change in the rail gap size.Therefore, for any possible gap sizes, the structural in te grity of the rail will be maintained.
The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 2 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-18.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-8Table 3C.3-1
 
Revision 806/14                                North Anna ISFSI SAR        A.1 Att. 4-7 Evaluation The interaction equation is re-evaluated by applying the results of the sensitivity analysis to the compression and bending components of the equation. Since the result from the equation (2) bounds equation (1), therefore only result from equation (2) is re-evaluated. So, for Case 2, which reflects the maximum gap between the two rails, at location 2:
0.440(1.034) + 0.483(1.101) = 0.987 < 1.0 and at Location 3:
0.369(1.076)+ 0.477(1.084) = 0.914 < 1.0 For Case 3, which reflects the minimum gap between the rails, the interaction equation at Location 2 becomes 0.440(0.961) + 0.483(0.863) = 0.840 < 1.0 and at Location 3:
0.369(0.955)+ 0.477(0.940) = 0.801 < 1.0
* Conclusion The results of this analysis show the following conclusions:
: 1. As the gap between these two rail decreases, the likelihood of buckling decreases.
: 2. At the maximum possible rail gap of 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket), the buckling interaction equations indicate that the rail will not buckle.
: 3. The stresses at Location 1 are not affected by a change in the rail gap size.
Therefore, for any possible gap sizes, the structural integrity of the rail will be maintained.
 
Revision 806/14                                    North Anna ISFSI SAR                A.1 Att. 4-8 Table 3C.3-1


==SUMMARY==
==SUMMARY==
OF STRESSES AND INTERACTION EQUATION EVALUATION CaseType At Location 2 (Node 71)At Location 3 (Node 81)0.48" Space between RailsMembrane Stress (psi)
OF STRESSES AND INTERACTION EQUATION EVALUATION At Location 2           At Location 3 Case                      Type (Node 71)               (Node 81) 0.48 Space between       Membrane Stress (psi)           -59.182                 -65.290 Rails                      Bending Stress (psi)             27.765                 38.627 1.1326 Space between     Membrane Stress (psi)            -61.181                -70.267 Rails                      Bending Stress (psi)              30.568                  41.87 Ratio Membrane Stresses    -61.181/-59.182 =      -70.265/-65.290 =
-59.182-65.290 Bending Stress (psi) 27.765 38.627 1.1326" Space between  
For 0.5663 & 0.24                1.034                  1.076 cases Ratio Bending Stresses      30.568/27.765 =        41.871/38.627 =
For 0.5663 & 0.24              1.101                  1.084 cases Interaction Equation          1.034(.44*) +          1.076(.369*) +
1.101(.483*) = 0.987 1.084(.477*) = 0.914 0.0 Space between Rails Membrane Stress (psi)              -56.883                -62.327 Bending Stress (psi)              23.962                  36.315 Ratio Membrane Stresses -56.883/-59.182 =          -62.327/-65.290 =
For 0.5663 & 0.24                0.961                  0.955 cases Ratio Bending Stresses      23.962/27.765 =        36.315/38.627 =
For 0.5663 & 0.24              0.863                  0.940 cases Interaction Equation          0.961 (.44*) +          0.955(.369*) +
0.863(.483*) = 0.840 0.940(.477*) = 0.801
* These coefficients are calculated in Section 3C.3-1. Since the result from the equation (2) bounds equation (1), therefore only result from equation (2) is re-evaluated.
 
Revision 806/14                          North Anna ISFSI SAR A.1 Att. 4-9 Figure 3C.3-14 FINITE ELEMENT MODEL - BOTTOM SUPPORT RAIL
 
Revision 806/14                          North Anna ISFSI SAR A.1 Att. 4-10 Figure 3C.3-15 FINITE ELEMENT MODEL - LOADING AND BOUNDARY CONDITIONS


RailsMembrane Stress (psi)
Revision 806/14                        North Anna ISFSI SAR A.1 Att. 4-11 Figure 3C.3-16 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.24 DISTANCE
-61.181-70.267 Bending Stress (psi) 30.568 41.87 Ratio Membrane Stresses


For 0.5663" & 0.24" cases-61.181/-59.182 =
Revision 806/14                          North Anna ISFSI SAR A.1 Att. 4-12 Figure 3C.3-17 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.5663 DISTANCE
1.034-70.265/-65.290 =
1.076 Ratio Bending Stresses For 0.5663" & 0.24" cases 30.568/27.765 =
1.101 41.871/38.627 =
1.084 Interaction Equation 1.034(.44*) +
1.101(.483*) = 0.987 1.076(.369*) +
1.084(.477*) = 0.914 0.0" Space between RailsMembrane Stress (psi)
-56.883-62.327 Bending Stress (psi) 23.962 36.315 Ratio Membrane Stresses


For 0.5663" & 0.24" cases-56.883/-59.182 =
Revision 806/14                        North Anna ISFSI SAR A.1 Att. 4-13 Figure 3C.3-18 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.0 DISTANCE
0.961-62.327/-65.290 =
0.955 Ratio Bending Stresses


For 0.5663" & 0.24" cases 23.962/27.765 =
Revision 806/14               North Anna ISFSI SAR A.1 Att. 4-14 Intentionally Blank}}
0.863 36.315/38.627 =
0.940 Interaction Equation 0.961 (.44*) +
0.863(.483*) = 0.840 0.955(.369*) +
0.940(.477*) = 0.801*These coefficients are calculated in Secti on 3C.3-1. Since the result from the equation (2) bounds equation (1), therefore only result from equation (2) is re-evaluated.
Revision 8-06/14North Anna ISFSI SARA.1 Att. 4-9 Figure 3C.3-14 FINITE ELEMENT MODEL - BOTTOM SUPPORT RAIL Revision 8-06/14 North Anna ISFSI SARA.1 Att. 4-10 Figure 3C.3-15 FINITE ELEMENT MODEL - LOADIN G AND BOUNDARY CONDITIONS Revision 8-06/14 North Anna ISFSI SARA.1 Att. 4-11 Figure 3C.3-16 FINITE ELEMENT MODEL - DEFORM ED SHAPE, 0.24" DISTANCE Revision 8-06/14 North Anna ISFSI SARA.1 Att. 4-12 Figure 3C.3-17 FINITE ELEMENT MODEL - DEFORM ED SHAPE, 0.5663" DISTANCE Revision 8-06/14 North Anna ISFSI SARA.1 Att. 4-13 Figure 3C.3-18 FINITE ELEMENT MODEL - DEFORM ED SHAPE, 0.0" DISTANCE Revision 8-06/14 North Anna ISFSI SARA.1 Att. 4-14 Intentionally Blank}}

Latest revision as of 18:13, 5 February 2020

Redacted - North Anna, Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 8
ML14233A488
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/05/2014
From:
Dominion, Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML14233A490 List:
References
14-106
Download: ML14233A488 (380)


Text

North Anna Power Station Units 1 & 2 Independent Spent Fuel Storage Installation (ISFSI)

Safety Analysis Report

Intentionally Blank Revision 806/14 North Anna ISFSI SAR RS-1 REVISION

SUMMARY

Revision 806/14 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

Figure 1-1, Figure 1-2, 2.5.1, Update adds description of an alternate transport route to 2.5.1.5, 2.5.1.5.1, 2.5.1.6, 2.5.1.7, the Independent Spent Fuel storage Installation.

2.5.1.9, 2.5.4, 2.5.5, 2.5.6 Refs, Figure 2-3, Figure 2-8, Figure 2-9, Figure 2-18 (new), Figure 2-19 (new), Appendix 2A, 4.1, 4.3.2, Figure 4-1, Figure 4-4, 5.1.1.1, 5.4

[NAPS-ICR-2010-001]

4.4.5.4 (new), 4.4.6 Refs Update added section to reflect the installation of new

[NAPS-ICR-2012-001] seismic instrumentation.

Revision 706/10 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

9.5 Revises description of Notification of Unusual Event to

[IN 2008-002] reflect new Emergency Action Level classification for damage to a loaded SSSC confinement boundary.

Revision 606/08 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

1.1, Figure 1-2 Describes the addition and location of the second storage

[IN 2006-001] pad.

2.1.3, 2.1.4, 4.4.1.3 Editorial package.

[IN 2008-001]

Revision 806/14 North Anna ISFSI SAR RS-2 Revision 506/06 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

1.5, 9.1.1, 11.1 Incorporated references to the recently implemented

[IN 2004-001] Topical Report DOM-QA-1. The Dominion Nuclear Facility Quality Assurance Program Description is based on ANSI/ASME NQA-1-1994 and will be maintained as a separate, single document for Dominion facilities.

[10 CFR 50.54(a)]

7.6, 7.7 Updated the description of the health physics program to

[IN 2004-002] include dosimetry placed on the ISFSI perimeter fence and clarified the description of the environmental monitoring program.

A.1.1 Deleted the description of the original TN-32 cask

[IN 2003-007] protective cover design.

Revision 406/04 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

Figures 2-9 & 4-4 Removed the fence and gate symbols incorrectly shown

[IN 2000-002] around the service water pump house.

3.1.1, 3.1.1.1, 3.1.1.1.1, 3.1.1.1.2, Updated the shielding, criticality, thermal, and accident 3.3.4, 3.3.4.1, 3.3.4.2, 3.3.4.3, evaluations associated with the increased initial 3.3.5, 3.3.7, Tables 3-1 & 3-2, enrichment of 4.30 weight percent U235 and the increased 4.2.3.3, 5.1.2, 5.1.3.1, 5.1.3.4, assembly average burnup of 45,000 MWD/MTU.

Tables 5-3 & 5-4, Chapter 6, 7.2.1, [10 CFR 72.56 License Amendment]

7.2.2, 7.2.3, 7.3.2, 7.3.2.1, 7.3.2.2, 7.3.4, 7.4, 7.4.1, 7.5, Tables 7-1, 7-2, 7-3, 7-4, 7-5, 7-6, 7-7, 7-8, 7-9, 7-10, 7-11, 7-12, 7-13, 7-14, 7-15, & 7-16, Figures 7-2, 7-3, 7-4, & 7-5, 8.2.10.2, 8.2.10.3, 8.2.11, Table 8-1, 9.1.1.4, 9.1.4, Table 10-2, A.1.1, A.1.2, A.1.3, A.1.3.1, A.1.4, A.1.8, A.1.8.1, A.1.9, A.1.10, Tables A.1-1, A.1-2, & A.1-3, Figures A.1-1, A.1-2, A.1-3, & A.1-4

[IN 2002-002 & IN 2003-002]

Revision 806/14 North Anna ISFSI SAR RS-3 Revision 406/04 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

4.1, 7.1.1, 7.1.2, 7.3.1, 7.4, Added locked security personnel access gates to the Figure 7-1 ISFSI perimeter fence.

[IN 2003-001]

4.4.1.2, Figure 4-14 Placed a cask pedestal in the cask loading area of the

[IN 2003-005] spent fuel storage pool.

4.4.5.3, 5.2 Revised organizational title of the Shift Manager.

[IN 2003-006]

11.1 Made editorial correction to correctly refer to QA

[IN 2003-004] Program Topical Report Table 17.2-0.

A.1.1 Identified the analyses in Chapters 4 & 6 of the TN-32

[IN 2002-004] FSAR, Rev. 0, that were added to the North Anna ISFSI SAR.

A.1.1 Provided bolt torque ranges for the TN-32 casks.

[IN 2002-005]

A.1.1, Appendix A.1 Attachment 1 Added explanation of the use of TN-32 casks designed

[IN 2002-003] and fabricated to TN-32 Final Safety Analysis Report, Revision 0.

A.1.1, Appendix A.1 Attachment 4 Incorporated additional analyses regarding TN-32 cask

[IN 2002-006] gap between center basket rails.

A.1.2 Added allowance for the storage of a fuel assembly with

[IN 2003-003] rod clips.

Revision 306/02 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

4.4.5.1, 8.2.5.1 Clarified the description of the placement of fire

[IN 2001-001] extinguishers at the ISFSI site as well as the availability of fire fighting equipment and personnel.

5.1.1.1 Changed cask receipt procedure consistent with the

[IN 2001-005] North Anna Power Station Updated Final Safety Analysis Report.

9.2.2.1 Deleted incorrect testing requirements for electrical and

[IN 2002-001] communications systems.

Revision 806/14 North Anna ISFSI SAR RS-4 Revision 306/02 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

A.1.1, Appendix A.1 Attachment 1 Incorporated the modified TN-32 cask lid bolt analysis.

[IN 2001-003]

A.1.1, Appendix A.1 Attachment 3 Modified the TN-32 cask protective cover and

[IN 2001-002] overpressure system.

A.1.7, Appendix A.1 Attachment 2 Incorporated structural analyses for missile impacts on

[IN 2000-001] TN-32 casks.

Revision 2 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

3.1.1, A.1.2 Added information on the storage of burnable poison rod

[IN 99-01] assemblies and thimble plug devices in TN-32 casks.

[10 CFR 72.56 License Amendment]

A.1.1 Revised the description of the weld in the neutron shield

[IN 99-02] outer shell of TN-32 casks.

A.1.1 Clarified the location of borated aluminum plates in the

[IN 99-03] fuel basket of TN-32 casks.

Revision 1 Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

3.1.1, 3.3.6, 4.2.1, 4.4.4.1, 4.5, Delete references to fuel insert components, clarify the Table 4-1, Chapter 6, 7.2.2, A.1.1, maximum capacity of the backup diesel generator fuel A.1.2, A.1.5, A.1.6, Appendix A.1 tank, update as-built parameters of the concrete pad, add Attachment 1 120V circuit description, clarify the status of cask

[IN 98-03] handling equipment, delete statement that emergency actions are neither credible nor postulated to occur, discuss operational practices to prevent weather-driven spread of contamination, add I129 and Co60 inventories per assembly, incorporate TN-32 lid bolt analysis, add TN-32 Cask Sliding and Tip-over Analysis, and add Evaluation of Tornado Missiles.

A.1.1 Include fillet weld as an alternative to the groove weld for

[IN 98-01] the fuel basket.

Revision 806/14 North Anna ISFSI SAR RS-5 Revision 1 (continued)

Changes Made under the provisions of 10 CFR 72.48 except Section where indicated in brackets.

A.1.3 Add discussion of dose rate and exposure estimates.

[IN 98-02]

Revision 806/14 North Anna ISFSI SAR RS-6 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR i NORTH ANNA ISFSI SAR Table of Contents Section Title Page Chapter 1 Introduction and General Description of Storage System . . . . . 1-1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2 General ........................................ 1-2 1.3 General Storage System Description . . . . . . . . . . . . . . . . . . . . 1-2 1.4 Identification Of Agents and Contractors . . . . . . . . . . . . . . . . 1-2 1.5 Material Incorporated By Reference . . . . . . . . . . . . . . . . . . . . 1-3 Chapter 2 Site Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1 Geography and Demography Of Site Selected . . . . . . . . . . . . 2-1 2.1.1 Site Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1.2 Site Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2.1.3 Population Distribution and Trends . . . . . . . . . . . . . . . 2-2 2.1.4 Use Of Nearby Land and Waters . . . . . . . . . . . . . . . . . 2-2 2.2 Nearby Industrial, Transportation, and Military Facilities . . . 2-3 2.2.1 Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 2.2.2 Effects of Potential Accidents . . . . . . . . . . . . . . . . . . . 2-3 2.3 Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.1 Regional Climatology . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.2 Local Meteorology. . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.3.3 Onsite Meteorological Measurement Program . . . . . . 2-5 2.3.4 Diffusion Estimates . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6 2.3.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6

Revision 806/14 North Anna ISFSI SAR ii NORTH ANNA ISFSI SAR Table of Contents (continued)

Section Title Page 2.4 Hydrology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 2.4.1 Hydrologic Description . . . . . . . . . . . . . . . . . . . . . . . . 2-7 2.4.2 Floods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8 2.4.3 Probable Maximum Floods On Streams and Rivers . . 2-9 2.4.4 Potential Dam Failures (Seismically Induced) . . . . . . 2-9 2.4.5 Probable Maximum Surge and Seiche Flooding . . . . . 2-9 2.4.6 Probable Maximum Tsunami Flooding . . . . . . . . . . . . 2-10 2.4.7 Ice Flooding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.8 Flooding Protection Requirements . . . . . . . . . . . . . . . 2-10 2.4.9 Environmental . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.10 Subsurface Hydrology . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2.4.11 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2.5 Geology and Seismology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2.5.1 Basic Geologic and Seismic Information . . . . . . . . . . 2-12 2.5.2 Vibratory Ground Motion . . . . . . . . . . . . . . . . . . . . . . 2-27 2.5.3 Surface Faulting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-31 2.5.4 Stability of Subsurface Materials. . . . . . . . . . . . . . . . . 2-31 2.5.5 Slope Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32 2.5.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32 Appendix 2A Boring Logs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2A-i Appendix 2B Laboratory Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . 2B-i Chapter 3 Principal SSSC Design Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3.1 Purposes of SSSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3.1.1 Spent Fuel to Be Stored . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3.1.2 General Operating Functions . . . . . . . . . . . . . . . . . . . . 3-3 3.2 Design Criteria for Environmental Conditions and Natural Phenomena 3-3 3.2.1 Tornado and Wind Loadings . . . . . . . . . . . . . . . . . . . . 3-4 3.2.2 Water Level (Flood) Design . . . . . . . . . . . . . . . . . . . . 3-5 3.2.3 Seismic Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3.2.4 Snow and Ice Loadings . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3.2.5 Combined Load Criteria . . . . . . . . . . . . . . . . . . . . . . . 3-5

Revision 806/14 North Anna ISFSI SAR iii NORTH ANNA ISFSI SAR Table of Contents (continued)

Section Title Page 3.3 Safety Protection Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3.3.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3.3.2 Protection By Multiple Confinement Barriers and Systems 3-6 3.3.3 Protection By Equipment and Instrumentation Selection 3-6 3.3.4 Nuclear Criticality Safety . . . . . . . . . . . . . . . . . . . . . . 3-7 3.3.5 Radiological Protection . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3.3.6 Fire and Explosion Protection . . . . . . . . . . . . . . . . . . . 3-8 3.3.7 Materials Handling and Storage . . . . . . . . . . . . . . . . . 3-8 3.4 Summary of SSSC Design Criteria . . . . . . . . . . . . . . . . . . . . . 3-8 Chapter 4 Storage System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.1 Location and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.2 Storage Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.2.1 Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4.2.2 Storage Site Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4.2.3 SSSC Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4.2.4 Instrumentation System Description . . . . . . . . . . . . . . 4-12 4.2.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4.3 Transport System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.1 Function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.2 Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4.3.3 Design Bases and Safety Assurance . . . . . . . . . . . . . . 4-15 4.3.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16 4.4 Operating Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16 4.4.1 Loading and Unloading System. . . . . . . . . . . . . . . . . . 4-16 4.4.2 Decontamination System . . . . . . . . . . . . . . . . . . . . . . . 4-18 4.4.3 SSSC Repair and Maintenance . . . . . . . . . . . . . . . . . . 4-18 4.4.4 Utility Supplies and Systems . . . . . . . . . . . . . . . . . . . . 4-18 4.4.5 Other Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4.4.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-20 4.5 Classification of Structures, Systems and Components. . . . . . 4-20 4.6 Decommissioning Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21

Revision 806/14 North Anna ISFSI SAR iv NORTH ANNA ISFSI SAR Table of Contents (continued)

Section Title Page Chapter 5 STORAGE SYSTEM OPERATIONS . . . . . . . . . . . . . . . . . . . . . 5-1 5.1 Operation Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5.1.1 Narrative Description. . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5.1.2 Flowsheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 5.1.3 Identification of Subjects for Safety and Reliability Analysis 5-3 5.2 Control Room and Control Areas . . . . . . . . . . . . . . . . . . . . . . 5-4 5.3 Spent Fuel Accountability Program. . . . . . . . . . . . . . . . . . . . . 5-4 5.4 Spent Fuel Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Chapter 6 Waste Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 Chapter 7 Radiation Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7.1 Ensuring That Occupational Radiation Exposures Are As Low As Reasonably Achievable (ALARA) . . . . . . . . . . . . 7-1 7.1.1 Policy Considerations and Organization . . . . . . . . . . . 7-1 7.1.2 Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . . 7-4 7.1.3 Operational Considerations . . . . . . . . . . . . . . . . . . . . . 7-5 7.2 Radiation Sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 7.2.1 Characterization of Sources . . . . . . . . . . . . . . . . . . . . . 7-6 7.2.2 Airborne Radioactive Material Sources. . . . . . . . . . . . 7-6 7.2.3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 7.3 Radiation Protection Design Features . . . . . . . . . . . . . . . . . . . 7-6 7.3.1 Storage System Design Description . . . . . . . . . . . . . . 7-6 7.3.2 Shielding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7 7.3.3 Area Radiation and Airborne Radioactivity Monitoring Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8 7.3.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9 7.4 Estimated Onsite Collective Dose Assessment . . . . . . . . . . . . 7-9 7.4.1 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-10 7.5 Offsite Collective Dose Assessment . . . . . . . . . . . . . . . . . . . . 7-10 7.6 Health Physics Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-11 7.7 Environmental Monitoring Program . . . . . . . . . . . . . . . . . . . . 7-11

Revision 806/14 North Anna ISFSI SAR v NORTH ANNA ISFSI SAR Table of Contents (continued)

Section Title Page Chapter 8 Accident Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8.1 Off-Normal Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8.1.1 Loss of Electric Power . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8.1.2 Radiological Impact from Off-Normal Operations . . . 8-2 8.2 Accidents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2 8.2.1 Earthquake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2 8.2.2 Extreme Wind . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8.2.3 Flood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8.2.4 Explosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4 8.2.5 Fire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4 8.2.6 Storage of an Unauthorized Fuel Assembly . . . . . . . . 8-4 8.2.7 Loss of Neutron Shield . . . . . . . . . . . . . . . . . . . . . . . . 8-5 8.2.8 SSSC Seal Leakage . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6 8.2.9 SSSC Drops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6 8.2.10 Loss of Confinement Barrier . . . . . . . . . . . . . . . . . . . . 8-6 8.2.11 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7 8.3 Site Characteristics Affecting Safety Analysis . . . . . . . . . . . . 8-8 Chapter 9 Conduct of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 9.1 Organizational Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 9.1.1 Corporate Organization . . . . . . . . . . . . . . . . . . . . . . . . 9-1 9.1.2 Operation Organization, Management, and Administrative Control System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 9.1.3 Personnel Qualification Requirements . . . . . . . . . . . . 9-2 9.1.4 Liaison with Outside Organizations . . . . . . . . . . . . . . 9-2 9.2 Startup Testing and Operation . . . . . . . . . . . . . . . . . . . . . . . . . 9-2 9.2.1 Administrative Procedures for Conducting Test Program 9-2 9.2.2 Test Program Description . . . . . . . . . . . . . . . . . . . . . . 9-2 9.2.3 Test Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3 9.3 Training Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

Revision 806/14 North Anna ISFSI SAR vi NORTH ANNA ISFSI SAR Table of Contents (continued)

Section Title Page 9.4 Normal Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4 9.4.1 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4 9.4.2 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 9.5 Emergency Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 9.6 Physical Security Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 Chapter 10 Operating Controls and Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1 10.1 Proposed Operating Controls and Limits. . . . . . . . . . . . . . . . . 10-1 10.1.1 Content of Operating Controls and Limits . . . . . . . . . 10-1 10.1.2 Bases for Operating Controls and Limits . . . . . . . . . . 10-1 10.2 Development of Operating Controls and Limits . . . . . . . . . . . 10-1 10.2.1 Functional and Operating Limits . . . . . . . . . . . . . . . . . 10-1 10.2.2 Limiting Conditions for Operation . . . . . . . . . . . . . . . 10-1 10.2.3 Surveillance Requirements . . . . . . . . . . . . . . . . . . . . . 10-2 10.2.4 Design Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2 10.2.5 Administrative Controls. . . . . . . . . . . . . . . . . . . . . . . . 10-2 Chapter 11 Quality Assurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1 11.1 Quality Assurance Program Description . . . . . . . . . . . . . . . . . 11-1 Appendix A.1 TN-32 DRY STORAGE CASK. . . . . . . . . . . . . . . A.1-1 Appendix A.1,Attachment 1 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 1-1 Appendix A.1,Attachment 2 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 2-1 Appendix A.1,Attachment 3 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 3-1 Appendix A.1,Attachment 4 . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 Att. 4-1

Revision 806/14 North Anna ISFSI SAR vii NORTH ANNA ISFSI SAR List of Tables Table Page Table 2-1 Dispersion Factors (/Q) in Accordance with Regulatory Guide 1.145. . . . . . 2-35 Table 2-2 Summary of Usgs Gauging Station Records and Estimated Stream Flow Data for the North Anna Dam . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-36 Table 2-3 Floods on the North Anna River. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37 Table 2-4 Recovery and RQD Values of Borings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38 Table 2-5 Earthquakes Within 200 Miles of North Anna Site Events Listed Chronologically . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-40 Table 3-1 Characteristics of Fuel Used at the North Anna Power Stationa . . . . . . . . . . . . 3-9 Table 3-2 Design Criteria for Dry Sealed Surface Storage Casks . . . . . . . . . . . . . . . . . . 3-10 Table 4-1 Compliance with General Design Criteria (Subpart F, 10 CFR 72) . . . . . . . . . 4-23 Table 4-2 Codes and Standards for Transporter Design and Fabrication . . . . . . . . . . . . . 4-25 Table 5-1 General Sequence of Loading Operationsa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 Table 5-2 General Sequence of Unloading Operationsa . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 Table 7-1 Maximum Design Basis Dose Rates Along ISFSI Perimeter Fence (mrem/hr) 7-12 Table 7-2 Estimated Occupational Exposures for Cask Loading, Transport, and Emplacementa (One Time Exposure). . . . . . . . . . . . . . . . . . . . 7-13 Table 7-3 North Anna ISFSI Maintenance Operationsa Annual Occupational Exposures 7-14 Table 7-4 Total Annual Occupational Exposures During ISFSI Loading Operationsa . . 7-14 Table 10-1 Functional and Operating Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3 Table 10-2 Limiting Conditions for Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3 Table A-1 Topical Safety Analysis Reports for SSSCs Approved for Use at the North Anna ISFSI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Table A.1-1 TN-32 ASME Code Exceptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.1-16 Table 3C.3-1 Summary of Stresses and Interaction Equation Evaluation . . . . . . . . . A.1 Att. 4-8

Revision 806/14 North Anna ISFSI SAR viii NORTH ANNA ISFSI SAR List of Figures Figure Page Figure 1-1 ISFSI Location on North Anna Site . . . . . . . . . . . . . . . . . . . . . . . . 1-4 Figure 1-2 ISFSI General Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 Figure 2-1 Area Map (0-10 Miles) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-46 Figure 2-2 Regional Map (0-50 Miles) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-47 Figure 2-3 North Anna Site Boundary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-48 Figure 2-4 Daily Average Temperatures for Richmond, Virginia (1951-1980) 2-49 Figure 2-5 Daily Extreme Temperatures for Richmond, Virginia (1898-1991) 2-50 Figure 2-6 Extreme 1-Mile wind Passage at Richmond, Virginia . . . . . . . . . . 2-51 Figure 2-7 Regional Topography and Characteristics . . . . . . . . . . . . . . . . . . . 2-52 Figure 2-8 ISFSI Local Topography and Grading Plan . . . . . . . . . . . . . . . . . . 2-53 Figure 2-9 Hydrologic Characteristics of the ISFSI Site . . . . . . . . . . . . . . . . . 2-54 Figure 2-10 Site Geological Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-55 Figure 2-11 ISFSI Boring Locations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-56 Figure 2-12 ISFSI Subsurface Cross Section . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-57 Figure 2-13 Regional Geologic Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-58 Figure 2-14 Pad #1 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-59 Figure 2-15 Pad #2 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-60 Figure 2-16 Pad #3 Surface Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-61 Figure 2-17 Earthquake Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-62 Figure 2-18 Alternate Transport Route Boring Locations . . . . . . . . . . . . . . . . . 2-63 Figure 2-19 Alternate Transport Route Subsurface Cross Sections . . . . . . . . . . 2-64 Figure 4-1 ISFSI Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-26 Figure 4-2 ISFSI Electrical Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-27 Figure 4-3 ISFSI Electrical Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-28 Figure 4-4 Transport Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-29 Figure 4-5 ISFSI Storage Pad Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-30 Figure 4-6 IMAGES-3D Model of Storage Pad Geometry . . . . . . . . . . . . . . . 4-31 Figure 4-7 SASSI Model of Storage Pad Geometry . . . . . . . . . . . . . . . . . . . . . 4-32 Figure 4-8 SASSI Cask Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-33 Figure 4-9 SASSI Pad Plate Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-34 Figure 4-10 Sliding Factors of Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-35

Revision 806/14 North Anna ISFSI SAR ix NORTH ANNA ISFSI SAR List of Figures (continued)

Figure Page Figure 4-11 Overturning Factors of Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-36 Figure 4-12 Transporter Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-37 Figure 4-13 Fuel and Decontamination Buildings Plan View . . . . . . . . . . . . . . 4-38 Figure 4-14 Fuel and Decontamination Buildings Side View . . . . . . . . . . . . . . 4-39 Figure 5-1 Plan and Profile of ISFSI Site Access Road . . . . . . . . . . . . . . . . . . 5-8 Figure 7-1 ISFSI Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-15 Figure 7-2 Dose Rate for 84 Base Case Casks Versus Distance. . . . . . . . . . . . 7-16 Figure A.1-1 TN-32 Surface Dose Rate Measurement Locations . . . . . . . . . . . . A.1-23 Figure 3C.3-14 Finite Element Model - Bottom Support Rail . . . . . . . . . . . . . . . . . A.1 Att. 4-9 Figure 3C.3-15 Finite Element Model - Loading and Boundary Conditions . . . . . .A.1 Att. 4-10 Figure 3C.3-16 Finite Element Model - Deformed Shape, 0.24 Distance . . . . . . .A.1 Att. 4-11 Figure 3C.3-17 Finite Element Model - Deformed Shape, 0.5663 Distance . . . . .A.1 Att. 4-12 Figure 3C.3-18 Finite Element Model - Deformed Shape, 0.0 Distance . . . . . . . .A.1 Att. 4-13

Revision 806/14 North Anna ISFSI SAR x Intentionally Blank

Revision 806/14 North Anna ISFSI SAR LEP-1 LIST OF EFFECTIVE PAGES Table of Contents First Page Last Page Revision i x Revision 806/14 List of Effective Pages First Page Last Page Revision LEP-1 LEP-2 Revision 806/14 Chapter 1 First Page Last Page Revision 1-1 1-6 Revision 806/14 Chapter 2 First Page Last Page Revision 2-1 2-64 Revision 806/14 2A-i 2A-ii Revision 806/14 2A-1 2A-44 Revision 806/14 2B-i 2B-ii Revision 806/14 2B-1 2B-72 Revision 806/14 Chapter 3 First Page Last Page Revision 3-1 3-10 Revision 806/14 Chapter 4 First Page Last Page Revision 4-1 4-40 Revision 806/14 Chapter 5 First Page Last Page Revision 5-1 5-8 Revision 806/14 Chapter 6 First Page Last Page Revision 6-1 6-2 Revision 806/14 Chapter 7 First Page Last Page Revision 7-1 7-16 Revision 806/14

Revision 806/14 North Anna ISFSI SAR LEP-2 LIST OF EFFECTIVE PAGES (CONTINUED)

Chapter 8 First Page Last Page Revision 8-1 8-8 Revision 806/14 Chapter 9 First Page Last Page Revision 9-1 9-6 Revision 806/14 Chapter 10 First Page Last Page Revision 10-1 10-4 Revision 806/14 Chapter 11 First Page Last Page Revision 11-1 11-2 Revision 806/14 Appendix A First Page Last Page Revision A-1 A-2 Revision 806/14 A.1-1 A.1-24 Revision 806/14 A.1 Att. 1-1 A.1 Att. 1-22 Revision 806/14 A.1 Att. 2-1 A.1 Att. 2-6 Revision 806/14 A.1 Att. 3-1 A.1 Att. 3-6 Revision 806/14 A.1 Att. 4-1 A.1 Att. 4-14 Revision 806/14

Revision 806/14 North Anna ISFSI SAR 1-1 Chapter 1 INTRODUCTION AND GENERAL DESCRIPTION OF STORAGE SYSTEM

1.1 INTRODUCTION

Discharged spent fuel assemblies from the North Anna Power Station, Units 1 and 2 are currently stored in a spent fuel pool common to both Units. The spent fuel pool provides for interim storage of 1737 fuel assemblies in high density storage racks. Typically, 64 spent fuel assemblies are discharged from each Unit about every 18 months. Section 3.1.1 provides a description of the spent fuel. Additional information on the fuel design is available in Section 4.2 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).

Based on the current fuel management strategy and refueling outage schedule, the spent fuel pool will lose the capacity for single unit full core discharge in late 1998. Storage capacity in the pool will be completely exhausted in 2000, therefore, additional spent fuel storage capacity is needed. To support this need, sealed surface storage casks (SSSCs) have been chosen for use at an Independent Spent Fuel Storage Installation (ISFSI) at the North Anna site.

The North Anna ISFSI is designed to store all the anticipated spent fuel resulting from the operation of the North Anna Power Station Units 1 and 2 in excess of that which can be stored in the spent fuel pool, or approximately 1824 fuel assemblies. Construction of the North Anna ISFSI is scheduled to begin in June 1997 and the first SSSC should be placed at the ISFSI in August 1998.

The North Anna ISFSI is located within the site boundary of the North Anna Power Station, which is owned 88.4% by Virginia Electric and Power Company (Virginia Power) and 11.6% by the Old Dominion Electric Cooperative. Virginia Power is responsible for operations at the Station.

This SAR is primarily directed towards analyzing the safety aspects of SSSC handling and storage once the SSSCs have been lifted by the cask transporter, and how the safety requirements in 10 CFR 72 are satisfied. Handling of the SSSCs inside the Fuel and Decontamination Buildings and cask crane bay is performed in accordance with the operating license for the North Anna Power Station under 10 CFR 50, however, these operations are also described in this SAR.

This SAR indicates that up to three concrete storage pads could be used at the North Anna ISFSI and were intended to store vertical, metal SSSCs. An additional pad, to be used under a 10 CFR 72, Subpart L general license, was installed in place of the original Pad 2. The ISFSI site plans described in this SAR have been updated to reflect the new configuration of the ISFSI site with this additional pad.

Revision 806/14 North Anna ISFSI SAR 1-2 1.2 GENERAL The North Anna site comprises approximately 1043 acres in Louisa County, Virginia. The ISFSI is located near the center of the site, approximately 2000 feet southwest of the protected area for North Anna Units 1 and 2. Figure 1-1 shows a general layout of the North Anna site.

North Anna Power Station Units 1 and 2 consist of two closed-cycle pressurized water reactors (PWR) provided by Westinghouse. Operating licenses were issued by the NRC in April 1978 and August 1980 for Units 1 and 2, respectively. Unit 1 started commercial operation in June 1978 and Unit 2 in December 1980. A complete description of the power station is provided in the North Anna Power Station UFSAR, NRC dockets 50-338/339.

The North Anna ISFSI consists of three concrete storage pads on which the loaded SSSCs are placed. The storage pads will be built in sequence, as needed, and in an order which minimizes radiation exposures. The storage pads will be surrounded by a security fence and a nuisance fence.

Another fence will enclose the perimeter of the ISFSI site (hereinafter referred to as the ISFSI perimeter fence).

1.3 GENERAL STORAGE SYSTEM DESCRIPTION The North Anna ISFSI uses SSSCs to store fuel irradiated at the North Anna Power Station.

Typically, the SSSCs are large cylindrical vessels capable of storing up to 32 unconsolidated PWR fuel assemblies. The SSSCs are made of carbon steel, stainless steel, or cast iron. They are about 16 feet long and 8 feet in diameter, have walls several inches thick and weigh 100 to 125 tons fully loaded. The fuel is stored in a helium atmosphere and held in place by a basket or rack.

Figure 1-2 shows the general arrangement of the North Anna ISFSI.

The loading and preparation of an SSSC takes place within the Fuel and Decontamination Buildings of the North Anna Power Station. The SSSC is loaded under water in the spent fuel pool where a lid is positioned on the SSSC prior to lifting it out of the water. Water in the SSSC is removed, the interior is further dried under vacuum and then filled with helium. Following decontamination of the outer surface, the SSSC is placed in a transporter outside the Decontamination Building. The SSSC is then transferred to the ISFSI, where it is emplaced on one of the three storage pads.

The SSSCs are totally passive systems, with natural convection cooling sufficient to maintain safe fuel clad temperatures. The SSSC walls provide adequate shielding, and no radioactive products are released under any credible conditions.

1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS SSSCs to be used in the North Anna ISFSI are designed and fabricated by other organizations and will be purchased by Virginia Power. The SSSC suppliers are responsible for SSSC fabrication, testing, and delineation of specific SSSC requirements, if any. Information

Revision 806/14 North Anna ISFSI SAR 1-3 related to the qualifications of the SSSC suppliers is contained in the Topical Safety Analysis Reports referenced in Section 1.5.

Site preparation and necessary construction will be performed by Virginia Powers Site Services Department, using specialty subcontractors, as required.

1.5 MATERIAL INCORPORATED BY REFERENCE Detailed information describing the SSSCs is provided in the SSSC Topical Safety Analysis Reports referenced in Appendix A, Table A-1 of this Safety Analysis Report (SAR). General references to the SSSC Topical Safety Analysis Reports are made in sections of this SAR, as needed, to supplement information contained in the SAR. Each SSSC type is described in a sub-appendix of Appendix A. Also, the sub-appendices provide SSSC-specific information not contained in the SSSC Topical Safety Analysis Reports. The combination of this SAR, including appendices, and any one of the reports describing the SSSCs (one per type of SSSC) provides all the information described in Regulatory Guide 3.62 (February 1989), Standard Format and Content for the Safety Analysis Report for Onsite Storage of Spent Fuel Storage Casks.

The following documents, which are already on file with the NRC, are referenced throughout this SAR:

1. North Anna Power Station Units 1 and 2, Updated Final Safety Analysis Report, NRC dockets 50-338 and 50-339.
2. North Anna Power Station Units 1, 2, 3 and 4, Environmental Report, submitted March 15, 1972.
3. North Anna Power Station, Emergency Plan.
4. Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1.
5. Surry Power Station, Independent Spent Fuel Storage Installation, Safety Analysis Report.

Revision 806/14 North Anna ISFSI SAR 1-5 Figure 1-2 ISFSI GENERAL ARRANGEMENT

Revision 806/14 North Anna ISFSI SAR 1-6 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 2-1 Chapter 2 SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY OF SITE SELECTED 2.1.1 Site Location The location of the Independent Spent Fuel Storage Installation (ISFSI) is approximately 2000 feet southwest of the North Anna Power Station Units 1 and 2 protected area and within the boundaries of the North Anna site (see Figure 1-1). The ISFSI occupies approximately 11 acres.

The North Anna site is located in the north-central portion of Virginia in Louisa County.

The site is on a peninsula on the southern shore of Lake Anna at the end of State Route 700. The earth dam that creates the lake is approximately 5 miles southeast of the site. The North Anna River flows southeasterly, joining the South Anna River to form the Pamunkey River approximately 27 miles southeast of the site.

The largest community within 10 miles of the site is the Town of Mineral (Louisa County),

which had a 1990 population of 452 persons, and is approximately 6 miles west-southwest of the site. The community of Louisa, which had a 1990 population of 1088 persons, is approximately 12 miles to the west of the site. Figure 2-1 shows the general location of the site and the surrounding localities within 10 miles.

Regionally, as indicated in Figure 2-2, the site is approximately 40 miles north-northwest of Richmond; 36 miles east of Charlottesville; 22 miles southwest of Fredericksburg; and 70 miles southwest of Washington, D.C. Interstate highways 95 and 64, the two principal highways serving Richmond, pass within 16 miles east and 16 miles southwest of the site, respectively.

The approximate coordinates of the ISFSI are:

Latitude-Longitude Universal Transverse Mercator 38° 3.8' N - 77° 47.5' W 4,215,900 mN - 255,100 mE; Zone 18S 2.1.2 Site Description The North Anna site property comprises 1803 acres, of which approximately 760 acres are covered by water. The site boundary is shown in Figure 2-3. Virginia Power owns, in fee simple, all of the land within the site boundary, both above and beneath the surfaces, including those portions of the reservoir and waste heat treatment facilities (cooling lagoons) that lie within the site boundary. The controlled area is all of the area within the site boundary. Virginia Power also owns, in fee simple, all land outside the site boundary that forms the reservoir and the cooling lagoons up to their expected high-water marks. The Station and all supporting facilities including the reservoir, cooling lagoons, earthen dam, dikes, railroad spur, and roads constitute approximately 13,775 acres.

The site plan for the North Anna ISFSI and its relative location to the North Anna Power Station are presented on Figure 2-3. Consistent with Section 2.1.2.1 of the North Anna Power

Revision 806/14 North Anna ISFSI SAR 2-2 Station UFSAR, the restricted area for the ISFSI is the North Anna site boundary. The controlled area boundary is also the site boundary. As shown on Figure 2-3, the minimum distance to the controlled area boundary from the ISFSI is approximately 2500 feet and occurs in the southwest sector relative to the ISFSI.

Since the controlled area for the North Anna ISFSI is wholly within the property lines for the North Anna site, Virginia Power has full authority to determine all activities including the exclusion and the removal of personnel and property. No activities unrelated to operation of the North Anna Power Station or the ISFSI are permitted within the controlled area.

The topography in the site region is characteristic of the central Piedmont Plateau with a gently undulating surface varying from 200 to 500 feet above sea level (see Figure 2-7). The surrounding region is covered with forest and brushwood interspersed with an occasional farm.

The land adjacent to the reservoir is becoming increasingly residential as the land is developed.

Figure 2-8 shows the topography in the vicinity of the ISFSI. Drainage of surface water at the ISFSI will be provided by channels to a small creek to the south and west. The area inside the ISFSI perimeter fence will be graded level. Areas not needed for ISFSI operations will be seeded with grass, while areas needed for ISFSI operations will be covered with course gravel. The areas surrounding the west, south and east sides of the ISFSI perimeter fence will remain forested.

Based on this description, the potential for erosion at the ISFSI is small, and the potential for forest fires exists only outside the ISFSI perimeter fence.

2.1.3 Population Distribution and Trends Cities within 50 miles of the site are shown on Figure 2-2. Section 2.1.2 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides detailed information on population projections.

2.1.4 Use Of Nearby Land and Waters The North Anna site is located in a predominantly rural area of Louisa County, Virginia. In Louisa County and the four adjacent counties of Spotsylvania, Orange, Hanover and Caroline, an average 42.5% of the total county acreage is used for agriculture. Approximately 38% of the 508,443 agricultural acres in these five counties is cropland, 15% is pastureland, and the balance is woodland. Principal crops are barley, tobacco, corn, wheat, hay and soybeans. Poultry, livestock and dairy products are also major agricultural products of the area and represent the greatest share of the areas cash farm income.

Section 2.1.2.3 of the North Anna ISFSI Environmental Report, contained in the ISFSI Reference Document Manual, provides information on recreational activities on Lake Anna.

Section 2.2.1 that follows provides information on industrial activities in the area.

Revision 806/14 North Anna ISFSI SAR 2-3 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.2.1 Description Currently, there are none of the following facilities within 5 miles of the North Anna site:

military bases, manufacturing plants, chemical plants and storage facilities, airports, major railroad lines, major water transportation routes or oil and gas pipelines. Also, there are no mining activities within 5 miles of the site.

There are no significant industrial activities within 5 miles of the site. Based on trends of industrial growth and projected population figures, it is not expected that any major industrial expansion will occur in this area.

Roads within 10 miles of the site are shown on Figure 2-1. Virginia Route 208 and US Route 522 are the major transportation routes serving the site area that pass within 5 miles of the site, however, there are no specific data on the types and quantities of products and materials transported on these roads.

State Route 700, east from State Route 652, is the only land access to the North Anna site. It ends at the site west boundary. No chemicals or cargo are expected to be transported on this portion of Route 700 unless the chemicals or cargo are used by the North Anna Power Station.

The railroad line closest to the site is the line owned by CSXT. It passes through the towns of Louisa, Mineral, Fredericks Hall and Bumpass; its closest approach to the site is approximately 5.5 miles southwest. A spur line connects the site with this line.

There are only two airports within 10 miles of the site: Lake Anna (Rest-A-While) Airport and Cub Field. The Louisa County Airport is located 11 miles west-southwest of the site.

Operations at these airports involve light aircraft. None of these airports are expected to grow significantly in the foreseeable future. Section 2.2.1.6.2 of the North Anna Power Station UFSAR includes a discussion of airways over the site.

2.2.2 Effects of Potential Accidents The only sources of explosion and formation of flammable vapor clouds are explosive materials/chemicals carried by truck traffic.

The largest possible explosive load routinely transported contains 8500 gallons of gasoline (set by highway weight limits). Based on an analysis in Section 2.2.2.1.1 of the North Anna Power Station UFSAR, if this amount of gasoline were to explode at the closest point to the site, 1.5 miles on State Route 652, a peak overpressure of 1 psi would be experienced approximately 1900 feet away from the point of explosion. The overpressure experienced by the SSSCs 1.5 miles away from the explosion would be significantly less than 1 psi.

Revision 806/14 North Anna ISFSI SAR 2-4 2.3 METEOROLOGY Meteorology at the North Anna Power Station is described in Section 2.3 of the North Anna Power Station UFSAR. Information from the UFSAR concerning meteorology is summarized and supplemented below.

2.3.1 Regional Climatology The climate of the site is basically modified continental. The summers are warm and humid while winters are generally mild. The Blue Ridge Mountains to the west act as partial barriers to winter storms, modifying their intensity as they move across the rolling Piedmont to the Tidewater region adjacent to the Atlantic Ocean.

Climatic characteristics are illustrated in Figure 2-4 through Figure 2-6 which show daily average temperatures, daily extreme temperatures, and the probability of an extreme l-mile wind passage for Richmond, Virginia. Temperatures in the site region rarely exceed 95°F or fall below 10°F.

Rainfall averages approximately 44 inches per year around the site region and is fairly well distributed throughout the year, with the exception of the months of July and August, when thunderstorm activity raises the monthly totals to approximately 5 inches. Tropical storms may also contribute significantly to precipitation during the late summer and fall. Records indicate that the maximum rainfall during a 24-hour period was 8.79 inches, which occurred in August 1955.

Snowfalls of 4 inches or more occur an average of once per year. Snow usually only remains on the ground from 1 to 4 days at a time. Richmond averages 14.6 inches of snow per year.

Tornadoes are infrequent in Virginia. In the period from 1916 through 1987, only 65 tornadoes were reported within a 50-mile radius of the North Anna site (Reference 1). This averages to less than one tornado per year within this radius. Based on statistical methods proposed by Thom (Reference 2) and as described in detail in Section 2.3.1.3.2 of the North Anna Power Station UFSAR, the probability of a tornado striking a point within the 50-mile radius is 3.25 x 10-5 per year, or a recurrence interval of 30,800 years.

Richmond averages 37 thunderstorm days per year with a quarter of these typically occurring in July. Cloud-to-ground lightning strike data within an approximate 10-kilometer radius of the site region was analyzed for the ten year period of 1984 to 1993. Results indicate a minimum yearly strike frequency of 1.1 strikes per square kilometer in 1992 and a maximum yearly strike frequency of 3.9 strikes per square kilometer in 1988.

2.3.2 Local Meteorology 2.3.2.1 Data Sources Meteorology in the North Anna Power Station site area was evaluated as part of its Operating License application review. Data acquired by the National Weather Service and

Revision 806/14 North Anna ISFSI SAR 2-5 summarized by the Environmental Data Service (Reference 3) were used to determine the normals, means, and extremes of temperature and precipitation applicable to the North Anna site region.

Temperature extremes for Richmond, Virginia are shown in Figure 2-5. In August 1918 a record high of 107°F was recorded and in January 1940 a record low of -12°F was recorded. The extreme temperatures used as the design criteria for the SSSCs, -20°F and 115°F, were selected because they exceed the recorded temperature extremes.

The design solar insolation values for casks stored at the ISFSI are adapted from 10 CFR 71.71(c). The insolation values are 800 gm-cal/cm2 for flat surfaces and 400 m-cal/cm2 for curved surfaces applied over a 12-hour daylight period. These insolation values may be averaged over a 24-hour period for long-term thermal analyses.

Joint frequency distributions of wind speed and horizontal atmospheric stability for both the lower and upper tower levels are presented in Tables 2.3-9 and 2.3-10 of the North Anna Power Station UFSAR. In addition, the joint frequency distribution of lower level wind speed and vertical atmospheric stability are presented in Table 2.3-11 of the North Anna Power Station UFSAR. The distributions are for Stability Classes A through G as defined in Regulatory Guide 1.23.

2.3.2.2 Topography The North Anna Power Station site and exclusion area consist of approximately 1043 acres located in the north-central portion of Virginia in Louisa County beside Lake Anna. The site region is characterized by gently rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is cut by the North Anna River. The topography in the site region is characteristic of the Central Piedmont Plateau, which has a gently undulating surface that varies from 200 to 500 feet above sea level.

Figure 2.3-24 of the North Anna Power Station UFSAR is a map showing detailed topographic features within an 8-kilometer (5 mile) radius centered on the site area.

2.3.3 Onsite Meteorological Measurement Program The North Anna Power Station will also provide meteorological monitoring for the ISFSI.

A detailed description of the meteorological monitoring program is provided in Section 2.3.3 of the North Anna Power Station UFSAR. Data from this program, however, will not be used to estimate offsite concentrations of airborne effluents from the ISFSI, as no credible mechanism for the release of airborne effluents has been postulated.

As illustrated in Figure 2.3-25 of the North Anna Power Station UFSAR, the ISFSI is located approximately 3500 feet from the primary meteorological tower, with the service water reservoir and the Units 1 and 2 discharge canal between the ISFSI and the tower. Based on the analysis in Section 2.3.3.6 of the Surry Power Station ISFSI SAR, the separation between the

Revision 806/14 North Anna ISFSI SAR 2-6 North Anna ISFSI and the meteorological tower, and the intervening topography and other heat sources, no effect is expected on the tower from the heat source represented by a fully loaded ISFSI.

2.3.4 Diffusion Estimates 2.3.4.1 Basis No routine or accidental releases are planned or postulated as a result of ISFSI operation.

Nevertheless, /Q values have been calculated which can be used to estimate radiological doses from the accidental release analyzed in Section 8.2.10.

2.3.4.2 Calculations Five years of meteorological data from 1989 through 1993 were used to calculate dispersion factors (/Q) for use in the dose assessment of accident airborne releases. Wind speed, direction, distance from the ISFSI to the North Anna Power Station site boundary, and atmospheric stability class (based on the temperature gradient determined from instrumentation at the 10 meter and the 158.9 foot elevations) serve as inputs to the dispersion model described in Regulatory Guide 1.145 (Reference 4).

Table 2-1 provides the /Q values at the site boundary for an instantaneous accidental release from the ISFSI. Time-dependent /Q values are not provided since routine releases are neither planned nor anticipated. The /Q values provided in Table 2-1 represent the most limiting

/Q values to members of the public with the SE sector having the greatest /Q at 1100 meters from the ISFSI to the site boundary. According to the dispersion model, the topographical features surrounding the North Anna site are such that the /Q values monotonically decrease with distance from the site boundary. Therefore, the limiting dose to members of the public will occur at the site boundary in the SE sector and dose to members of the public will decrease as the distance from the site boundary increases.

2.3.5 References

1. Storm Data, National Oceanic and Atmospheric Administration, National Weather Records Center, Environmental Data Service, Asheville, North Carolina.
2. H. C. S. Thom, Tornado Probabilities, Monthly Weather Review, Vol. 91, Nos. 10-12, pp. 730-736.
3. Richmond, Virginia 1987 Local Climatological Data, Annual Summary With Comparative Data, National Oceanic and Atmospheric Administration, National Weather Records Center, Environmental Data Service, Asheville, North Carolina.
4. U. S. NRC Regulatory Guide 1.145, Atmospheric Dispersion Models for Post Accident Consequence Assessments at Nuclear Power Plants, Revision 1, November 1982, Reissued February 1983.

Revision 806/14 North Anna ISFSI SAR 2-7 2.4 HYDROLOGY The data and analyses in this section were obtained from the material presented in Section 2.4 of the North Anna Power Station UFSAR (References 1 & 2). In addition, hydrologic data for the period from 1971 to 1993 were also reviewed. No severe event occurred from 1973 to the present which exceeded the maximum flood on record that has occurred on the North Anna River. The subsurface hydrology section includes site specific data produced as a result of the ISFSI site soils investigation, and follow-up monitoring.

2.4.1 Hydrologic Description 2.4.1.1 Site and Structures The general site grade for the ISFSI is at Elevation 311 feet msl. This grade varies somewhat to permit proper drainage. The top elevation of the storage pads will be at 311.5 feet msl. Areas outside of the ISFSI generally slope to the south, towards Lake Anna. There is an ISFSI access road to the west of the ISFSI which is graded from Elevation 332 feet msl to Elevation 311 feet msl into the site. Site grade is above the probable maximum flood level, as discussed in Section 2.4.2.2. There are no above-ground enclosed structures associated with this facility.

2.4.1.2 Hydrosphere Regional topography and characteristics are shown on Figure 2-7. The region surrounding the North Anna Power Station site is characterized by gently rolling terrain that rises to an average height of 50 to 150 feet above Lake Anna and is bisected by the North Anna River. The topography in the site region is characteristic of the Central Piedmont Plateau, which has a gently undulating surface that varies from 200 to 500 feet above sea level.

An earth dam approximately five miles southeast of the site forms Lake Anna, which extends approximately 17 miles along the old North Anna river bed. The lake and waste heat treatment facility cover a surface area of 13,000 acres and contain approximately 100 billion gallons of water.

The ISFSI site is located more than 60 feet above normal lake level elevation, and 45 feet above the flood elevation assumed to occur due to the Probable Maximum Flood postulated to occur on Lake Anna. The terrain near the ISFSI site varies from Elevation 336 feet msl northwest of the ISFSI to Elevation 250 feet msl near the lake.

The North Anna River rises in the eastern slopes of the southwestern mountains in the Appalachian Range near Gordonsville, Virginia, flows into the Lake, and then continues along a southeasterly course to its confluence with the South Anna River 5 miles northeast of Ashland, Virginia, where the Pamunkey River is formed. The Pamunkey River continues on a general southeasterly course to West Point, Virginia, where it is joined by the Mattaponi to form the York River. The York River flows into the Chesapeake Bay approximately 15 miles north of Hampton, Virginia.

Revision 806/14 North Anna ISFSI SAR 2-8 The North Anna River drains a watershed of 343 square miles above the dam. The dam is located approximately 4 miles north of Bumpass, Virginia and approximately 0.5 mile upstream of Virginia Route 601. The nearest United States Geological Survey (USGS) stream gauging station on the North Anna River was at the bridge at Virginia Route 601. This stream gauge had been operating from October 1978 to January 1997. There have also been gauges located at Doswell and Hart Corner, Virginia, approximately 15 miles downstream from the dam. These gauges have provided coverage since 1929. The current USGS gauge at Hart Corner monitors flow over a watershed of approximately 463 square miles. Table 2-2 summarizes the records at these gauging stations and tabulates basic stream flow data for the dam site, which have been estimated using the gauge records as a guide for years prior to 1971, and the Partlow gauge data for years after 1977.

No river control structures exist on the North Anna River other than the dam described above.

There is one industrial user of water on the North Anna River downstream of the dam, Bear Island Paper Company, and this facility is located approximately 26 miles from the North Anna Power Station. There are no known industrial users of water on the Pamunkey River until it reaches the York River some 60 miles downstream at West Point, where a large pulp and paper manufacturing plant is located. There is one known potable water withdrawal on the North Anna River, the Hanover County Treatment Plant near Doswell. This plant is located approximately 24 miles downstream from the power station.

2.4.2 Floods The North Anna ISFSI is a flood-dry site due to the elevation of the site with respect to Lake Anna and the conservative design of storm drainage facilities within the local site area.

Local intense precipitation is the controlling case for storm drainage design.

2.4.2.1 Flood History Floods due to precipitation on the watershed of the North Anna River are the only flooding conditions applicable to historical consideration. Surges due to tropical systems, or tsunamis are not applicable to this site. The site is also not influenced by tidal effects. Gauge records have been available since the late 1920s at the USGS gauge near Doswell and in later years at Hart Corner (Reference 3). In this time the most serious flooding on the North Anna River that occurred took place in 1969 due to the remnants of Hurricane Camille (Reference 4). The second largest event on gauged record was in 1972 with the passing of the remnants of Hurricane Agnes through the watershed. Two smaller events occurred in 1928 and 1937 (Reference 5). The largest twelve floods on gauged record are listed in Table 2-3.

The average annual flood on the North Anna River near Doswell is approximately 7000 cfs.

Revision 806/14 North Anna ISFSI SAR 2-9 2.4.2.2 Flood Design Considerations A discussion of flood elevation levels compared to the ISFSI site is provided in Section 2.4.1.2. A discussion of the analysis of the Probable Maximum Flood and its basis is contained in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR. The effects of local intense precipitation have been taken into account in the design of the storm drainage system for the ISFSI site. Detailed discussion of this item is contained in Section 2.4.2.3.

2.4.2.3 Effects of Local Intense Precipitation The ISFSI site is at a higher elevation than the surrounding area as shown on Figure 2-8.

The site is drained by gradual fine grading away from the storage pads, and a combination of earthen, and concrete channels to the exterior of the site. The southern eight acres of the site are drained by a system of earthen and concrete trapezoidal channels, and the remainder of the site is drained via concrete culverts. This is shown on Figure 2-8. The drainage system was designed using a 10-year storm rainfall intensity. Storm drainage channels were checked and provided with additional depth to accommodate the 100-year storm (References 6, 7 & 8). These channels were checked to confirm that adequate hydraulic capacity existed in the storm drain system, and that the hydraulic grade line elevations were less than the top elevations of the storage pads. Since the storage pads are located at the highest part of the ISFSI, severe flooding or hydrodynamic loading due to floodwater is not credible based on the 100-year storm.

2.4.3 Probable Maximum Floods On Streams and Rivers Based on information presented in Section 2.4.3 and Appendix 2A of the North Anna Power Station UFSAR, the probable maximum flood on Lake Anna would result in a lake level of 264.2 feet msl at the Main Dam. The water level at the Power Station site was calculated to be 267.3 feet msl, including possible wave effects. The effects in the Sedges creek area of the Waste Heat Treatment facility would be similar to that in the main lake, however, the wave effects would be less due to decreased fetch. The ISFSI is sited at an elevation approximately 45 feet above the postulated PMF lake elevation.

2.4.4 Potential Dam Failures (Seismically Induced)

As stated in Section 2.4.4 of the North Anna Power Station UFSAR, there are no dams in existence on the North Anna River, other than the Lake Anna dam, either upstream or downstream. The only impoundments in the area would be small farm ponds whose failure would not produce any measurable effect on Lake Anna, the Lake Anna dam, or any safety-related systems. Thus, because the ISFSI is at a higher elevation than the station, the ISFSI is unaffected by flood levels due to seismically induced dam failures.

2.4.5 Probable Maximum Surge and Seiche Flooding Surge and seiche flooding effects are considered in coastal or tidal areas where cyclonic activity results in increased water levels. These increased levels are due to the momentum of the storm event and the reduction in volumetric flow area near the coast (References 9 & 10). The

Revision 806/14 North Anna ISFSI SAR 2-10 North Anna Power Station is approximately forty miles upstream from the confluence of the North Anna river with the South Anna near Doswell. The Pamunkey River becomes tidal in the region of the US 360 bridge approximately thirty-six miles downstream of this confluence. Surge effects would dissipate with distance from the coast, available storage of floodwater, elevation above sea level, etc. Therefore, surge flooding is not considered credible. Since the Power Station and the ISFSI site are not within an enclosed or semi-enclosed bay or harbor, seiche due to free oscillations is not applicable. Seiche due to forced oscillations is applicable primarily to coastal situations and as stated previously, the ISFSI site is inland.

2.4.6 Probable Maximum Tsunami Flooding Tsunami flooding is not a consideration for the North Anna site because of its inland location (Reference 9).

2.4.7 Ice Flooding As discussed in Section 2.4.1.2, the North Anna ISFSI is approximately 60 feet above the normal level of Lake Anna. The formation of ice on Lake Anna would not have an effect on the ability of the North Anna ISFSI site to drain properly.

2.4.8 Flooding Protection Requirements The ISFSI is situated well above the maximum water level occurring on Lake Anna. As stated in Section 2.4.1.2, the ISFSI site grade is 60 feet above the normal stillwater level of Lake Anna. There are no special precautions that need to be taken to protect SSSCs on the storage pads.

2.4.9 Environmental There are no liquid or gaseous releases that could result from operation of the North Anna ISFSI.

2.4.10 Subsurface Hydrology 2.4.10.1 Regional Characteristics and Site Characteristics The hydrologic boundaries of the North Anna Power Station site proper are Lake Anna on the north and east, Freshwater Creek approximately three miles to the west, and Elk Creek approximately four miles to the south. A description of groundwater conditions and onsite use are discussed in Section 2.4.13 of the North Anna Power Station UFSAR.

The hydrologic boundaries of the North Anna ISFSI site consist of a tributary to Sedges Creek to the west and south of the site, Canal A to the east, and Lake Anna to the north. The closest distance to Lake Anna to the north is located near the Unit 2 intake structure which is approximately 3000 feet away. The distance to Canal A is approximately 2500 feet to the east.

The closest distance to Lake Anna in the Waste Heat Treatment Facility is 1500 feet to the southeast. A tributary to Sedges Creek, however, varies from less than 100 feet to the west of the

Revision 806/14 North Anna ISFSI SAR 2-11 ISFSI to 1000 feet directly to the south of the ISFSI. Figure 2-9 depicts the ISFSI and its location with respect to the lake.

The elevation of rock surface varies at the ISFSI site from Elevation 272 feet msl to Elevation 245 feet msl. The groundwater generally moves along this rock surface until it exits the ground surface as springs, or into the lake. There are three permanent groundwater monitoring wells that have been installed onsite, one upgradient and two downgradient. The average groundwater elevation of the upgradient well is 296.3 feet msl. The average groundwater elevation of the southwesterly downgradient well is 289.0 feet msl. The average groundwater elevation of the southeasterly downgradient well is 280.3 feet msl. The average elevations cited are based on a three month period in which the readings were taken. The southwesterly gradient is approximately 0.01 ft/ft, and the southeasterly gradient is approximately 0.02 ft/ft. Using a horizontal coefficient of permeability of 10-6 cm/sec, an estimate of the seepage rate is between 1.5 and 3.0 gal/day/ft near the ISFSI. Groundwater from below the ISFSI site will tend to migrate towards the lake via springs, which will accumulate in the tributary stream to Sedges Creek. This groundwater will eventually move into the lake at the Sedges Creek arm of the Waste Heat Treatment Facility.

2.4.10.2 Onsite and Offsite Water Use Water for domestic use at the plant site is taken from groundwater wells. There are currently seven wells in use at the Power Station. The closest of these to the ISFSI site is approximately 1500 feet away to the east near the North Anna Nuclear Information Center (NANIC).

The closest offsite well to the ISFSI site is in a residential area approximately 3500 feet away to the south. As discussed in Section 2.4.10.1, the groundwater regime below the ISFSI site will tend to move water to the tributary of Sedges Creek directly to the south of the site, and eventually into the Lake. The wells in this residential area are drilled very close to the lake and the effects of the presence of the lake (hydrostatic pressure), and distance from the site would preclude any groundwater movement from the ISFSI to this location.

2.4.11 References

1. Site Environmental Studies, Proposed North Anna Power Station, Louisa County, Virginia, Dames & Moore.
2. Site Environmental Studies, North Anna Power Station Proposed Units 3 & 4, Louisa County, Virginia, Dames & Moore.
3. Water Resources Data for Virginia, U.S. Geological Survey Water-Data Reports, 1961 through 1993.
4. Flood of August 1969 in Virginia, U.S. Department of the Interior, Geological Survey, Water Resources Division, 1970.

Revision 806/14 North Anna ISFSI SAR 2-12

5. Floods in Virginia, Magnitude and Frequency, U.S. Department of the Interior, Geologic Survey, Water Resources Division, E. M. Miller, 1969.
6. Drainage Manual, Virginia Department of Transportation, 1989.
7. Applied Hydrology, Chow, Maidment and Mays, 1988.
8. Open Channel Hydraulics, Chow, 1959.
9. Handbook of Coastal and Ocean Engineering, Vol. 1, Wave Phenomenon and Coastal Structures, John B. Herbich, Editor.
10. Shore Protection Manual, Vol. 1, Coastal Engineering Research Center, Department of the Army, 1984.

2.5 GEOLOGY AND SEISMOLOGY 2.5.1 Basic Geologic and Seismic Information This section presents information developed from analysis of borings, laboratory tests and additional bedrock exposures at the ISFSI site. The geology and seismology for the North Anna Power Station as previously presented from the original plant licensing and other documents is discussed in Section 2.5 and Appendices 2B, 2C and 3E of the North Anna Power Station UFSAR. Also presented is a general update to Section 2.5 of the North Anna Power Station UFSAR based on geologic information developed over the last 15 to 20 years, including a reclassification of the basic Piedmont geologic nomenclature as a result of geologic mapping in the Northern Virginia Piedmont.

The results of additional subsurface investigation, laboratory testing, and geotechnical evaluation for areas south and east of Units 1 and 2 are summarized in a geotechnical report (Reference 39). This report provides geotechnical information from additional borings completed at locations along the alternate transport route.

2.5.1.1 Storage Site Geomorphology The ISFSI site is contiguous with that of the North Anna Power Station, and is collectively called the site hereinafter. The site is located within the Piedmont Plateau Province, which is characterized by an undulating, rolling topography with as much as 100 feet of relief in the general site area. The Piedmont Province is bounded on the east by the Atlantic Coastal Plain Province, some 15 miles east-southeast of the site, and the Blue Ridge Province to the northwest, some 40 miles distant from the site. Bedrock within the Piedmont is typically metasedimentary and metavolcanic, with some plutonic granitic rocks. The bedrock typically is deeply weathered into a saprolitic cover of up to 100 feet in thickness.

2.5.1.2 Geologic History of Storage Site and Surrounding Region The ISFSI site is located within an area of the eastern North American craton that has undergone extensive tectonism since Precambrian time. This has resulted in a complex pattern of

Revision 806/14 North Anna ISFSI SAR 2-13 regional folding and faulting. Three of the periods of tectonism in the Paleozoic era were the result of a collisional or accretionary tectonic style, while the last period of tectonism was generally a continental rifting, or extensional style of deformation. This last period of tectonism in the late Jurassic and early Triassic resulted in the formation of the numerous downfaulted Triassic basins that exist along the eastern margin of North America, from Connecticut to Georgia.

2.5.1.3 Specific Structural Features of Significance The ISFSI site lies adjacent to the North Anna Power Station upon a bedrock lithology mapped previously (Reference 1), and shown in Figure 2-10, as hornblende gneiss. The hornblende gneiss, which is the dominant lithology, is generally an interbedded sequence of hornblende gneiss, biotite granite gneiss and granite gneiss. As shown in Figure 2-10, the dominant lithology onsite is the interbedded hornblende gneiss/biotite granite gneiss/granite gneiss sequence, with the massive granite gneiss unit being subordinate. Both units as mapped onsite are part of the Ta River Metamorphic Suite, mapped and classified by Bobyarchick, et al.

(1981) (Reference 2). The Ta River occurs west of the Spotsylvania Lineament (a northeast-southwest trending aeromagnetic lineament described below), and is generally composed of amphibolites, amphibole gneiss and minor biotite granite gneiss and schist units.

The dominant structural features noted during detailed geologic mapping at the site in 1973 (Reference 1) are shown in Figure 2-10. The site is located on the northwest flank of a northeasterly trending, gently plunging (15 degrees) to the north, antiform. During the Paleozoic era, these rocks were deformed repeatedly and resulted in the polydeformational expression seen in the rocks today. Boundaries between the different units at the site were primarily affected by flexural slip folding during that era as the antiform was forming. The resulting deformation along one of these boundaries formed the Zone A Chlorite Seam that was the object of the very detailed geologic investigation in 1973 because of its location relative to Units 1 through 4 of the North Anna Power Station. Details describing this geologic investigation can be found in Section 2.5.2.4 of the North Anna Power Station UFSAR.

The closest fault to the site other than that described above is located near Mineral, Virginia, some six to seven miles west of the site. The fault has no surface expression and is known only from exposures in underground mine workings near Mineral. The known length of the fault is approximately 1000 feet, with a projected maximum length of several miles. If projected along its strike of N20°E, it would pass approximately 4-1/2 miles northwest of the site (Section 2.5.2.4 of the North Anna Power Station UFSAR).

The locations of recent borings drilled at the ISFSI site for purposes of developing subsurface information for foundation design and for confirming bedrock geology characteristics are shown on Figure 2-11. Figure 2-12 presents a subsurface cross-section of the bedrock and overlying soils beneath the storage pads. The bedrock encountered in the core retrieved from the borings confirms the previous bedrock mapping and interpretation made in 1973. Additionally, fractures identified in the core were consistent in both frequency and general orientation relative

Revision 806/14 North Anna ISFSI SAR 2-14 to the core as those observed and mapped in the excavations for Units 3 and 4 and elsewhere onsite in 1973. No structural zones similar to what was observed in Units 3 and 4 during the 1973 geologic investigation were observed in the core retrieved from the recent ISFSI borings.

Foliation observed in the core ranged from 35 to 50 degrees (interpreted to be dipping to the northwest based on previous mapping onsite).

Details regarding the recovery and rock quality designation (RQD) values are contained in Table 2-4. The boring logs and logs of the rock coring for the bedrock investigation, are provided in Appendix 2A.

A brief description of structural features of significance is provided below. Additional details regarding the site can be found in Section 2.5.3.1 of the North Anna Power Station UFSAR.

1. Hylas Zone In a section of the Piedmont and Triassic subprovince approximately 25 km west of Richmond, and to the south-southeast of the site, lies the Hylas zone which trends roughly northeast (Figure 2-13). This is a group of mylonitic rocks produced by late Paleozoic ductile shearing of pre-existing biotite gneiss, granite gneiss, and amphibolite. The rocks west of the Hylas zone (between Columbia and the Hylas zone), referred to as the Goochland complex, are metamorphosed sedimentary and igneous rocks consisting of biotite gneiss and schist, granite gneiss, amphibolite, and granite.

The Petersburg granite, a coarse-grained unit, bounds the eastern margin of the Hylas zone at Hylas and northeastward to the Taylorsville Basin. It is a two-feldspar muscovite-biotite granite with at least one poorly to moderately developed tectonic foliation. Emplacement of the Petersburg granite occurred prior to the formation of the Hylas zone since field mapping indicates mylonitic rocks are gradational into relatively unaltered granite (Reference 3).

Rocks in the Goochland complex west of the Hylas zone underwent at least two deformations (Dl, D2) prior to ductile shearing in the Hylas zone (D3). D3 was responsible for a mylonitic foliation (Sc) and a later widely-spaced shear cleavage (Ss) to be formed in rocks in the Hylas zone. At about 220 Ma, brittle deformation was superimposed on the Hylas zone in the form of high-angle faulting and locally intense fracturing (D4) which is probably equivalent to the Palisades disturbance of New England. D 4 was associated throughout the Piedmont with synchronous downwarping and dominantly continental sedimentation to form a series of parallel Triassic basins represented locally by the Richmond Basin. Northwest-oriented high-angle faults that apparently displace Triassic sedimentary rocks are interpreted to have occurred prior to the Late Cretaceous (Reference 3).

The Goochland complex underwent regional prograde metamorphism to amphibolite facies (M1) and included D1 and D2; structural elements that compose these deformational events consist mainly of oriented metamorphic minerals. Well-equilibrated microstructures seen in

Revision 806/14 North Anna ISFSI SAR 2-15 the gneiss suggest that the M1 peak persisted past D2. M1 is interpreted to have occurred approximately 340 Ma. During the late Paleozoic time, D3 was accompanied by retrograde metamorphism (M2) to greenschist facies in the Hylas zone. The Hylas zone may continue to the north in the Brandywine area of the Coastal Plain as indicated by Cenozoic reverse faulting 90 km along the strike of the Hylas zone (Reference 4). Current stress release beneath the Coastal Plain may be influenced by the Hylas zone and analogous fault systems throughout the Piedmont (Reference 2).

2. Stafford Fault System Various field investigations of the upper Mesozoic and Cenozoic deposits of the Inner Coastal Plain of Virginia between Washington, D.C. and Richmond, Virginia have revealed evidence of faulting of Coastal Plain beds. In 1976 Newell and others (Reference 5) recognized and described the Stafford fault system which is a series of end echelon, northeast striking, northwest dipping, high-angle reverse faults that displace both the Apostolic rocks of the Piedmont and the overlying Coastal Plain sediments. The Stafford fault extends for more than 33 miles along the Virginia Fall Line and the northeast-trending reach of the Potomac River. Mixon and Newell (1977) (Reference 6) believe that the position of the Stafford fault system supports the hypothesis that the Fall Line and major river deflections along it have been tectonically influenced (Reference 7).

Fault movement along the Stafford system began as compressional deformation at least as early as the Early Cretaceous. A detailed trench study of the Dumfries fault zone west of Stafford, Virginia is of special significance: Ordovician slate, phyllite, and schist have been thrust at a high angle over the lower Cretaceous Potomac Formation. Likewise, major deformation occurred in the middle Tertiary and pre-Choptank time. There is as much as 1-1/2 feet of reverse fault offset at the base of the upland gravel in an artificial cut near the US 1 highway bypass in south Fredericksburg, Virginia which indicates that at least some Pliocene deformation occurred along the Stafford system. Approximately 1.0 foot of fault offset of the base of high-level Rappahannock River terrace deposits by the Fall Hill fault, which is a major strand of the Stafford system, indicates middle to late Pliocene or, possible, younger faulting. (Reference 7)

Mixon and Newell (1977) (Reference 6) noted the alignment of zones of compressional faulting in the Maryland and Virginia Coastal Plain in linear zones of early Mesozoic extensional faulting in the Piedmont and in the crystalline basement beneath the Coastal Plain. The early Mesozoic extensional faults and the Coastal Plain compressional fault zones are, in turn, aligned with Paleozoic thrusts and shear zones in the underlying basement rock.

In Virginia, for example, the Stafford fault system is aligned with the border faults of the early Mesozoic Farmville basin trend and with the Spotsylvania magnetic lineament (Reference 5).

Revision 806/14 North Anna ISFSI SAR 2-16 During 1976, Dames & Moore (Reference 4) investigated the age and geologic origin of the Stafford fault system, which approaches the site at its closed point, approximately 22 km northeast in the vicinity of Fredericksburg. The detailed drilling, trenching and mapping program demonstrated that the youngest identifiable fault movement on any one of the four structures making up the Stafford fault system was pre-mid-Miocene in age, or more than 10 million years ago. Accordingly, the Stafford fault system is not capable in the meaning or intent of Appendix A to 10 CFR 100.

3. Spotsylvania Lineament The Spotsylvania lineament is a northeast-trending aeromagnetic anomaly that separates the Ta River and Po River Metamorphic Suites. To the west of the lineament, and where the North Anna Power Station is located, the Ta River rocks are characterized by linear, northeast trending medium to high intensity anomalies; however, to the east of the lineament, the Po River terrane is characterized by relatively lower intensity, north-trending anomalies.

Researchers believe that the Spotsylvania lineament represents a fault or system of faults to explain its regional linearity. Microstructures and field data indicate that the Spotsylvania lineament, if it represents a fault, formed during or before regional metamorphism (Reference 2).

Inasmuch as the Spotsylvania lineament is directly on strike with a projected extension of the Stafford fault system to the southwest, Dames & Moore (1977) (Reference 8) investigated the minimum age of the Spotsylvania lineament (then known as Neuschels lineament) by categorizing and mapping the extent and continuity of a Pre- or Early Cretaceous erosion surface across the extent of the lineament. Dames & Moores findings were that the lines of evidence discerned indicated a minimum age of movement of 100 million years (Early Cretaceous) if the lineament were indeed a fault zone, and that it is not structurally related to the Stafford fault system.

4. Mountain Run Fault Zone The Mountain Run fault zone (MRFZ) is a regional feature approximately 75 km in length. It is best defined as a physiographic feature, in the form of a northeast-trending linear fault-scarp, in the Unionville, Virginia quadrangle. The northern end of the MRFZ forms part of the southeast boundary of the early Mesozoic Culpeper basin. The scarp is held up by phyllonite which extends over a width of at least 2-1/2 km to the southeast of the scarp. On the northwest side of the scarp lies an alluvium-filled valley. The northwest side of this valley is a narrow zone of faulted and sheared rocks that form the northwest boundary of the MRFZ.

Mapping indicates that the MRFZ extends from about the Mesozoic basin near the Rappahannock River southwestward to near Charlottesville, Virginia (Reference 9).

On its southeast side, the MRFZ separates a thrust-faulted early Paleozoic (pre-440 Ma) melange terrane from a phyllite, slate, and limestone unit that uncomformably overlies the Precambrian Catoctin Greenstone; together these are considered as part of ancestral (pre-400 Ma) North America. Therefore, the MRFZ is thought to be a suture which

Revision 806/14 North Anna ISFSI SAR 2-17 juxtaposed a Cambrian island arc (Central Virginia volcanic-plutonic belt) and its associated fault-imbricated back-arc basin (melange terrane) onto or against ancestral North America in pre-440 Ma. In early Mesozoic time, part of the MRFZ was reactivated to partly delineate the southeast boundary of the Triassic-Jurassic Culpeper basin. According to Pavlides (1986)

(Reference 9), there may have been additional local reactivation within the MRFZ during the late Cenozoic time indicated by the recent (ca. 1986) discovery of a thrust fault within the MRFZ that offsets gravels of probably post-Pliocene age (Reference 9).

5. Giles County Zone A series of five extensional faults were recently uncovered in new excavation for landfill material adjacent to the New River in Giles County, Virginia, some 220 miles west-southwest of the site (Figure 2-13). The faults strike about N50°E and dip either northwesterly or southeasterly. The structures displace alluvial terrace deposits of suspected Tertiary or Quaternary age. Seismic monitoring in this part of the Valley and Ridge Province over the past 20 years indicate that earthquake foci are located at depths greater than 5 km (Reference 10).

2.5.1.3.1 Regional Geology The predominant lithologies in the region surrounding the site include rocks of the Central Virginia Volcanic-Plutonic Belt, the Ta River and Po River Metamorphic Suites and interlayered mafic and felsic metavolcanic rocks. The Falmouth Intrusive Suite and the Quantico Formation are rocks of the Central Virginia Volcanic-Plutonic Belt. The Falmouth Intrusive Suite is composed of fine-grained to pegmatitic granite, quartz monzonite, granodiorite, and tonalite and also consists of dike, sills and small plutons. This unit has been dated at about 300 to 325 Ma and locally intrudes the Ta River Metamorphic Suite and the Quantico Formation. The Quantico Formation is predominantly a slate and porphyroblastic schist. This unit contains gray to black, graphitic, pyritic phyllite and slate (in the northern Piedmont) whose metamorphic grade increases to the southwest to produce porphyroblastic staurolite-, kyanite-, and garnet-biotite-muscovite schists. This unit reaches a thickness of up to 3000 feet. The Quantico Formation is Ordovician in age and unconformably overlies older units in the northeastern Piedmont. It is correlated with the Arvonia Formation to the southwest (Reference 11).

The Ta River Metamorphic Suite is a layered sequence which consists mainly of greenish-gray to black, medium to coarse-grained, poorly to well lineated, massive to well-layered amphibolite and amphibole-bearing gneiss and schist. Likewise, this suite contains interlayered ferruginous quartzite, and minor biotite gneiss and schist, felsic volcanic rocks, gabbro and granite. The amphibolitic rocks commonly contain quartz-epidote lenses and veins.

The grade of regional metamorphism increases from northeast to southwest along strike as does the proportion of biotite gneiss and schist. Pavlides (Reference 12) correlated the Ta River with the James Run and Chopawamsic Formations, and considered the Ta River to be a more oceanward facies of a Chopawamsic island arc sequence, based on geologic and geochemical factors. The Ta River is Cambrian in age. The Quantico Formation generally overlies the

Revision 806/14 North Anna ISFSI SAR 2-18 boundary between the Ta River and the Chopawamsic, obscuring the contact relationships (Reference 11).

The Po River Metamorphic Suite, which lies to the east of the Ta River Metamorphic Suite, is characterized primarily by biotite gneiss with lesser amounts of hornblende gneiss and schist.

Furthermore, pegmatoid and granitoid dikes are abundant. The age of the Po River is uncertain, but may be considered Proterozoic Z and (or) early Paleozoic based on its stratigraphic position underlying the Ta River Metamorphic Suite and the Holly Corner Gneiss, both correlated with the Lower Cambrian Chopawamsic Formation. (Reference 12)

Ferruginous quartzites, which are distinctive local marker units, locally delineate map-scale structures in some places. This lithology is recognizable in rocks of variable degree of deformation and metamorphic grade; it has been mapped within the Ta River Metamorphic Suite and within correlative unnamed interlayered mafic and felsic metavolcanic rocks to the southwest. (Reference 11) 2.5.1.3.2 Regional Tectonics Since the time of the initial geologic investigation at the North Anna Power Station, two major tectonic models have emerged to explain the evolution of the central and southern Appalachians. The initial model was presented in 1972 by Hatcher, which proposed that the eastern Piedmont volcanics (Charlotte, Caroline Slate, Raleigh, and eastern slate belts) represented a late Precambrian to Early Ordovician island arc on the eastern edge of Laurentia.

An Andean-type orogeny during the Middle Ordovician-Silurian was presumed to have formed by westward subduction of oceanic crust. Collision with Africa, during Mid-Late Devonian to Permian, resulted from continued westward subduction and produced the Acadian and Alleghanian orogenies. Following Hatchers model in 1972, Odem and Fullagar and Rankin suggested models in which the Brevard zone along the Eastern Blue Ridge was a suture (Reference 13).

In 1978, Hatcher revised his earlier model increasing the number of sutures from one to three. Between 800 and 700 Ma, the basements of the Inner Piedmont and Charlotte/slate belts were thought to be continental fragments rifted from Laurentia. From about 700 to 450 Ma, subduction towards the west draped the outer fragment with Charlotte/slate belt volcanics.

Concurrently, the oceanic basins between the Laurentian continent/Inner Piedmont and Charlotte belt/slate belt fragments were closing, culminating in the Taconic Orogengy during the Middle/Late Ordovician. Oceanic crust continued to subduct to the west beneath the Charlotte/slate belt, which eventually closed the Iapetan Ocean. Continental collision with Africa took place in the Acadian/Alleghanian orogenies during the Late Paleozoic (Reference 13).

In 1980, Hatcher and Odom modified the 1978 model to include: Taconic collision between the North American craton and the Piedmont fragment; Acadian collision between the Piedmont-North American block and Avalonia; and the Alleghanian collision between Africa and Avalonia (Reference 13).

Revision 806/14 North Anna ISFSI SAR 2-19 Coney and others (1980) established the suspect terrane concept which was formalized in the western North American Cordillera. This concept initiated the beginning of a new tangent in the development of Appalachian tectonic models. In 1982, Williams and Hatcher published a paper on the accretionary history of the Appalachians, essentially discarding the model proposed by Hatcher in 1978 for the southern and central Appalachians, but added several new terranes thought to possibly be bounded by suture zones. Since that time, others have proposed that the southern and central Appalachians are divided into numbers of micro-terranes each bounded by possible sutures (Reference 13).

In 1982, Glover and others presented another model, different than the one proposed by Williams and Hatcher, to explain the tectonic configuration of the Appalachians. They concluded that the only suture in the Piedmont and the Blue Ridge of the central and southern Appalachians is the Taconic suture, based on the ages of ductile deformation and metamorphism in the central and southern Appalachians. The Taconic suture is found along the western boundary of the Kings Mountain belt in North Carolina and extends into Virginia along the western boundary of the Charlotte belt and Chopawamsic volcanics. Likewise, Glover and others believe that other sutures, of Acadian and/or Alleghanian ages, must lie under the Atlantic Coastal Plain or offshore in basement rocks (Reference 13).

In 1987, Hatcher further revised the Hatcher and Odom (1980) model to include the Penobscottian orogeny (early Cambrian to Early Ordovician) as an early stage in the collision of the Piedmont arc with the North American craton (Reference 13). Additional details regarding the regional tectonic characteristics of the area around North Anna Power Station can be found in Section 2.5.2.4 of the North Anna Power Station UFSAR.

2.5.1.4 Large Scale Geologic Map The locations of the structural feature discussed in Section 2.5.1.3 are shown in Figure 2-13.

2.5.1.5 Plot Plan and Site Investigations Soil borings and laboratory tests were performed as part of the development of the North Anna Power Station license application. The boring logs and site maps showing the boring locations are contained in Appendix 2C of the North Anna Power Station UFSAR. Additional borings and laboratory tests were performed in the area of the Service Water Reservoir. Results of these borings and tests are contained in Appendix 3E of the North Anna Power Station UFSAR.

An investigation consisting of soil test borings, rock coring, and laboratory tests was performed at the ISFSI site to identify and document site geotechnical conditions and to develop soil parameters required for evaluation of design requirements. Two soil test borings were performed in 2008 to support development of the alternate transport route. Results of the borings and rock coring are contained in Appendix 2A and laboratory tests are contained in Appendix 2B of this document.

Revision 806/14 North Anna ISFSI SAR 2-20 The geologic portion of the field investigation for the siting of the ISFSI at the North Anna Power Station consisted of:

1. The logging and preparation of bedrock boring logs for eight borings, using standard techniques; and
2. Examination of weathered bedrock exposures in a borrow pit west of the North Anna Power Station switchyard and close to a tributary arm of Lake Anna.

The purpose of the field geologic investigation was to ascertain the physical nature and characteristics of the bedrock from the cores retrieved from the borings, as well as the limited exposure afforded in the borrow pits, in order to compare them to previous onsite geologic investigations in 1973 and 1974. The field geologic investigation was performed by a geologist from Dames & Moore.

2.5.1.5.1 Field Investigation At the direction of Virginia Power, eight borings (F-4 through F-11) were drilled in June through July of 1994 at the proposed ISFSI storage pad locations as shown on Figure 2-11. The borings were located in plan and elevations by Stone & Webster surveyors. Boring F-2, drilled in April 1994 for a preliminary investigation and located at the North end of the center storage pad is also included herein. In addition, seven shallow borings designated P-l through P-7 were drilled along the original (main) transport route. The soil test borings were drilled by Froehling &

Robertson, Inc. (F&R) using a Central Mining Equipment (CME), Model 55 truck mounted drill rig by mechanically advancing continuous flight hollow stem augers into the soil. At regular intervals a standard 1.4-inch i.d., 2.0-inch o.d., 20-inch long split spoon sampler was driven into the soil with a 140 lb hammer falling 30 inches in accordance with American Society for Testing and Materials (ASTM) D1586 Standard Penetration Test (SPT) procedures (Reference 14). SPT results provide an indication of compaction, strength and support capacity of the soil. SPT tests were performed continuously to depths of 4.5 feet, from 6.0 to 7.5 feet, 9.0 to 10.5 feet, and at five-foot intervals thereafter to spoon or auger refusal (rock). Disturbed split-spoon samples were collected with each SPT and visually classified by a geotechnical engineer from Virginia Power.

The boring logs showing elevation and depth of samples, penetration resistances (blow count),

soil stratum description and Unified Classification, and groundwater information are contained in Appendix 2A.

Where borings could no longer be advanced with standard soil boring equipment, rock was cored. A water-cooled double-tube NX-size core barrel with diamond studded bit was used to secure the rock cores. The core recovery from each five foot long run was examined and classified by a geologist from Dames & Moore. The percent recovery, which is the ratio of the recovered length to the total length of run, was calculated for each run. The RQD was also calculated for each five-foot run. RQD is the ratio of the cumulative length of pieces of core greater than 4 inches long compared to the total length of run. RQD is an index to the soundness and quality of the rock. Core recoveries and RQD values for all core runs are contained on the boring logs and are provided in tabular form in Table 2-4.

Revision 806/14 North Anna ISFSI SAR 2-21 Split spoon samples are suitable for visual examination and classification (index) tests but are not sufficiently intact for quantitative laboratory testing. Six relatively undisturbed samples were obtained by forcing sections of 3-inch o.d., 16 gauge, steel tubing into the soil at the desired sampling levels. This sampling procedure is described by ASTM Specification D-1587 (Reference 15). Each tube, together with the encased soil, was carefully removed from the ground, made airtight, and transported to the laboratory. Locations and depths of undisturbed samples are shown on the boring logs. Five additional undisturbed samples were obtained by pushing sampling tubes into the soil using a backhoe bucket.

Five monitoring wells were installed at locations across the site. These wells consist of slotted well screens attached to 2-inch diameter PVC riser pipe. Filter sand was placed around the screen and a bentonite seal was placed above the well screen and sand. The annular space around the pipe and soil above the seal was filled to the surface with cement grout. Logs of the monitoring wells are also contained in Appendix 2A.

The locations o f the two soil test borings conducted by MACTEC Engineering and Consulting, Inc. in April 2008 along the alternate transport route are shown in Figure 2-18. These borings, designated B-713 and B-714, were each drilled to 20 feet depth. The borings were advanced by a CME 550x drill rig using hollow-stem augers with 4.25-inch inside diameter and a nominal 8-inch outside diameter. The soil was sampled using an SPT sampler at 2.5-feet intervals to 15 feet depth, with a final sample being taken between 18.5 to 20 feet depth. The SPT was performed using an automatic hammer, and was conducted in accordance with ASTM D 1586.

The recovered soil samples were visually described and classified by the MACTEC geotechnical technician. Pocket penetrometer (PP) tests were performed in the field on the lower end of the samples. No laboratory testing was performed on samples from these two borings, and no intact samples were collected. All of the borings were backfilled with a cement/bentonite grout upon completion.

2.5.1.5.2 Laboratory Testing The following tests were performed on selected split spoon, bulk, and undisturbed samples.

Results of the test are contained in Appendix 2B:

ASTM Reference Test Name of Test Standard No. Performed Particle (Gradation) Size Analysis D422 and D1140 16 and 17 19 Atterberg Limits D4318 18 3 Natural Moisture Content D2216 19 19 Moisture Density Determination D1557 20 2 California Bearing Ratio (CBR) D1883 21 6 Consolidation Test D2435 22 3 Triaxial Shear Test D2850 23 2 Unconfined Compression Test D2166 24 5 Constant Head Permeability D2434 25 1

Revision 806/14 North Anna ISFSI SAR 2-22 ASTM Reference Test Name of Test Standard No. Performed Note: 1 ASTM D2850 is the standard for the Unconsolidated Undrained Triaxial Shear Tests. One Consolidated Undrained Shear Test with pore pressure was also performed. Currently there is no ASTM standard for the Consolidated Undrained Shear Test.

2.5.1.5.3 Borrow Pit Exposure A borrow pit, located approximately 1000 feet west of the North Anna Power Station switchyard (Figure 2-10), was used to provide fill for a number of onsite projects over the last five to ten years. Its location in relation to a previously-mapped fold axis would have provided additional confirmation of the presence of the fold axis and the interpreted bedrock geology from saprolite exposures during the 1973 onsite geologic mapping.

During the onsite logging of the core retrieved from the ISFSI site borings, the borrow pit was visited by the geologist from Dames & Moore to map the exposed bedrock. The borrow pit, unfortunately, had been in-filled and graded to reclaim and replant the exposed saprolite slopes.

Enough exposed saprolite bedrock could be observed, however, to confirm that the interpreted bedrock at that location was indeed granite gneiss, and that the fold axis was within the exposure limits. It was observed that the fold axis, although not directly measurable because of the lack of complete exposure of the saprolite bedrock, would have been aligned in a northerly direction and plunging gently. This is consistent with the orientation of F2 folds in the Lake Anna East Quadrangle west of the Spotsylvania Lineament (Reference 1).

2.5.1.6 Geologic Profiles Based on the information gathered from the eight borings and associated sampling and testing obtained in June and July 1994, the following stratigraphic sequence is inferred to underlay the site.

Surface elevations, depth of residual soil and quality of rock varied moderately across the site. The materials encountered consist of residual soil derived from the in-place weathering of the parent metamorphic rock. The typical soil profile consists of clay minerals near the ground surface which were converted from the feldspars, micas, and ferro magnesian minerals contained in the parent rock. At depth, these minerals become less weathered and only partially altered, retaining their inter-particle bonding. Below the firm surficial clays and clayey silts (ML and MH), the soil grades from a fine sandy silt to a silty fine sand (SM to SP) with varying amounts of mica. The soils possess highly plastic fines in varying amounts, therefore, the characteristics of the fine grained soils and predominantly granular soils with some fines and mica are similar. The transition between the surficial fine grained soils and the more granular soils encountered with depth is gradual.

Revision 806/14 North Anna ISFSI SAR 2-23 The penetration resistances (SPT) are higher in the surficial clays and clayey silts, drop off in the highly micaceous silty soils, and pick back up in the sandy soil and decomposed rock above the less weathered parent rock. The deeper residual soils retain the original fabric or bonding of the parent rock and are termed saprolites. The saprolite retains the foliation of the parent rock along with interparticle bond. There is no well defined boundary between soil and rock, only a transition.

The generalized soil profile as encountered by the borings across the ISFSI site is as follows. The surficial fine grained clayey silts (ML and MH) extend to depths of 7 to 29 feet in all but two borings. In borings F-5 and F-8, the clayey silt extends all the way to rock. These soils are stiff to hard in consistency and possess good to excellent strength and support capacity.

The more granular sandy micaceous silt and micaceous silty fine sand (SM and SP) are encountered below the cohesive material and normally extend to rock. However, in two of the borings, F-9 and F-10, silty fine sand was present from the ground surface to the top of rock. This material was medium dense to very dense in consistency with only a few SPT results falling below 10 blows per foot.

As shown on the boring logs (contained in Appendix 2A), the lithologies penetrated by the borings are entirely consistent with those mapped and shown on Figure 2-10. The ISFSI is located entirely within a unit mapped as interbedded hornblende gneiss, biotite granite gneiss and granite gneiss, with the predominant lithology being hornblende gneiss.

Rock as defined by auger or spoon refusal and the initiation of rock coring was encountered at elevations varying from 245 to 272 feet. All of the cores retrieved, except for portions of Borings F-10 and F-4, were extremely weathered. Primary structures in the rock, however, are still recognizable. Table 2-4 provides a summary of the percent recovery and percent RQD values for all eight borings. Recovery varies from 0 to 95%, and RQD values vary from 0 to 35.8%.

Fractures are clearly observable, even in the most weathered of the cores. Typically, fractures vary from near horizontal to about 70 degrees from the vertical. Almost all fractures observed have iron and manganese staining on the fracture surfaces, indicative of groundwater flow. Slickensides were not observed on any of the fractures. This is not surprising, as the borings penetrate a rock mass away from those boundaries (such as Zone A) that underwent primarily flexural slip deformation during tectonism in the Paleozoic.

Foliation in the hornblende gneiss is well developed, with elongation of individual hornblende crystals. Foliation dip observed was between 35 and 50 degrees, which is consistent with the closest field observation point (Figure 2-10).

Groundwater was encountered at depths of 19 to 27 feet below existing grade (Elevation 289 to 296 feet) across the site several days after completion of individual borings. The groundwater level is at least 20 feet below the proposed final elevation of Elevation 311 feet.

Revision 806/14 North Anna ISFSI SAR 2-24 Figure 2-12 presents a geologic profile across the site showing the soil and rock stratigraphy as discussed above.

The soil profile interpreted from Borings B-713 and B-714 drilled for the alternate haul route in 2008 is shown in Figure 2-19. Very stiff sandy clay fill was encountered in the top 5 feet of B-713, reducing to about 3 feet at B-714. Below the fill, the native saprolitic soils extend to the bottom of the borings at 20 feet depth. The saprolite consists of medium dense sandy silt (ML) underlain by medium dense silty sand (SM). About 5 ft of clayey topsoil was encountered beneath the fill in B-713.

2.5.1.7 Plan and Profile Drawings Figure 2-8 shows the site grading plan. Figures 2-14, 2-15 and 2-16 show sections through the centerline of the three storage pads and details of cut and fill. As noted in the previous section, Figure 2-18 shows the subsurface profile along a section of the alternate transport route.

2.5.1.8 Local Geologic Features Affecting Site Location The location of recent borings drilled at the ISFSI site for the purposes of developing subsurface information for foundation design and for confirming bedrock geology characteristics are shown in Figure 2-11. Figure 2-12 presents a subsurface cross-section of the bedrock beneath the ISFSI storage pads. The bedrock encountered in the core retrieved from the borings confirms the previous bedrock mapping and interpretation made in 1973. Additionally, fractures identified in the core were consistent in both frequency and general orientation relative to the cores observed and mapped in the excavations for Units 3 and 4 and elsewhere onsite in 1973. No structural zones similar to those observed during the 1973 geologic investigation were observed in the core retrieved from the recent ISFSI borings. Foliation observed in the core ranged in depth from 35 to 50 degrees (interpreted to be dipping to the northwest based on previous mapping onsite).

Details regarding the recovery and RQD values, and the boring logs for the bedrock investigation, are found in Appendix 2A.

2.5.1.9 Site Groundwater Conditions The depth to the water table was measured in each of the borings taken in June and July 1994. The depth to the ground water was 19 to 27 feet (Elevation 289 to 296 feet). Water levels in groundwater monitoring wells three months after installation varied from Elevation 280 to 296 feet which is consistent with water levels obtained initially. No water was encountered in the two borings drilled in the alternate transport route (maximum depth of drilling was 20 feet).

Site groundwater conditions are discussed in Section 2.4.2. Additional groundwater information is provided in Section 2.4 of the North Anna Power Station UFSAR.

Revision 806/14 North Anna ISFSI SAR 2-25 2.5.1.10 Geophysical Surveys and Studies Section 2.5 of the North Anna Power Station UFSAR summarizes geophysical surveys and studies which have been performed to evaluate the stratigraphic structure and bedrock in the region of the North Anna Power Station.

2.5.1.11 Engineering Properties of Soil and Rock The static and dynamic engineering properties of the site are described in this section. The engineering properties of the weathered rock (saprolite) and crystalline rock are described in Section 2.5.4.3 of the North Anna Power Station UFSAR, and further referenced in Appendices 2B and 2C of the North Anna Power Station UFSAR.

Physical property tests conducted on the saprolitic soils and fresh rock included:

  • Dry density tests on selected samples
  • Moisture Content Tests
  • Triaxial Compression on undisturbed samples
  • Particle Size Analysis (Gradation)
  • Consolidation Tests on undisturbed samples
  • Cyclic Triaxial Tests
  • Shock Scope Tests Additional onsite investigations that provide information on seismic wave propagation properties of the subsurface saprolite and rock included:
  • Birdwell 3D Seismic Logs
  • A Refraction Seismic Survey of the site area C
  • A Cross Hole Shear Wave Survey of the rock supporting the reactor containments Soil and rock properties defined by the borings and laboratory test results at the ISFSI site are contained in Appendices 2A and 2B. The properties developed from the ISFSI site investigation compare closely to the properties previously documented in the North Anna Power Station UFSAR and other references provided below.

Shear strength tests consisting of Unconfined Compression Test and Unconsolidated Undrained Triaxial Shear tests performed on the partially saturated surficial clayey silts (ML and MH) indicated these soils possess a cohesion (c) of 1500 psf and an angle of internal friction ()

of 15 degrees for the total stress condition. This compares closely with an average c of 1800 psf and of 14.5 degrees obtained on extensive testing at the main dam site (Reference 26).

Consolidated Undrained Triaxial Shear test on the more granular silty sand (SM) encountered at a greater depth and near below the water table yield a cohesion of 700 psf and a

Revision 806/14 North Anna ISFSI SAR 2-26 of 27 degrees for the effective stress condition. This compares closely with a c of 720 psf and a of 26 degrees previously obtained and used as design parameters (Reference 26).

Consolidation Tests performed on samples of residual soil did not exhibit the sharp curvature or break-in-slope usually present in over-consolidated deposited soils. The test results on the surficial soils tested (4 to 6 feet) show a slight curvature, but no distinctive break. This is probably the result of sample disturbance or rebound due to stress changes during and after sampling or both.

The deeper sample (F-7A, 16 to 18 feet) which classifies as a SM, is predominantly granular. Consolidation tests performed on material shows significant curvature at slightly less than the expected overburden pressure. Disturbance may also be present in this sample.

For these reasons results of these Consolidation Tests were not used in estimating settlement on this project. Results of previous testing on similar material from the same geologic formation was used. An average Recompression Ratio of 0.024 was used to estimate consolidation settlement. An average initial target modulus (Es) of 500 ksf was used in elastic settlement estimates (Reference 27).

The average unit weight and natural moisture content as determined from the laboratory tests contained in Appendix 2B are 100 pcf and 36% respectively. The vertical permeability, as obtained from a constant head permeability test, was 4 x 10-7 cm/sec, which compares closely with previously developed permeabilities.

Results of CBR tests performed for this project were compared to corresponding values for Modulus of Subgrade Reactor (ks) provided by a chart giving the interrelationship of soil classifications and bearing values (Reference 28). The average unsoaked CBR of the near surface soils was 39 and soaked 7.5. The corresponding ks from the chart was 375 pci and 175 pci which is higher than the conservative ks of 115 pci (100 tcf) for saprolite as described in Section 3.8 of the North Anna Power Station UFSAR.

No new testing was performed on the rock encountered at the ISFSI site. Due to the depth of the rock and the very small increase in loading which the storage pad and SSSC would impose on the rock, the physical properties of the rock are not a factor. Rock was encountered at sufficient depth as not to be an influence in bearing capacity or settlement. The rock is competent and possesses no solution cavities, sink holes, voids or caverns.

No new dynamic testing was performed during the investigation for the ISFSI since the results of recent borings and laboratory tests were similar to those previously obtained and documented at the station and main dam site. Dynamic soil and rock properties for the site are contained in Section 2.5 of the North Anna Power Station UFSAR. A shear modulus (G) of 19,800 psi and Poissons Ratio () of 0.3 were used in design of the storage pads.

Revision 806/14 North Anna ISFSI SAR 2-27 2.5.1.12 Analysis Techniques and Calculated Results The factor of safety against a bearing capacity failure is defined as the ratio of the net ultimate soil bearing capacity to the net applied foundation bearing pressures. The static factor of safety considered the total dead and live loads acting on the structure. A minimum safety factor of 3.0 was established as the design criterion. The ultimate bearing capacity was calculated using conventional bearing capacity equations for shallow strip footings and the appropriate bearing capacity factors for the soil parameters present (Reference 29). Bearing capacity for a wide footing is normally not critical unless the footing is subject to very heavy load and a high water table and/or very soft or loose soil conditions exist. The factor of safety against a bearing capacity failure calculated for the storage pad bearing on the stiff residual soil was significantly in excess of the required factor of 3.

Settlement was estimated by calculating the immediate elastic settlement and long-term consolidation settlement of the underlying residual soil. The elastic and consolidation settlement occur at different times but are additive. However, settlement calculations utilizing the classical consolidation theories which were developed for saturated sedimentary soils are generally not appropriate for the partially saturated residual soils. Consolidation theory considers the soils to be cohesive, homogeneous and isotropic. The residual soils encountered below the storage pads are only partially saturated, are highly variable and possess an interparticle bond related to the weathering of the parent rock, not the clay ion bond. Previous estimates of settlement of residual soils using consolidation theory have not agreed closely with the actual documented settlement which occurred at various structures onsite.

Therefore, settlement calculations were also performed using empirical equations developed by Schmertmann and others and utilizing results of correlations between STP and in-situ pressuremeter tests in residual soils (Reference 30). Based on results obtained from the two different methods, it is estimated that a total settlement of less than 1-1/2 inches will occur under full load. This estimate assumes that only 5 feet of overburden will be removed. Six and a half to ten feet (for pad 1) of overburden will be removed prior to construction of the storage pads, which would reduce the amount of settlement that would occur. This estimate assumes that the total load will be placed on the soil in one increment, which is a very conservative assumption. The time rate of loading will decrease the actual effect of any settlement that does occur, since it will take over nine years after the initial SSSC is placed for the storage pads to be fully loaded. The settlement will occur in small increments as the SSSCs are placed on the storage pads.

2.5.2 Vibratory Ground Motion This section of the report describes the principal bases of the seismologic studies for Units 1 and 2 of the North Anna Power Station, and provides the framework for which the design-basis earthquake and its associated vibratory ground motion were evaluated. Additional reference is made to studies to evaluate the engineering properties of materials and their effect on seismic wave propagation and soil structure interaction.

Revision 806/14 North Anna ISFSI SAR 2-28 2.5.2.1 Engineering Properties of Materials The static and dynamic engineering properties of the site are described in Section 2.5.1.11.

2.5.2.2 Seismic History A complete description of the seismic history of the site areas, as well as a summary of all significant earthquakes to the establishment of the design basis earthquake for North Anna Power Station Units 1 and 2, are presented in Appendix 2B of the North Anna Power Station UFSAR.

Table 2-5 and Figure 2-17 in this report provide an updated chronological listing (through January 1994) and a regional epicenter map, respectively, for an area of 200-mile radius around the site.

The eastern United States is generally divided into four basic geologic-tectonic provinces:

the Valley and Ridge, the Blue-Ridge, the Piedmont and the Coastal Plain. All four of these provinces are characterized by a general northeast-southwest trend. The Valley and Ridge is dominated by a structural style of large anticline-syncline structures which are further complicated by faulting, igneous intrusions and the development of terrestrial sedimentary basins (Reference 1).

The Piedmont Province is a large northeasterly-trending elongated group of crystalline rocks extending for approximately 800 miles (1288 km) from Alabama to New Jersey. This province is primarily characterized by metamorphosed sedimentary and volcanic rocks deformed into anticlinoria and synclinoria whose major axes parallel the dominant northeasterly trend of the province (Reference 1). The North Anna site is located in the north-central portion of Virginia within the Piedmont Province.

The historical record of earthquakes in the Appalachian region of the United States reveals significant differences in the seismic characteristics between the individual provinces. Generally, the activity occurs parallel to the regional structure and primarily in the Valley and Ridge and Blue Ridge Provinces northwest of the Piedmont Province (References 31, 32 & 33). Earthquakes are found to occur with less frequency in the Piedmont Province than in the adjacent provinces.

Furthermore, none of the historical earthquakes in the Piedmont province in particular, or in the Appalachian region in general, have been reported to have caused surface displacement. There are three principal geographic zones in the Piedmont and Coastal Plain Provinces where there is a tendency for epicenter clustering. One recognizable geographic cluster of activity is in the South Carolina-Georgia region (Piedmont-Coastal Plan), and another is in central Virginia (Piedmont Province). The third apparent cluster of activity is along the Fall Zone (Coastal Plain and Piedmont boundary) in the Delaware-New Jersey region.

The clustering of activity in Central Virginia is referred to as the Central Virginia Seismic Zone (Reference 31) and includes the North Anna site on its northern boundary. The principal activity in this zone is some 30 miles (48 km) south of North Anna, following an east-west trend.

There have been 22 earthquakes of Modified Mercalli (M.M.) intensity V to VI reported within 100 miles (161 km) of the site since the end of the 18th century (Reference 34). The Central

Revision 806/14 North Anna ISFSI SAR 2-29 Virginia Seismic Zone has historically exhibited a low level of activity (2 to 10 shocks per decade), with most shocks having M.M. intensity levels of III to V.(31) Based on historical seismicity, the largest intensity shock that has occurred in the immediate site area (within 30 km) is approximately M.M. V (Figure 2-17).

The most significant earthquake in the region of the station affecting its design occurred near the Richmond Basin in 1774 (Intensity VI-VII), and near the Arvonia Syncline in 1875 (Intensity VII). These shocks and related zones of earthquake activity are both located within 50 miles of the site, and are believed to be associated with faulting in their respective basin-like structures. Additional earthquakes of epicentral intensity V occurred on December 11, 1969, near Richmond, Virginia (37.8°N 77.4°W) and on March 15, 1991, west of Richmond in Goochland County, some 37 km south-southwest of the site (Reference 35).

The 1875 shock was probably felt in the vicinity of the site, with an intensity approaching V. The 1774 shock cannot be accurately projected to the site area because of the lack of information, but it is believed that ground motion at the site did not exceed a few percent of gravity. The 1969 shock was perceptible over a 3500 square-mile area. A study of the recent land forms in the site area does not reveal any adverse features such as faulting, slides, or areas of instability or brecciation that could have been caused by these shocks or from earlier earthquake shocks.

Additional details on seismic history are found in Appendix A to the North Anna Power Station Units 1 and 2 PSAR.

2.5.2.2.1 Microearthquake Monitoring Dames & Moores geologic investigation of the fault zone at the North Anna Power Station indicated that the zone had not experienced movement for the past 500,000 years, and was not in a critical state (Reference 1). None of the historic earthquakes in the Piedmont Province are known to have caused faulting at or near the surface. The fault zone underlying the reactor containment buildings and the fault zone underlying the North Anna dam appear to be of limited extent, and not structurally related to, or a continuation of, any known fault. No seismic activity, either instrumentally recorded or historically determined, can be shown to have any direct tectonic relationship to these fault zones. The closest zone of activity is 30 miles (48 km) south of the lake (Central Virginia Seismic Zone). No topographic expression of recent faulting has been observed in the vicinity of the lake. Due to the absence of definite earthquake-tectonic correlations for the region, it is not surprising that no activity was found associated with the fault zone, nor associated with the impoundment of Lake Anna.

As a means of demonstrating this observation, the NRC required confirmatory microearthquake monitoring of the area around the site and Lake Anna. Phase I and Phase II (permanent) monitoring occurred at the site between January 21, 1974 through August 1, 1977.

No microearthquake detected in the three and one-half years of monitoring was associated either with the fault onsite or related to the impoundment of Lake Anna. Four stations of the original

Revision 806/14 North Anna ISFSI SAR 2-30 17-station monitoring network were incorporated into Virginia Techs Central Virginia Monitoring Network for the specific purpose of monitoring any changes in seismicity in the region of the North Anna Power Station. To date, no changes have been observed that would contradict the conclusions reached in 1977 regarding the lack of association of microearthquakes with Lake Anna or with the fault at the North Anna Power Station (Reference 36).

2.5.2.3 Design Basis Earthquake The North Anna Power Station Units 1 and 2 Preliminary Safety Analysis Report and design were completed prior to the promulgation of Appendix A to 10 CFR 100. Consequently, the term design-basis earthquake, as used in this report, has the meaning it had prior to December 1973 when Appendix A to 10 CFR 100 became effective.

The design basis earthquake (DBE) for the North Anna Power Station Units 1 and 2 was established by assuming that an earthquake equivalent to the largest shock associated with the Arvonia Syncline might occur close to the North Anna site area. With the epicenter of a shock similar to the 1875 MM I-VII moved to the vicinity of the site, it was estimated that the maximum horizontal ground acceleration at rock surface would be less than 0.12g.

Accordingly, the design basis earthquake for Seismic Class I structures founded on rock was established as 0.12g for horizontal ground motion, and two-thirds (0.08g) that value for vertical ground motion.

For Seismic Class I structures founded on rock, analyses for earthquake motion were made using response spectra developed by enveloping the response spectra, for various degrees of damping, of the east-west and north-south components of the Helena (1935) earthquake and the southeast component of the Golden Gate record of the San Francisco (1957) earthquake, all normalized to 0.12g for the DBE. For Seismic Class I structures founded on saprolite more than 15 feet thick, these analyses for earthquake motion were normalized to 0.18g for the DBE to provide for calculated amplification through the overburden. The response spectra are shown on Figures 2.5-12 and 2.5-14 of the North Anna Power Station UFSAR.

The amplification of earthquake motion through the overburden was computed using a lumped-mass spring system with model superposition.

Based on the two-to-three pulses of strong ground motion for the San Francisco, California (1957), and Helena, Montana (1935), earthquakes, a conservative estimate of strong ground motion pulses to be experienced at the North Anna site is four to five pulses of strong ground motion for the operating-basis earthquake and eight to ten pulses of strong ground motion for the design-basis earthquake.

The results of the regional seismicity and structural geologic update for this report have not provided any basis for modifying the original seismic design basis for the site. Additionally, continued seismic monitoring in the region surrounding the site over the last 20 years has not provided any basis to associate the minor seismicity of the region with either Lake Anna or the

Revision 806/14 North Anna ISFSI SAR 2-31 fault at the North Anna Power Station. The North Anna Power Station seismic design provides adequate conservatism for seismic Class I Structures at the North Anna Power Station.

2.5.3 Surface Faulting Surface faulting and capable faults are addressed in Section 2.5.2.2.

2.5.4 Stability of Subsurface Materials The geologic features, seismicity, groundwater conditions, and soil and rock characteristics are addressed in Section 2.5.1 and Appendices 2A and 2B. The earthquake design basis is addressed in Section 2.5.2.

The storage pads and new portions of the original (main) transport route will be undercut a minimum of 18 inches and be brought up to grade with a compacted dense graded crushed aggregate fill. Random soils across the site will be used to construct leveling fills, slopes and berms. The soil fill will be placed in a controlled compacted manner.

Portions of the alternate transport route were constructed using both cut and fill. Alternate transport route areas were proof-rolled prior to road construction to determine subgrade conditions and stability. Portions of the alternate transport route with soft or unsuitable materials were replaced with soil and/or sand/gravel fill, and additional subgrade stabilization was provided, as required, by a 3 inch layer of crusher-run stone. Rock encountered during cut was removed to a depth of 6 inches below finished subgrade and replaced with suitable fill. Soil and sand/gravel fill was placed in a controlled and compacted manner.

Liquefiable soils consist primarily of loose sands at or below the water table which have low overburden or confining pressures, or highly sensitive clays. The fine grained soils encountered at the ISFSI site possess significant cohesion or inter-particle bond from the relic rock structure of the parent rock. Even the granular soils possess relatively high percentages (25% to 50%) of fine grained silt and clay size particles. The grains are also angular or sub-angular, not rounded or sub-rounded as deposited soils tend to be. Only one STP taken in the predominantly granular soils below the water table had a penetration resistance below 10 blows per foot, which would classify the soil as loose. Liquefaction at the Service Water Reservoir (SWR) was addressed in Section 3.6 of Appendix 3E of the North Anna Power Station UFSAR. It was concluded that liquefaction would not occur under the DBE of 0.18g. As stated, the soils encountered at the ISFSI site are similar to those encountered at the reactors, the Service Water Reservoir and the main dam. The soils encountered at the ISFSI site are a product of weathering of the same parent rock.

Dr. James Martin at Virginia Polytechnic Institute was retained by Virginia Power to evaluate the liquefaction potential for a horizontal earthquake acceleration of 0.30g at North Anna (Reference 38). This acceleration value is 2/3 higher than that generated by the DBE. His report concludes that liquefaction of the residual soils at the North Anna site will not occur under this horizontal earthquake loading.

Revision 806/14 North Anna ISFSI SAR 2-32 2.5.5 Slope Stability The ISFSI site will utilize both cut and fill to obtain final grade. A berm will be constructed across the front of the site. Soil fill will be utilized to construct portions of the original (main) transport route. Cut and fill slopes will not be steeper than two horizontal to one vertical (2H:lV).

Proper compaction of onsite soils as required by specifications will ensure that the design parameters are achieved. The soils that comprise the cut or fill slopes are highly erodible, therefore, care will be taken to grade and seed the slopes to minimize the effects of erosion.

Soil and/or sand/gravel were used to construct portions of the alternate transport route. Cut and fill slopes were not steeper than two horizontal to one vertical (2H:1V). Proper compaction of soil and/or sand/gravel fill ensured that design requirements were achieved. Compliance with applicable jurisdictional requirements for soil erosion and sediment control including dust abatement, were implemented to minimize soil erosion.

2.5.6 References

1. Supplemental Geologic Data, North Anna Power Station, Louisa County, Virginia, Dames &

Moore, 1973.

2. Bobyarchick, A. R., Pavlides, L, and Wier, K., 1981, Piedmont Geology of the Ladysmith and Lake Anna East Quadrangles, and Vicinity, Virginia, U. S. Geological Survey Map I-1282, scale 1:24,000.
3. Bobyarchick, A. R. and Glover, L. III, 1979, Deformation and Metamorphism in the Hylas Zone and Adjacent Parts of the Eastern Piedmont in Virginia, Geological Society of America Bulletin, Part 1, v. 90, pp. 739-752.
4. Geologic Investigation of the Stafford Fault Zone, for Potomac Electric and Power Company, Dames & Moore, 1976.
5. Newell, W. L., Prowell, D. C. and Mixon, R. B., 1976, Detailed Investigation of a Coastal Plain - Piedmont Fault Contact in Northeastern Virginia, U. S. Geological Survey, Open File Report No.76-329.
6. Mixon, R. B. and Newell, W. L., 1977, Stafford Fault System: Structures Documenting Cretaceous and Tertiary Deformation Along the Fall Line in Northeastern Virginia, Geology, Vol. 5, pp. 437-440.
7. Mixon, R. B., Powars, D. S., Daniels, D. L., 1992, Nature and Timing of Deformations of Upper Mesozoic and Cenozoic Deposits in the Inner Atlantic Coastal Plain, Virginia and Maryland, Proceedings of the 1988 U. S. Geological Survey Workshop on the Geology and Geohydrology of the Coastal Plain, ed. G. S. Cohn, U. S. Geological Survey Circular 1059, pp. 65-73.

Revision 806/14 North Anna ISFSI SAR 2-33

8. Report, Lateral Continuity of a Pre- or Early Cretaceous Erosion Surface Across Neuschels Lineament, Northern Virginia, for Virginia Electric and Power Company, Dames & Moore, 1977.
9. Pavlides, Louis, 1986, Mountain Run Fault Zone of Virginia, in Jacobesen, M. L. and Rodriguez, T. R., compilers, National Earthquake Reduction Program, Summaries of Technical Reports Volume XXIV, U. S. Geological Survey Open-File Report 87-63, pp. 93-94.
10. Law, R. D., Pope, M. C., Wergart, R. H., Bollinger, G. A. and Whitmarsh, R. S., Geologically Recent Near-Surface Folding and Faulting in the Valley and Ridge Province: New Exposures of Extensional Faulting in Alluvial Sediments in Giles Co., Virginia, BSSA Annual Meeting Proceedings, October 1994.
11. Rader, E. K. and Evans, N. H., editors, 1993, Geologic Map of Virginia - Expanded Explanation, Virginia Division of Mineral Resources, 80 p.
12. Pavlides, Louis, 1980, Revised Nomenclature and Stratigraphic Relationships of the Fredericksburg Complex and the Quantico Formation of the Virginia Piedmont, U. S.

Geological Survey Professional Paper 1146, 29 p.

13. Glover, Lynn III, 1989, Tectonics of the Blue Ridge and Piedmont Field Trio Guidebook T363, American Geophysical Union, 59 p.
14. American Society for Testing and Materials, ASTM, D1586-84, Penetration and Split-Bond Sampling of Soils.
15. American Society for Testing and Materials, ASTM, D1587-83, Thin-Walled Tube Sampling of Soils.
16. American Society for Testing and Materials, ASTM, D422-63, Particle Size Analysis of Soils.
17. American Society for Testing and Materials, ASTM, D1140-54, Amount of Material in Soil Finer Than the No. 200 (75 mm) sieve.
18. American Society for Testing and Materials, ASTM, D4318-84, Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
19. American Society for Testing and Materials, ASTM, D2216-90, Laboratory Determination of Water (Moisture) content of Soil and Rock.
20. American Society for Testing and Materials, ASTM, D1557-78, Moisture Density Relations of Soils and Soil Aggregate Mixtures Using 10 lb (4.54 kg) Rammer and 18 in. (457 mm)

Drop.

21. American Society for Testing and Materials, ASTM, D1883-87, CBR (California Bearing Ratio) of Laboratory-Compacted Soils.

Revision 806/14 North Anna ISFSI SAR 2-34

22. American Society for Testing and Materials, ASTM, D2435-90, One-Dimensional Consolidation Properties of Soil.
23. American Society for Testing and Materials, ASTM, D2850-87, Unconsolidated, Undrained Compressive Strength of Cohesive Soils in Triaxial Compression.
24. American Society for Testing and Materials, ASTM, D2166-91, Unconfined Compression Strength of Cohesive Soil.
25. American Society for Testing and Materials, ASTM, D2434-68, Permeability of Granular Soils (Constant Head).
26. Design and Stability of North Anna Dam, Stone & Webster Engineering Corp., May 1971.
27. Settlement of the Service Water Pump House North Anna Units 3 & 4, Stone & Webster Engineering Corp., March 1976.
28. Thickness Design for Concrete Pavements, Portland Cement Association, 1966.
29. Foundation Engineering Handbook, Winterkorn & Fang, Van Nostrand Reinhold Co., 1975.
30. Roy E. Martin, Estimating Foundation Settlement in Residual Soils, ASCE Geotechnical Journal, March 1977, p. 197-212.
31. Bollinger, G.A., 1973; Seismicity and Crustal Uplift in the Southeastern United States; American Journal of Science, Vol. 373-A, pp. 396-408.
32. Preliminary Safety Analysis Report, Section 2.5, Fulton Generating Station Units 1 and 2, Philadelphia Electric Co., Dames & Moore 1972.
33. Supplemental Geologic Investigation, Virgil C. Summer Nuclear Station, Unit 1, Fairfield County, South Carolina, for South Carolina Electric & Gas Co, Dames & Moore, 1974.
34. Site Environmental Studies, Proposed Units 3 and 4, North Anna Power Station, Louisa County, Virginia, Dames & Moore, 1971.
35. Southeastern United States Seismic Network Bulletin, Nos. 1 through 28; Compiled and edited by Seismological Observatory at Virginia Polytechnic Institute and State University, Blacksburg, Virginia (1977 through 1993).
36. Summary Report of Microearthquake Monitoring at North Anna Power Station, January 24, 1974 through August 1, 1977, Dames & Moore, 1977.
37. Chapman, M.D. and Krimgold, F., 1994; Seismic Hazard Assessment for Virginia; Report for Virginia Department of Emergency Services and Federal Emergency Management Agency, Virginia Tech Seismic Obs., 62p.
38. Martin, J. R., 1994; Soil Failure/Liquefaction Susceptibility Analysis For North Anna Power Station Seismic Margin Assessment.
39. Geotechnical Report, North Anna Unit 3 - Site Separation Project, Louisa County, Virginia; Bechtel Power Corporation, December 2009.

Revision 806/14 North Anna ISFSI SAR 2-35 Table 2-1 DISPERSION FACTORS (/Q) IN ACCORDANCE WITH REGULATORY GUIDE 1.145 Distance /Q Sector (meters) (sec/m3)

N 2033 6.61 x 10-5 NNE 2113 6.85 x 10-5 NE 2055 7.74 x 10-5 ENE 1867 6.45 x 10-5 E 1606 1.16 x 10-4 ESE 1335 2.01 x 10-4 SE 1100 3.15 x 10-4 SSE 948 1.77 x 10-4 S 847 1.10 x 10-4 SSW 818 1.03 x 10-4 SW 836 9.30 x 10-5 WSW 919 8.43 x 10-5 W 1067 8.53 x 10-5 WNW 1281 7.04 x 10-5 NW 1556 5.24 x 10-5 NNW 1820 4.42 x 10-5

Revision 806/14 North Anna ISFSI SAR 2-36 Table 2-2

SUMMARY

OF USGS GAUGING STATION RECORDS AND ESTIMATED STREAM FLOW DATA FOR THE NORTH ANNA DAM River Drainage Area Period of Discharge (cfs)

Location (sq.mi.) Record a Average Minimum Maximum USGS gauge 439 1929-1971 382 b 1c 24,800 d at Doswell USGS gauge 439 1972-1992 399 e 35.5 f 23,300 g at Doswell North Anna 343 1929-1971 300 h lh 19,500 h Dam North Anna 343 1978-1999 288 i 25 j 11,700 k Dam

a. Dam was closed January 1972.
b. Average discharge for 41-year period.
c. Date of discharge: September 30 to October 2, 1932.
d. Date of discharge: August 21, 1969.
e. Average discharge for 21-year-period since 1971.
f. Date of Discharge: October 8, 1991.
g. Date of Discharge: June 22, 1972.
h. Estimated.
i. Average Discharge since Partlow gauge has been in operation.
j. Date of Discharge: August 1, 1988.
k. Date of Discharge: February 26, 1979.

References 3, 4 and 5

Revision 806/14 North Anna ISFSI SAR 2-37 Table 2-3 FLOODS ON THE NORTH ANNA RIVER Volume of Direct Peak Flow at Runoff at Doswell Flood Period Doswell (cfs) (acre-feet)

August 12, 1928 18,400 April 24-29, 1937 18,300 81,400 October 17, 1943 11,600 August 12-25, 1955 12,400 54,700 August 20-23, 1969 24,800 141,000 June 20-22, 1972 23,300 107,200 Sept. 21-30, 1975 11,600 77,870 Feb. 22-March 3, 1979 11,700 73,131 March 27-April 3, 1984 11,700 78,229 Nov. 1-11, 1985 10,700 55,625 March 27-April 2, 1994 12,000 85,600 Sept. 5-13, 1996 11,600 61,380

l. References 3, 4 and 5

Revision 806/14 North Anna ISFSI SAR 2-38 Table 2-4 RECOVERY AND RQD VALUES OF BORINGS Boring Run From To Inches Recovery Percent No. No. (Feet) (Feet) Recovered Percent RQD F-4 1 49.1 54.1 13 21.6 0 2 54.1 59.1 47 78.3 40 F-5 1 64.5 69.5 0 0 0 2 69.5 74.5 8 13.3 0 3 74.5 79.5 2 3.3 0 4 79.5 84.5 0 0 0 5 84.5 89.5 4 6.6 0 6 89.5 94.5 0 0 0 7 94.5 99.5 0 0 0 8 99.5 104.5 0 0 0 9 104.5 109.5 30 50 0 10 109.5 114.5 48 80 0 F-6 1 44.0 49.0 0 0 0 2 49.0 54.0 0 0 0 3 54.0 59.0 42 70 18.3 F-7 1 75.0 80.0 0 0 0 2 80.0 85.0 0 0 0 3 85.0 90.0 0 0 0 4 90.0 95.0 2 3.3 0 5 95.0 100.0 0 0 0 6 100.0 105.0 38 63 0 F-8 1 64.2 69.2 48 80 0 F-9 1 59.1 64.1 0 0 0 2 64.1 69.1 0 0 0 3 69.1 74.1 7.5 12.5 0 4 75.0 80.0 28.5 47 7.5 5 80.0 85.0 12 20 6.6 6 85.0 90.0 0 0 0 7 90.0 95.0 8 13 0 8 95.0 100.0 19 31 6.6 9 100.0 105.0 36 60 17.5 F-10 1 69.0 74.0 57 95 35.8

Revision 806/14 North Anna ISFSI SAR 2-39 Table 2-4 (CONTINUED)

RECOVERY AND RQD VALUES OF BORINGS Boring Run From To Inches Recovery Percent No. No. (Feet) (Feet) Recovered Percent RQD F-11 1 39.0 44.0 6 10 0 2 44.0 49.0 8 13.3 0 3 49.0 54.0 14 23 0 4 54.0 59.0 42 70 0 5 59.0 64.0 35 58 28 6 64.0 69.0 42 70 22.5

Revision 806/14 North Anna ISFSI SAR 2-40 Table 2-5 EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude Apr 25, 1758 38.900 N 76.500 W V 4.20 Feb 21, 1774 37.200 N 77.400 W VI 4.54 Feb 22, 1774 37.200 N 77.400 W IV 3.61 Mar 16, 1775 37.700 N 78.800 W IV 3.61 Aug 30, 1775 37.700 N 78.800 W III Nov 19, 1798 38.300 N 77.500 W III Jan 13, 1791 37.700 N 78.800 W IV 3.61 Jan 15, 1791 37.500 N 77.500 W IV 3.61 Feb 11, 1795 37.800 N 77.300 W III Feb 12, 1795 38.300 N 77.500 W III Mar 29, 1800 39.800 N 75.200 W 3.00 Feb 11, 1801 37.400 N 79.200 W III Aug 23, 1802 37.400 N 79.100 W V 4.20 May 1, 1807 37.400 N 79.100 W V 4.20 Nov 27, 1811 36.100 N 80.200 W IV 3.61 Feb 2, 1812 37.600 N 77.400 W IV 3.61 Apr 22, 1812 37.500 N 77.500 W IV 3.61 Jan 8, 1817 36.000 N 80.200 W V 5.04 Jul 15, 1824 39.700 N 80.500 W IV 3.61 Mar 9, 1828 37.000 N 80.000 W V 5.04 Aug 27, 1833 37.700 N 78.000 W VI 5.04 Nov 11, 1840 39.800 N 75.200 W V 4.20 Oct 19, 1846 39.300 N 77.900 W III Mar 30, 1850 35.400 N 78.000 W V 4.20 Oct 17, 1850 37.300 N 78.400 W IV 3.61 Oct 18, 1850 37.400 N 78.400 W IV Nov 2, 1852 37.500 N 78.600 W VI 4.34 Jan 30, 1853 38.900 N 78.500 W III May 2, 1853 38.500 N 79.500 W V 4.64 Jan 3, 1855 39.200 N 77.500 W V Feb 2, 1855 37.00 N 78.600 W V 4.04 Jan 16, 1856 39.200 N 78.20 W IV 3.61 Mar 21, 1856 37.700 N 78.900 W III Apr 21, 1871 36.400 N 78.600 W III Oct 9, 1871 39.700 N 75.500 W VII 4.59 Mar 1, 1872 36.800 N 79.400 W III Jun 5, 1872 37.700 N 78.000 W IV 3.61

Revision 806/14 North Anna ISFSI SAR 2-41 Table 2-5 (CONTINUED)

EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude Oct 3, 1873 37.200 N 78.200 W IV 3.61 Dec 23, 1875 37.600 N 78.500 W VII 4.54 Jan 3, 1876 37.600 N 77.900 W III Apr 10, 1876 38.500 N 76.600 W III Dec 23, 1876 37.400 N 77.500 W IV 3.61 Sep 1, 1877 38.700 N 76.800 W III Jan 3, 1878 37.900 N 77.700 W III Mar 26, 1879 39.200 N 75.500 W V 4.20 Apr 2, 1882 38.600 N 78.700 W IV Mar 11, 1883 39.500 N 76.400 W IV 3.61 Mar 12, 1883 39.500 N 76.400 W IV 3.61 Sep 21, 1883 36.100 N 79.800 W V 4.20 Jan 3, 1885 39.200 N 77.500 W V 4.06 Jan 15, 1885 4.300 N 76.300 W III 3.02 Feb 2, 1885 36.900 N 81.100 W IV 3.61 Oct 10, 1885 37.700 N 78.800 W VI 4.24 Mar 8, 1889 40.000 N 76.000 W V 4.11 Oct 7, 1895 35.900 N 77.500 W V 4.20 Feb 11, 1896 36.300 N 78.600 W IV 3.61 May 3, 1897 37.100 N 80.700 W VII 4.34 May 31, 1897 37.300 N 80.700 W VII 5.84 Jun 28, 1897 37.300 N 80.700 W V 4.04 Sep 3, 1897 37.300 N 80.700 W IV 3.61 Oct 22, 1897 36.900 N 81.100 W V 4.20 Nov 27, 1897 37.700 N 77.500 W IV 3.61 Dec 18, 1897 37.700 N 77.500 W V 4.04 Feb 5, 1898 37.000 N 81.000 W VI 4.34 Nov 25, 1898 37.000 N 81.000 W V 4.64 Feb 13, 1899 37.000 N 81.000 W V 4.74 Mar 3, 1899 36.900 N 76.300 W IV 3.61 Mar 11, 1902 39.600 N 77.100 W III May 18, 1902 37.300 N 80.600 W V 4.20 Jan 1, 1903 39.600 N 77.200 W III Apr 29, 1905 37.300 N 79.500 W III May 8, 1906 38.700 N 75.700 W IV 3.40 Oct 13, 1906 39.200 N 76.700 W III Feb 11, 1907 37.700 N 78.300 W VI 4.79

Revision 806/14 North Anna ISFSI SAR 2-42 Table 2-5 (CONTINUED)

EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude Aug 23, 1908 37.500 N 77.900 W V 4.20 Apr 2, 1909 39.400 N 78.000 W V 4.20 Feb 8, 1910 38.800 N 78.700 W IV 3.64 Apr 24, 1910 39.200 N 76.700 W III May 8, 1910 37.700 N 78.400 W IV 3.61 Feb 10, 1911 36.600 N 79.400 W IV 3.61 Apr 8, 1911 38.300 N 75.500 W IV 3.61 Aug 7, 1912 37.700 N 78.400 W IV 3.61 Aug 8, 1912 37.700 N 78.400 W IV 3.61 Apr 10, 1918 38.700 N 78.400 W VI 4.93 Apr 16, 1918 38.700 N 78.400 W IV 3.61 Apr 19, 1918 36.800 N 76.300 W III Sep 6, 1919 38.800 N 78.200 W VI 4.79 Jul 24, 1920 38.700 N 78.400 W IV 3.61 Aug 7, 1921 37.800 N 78.400 W VI 4.79 Dec 31, 1923 39.200 N 78.000 W V Jan 1, 1924 39.100 N 78.100 W IV Jan 5, 1924 39.100 N 78.100 W IV 3.61 Dec 26, 1924 37.300 N 79.900 W V 4.20 May 16, 1925 37.300 N 77.500 W V 4.20 Jul 14, 1925 37.600 N 77.500 W IV 3.61 Jun 10, 1927 38.000 N 79.000 W V 4.20 Oct 27, 1927 36.300 N 76.200 W IV 3.61 Oct 15, 1928 38.300 N 75.100 W IV 3.61 Oct 30, 1928 37.500 N 77.500 W IV 3.61 Dec 26, 1929 38.100 N 78.500 W VI 4.79 Sep 15, 1930 37.500 N 77.500 W III Nov 1, 1930 39.100 N 76.500 W IV 3.61 Oct 6, 1931 37.700 N 78.300 W III Jan 5, 1932 37.600 N 78.400 W IV 3.61 Jan 27, 1933 37.200 N 77.400 W IV 3.61 Jul 23, 1933 37.700 N 78.300 W III Apr 3, 1934 37.200 N 77.400 W III Feb 10, 1935 37.200 N 77.400 W IV 3.61 Nov 1, 1935 38.900 N 78.900 W IV 3.61 Feb 3, 1937 37.700 N 78.700 W IV 3.611 Mar 25, 1937 40.900 N 78.200 W III 3.02

Revision 806/14 North Anna ISFSI SAR 2-43 Table 2-5 (CONTINUED)

EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude Jul 15, 1938 40.680 N 78.430 W VI 3.34 Nov 15, 1939 39.580 N 75.050 W V 4.04 Nov 18, 1939 39.500 N 76.600 W IV 3.61 Nov 26, 1939 39.500 N 76.600 W V 4.20 Mar 26, 1940 38.800 N 78.500 W V 4.20 Jan 3, 1942 37.400 N 79.100 W III Oct 7, 1942 37.600 N 78.400 W IV 3.61 Jan 8, 1944 39.800 N 75.500 W 4.25 Oct 10, 1945 37.700 N 78.300 W III Oct 12, 1945 37.500 N 78.500 W IV 3.61 Oct 30, 1945 37.500 N 78.500 W IV 3.61 May 24, 1946 38.000 N 78.600 W III Jan 4, 1948 37.600 N 78.600 W IV 3.61 Jan 5, 1948 37.500 N 78.500 W V 4.20 Mar 26, 1948 38.100 N 78.500 W III May 8, 1949 37.600 N 77.600 W V 4.20 Nov 26, 1950 37.700 N 78.300 W V 4.20 Mar 9, 1951 37.600 N 77.600 W V 4.20 Sep 11, 1952 38.100 N 78.500 W IV Feb 7, 1953 37.700 N 78.100 W IV 3.61 Jan 7, 1954 40.300 N 76.000 W VI 4.79 Aug 11, 1954 40.30 N 76.000 W IV 3.61 Jan 17, 1955 37.300 N 78.400 W IV 3.61 Jan 20, 1955 40.300 N 76.000 W IV 3.61 Apr 23, 1959 37.380 N 80.680 W VI 3.84 Jul 7, 1959 37.300 N 80.700 W IV 3.61 Aug 21, 1959 37.300 N 80.700 W IV 3.61 Sep 4, 1960 37.400 N 79.300 W IV 3.61 Sep 4, 1962 39.500 N 77.700 W IV 3.61 Sep 7, 1962 39.700 N 78.200 W IV 3.61 Jan 17, 1963 37.300 N 80.100 W IV 3.61 Oct 10, 1963 39.800 N 78.200 W 3.60 Feb 13, 1964 40.380 N 77.960 W VI 3.29 May 12, 1964 40.300 N 76.410 W VI 3.19 Jul 15, 1965 37.310 N 74.390 W 5.30 Sep 16, 1965 37.250 N 74.360 W 5.00 Oct 8, 1965 40.080 N 79.750 W 3.60

Revision 806/14 North Anna ISFSI SAR 2-44 Table 2-5 (CONTINUED)

EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude May 31, 1966 37.660 N 78.130 W V 3.69 Sep 28, 1966 39.300 N 80.300 W IV 3.61 Mar 8, 1968 37.280 N 80.770 W IV 4.09 May 22, 1969 39.610 N 78.250 W 3.10 Nov 20, 1969 37.450 N 80.930 W VI 4.69 Dec 11, 1969 37.840 N 77.670 W V 3.39 May 27, 1970 39.620 N 78.280 W 3.20 Jul 14, 1971 39.700 N 75.600 W IV 3.61 Sep 12, 1971 38.150 N 77.590 W V 3.60 Dec 29, 1971 39.70 N 75.600 W IV 3.61 Jan 2, 1972 39.700 N 75.600 W IV 3.61 Jan 3, 1972 39.700 N 75.600 W IV 3.61 Jan 7, 1972 39.700 N 75.600 W IV 3.61 Jan 22, 1972 39.700 N 75.600 W IV 3.61 Jan 23, 1972 39.700 N 75.600 W IV 3.61 Feb 11, 1972 39.700 N 75.600 W V 4.20 Aug 14, 1972 39.700 N 75.600 W IV 3.61 Sep 5, 1972 37.600 N 77.700 W IV 3.39 Sep 12, 1972 39.600 N 79.900 W III 3.02 Dec 8, 1972 40.140 N 76.240 W V 3.52 Feb 28, 1973 39.690 N 75.430 W V 3.79 Apr 9, 1973 37.300 N 77.700 W IV 3.61 Jul 10, 1973 39.700 N 75.700 W IV 3.61 Mar 23, 1974 38.700 N 77.800 W 3.80 Apr 28, 1974 39.800 N 75.600 W IV 3.61 May 30, 1974 37.460 N 80.540 W V 3.59 May 31, 1974 37.400 N 80.400 W 3.80 Mar 7, 1975 37.320 N 80.480 W II 3.04 Nov 11, 1975 37.220 N 80.890 W IV 3.19 May 6, 1976 39.600 N 79.900 W IV 3.61 Sep 13, 1976 36.620 N 80.770 W VI 3.29 Apr 26, 1978 39.700 N 78.240 W 3.10 Jul 16, 1978 39.900 N 76.220 W V 3.09 Oct 6, 1978 40.080 N 76.150 W 3.00 Aug 30, 1980 39.800 N 74.900 W 3.00 Nov 5, 1980 38.180 N 79.900 W 3.00 Feb 11, 1981 37.720 N 78.440 W IV 3.39

Revision 806/14 North Anna ISFSI SAR 2-45 Table 2-5 (CONTINUED)

EARTHQUAKES WITHIN 200 MILES OF NORTH ANNA SITE EVENTS LISTED CHRONOLOGICALLY Date Latitude Longitude MMI Magnitude May 12, 1982 40.410 N 77.960 W 3.00 Apr 19, 1984 40.131 N 76.037 W 3.00 Apr 23, 1984 39.950 N 76.370 W V 4.46 Aug 17, 1984 37.868 N 78.324 W 4.20 Jun 10, 1985 37.248 N 80.485 W 3.20 Mar 15, 1991 37.746 N 77.916 W V 3.80 Apr 22, 1991 37.996 N 80.266 W 3.40 Jun 28, 1991 38.231 N 81.335 W 3.00 Aug 15, 1991 40.786 N 77.657 W V 3.00 Mar 16, 1993 39.190 N 76.870 W III Nov 17, 1993 39.190 N 76.870 W III Jan 16, 1994 40.330 N 76.037 W V 4.60

Revision 806/14 North Anna ISFSI SAR 2-46 Figure 2-1 AREA MAP (0-10 MILES)

Revision 806/14 North Anna ISFSI SAR 2-47 Figure 2-2 REGIONAL MAP (0-50 MILES)

Revision 806/14 North Anna ISFSI SAR 2-48 Figure 2-3 NORTH ANNA SITE BOUNDARY N

,AKE !NNA 3ECURITY

&ENCE

-ETEOROLOGICAL 4OWER 5NIT 

  1. ONT

5NIT 

  1. ONT

)3&3) 3ITE "OUNDARY

%XCLUSION !REA

'RAPHICS .O 36+

Figure 2-4 DAILY AVERAGE TEMPERATURES FOR RICHMOND, VIRGINIA (1951-1980)

Revision 806/14 North Anna ISFSI SAR 2-49

Figure 2-5 DAILY EXTREME TEMPERATURES FOR RICHMOND, VIRGINIA (1898-1991)

Revision 806/14 North Anna ISFSI SAR 2-50

Revision 806/14 North Anna ISFSI SAR 2-51 Figure 2-6 EXTREME 1-MILE WIND PASSAGE AT RICHMOND, VIRGINIA

Figure 2-7 REGIONAL TOPOGRAPHY AND CHARACTERISTICS Revision 806/14 North Anna ISFSI SAR 2-52

Figure 2-8 ISFSI LOCAL TOPOGRAPHY AND GRADING PLAN Revision 806/14 North Anna ISFSI SAR 2-53

Revision 806/14 North Anna ISFSI SAR 2-55 Figure 2-10 SITE GEOLOGICAL MAP

Revision 806/14 North Anna ISFSI SAR 2-56 Figure 2-11 ISFSI BORING LOCATIONS

Figure 2-12 ISFSI SUBSURFACE CROSS SECTION Revision 806/14 North Anna ISFSI SAR 2-57

Revision 806/14 North Anna ISFSI SAR 2-58 Figure 2-13 REGIONAL GEOLOGIC MAP

Revision 806/14 North Anna ISFSI SAR 2-59 Figure 2-14 PAD #1 SURFACE PROFILE

Revision 806/14 North Anna ISFSI SAR 2-60 Figure 2-15 PAD #2 SURFACE PROFILE

Revision 806/14 North Anna ISFSI SAR 2-61 Figure 2-16 PAD #3 SURFACE PROFILE

Revision 806/14 North Anna ISFSI SAR 2-62 Figure 2-17 EARTHQUAKE LOCATIONS

Figure 2-19 ALTERNATE TRANSPORT ROUTE SUBSURFACE CROSS SECTIONS Revision 806/14 North Anna ISFSI SAR 2-64

Revision 806/14 North Anna ISFSI SAR 2A-i Appendix 2A Boring Logs

Revision 806/14 North Anna ISFSI SAR 2A-ii Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 2A-1 (1994 BORINGS)

FIELD EXPLORATION PROCEDURES Disturbed Sampling Soil test borings were drilled and tested in accordance with ASTM D 1452 and ASTM D 1586 procedures with a CME-55 truck mounted drill rig, by mechanically advancing hollow stem auger flights into the ground. At regular intervals, the plug was removed from the auger head, and soil samples were obtained with a standard 1.4"I.D., 2"O.D., 20" long split tube sampler. The sampler was attached to the end of A size drill rods and lowered through the augers to sampling elevation. The sampler was first seated to penetration loose cuttings and disturbed soil, then driven an additional foot with blows of a 140 lb. hammer falling 30". The sampler was then extracted from the soil, the plug reinserted into the auger head, and the auger advanced to the next sampling elevation. The number of blows required to drive the sampler each 6" increment of penetration was recorded and is shown on the boring logs. The number of blows required to drive the sampler the final foot is termed the penetration resistance. Penetration resistance, when properly evaluated, is an index to soil density, strength, and foundation support capacity.

Undisturbed Sampling Split tube samples are suitable for visual examination and classification tests but are not sufficiently intact for quantitative laboratory testing. Relatively undisturbed samples were obtained by forcing sections of 3"O.D., 16 gauge, steel tubing into the soil at the desired sampling levels. This sampling procedure is described by ASTM Specification D-1587. Each tube, together with the encased soil, was carefully removed from the ground, made airtight, and transported to the laboratory. Locations and depths of undisturbed samples are shown on the test boring records.

Revision 806/14 North Anna ISFSI SAR 2A-2 ROCK CORING PROCEDURES Rock coring procedures are used to evaluate subsurface conditions below the depth of auger refusal. Auger refusal typically reflects the presence of obstructions (e.g., boulders) or the presence of bedrock.

Water is used to drill a diamond studded drill bit through bedrock or obstructions. The drill pipe at the bottom of the boring contains a steel sleeve, or core barrel, that accepts the drill core as the bit is advanced. Typically, the core barrel can accommodate 5 or 10 feet of core. When bedrock is encountered, a run number is designated each time the core barrel is filled with sample and removed from the boring.

The percent of recovery is calculated for every run. Percent recovery is the ratio of the recovered length of core to the length of the core run.

The rock quality designation (RQD) is calculated for each core run when N-sized core sampling procedures are used. N-sized core is approximately 2-inches in diameter. The RQD is the ratio of the cumulative length of core greater than 4-inches long and the length of core run.

The RQD is often used to evaluate the engineering properties of bedrock.

Revision 806/14 North Anna ISFSI SAR 2A-3 KEY TO BORING LOG SOIL CLASSIFICATIONS Soils Identification ASTM SOIL CLASSIFICATION IS BASED ON THE DISTRIBUTION OF THE SAND AND GRAVEL SEED PARTICLES, THE PLASTICITY (E.G. ATTERBERG LIMITS) OF THE F I N E S A N D , S I LT A N D C L AY F R AC T I O N , A N D T H E R E L AT I V E DENSITY/CONSISTENCY AS DETERMINED FROM THE STANDARD PENETRATION TEST N-VALUE.

Soil Type Particle Size Boulder 12 in.

Cobble 3 - 12 in.

Gravel - Coarse 3/4 - 3 in.

- Fine #4 - 3/4 in.

Sand - Coarse #10 - #4

- Medium #40 - #10

- Fine #200 - #40 Silt (non-cohesive) <#200 Clay (cohesive) <#200 NOTE: Particle Size is Designated by U.S. Standard Sieve Sizes.

Relative Density or Consistency THE STANDARD PENETRATION TEST N-VALUES ARE USED TO EVALUATE THE RELATIVE DENSITY OF COARSE-GRAINED SOILS OR THE CONSISTENCY OF FINE-GRAINED SOILS.

RELATIVE DENSITY CONSISTENCY Term N-Value Term N-Value Very Loose 0 - 4 Very Soft 0 - 1 Loose 5 - 9 Soft 2 - 4 Medium Dense 10 - 30 Firm 5 - 8 Dense 31 - 50 Stiff 9 - 16 Very Dense Over 50 Very Stiff 17 - 30 Hard 31 - 50 Very Hard Over 50

Revision 806/14 North Anna ISFSI SAR 2A-4 Revision 806/14 North Anna ISFSI SAR 2A-5 Revision 806/14 North Anna ISFSI SAR 2A-6 Revision 806/14 North Anna ISFSI SAR 2A-7 Revision 806/14 North Anna ISFSI SAR 2A-8 Revision 806/14 North Anna ISFSI SAR 2A-9 Revision 806/14 North Anna ISFSI SAR 2A-10 Revision 806/14 North Anna ISFSI SAR 2A-11 Revision 806/14 North Anna ISFSI SAR 2A-12 Revision 806/14 North Anna ISFSI SAR 2A-13 Revision 806/14 North Anna ISFSI SAR 2A-14 Revision 806/14 North Anna ISFSI SAR 2A-15 Revision 806/14 North Anna ISFSI SAR 2A-16 Revision 806/14 North Anna ISFSI SAR 2A-17 Revision 806/14 North Anna ISFSI SAR 2A-18 Revision 806/14 North Anna ISFSI SAR 2A-19 Revision 806/14 North Anna ISFSI SAR 2A-20 Revision 806/14 North Anna ISFSI SAR 2A-21 Revision 806/14 North Anna ISFSI SAR 2A-22 Revision 806/14 North Anna ISFSI SAR 2A-23 Revision 806/14 North Anna ISFSI SAR 2A-24 Revision 806/14 North Anna ISFSI SAR 2A-25 Revision 806/14 North Anna ISFSI SAR 2A-26 Revision 806/14 North Anna ISFSI SAR 2A-27 Revision 806/14 North Anna ISFSI SAR 2A-28 Revision 806/14 North Anna ISFSI SAR 2A-29 Revision 806/14 North Anna ISFSI SAR 2A-30 Revision 806/14 North Anna ISFSI SAR 2A-31 Revision 806/14 North Anna ISFSI SAR 2A-32 Revision 806/14 North Anna ISFSI SAR 2A-33 Revision 806/14 North Anna ISFSI SAR 2A-34 Revision 806/14 North Anna ISFSI SAR 2A-35 Revision 806/14 North Anna ISFSI SAR 2A-36 Revision 806/14 North Anna ISFSI SAR 2A-37 Revision 806/14 North Anna ISFSI SAR 2A-38 Revision 806/14 North Anna ISFSI SAR 2A-39 Revision 806/14 North Anna ISFSI SAR 2A-40 Revision 806/14 North Anna ISFSI SAR 2A-41 2008 BORINGS

Revision 806/14 North Anna ISFSI SAR 2A-42 Revision 806/14 North Anna ISFSI SAR 2A-43 Revision 806/14 North Anna ISFSI SAR 2A-44 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 2B-i Appendix 2B Laboratory Tests

Revision 806/14 North Anna ISFSI SAR 2B-ii Intentionally Blank

PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring F-5A F-5 F-6 F-6 F-6 F-7A F-7A Sample No. UD-1 S-7 S-2 S-5 S-9 UD-l UD-2 Depth (ft.) 18.0-20.0 19.0-20.5 1.5-3.0 9.0-10.5 29.0-30.5 4.0-6.0 16.0-18.0 Gradation

% Passing Sieve No. 4 .... .... .... 100 100 .... 100 No. 10 100 100 100 97.9 99.9 100 99.8 No. 40 92.5 96.1 96.6 84.4 77.8 96.8 83.1 No. 100 67.7 79.5 90.3 61.7 35.9 77.9 50.8 No. 200 53.9 70.2 87.9 54.3 24.8 72.0 38.0 Liquid Limit (%) ... 65 85 62 ... 84 ...

Plasticity Index ... 19 31 19 ... 30 ...

Natural Moisture (%) 53.3 55.7 37.4 29.0 29.3 34.1 31.8 North Anna ISFSI SAR ASTM Classification ... MH MH MH ... MH ...

2B-1

PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring F-7 F-7 F-8 F-8 F-9A F-9 F-10 Sample No. S-7 S-18 S-4 S-7 UD-1 S-13 S-3 Depth (ft.) 19.0-20.5 74.0-74.8 9.0-10.5 19.0-20.5 4.0-6.0 49.0-50.5 3.0-4.5 Gradation

% Passing Sieve 3/8 inch ... ... ... ... ... ... ...

No. 4 100 100 100 100 100 100 100 No. 10 98.6 97.6 99.9 99.9 99.8 97.7 99.7 No. 40 80.7 70.7 93.1 84.9 84.3 78.8 69.0 No. 100 60.8 47.2 81.3 64.4 52.3 39.3 44.5 No. 200 53.1 34.2 76.3 51.2 44.9 26.2 36.8 Liquid Limit (%) 60 40 58 ... 64 ... 46 Plasticity Index 16 6 26 ... 18 ... 15 North Anna ISFSI SAR Natural Moisture (%) 30.3 25.4 34.7 27.0 27.1 22.7 13.6 ASTM Classification MH SM MH ... SM ... SM 2B-2

PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 LABORATORY TEST RESULTS Revision 806/14 Boring F-10 F-10 P-2 P-3 P-4 Sample No. S-5 S-10 BAG BAG BAG Depth (ft.) 9.0-10.5 34.0-35.5 0.0-5.0 0.0-5.0 0.0-5.0 Gradation

% Passing Sieve 3/8 inch ... 100 100 ... ...

No. 4 100 99.2 98.7 100 100 No. 10 99.4 90.9 94.8 99.4 99.1 No. 40 65.4 55.4 81.1 83.5 90.9 No. 100 41.5 33.9 57.8 67.7 64.9 No. 200 31.6 24.8 49.5 62.1 55.7 Liquid Limit (%) 41 ... 41 60 48 Plasticity Index 12 ... 20 30 19 North Anna ISFSI SAR Natural Moisture (%) 14.9 22.1 8.5 15.0 8.5 ASTM Classification SM ... SC CH ML 2B-3

PHASE 2 - ISFSI NORTH ANNA POWER STATION - MINERAL, VIRGINIA VIRGINIA POWER F&R #V60-073 CBR TEST RESULTS Revision 806/14 Boring P-2 P-3 F-7A Sample No. Bulk Bulk Composite Depth (ft.) 0.0-5.0 0.0-5.0 16.0-22.0 ASTM Classification SC CH SM Moisture-Density Relationship Test Maximum Dry Density (pcf) 117.5 111.2 109.0*

Optimum Moisture (%) 12.4 16.6 35.0*

CBR (Unsoaked) 39.2 38.9 6.4 CBR (Soaked) 7.6 7.3 NA

  • Sample was molded at natural moisture content and unit weight.

North Anna ISFSI SAR 2B-4

Revision 806/14 North Anna ISFSI SAR 2B-5 Revision 806/14 North Anna ISFSI SAR 2B-6 PARTICLE SIZE ANALYSIS TEST Objective: The grain size data are used to aid in the classification of soils and in the estimation of soil behavior.

Procedure: The test can be divided into two parts, the determination of the size and distribution of the coarse fraction and the determination of the size and distribution of the fine fraction. The division between the coarse and fine fraction is the No. 200 sieve. The coarse fraction is tested using the sieve method; the fine fraction is tested using the hydrometer method. If both tests are performed, the test is referred to as the combined analysis.

For the analysis of the coarse fraction, the dried soil is soaked and then washed through a #200 sieve. The sand and gravel remaining on the sieve is oven dried. The dried sand and gravel is then passed through a series of sieves, and the weight retained on each sieve is determined. The distribution of weights is then computed and the percent passing each sieve is plotted as a curve.

In the hydrometer method, the particle size is determined by Stoke's equation.

The soil is mixed with water to form a heavy slurry. The rate of sedimentation is measured using a hydrometer. Hydrometer data can be reduced to develop the weight percent distribution curve for the fine grained soil fraction.

References:

ASTM Specification D-422, Particle Size Analysis of Soils.

Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army, Appendix V.

Revision 806/14 North Anna ISFSI SAR 2B-7 Revision 806/14 North Anna ISFSI SAR 2B-8 Revision 806/14 North Anna ISFSI SAR 2B-9 Revision 806/14 North Anna ISFSI SAR 2B-10 Revision 806/14 North Anna ISFSI SAR 2B-11 ATTERBERG LIMITS

Purpose:

Dr. Atterberg (1911) defined the liquid limit of a soil as the water content, expressed as a percentage of the dry weight of the soil, at the boundary between the liquid and plastic states. The plastic limit is the water content expressed as a percentage of the dry weight of the soil, at the boundary between the plastic and semisolid states. The difference between these two values is the Plasticity Index (PI).

Liquid and Plastic limits are performed to determine the soil classification and plasticity properties of the soil specimen. Atterberg limits can be correlated with approximate values for compressibility and strength.

Procedure: The liquid limit is the water content when a soil will flow under a specific dynamic force. The soil is wetted, placed in a special liquid limit device, and grooved into two halves. The water content is measured when the two halves flow together over a specified distance.

The plastic limit is determined, as described by ASTM Specification D-4318, by obtaining the water content when a soil can be rolled by hand into thin threads on a surface of ground glass. The plastic limit is defined as the moisture content at which the soil can not be rolled into threads smaller than 1/8 inch in diameter.

References:

ASTM Specification D4318 Standard Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

Revision 806/14 North Anna ISFSI SAR 2B-12 Revision 806/14 North Anna ISFSI SAR 2B-13 MOISTURE CONTENT TEST Objective: To determine the ratio between the moisture contained in the soil and the weight of the solid soil grains, expressed as a percentage. The in-situ moisture content with other index properties are used to evaluate anticipated soil behavior.

For controlled fill placement, the moisture content is critical in achieving maximum compaction.

Procedure: A moist sample is weighed and then oven dried. The dry sample is then weighed. The moist sample weight minus the dry sample weight is used to determine the weight of water removed. The weight of the sample remaining after oven-drying is used as the weight of the solid soil grains. The moisture content, in percent, is the ratio of the weight of moisture to the weight of dry soil multiplied by 100.

References:

ASTM Specification D-2216 Standard Method of Laboratory Determination of Moisture Content of Soil.

Laboratory Soils Testings, EM 1110-2-1906 by the Department of the Army, Appendix I.

Revision 806/14 North Anna ISFSI SAR 2B-14 UNIT WEIGHT TEST Objective: The unit weight test is performed to determine the density of moist soil, expressed in terms of weight per volume. The dry unit weight is calculated from the moist unit weight and the natural moisture content. The unit weight is used in soils engineering calculations.

Procedure: The volumetric method consists of computing the total volume of a regular-shaped sample. The weight and volume of the sample is measured. The moist unit weight equals the weight of sample divided by the volume of the sample.

To determine the dry unit weight, the moisture content of the sample needs to be determined. The moist unit weight divided by the moisture content plus one equals the dry unit weight.

The displacement method consists of determining the total volume of a soil by measuring the volume or weight of water displaced by the soil mass. The sample is placed in a wire cage and submerged in water. The volume of the displaced water is measured. The weight of the sample is determined. The moist unit weight is estimated by dividing the sample weight by the volume of water displaced.

References:

Laboratory Soils Testing, EM 1110-2-1906, by the Department of the Army, Appendix II.

Revision 806/14 North Anna ISFSI SAR 2B-15 MOISTURE-DENSITY (MODIFIED)

Purpose:

The moisture-density relationship of a given soil is determined to provide an index unit weight that can be compared to the field compacted unit weight. The maximum dry unit weight determined using this test method is termed 100 percent of Modified Proctor.

Procedure: The Modified Proctor Test is performed on a bulk soil sample. Gravel (plus No. 4 or plus 3/4 inch, depending on the test method) is removed from the bulk sample. The prepared bulk sample is split to form four to five test specimens.

The moisture content of each prepared specimen is adjusted in the laboratory to vary by 1-1/2 to 2 percent from the other prepared specimens.

The prepared soil specimens are compacted in a cylindrical mold in five equal layers to give a total compacted depth of about 5 inches. Each layer is compacted by uniformly distributed blows using a 10 pound, sliding weight hammer and a 18-inch drop. The number of blows used for compaction (25 or 56) depends on the test method. The dry density and compaction moisture content is determined for each compacted test specimen and plotted to provide the moisture-density curve. The maximum dry density and the optimum compaction moisture content for the sample with the gravel removed is determined from the moisture-density curve. The maximum dry density for the bulk sample with gravel is determined using the gravel correction factor as outlined in ASTM Procedures D-4718.

References:

ASTM Specification D-1557, Standard Methods of Test for Moisture-Density Relations of Soils using 10.0 lb. (4.5 Kg) Rammer and 18-inch (457 mm) Drop.

Revision 806/14 North Anna ISFSI SAR 2B-16 Revision 806/14 North Anna ISFSI SAR 2B-17 Revision 806/14 North Anna ISFSI SAR 2B-18 CALIFORNIA BEARING RATIO

Purpose:

The California Bearing Ratio test is performed on subgrade, subbase and base course materials to provide supporting values of various roadway materials which can be used as a basis for pavement design.

Procedure: A sample of the subgrade soil is compacted in a cylindrical mold to the density and moisture anticipated in actual construction. Cohesive soils are allowed to soak, immersed in water for 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />. By means of a hydraulic jack, a penetration needle is forced into sample at a controlled rate. Load values and corresponding strain or deformation are noted. The ratios of the load values in pounds per square inch at 0.1 inch and 0.2 inch penetration, respectively, are compared to the standard loads of 1000 and 1500 pounds per square inch respectively. (The latter are those loads required to produce the same penetration in a compacted limestone sample.)

The CBR in percent is the ratio of the loads at 0.1 penetration multiplied by 100.

References:

ASTM Specification D-1883-67, Standard Method of Test for Bearing Ratio of Laboratory-Compacted Soils.

Revision 806/14 North Anna ISFSI SAR 2B-19 Revision 806/14 North Anna ISFSI SAR 2B-20 Revision 806/14 North Anna ISFSI SAR 2B-21 Revision 806/14 North Anna ISFSI SAR 2B-22 Revision 806/14 North Anna ISFSI SAR 2B-23 Revision 806/14 North Anna ISFSI SAR 2B-24 CONSOLIDATION TEST Objective: Consolidation tests are performed on undisturbed soil samples in order to estimate the settlement resulting from imposed loads. The time required for consolidation and the amount of consolidation settlement can be predicted from this test data.

Procedure: An undisturbed sample is trimmed to fit a consolidometer ring. The trimmed sample has a diameter of 2.5 inches and a height of 1.0 inch. The soil sample is sandwiched between porous stones. A seating pressure is applied and the micrometer dial gauge is adjusted to zero. Load increments are placed on the soil sample at regular intervals (e.g. every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.) Load increments are determined from anticipated field loading conditions and project requirements. The test results are presented in the form of a void ratio, or an axial strain versus applied pressure curve on a semilogrithmitic graph.

References:

ASTM Specification D-2435, One-Dimensional Consolidation Properties of Soils.

Engineering Properties of Soil & Their Measurements by Joseph E.

Bowles, McGraw-Hill, Inc., Consolidation Test.

Laboratory Soils Testing, EM-1110-2-1906 by The Department of the Army, Appendix VIII.

Revision 806/14 North Anna ISFSI SAR 2B-25 Revision 806/14 North Anna ISFSI SAR 2B-26 Revision 806/14 North Anna ISFSI SAR 2B-27 Revision 806/14 North Anna ISFSI SAR 2B-28 Revision 806/14 North Anna ISFSI SAR 2B-29 Revision 806/14 North Anna ISFSI SAR 2B-30 Revision 806/14 North Anna ISFSI SAR 2B-31 TRIAXIAL COMPRESSION TEST Objective: The triaxial compression test is performed to estimate the shear strength of a soil under controlled drainage conditions. Sheer strength is expressed in terms of the angle of internal friction (O) and the cohesion intercept (c).

Procedure: Triaxial tests on undisturbed soil samples may be: (1) unconsolidated undrained, UU; (2) consolidated undrained, CU; or (3) consolidated drained, CD. The type of test is selected to best represent the field and loading conditions.

Back pressure is often applied to facilitate complete saturation. Pore water pressure readings may also be taken to determine the effective stresses and defective angle of internal friction.

In the triaxial test, a cylindrical specimen of soil, encased in a rubber membrane, is placed in a compression chamber, subjected to a confining fluid pressure and then loaded axially to failure. Connections at the ends of the specimen permit controlled drainage of pore water from the specimen. Also, pore pressure readings can be recorded as the axial load is applied. In general, a minimum of three specimens, each under a different confining pressure, are tested to establish the relation between shear stress and normal stress. The test results are represented by a plot of shear versus axial stress (Mohr Circle Diagram).

References:

ASTM Specification D-2850, Standard Method of Test for Unconsolidated Undrained Strength of Cohesive Soils in Triaxial Compression.

Laboratory Soils Testing, EM 1110-2-1906,by The Department of the Army, Appendixes X, XA, & XB Engineering Properties of Soils & Their Measurements, by Joseph E.

Bowles, McGraw-Hill Book Company The Measurement of Soil Properties in the Triaxial Test, by Bishop &

Henkel, 2nd Edition 1962, Edward Arnold Publishers, LTD.

Revision 806/14 North Anna ISFSI SAR 2B-32 Revision 806/14 North Anna ISFSI SAR 2B-33 Revision 806/14 North Anna ISFSI SAR 2B-34 Revision 806/14 North Anna ISFSI SAR 2B-35 Revision 806/14 North Anna ISFSI SAR 2B-36 Revision 806/14 North Anna ISFSI SAR 2B-37 Revision 806/14 North Anna ISFSI SAR 2B-38 Revision 806/14 North Anna ISFSI SAR 2B-39 Revision 806/14 North Anna ISFSI SAR 2B-40 Revision 806/14 North Anna ISFSI SAR 2B-41 Revision 806/14 North Anna ISFSI SAR 2B-42 Revision 806/14 North Anna ISFSI SAR 2B-43 Revision 806/14 North Anna ISFSI SAR 2B-44 Revision 806/14 North Anna ISFSI SAR 2B-45 Revision 806/14 North Anna ISFSI SAR 2B-46 Revision 806/14 North Anna ISFSI SAR 2B-47 Revision 806/14 North Anna ISFSI SAR 2B-48 Revision 806/14 North Anna ISFSI SAR 2B-49 Revision 806/14 North Anna ISFSI SAR 2B-50 Revision 806/14 North Anna ISFSI SAR 2B-51 Revision 806/14 North Anna ISFSI SAR 2B-52 Revision 806/14 North Anna ISFSI SAR 2B-53 Revision 806/14 North Anna ISFSI SAR 2B-54 Revision 806/14 North Anna ISFSI SAR 2B-55 Revision 806/14 North Anna ISFSI SAR 2B-56 UNCONFINED COMPRESSION TEST Objective: To estimate the load per unit area (compressive strength) that an unconfined, cohesive soil will fail in a simple compression test. The compressive strength is taken as the maximum load (e.g. load at failure) per unit area or the load per unit area at 20% axial strain, whichever occurs first.

Procedure: A cylinder of soil having a height of 1.5 to 2 times the average diameter is loaded to failure, in simple compression, quickly enough that the water content of the soil does not change. The test load is applied using a strain-controlled method. Simultaneous observations are made of the applied load and of the axial strain. The failure load or the load required to produce 20 percent axial strain is expressed as the load per unit of cross-sectional area, in KIPS per square foot.

References:

ASTM SPECIFICATION D-2166, Standard Methods of Test for Unconfined Compressive Strength of Cohesive Soil.

Laboratory Soils Testing, EM 1110-2-1906 by The Department of the Army, Appendix XI.

Revision 806/14 North Anna ISFSI SAR 2B-57 Revision 806/14 North Anna ISFSI SAR 2B-58 Revision 806/14 North Anna ISFSI SAR 2B-59 Revision 806/14 North Anna ISFSI SAR 2B-60 Revision 806/14 North Anna ISFSI SAR 2B-61 Revision 806/14 North Anna ISFSI SAR 2B-62 Revision 806/14 North Anna ISFSI SAR 2B-63 Revision 806/14 North Anna ISFSI SAR 2B-64 Revision 806/14 North Anna ISFSI SAR 2B-65 Revision 806/14 North Anna ISFSI SAR 2B-66 Revision 806/14 North Anna ISFSI SAR 2B-67 Revision 806/14 North Anna ISFSI SAR 2B-68 Revision 806/14 North Anna ISFSI SAR 2B-69 Revision 806/14 North Anna ISFSI SAR 2B-70 Revision 806/14 North Anna ISFSI SAR 2B-71 Revision 806/14 North Anna ISFSI SAR 2B-72 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 3-1 Chapter 3 PRINCIPAL SSSC DESIGN CRITERIA This chapter describes the design criteria to be met by the SSSCs to be used in the North Anna ISFSI. Compliance with these criteria ensures that the North Anna ISFSI complies with the requirements of 10 CFR 72.

3.1 PURPOSES OF SSSC A summary description of each SSSC approved for use at the North Anna ISFSI is provided in Appendix A. A detailed description of the approved SSSCs is provided in the Topical Safety Analysis Reports (TSAR) listed in Table A-1 of Appendix A.

3.1.1 Spent Fuel to Be Stored The ISFSI is designed to accommodate a total of 84 SSSCs. However, the licensed spent fuel storage design capacity of the facility is 839.04 MTU. At approximately 0.46 metric tons of uranium (MTU) per fuel assembly, the facility can accommodate 1824 fuel assemblies under the current license.

The physical characteristics of the fuel to be stored in the ISFSI are described in detail in Section 4.2 of the North Anna Power Station UFSAR and are summarized in Table 3-1. An evaluation of the storage of burnable poison rod assemblies (BPRAs) and/or thimble plug devices (TPDs) with the fuel assemblies placed in SSSCs is provided in Appendix A for each cask design.

The fuel used during the first years of North Anna Power Station Units 1 and 2 operation had initial enrichments not exceeding 3.5 weight percent U 235 and discharge burnup not exceeding 35,800 MWD/MTU. The North Anna Power Station has been authorized to operate with fuel with higher initial enrichment and higher burnup. The design basis fuel characteristics used in the analyses included in Chapters 7 and 8 include initial enrichment of 4.3 weight percent U235, burnup of 45,000 MWD/MTU and a cooling time of 7 years. The radioactive characteristics of the design basis fuel are discussed in Section 7.2.

3.1.1.1 Spent Fuel Characteristics The following fuel assembly characteristics constitute limiting parameters for storage of fuel assemblies at the ISFSI:

  • Initial Fuel Enrichment
  • Fuel Burnup
  • Heat Generation
  • Decay time
  • Spent Fuel Physical Configuration/Condition

Revision 806/14 North Anna ISFSI SAR 3-2 3.1.1.1.1 Allowable Limits The allowable limits for each of these characteristics are discussed below.

1. Initial Fuel Enrichment The initial fuel enrichment of any fuel that is stored in a SSSC will be limited to the maximum enrichment specified in the ISFSI Technical Specifications.
2. Fuel Burnup The burnup of any fuel that is stored in a SSSC will be limited to that specified in the ISFSI Technical Specifications.
3. Heat Generation The heat generation rate by an individual fuel assembly is dependent on three factors: the initial fuel enrichment, the fuel burnup, and the amount of decay time after discharge. The maximum allowable heat generation rate for a particular SSSC is specified in the ISFSI Technical Specifications.
4. Decay Time The decay time of any fuel that is stored in a SSSC will be at least greater than that specified in the ISFSI Technical Specifications.
5. Spent Fuel Physical Configuration/Condition Only spent fuel irradiated at North Anna Power Station Units 1 and 2 with the physical configuration as listed in items 1, 2, and 3 of Table 3-1 will be stored in the ISFSI. The fuel stored shall be intact, shall not have gross cladding defects, and shall not have visible physical damage which would inhibit insertion or removal from the SSSC basket.

3.1.1.1.2 Verification The method of verification for each of these characteristics is discussed below:

1. Initial Fuel Enrichment, Fuel Burnup and Decay Time Fuel management records shall be utilized to verify that the initial fuel enrichment, fuel burnup and decay time meet the specified limits. Each fuel assembly is engraved with a unique identification number (based on ANSI/ANS 57.8) and a vendor identification, which is unique to the site for which the fuel assemblies were fabricated. This will allow visual confirmation of the identity of the fuel assemblies placed in the SSSC.
2. Heat Generation The heat generation rate of a fuel assembly is based primarily on the fuel enrichment, burnup, operating history, and cooling time after discharge. Fuel management records will be used to obtain the parameters. A decay heat analysis using a computer code such as ORIGEN or the method described in NUREG/CR-5625 will be used to ensure that the heat generation per fuel assembly is less than that specified in the ISFSI Technical Specifications.

Revision 806/14 North Anna ISFSI SAR 3-3

3. Spent Fuel Physical Configuration/Condition Fuel management records will be reviewed to ensure that the assemblies to be put in the SSSC have not been previously identified as having gross cladding defects. The fuel assemblies shall also be visually inspected (e.g., using closed-circuit television cameras) for physical damage which could potentially cause problems during insertion and/or removal from the SSSC.

3.1.2 General Operating Functions The fuel assemblies will be stored unconsolidated and dry in SSSCs. The SSSCs will rest on a reinforced concrete storage pad, and provide safe storage by ensuring a reliable decay heat path from the spent fuel to the environment and by providing appropriate shielding and containment of the fission product inventory.

Storage of spent fuel in SSSCs is a totally passive function, with no active systems required to function. Cooling of the SSSCs is accomplished by convective cooling.

The SSSCs are to be handled with a lifting yoke, the Fuel Building cask handling crane, a transporter, or other appropriate equipment. The Fuel Building crane places the loaded SSSC on the ground outside the Decontamination Building. The SSSC is then lifted by the transporter which is moved to the ISFSI by a tow vehicle. After the transporter has been maneuvered to locate the SSSC in its storage position, the SSSC is set down by the transporter.

The equipment in the Fuel and Decontamination Buildings is capable of handling SSSCs weighing up to 125 tons fully loaded and measuring approximately 16 feet in length with the top cover removed.

All the handling equipment to be used will be sized to handle SSSCs measuring up to the above specifications, as needed. This equipment will be designed according to appropriate commercial codes and standards, and will be operated, maintained, and inspected in accordance with the suppliers recommendations. Documentation will be maintained to substantiate conformance with all applicable standards.

3.2 DESIGN CRITERIA FOR ENVIRONMENTAL CONDITIONS AND NATURAL PHENOMENA The SSSCs are designed with the objectives of ensuring that fuel criticality is prevented, SSSC integrity is maintained, and fuel is not damaged so as to preclude its removal from the SSSC. The conditions under which these objectives must be met are described below.

The safe storage of the spent fuel assemblies depends on the capability of the SSSCs to fulfill their design functions. The SSSCs are self-contained, independent, passive systems, which do not rely on any other systems or components for their operation. Therefore, the SSSCs are the only components at the North Anna ISFSI which are safety-related. The criteria used in the design of the SSSCs ensure that exposure of the SSSCs to credible site hazards will not impair their

Revision 806/14 North Anna ISFSI SAR 3-4 safety functions. Because the North Anna ISFSI is located on the North Anna site, all ISFSI design criteria for environmental conditions and natural phenomena are the same as the plant design bases, as found in Chapter 3 of the North Anna Power Station UFSAR.

The design criteria satisfy the requirements of 10 CFR 72. They consider the effects of normal operation, natural phenomena and postulated man-made accidents. The criteria are defined in terms of loading conditions imposed on the SSSCs. The loading conditions are evaluated to determine the type and magnitude of loads induced on the SSSC. The combination of these loads are then established based on the number of conditions that can be superimposed.

3.2.1 Tornado and Wind Loadings The SSSC manufacturers will be required to meet either the design basis tornado and extreme wind used for the Class 1 (safe shutdown) systems and structures of the North Anna Power Station, as described in Sections 3.3.1 and 3.3.2 of the North Anna Power Station UFSAR or alternately, those prescribed by Regulatory Guide 1.76, Design Basis Tornado for Nuclear Power Plants, April 1976.

3.2.1.1 Applicable Design Parameters The design basis tornado for the North Anna Power Station has a rotational wind velocity of 300 mph, a translational velocity of 60 mph, and a pressure drop of 3 psi in 3 seconds, as described in Section 3.3.2 of the North Anna Power Station UFSAR.

The design basis extreme wind is 80 mph as described in Section 2.3.1 of this SAR.

The design basis tornado and wind loadings for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.

3.2.1.2 Determination of Forces on Structures The description of the methods used to convert the tornado and wind loading into forces on the SSSCs is addressed in the SSSC Topical Safety Analysis Reports.

The safety function of the SSSCs is not dependent on any other structures or systems. In addition, there are no structures in the vicinity of the ISFSI, which, if failed under tornado loads, could damage the SSSCs.

3.2.1.3 Tornado Missiles The design basis tornado missiles listed in Section 3.3.2 of the North Anna Power Station UFSAR are the following:

  • A wooden utility pole 40 feet long, 12 inches in diameter, with a density of 50 lb/ft3, and traveling in a vertical or horizontal direction at 150 mph
  • A 1-ton automobile traveling at 150 mph not more than 25 feet above ground and with a contact area of 30 ft2

Revision 806/14 North Anna ISFSI SAR 3-5

  • A 1-inch solid steel rod, three feet long, with a density of 490 lb/ft3
  • A 6-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft3
  • A 12-inch Schedule 40 pipe, 15 feet long, with a density of 490 lb/ft3 Analysis of the potential effects of tornado missiles on the SSSCs is addressed in the SSSC Topical Safety Analysis Reports and in Appendix A.

3.2.2 Water Level (Flood) Design The design finished grade elevation of the ISFSI is approximately 311 feet msl, leaving a margin of approximately 45 feet above the maximum flood. Therefore, the ISFSI site is flood-free. See Section 2.4.2 for additional details.

3.2.3 Seismic Design Section 2.5.2 describes the vibratory ground motions experienced in the region of the North Anna site and defines design earthquake ground acceleration values of 0.18g horizontal and 0.12g vertical for the ISFSI, which are also the values used for the design basis earthquake (DBE) for North Anna Units 1 and 2 for Seismic Class I structures founded on saprolite more than 15 feet thick.

3.2.4 Snow and Ice Loadings The rain and snow falls experienced at the North Anna site are described in Section 2.3.1 of this SAR.

Snow and ice would melt soon after contacting the surface of the SSSC due to the decay heat generated by the stored fuel. These phenomena are not considered credible challenges to the SSSCs. Therefore, snow and ice loadings are not identified among the design criteria for the SSSCs.

3.2.5 Combined Load Criteria The loads postulated as design criteria for the SSSCs have been described in this chapter.

The methods and assumptions made in analyzing the mechanical and structural behavior of the SSSCs are described in the SSSC Topical Safety Analysis Reports and in Appendix A.

3.3 SAFETY PROTECTION SYSTEMS 3.3.1 General The handling of the SSSCs while they are being placed in the ISFSI requires that they be lifted by a transporter. Technical Specifications for the North Anna ISFSI limit the height the SSSCs may be lifted while being transported and while being emplaced at the ISFSI. The SSSCs are able to withstand drops onto the storage pad without compromising their integrity and without resulting in physical damage to the fuel.

Revision 806/14 North Anna ISFSI SAR 3-6 Because of the passive nature of the North Anna ISFSI and the absence of support systems, no other items requiring special design consideration have been identified.

3.3.2 Protection By Multiple Confinement Barriers and Systems 3.3.2.1 Confinement Barriers and Systems Confinement of radioactivity during the storage of spent fuel is achieved by (1) the uranium dioxide fuel pellet matrix, (2) the metallic tubes (cladding) in which the pellets are contained, and (3) the SSSC in which the assemblies are stored.

The confinement function of the SSSCs is achieved by totally enclosing the spent fuel assemblies within a double-seal rigid metal vessel. The SSSCs are fabricated, delivered to the North Anna site, loaded, sealed, and emplaced at the ISFSI in a manner that ensures their integrity, the capability to perform their safety functions, and compliance with all applicable rules and regulations.

Once the SSSCs are sealed, there are no credible events which could result in a release of radioactive material to the environment. Similarly, there are no credible scenarios which could result in contamination of the outside surface of the SSSCs or in the generation of radioactive waste products.

More detailed information on SSSC confinement barriers is provided in the SSSC Topical Safety Analysis Reports.

3.3.2.2 SSSC Cooling Natural air flow around the SSSCs provides sufficient cooling. No forced ventilation is required.

3.3.3 Protection By Equipment and Instrumentation Selection 3.3.3.1 Equipment As discussed in Section 3.2, the SSSCs represent the only components of the ISFSI which are important to safety. Design criteria for the SSSCs are described in this section and summarized in Table 3-2.

3.3.3.2 Instrumentation Due to the totally passive and inherently safe nature of the SSSCs, safety-related instrumentation is not necessary.

High quality commercial grade instrumentation will be provided to monitor the SSSCs functional performance. Instrumentation to monitor SSSC parameters such as pressure will be furnished as recommended by the specific SSSC designs. The appropriate capabilities to check these monitors will also be provided. The SSSCs are provided with pressure monitoring systems as described in the SSSC Topical Safety Analysis Reports.

Revision 806/14 North Anna ISFSI SAR 3-7 3.3.4 Nuclear Criticality Safety The criterion for ensuring that the fuel remains subcritical at all times is that the effective neutron multiplication factor keff be less than 0.95 (including two standard deviations), assuming a single active or passive failure, and that an infinite number of SSSCs can be stored in close proximity.

3.3.4.1 Control Methods for Prevention of Criticality Methods to be used to ensure that subcriticality is maintained at all times in the SSSCs are addressed in the SSSC Topical Safety Analysis Reports or Appendix A.

3.3.4.2 Error Contingency Criteria Error contingency criteria for the SSSCs are presented in the SSSC Topical Safety Analysis Reports or Appendix A.

3.3.4.3 Verification Analyses The criteria for establishing verification of the models and programs used in the criticality calculations for the SSSCs are presented in the SSSC Topical Safety Analysis Reports or Appendix A.

3.3.5 Radiological Protection Provisions for radiological protection by confinement barriers and systems are described in Section 3.3.2.1. No additional radiological protection design criteria are considered to be necessary.

The North Anna ISFSI does not require the continuous presence of operators or maintenance personnel. Access to the ISFSI perimeter fence is limited to personnel needed during operations at the ISFSI, e.g., periodic inspection of the facility, emplacement of SSSCs, and security checks. These activities will be defined and controlled by the Health Physics and Security procedures covering the North Anna ISFSI. Because personnel are seldom at the ISFSI and only for short periods of time, further reduction of collective occupational doses is not practical.

Estimates of the collective occupational doses (in person-rem) per year for SSSC operation, maintenance and repair are included in Section 7.4. No occupational dose is expected for decommissioning of the ISFSI facility, since the facility will not be contaminated. The occupational dose to unload SSSCs will be similar to that for SSSC loading shown in Table 7-2.

The occupational dose to dispose of SSSC components as radioactive waste is expected to be very small, as discussed in Section 4.6. Occupational exposures will be kept as-low-as-reasonably-achievable as discussed in Sections 7.1 and 7.3.

Revision 806/14 North Anna ISFSI SAR 3-8 3.3.6 Fire and Explosion Protection A backup diesel generator and its associated fuel tank are located within the ISFSI security fence. To prevent a postulated fire associated with a leaking fuel tank a monitored, double-walled diesel fuel tank with a maximum capacity of 200 gallons is provided. There are no other significant combustible sources within the ISFSI security fence.

As indicated in Section 2.2.2, overpressure of much less than 1 psi can be conservatively postulated to occur at the North Anna ISFSI as a result of accidents involving explosive materials which are transported near the site. The SSSCs are designed to withstand a 1 psi external overpressure without any impairment of their safety functions.

3.3.7 Materials Handling and Storage The handling of spent fuel within the North Anna Power Station will be conducted in accordance with existing fuel handling procedures. Spent fuel that may be damaged to the extent of losing its cooling geometry or reasonable cladding integrity will be kept at the spent fuel pool and not considered for storage at the ISFSI.

The design criteria for SSSCs related to cooling requirements, criticality and contamination control are provided in the SSSC Topical Safety Analysis Reports or Appendix A. The detection and handling of breached fuel rods is discussed in Section 3.1.1.1.2.

3.4

SUMMARY

OF SSSC DESIGN CRITERIA The principal design criteria for SSSCs used at the North Anna ISFSI are presented in Table 3-2.

Revision 806/14 North Anna ISFSI SAR 3-9 Table 3-1 CHARACTERISTICS OF FUEL USED AT THE NORTH ANNA POWER STATIONa

1. Fuel Assemblies
a. Manufacturer Westinghouse
b. Type PWR
c. Rod array 17 x 17
d. Rods per assembly 264 (25 fuel rods are omitted to provide passage for control rods and in-core instrumentation)
e. Assembly length 161.80 in.
f. Rod pitch 0.496 in.
g. Overall assembly dimensions 8.426 in. x 8.426 in.
h. Total assembly weight 1533 lb (with heaviest insert component)
i. Active fuel length 144 in.
2. Fuel Rods
a. Outside diameter 0.374 in.
b. Clad thickness 0.0225 in.
c. Clad material Zircaloy-4 and Zirlo
3. Fuel Pellets
a. Material UO2 Sintered
b. Length 0.530 or 0.387 in. c
4. Fuel Condition for Storage in SSSCs
a. Maximum initial enrichment b
b. Maximum burnup b
c. Maximum heat generation for each b fuel assembly at the time of storage
d. Minimum decay time b
a. From North Anna Power Station UFSAR. All dimensions are for cold conditions.
b. Specified in the North Anna ISFSI Technical Specifications.
c. Reload batches starting with North Anna Unit 1, Batch 9 and North Anna 2, Batch 8 changed fuel pellet length from 0.530 in. to 0.387 in.

Revision 806/14 North Anna ISFSI SAR 3-10 Table 3-2 DESIGN CRITERIA FOR DRY SEALED SURFACE STORAGE CASKS The SSSCs must meet the following criteria, assuming that they are loaded with the fuel described in Table 3-1.

1. Maximum weight with yoke 125 tons
2. Criticality with single active or credible keff < 0.95 passive failure
3. Ambient temperature -20°F to 115°F
4. Direct exposure to sunlight 800 gm-cal/cm2 for flat surfacesa 400 gm-cal/cm2 for curved surfacesa
5. Tornado winds 300 mph rotational velocity, 60 mph translational velocity
6. Tornado pressure drop 3 psi in 3 seconds
7. Maximum winds (V) 80 mph
8. Explosive peak overpressure 1 psi
9. Design Earthquake peak acceleration 0.18g horizontal 0.12g vertical
10. Adequate provisions to monitor performance of SSSC leak tightness
11. 15-inch drop onto concrete pad without compromising SSSC integrity and without physical damage to fuel or loss of subcriticality
12. Capable of tipping over and rolling without compromising SSSC integrity and without physical damage to fuel or loss of subcriticality
13. Leak tightness to be maintained under all operating conditions and credible events
a. These values are adapted from 10 CFR 71.71(c) and apply to a 12-hour daylight period. These values may be averaged over a 24-hour period for long-term thermal analyses.

Revision 806/14 North Anna ISFSI SAR 4-1 Chapter 4 STORAGE SYSTEM This chapter provides descriptive information on the North Anna ISFSI structures, systems and components. It also provides the bases for the design criteria presented in Chapter 3.

4.1 LOCATION AND LAYOUT The location of the North Anna ISFSI and the main and alternate transport route of the SSSCs from the Decontamination Building to the ISFSI are shown in Figure 4-4. In addition, this figure shows other facilities in the vicinity of the ISFSI site, such as roadways and buildings.

However, none of these other facilities are related to the ISFSI. The ISFSI and both transport routes are within the North Anna Power Station exclusion area.

The only components with a safety function are the SSSCs. The SSSCs are stored on three nonsafety-related concrete storage pads, 224-by-32-feet, to be built one at a time, as needed, within the ISFSI perimeter fence. Each storage pad is designed to accommodate 28 SSSCs. Each SSSC is approximately 8 feet in diameter and weighs no more than 125 tons. There is approximately 8 feet surface-to-surface distance between SSSCs when they are stored in the vertical position.

The North Anna ISFSI perimeter fence is approximately 750-by-660 feet with a vehicle entrance on the northwest side and seven personnel entrances spaced around the perimeter. A security fence and a nuisance fence are also provided around the storage pads. The layout of the ISFSI site is shown on Figure 4-1.

The only utility associated with the North Anna ISFSI is electrical power for lights, communications, and monitoring instrumentation as shown on Figures 4-2 and 4-3. The source of this power is described in Section 4.4.4.

Loading and unloading of the SSSCs takes place in the Fuel and Decontamination Buildings of the North Anna Power Station. These facilities are described in Sections 9.1 and 9.5, respectively, of the North Anna Power Station UFSAR. Figure 4-4 shows the route for transport of the SSSCs from the Decontamination Building to the ISFSI.

4.2 STORAGE SITE The North Anna ISFSI is designed in accordance with the General Design Criteria set forth in 10 CFR 72, Subpart F. Table 4-1 summarizes compliance with these criteria, and additional details are provided below.

The North Anna ISFSI will consist of three concrete storage pads on which the loaded SSSCs are placed. The storage pads will be constructed one at a time as the need for storage space arises. The storage pads will be surrounded by a security fence and a nuisance fence which are surrounded by an ISFSI perimeter fence. In addition, the ISFSI storage area will include lighting, monitors, alarms, and a diesel generator. The ISFSI site plan is shown on Figure 4-1.

Revision 806/14 North Anna ISFSI SAR 4-2 The SSSCs are self-contained, independent, passive systems, which do not rely on any other systems or components for their operation, and are classified as safety-related. The storage pads and other systems and components at the storage site are classified as nonsafety-related.

4.2.1 Structures The operational areas of the North Anna ISFSI are the three storage pads and the areas immediately around them. The storage pads provide a uniform level surface for storing the SSSCs. The compacted gravel areas around the storage pads allow movement and positioning of SSSC handling equipment.

These storage pads will be built in accordance with the BOCA Basic Building Code (Reference 1) and applicable American Concrete Institute codes and standards. The area surrounding the storage pads will be compacted to properly support the tow vehicle and transporter needed for the handling of the SSSCs.

The primary function of the concrete storage pads is to provide a uniform level surface for storing the SSSCs. Each pad will be a reinforced concrete slab on grade with nominal dimensions of 32 feet by 224 feet by 2 feet thick. Nominal forty-foot long concrete ramps are required on each end of the storage pads to enable the SSSC transporter to gain access to the storage pad. The nominal overall length of the storage pad will be 304 feet. Each storage pad is designed to support a total of 28 SSSCs arranged in fourteen rows of two SSSCs with a nominal center-to-center spacing of 16 feet in both directions. SSSCs will be placed on the storage pad starting in the center and moving to the ends in a symmetrical manner. The soil subgrade modulus of elasticity has a nominal value of 30,000 psi. The concrete has a minimum design compressive strength of 3000 psi in 28 days. Reinforcing steel shall be nominally No. 10 bars at 12 inches-on-center, each way, top and bottom, with a minimum yield strength of 60,000 psi. The as-built soil and concrete parameters of the ISFSI storage pad have been verified to ensure that the final storage pad is robust enough to withstand the maximum loads associated with all cask load conditions, yet soft enough to limit the deceleration of the cask during design accident cases. The engineering drawing of the plan, sections and details of the storage pads is provided in Figure 4-5.

Specifications will be produced so that construction of the storage pads will meet the requirements of ACI 301, Specifications for Structural Concrete for Buildings (Reference 2).

The storage pads are designed to support generic SSSCs that are cylindrical in shape and are each approximately 8 feet in diameter by 16 feet high.

Load combinations and design limits for the reinforced concrete structures are in accordance with ANSI/ANS 57.9 (Reference 3). The available strength of the concrete storage pads was calculated in accordance with the requirements and assumptions of ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures (Reference 4).

Revision 806/14 North Anna ISFSI SAR 4-3 Structural design of the concrete storage pads included the following loads identified in Section 6.17 of ANSI/ANS 57.9. The following loads were evaluated:

D Dead load of the structure and attachments including permanent equipment and piping. The weight of the storage pads at 150 pounds per cubic foot was included for the pad design.

L Live loads include snow, rain, operational loads including impact, and vibratory loads due to operating equipment. For the storage pad design, the SSSC weight of 250 kips was conservatively treated as a live load. The SSSC transporter was also included as live load. The transporter will be moved at very slow speeds and no impact loads need be applied. Also, the SSSC will be lowered from the transporter at a very slow speed and no impact loads will be applied - the SSSC is designed to survive an accidental drop; if the storage pad is damaged it will be repaired. Snow, rain and/or ice loads that could develop are minor in comparison to the weight of the SSSCs. Also, any accumulation of these loads on the storage pad between the SSSCs would reduce the flexural stress in the storage pad and were, therefore, not included.

T Thermal loads during operation. The SSSCs will be stored on the exterior storage pads and will not be enclosed by an additional structure. The storage pad is not restrained except by the foundation soil. No thermal loads need be considered.

H Lateral soil pressure. The storage pad is a slab-on-grade and there are no differential soil pressures to consider.

E Loads generated by the Design Earthquake. The North Anna Power Station design basis earthquake (DBE) described in Section 2.5.2.6 of the UFSAR and Section 2.5.2.3 of this SAR was used as the Design Earthquake.

W Loads generated by the Design Wind. ANSI/ANS-57.9 references ANSI/ANS 2.19 for guidance for determining the Design Wind. ANSI/ANS 2.19 identifies the 100-year recurrence interval wind that shall be used. Design Wind was determined at a 100-year recurrence level in accordance with ASCE 7-88 (Reference 6).

Ta Loads due to a temperature rise resulting from loss of cooling air for an extended period of time or loads resulting from the maximum anticipated heat load. The SSSCs will be stored on the exterior storage pads and will not be enclosed by an additional structure. The storage pads are not restrained except by the foundation soil. Thermal loads need not be considered.

A Loads due to a drop of a heavy load. The SSSCs are designed to survive impact as a result of tornado missile impact (see Section 3.2.1.3) and also survive an accidental drop (see Section 8.2.9). Loads due to a drop of a heavy load need not be considered for the concrete storage pad; if the storage pad is damaged it will be repaired.

Revision 806/14 North Anna ISFSI SAR 4-4 Although not identified in ANSI/ANS 57.9, the following extreme environmental loads were also investigated and conservatively included in the design of the concrete storage pad:

WT Wind loads generated by a tornado. The same maximum tornado wind speed of 360 mph as used for the North Anna Power Station was used to determine loads on the SSSCs, sliding and overturning, and effect on the concrete storage pad.

F Loads resulting from maximum hypothetical flood including buoyancy and dynamic pressure. As stated in Section 2.4.2.3, flood loading need not be considered.

The design of the concrete storage pads included the following load combinations:

U = 1.4D + 1.7L U = 0.75(1.4D + 1.7L + 1.7W)

U = D+L+WT U = D+L+E where U = required concrete strength.

The factor of safety against overturning and sliding is based on Section 6.17.4.1 of ANSI/ANS 57.9 as modified below and is conservatively applied to each SSSC:

Minimum Safety Factors Load Combinations Overturning Sliding D+L+E 1.1 1.1 D+L+W 1.1 1.1 D + L + WT 1.1 1.1 4.2.1.1 Static Analysis The concrete storage pad design was analyzed using the IMAGES-3D finite element computer program (Reference 7). The analysis was performed to verify that the strength of the storage pad was adequate. Since the ramps are connected to the main portion of the storage pad, they were included in the storage pad model. A 9 x 77 array of 693 nodes and 608 plate elements was used for the model. Nodes were spaced at 4 feet spacing in both directions (See Figure 4-6).

Vertical translational springs were used to model the soil stiffness. These springs were placed at each node of the model based on the tributary area of the node. A conservative modulus of subgrade reaction of 200 kips per cubic foot (115 pci) was used to calculate the spring stiffness (see Section 2.5.1.11 for discussion on soil parameters). The model was restrained at the corners from lateral and rotational displacements for stability but these restraints received no loads from vertical static loading.

The weight of each 250-kip SSSC was modeled as a 50 kip load at the node directly beneath the centerline of the SSSC and 50 kips each at the four adjacent nodes (one on either side of the

Revision 806/14 North Anna ISFSI SAR 4-5 center node, in both directions). The SSSCs were conservatively treated as a live load and a 1.7 load factor was applied for the ultimate strength evaluation. The five nodal loads were therefore:

50 kips x 1.7 = 85 kips The storage pad was analyzed for several SSSC loading patterns to determine the maximum stress in the concrete pad. Since the SSSCs will be located starting at the center of the storage pad and will proceed towards both ends in a symmetrical pattern, the following loading cases were considered:

  • One center SSSC
  • Two center SSSCs
  • Four center SSSCs
  • Eight center SSSCs
  • All 28 SSSCs The weight of the concrete storage pad was included as dead load in all cases.

As expected, the bending stresses in the storage pad are less with a more uniform loading of all SSSCs and are higher with the less uniform loads of the other cases. The maximum concrete bending stress for the above loading pattern occurs with two center SSSCs.

Also, the effect of the SSSC transporter was evaluated. The transporter was assumed to have a total loaded weight of 310 kips and a wheel load at each of the eight wheels of 38.75 kips per wheel. With the 1.7 load factor, the wheel load becomes 65.88 kips. Several transporter locations with and without other SSSCs were checked. The following cases were evaluated:

  • Transporter at edge of storage pad
  • Transporter over one center SSSC
  • Transporter over one center SSSC plus one additional center SSSC
  • Transporter over one center SSSC plus three additional center SSSCs For these cases, the maximum storage pad stress occurred with the transporter at the edge of the storage pad.

4.2.1.2 Design Wind Design Wind loads on the SSSCs were determined using ASCE 7-88 for a 100-year recurrence interval. From Table 4, design wind forces, F, for structures other than buildings:

F = qzGhCfAf or p = F/Af, where:

qz = velocity pressure evaluated at height z above ground Gh = gust response factor evaluated at height z = h

Revision 806/14 North Anna ISFSI SAR 4-6 Cf = force coefficient Af = area of structure projected on a plane normal to wind direction h = height of structure above ground ASCE 7-88 takes into account characteristics of ground surface irregularities for a particular site and establishes four exposure categories. For the North Anna site, Exposure C was conservatively chosen which describes the site area as open terrain with scattered obstructions having heights generally less than 30 feet and includes flat open country and grasslands. With a SSSC height of 16 feet and storage pad thickness of 2 feet, z and h were conservatively selected as 20 feet.

From Equation 3, qz = 0.00256Kz(IV)2, where:

Kz = velocity pressure exposure coefficient at height z I = Importance factor V= basic wind speed From the map on Figure 1, V = 70 mph.

From Table 5, with essential structure classification Category III, and location 100 miles from hurricane oceanline and other areas, I = 1.07. This adjusts the design wind speed to a mean recurrence interval of 100 years, therefore:

IV = 1.07(70) = 74.9 mph In Section 2.3.1, a 100-year design wind speed of 80 mph was identified and will be used in this analysis, as it bounds 74.9 mph calculated above.

From Table 6, with z = 20 feet and Exposure C, Kz = 0.87.

Therefore, qz = 0.00256(0.87)(80)2 = 14.25 psf.

From Table 8, with z = 20 feet and Exposure C, Gh = 1.29.

From Table 12, with round shape and D(qz)0.5 > 2.5, moderately smooth surface, and interpolating for h/d = 2, Cf = 0.52.

Therefore, p = 14.25(1.29)(0.52) = 9.6 psf < 10 psf minimum.

Af = 8.0(16.0) = 128 sf Therefore, F = 10(128) = 1280 lb, or 1.3 kips.

This lateral force will tend to cause the SSSC to slide or tip over. Sliding is resisted by the static friction force between the SSSC and the concrete storage pad surface. In order to slide, the lateral force must overcome a friction force equal to the SSSC weight times the coefficient of friction of the surface:

Ff = uW

Revision 806/14 North Anna ISFSI SAR 4-7 The coefficient of static friction for metal on concrete is approximately 0.30 to 0.70 (Reference 8). With a 250-kip SSSC, the minimum resistance would be:

Ff = 0.30(250) = 75 kips which is over 57 times greater than the calculated Design Wind load, therefore, the SSSC will not slide.

The SSSC will start to tip if the overturning moment about the outside edge of the base is greater than the resisting moment about that same point.

MO = F(h/2) = 1.3(8) = 10.4 ft-kips MR = Weight(7.0/2) = 250(3.5) = 875 ft-kips The factor of safety against the start of tipping is:

FS = MR/MO = 875/10.4 = 84.1 The effect of the Design Wind loads was included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.

R = MO/(diameter of base) = 10.4/7.0 = +/- 1.5 kips RU = 1.7R = 1.7(1.5) = +/- 2.55 kips Therefore, the outside two vertical nodal ultimate loads are:

PU = 0.75(85.0 +/- 2.55) = 61.8 kips to 65.6 kips 4.2.1.3 Tornado Wind Loads Wind loads due to a tornado were similarly determined using ASCE 7-88, except gust and velocity pressure coefficients need not be applied. Using the same maximum tornado wind velocity as used for the North Anna Power Station, V = 360 mph.

q = 0.00256V2 = 0.00256(360)2 = 332 psf = 0.332 ksf F = qCfAf = 0.332(0.52)(128) = 22.1 kips As demonstrated with the Design Wind, a lateral force of 75 kips would be necessary to overcome the static frictional resistance, therefore, the SSSCs will not slide under the tornado wind. The Factor of Safety against sliding is 75.0/22.1 = 3.4.

Checking tipping under tornado wind conditions, MO = 22.1(8.0) = 176.8 ft-kips MR = 250(3.5) = 875 ft-kips FS = 875/176.8 = 4.95 Therefore, the SSSCs will not start to tip due to tornado winds.

Revision 806/14 North Anna ISFSI SAR 4-8 The effect of the tornado wind loads was included in the static analysis of the storage pad by modifying the SSSC nodal vertical loads by a resultant couple equal to the overturning moment caused by the wind.

R = MO/(diameter of base) = 176.8/7.0 = +/- 25.3 kips With tornado winds, the load factors are 1.0, and the outside two vertical nodal ultimate loads are:

PU = p = 50.0 +/- 25.3 = 24.7 kips to 75.3 kips 4.2.1.4 Dynamic Analysis A dynamic analysis was performed to determine the effect of the Design Earthquake on the SSSCs and concrete storage pad. A finite element model was developed using the computer code SASSI (Reference 9). For the dynamic analysis a weight of 230 kips was used for each SSSC. The SSSCs were modeled as a rigid beam 8 feet long connected to the mid elevation of the pad by an ensemble of rigid elements. The translational and rotary weights of the SSSC were lumped at the top of the 8-foot rigid beam.

Due to the symmetry of the pad, a quarter of the pad was modeled. The pad was modeled by 4-foot x 4-foot plate elements, 2-foot thick, and a unit weight of 0.15 kcf. The elastic properties for reinforced concrete were used based on a design compressive strength, f'c = 3000 psi. The slab geometry and elements for the SSSCs and pad plate elements are shown on Figures 4-7, 4-8 and 4-9.

The analysis for the soil-structure interaction was based on the soil boring logs shown in Appendix 2A for the Design Earthquake.

Input motion acceleration time histories for soil conditions were used which envelop the design basis earthquake (DBE) Response Spectra for the Seismic Class I structures for the North Anna Power Station.

Accelerations were calculated at the SSSCs in order to determine the factor of safety for sliding and overturning and the global forces and moments at the base of the SSSCs. These results consider the three components of the input applied simultaneously. For calculating the factor of safety for sliding, a friction coefficient of 0.3 was assumed between the SSSCs and the supporting concrete slab.

When combining responses as identified in Regulatory Guide 1.92 (Reference 10), the lowest factor of safety for sliding is slightly higher than one. The lowest factor of safety for overturning is about 1.6. Figures 4-10 and 4-11 show the time plot of the inverse of the sliding and overturning factors of safety (1/FS), respectively. However, it should be noted that the ground motions in the x and y directions (two horizontal directions) have an extreme peak occurring at the same time at 3.71 seconds even though these motions are statistically independent. This situation is very unrealistic and overly conservative due to the coincidence of two extreme peaks

Revision 806/14 North Anna ISFSI SAR 4-9 in the horizontal input motions. It is due to the fact that these motions correspond to artificially generated time histories. At any other time, the next lowest factor of safety for sliding during the duration of the earthquake is about 1.25 and for overturning it is approximately 2.0.

The analysis confirmed that the responses due to the 3 components of the input are uncoupled. A better estimate of the factors of safety for sliding and overturning can be obtained by calculating them using the maximum responses for each direction and then combining them using the 100%, 40%, 40% combination rule recommended in ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Structures and Commentary on Standard for Seismic Analysis of Safety-Related Nuclear Structures (Reference 11). Using 100% of the maximum response due to the X input, 40% of the maximum response due to the Y input, and 40% of the maximum response due to the Z input, the factor of safety for sliding is approximately 1.17. The same value results if 40% of X and 100% of Y are used. For the case when 40% of the horizontal cases and 100% of the vertical case are used, then the sliding factor of safety is approximately 2.04.

Also performed was a verification of the personal computer version of the computer code SASSI. A model formed by plates and beams was analyzed using the personal computer version of SASSI and EQE Internationals QA-verified version of the computer code CLASSI (Reference 12). For comparison purposes, in-structure acceleration response spectra at various elevations and plate stress time histories were calculated using both programs and then plotted together. It was concluded that the personal computer version of SASSI gives results similar to CLASSI for soil-structure interaction analysis.

4.2.1.5 Storage Pad Design Several SSSC loading patterns were investigated during the static analysis to determine the maximum stress in the concrete storage pad:

  • One center SSSC
  • Two center SSSCs
  • Four center SSSCs
  • Eight center SSSCs
  • All 28 SSSCs It was determined that the maximum stress occurred with two center SSSCs. Wind and seismic loads were then applied to the two center SSSCs using the load factors previously described to determine the critical condition for the concrete storage pad.

The storage pad was also analyzed using the SAFE (Reference 13) finite element computer program and designed using the SAFERC reinforced concrete design computer program which is a post processor for SAFE. The model for the SAFE runs was similar to the IMAGES run except a finer 2.0-foot x 2.0-foot mesh and a shorter model was used for the SAFE runs concentrating on

Revision 806/14 North Anna ISFSI SAR 4-10 the critical condition of two center SSSCs. Several runs were made with varying design strip widths. A 48-inch design strip was conservatively selected which resulted in number 10 rebar with 12-inch spacing. This provides an area of 1.27 square inches per linear foot. The number 10 rebar will be placed at 12-inch spacing in both directions, and in both the top and bottom of the storage pad and used for the entire pad area. This exceeds the minimum spacing requirements for primary flexural reinforcement and exceeds the minimum reinforcement requirement of AC1 349.

The minimum concrete cover will be three inches on the bottom and two inches on the top in accordance with the concrete protection requirements of AC1 349.

4.2.2 Storage Site Layout The overall layout of the North Anna ISFSI is described in Section 4.1, and is shown in Figure 1-2.

The SSSCs are the only component of the North Anna ISFSI vital to the fulfillment of its safety function. All other structures and components are of a support nature and do not perform safety functions.

The most important of these support systems are the concrete storage pads, which provide a uniform level surface, slightly above grade elevation, for the SSSCs. These are described in Section 4.2.1. Engineering drawings showing section and details of the storage pads are provided in Figure 4-5.

4.2.3 SSSC Description The bases and engineering design specifications for the SSSCs are described in the SSSC Topical Safety Analysis Reports. These reports also provide assurance that the applicable design criteria described in Chapter 3 are met.

Compliance with the design criteria ensures that the General Design Criteria in 10 CFR 72, Subpart F are satisfied. This is illustrated in Table 4-1 which shows a correspondence between each of the General Design Criteria and the design criteria of specifications that the SSSCs must meet as identified in Chapter 3.

The specific codes and standards to which the SSSCs are fabricated, delivered to the site, and sealed are addressed in the SSSC Topical Safety Analysis Reports. Compliance with applicable current nationally recognized codes and standards is expected. Codes and standards representing an acceptable level of design are:

  • American Welding Society (AWS) The Structural Welding Code (AWS Dl.l-1980)
  • American Iron and Steel Institute (AISI) Steel Products Manual
  • American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code
  • American Society of Testing and Materials (ASTM) Standards

Revision 806/14 North Anna ISFSI SAR 4-11 As described in Chapter 11, the SSSC manufacturers will be required to maintain the necessary documentation to substantiate conformance with the specified codes and standards.

Construction materials are compatible with each other and with the expected radiation levels. In addition, the baskets holding the fuel assemblies within the SSSCs are typical of those currently used in spent fuel pools throughout the industry, and are designed to protect the spent fuel assemblies from mechanical damage during insertion and removal operations and as a result of all credible events. Damage resulting from postulated accidents is limited to the extent that normal removal of the fuel assemblies is not precluded.

4.2.3.1 Function Descriptions of the fuel loading, SSSC preparation, and SSSC placement operations are provided in Chapter 5.

The performance objectives during fuel loading are to transfer the selected fuel assemblies from their storage location in the spent fuel pool to the SSSC without damaging the fuel. All operations within and outside the Fuel Building will be conducted in a manner that does not jeopardize the safe operation of the North Anna Power Station, does not present a hazard to the stored fuel, and does not result in releases of radioactive gases in excess of the guidelines in 10 CFR 100.

The performance objectives for the post-loading activities are to ensure that the SSSCs can fulfill all of their design functions, and in particular that the SSSCs will confine the radioactive products under all credible conditions.

The performance objectives for SSSC transfer and emplacement operations are to ensure that the design criteria are not exceeded, and that the safety of the North Anna Power Station is not impaired.

The performance objectives for SSSC unloading operations are to ensure that all operations within and outside the Fuel Building will be conducted in a manner that does not jeopardize the safe operation of the North Anna Power Station, that there is no hazard to the stored fuel, and that there are no releases of radioactive gases in excess of the guidelines in 10 CFR 100.

4.2.3.2 Description A description of the SSSC components is provided in the SSSC Topical Safety Analysis Reports.

4.2.3.3 Design Bases and Safety Assurance The ability of the SSSCs to perform their design function is demonstrated in the SSSC Topical Safety Analysis Reports and in Appendix A.

Loading and handling of the SSSCs will be done according to the applicable procedures.

Revision 806/14 North Anna ISFSI SAR 4-12 As described in Chapter 8, the design and operation of the North Anna ISFSI ensures that a single failure does not result in the release of significant radioactive material.

The only interactions between the ISFSI and the North Anna Power Station are those concerning the loading and handling of the SSSCs in the Fuel and Decontamination Buildings.

These are discussed in Chapter 5.

Radiation protection of operating personnel is addressed in Chapter 7.

Nuclear criticality safety for the SSSCs is addressed in the SSSC Topical Safety Analysis Reports or Appendix A.

4.2.4 Instrumentation System Description Due to the passive nature of the SSSCs, no safety-related instrumentation is required. A description of the nonsafety-related SSSC pressure monitoring system is provided in Section 4.4.5.3.

4.2.5 References

1. BOCA Basic Building Code, Building Officials and Code Administrations International, Inc., 1993.
2. American Concrete Institute, ACI 301, Specifications for Structural Concrete for Buildings, 1989.
3. American Nuclear Society, ANSI/ANS 57.9, Design Criteria for an Independent Spent Fuel Storage Installation (Dry Storage Type), 1984.
4. American Concrete Institute, ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures, 1985.
5. American Nuclear Society, ANSI/ANS 2.19, Guidelines for Establishing Site-Related Parameters for Site Selection and Design of an Independent Spent Fuel Storage Installation (Water Pool Type), 1981.
6. American Society of Civil Engineers, ASCE 7-88, Minimum Design Loads for Buildings and other Structures, 1988.
7. Celestial Software, IMAGES-3D, Version 3.0, 1993.
8. Beer, F. P., Johnston, E. R. Jr., Vector Mechanics for Engineers: Statics and Dynamics, McGraw-Hill Book Company, 1962.
9. Stevenson & Associates, Inc., SUPER SASSI/PC Complete Dynamic Soil-Structure Analysis System on Personal Computers, May 1996.
10. Regulatory Guide 1.92, Combining Modal Responses and Spatial Components In Seismic Response Analysis, Revision 1, dated February 1976.

Revision 806/14 North Anna ISFSI SAR 4-13

11. ASCE Standard 4-86, Seismic Analysis of Safety-Related Nuclear Structures and Commentary on Standard for Seismic Analysis of Safety-Related Nuclear Structures, September 1986.
12. H. L. Wong and J. E. Luco, Soil-Structure Interaction: A Continuum Mechanics Approach (CLASSI), Report No. CE 79-03, Department of Civil Engineering, University of Southern California, in publication.
13. Computers and Structures, Inc., SAFE, Slab Analysis by the Finite Element Method, 1988.

4.3 TRANSPORT SYSTEM 4.3.1 Function The function of the transporter is to move the loaded SSSCs between the Decontamination Building and the ISFSI storage pads. The transporter shall be capable of being towed over several different types of ground surfaces, including compacted gravel, and concrete and asphalt paving.

The performance objectives of the transporter are to move the loaded SSSC in a vertical position in a manner that will preclude damage to the SSSC body and its internal components, and to any other safety or security related system or component which could be affected by SSSC transport.

4.3.2 Components The transporter is a gantry lift system on a U shaped trailer which carries the SSSC in a vertical position. It is approximately 16 feet wide, 21 feet long, 20 feet high and weighs approximately 30 tons. It has a tow bar pivot and four steerable wheels as well as four fixed wheels with solid tires to ensure maximum stability, maneuverability, and even-load distribution.

A tow vehicle will be used to move the transporter. Side and plan views of the transporter are provided in Figure 4-12.

The hydraulic cylinders used for SSSC lifting are a heavy duty design and made of steel. No load bearing member of the hydraulic unit is made of cast iron or any other brittle material. There are flow control valves at the downside of the cylinders in order to restrict the flow of hydraulic fluid from the cylinders, thus preventing the load from dropping too fast. There are lift cylinder locking valves to assure that the SSSC will not be accidently lowered.

The power unit used for SSSC lifting is diesel powered and is placed at the front of the transporter. The backup power unit is a 480V, three phase motor coupled to a heavy duty pump.

The pumping unit contains suction and return line filters, pressure relief valves, pressure gauges, and check valves.

The transporter is equipped with disc brakes designed for normal, park, and emergency functions. Normal and park brake operations are controlled by a lever mounted on the side of the transporter, easily accessible to an operator walking alongside.

Revision 806/14 North Anna ISFSI SAR 4-14 The emergency brake has a separate control and will control brake application to minimize dynamic braking effects and yet bring the transporter to a stop quickly.

The transporter tires are designed to distribute the load and provide adequate mobility. Solid tires are used to assure reliability. The transporter, loaded with a SSSC, is designed for a nominal towing speed of 5 miles per hour.

None of the features or components of the transporter are important to the safety function of the SSSCs and will not be covered by the Quality Assurance program described in Chapter 11.

The location of the transfer routes from the Decontamination Building to the ISFSl is shown in Figure 4-4. The main route runs west from the Decontamination Building toward the West End Security Access Facility and south to the ISFSI, while an alternate transfer route runs east from the Decontamination Facility, south to the South East Security Access Facility and then west to the ISFSI. Both routes consist of asphalt roadways. The portions of the routes within the North Anna Power Station are asphalt and lines for several safety-related systems for North Anna Power Station Units 1 and 2 are located beneath the transfer routes. The portion of the transfer route in and to the west of the Station has also been used for the transport of replacement steam generators, otherwise, only personnel and maintenance vehicles use portions of the transfer route.

Safety-related and nonsafety related with special quality regulatory requirements utilities located beneath the main transfer route include an electrical ductbank, service water lines, fuel oil lines and fire protection lines. All of these utilities are located within the protected area for North Anna Units 1 and 2. Based on a combined transporter and cask weight of 315,000 lb and a load of 39,400 lb/wheel, none of these utilities will be affected by movement of the loaded transporter over them.

The electrical ductbank is approximately 5.5 feet below grade and would be subject to approximately 1000 psf surcharge loading. This ductbank is founded on rock and requires no protection due to the depth of burial and its reinforcement design. The service water lines are approximately 6.7 feet below grade and would be subject to a surcharge loading of approximately 900 psf, which is negligible. The ten l-1/2-inch diameter fuel oil lines are encased in concrete on top of the electrical ductbank discussed above, and, for the same reasons, they require no protection. There are two fire lines crossing under the transport path that are 6.0 feet below grade.

These pipes are not encased, however, they are not overstressed by the additional 1000 psf surcharge pressure.

Nonsafety-related utilities passing under the main transport route in the protected area include domestic water lines, a well water line, a 42-inch diameter storm drain and a security duct bank. The water lines do not lie directly under the transport route, are relatively deep and have a small diameter. The storm drain is protected by a 2.5-foot thick concrete slab that will distribute loads evenly, and is approximately 5.0 feet below grade.

Revision 806/14 North Anna ISFSI SAR 4-15 A 24-inch diameter surface drain culvert passes beneath the main transport route approximately 900 feet west of the protected area gate. The top of this culvert is approximately three feet below surface grade, and steel plates or concrete will be used to protect this culvert from damage.

There are no portions of safety-related systems located beneath the alternate transfer route.

Within the protected area, there is a single buried section of' fire protection pipe beneath this route. This pipe is located a minimum of 6 feet below grade. Based on a combined transporter and cask weight of 315,000 lb, this results in a load of 39,400 lb/wheel and a corresponding surcharge loading of 1000 psf at 6 feet below grade. The pipe is not overstressed by the loaded transporter movement.

The portions of nonsafety-related systems located beneath the alternate transfer route and within the protected area include duct banks, a domestic water pipe, storm drain pipes, a waterline, a well waterline, mat sump pump lines, a pipe tunnel, manholes, and a diesel fuel pipe.

These nonsafety-related systems, with the exception of a 12 foot wide security ductbank and a 9 foot wide pipe tunnel, are either located at acceptable depth or constructed of materials able to withstand the stresses generated from loaded transporter movement.

An East-West running security duct bank and a North-South running reinforced concrete pipe tunnel each have top-of-concrete elevations located at 2.3 feet and 2 feet below grade, respectively. Both the duct bank and tunnel are located directly beneath the alternate transport route. Reinforced concrete protective slabs are installed over the duct bank and tunnel to bridge each structure and divert transporter surcharge loads so that the duct bank and tunnel are not adversely impacted by stresses generated by loaded transporter movement 4.3.3 Design Bases and Safety Assurance The transporter is designed to limit SSSC lift height to less than 15 inches by the use of internal mechanical stops. Lifting system integrity is maintained during transport by means of a hydraulic lock valve. The transporter is equipped with a SSSC restraint system which prevents SSSC sway during road movement.

The transporter design includes static and dynamic evaluations for strength, fatigue resistance, buckling resistance, joint design and the use of stiffeners. These evaluations included a minimum factor of safety of 1.67 in accordance with CMAA (Reference 1) and the AISC Manual of Steel Construction (Reference 2).

In order to minimize the weight of the transporter, no radiation shielding is provided in the transporter design. However, operation of the transporter can be done by one person, thereby minimizing radiation dose to operating personnel. Other personnel accompanying transport of SSSCs may do so at a distance from the transporter that minimizes their exposure to radiation.

Section 7.4 includes an evaluation of the occupational exposure during transport.

Revision 806/14 North Anna ISFSI SAR 4-16 The transporter is designed for independent operation, however, the electrical system may be powered from an external source. The transporter has no other backup provisions and no interfaces with SSSC or ISFSI systems. The codes and standards used in the design and fabrication of the transporter are listed in Table 4-2.

4.3.4 References

1. Crane Manufacturers Association of America, Specification No. 70, Specification for Electric Overhead Traveling Cranes.
2. American Institute of Steel Construction, Manual of Steel Construction, Ninth Edition.

4.4 OPERATING SYSTEMS 4.4.1 Loading and Unloading System 4.4.1.1 Function The functions of the loading systems are to transfer the spent fuel from the spent fuel pool to the SSSC and move the SSSC from the spent fuel pool to the transporter outside the Decontamination Building. The same systems would be used to unload the SSSCs.

The performance objectives are to load the spent fuel into the SSSCs in such a manner as to preclude damage to the fuel and ensure that subcriticality is maintained, and to move the loaded SSSC in a manner which will preclude damage to the SSSC and to any other safety-related system or component in the load path. The same objectives apply to unloading the SSSCs.

The ISFSI, SSSCs and related support equipment will be designed to interface with existing and planned equipment and systems at the North Anna Power Station. An amendment to the North Anna Power Station UFSAR will provide a description of the systems and equipment.

4.4.1.2 Major Components and Operating Characteristics The fuel storage area at the North Anna Power Station is located in the Fuel Building between the two reactor containments, and consists of a new fuel storage area, a pool for storing spent fuel, a cask loading area, and two canals for transfer of fuel assemblies between the reactors and the pool. The spent fuel pool is 72 feet 6 inches long, 26 feet 9 inches wide at the east end, 21 feet 4 inches wide at the west end and normal water depth is approximately 40 feet. The cask loading area at the west end of the spent fuel pool is separated from the spent fuel storage racks by a concrete wall that is 3 feet 6 inches thick and has a gate to allow spent fuel assemblies to be moved from the rack area. The cask loading area has two locations for casks, one that is 12 feet by 12 feet with a floor elevation 2 ft. 6 in. lower than the spent fuel storage area, and a second that is 12 feet by 9 feet 4 inches with a floor elevation 19 ft. 8 in. above the spent fuel storage area. A 32-inch high pedestal has been placed in the deep end of the cask loading area to allow the fuel assemblies in the spent fuel cask to be at approximately the same elevation as the assemblies in the spent fuel racks.

Revision 806/14 North Anna ISFSI SAR 4-17 The Fuel Building walls consist of blow-off siding attached to the steel superstructure.

Access to the Fuel Building for the 125-ton cask crane and SSSCs is provided by a roll-up door.

Movement of the cask crane in the Fuel Building is limited to the cask loading area and adjacent areas north and south, so that casks cannot pass over the fuel storage area. Figure 4-13 shows the layout of the Fuel and Decontamination Buildings and the load path for the SSSCs. Figure 4-14 is a section view of the load path in the Fuel and Decontamination Buildings.

The Decontamination Building is used for preparation of empty SSSCs and for vacuum drying, helium backfill, leak testing and decontamination of loaded SSSCs. Preparation of loaded SSSCs for unloading also takes place in the Decontamination Building, including testing of the helium backfill for indications of fuel failure. The north bay of the Decontamination Building will be used specifically for SSSCs, and is equipped with a platform to allow easy access to all areas of the SSSC surface, vacuum pumps, helium leak detector equipment and a system control panel.

Helium bottles are placed outside the Decontamination Building, for easy access during bottle replenishment, and are connected by piping to the north bay.

Station systems and other components used during the loading and unloading of SSSCs include the 125-ton cask handling crane and 10-ton auxiliary crane that service the Fuel and Decontamination Buildings. Other components include a cask lift beam and special tools for lifting SSSC lids and covers. A vacuum drying system (vacuum pumps, water collection bottle, piping and hoses) is used in the Decontamination Building to remove any water remaining in the cask cavity after pumping water from the cavity back to the spent fuel pool. Specialized leak detection equipment is used for seal testing.

Fuel assembly crud is controlled during unloading of the SSSCs through the slow addition of water to the SSSC cavity. Once the SSSC cavity is filled with water and the SSSC has been placed in the spent fuel pool, slow removal of the lid will also help prevent the spread of crud into the spent fuel pool.

4.4.1.3 Safety Considerations and Controls Fuel handling activities in the spent fuel pool are subject to limiting conditions for operations as set forth in Section 3.9, Refueling Operations, of the North Anna Units 1 and 2 Technical Specifications. A 125-ton trolley crane with a 10-ton auxiliary crane serve the Decontamination Building and Fuel Building. This crane and the fuel loading and SSSC handling will be subject to conditions as set forth in the North Anna Units 1 and 2 Technical Specifications and Operating License.

A lift beam designed to ANSI N14.6 (Reference 1) is used for SSSC handling. The lift beam and the SSSC lifting trunnions are designed such that stresses from lifting three times the weight of the SSSC will not exceed the yield strength of the lift beam materials and five times the weight will not exceed the ultimate strength. The arms of the lift beam open as the lift beam is attached to the SSSC. The arms are hydraulically locked in the closed position for lifting the SSSC.

Revision 806/14 North Anna ISFSI SAR 4-18 4.4.2 Decontamination System Standard decontamination methods will be used to remove surface contamination from the SSSCs resulting from their submersion in the spent fuel pool during loading. Decontamination of the SSSCs will be performed in the north bay of the Decontamination Building. Decontamination will typically be done manually, using water detergents and wiping cloths.

4.4.3 SSSC Repair and Maintenance Incidental mechanical operations involving the SSSCs include receiving the new SSSCs from the supplier, their temporary (empty) storage, and transfer to the Fuel Building. During these operations, the SSSCs will be inspected in detail and corrections made as needed. The facilities and machine shops of the North Anna Power Station will be available in the event repair operations become necessary. Repairs made to SSSCs must be done in or outside the Decontamination Building where the crane capacity exists for lifting the SSSC. Occupational exposures during repair operations will be kept as-low-as-reasonably-achievable (ALARA) under the North Anna Power Station ALARA program.

No maintenance or repair operations are anticipated once the SSSCs are placed into storage.

Periodic maintenance is not required beyond instrument adjustments and other similar evolutions of a minor nature, such as touching up defects in outer decontamination coatings. These can all be performed within the ISFSI area, without need to move the SSSCs.

Degradation of a SSSC primary seal is considered extremely unlikely. Nevertheless, in the event that this were to occur, the pressure sensor would activate an alarm. Upon identification of the affected SSSC, a series of actions identified in the ISFSI procedures will be taken. Depending on the exact circumstances, these may include monitoring the SSSC pressure with a time recorder in order to ascertain whether the malfunction is a progressing one, and checking for possible instrumentation failure. If a failure of a seal is ascertained, arrangements will be made to repair the SSSC in place, to transfer the SSSC to the Decontamination Building for repair work, if necessary, or any other action recommended by the manufacturer and included in the North Anna ISFSI operating procedures.

Because SSSCs have double seals, seal failure hypothesized in this section would not result in release of radioactive material.

The ISFSI operating procedures will be prepared to provide step-by-step actions to be taken for all alarms. These will be prepared according to the specific SSSC manufacturers designs and recommendations.

4.4.4 Utility Supplies and Systems The SSSCs are passive devices and no utility services are necessary for their operation.

Revision 806/14 North Anna ISFSI SAR 4-19 4.4.4.1 Electrical Systems Electric power is not required to support functions of the North Anna ISFSI important to safety. Power for ISFSI security equipment is provided by normal station power. A discussion of emergency power for security equipment is provided in the Physical Security Program.

Nonsafety-related electric power is supplied to the ISFSI for purposes of lighting, general utility, and instrumentation with which SSSC seal integrity is monitored. These support systems are not needed for effective SSSC function.

The source of electric power is obtained from three new pole-mounted transformers inside the ISFSI perimeter fence. The 34.5 kV line providing service to these transformers comes from the plants electrical switchyard. The transformers provide power to ISFSI loads through a separate feeder and disconnect and distribution panel which are located at the diesel generator pad. This distribution panel will provide normal power to loads for all three storage pads. Service power for lighting and welding receptacles is 480V, 60 Hz, single or three phase. A 120V circuit is also provided.

Since the SSSCs are the only components important to safety and since they do not require electric power to perform their functions, loss of electricity will not jeopardize the safety of the facility. A backup diesel generator will be provided to power security-related and SSSC monitoring equipment on the loss of normal power.

The ISFSI is a passive installation. There are no motorized fans, dampers, louvers, or valves, and no electrically operated cranes or lifts. Electricity is required only for monitoring equipment, lighting and security-related equipment.

4.4.5 Other Systems 4.4.5.1 Fire Protection System As described in Section 8.2.5.1, no fires other than small electrical fires are considered credible at the North Anna ISFSI.

Therefore, the North Anna ISFSI does not include a fire protection system, other than portable fire extinguishers which will be available within the ISFSI perimeter fence. In addition, the fire fighting equipment and personnel present at the North Anna Power Station would be available if needed.

4.4.5.2 Sewage Treatment System Neither sanitary nor chemical sewage is produced at the North Anna ISFSI. During the infrequent periods of manning for SSSC transfer operations or construction of the second and third storage pads, portable sanitary facilities may be provided in the vicinity of, but not directly within, the ISFSI. Chemical wastes, such as small amounts of ethylene glycol (antifreeze) or drips of lubricating fluid from transport vehicles could be cleaned up manually and disposed of at

Revision 806/14 North Anna ISFSI SAR 4-20 appropriate facilities of the North Anna Power Station. No permanent sewage treatment system is required or provided.

4.4.5.3 Alarm Systems The ISFSI is not manned on a continuous basis. All of the SSSCs will be provided with a pressure sensing device to monitor their seal tightness.

The monitoring devices will actuate a pressure switch at a preset alarm level. Specific recommendations for monitoring the SSSCs are provided in the SSSC Topical Safety Analysis Reports. Each of the SSSC alarms (maximum of two per SSSC) will initiate an annunciator alarm in the local annunciator panel at the ISFSI. The alarm panel will indicate the specific SSSC and will remain lit until reset. Actuation of the pressure monitoring alarm will also cause an alarm in the Station Security Central Alarm Station (CAS) and the Secondary Alarm Station (SAS).

Security personnel continuously monitor these stations and they will notify the Shift Manager.

This instrumentation is not required for safe operation of the ISFSI and therefore will not be safety-related.

4.4.5.4 Seismic Recording Instrumentation On August 23, 2011, an earthquake occurred approximately 5 miles from Mineral, Virginia.

In response to this event, Dominion committed to install seismic recording instrumentation at the ISFSI (Reference 2). This instrumentation consists of a triaxial time-history accelerograph and a motion recorder, and is located in the north-west section of the ISFSI adjacent to the alarm panel pad. The motion recorder is equipped with seismically qualified battery backup that permits continuous operation of the instrumentation upon loss of external power. The instrumentation is designed to detect the occurrence of an earthquake and provide records on intensity and duration.

The data collected can be used to evaluate the potential degradation of equipment and structures at the ISFSI due to an earthquake. This instrumentation is not required for safe operation of the ISFSI and therefore is not classified safety-related.

4.4.6 References

1. ANSI N14.6-1993, Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4,500 kg) or More for Nuclear Materials, American National Standards Institute.
2. Grecheck, E. S., Virginia Electric and Power Company (Dominion), Letter to U.S. Nuclear Regulatory Commission, Virginia Electric and Power Company (Dominion), North Anna Power Station Units 1 and 2, Independent Spent Fuel Storage Installation, Revised Long-Term Actions Commitment List, Serial No. 11-520D, dated November 7, 2011.

4.5 CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS The SSSCs are the only components of the North Anna ISFSI which are important to safety.

None of the other systems and structures comprising the North Anna ISFSI (storage pads, fence, monitors, wiring, and lights) perform a safety function. The SSSC transporter is not considered

Revision 806/14 North Anna ISFSI SAR 4-21 important to safety because the SSSCs are designed to withstand its failure without jeopardizing the health and safety of the public. The SSSC handling equipment (cask lift beam and cask lid lifting tools) used during loading and unloading operations is also considered important to safety because the SSSCs are not designed to withstand their failure. The cask handling and auxiliary cranes are included in the Station NUREG-0612 Heavy Loads program in order to provide programmatic control. A cask drop analysis has been conducted which evaluated potential Station structural damage and offsite dose consequences. This analysis is included in Appendix 15A of the North Anna Power Station UFSAR.

The specific portions of the SSSCs that are important to safety and a definition of the specific safety function are provided in the SSSC Topical Safety Analysis Reports.

4.6 DECOMMISSIONING PLAN The SSSC design concept utilized at the North Anna ISFSI features inherent ease and simplicity for decommissioning. At the end of its service lifetime, SSSC decommissioning could be accomplished by one of the options described below.

The SSSC, including the spent fuel stored inside, could be shipped to a fuel repository for permanent disposal. Depending on licensing requirements existing at the time of shipment offsite, placement of the entire SSSC inside a supplemental shipping container or overpack would be considered.

Alternately, the spent fuel could be removed from the SSSC and shipped in a licensed shipping container to a fuel repository. If needed, SSSC decontamination could be accomplished through the use of conventional high pressure water sprays to reduce contamination on the SSSC interior. The sources of contamination on the interior of the SSSC would be crud from the outside of the fuel rods and the crud left by the spent fuel pool water. The expected low levels of contamination from these sources could be easily removed with a high pressure water spray. After decontamination, the SSSC could either be cut-up for scrap or partially scrapped and any remaining contaminated or activated portions shipped as low-level radioactive waste to a disposal facility.

The volume of waste material produced incidental to ISFSI decommissioning will be limited to that necessary to accomplish surface decontamination of the SSSCs once the spent fuel assemblies are removed.

SSSC activation analyses have been performed to quantify specific activity levels of SSSC materials after years of storing spent fuel. These activation calculations and the assumptions under which they were performed are described in the SSSC Topical Safety Analysis Reports. Based on the results of the analyses, the SSSC materials will be only slightly activated by the low level neutron flux emanating from the stored spent fuel. Consequently, after application of the surface decontamination process described above, the radiation level due to activation products will be

Revision 806/14 North Anna ISFSI SAR 4-22 negligible, and the SSSCs may be able to be scrapped. A detailed evaluation will be performed at the time of decommissioning to determine the appropriate mode of disposal.

Due to the leak tight design of the SSSCs, no residual contamination is expected to be left behind on the storage pads. The storage pad, fence, and peripheral utility structures require no decontamination or special handling after the last SSSC has been removed.

The spent fuel pool at the North Anna Power Station will remain functional until the ISFSI is decommissioned. This will allow the pool to be utilized to transfer fuel from the SSSCs to licensed shipping containers for shipment offsite if the SSSCs cannot be utilized for transport.

Virginia Power presently owns and operates four nuclear power generating units. The cost to decommission the ISFSI is expected to be a small fraction of the total decommissioning costs for the North Anna Power Station. Nuclear decommissioning trusts have been established to accumulate the funds needed to cover the costs of decommissioning.

Revision 806/14 North Anna ISFSI SAR 4-23 Table 4-1 COMPLIANCE WITH GENERAL DESIGN CRITERIA (SUBPART F, 10 CFR 72) 72.122(a) Quality standards The design criteria require that the SSSCs be designed, fabricated, delivered to the site, and sealed according to recognized commercial codes and standards and in accordance with Virginia Powers quality assurance (QA) program for safety-related equipment.

72.122(b) Protection against environmental conditions and natural phenomena Extreme environmental conditions are defined in Chapter 2. The design criteria require that the SSSCs be designed to withstand the Design Earthquake, high ambient temperature, exposure to sunlight, and extreme winds.

72.122(c) Protection against fire and explosions No large fire within the North Anna ISFSI is considered credible. The design criteria require that SSSCs be designed to withstand extreme ambient temperatures and peak overpressure resulting from postulated nearby explosions.

72.122(d) Sharing of structures, systems, and components The ISFSI activities will be done without jeopardizing the safe shutdown capability of the North Anna Power Station Units 1 and 2.

72.122(e) Proximity of sites The design and operation of the North Anna ISFSI result in minimal additions of risk to the health and safety of the public.

72.122(f) Testing and maintenance of systems and components The SSSCs require minimum maintenance. The design criteria require that the SSSCs be capable of being inspected and monitored.

72.122(g) Emergency Capability All emergency facilities at the North Anna Power Station will be available if needed.

72.122(h) Confinement barriers and systems The design of the SSSCs will ensure that the stored fuel is maintained in a safe condition.

No paths for the release of radioactive material are considered credible. No ventilation or off gas systems are needed. Continuous monitoring of SSSC confinement barriers is provided.

72.122(i) Instrumentation and control systems No instrumentation or control systems are needed for the SSSCs to perform their safety functions, however, continuous monitoring of SSSC confinement barriers is provided.

72.122(j) Control room or control areas The North Anna ISFSI is a passive installation, with no need for operator actions. No control room or control area is needed.

72.122(k) Utility services The SSSCs are the only safety-related components at the North Anna ISFSI. There are no utility or emergency systems required to perform any safety functions or to meet emergency conditions at the North Anna ISFSI.

Revision 806/14 North Anna ISFSI SAR 4-24 Table 4-1 (CONTINUED)

COMPLIANCE WITH GENERAL DESIGN CRITERIA (SUBPART F, 10 CFR 72) 72.122(l) Retrievability The design of the SSSCs will enable subsequent removal of the stored fuel in the North Anna spent fuel pool and repackaging of the spent fuel into shipping casks. The spent fuel pool will remain operational as needed for spent fuel transfer.

72.124(a) Design for criticality safety The design criteria require that the SSSCs be designed to maintain subcriticality at all times, assuming a single active or credible passive failure.

72.124(b) Methods of criticality control Different SSSC designs may use different methods of criticality control. All designs use conservative analyses and specified error contingency criteria. Since criticality control is provided entirely within the SSSC design, additional design features for criticality control at the ISFSI are not needed.

72.124(c) Criticality monitoring Not required 72.126(a) Exposure control Operations at the North Anna ISFSI will be done according to ALARA procedures.

Minimal maintenance operations are needed following SSSC emplacement at the ISFSI.

SSSC loading, transport and unloading are done in accordance with health physics procedures in effect for the North Anna Power Station.

72.126(b) Radiological alarm systems No radioactive releases are considered credible at the North Anna ISFSI. No safety-related alarm systems are needed at the ISFSI. Radiological alarm systems are provided for operations in the Fuel Building at the North Anna Power Station.

72.126(c) Effluent and direct radiation monitoring Operation of the North Anna ISFSI does not result in any radioactive effluents. No safety-related monitors are needed. Direct radiation monitors will be installed around the ISFSI.

72.126(d) Effluent control No radioactive releases are considered credible at the North Anna ISFSI.

72.128(a) Spent fuel and radioactive waste storage and handling systems The design criteria require that the SSSCs have adequate provisions to monitor the SSSC performance, provide sufficient shielding to restrict surface dose rates to below prescribed levels, maintain leak tightness under all operating and credible accident conditions, and maintain the spent fuel in a safe condition. Only minimal amounts of radioactive waste are generated in the decontamination of the SSSCs.

72.128(b) Waste treatment Radioactive wastes generated in the decontamination of the SSSCs are processed by the North Anna Power Station waste processing systems.

72.130 Decommissioning Operation of the North Anna ISFSI does not result in contamination of the outside surface of the SSSCs or any other ISFSI components. Therefore, there is no need for additional provisions to facilitate decommissioning.

Revision 806/14 North Anna ISFSI SAR 4-25 Table 4-2 CODES AND STANDARDS FOR TRANSPORTER DESIGN AND FABRICATION

1. American National Standards Institute (ANSI)
a. B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)
b. B30.9, Slings
c. B30.10, Hooks
2. American Institute of Steel Construction (AISC) - Manual of Steel Construction, Ninth Edition, 1989
3. American Welding Society (AWS)
a. D1.1, Structural Welding Code
b. D14.1, Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment
4. Crane Manufacturers Association of America, Specification No. 70, Specification for Electric Overhead Traveling Cranes
5. American Society of Non-Destructive Testing - SNT-TC-1A (1980), Recommended Practice for Non-Destructive Testing, Personnel Qualification and Certification
6. American Society for Testing and Materials (ASTM)
a. A36, Specification for Carbon Structural Steel
b. A48, Standard Specification for Gray Iron Castings
c. A108, Specification for Steel Bars, Carbon, Cold-Finished, Standard Quality
d. A148, Specification for Steel Castings, High-Strength for Structural Purposes
e. A325, Specification for Structural Bolts, Steel, Heat Treated for Structural Steel Joints
f. A434, Specification for Steel Bars, Alloy, Hot-Wrought or Cold-Finished, Quenched and Tempered
g. A490, Specification for Heat Treated Steel Structural Bolts
h. A514, Specification for High Yield Strength Quench and Tempered Alloy Steel Plate Suitable for Welding
i. A576, Specification for Steel Bars, Carbon, Hot-Wrought Special Quality
j. A668, Specification for Steel Forgings, Carbon and Alloy for General Industrial Use
k. A730, Specification for Forgings, Carbon and Alloy, for Railway Use
l. E709, Standard Guide for Magnetic Particle Examination
7. Code of Federal Regulations, Title 29, Part 1910, Occupational Safety and Health Standards

Revision 806/14 North Anna ISFSI SAR 4-26 Figure 4-1 ISFSI SITE PLAN

Revision 806/14 North Anna ISFSI SAR 4-30 Figure 4-5 ISFSI STORAGE PAD DETAILS

Revision 806/14 North Anna ISFSI SAR 4-31 Figure 4-6 IMAGES-3D MODEL OF STORAGE PAD GEOMETRY

Revision 806/14 North Anna ISFSI SAR 4-32 Figure 4-7 SASSI MODEL OF STORAGE PAD GEOMETRY

Revision 806/14 North Anna ISFSI SAR 4-33 Figure 4-8 SASSI CASK MODEL

Revision 806/14 North Anna ISFSI SAR 4-34 Figure 4-9 SASSI PAD PLATE ELEMENTS

Revision 806/14 North Anna ISFSI SAR 4-35 Figure 4-10 SLIDING FACTORS OF SAFETY

Revision 806/14 North Anna ISFSI SAR 4-36 Figure 4-11 OVERTURNING FACTORS OF SAFETY

Revision 806/14 North Anna ISFSI SAR 4-37 Figure 4-12 TRANSPORTER DESIGN

Figure 4-14 FUEL AND DECONTAMINATION BUILDINGS SIDE VIEW Revision 806/14 North Anna ISFSI SAR 4-39

Revision 806/14 North Anna ISFSI SAR 4-40 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 5-1 Chapter 5 STORAGE SYSTEM OPERATIONS This chapter describes the operations associated with the North Anna ISFSI. As indicated in previous chapters, the North Anna ISFSI is a totally passive installation, requiring no actions or maintenance for its proper functioning. The operations described in this chapter relate to the loading and preparation of the SSSCs and their transfer to the ISFSI. Also described is the transfer of the SSSCs from the ISFSI and unloading operations.

5.1 OPERATION DESCRIPTION 5.1.1 Narrative Description 5.1.1.1 Loading Operations The loading of the SSSCs takes place within the North Anna Power Station Fuel and Decontamination Buildings. These operations are similar to the loading of transport casks, as described in Section 9.1 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR). An update to the North Anna Power Station UFSAR will address the loading and unloading of the SSSCs in the Fuel and Decontamination Buildings. These operations are conducted in a manner that ensures that the capability to safely operate Units 1 and 2 is not jeopardized. Handling of the SSSCs inside the Fuel and Decontamination Building is performed in accordance with the operating license for the North Anna Power Station under 10 CFR 50.

The cask loading operation begins with the receipt and inspection of an empty SSSC outside the Decontamination Building. A two-point lift beam is attached to the 125-ton crane and placed on the upper trunnions of the SSSC. The SSSC is rotated to a vertical position, lifted from the shipping frame, moved over the Decontamination Building and through a roll-up door, and lowered into the preparation area in the north bay of the Decontamination Building. The SSSC lid is removed and inspected. The fuel basket is also visually inspected for foreign material. The lid is attached to the 10-ton auxiliary crane and all seals are replaced.

Once prepared, the SSSC is lifted from the north bay and moved to the cask loading area, with the lid still attached to the 10-ton crane. The SSSC is lowered into the deep end of the cask loading area and the lift beam detached. Fuel assemblies are loaded into the SSSC using a long handling tool suspended from the spent fuel bridge crane hoist. An underwater camera is used to verify the proper placement of the fuel assemblies in the SSSC. After the SSSC is loaded with spent fuel, the lid is placed on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface, the lid bolts are installed and water is pumped from the fuel cavity.

The SSSC is lifted from the cask loading area, moved to the north bay, and is lowered into the bay.

In the north bay, the lid bolts are tightened according to vendor specifications. Vacuum drying of the fuel cavity is completed and tested. The cavity is backfilled with helium to design pressure, and the lid seals are tested. All exterior surfaces of the SSSC are decontaminated.

Revision 806/14 North Anna ISFSI SAR 5-2 Additional lids, if any, are installed and the pressure monitoring system is installed and tested. If appropriate, the weather cover is installed. Surface radiation dose measurements are then completed. When all preparations have been completed, the SSSC is lifted from the north bay and placed on the concrete surface outside of the Decontamination Building.

The SSSC is lifted by the transporter for transfer to the ISFSI. The routes followed by the transporter from the Decontamination Building to the ISFSI are shown on Figure 4-4. This figure also shows the location of all nearby systems and structures needed for the safe shutdown of Units 1 and 2. Drop of an SSSC while in transit to the ISFSI will not result in damage to any of these systems and structures, nor in radioactive releases in excess of the guidelines in 10 CFR 100. As indicated in Section 3.3.1, the design criteria require that the SSSC maintain its integrity, preclude physical damage to the fuel, and ensure sub-criticality following a 15-inch drop. Operating procedures will limit the lifting heights to less than 15 inches once the SSSC is lifted by the transporter.

The pressure monitoring device on the SSSC must be connected to the monitoring panel after the SSSC is placed on the ISFSI pad.

5.1.1.2 Unloading Operations Unloading of an SSSC begins with disconnecting the pressure monitoring device on the SSSC from the monitoring panel and transporting the SSSC along the same route used for its placement at the ISFSI. Once the transporter and SSSC are outside the Decontamination Building, the SSSC is lowered to the concrete surface beneath the 125-ton crane. The SSSC is lifted using the lift beam and moved to the north bay of the Decontamination Building. A sample of the helium in the fuel cavity is tested for indications of fuel failure (Kr85). If this test indicates that failed fuel is present in the SSSC, the fuel cavity is evacuated to the Decontamination Building ventilation system described in Chapter 6, and refilled with helium. This process of sampling, evacuating and refilling is continued until helium sample tests are acceptable.

The lid bolts are then loosened and the SSSC is lifted from the north bay and moved to the cask loading area. The SSSC is lowered into the deep end of the cask loading area until the top of the cask is level with the spent fuel bridge crane platform. A water supply, with flow indicator, is attached to the SSSC reflood valve and water is slowly added to the fuel cavity. Flooding of the cask cavity takes at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. When the cavity is full, the lid bolts are removed, the SSSC is lowered to the bottom of the cask loading area, and the lift beam is detached. The lid is slowly removed from the SSSC, lifted from the pool and placed at its designated laydown area. Fuel assemblies are then removed from the SSSC using a long handling tool suspended from the spent fuel bridge crane hoist. After the SSSC is unloaded, the lid is placed back on the SSSC with the aid of guide pins. The SSSC is lifted to the pool surface and water is pumped from the fuel cavity.

The SSSC is then returned to the north bay for decontamination of the inner and outer surfaces.

Revision 806/14 North Anna ISFSI SAR 5-3 None of the operations needed to load or unload the SSSCs at the North Anna ISFSI will result in unacceptable damage to the North Anna Power Station Units 1 and 2, or to the stored spent fuel.

5.1.2 Flowsheets Table 5-1 shows a general sequence of operations to load and transport an SSSC to the ISFSI. Table 5-2 shows the general sequence of operations for unloading an SSSC. Operations more specific to a particular vendors SSSCs are outlined in the vendors SSSC Topical Safety Analysis Report.

These operations are performed in accordance with procedures addressing health physics and handling of the SSSCs. They also fulfill the surveillance requirements specified in Chapter 10.

5.1.3 Identification of Subjects for Safety and Reliability Analysis 5.1.3.1 Criticality Prevention The design criteria specified in Section 3.3.4 require that spent fuel stored at the North Anna ISFSI be maintained subcritical at all times. The specific means by which the SSSCs comply with this criterion are described in the SSSC Topical Safety Analysis Reports or Appendix A.

5.1.3.2 Instrumentation Due to the totally passive and inherently safe nature of the SSSCs, there is no need for any instrumentation to perform safety functions. It is desirable, however, to monitor the performance of some or all of the SSSCs. Accordingly, the design criteria described in Section 3.3.3 require that the SSSCs have adequate provisions for the installation and testing of monitors.

The parameters to be monitored will be selected based on recommendations made by the SSSC manufacturers, experience gained with specific SSSC designs, and other engineering and health physics considerations. Instrumentation provisions for the SSSCs are described in the SSSC Topical Safety Analysis Reports.

Although these instruments are not safety related, commitments for their installation, inspection, and replacement (if needed) are proposed in Section 10.2.

Actions to be taken when monitored parameters exceed preset levels are described in Section 4.4.5.3.

5.1.3.3 Maintenance Techniques Because of their passive nature, the SSSCs require little, if any, maintenance over the lifetime of the ISFSI. No major maintenance tasks are required. Typical maintenance tasks would involve occasional replacement of monitoring instrumentation, recoating of some SSSCs with

Revision 806/14 North Anna ISFSI SAR 5-4 corrosion-inhibiting coatings, minor road and drainage ditch repairs, and minor maintenance of security systems. No special maintenance techniques are necessary.

Specific maintenance recommendations for the SSSCs are provided in the SSSC Topical Safety Analysis Reports.

In addition to ISFSI maintenance and SSSC maintenance, a visual surveillance of the ISFSI will be performed on a periodic basis to determine that no significant accumulation of debris on or near SSSC surfaces has occurred.

5.2 CONTROL ROOM AND CONTROL AREAS The North Anna ISFSI does not require continuous surveillance by the operations staff or operator actions, even during postulated accidents. Therefore, a control room or control area is not considered necessary.

Local panels at the ISFSI site provide an annunciator alarm if the value of a monitored parameter exceeds an alarm setpoint. The local panels indicate the SSSC that requires operator attention. Provisions have been made to allow for two alarms per SSSC at the local panels.

If an alarm signal is received at the alarm panel, an alarm is also transmitted to the Station Security Central Alarm and Secondary Alarm Stations. Security personnel continuously monitor these stations and they would notify the Shift Manager for a response. Personnel first determine that an electronic fault at the alarm panel is not causing the alarm. If no electronic fault is found and an alarm signal is being received from an SSSC, the pressure switch for this SSSC is checked for proper function. If the pressure switch has failed, it is replaced. If the pressure switch is functioning properly, a seal leak is occurring, and the SSSC is returned to the Decontamination Building for repairs.

5.3 SPENT FUEL ACCOUNTABILITY PROGRAM Accountability and control of special nuclear materials will be maintained at all times during the loading, transport, and storage of spent fuel assemblies. Accountability records for all fuel assemblies transferred to, stored in or removed from the ISFSI will be maintained for as long as the fuel assemblies are stored on the North Anna site.

Material status reports shall be completed and submitted to the NRC, as specified in 10 CFR 72.76. Nuclear material stored at the ISFSI will not be transferred from Virginia Power to other ownership, therefore, Nuclear Material Transaction Reports (DOE/NRC Form-741) required by 10 CFR 72.78 will not be needed. The North Anna ISFSI will be treated as a separate material balance area of the North Anna Power Station.

Records showing the transfer of spent fuel between the spent fuel storage pool and the ISFSI shall be maintained in accordance with the administrative procedure that provides for control of nuclear material.

Revision 806/14 North Anna ISFSI SAR 5-5 5.4 SPENT FUEL TRANSPORT The transporter to be used to move the SSSCs between the Decontamination Building and the ISFSI is described in Section 4.3. A tow vehicle, such as a diesel tractor, will be used to move the transporter.

Each SSSC will be lifted by the transporter outside the Decontamination Building. The transporter will then be towed to either the west gate or the south east gate of the protected area fence. Beyond each gate, an asphalt road is used to the ISFSI site.

The plan and profile of the ISFSI site access road is shown in Figure 5-1.

Revision 806/14 North Anna ISFSI SAR 5-6 Table 5-1 GENERAL SEQUENCE OF LOADING OPERATIONSa

1. Unload empty SSSC from rail car.
2. Move SSSC inside Decontamination Building.
3. Remove weather cover and inspect for shipping damage.
4. Remove lid(s) and inspect the following for damage: exterior surfaces, sealing surfaces, trunnions, accessible interior surfaces and basket assembly, bolts, and bolt holes and threads.
5. Replace lid seals.
6. Move SSSC to cask loading area.
7. Lower SSSC into cask loading area.
8. Load SSSC with preselected spent fuel assemblies using spent fuel handling crane.
9. Verify inventory of fuel assemblies loaded into SSSC.
10. Place lid on SSSC.
11. Lift SSSC to surface and install lid bolts.
12. Pump water from the SSSC fuel cavity into cask loading area.
13. Raise SSSC from cask loading area and spray exterior with water.
14. Return SSSC to Decontamination Building.
15. Begin to decontaminate exterior surfaces of SSSC.
16. Secure lid with bolts.
17. Vacuum dry SSSC cavity and test.
18. Fill SSSC cavity with helium and test seals.
19. Install pressure monitoring device and test.
20. Perform SSSC surface radiation measurements.
21. Lift SSSC from Decontamination Building and place on concrete surface.
22. Lift SSSC with transporter.
23. Transport SSSC to ISFSI.
24. Connect pressure monitoring device to monitoring panel.
a. Some steps indicated on this flowsheet may be performed in parallel with other steps.

Revision 806/14 North Anna ISFSI SAR 5-7 Table 5-2 GENERAL SEQUENCE OF UNLOADING OPERATIONSa

1. Disconnect pressure monitoring device.
2. Transport SSSC to Decontamination Building.
3. Release SSSC from transporter.
4. Lift SSSC to Decontamination Building.
5. Sample and test helium in fuel cavity.
6. Purge helium in fuel cavity, if necessary.
7. Loosen lid bolts.
8. Lift SSSC from north bay and move to fuel loading area in Fuel Building.
9. Lower SSSC into cask loading area and install reflood water supply.
10. Reflood fuel cavity with water and remove lid bolts.
11. Lower SSSC into cask loading area.
12. Remove lid from SSSC and store.
13. Remove fuel assemblies from SSSC.
14. Place lid on SSSC.
15. Lift SSSC to surface of cask loading area.
16. Pump water from the SSSC fuel cavity into the cask loading area.
17. Raise SSSC from cask loading area and spray exterior with water.
18. Return SSSC to Decontamination Building.
19. Decontaminate interior and exterior surfaces of SSSC.
a. Some steps indicated on this flowsheet may be performed in parallel with other steps.

Revision 806/14 North Anna ISFSI SAR 6-1 Chapter 6 WASTE MANAGEMENT No radioactive wastes will be generated during storage of the SSSCs at the ISFSI or during transport to/from the ISFSI. Radioactive wastes generated during loading operations in the Fuel and Decontamination Buildings will be treated using existing North Anna Power Station radioactive waste control systems as described in Chapter 11 of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR).

Contaminated water from loaded SSSCs will normally be drained back into the spent fuel pool with no additional processing. A small amount of liquid waste will result from SSSC decontamination. The decontamination procedure may result in a small amount of detergent/demineralized water mixture being collected in the Decontamination Building. Liquid wastes in this building are directed to the Fluid Waste Treatment Tank for transfer to the liquid waste disposal system.

Potentially contaminated air and helium purged from the SSSCs during loading and unloading will be handled by the Fuel and Decontamination Building ventilation systems, as described in Sections 9.4.3 and 9.4.4 of the North Anna Power Station UFSAR. Ventilation air from these buildings may be exhausted through filter banks consisting of roughing, particulate and charcoal filters in series.

A small quantity of low-level solid waste may be generated during SSSC loading operations. This solid waste may include disposable anti-contamination garments and plastic sheeting, tape, and rags, and will be processed as described in Section 11.5 of the North Anna Power Station UFSAR.

Revision 806/14 North Anna ISFSI SAR 6-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 7-1 Chapter 7 RADIATION PROTECTION 7.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 7.1.1 Policy Considerations and Organization A radiological protection program will be implemented at the North Anna ISFSI in accordance with the requirements of 10 CFR 72.126. The program will be based on policies in existence at the North Anna Power Station, which are described below.

The management policies, organizational structure and program criteria for maintaining exposures ALARA at the North Anna ISFSI are the same as for the North Anna Power Station, and are collectively referred to as the Virginia Power ALARA Program. The Virginia Power ALARA Program is an important part of the North Anna Power Station radiation protection program. The basic principles of the Virginia Power ALARA Program are described in Virginia Power administrative procedures and are implemented by health physics technical procedures.

The North Anna Power Station ALARA program complies with 10 CFR 20.1101, Radiation Protection Programs, and is consistent with the guidance of Regulatory Guide 8.8 (June 1978), Information Relevant to Ensuring That Occupational Radiation Exposures at Nuclear Power Stations Will Be As Low As Reasonably Achievable. The station ALARA program includes the following aspects:

  • Specific individuals are assigned responsibility for, and authority to implement the station ALARA Program consistent with Virginia Power policy. These individuals include the station ALARA coordinator and department ALARA coordinators.
  • A Station ALARA Committee has been established with the responsibility for overall coordination of the station ALARA Program and for advising the Station Management on matters relating to ALARA. A member of station management chairs the Committee.
  • Pre-job measures are required to implement the station ALARA philosophy. These include ALARA evaluations of proposed work, pre-job meetings, and tiered levels of review based on projected expended person-rem.
  • Monitoring and control of ongoing work is accomplished by the establishment of an exposure tracking system, ALARA hold points, and ALARA Radiation Work Permit (RWP) re-evaluation meetings.
  • Completed work is evaluated via post-job reviews, maintenance of job history files and periodic process reviews of selected work evolutions.
  • A temporary shielding program has been established.
  • An ALARA suggestion system is maintained to solicit, evaluate, and reward employee ideas that save person-rem.

Revision 806/14 North Anna ISFSI SAR 7-2

  • Engineering design change packages receive an ALARA review prior to implementation.
  • A system has been established to actively involve, guide, and monitor the performance of the station and individual departments toward meeting ALARA objectives.

The location of the ISFSI within the North Anna Power Station site allows the health physics facilities, equipment and personnel to be readily available at all times to ensure that ALARA considerations are met. The ISFSI is located a sufficient distance from buildings and occupied spaces to minimize total personnel exposure.

Regulatory Guide 8.10 (May 1977), Operating Philosophy for Maintaining Occupational Radiation Exposures As Low As Reasonably Achievable, Regulatory Position 1, concerning management commitment to minimizing exposures, is addressed by Virginia Power administrative procedures. Regulatory Position 2, concerning radiation protection staff vigilance in ALARA matters, is addressed and implemented by Virginia Power administrative procedures and health physics technical procedures.

The health physics organization is described in an administrative procedure. The organization to maintain exposures ALARA is also described in Virginia Power administrative procedures. The Station ALARA Committee is a major part of that organization. An administrative procedure also lists North Anna Power Station health physics administrative procedures by functional grouping. These procedures are also applicable to the North Anna ISFSI.

The guidance of Regulatory Position 2 of Regulatory Guide 8.8 (June 1978) is followed as described in Section 7.1.2. The guidance of Regulatory Guide 8.10 (May 1977) is followed as described in this section.

Virginia Power personnel qualifications and experience are considered more than sufficient for operation of the North Anna ISFSI since these personnel have gained considerable experience at the North Anna Power Station. An administrative procedure provides the functional responsibilities and reporting relationships of the members of the health physics organization and the personnel qualification requirements for positions in the station health physics organization.

Health physics equipment, instrumentation, and facilities for the North Anna ISFSI will be those of the North Anna Power Station. Radiation surveys with portable instruments will be performed during surveillance of the SSSCs and other activities at the ISFSI. Portable instruments required for measuring dose rates and radiation characteristics are maintained in accordance with approved health physics procedures.

As indicated in Section 7.2.2, respiratory protection equipment will not be needed at the North Anna ISFSI.

Radiation protection facilities, instrumentation, and equipment available at the North Anna Power Station are similar to that described by Regulatory Position 4 of Regulatory Guide 8.8

Revision 806/14 North Anna ISFSI SAR 7-3 (June 1978). These include count room equipment, portable instruments, personnel monitoring instruments, protective equipment, and their associated support facilities.

The guidance for testing, rejection criteria, and use in mixed radiation fields being followed for the dosimeters at the North Anna Power Station will be used at the North Anna ISFSI.

The bioassay program in use for personnel at the North Anna Power Station will also apply to the North Anna ISFSI.

The methods and procedures for conducting radiation surveys at the North Anna ISFSI will comply with the approved health physics procedures in effect at the North Anna Power Station.

This section describes the health physics and ALARA procedures and planning for the North Anna Power Station which will be used at the ISFSI. The complete details are in the applicable Virginia Power station and departmental administrative procedures and health physics technical procedures.

The radiological respiratory protection program is outlined in Virginia Power administrative procedures and implemented by health physics technical procedures.

Access control will be accomplished by means of a perimeter fence with locked gates surrounding the North Anna ISFSI. Control of the keys will be in accordance with security and health physics policies and procedures.

The bases and methods for monitoring and controlling personnel, equipment and surface contamination control, and radiation protection training program content are described in Virginia Power administrative procedures and health physics technical procedures.

The guidance provided by Regulatory Guide 8.10 (May 1977) will be followed as described in this section and Section 7.1.3. The guidance of Regulatory Guide 8.15 (October 1976),

Acceptable Programs for Respiratory Protection, will be followed as described in this Section.

There should be no need for bioassay of personnel after surveillance activities at the North Anna ISFSI. There should also be no need for radiological respiratory protection equipment.

Personnel dosimetry used at the North Anna ISFSI will be controlled by the external dosimetry program approved for the North Anna Power Station. An ALARA feedback mechanism using dosimeter results for preplanning future tasks is included in Virginia Power administrative procedures and their implementing documents.

The criteria for performing routine and non-routine whole-body counting and bioassay are contained in Virginia Power administrative procedures and health physics technical procedures for the North Anna Power Station. Methods and procedures for evaluating and controlling airborne radioactive material are also given in these procedures.

Respiratory protection program requirements, equipment use and maintenance guidance, and fit testing protocol are delineated in Virginia Power administrative procedures and health

Revision 806/14 North Anna ISFSI SAR 7-4 physics technical procedures. Radiological respiratory protection training is conducted in accordance with Nuclear Training Department procedures.

7.1.2 Design Considerations The North Anna ISFSI has been located in an area adjacent to the Station main access road.

This location was chosen based on several considerations, including ALARA, as follows:

1. The ISFSI is centrally located within the North Anna Power Station site boundary, thus minimizing off-site exposures.
2. The ISFSI is sufficiently distant from buildings and occupied spaces to minimize dose to station personnel.

The layout of the ISFSI is designed to minimize personnel exposures. The SSSCs will be stored with sufficient separation between them to allow adequate personnel access between the SSSCs for surveillance and handling operations.

The equipment design considerations are ALARA since the fuel will be stored dry, inside heavily-shielded SSSCs. The heavy shielding will minimize personnel exposures. The required maintenance and surveillance of the SSSCs will be minimal and therefore ALARA. Additionally, the SSSCs will not be opened nor will fuel be removed from the SSSCs while at the ISFSI.

Storage of the fuel in dry SSSCs eliminates the possibility for release of contaminated liquids.

Gaseous releases are also not considered credible. The exterior of the SSSCs will be decontaminated before being placed at the ISFSI. There will be no contaminated equipment at the ISFSI, so there will be no potential for personnel contamination at the ISFSI.

Guidance provided by Regulatory Guide 8.8 (June 1978), Regulatory Position 2, which concerns design considerations, is being addressed as follows:

1. Regulatory Position 2.a concerning access control is met by use of a perimeter fence with locked gates that surrounds the ISFSI and prevents unauthorized access.
2. Regulatory Position 2.b concerning radiation shielding is met by the heavy shielding of the SSSCs which minimizes personnel exposures.
3. Regulatory Position 2.c concerning process instrumentation and controls is not applicable since there are no radioactive systems at the ISFSI. No process controls are required at the ISFSI. However, there may be minor exposure attributed to monitoring instrument testing and replacement.
4. Regulatory Position 2.d concerning control of airborne contaminants is not applicable because no gaseous releases are expected. No significant surface contamination is expected because the exterior of the SSSCs will be decontaminated before being placed at the ISFSI.
5. Regulatory Position 2.e concerning crud control is not applicable to the ISFSI because there are no radioactive systems at the ISFSI that could transport crud.

Revision 806/14 North Anna ISFSI SAR 7-5

6. Regulatory Position 2.f concerning decontamination is met because the exteriors of the SSSCs are decontaminated before being placed at the ISFSI.
7. Regulatory Position 2.g concerning radiation monitoring is met because the SSSCs are sealed. There is no need for airborne radioactive material monitoring since no airborne radioactive material is anticipated. Area radiation monitors will not be required because the ISFSI will not normally be occupied; however, thermoluminescent devices will be installed along the ISFSI perimeter fence. Portable survey meters will normally be used for work performed near or on the storage pads. Personnel dosimetry will be used at all times. An RWP will be required for any entry into the ISFSI.
8. Regulatory Position 2.h concerning resin and sludge treatment systems is not applicable to the ISFSI because there will not be any radioactive systems containing resins or sludges.
9. Regulatory Position 2.i concerning other miscellaneous ALARA items is not applicable because these items refer to radioactive systems not present at the North Anna ISFSI.

7.1.3 Operational Considerations The ALARA procedures for the ISFSI will be the same as those used in the health physics program for the North Anna Power Station. Section 7.1.1 describes the policy and procedures that ensure that ALARA occupational exposures and contamination levels are achieved. Section 7.1.2 describes how the design considerations are ALARA.

Storage of spent fuel in SSSCs is expected to involve lower exposures than other methods or designs for onsite storage. For example, storage in a fuel pool would involve the use of contaminated water cooling and cleanup systems, and filtered heating, ventilation and air conditioning. There would be higher operator exposures due to pump, valve, and motor maintenance of these systems, and filter and resin replacement. This alternative would also lead to additional airborne and liquid releases that will not occur at the North Anna ISFSI.

The count room, portable instruments, personnel monitoring instruments, protective equipment, and support facilities similar to those described in Regulatory Position 4 of Regulatory Guide 8.8 (June 1978) will be provided by the health physics facilities and personnel at the North Anna Power Station. Section 7.1.1 provides additional details.

Operational requirements for surveillance are incorporated into the design considerations described in Section 7.1.2 in that the SSSCs are stored with adequate spacing to allow ease of surveillance. The operational requirements are incorporated into the radiation protection design features described in Section 7.3 since the SSSCs are heavily shielded to minimize occupational exposure.

The criteria and conditions under which certain ALARA techniques are implemented to ensure ALARA exposures and contamination levels are described in Section 7.1.1. ALARA techniques will be implemented at all times.

Revision 806/14 North Anna ISFSI SAR 7-6 As the potential person-rem per task increases, the ALARA techniques employed become more stringent as described in Virginia Power administrative procedures.

The ISFSI does not contain any systems that process liquids or gases or contain, collect, store, or transport radioactive liquids or solids, other than the SSSCs. Therefore, the ISFSI is ALARA since there are no such systems to be maintained, or repaired, or be a source of leaks.

7.2 RADIATION SOURCES 7.2.1 Characterization of Sources The physical characteristics of the fuel used at the North Anna Power Station are summarized in Table 3-1. Typical fuel assembly source data for the fuel used at North Anna is provided in the TN-32 Final Safety Analysis Report (Reference 1). Descriptions of the fuel which the SSSCs are designed to store are provided in the SSSC Topical Safety Analysis Reports and Appendix A. The exterior surfaces of the SSSCs will be decontaminated prior to transfer to the ISFSI. The fuel will not be removed from the SSSCs nor will the SSSCs be opened while at the ISFSI. There are no radioactive systems at the ISFSI. Therefore, the only source of radioactivity will be the direct radiation from the fuel stored inside the SSSCs.

7.2.2 Airborne Radioactive Material Sources Under normal operation, the radioactive material sources are safely confined both within the fuel cladding and within the SSSC containment during storage. Surface contamination from the spent fuel pool will be removed prior to storage at the ISFSI. Therefore, provisions for personnel protection measures against airborne sources are not required. A loss of confinement barrier event and subsequent airborne radiation impact is discussed in Section 8.2.10.

7.2.3 References

1. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear, Inc.,

January 2000.

7.3 RADIATION PROTECTION DESIGN FEATURES 7.3.1 Storage System Design Description A description of the North Anna ISFSI, including layout and characteristics is provided in Section 4.1. Figure 7-1 depicts the ISFSI showing the storage pads numbered to correspond with the order in which they will be filled.

The ISFSI has a number of design features which ensure that exposures are ALARA:

  • There are no radioactive systems in the ISFSI other than the SSSCs
  • The SSSCs are loaded, sealed, and decontaminated prior to transfer to the ISFSI
  • The fuel is not unloaded nor are the SSSCs opened at the ISFSI

Revision 806/14 North Anna ISFSI SAR 7-7

  • The fuel is stored dry inside the SSSCs, so that no radioactive liquid is available for leakage
  • The SSSCs are sealed airtight
  • The SSSCs are heavily shielded to minimize external dose rates
  • A perimeter fence with locked gates surrounds the ISFSI to limit access near the SSSCs Typically, the ISFSI will not be occupied, therefore, no personnel areas, equipment decontamination areas, contamination control areas, or health physics facilities need to be located at the ISFSI. These types of facilities are available at the North Anna Power Station.

7.3.2 Shielding The SSSC shielding designs are provided in the SSSC Topical Safety Analysis Reports. An earth berm was constructed inside the north and east perimeter fences of the ISFSI to reduce direct radiation. No other shielding is required.

7.3.2.1 SSSC Surface Dose Rates The gamma and neutron dose rates on the SSSC surface and their associated energy spectra are dependent on the SSSC design. These dose rates are also dependent on the burnup and initial enrichment of the fuel stored in the SSSCs. Therefore, SSSC-specific analyses have been performed for representative North Anna Power Station fuel. The assumptions used in the SSSC-specific analyses for SSSC surface dose rates and energy spectra are provided in the SSSC Topical Safety Analysis Reports.

The TN-32 SSSC loaded with fuel with an enrichment of 3.50 weight percent U-235, burnup of 45,000 MWD/MTU and cooling time of 7 years has been chosen as the base case for analysis purposes. Using an enrichment lower than the 4.30 weight percent U-235 approved for the TN-32 yields a bounding isotope inventory, and is in accordance with NUREG-1536 and NRC Interim Staff Guidance.

Source terms for the fuel were calculated using the SAS2H/ORIGEN-s module of SCALE4.3 as described in Section 5.1 of Reference 1. These source terms are then passed through a SAS2H cask shielding model for a 1-dimensional dose assessment. Section 5.2 (Reference 1) describes the source specification and Section 5.3 (Reference 1) describes the shielding analyses performed for the TN-32 cask.

In addition to the spent fuel, the TN-32 is capable of storing burnable poison rod assemblies (BPRA) and thimble plug assemblies (TPA). BPRAs and TPAs with combinations of cumulative exposures and cooling times are permissible for storage in the TN-32 cask. The source evaluation of the BPRAs and TPAs is described in Section 5.2 (Reference 1).

Dominion conducted an independent analysis of the TN-32 surface dose rate using the MCNP Monte Carlo transport code (Reference 2). This analysis was used to form the basis for the

Revision 806/14 North Anna ISFSI SAR 7-8 average cask surface dose rate limit in the ISFSI Technical Specifications. The average surface dose rates calculated for the TN-32 base case SSSC were 218 mrem/hr (neutron and gamma) for the side surface and 58 mrem/hr (neutron and gamma) for the top surface.

7.3.2.2 Dose Rate Versus Distance Analyses have been completed to determine dose rates at the ISFSI perimeter fence, the site boundary and the nearest permanent resident. These analyses were performed using the MCNP Monte Carlo transport code (Reference 2) and the following conservative inputs.

1. Isotope inventories were based on 32 fuel assemblies with enrichment of 3.5 weight percent U-235 and burnup of 45,000 MWD/MTU.
2. The three storage pads are filled with 84 TN-32 SSSCs, each pad having 28 SSSCs.

Assuming 84 TN-32 SSSCs results in an amount of fuel stored on the pads which exceeds the current licensed limit of 839.04 TeU (approximately 57 TN-32 SSSCs), providing additional conservatism to the analysis.

3. The inventory of SSSCs stored in the ISFSI will increase by four SSSCs per year. This average rate of inventory change was used to determine the age of the spent fuel (years after discharge) and the subsequent reduction in dose rates.
4. The effects of irradiated insert components are included in the MCNP analyses.

Figure 7-1 shows the layout of the ISFSI. The MCNP analysis of the dose rate at the ISFSI perimeter fence using base case TN-32 SSSCs resulted in peak dose rates that range from 0.3 to 1.9 mrem/hr when all three pads were full. The specific dose rates for the various points on Figure 7-1 are provided in Table 7-1. Dose rate measurements at the ISFSI perimeter fence will be used to ensure that the requirements of 10 CFR 20 are met.

The MCNP analysis for the nearest site boundary indicated that the maximum dose rate at this location was less than 100 mrem/yr, which meets the requirements of 10 CFR 20.1301.

The MCNP analysis for the nearest permanent resident indicated that the contribution to the maximum dose rate from the operation of the ISFSI was 2.1 mrem/yr. When combined with the contributions from the operations of North Anna Power Station Units 1 and 2, the result is well below the 25 mrem/yr imposed by 10 CFR 72.104(a).

7.3.3 Area Radiation and Airborne Radioactivity Monitoring Instrumentation As indicated in Section 3.3.5, area radiation and airborne radioactivity monitors are not needed at the North Anna ISFSI. However, thermoluminescent devices will be used to record gamma radiation doses at appropriate intervals along the ISFSI perimeter fence. Neutron radiation detection devices may also be used on the ISFSI perimeter fence if they are available and reliable.

Revision 806/14 North Anna ISFSI SAR 7-9 7.3.4 References

1. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear Inc.,

January 2000.

2. Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel for use at the North Anna Power Station Independent Spent Fuel Storage Installation, Dominion Technical Report NE-1311, Revision 0, January 2002.
3. MCNP4C, Monte Carlo N-Particle Transport Code System, CCC-700, J. W. Briesmeister, LANL, December 2000.

7.4 ESTIMATED ONSITE COLLECTIVE DOSE ASSESSMENT Table 7-2 provides the estimated occupational exposures to ISFSI personnel during the loading, transport, and emplacement of one SSSC. These results are based on the design basis surface dose rates discussed in Section 7.3.2.1. Our experience at the Surry Power Station ISFSI indicates that these estimated occupational exposures are very conservative, and that actual occupational exposures for loading, transport and emplacement activities are approximately 0.250 person-rem (Reference 1).

Table 7-3 provides the estimated annual occupational exposure for ISFSI surveillance and maintenance activities. The design basis surface dose rates were utilized, and it was assumed that all storage pads were filled with SSSCs. To estimate the dose rates for operability tests and calibration, the worker was assumed to be located at the control panel at the perimeter fence vehicle gate entrance. Visual surveillance was based on a walkdown of each of the three storage pads at a distance no closer than 2 meters to the SSSCs. During surface defect repairs, the worker was assumed to be positioned next to an SSSC. The two surrounding SSSCs (all within 16 feet of the worker) are the predominant dose contributors during repair work.

To evaluate the additional dose to station personnel from ISFSI operations, a conservative analysis has been performed using the assumptions given in Section 7.3.2.2, including annual decay. The dose calculation considers all workers at the North Anna Power Station to be in offices, non-shielded buildings, or in the plant yard. This population includes a normal work force of utility and contractor personnel as well as the increased staffing required during outages. As a bounding estimate, the total number of workers assumed was 750 spending a total of 1,560,000 person-hours/year in the North Anna yard area and in offices.

The minimum distance between the North Anna Units 1 and 2 protected area fence and the nearest SSSC is approximately 2000 feet. The dose rate from the fully-loaded ISFSI to a location 2000 feet away is 1.83E-03 mrem/hr. The annual dose for station workers due to the fully-loaded ISFSI is calculated to be 3.66 mrem/person or a total annual dose to Station personnel of 2.75 person-rem. The maximum annual dose of 3.66 mrem/person represents less than 0.1% of the 5 rem annual occupational exposure limit.

Revision 806/14 North Anna ISFSI SAR 7-10 The total annual occupational exposure during ISFSI loading operations is 14.39 person-rem (see Table 7-4), and represents the maximum expected. As indicated previously, the actual occupational exposures for loading, transport, and emplacement of an SSSC are approximately 0.25 to 0.5 person-rem per loading. This combined with the North Anna Power Station annual occupational exposure during ISFSI loading operations (Table 7-4) results in a total annual occupational exposure during ISFSI operations of approximately 4 person-rem. This exposure represents approximately 5% of the average annual occupational exposure from all operations at the North Anna Power Station.

7.4.1 References

1. C. J. Hostick, J. C. Lavender and B. H. Wakeman, Time and Dose Assessment of Barge Shipment and At-Reactor Handling of a CASTOR V/21 Spent Fuel Storage Cask, Pacific Northwest Laboratory, PNL-7205, April 1992.

7.5 OFFSITE COLLECTIVE DOSE ASSESSMENT The site plan for the North Anna ISFSI and its relative location to the North Anna Power Station are provided in Figure 2-3. The North Anna site within the boundary is the controlled area as defined in 10 CFR 72.

Based on projections for year 2000, 354 permanent residents are located within a 2-mile radius of the North Anna site boundary. The nearest permanent resident is located at 2860 feet from the ISFSI. The maximum annual dose to the nearest resident is 2.10 mrem. Using the conservative assumption that all of the residents within two miles are located at the same distance from the ISFSI as the nearest resident, their maximum annual collective dose from the ISFSI would be:

0.00210 rem/year x 354 persons = 0.74 person-rem/year The annual dose to the maximally exposed individual from all significant sources at the North Anna Power Station has been estimated in Appendix 11B of the North Anna Power Station Updated Final Safety Analysis Report (UFSAR) as 3 mrem/yr. Therefore, the maximum combined radiation contribution to the nearest permanent resident from the operation of the ISFSI (2.10 mrem/yr) and North Anna Power Station Units 1 and 2 (3.00 mrem/yr) is 5.10 mrem/yr.

This is well below the 25 mrem/yr limit imposed by 10 CFR 72.104(a).

The North Anna ISFSI has no gaseous or liquid effluents, therefore, these do not contribute to the dose of nearby residents.

Considering the conservatisms in the above calculation and the rapid attenuation of neutron and gamma dose rates with distance, the dose for the more distant population is negligible.

Revision 806/14 North Anna ISFSI SAR 7-11 7.6 HEALTH PHYSICS PROGRAM The health physics organization and the health physics equipment associated with operation of the North Anna Power Station are considered sufficient for the operation of the ISFSI. The health physics technical procedures directing routine surveys include ISFSI activities.

Thermoluminescent devices are in place along the ISFSI fence for routine monitoring of onsite dose.

7.7 ENVIRONMENTAL MONITORING PROGRAM The North Anna Power Station environmental monitoring program is utilized for the ISFSI.

Since there are no effluents from the ISFSI, no changes are required for the environmental monitoring program.

Revision 806/14 North Anna ISFSI SAR 7-12 Table 7-1 MAXIMUM DESIGN BASIS DOSE RATES ALONG ISFSI PERIMETER FENCE (MREM/HR)

Yearsa Status A B C D E F G H 14 Pads 1 and 2 Full 0.318b 0.556b 0.736b 21 Pads 1, 2, and 3 Full 1.933 0.365 0.974 0.302 0.397 0.630 0.974 0.813

a. 14 years corresponds to the first two pads being filled assuming 4 SSSCs stored per year. Fuel stored would have minimum of additional 7 years of decay.
b. Due to location of pad 2, maximum dose rates at these locations occur after pad 2 is filled.

Revision 806/14 North Anna ISFSI SAR 7-13 Table 7-2 ESTIMATED OCCUPATIONAL EXPOSURES FOR CASK LOADING, TRANSPORT, AND EMPLACEMENTa (ONE TIME EXPOSURE)

Time Required No. of Dose Rate Task (hr) Persons (rem/hr) Person-Rem

1. Unload empty SSSC from rail car 2.00 5 0.00E+00 0.00E+00
2. Move SSSC inside Decon Bldg 0.25 2 0.00E+00 0.00E+00
3. Remove cover; inspect 2.00 2 0.00E+00 0.00E+00
4. Remove lid(s); inspect 2.00 2 0.00E+00 0.00E+00
5. Replace lid seals 0.50 2 0.00E+00 0.00E+00
6. Move SSSC to loading area 1.00 3 1.70E-03 5.10E-03
7. Lower SSSC into loading area 0.25 3 1.70E-03 1.28E-03
8. Load SSSC with spent fuel 3.00 3 1.70E-03 1.53E-02
9. Verify fuel inventory 0.50 1 1.70E-03 8.50E-04
10. Place lid on SSSC 1.00 2 1.70E-03 3.40E-03
11. Lift SSSC; install lid bolts 0.50 2 2.86E-02 2.86E-02
12. Remove water in fuel cavity 1.00 2 2.86E-02 5.72E-02
13. Raise SSSC from loading area 0.25 2 8.39E-02 4.20E-02
14. Return SSSC to Decon Building 0.33 2 8.39E-02 5.54E-02
15. Decontaminate SSSC 2.00 2 8.39E-02 3.36E-01
16. Secure Lid 1.00 2 8.39E-02 1.68E-02
17. Vacuum dry cavity and test 4.00 2 8.39E-02 6.71E-01
18. Fill cavity with helium and test 3.00 2 8.39E-02 5.04E-01
19. Install pressure device and test 3.00 2 8.39E-02 5.04E-01
20. Perform radiation measurements 0.50 1 8.39E-02 4.20E-02
21. Lift SSSC; place outside of Decon 0.50 2 5.88E-02 5.88E-02 Building
22. Lift SSSC with transporter 1.00 2 3.36E-02 6.72E-02
23. Transport SSSC to ISFSI 0.50 3 3.36E-02 5.20E-02
24. Connect pressure monitoring device; 1.00 2 8.39E-02 1.68E-01 install weather cover Total 2.78E+00
a. Dose rates are from the base TN-32 cask.

Revision 806/14 North Anna ISFSI SAR 7-14 Table 7-3 NORTH ANNA ISFSI MAINTENANCE OPERATIONSa ANNUAL OCCUPATIONAL EXPOSURES Time Required No. of Dose Rate Task (hr) Persons (rem/hr) Person-Rem Visual Surveillance of Casks b 1.00 2 8.39E-02 1.68E-01 Instrumentation

a. Operability Tests c 1.00 2 1.90E-03 3.80E-03
b. Calibration d 2.00 2 1.90E-03 7.60E-03
c. Repair e 1.00 2 8.39E-02 1.68E-01 Surface defect repairs f 1.00 2 8.39E-02 1.68E-01 5.15E-01
a. Dose rates are from the base case TN-32 cask. Assumes ISFSI is full.
b. Based on four surveys per year, 15 minutes each.
c. Based on two tests per year, 30 minutes each.
d. Based on recalibration of the instruments every two years. Total time required is four hours every two years.
e. Based on repair of one instrument every year, one hour per repair.
f. Based on repair of three SCCCs per year, 20 minutes each.

Table 7-4 TOTAL ANNUAL OCCUPATIONAL EXPOSURES DURING ISFSI LOADING OPERATIONSa Person-Rem North Anna Power Station b 2.75E+00 ISFSI Operations SSSC Preparation and Placement c 11.12E+00 Maintenance and Surveillance b 5.15E-01 Total 14.39E+00

a. Utilizes design basis SSSC surface dose rates.
b. Assumes full ISFSI (84 SSSCs).
c. Assumes four SSSCs every year.

Revision 806/14 North Anna ISFSI SAR 7-15 Figure 7-1 ISFSI LAYOUT Data for points A-H in Table 7-1 Note: Only the vehicle gate is shown. Personnel gates are not shown but exist at the top right and bottom two corners and in the center of each side.

Revision 806/14 North Anna ISFSI SAR 7-16 Figure 7-2 DOSE RATE FOR 84 BASE CASE CASKS VERSUS DISTANCE

Revision 806/14 North Anna ISFSI SAR 8-1 Chapter 8 ACCIDENT ANALYSES An evaluation of the safety of the North Anna ISFSI with respect to postulated accident events is presented in this chapter. The facility response is analyzed in terms of event causes and precursors, recognition and quantification, and consequence mitigation for the spectrum of postulated occurrences.

Four categories of design events have been considered, as defined in ANSI/ANS 57.9-1984.

Design event categories are designated as:

I Events that are expected to occur regularly or frequently in the course of normal operation II Events which can be expected to occur with moderate frequency as on the order of once per year III Events anticipated to occur infrequently or, at most, once during the lifetime of the installation IV Events which are not considered credible, but nevertheless are postulated in order to bound the consequences.

8.1 OFF-NORMAL OPERATIONS The design and operation of the North Anna ISFSI include features intended to minimize or preclude the compromise of safety functions due to off-normal conditions. These features are described in Chapters 4 and 5. Nevertheless, design events have been postulated and analyzed to demonstrate the inherent safety of the facility.

Design events in Category I (normal operations) have been previously discussed in Chapters 4, 5, and 6 and are not presented further here. A loss of electric power design event has been included as a Category II event and is discussed in the following section. The SSSC Topical Safety Analysis Reports postulate additional off-normal events for the SSSCs. The Topical Safety Analysis Reports analyze the effects of these additional events and identify the corrective actions.

8.1.1 Loss of Electric Power A total loss of ac power is postulated to occur in the feeder cabling which supplies power to the ISFSI. The failure could be either an open or a short to ground circuit, or any other mechanism capable of producing an interruption of power.

8.1.1.1 Postulated Cause of Event A loss of power to the ISFSI may occur as a result of natural phenomena, such as lightning or extreme wind, or as a result of undefined disturbances in the nonsafety-related portion of the electric power system of the North Anna Power Station.

Revision 806/14 North Anna ISFSI SAR 8-2 If electric power is lost, the following systems would be powered from the ISFSI diesel:

  • Area lighting
  • Area receptacles
  • SSSC pressure monitoring instrumentation
  • Microwave
  • Camera System 8.1.1.2 Detection of Event A loss of ac power at the North Anna site would be indicated in the CAS. If the loss of power were localized solely at the ISFSI, this would be indicated at the local annunciator.

8.1.1.3 Analysis of Effects and Consequences This event has no safety or radiological consequences. None of the systems whose failure could be caused by this event are required for the accomplishment of the safety function of the ISFSI. The lighting system functions merely for convenience and visual monitoring, and the instrumentation monitors the long-term performance of the SSSCs with respect to seal integrity.

Seal integrity is not expected to change rapidly and its status is not dependent upon electric power.

8.1.1.4 Corrective Actions Following a loss of electric power to the ISFSI, plant maintenance personnel will be informed, and will isolate the fault and restore electrical service by conventional means. Such an operation is straightforward and routine for the maintenance crews of an electric utility.

8.1.2 Radiological Impact from Off-Normal Operations A loss of power will not affect the integrity of the SSSCs, jeopardize the safe storage of the fuel, nor result in radiological releases.

8.2 ACCIDENTS This section addresses more serious occurrences which are expected to happen on an extremely infrequent basis, if ever, during the lifetime of the facility (Event Category III). In addition, a maximum hypothetical accident, which is not considered credible (Event Category IV), is identified and analyzed.

8.2.1 Earthquake 8.2.1.1 Cause of Accident The design earthquake (DE) as described in Sections 2.5.2 and 3.2.3, is postulated to occur as a design basis extreme natural phenomenon.

Revision 806/14 North Anna ISFSI SAR 8-3 8.2.1.2 Accident Analysis Analyses of the storage pads for the DE is provided in Section 4.2.1.4. The results of these analyses show that the storage pads remain intact and that the SSSCs will not slide or tip over.

The seismic response characteristics of the SSSCs are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that SSSC leak-tight integrity is not compromised and that no damage will be sustained by the SSSC or the spent fuel.

8.2.1.3 Accident Dose Calculations As demonstrated in Section 4.2.1.4, the DE is not capable of damaging the storage pads or causing SSSC sliding or tipover. As demonstrated in the SSSC Topical Safety Analysis Reports, the DE is not capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.

8.2.2 Extreme Wind 8.2.2.1 Cause of Accident The extreme winds due to passage of the design basis wind and tornado as defined in Section 3.2.1 are postulated to occur as a design basis extreme natural phenomenon. As described in Section 2.3.1, the design basis tornado is expected to occur less than once in 30,800 years, and the design basis wind is expected to occur less than once in 100 years.

8.2.2.2 Accident Analysis The effect of the design basis wind on the storage pads is provided in Section 4.2.1.2. The effect of the design basis tornado on the storage pads is provided in Section 4.2.1.3. Both analyses demonstrate that the storage pads are not damaged and the SSSCs will not slide or tip over during the design basis extreme wind events.

The effects and consequences of extreme winds on the SSSCs are provided in the SSSC Topical Safety Analysis Reports. The results of these analyses show that minor damage to the SSSC may be sustained from tornado missiles, but SSSC leak-tight integrity is not compromised.

8.2.2.3 Accident Dose Calculations As demonstrated in Sections 4.2.1.2 and 4.2.1.3 and the SSSC Topical Safety Analysis Reports, design basis extreme winds are not capable of damaging the storage pads or tipping over or sliding an SSSC, and that the damage sustained from the tornado missiles will not compromise seal integrity. No radioactive material is released, and there are no dose consequences associated with these events.

8.2.3 Flood As discussed in Section 3.2.2, the North Anna ISFSI is considered flood-dry. Flooding is not considered as a design basis event.

Revision 806/14 North Anna ISFSI SAR 8-4 8.2.4 Explosion 8.2.4.1 Cause of Accident An explosion is postulated to occur as a result of a vehicular accident at a point approximately 1.5 miles from the ISFSI. The evaluation of this event is described in detail in Section 2.2.2. A pressure wave of less than 1 psi is estimated to reach the ISFSI.

8.2.4.2 Accident Analysis As described in the SSSC Topical Safety Analysis Reports, a pressure wave of the magnitude associated with this event will not damage the SSSCs or cause tip-over.

8.2.4.3 Accident Dose Calculations The postulated event will not damage the SSSC exterior nor cause SSSC tip-over. This event is not capable of producing leakage from the SSSC. No radioactive material is released, and there are no dose consequences associated with this event.

8.2.5 Fire 8.2.5.1 Cause of Accident The only combustible materials at the ISFSI storage pads are in the form of insulation on instrumentation wiring, and coating of the outside surface of the SSSCs. No other combustible or explosive materials are allowed to be stored on the storage pads. As described in Section 2.1.2, the ISFSI area will be cleared of trees and seeded with grass. In addition, other equipment in the area has adequate separation from the storage pads. Therefore, no fires other than small electrical fires are considered credible at the storage pads.

The fire protection capabilities available at the ISFSI are described in Section 4.4.5.1. These include portable fire extinguishers within the ISFSI perimeter fence. In addition, the fire fighting equipment and personnel present at the North Anna Power Station would be available if needed.

8.2.5.2 Accident Analysis The ability of the SSSCs to withstand postulated fires and the consequence of postulated fires are addressed in the SSSC Topical Safety Analysis Reports. Results of these analyses indicate that the postulated fires are not capable of compromising seal integrity.

8.2.5.3 Accident Dose Calculations The damage to an SSSC due to fire is not capable of producing SSSC seal leakage. No radioactive material is released, and there are no dose consequences associated with this event.

8.2.6 Storage of an Unauthorized Fuel Assembly The ISFSI Technical Specifications specify limiting values for the initial enrichment, average burnup, decay heat, and cooling time after reactor discharge for the fuel assemblies to be

Revision 806/14 North Anna ISFSI SAR 8-5 placed in SSSCs. The Technical Specifications also specify required structural attributes for those fuel assemblies. The possibility of storing a fuel assembly that does not meet the Technical Specification requirements has been considered.

8.2.6.1 Cause of Accident The cause of this event is postulated to be an error during the loading operations, e.g., the wrong fuel assembly is selected by the fuel handling operator, or a failure in the administrative controls governing the fuel handling operations.

8.2.6.2 Accident Analysis The loading of an unauthorized fuel assembly has no consequence while the SSSC remains in the spent fuel pool. The borated water in the spent fuel pool provides adequate protection against a criticality event, and also provides shielding and heat removal. Loading of an unirradiated fuel assembly will not cause a criticality event because SSSC criticality analyses must show subcritical conditions assuming all fuel assemblies are unirradiated. Loading of an unauthorized fuel assembly with gross cladding defects will not cause further damage to the cladding or result in the release of radioactive material. Loading of an unauthorized fuel assembly with structural defects will likely be detected during placement of the assembly in the SSSC. In order to preclude this event from going undetected, however, and to ensure that appropriate corrective actions can take place prior to placing the lid on an SSSC, a final verification of the identity and location of the fuel assemblies loaded into the SSSCs is performed with an underwater video camera to ensure that the correct fuel assemblies have been loaded into the SSSC.

These administrative controls and the records associated with them are included in the procedures described in Chapter 9 and in the proposed license requirements described in Chapter 10, and will comply with the applicable requirements of the Quality Assurance Program described in Chapter 11.

Appropriate and sufficient actions will be taken to ensure that a fuel assembly loading error does not remain undetected. In particular, the storage of an unauthorized fuel assembly is not considered credible in view of the multiple administrative controls.

8.2.6.3 Accident Dose Calculations The storage of an unauthorized fuel assembly is not considered to be a credible event. No radioactive material is released, and there are no dose consequences associated with this event.

8.2.7 Loss of Neutron Shield The design of the SSSCs includes neutron absorbing material either internal or external to the SSSC body. As applicable to the particular SSSC design, the SSSC Topical Safety Analysis Reports discuss a postulated loss of neutron shield. As concluded in these documents, a total loss of neutron shield is not a credible event for the North Anna ISFSI.

Revision 806/14 North Anna ISFSI SAR 8-6 8.2.8 SSSC Seal Leakage The SSSCs feature redundant seals in conjunction with extremely rugged body designs.

Additional barriers to the release of radioactive material are provided by the sintered fuel pellet matrix and the zircaloy cladding. Furthermore, the fuel cavity helium pressure is substantially less than the helium pressure-of the volume monitored by the pressure monitoring device. The pressure monitoring device provides an early warning of a decrease in the pressure of this monitored volume. No credible mechanisms that could result in leakage of radioactive material have been identified.

8.2.9 SSSC Drops SSSC handling and drop events postulated to occur in the Fuel and Decontamination Buildings are addressed in Appendices 9B and 15A of the North Anna Power Station UFSAR.

The SSSCs are designed to withstand drops of at least 15 inches without compromising SSSC integrity. SSSC drops in excess of these heights at the ISFSI, or during transport, are not considered credible because of procedures that preclude the lifting of the SSSCs any higher.

Analyses of SSSC drop events are presented in the SSSC Topical Safety Analysis Reports.

8.2.10 Loss of Confinement Barrier The following postulated event scenario is not considered to be credible. It is hypothesized solely to demonstrate the inherent safety of the North Anna ISFSI by subjecting it to a set of simultaneous multiple failures, any one of which is far beyond the capability of natural phenomena or man-made hazards to produce.

8.2.10.1 Cause of Accident A simultaneous failure of all protective layers of radioactive material confinement is postulated to occur by unspecified nonmechanistic means for a single SSSC.

8.2.10.2 Accident Analysis In this event, the SSSC confinement function is nonmechanistically removed. Heat removal and radiation shielding functions are assumed to continue to operate in the normal passive manner.

This event was analyzed for a TN-32 cask based on the requirements of NUREG-1536 (Reference 1), Interim Staff Guidance-5 (ISG-5), Revision 1 (Reference 2), and the following inputs:

1. Isotope inventories are based on 32 fuel assemblies with an enrichment of 3.30 weight percent U-235, burnup of 45,000 MWD/MTU and seven years decay. This enrichment was selected after reviewing the enrichment and burnup of all North Anna spent fuel to ensure that this enrichment is bounding. Using a lower enrichment yields a bounding isotope inventory, and is in accordance with NRC ISG-6 (Reference 3).

Revision 806/14 North Anna ISFSI SAR 8-7

2. The Co-60 source is calculated based on the surface area of a 17 x 17 fuel assembly and a seven year decay time from discharge.
3. The cask seal leak rate calculated in Reference 4 was increased by 50 percent.
4. The maximum boundary dispersion factor (X/Q) calculated for the North Anna site (see Table 2-1).
5. The breathing rate identified in Reference 4.
6. The bounding dose conversion factors in EPA Guidance Report No. 11 (Reference 5) are used to calculate the whole body, critical organ, and thyroid dose from inhalation.
7. The bounding dose conversion factors in EPA Guidance Report No. 12 (Reference 6) are used to calculate the whole body, critical organ, thyroid, and skin dose from immersion.

The isotopes used in the analysis were based on the selection criteria in ISG-5, Revision 1, including Co-60 in the fuel rod crud, iodine-129, tritium, metastable tellurium-125, fission products that contribute greater than 0.1% of activity, and actinides that contribute greater than 0.01% of activity. The isotope concentrations were used with the release fractions, the free volume in the cavity of the TN-32 cask (5.39 cubic meters), and the cask seal leak rate to calculate the isotope release rate (Ci/sec) from the cask. The isotope release rate is used over a 30-day period to calculate a release inventory in curies.

Using this release inventory, the bounding dose conversion factors from EPA Guidance Report No. 11, the maximum dispersion factor (X/Q), and the breathing rate from Reference 3, the site boundary inhalation dose for each isotope was calculated. Similarly, using this release inventory, the bounding dose conversion factors from EPA Guidance Report No. 12, and the maximum bounding dispersion factor (X/Q), the site boundary immersion dose for each isotope was calculated.

8.2.10.3 Accident Dose Calculations This accident evaluation, performed to determine the radiological consequences of a release of the inventory in an SSSC, resulted in a deep dose plus committed dose equivalent to the worst organ (bone marrow) of 13 mrem at the nearest site boundary. This dose is well within the criteria of 10 CFR 72.106(b).

8.2.11 References

1. NUREG-1536, Standard Review Plan for Dry Cask Storage Systems, US NRC, Spent Fuel Project Office.
2. Interim Staff Guidance-5, Revision 1, Confinement Evaluation, US NRC Spent Fuel Project Office.
3. Interim Staff Guidance-6, Minimum Enrichment for Design Basis, US NRC Spent Fuel Project Office.

Revision 806/14 North Anna ISFSI SAR 8-8

4. TN-32 Final Safety Analysis Report, Revision 0, Transnuclear Inc., January 2000.
5. U. S. Environmental Protection Agency, Federal Guidance Report No. 11, Limiting Values of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion, EPA 520/1-88-020, 1988.
6. U. S. Environmental Protection Agency, Federal Guidance Report No. 12, External Exposure to Radionuclides in Air, Water, and Soil, EPA 402-R-93-081, September 1993.

8.3 SITE CHARACTERISTICS AFFECTING SAFETY ANALYSIS Site characteristics have been considered in the formation of the bases for these safety analyses. Conditions of meteorology were used in the determination of /Q values as well as the characteristics of extreme winds and their contribution to maximum flood level. Regional and site seismology and geology were used to help define the design earthquake acceleration value.

Regional population distribution and other demographic data were used to determine radiation doses.

Revision 806/14 North Anna ISFSI SAR 9-1 Chapter 9 CONDUCT OF OPERATIONS 9.1 ORGANIZATIONAL STRUCTURE 9.1.1 Corporate Organization The ISFSI will be operated under the same corporate management organization responsible for operation of the North Anna Power Station. This organization is depicted in the Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1 (QA Program Topical Report).

9.1.1.1 Corporate Functions, Responsibilities, and Authorities Corporate functions, responsibilities and authorities for the North Anna ISFSI are discussed in the QA Program Topical Report.

9.1.1.2 Applicants In-House Organization A discussion of Virginia Powers in-house organization is provided in the QA Program Topical Report.

9.1.1.3 Relationships with Contractors and Suppliers The SSSC suppliers are responsible for the fabrication and testing of the SSSCs, and for recommending SSSC handling procedures. The Nuclear Analysis and Fuel Department is the primary interface with the SSSC supplier and other equipment vendors.

Site preparation and construction will be performed by Virginia Power, using specialty subcontractors, as required.

9.1.1.4 Applicants Technical Staff Virginia Powers technical staff is described in the QA Program Topical Report.

9.1.2 Operation Organization, Management, and Administrative Control System 9.1.2.1 Onsite Organization The North Anna Power Station onsite organization is described in the QA Program Topical Report.

9.1.2.2 Personnel Functions, Responsibilities, and Authorities Personnel functions, responsibilities and authorities are described in the QA Program Topical Report.

Revision 806/14 North Anna ISFSI SAR 9-2 9.1.3 Personnel Qualification Requirements 9.1.3.1 Minimum Qualification Requirements Each member of the North Anna Power Station staff is required to meet or exceed the minimum qualifications specified in the QA Program Topical Report.

9.1.3.2 Qualifications of Personnel The qualification requirements for the managerial and technical positions are described in the QA Program Topical Report.

9.1.4 Liaison with Outside Organizations Dames & Moore provided geotechnical expertise initially required to evaluate site conditions and to design the ISFSI structures and foundations. SSSC vendors provide technical expertise in the design, fabrication and use of the SSSCs. Bechtel Power Corporation provided expertise in the development of computer models to initially assess radiation doses.

9.2 STARTUP TESTING AND OPERATION 9.2.1 Administrative Procedures for Conducting Test Program The administrative procedures and instructions for the North Anna ISFSI are the same as those used for the North Anna Power Station. Any changes to, or deviations from, these procedures and instructions are reviewed and approved in accordance with the QA Program Topical Report.

9.2.2 Test Program Description The objectives of the pre-operational testing program are to ensure that the SSSCs perform their safety functions as intended and that the means to fulfill the commitments made in Chapter 10 are available.

9.2.2.1 Physical Facilities Before operation of the ISFSI, the SSSC monitoring instrumentation, the electrical system, the communications system and the security system are tested to ensure their proper functioning.

The ISFSI security system is tested after completion of its installation. Details on security system testing are provided in the Security Plan.

The SSSC monitoring instrumentation alarms are tested to ensure that individual alarm signals annunciate at the local annunciator enclosure at the ISFSI location.

The electrical system is tested to ensure that power is available for the SSSC monitoring instrumentation and the local annunciator. The lighting and service receptacles are also tested for proper operation.

Revision 806/14 North Anna ISFSI SAR 9-3 The communications system is tested to ensure that the telephone at the local annunciator is properly connected into the station phone system.

9.2.2.2 Operations Testing of SSSC operations, i.e., loading, drying, sealing and unloading, shall be conducted prior to the first use of each SSSC design. This simulation shall include all SSSC loading and unloading operations, with the exception of loading actual fuel assemblies into the SSSC. SSSC loading will instead be tested with a dummy fuel assembly to ensure that fuel assemblies will fit properly into the SSSC. All SSSCs are tested for fuel assembly fit by the vendor at the fabrication facility. The SSSCs are also tested by the vendor to ensure that they seal properly. New seals are installed prior to and tested following fuel loading.

The function of the transporter is tested prior to its first use with each new SSSC design using an empty SSSC for a transport simulation to and from the ISFSI, including placement of the SSSC at a storage location.

9.2.3 Test Discussion The pre-operational test purposes, responses, acceptance criteria, margins, and corrective actions are discussed in Section 9.2.2. Instrumentation, electrical, and communications equipment shall be functionally tested to confirm operability. Acceptance criteria for SSSC seal testing shall be as specified in Section 3.3.

9.3 TRAINING PROGRAM The training program has the objective of providing and maintaining a well qualified work force for safe and efficient operation of the ISFSI. All personnel working in the fuel storage area receive radiation and safety training. Those personnel actually performing SSSC and fuel handling functions are given additional training in specific areas as required by the radiological protection program in effect at the North Anna Power Station.

All personnel working at the North Anna ISFSI receive training and indoctrination geared toward providing and maintaining a well-qualified work force for safe and efficient operation of the ISFSI. The existing North Anna training programs are INPO accredited and are directly applicable to the North Anna ISFSI, and provide this training and indoctrination. Additional training requirements specific to the ISFSI will address the following subjects:

  • ISFSI Licensing Basis and Technical Specifications
  • ISFSI Layout and Function
  • ISFSI Communications Systems
  • ISFSI Operation, Emergency, Maintenance, and Administrative Procedures

Revision 806/14 North Anna ISFSI SAR 9-4

  • SSSC Loading and Unloading, Handling and Onsite Transportation
  • SSSC Decontamination Techniques Following completion of the ISFSI training program, trainees are given a written and practical exam to ensure they understand the important aspects of the information described above. Retention of training records and certifications of proficiency is consistent with that for personnel involved in fuel handling operations.

ISFSI retraining is consistent with the retraining requirements in effect at the North Anna Power Station for personnel involved in fuel handling operations.

Training records are maintained for in accordance with the QA Program Topical Report.

Such records include dates and hours of training and other documentation on training subjects, information on physical requirements, job performance statements, copies of written examinations, information pertaining to walk-through examinations, and retesting particulars.

9.4 NORMAL OPERATIONS 9.4.1 Procedures Written procedures for all normal operating, maintenance, and testing at the ISFSI will be prepared and will be in effect prior to operation of the North Anna ISFSI. These procedures are briefly described in Sections 9.4.1.1 through 9.4.1.8.

These procedures, and any subsequent revisions, will be reviewed and approved in accordance with the QA Program Topical Report. All procedure revisions shall be documented.

The Nuclear Oversight Department periodically audits (on a sampling basis) the procedures to ensure revisions are made promptly and that obsolete material is deleted.

9.4.1.1 Administrative Procedures Administrative procedures will provide a clear understanding of operating philosophy and management policies to all ISFSI personnel. These procedures include instructions pertaining to personnel conduct and control, including consideration of job-related factors which influence the effectiveness of operating and maintenance personnel, e.g., work hours, entering and exiting the ISFSI, organization, and responsibility, etc.

9.4.1.2 Annunciator Procedures Annunciator procedures will provide information relative to each alarm annunciator which monitors SSSC parameters. The procedures will provide alarm set points and appropriate corrective action.

Revision 806/14 North Anna ISFSI SAR 9-5 9.4.1.3 Health Physics Procedures Health physics procedures are used to implement the radiation protection plan. The radiation protection plan involves the acquisition of data and provision of equipment to perform necessary radiation surveys, measurements, and evaluations for the assessment and control of radiation hazards associated with the operation of the ISFSI. Procedures have been developed and implemented for monitoring exposures of employees, utilizing accepted techniques, radiation surveys of work areas, radiation monitoring of maintenance activities, and for records maintenance demonstrating the adequacy of measures taken to control radiation exposures of employees and others within prescribed limits and as low as practicable. These procedures will be revised as needed to address ISFSI operations prior to operation of the ISFSI. The revised procedures will ensure the safety of personnel performing loading, transport, and unloading operations, and surveillance and maintenance at the ISFSI. Entrance to the ISFSI and all work performed inside will require a radiation work permit and will be controlled by health physics and security personnel.

9.4.1.4 Maintenance Procedures Maintenance procedures will be established for performing preventative and corrective maintenance on ISFSI equipment and the SCCSs. Preventative maintenance will be performed on a periodic basis to preclude the degradation of ISFSI systems, equipment, and components.

Corrective maintenance will be performed to rectify any unexpected system, equipment, or component malfunction, as the need arises.

9.4.1.5 Operating Procedures The operating procedures will provide the instructions for handling, loading, sealing, transporting, storing and unloading the SSSCs.

9.4.1.6 Test Procedures Periodic test procedures will be established to verify operability of the ISFSI systems, equipment, and components on a routine basis.

9.4.1.7 Pre-operational Test Procedures Pre-operational test procedures will be established to ensure that ISFSI structures, systems, and components satisfactorily perform their required functions. These test procedures will further ensure that the ISFSI has been properly designed and constructed and is ready to operate in a manner that will not endanger the health and safety of the public.

9.4.1.8 Procedures Implementing the QA Program Procedures will be established to ensure that the operation and maintenance of the ISFSI is performed in accordance with the QA program described in Chapter 11.

Revision 806/14 North Anna ISFSI SAR 9-6 9.4.2 Records In accordance with the requirements of 10 CFR 72.72, records on the identity of each fuel assembly will be maintained with SSSC loading procedures, and shall include the following:

  • Fuel manufacturer
  • Date of delivery
  • Reactor exposure history
  • Burnup
  • Inventory control number
  • Pertinent data on discharge and storage at the reactor, transfer to the ISFSI and storage at the ISFSI All records related to the ISFSI, including those for quality assurance, operations, accountability, off-normal occurrences, events associated with radioactive releases and environmental surveys shall be maintained by the North Anna Power Station document management system.

9.5 EMERGENCY PLANNING The North Anna Emergency Plan (NAEP) describes the organization, assessment actions, conditions for activation of the emergency organization, notification procedures, emergency facilities and equipment, training, provisions for maintaining emergency preparedness, and recovery criteria used at the North Anna Power Station. This emergency plan will also be used for any radiological emergencies that may arise at the North Anna ISFSI.

Portions of Section 4 of the NAEP and applicable implementing procedures reflect the conditions and indications that require entry into the Emergency Plan. Appropriate response actions and notifications have been established in the Emergency Plan. Damage to a loaded SSSC confinement boundary requires declaration of a Notification of Unusual Event.

9.6 PHYSICAL SECURITY PLAN The purpose of a security program for the ISFSI is to establish and maintain a physical security capability for the protection of the spent fuel stored in the SSSCs. The physical security program for the North Anna ISFSI is provided in the Physical Security Plan, Safeguards Contingency Plan and the Nuclear Security Personnel Training and Qualification Plan for the North Anna Power Station.

Additional information regarding the security program for the ISFSI is contained in a separate enclosure, that is withheld from public disclosure in accordance with 10 CFR 2.790(d) and 10 CFR 73.21.

Revision 806/14 North Anna ISFSI SAR 10-1 Chapter 10 OPERATING CONTROLS AND LIMITS 10.1 PROPOSED OPERATING CONTROLS AND LIMITS The proposed operating controls and limits for the North Anna ISFSI are provided in the North Anna ISFSI Technical Specifications. The Technical Specifications contain definitions, functional and operating limits, limiting conditions for operation, the applicability for the limiting conditions, action statements, surveillance requirements, design features, and administrative controls. Functional and operating limits are utilized to protect the integrity of the stored fuel or SSSC, and to guard against the uncontrolled release of radioactive materials. The items addressed by the functional and operating limits are provided in Table 10-1. The limiting conditions for operation specify the lowest functional capability or performance levels for equipment required for safe operation. The items addressed by the limiting conditions for operation are provided in Table 10-2.

10.1.1 Content of Operating Controls and Limits The functional and operating limits, and the limiting conditions for operation specify the required technical limits and operating status for the variables, technical characteristics and conditions, and equipment addressed by the Technical Specifications. The applicability specifies the equipment, time period, or operational condition to which the operating controls and limits apply. The action statements provide the corrective action instructions that must be followed if the technical limits or operating status requirements are not met. The surveillance requirements specify the verification needed to assure that the functional and operating limits, and the limiting conditions for operation are being met.

10.1.2 Bases for Operating Controls and Limits A basis is provided with each functional and operating limit, and each limiting condition for operation in the North Anna ISFSI Technical Specifications. Each basis describes the significance to safety of the required technical limits and operating status established for the variables, technical characteristics and conditions, and equipment addressed by the Technical Specifications.

10.2 DEVELOPMENT OF OPERATING CONTROLS AND LIMITS 10.2.1 Functional and Operating Limits Functional and operating limits have been established in order to define the requirements for the fuel to be stored at the ISFSI. The functional and operating limits for the parameters listed in Table 10-1 are provided in Chapter 2.0 of the North Anna ISFSI Technical Specifications.

10.2.2 Limiting Conditions for Operation Limiting conditions for operation have been established to control the equipment, and technical conditions and characteristics of the ISFSI necessary for continued operation. The

Revision 806/14 North Anna ISFSI SAR 10-2 limiting conditions for operation of equipment address the lowest acceptable level of performance for a system or component, and the minimum portion of the system or the minimum number of components that should be available. The limiting conditions for operation for technical conditions and characteristics address allowable quantities during loading, transport, storage, and unloading operations. The limiting conditions for operation for the equipment, and technical conditions and characteristics listed in Table 10-2 are provided in Chapter 3.0 of the North Anna ISFSI Technical Specifications.

10.2.3 Surveillance Requirements Surveillance requirements have been established in order to confirm that the limiting conditions for safe storage are met. Surveillance requirements have been established for each functional and operating limit, and limiting condition for operation, and are provided with them in Chapter 3.0 of the North Anna ISFSI Technical Specifications.

10.2.4 Design Features The design features describe ISFSI design characteristics of importance. The design features are provided in Chapter 4.0 of the North Anna ISFSI Technical Specifications.

10.2.5 Administrative Controls The administrative controls include the organization and management procedures, recordkeeping, review and audit, and reporting necessary to assure that the operations involved in the storage of spent fuel at the North Anna ISFSI is performed in a safe manner. The administrative controls are provided in Chapter 5.0 of the North Anna ISFSI Technical Specifications.

Revision 806/14 North Anna ISFSI SAR 10-3 Table 10-1 FUNCTIONAL AND OPERATING LIMITS

  • Fuel To Be Stored At The ISFSI Table 10-2 LIMITING CONDITIONS FOR OPERATION
  • SSSC Cavity Vacuum Drying Pressure
  • SSSC Combined Helium Leak Rate
  • SSSC Internal Pressure
  • SSSC Maximum Lifting Height
  • Dissolved Boron Concentration
  • SSSC Average Surface Dose Rates
  • SSSC Surface Contamination
  • SSSC Spacing

Revision 806/14 North Anna ISFSI SAR 10-4 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR 11-1 Chapter 11 QUALITY ASSURANCE 11.1 QUALITY ASSURANCE PROGRAM DESCRIPTION 10 CFR 72.140 requires that a quality assurance program be established and implemented for the structures, systems, and components of an ISFSI that are important to safety, commensurate with their importance to safety. However, 10 CFR 72.140 provides for the use of previously approved programs.

Since Virginia Power is currently licensed under 10 CFR 50 to operate nuclear power facilities, a quality assurance (QA) program meeting the requirements of 10 CFR 50, Appendix B is already in place. The governing document for this program is the Dominion Nuclear Facility Quality Assurance Program Description, Topical Report DOM-QA-1 (QA Program Topical Report), which has been reviewed and approved by the NRC. (See Section 1.5.) The document is updated in accordance with 10 CFR 50.54(a). The NRC is periodically notified of changes to the document. This program is implemented through the Virginia Power administrative and technical procedures. The objective of the company Quality Assurance Program for operating nuclear power stations is to comply with the criteria expressed in 10 CFR 50, Appendix B, as amended, and with the quality assurance program requirements for nuclear power plants as referenced in the Regulatory Guides and ANSI standards referenced in the QA Program Topical Report. This program will be applied to those activities associated with the North Anna ISFSI that are important to safety. No changes to this program are required for the ISFSI activities.

As indicated in previous chapters, the SSSCs are the only components with a safety function. As such, Virginia Power procedures delineate the requirements for the engineering, procurement, fabrication, and inspection of this equipment. The procurement documents (specifications, requisitions, etc.) are reviewed technically prior to use to ensure that the proper criteria have been specified. During the SSSC design phase, vendor information (drawings, specifications, procedures, etc.) are reviewed to ensure compliance with Virginia Powers technical requirements. During SSSC fabrication, Virginia Powers Vendor Surveillance Representative will visit the vendors shop to ensure compliance with Virginia Powers requirements and to witness parts of the SSSC fabrication and testing.

Revision 806/14 North Anna ISFSI SAR 11-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A-1 Appendix A SSSC Specific Information This appendix provides:

  • A list of the Topical Safety Analysis Reports for SSSCs approved by the USNRC for use at the North Anna ISFSI (see Table A-1).
  • A subappendix for each SSSC type that provides specific references to the SSSC Topical Safety Analysis Reports, and supplements the information contained in the SSSC Topical Safety Analysis Reports.

Revision 806/14 North Anna ISFSI SAR A-2 Table A-1 TOPICAL SAFETY ANALYSIS REPORTS FOR SSSCs APPROVED FOR USE AT THE NORTH ANNA ISFSI A.1. TN-32 Dry Storage Cask Topical Safety Analysis Report, Revision 9A, Transnuclear, Inc.,

December 1996.

Revision 806/14 North Anna ISFSI SAR A.1-1 Appendix A.1 TN-32 DRY STORAGE CASK A.1.1 General Description The TN-32 cask is a smooth right circular cylinder of multi-wall construction that is approximately 16.8 feet high, 8.1 feet in diameter and weighs (empty) approximately 91.0 tons.

The cask inner shell and containment vessel is a welded, carbon steel cylinder that is 1.5 inches thick and has a sprayed metallic aluminum coating for corrosion protection. Surrounding the outside of the containment vessel wall is a steel gamma shield with a wall thickness of 8.0 inches.

The bottom end of the gamma shield has a thickness of 8.75 inches. The cask has a cylindrical cavity which holds a fuel basket designed to accommodate 32 PWR fuel assemblies. The loaded weight of the cask is approximately 115.5 tons. Four trunnions are welded on, two at the top end and two at the bottom end of the body.

During fabrication of the TN-32 cask, the inner containment vessel and the gamma shielding are fit together by a shrink-fit procedure. The gamma shielding is heated so that the inner containment vessel, with the flange attached, can be inserted into the outer gamma shielding vessel. This allows a close fit between the two cylindrical shells for good heat transfer. During the shrink fit operation, a small circumferential gap between the flange of the inner vessel and the gamma shielding forms as the heated gamma shield cools. Prior to welding the flange to the gamma shield, the gap is filled with shims made of one of the materials specified in the TN-32 TSAR for the gamma shield shell.

The cask is sealed with one carbon steel lid bolted to the top flange of the containment vessel. The lid is 10.5 inches thick and is secured to the cask body with 48 bolts. The lid and lid penetration covers are sealed with metallic O-ring seals.

Neutron shielding is provided by a 4.5-inch thick resin compound enclosed in long aluminum boxes that surround the gamma shield. The neutron shield boxes are enclosed by a painted carbon steel shell that is 0.50 inches thick.

In Chapter 1 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96), drawing 1049-70-2, Rev. 2, includes a view of a cask trunnion (item 6). The back side of the trunnion (weld prep) is shown at a 30 degree angle. This angle should actually be shown as 45 to 50 degrees.

Sections 3.1.1, Paragraph 3 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96) states that Other structural and structural attachment welds are examined by the liquid penetrant or the magnetic particle method in accordance with Section V, Article 6 of the ASME Code.

Acceptance standards are in accordance with Section III, Subsection NF, Paragraph NF-5350.

However, Paragraph NF-5350 only pertains to liquid penetrant inspection. Paragraph NF-5340 pertains to magnetic particle inspection. Section 3.1.1, Paragraph 3 of the TN-32 Topical Safety Analysis Report (Rev. 9A, 12/96) should read Other structural and structural attachment welds

Revision 806/14 North Anna ISFSI SAR A.1-2 are examined by the liquid penetrant or the magnetic particle method in accordance with Section V, Article 6 of the ASME Code. Acceptance standards are in accordance with Section III, Subsection NF, Paragraph NF-5340 and NF-5350.

The weld between the aluminum plates separating the fuel storage tubes and the outer aluminum plates at twenty-four locations around the periphery of the fuel basket is shown on TN-32 TSAR drawing 1049-70-6, Rev. 3 as a 0.25-inch groove weld. In order to provide consistency with as-built conditions, this weld may alternatively be a 0.25-inch fillet weld.

The weld creating the longitudinal seam of the neutron shield outer shell is shown on TN-32 TSAR drawing 1049-70-2, Revision 2 as a full penetration weld. In order to provide improved heat transfer between the outer shell and the neutron shield tubes, this weld may alternatively be a partial penetration weld.

TN-32 TSAR Revision 9A drawing 1049-70-5 specifies that the top of borated aluminum plates in the fuel basket be placed nominally 11.88 inches from the top of the basket assembly.

Revision 0 of the TN-32 FSAR, which contains analyses to support loading of fuel with higher burnup and enrichment, specifies that the top of the borated aluminum plates be placed nominally 12.00 inches from the top of the basket assembly. Since Revision 9A is the TN-32 TSAR of record for the North Anna ISFSI, the dimensions must be reconciled in order to facilitate future loading of TN-32 casks with North Anna fuel of higher burnup and enrichment. Therefore, the nominal dimension may be either 11.88 inches or 12.00 inches without any impact to cask criticality evaluations.

The lid bolt analysis presented in Appendix 3A.3 of the TN-32 TSAR has been updated to allow for torque in the range of 880 ft-lb to 1230 ft-lb, to incorporate High Purity Loctite N-5000 Antiseize lubricant, and to allow the use of silver-jacketed O-rings. In addition, the summary of bolt stresses presented in Table 3.4-7 of the TN-32 TSAR has been corrected. The updated analysis, figures, and tables are included as Attachment 1 to this appendix. The revised analysis concludes that the code allowable stresses on the bolts are not exceeded for both normal and accident conditions. Pages 3A.3-1 through 3A.3-13, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7 in the TN-32 TSAR Revision 9A are replaced by the attached pages 3A.3-1 through 3A.3-15, Figures 3A.3-1, 3A.3-2, 3A.3-4, 3A.3-5 and 3A.3-6, and Table 3.4.7.

In addition to the sections above, Section 7.1.4 of the TN-32 TSAR, Revision 9A, states that the bolt torque for the main lid bolts is 930 +/- 50 ft-lb and for the penetration port covers the torque is 60 +/- 10 ft-lb. In accordance with the lid bolt analysis update, the required torque for the main lid bolts is 880 ft-lb to 1230 ft-lb. The required torque for the penetration cover bolts ranges from 60 ft-lb to 100 ft-lb depending on the bolt material supplied by the vendor.

The protective covers at the North Anna ISFSI have been modified from the cover described in TN-32 TSAR Revision 9A to the cover described in the drawings in Attachment 3. The modified protective cover includes a sealable bolt-on access plate that is both airtight and

Revision 806/14 North Anna ISFSI SAR A.1-3 watertight. The access plate has a through-wall fitting that connects to the OP system on the inside of the protective cover and connects to tubing on the outside of the protective cover. This tubing runs down the side of the cask to an instrumentation box in which the pressure switches/transducers are located. In addition, another connection is located at the access plate which openly communicates to the atmosphere within the protective cover. The external connection to this fitting will connect to tubing that also is mounted along the side of the cask.

Drawing SK-VP-SAR-1 in Attachment 3 shows the cask with the modified protective cover and pressure switches. Figures VP1.2-1 and VP2.3-1 contained in Attachment 3 illustrate the confinement boundary components and pressure monitoring system. The confinement boundary components shown in Figures 1.2-1 and VP1.2-1 are:

1. Inner shell and bottom closure
2. Flanged and bolted lid
3. Flange
4. Vent cover
5. Drain cover The containment boundary components are not changed with the alternate design.

The plastic structural analysis presented in Section 3C.3-1 of the TN-32 TSAR utilizes a value of 0.48" for the gap between center basket rails. The actual gap can range from 0.0" to 1.1326" while maintaining the required opening between opposite rails. Therefore, additional analyses have been performed to demonstrate that the structural integrity of the basket and rails is maintained for the full range of possible gap sizes. The additional analyses are included as to this appendix.

Table 8.1-1 of the TN-32 TSAR Revision 9A describes the sequence of operations associated with the TN-32 cask. For installation of the modified protective cover, Step 13 will be performed prior to Step 11 in order to check the function of the overpressure system transducers or pressure switches. Step 11 will also be modified not to include specific instructions for checking the function of the transducers or switches before the protective cover is installed.

TN-32 casks used at the North Anna ISFSI are fabricated to the requirements of the TN-32 Topical Safety Analysis Report (TSAR), Revision 9A, or the TN-32 Final Safety Analysis Report (FSAR), Revision 0. TN-32 casks fabricated to the requirements of the TN-32 FSAR, Revision 0, have been evaluated with respect to the design bases for the TN-32 TSAR, Revision 9A, and have been found to be acceptable. Analyses included in the TN-32 FSAR, Revision 0, may not be credited in the use of TN-32 casks unless they have been added to the ISFSI SAR.

The only physical difference between TN-32 TSAR, Rev. 9A, casks and TN-32 FSAR, Rev. 0, casks is the design of the nonsafety related overpressure system. TN-32 TSAR, Rev. 9A, casks use an overpressure system with two pressure switches located under the protective cover

Revision 806/14 North Anna ISFSI SAR A.1-4 and wiring through the protective cover that connects to the facility alarm panel. TN-32 FSAR, Rev. 0, casks use tubing through the protective cover to the pressure switches/transducers in a box on the side of the cask near ground level. An evaluation has shown that either overpressure system configuration is acceptable for use at the North Anna ISFSI.

The fabrication of TN-32 FSAR, Rev. 0, casks differs in the following two ways from the fabrication of TN-32 TSAR, Rev. 9A, casks.

1. The nil ductility transition temperature (NDTT) required for containment material is minus 80°F. The TN-32 TSAR, Rev. 9A, cask containment materials have a specified NDTT of no more than minus 40°F
2. Progressive PT and MT inspections are required of the bottom to gamma shield weld and the lid to lid shield weld. Progressive inspections were not required in the TN-32 TSAR, Rev. 9A.

These two changes provide additional margin in the structural evaluation performed for the TN-32 FSAR, Rev. 0, cask; however, this evaluation is not approved for use at the North Anna ISFSI. The TN-32 FSAR, Rev. 0, cask meets the structural design criteria for casks to be used at the North Anna ISFSI. The design and fabrication changes described above will be in effect for TN-32 casks number TN-32.32 and higher.

The US NRC has approved the generic use of TN-32 casks by 10 CFR Part 50 licensees.

The TN-32 FSAR, Rev. 0, provides the licensing basis for this use and includes generic Technical Specifications. The North Anna ISFSI Technical Specifications, and the TSAR, Rev. 9A, however will govern the use of TN-32, Rev. 0, casks at the North Anna ISFSI, except to the extent that specific analyses (e.g., criticality or thermal performance) from the FSAR, Rev. 0, have been added to the ISFSI SAR. The analyses in Chapters 4 and 6 of the TN-32 FSAR, Rev. 0, have been added to this Appendix A.1.

A.1.2 Spent Fuel to Be Stored Two types of burnable poison rod assemblies (BPRAs) exist at North Anna. One type, manufactured by Westinghouse Electric, contains an annular section of borosilicate glass contained within a stainless steel tube. The inside annular region of the glass also contains a stainless steel tube. The glass and tube region is plugged and seal-welded at both ends, and remains dry during operation, and forms one burnable poison (BP) rod. One end of the BP rod is attached to a flat baseplate, which is used to join other BP rods to form a single BPRA. One BPRA can have as many as twenty BP rods.

Framatome Cogema Fuels (FCF) manufactures the other type of BPRA used at North Anna.

An FCF BP rod uses AL2O3 - B4C (boron carbide in an alumina matrix) pellets encapsulated within a Zircaloy cladding. The cladding is plugged and seal-welded at both ends and remains dry during operation. A small gas plenum region is provided at the top of the pellet stack to accommodate helium off-gas. One end of the BP rod is attached to a flat baseplate, which is used

Revision 806/14 North Anna ISFSI SAR A.1-5 to join other BP rods to form a single BPRA. One FCF BPRA can have as many as twenty-four individual rods; one for each of the thimble tubes in a Westinghouse 17 x 17 fuel assembly.

The Westinghouse and FCF BPRA baseplates are similar in design and manufactured from stainless steel.

The thimble plug devices (TPDs) used at North Anna were manufactured by Westinghouse.

The purpose of the device was to restrict (plug) reactor coolant flow in the thimble tubes in fuel assemblies that contained no insert components (i.e., control rods, BPRAs, source assemblies, etc.). TPDs are no longer used in either Unit 1 or Unit 2 at North Anna. A TPD uses the same baseplate as a Westinghouse BPRA to attach twenty-four rodlets, each approximately 8 inches long. Each TPD rodlet is manufactured of solid stainless steel.

The structural evaluations of the TN-32 cask are provided in Chapters 3 and 11 of the Rev. 9A TN-32 Topical Report. These evaluations used a fuel weight of 1533 lb, which bounds all possible combinations of North Anna Units 1 and 2 fuel assemblies containing a BPRA or TPD.

An evaluation has also been performed on the effect to the cask surface dose rates as a result of placing BPRAs and/or TPDs in the fuel stored in the TN-32. If BPRAs or TPDs have at least one-year decay time after discharge from the reactor, the cask surface dose rates for the TN-32 remain less than the design basis dose rates used to calculate doses at the ISFSI perimeter fence and to the nearest resident.

An evaluation has been performed on the effect on criticality control from the storage of BPRAs and/or TPDs in the fuel stored in the TN-32. The criticality control analysis assumes that water borated to 2500 ppm is present in the cask cavity. This analysis was performed assuming that the borated water in the fuel assembly guide tubes was replaced with aluminum rods, which have lower neutron cross sections than a fully depleted BPRA. The results show a slight increase in reactivity which is well within the subcritical limit. TPDs are short and do not displace water in the guide tubes, therefore, their use will not affect reactivity.

The TN-32 is designed for a maximum internal pressure under normal and accident conditions, and helium buildup of pre-pressurization in BPRAs will affect this analysis. The confinement analysis for the TN-32 has been reanalyzed conservatively for thirty-two BPRAs, and this reanalysis shows that the maximum pressure under accident conditions would be 69.4 psig, when the design basis for this cask is 100 psig. This analysis bounds the storage of any type of Westinghouse or FCF 17 x 17 BPRA. The impact of TPDs on the confinement analysis is bounded by the impact of BPRAs.

To account for the additional decay heat from BPRAs and/or TPDs, fuel assembly decay heat estimates must include an estimate for the decay heat from the actual component in each fuel assembly. Therefore, the combined decay heat from the fuel assembly and its component must be less than the limit for a fuel assembly in the TN-32.

Revision 806/14 North Anna ISFSI SAR A.1-6 Based on these evaluations, the storage of fuel assemblies with BPRAs and/or TPDs is acceptable for the TN-32.

Rod clips have been attached to some fuel assemblies at North Anna. Rod clips resemble a fuel assembly grid strap, but are shorter in length and do not span the full row of rods as grid straps do. Rod clips are physically attached to the fuel rods mid-span between grids for the purpose of reducing rod vibration and ultimately eliminating baffle-jetting fuel rod failures, which occurred in North Anna Unit 1 prior to vessel upflow conversion. Rod clips may exist on one or two faces of a fuel assembly.

An evaluation has been performed on the effect on the TN-32 shielding analysis of rod clips on fuel assemblies stored in TN-32 casks. The analysis determined that the total actual Inconel-718 in the fuel zone region for an assembly with rod clips is less than the design basis value of 5.9 kilograms, which is the bounding analysis value from the TN-32 Topical and Final Safety Analysis Reports. Therefore, it is acceptable to load a fuel assembly with rod clips in a TN-32 cask.

A.1.3 Criticality Evaluation The criticality evaluation from Chapter 6 of the TN-32 FSAR Revision 0 (Reference 2) includes an evaluation of the storage of the Westinghouse 17 x 17 Standard Fuel design. This evaluation is summarized below.

Criticality control in the TN-32 is provided by the basket structural components, which maintain the relative position of the spent fuel assemblies under normal and accident conditions, by the neutron absorbing plates between the basket compartments, and by dissolved boron in the spent fuel pool water.

Transnuclear evaluated five Westinghouse fuel designs to determine the most reactive fuel configuration. The five were the Westinghouse 14 x 14 Standard, 14 x 14 OFA, 15 x 15 Standard, 17 x 17 Standard, and 17 x 17 OFA designs. Of these five designs, the Westinghouse 17 x 17 Standard design with BPRA was determined to be the most reactive, and this fuel design was used for the criticality evaluation.

The contents of a TN-32 cask at the North Anna ISFSI are limited to the Westinghouse 17 x 17 Standard Fuel and North Anna Improved Fuel (NAIF) designs. The NAIF design envelope has dimensions identical to the Standard Fuel design, but several structural elements are made of different materials. These material differences do not affect the criticality analyses, however, and so the criticality evaluations for these fuel types are equivalent.

The fuel assemblies were evaluated with and without burnable poison rod assemblies (BPRA). BPRA were modeled using aluminum rods containing no boron. This displaces the borated water and bounds the effect of depleted BPRA. The criticality evaluations did not rely on any special loading patterns or orientation of the fuel assemblies for criticality control. However, a

Revision 806/14 North Anna ISFSI SAR A.1-7 boron concentration of 2300 ppm in the water used in the cask was assumed in the TN-32 FSAR Rev. 0 analysis.

The evaluations assumed that each fuel assembly design contained a certain amount of uranium. In the case of the Westinghouse 17 x 17 Standard Fuel design, this content was 467.1 kgU per fuel assembly.

The criticality evaluations were performed by Transnuclear using the CSAS25 sequence from the SCALE-4.4 code system and the SCALE 27-group ENDF/B-lV cross section library.

Within this sequence, resonance correction based on the fuel pin cell description is provided by NITAWL using the Nordheim Integral method, and keff was determined by the KENOVa code.

A sufficiently large number of neutron histories were run so that the standard deviation was below 0.0020 for all calculations.

The TN-32 was evaluated for a variety of configurations intended to bound all normal, off-normal, and accident conditions. The following conditions were evaluated individually.

1. Baseline: Most reactive TN-32 fuel configuration, 100% borated water density. The fuel assemblies are shifted toward the cask vertical axis until the outer pin cells contact the basket compartment wall. This condition bounds all possibilities of fuel assemblies positioned off-center in the compartment.
2. The neutron absorber plates and the active fuel zone are offset by two inches axially. This condition might occur due to fuel design differences in the distance from the bottom of the fuel assembly to the beginning of the active fuel, or due to fuel pins slipping in the spacer grids during handling.
3. The inside dimension of the compartment is increased and decreased by 0.06 inches. All compartments move correspondingly further apart or closer together. This condition bounds the dimensional tolerance on the basket tubes.
4. The width of the neutron poison plate is reduced by 0.06 inches, corresponding to its dimensional tolerance. It is not necessary to evaluate the tolerance in length because it is bounded by the two-inch axial offset condition above.
5. Fresh water is placed in the gap of all fuel rods. Although a fuel rod that develops a cladding breach during reactor operations could be saturated with unborated water at the end of its operating cycle, it is unlikely that the water in the fuel rod would remain unborated after years of storage in borated water.
6. The borated water density is varied, except in the homogenized basket rail/borated water zone, to simulate the reduction in density that might occur during unloading operations.
7. Borated water is drained down to the top of the active fuel, except in the basket rail zone.

This is the most reactive configuration expected during loading and unloading operations, because it reduces the boron capture of reflected neutrons.

Revision 806/14 North Anna ISFSI SAR A.1-8 As expected, reduction of the neutron absorber plate width, reduction of compartment size, borated water drain-down, and inclusion of fresh water in the fuel rod gap all cause a slight increase in keff. The optimal borated water density was found at about 95%.

These conditions were combined for a worst case normal condition and the borated water density was varied from 85% to 100%. This resulted in a maximum keff = 0.9264 +/- 0.0009 at 90%

borated water density.

To evaluate accident conditions, the worst case normal model was re-run with a single fuel assembly of 5 weight percent U-235 enrichment. This fuel assembly was placed in one of the four center basket locations. This case demonstrated compliance with the requirement of 10 CFR 72.124 by combining at least two unlikely, independent, and concurrent changes in the conditions essential to nuclear criticality safety; worst case geometry and accidental loading of a fuel assembly with enrichment greater than assumed in the analysis. This resulted in a keff = 0.9315 +/- 0.0009.

Transnuclear performed additional analyses to determine what initial enrichment could be stored if the water in the spent fuel pool had a boron concentration of 2500 ppm. These analyses assumed that the most reactive fuel design and worst-normal configuration remained the same even with the boron increase.

The same criticality model as before was used, however the CSAS25 sequence from SCALE-4.4 was used to determine the keff using KENOVa and the 44-group ENDF/V cross section library. The worst normal case from before with the enrichment changed to 4.30 weight percent U-235 and the soluble boron concentration changed to 2500 ppm was analyzed. As before, the water density was varied to simulate the reduction in density that might occur during unloading operations. Similarly, the accident condition (assembly misload), was simulated as before but with a loading of 4.30 weight percent assemblies and a misloaded 5 weight percent U-235 assembly in an interior cell. A new upper subcritical limit (USL) was determined using SCALE-4.4 for comparison to the calculated keffs for the analyzed conditions. These analyses verified that under normal, off-normal, and accident conditions, that the maximum value of keff + 2 is less than the USL of 0.9419. The worst case which combines the two independent conditions of a misloaded single fuel assembly with the worst-normal configuration at reduced (optimum, 92.5% density) water moderation has a keff + 2 = 0.9404.

The TN-32 cask is designed to be substantially subcritical under all credible conditions. The criticality design is based on favorable geometry, fixed neutron poisons, and soluble poisons in the spent fuel pool, with unirradiated fuel having an initial enrichment, up to and including, 4.30 weight percent U-235. An appraisal of the fixed neutron poisons has shown that they will remain effective for the 20-year storage period, and there is no credible way to lose them. The analysis and evaluation of the criticality design and performance have demonstrated that the cask will provide for the safe storage of spent fuel for a minimum of 20 years with an adequate subcritical margin.

Revision 806/14 North Anna ISFSI SAR A.1-9 The criticality design features for the TN-32 are in compliance with 10 CFR 72 and the applicable design and acceptance criteria have been satisfied. The evaluation of the criticality design provides reasonable assurance that the TN-32 will allow the safe storage of spent fuel.

A.1.3.1 Neutron Absorber Tests As allowed by NUREG/CR-5661 (Reference 3), the criticality evaluation performed in the TN-32 FSAR Revision 0 takes credit for 90% of the boron-10 in the borated aluminum absorber plates rather than the maximum value of 75% used in prior evaluations. Testing to verify the presence and uniformity of the neutron absorber are discussed below.

Effective boron-10 content of the borated aluminum fuel basket neutron absorber sheets is verified by neutron transmission testing of coupons taken from each sheet. The transmission through the coupons is compared with transmission through calibrated standards composed of a homogeneous boron compound without other significant neutron absorbers, for example zirconium diboride or titanium diboride. These standards are paired with aluminum shims sized to match the scattering by aluminum in the neutron absorber sheets. The effective boron-10 content of each coupon, minus 3 based on the neutron counting statistics for that coupon, must be 10 mg boron-10/cm2.

In the event that a coupon fails the single neutron transmission measurement, four additional measurements may be made on the coupon, and the average of the 5 measurements, less 3 based on the counting statistics, must be 10 mg boron-10/cm2.

Macroscopic uniformity of boron-10 distribution is verified by neutron radioscopy or radiography of the coupons. The acceptance criterion is that there be uniform luminance across the coupon. This inspection shall cover the entire coupon.

Normal sampling of coupons for neutron transmission measurements and radiography/radioscopy shall be 100%. Rejection of a given coupon shall result in rejection of the associated sheet. Reduced sampling (50% - every other coupon) may be introduced based upon acceptance of all coupons in the first 25% of the lot. A rejection during reduced inspection will require a return to 100% inspection of the lot. A lot is defined as all the sheets rolled from a single casting.

A.1.4 Thermal Evaluation Chapter 4 of the TN-32 Final Safety Analysis Report, Revision 0 (Reference 2) includes a thermal evaluation for normal conditions that was based on the following inputs.

1. A maximum heat load of 32.7 kilowatts from 32 fuel assemblies with BPRAs or TPDs, or 1.02 kilowatt/fuel assembly.
2. An ambient temperature range of -30 to 115°F. The temperature range was averaged over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and a maximum daily averaged ambient temperature of 100°F was used for the maximum cask temperature evaluation.

Revision 806/14 North Anna ISFSI SAR A.1-10

3. A total solar heat load for a 12-hour period of 1475 Btu/ft2 for curved surfaces and 2950 Btu/ft2 for flat surfaces, per 10 CFR 71.71(c). Since the cask has a large thermal inertia, the total insolation was averaged over a 24-hour period.

The thermal analysis for normal storage concluded that the TN-32 design meets all applicable requirements. The maximum temperature of any confinement structure component was less than 315°F, which has an insignificant effect on the mechanical properties of the confinement materials used. The predicted maximum fuel cladding temperature was 565°F, which is well below the allowable fuel cladding temperature limit of 752°F (400°C) for loading, unloading, and normal operating conditions.

All fuel transfer operations occur when the cask is in the spent fuel pool with the cask lid removed. The fuel is always submerged in free-flowing water, permitting heat dissipation. After fuel loading is complete, the cask is removed from the pool, drained and the cavity is dried.

The loading condition evaluated for the TN-32 is the heatup of the cask before its cavity can be backfilled with helium. This occurs during the vacuum drying operation of the cask cavity.

Transient thermal analyses were performed to predict the heatup time history for the cask components assuming air is in the cask cavity.

The results of the transient thermal analysis for the maximum heat load of 32.7 kw showed that in order to prevent cask component peak temperatures from exceeding their analyzed temperature range, in particular the basket, the time before backfilling the cask with helium must be limited to less than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Backfilling the cask with helium within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of the completion of draining also provides assurance that the fuel pin cladding temperature does not exceed 400°C.

Unloading of a cask would require the flooding of the cask prior to the removal of the fuel.

A quench analysis of the fuel concluded that the total stress on the fuel cladding was below the cladding materials minimum yield stress. In addition, by limiting the water flow rate into the cask and monitoring the pressure of the air/steam outflow mixture, the buildup of steam pressure in the cavity was limited to less than the cask design pressure.

The temperatures determined by the evaluation of the cask systems, structures and components important to safety will remain within their operating temperature ranges, and cask internal pressures under normal conditions were acceptable. The TN-32 cask provides adequate heat removal capacity without active cooling systems. The TN-32 cask is designed with a heat removal capability having testability and reliability consistent with its importance to safety. Spent fuel cladding will be protected against degradation that leads to significant fuel failures by maintaining the clad temperature below maximum allowable limits and by providing an inert environment in the cask cavity.

Revision 806/14 North Anna ISFSI SAR A.1-11 The thermal design of the TN-32 cask is in compliance with 10 CFR 72 and applicable design and acceptance criteria have been satisfied. The evaluation of the thermal design provides reasonable assurance that the TN-32 will allow the safe storage of spent fuel for 20 years.

A.1.5 Cask Sliding and Tip-over Analysis Analysis demonstrates that the casks will not slide or tip-over as a result of the ISFSI design earthquake (Section 4.2.1.4). The analysis utilized a dynamic, soil-structure interaction analysis to determine the effect of the design earthquake on the casks and concrete storage pad. A generic cask, 16 feet high x 8 feet diameter, was used for the analysis. Since cask sliding was the major concern of the analysis effort, the generic cask approach is considered acceptably bounding and produces more conservative factors of safety for sliding. A comparison with the generic cask modeled and the TN-32 is shown below:

TN-32STABILITY ANALYSIS TSAR PROPERTY GENERIC CASK TN-32 SECTION 2.2.3.2 Weight 230 kips 230.99 kips 228 kips Vertical Distance to 96 inches 92.09 inches 92 inches Center of Gravity, Iv Base Radial Distance to 48 inches 43.875 inches 43.875 inches Center of Gravity, Ir A finite element model was used to perform the dynamic analysis. The casks were modeled as a rigid beam from the top of the concrete pad to the center of gravity of the generic casks and the transitional and rotary weights of the casks were lumped at the top of the 96-inch rigid beams.

This is more conservative than using the 92-inch vertical distance of the TN-32 cask and will result in slightly higher accelerations for the casks and a higher moment arm for those accelerations.

The difference in weight between the generic cask and the TN-32 cask is negligible.

The factor of safety against sliding is determined as:

FS = R/H where:

R = Resistance to sliding = µ x W x (1 - Az)

µ = Coefficient of friction = 0.3 W = Weight of cask on pad Az = Vertical acceleration of cask at cask center of gravity

Revision 806/14 North Anna ISFSI SAR A.1-12 H = Horizontal sliding force = (Sx2 + Sy2)0.5 Sx,Sy = Horizontal cask forces at the cask center of gravity in x,y directions

= W x Ai, i = x,y; Ai = horizontal accelerations Thus, FS = 0.3(1 - Az)/(Ax2 + Ay2)0.5 Higher accelerations will result in a lower factor of safety against sliding, therefore using the higher center of gravity of the generic casks is conservative and envelops the TN-32 cask. It should also be noted that the weight of the cask is not involved in the final calculation for the factor of safety against sliding.

Using the methodology of TSAR Section 2.2.3.2, the g value necessary to tip the cask is calculated below:

Mtip = gWIv + (2/3)gWIr and Mstab = WIr Where:

Mtip = Moment necessary to tip the cask Mstab = Stabilizing moment on the cask g = Acceleration value necessary to tip the cask W = Weight of cask on pad Iv = Vertical distance to cask center of gravity Ir = Radial distance to cask center of gravity Therefore, the g value necessary to tip the cask is found by equating Mtip to Mstab:

(gWIv) + (2/3)gWIr = WIr g = (Ir)/(Iv + 0.67 x Ir)

Solving for the TN-32 cask, g = 0.36.

Solving for the generic cask, g = 0.37 which is virtually the same as for the TN-32 cask.

Using the higher center of gravity of the generic casks will result in higher cask accelerations and higher overturning moments which will result in a lower factor of safety against overturning and is therefore conservative.

Revision 806/14 North Anna ISFSI SAR A.1-13 It is concluded that the generic cask used in the analysis is more conservative than using the TN-32 cask for the critical sliding analysis and is essentially equivalent to the TN-32 cask for overturning which shows significant margin to the minimum 1.1 safety factor. The lowest factor of safety for overturning is about 1.6.

A.1.6 Evaluation of Tornado Missiles An evaluation of the TN-32 cask using the North Anna ISFSI design basis tornado missiles was performed. The results are compared below with results provided for the design basis tornado missiles evaluated in TN-32 TSAR Sections 2.2.1.2 and 2.2.1.3. The effects from the design basis tornado missiles evaluated in the TN-32 TSAR bound the effects from the North Anna ISFSI design basis tornado missiles.

TN-32 TSAR NAPS ISFSI PARAMETER TORNADO MISSILES TORNADO MISSILES Cask Sliding 7.6 inches 2.7 inches Cask Tipping 8.9 degrees 2.8 degrees Cask Penetration 2.03 inches 1.65 inches The evaluation for cask sliding was performed after determining that the worst case was the 1-ton automobile traveling at 150 mph impacting the cask below the center of gravity. The evaluation for tipping also used the automobile, but with impact near the top of the cask. Five missiles were evaluated for penetration of the cask body, and the worst cask penetration was 1.65 inches for the 6-inch diameter steel pipe. Other scenarios mentioned in the SAR are bounded by these three conditions.

A.1.7 Revised Type B and C Tornado Missile Analyses The structural analyses for missile types B and C, contained in Sections 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR, include the protective cover. Transnuclear has performed revised analyses which no longer credit the protective cover for missile protection. The revised analyses conclude that the code allowable stresses on the lid are not exceeded during a missile impact event. Section 2.2.1.3.2 and 2.2.1.3.3 of Revision 9A of the TN-32 TSAR are supplanted by the following sections providing a description of the revised analyses. The revised TSAR pages are included as Attachment 2 to this appendix.

A.1.8 SSSC Average Surface Dose Rate The North Anna ISFSI design basis dose rates in Chapter 7 were determined based upon the use of TN-32 SSSCs utilizing design basis fuel loadings with no additional conservatisms applied other than those described in the calculational methodology.

Revision 806/14 North Anna ISFSI SAR A.1-14 A.1.8.1 SSSC Average Surface Dose Rate Measurement In order to determine the average surface dose rates of TN-32 casks to compare with Technical Specifications limits the following method is applied.

Average Side Surface Dose Rate The side surface dose rates shall be measured at approximately the following locations (see Figure A.1-1). Obtain separate measurements for gamma and neutron dose rates.

1. Above the Radial Neutron Shield (Map location A)

Obtain four measurements, equally spaced circumferentially, midway between the top of the cask body flange and the top of the radial neutron shield. Do not obtain measurements over or in the immediate vicinity of the cask trunnions.

Add the measurements together and divide by the number of measurements obtained in this area. The result is the dose rate above the neutron shield.

2. Sides of Radial Neutron Shield (Map locations B, C, and D)

Obtain four measurements, equally spaced circumferentially, at each of the following approximate elevations: one sixth, one half and five sixths along the axial span of the radial neutron shield. Do not obtain measurements over or in the immediate vicinity of the cask trunnions.

Add the measurements together and divide by the number of measurements obtained over the neutron shield. The result is the dose rate over the radial neutron shield.

3. Below Radial Neutron Shield (Map location E)

Obtain four measurements, equally spaced circumferentially, midway between the bottom of the radial neutron shield and the bottom of the cask. Do not obtain measurements over or in the immediate vicinity of the cask trunnions. Also, it may not be possible for a neutron dose rate meter to access the surface at location E. If so, the neutron dose rate meter may be located as much as one foot away from the cask surface to obtain measurements.

Add the measurements together and divide by the number of measurements obtained in this area. The result is the dose rate below the neutron shield.

Average Top Surface Dose Rate

4. Top of Cask (Map locations F, G, and H)

Obtain one measurement at the center of the protective cover (F). Obtain four measurements equally spaced circumferentially half way between the center and the knuckle (G). Obtain four measurements equally spaced circumferentially at the knuckle (H).

Add the measurements together and divide by the number of measurements obtained over the protective cover. The result is the dose rate over the top surface of the cask.

Revision 806/14 North Anna ISFSI SAR A.1-15 Final Surface Dose Rate The average surface gamma and neutron dose rates shall be determined by the following formulae. Note that A, B, C, and D refer to the values obtained in steps 1, 2, 3, and 4 above, respectively. The 0.1 and 0.8 multipliers are area weighting factors.

Average Side Surface Gamma Dose Rate = (0.1 x A) + (0.8 x B) + (0.1 x C)

Average Side Surface Neutron Dose Rate = (0.1 x An) + (0.8 x Bn) + (0.1 x Cn)

Average Top Surface Gamma Dose Rate = D Average Top Surface Neutron Dose Rate = Dn A.1.9 Codes and Standards The TN-32 cask is designed and fabricated in accordance with Section III of the 1992 edition of the ASME Code. Exceptions to the Code are listed in Table A.1-1.

Changes to Table A.1-1 or ASME Code exceptions not included in the Table shall be reviewed in accordance with 10 CFR 72.48. This review should demonstrate that:

1. The changes or exceptions would provide an acceptable level of quality and safety, or
2. Compliance with the specified requirements of Section III of the 1992 edition of the ASME Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

A.1.10 References

1. TN-32 Dry Storage Cask Topical Safety Analysis Report, Revision 9A, Transnuclear, Inc.,

December 1996.

2. TN-32 Dry Storage Cask Final Safety Analysis Report, Revision 0, Transnuclear, Inc.,

January 2000.

3. NUREG/CR-5661, Recommendations for Preparing the Criticality Safety Evaluation of Transportation Packages, 1997.

Table A.1-1 TN-32 ASME CODE EXCEPTIONS List of ASME Code Exceptions for TN-32 Dry Storage Cask Confinement Boundary/Gamma Shielding/Basket The cask confinement boundary is designed in accordance with the 1992 edition of the ASME Code,Section III, Subsection NB. The Revision 806/14 basket was designed in accordance with the 1992 edition of the ASME Code,Section III, Subsection NF. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during drop accidents, was analyzed in accordance with Subsection NB. Inspections of the gamma shielding are performed in accordance with the 1992 edition of the ASME Code as detailed in the TN-32 Topical Safety Analysis Report, Rev. 9A, December 1996 (the TSAR).

Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures TN-32 Cask NB-1100 Stamping and preparation The TN-32 cask is not N stamped, nor is there a code design of reports by the Certificate specification generated. A design criteria document was Holder generated in accordance with TNs QA Program and the design and analysis is provided in the TSAR.

TN-32 Cask NCA-3800 Quality Assurance The Quality assurance requirements of NQA-1 or 10 CFR 72 Requirements Subpart G are imposed in lieu of NCA-3800 requirements.

Lid Bolts NB-3232.3 Fatigue analysis of bolts A fatigue analysis of the bolts is not performed for storage, since the bolts are not subject to significant cyclical loads.

Gamma Shielding NB-1132.2 Non-pressure retaining The primary function of the gamma shield is shielding, although structural attachments shall credit is taken for the gamma shielding in the structural analysis.

conform to Subsection NF A surface examination of the welds is performed in accordance North Anna ISFSI SAR with the requirements of Subsection NF.

A.1-16

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures Pressure test of the NB-6110 All pressure retaining The TN-32 cask is not pressure limited. All confinement welds are Revision 806/14 confinement components shall be fully radiographed. In addition, the gamma shielding supports the boundary pressure tested. confinement boundary under all conditions, so a pressure test of the confinement vessel separately will not simulate actual loading conditions. If the pressure test is performed with the confinement vessel inside the gamma shield, the confinement boundary welds cannot be examined.

North Anna ISFSI SAR A.1-17

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures Confinement NB-2120 Required materials to be Standard Review Plan, NUREG-1536 has accepted the use of Revision 806/14 Vessel Material ASME Class 1 materials either Subsection NB (Class 1) or NC (Class 2 or 3) of the Code for the confinement. SA-203 Gr. D is similar to SA-203 Gr. E, which is a Class 1 material. The chemical content of the two grades are identical, except that Gr. E restricts the carbon to 0.20 max., while Gr. D further restricts the carbon content to 0.17 max. Gr. D is acceptable as a Class 2 material up to 500°F.

SA-350, Gr. LF3 is the same material as the SA-203, Gr. D, except in a forged condition. SA-350, Gr. LF3 is a Class 1 material in the 1995 edition of the ASME Code, and a Class 2 material in the 1992 Code.

Gr. D was selected because of its ductility, since the higher strength is not required. SA-203 Gr. D has better elongation than Gr. E and due to its lower strength is more likely to have the good fracture toughness at low temperatures.

In selecting materials for storage and transport casks, one of the major selection criteria is fracture toughness at low temperatures.

SA-203, Gr. D and SA-350, Gr. LF3 were selected on this basis.

There is no similar requirement for pressure vessels, as they are used at much higher temperatures. For the SA-203 Gr. D and North Anna ISFSI SAR SA-350, Gr. LF3 materials, the allowable stress was based on S, the allowable stress for Class 2 components. This is conservative, since NB is based on Sm, which is 1/3 the tensile strength, while S is 1/4 the tensile strength. Thus there is additional margin over and above the margin required by the code for Class I materials.

A.1-18

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures Weld of lid Shield NB-4335 Impact testing of weld and If two different materials are joined, the fracture toughness Revision 806/14 Plate to Lid heat affected zone of lid to requirements of either may be used for the weld metal. There are shield plate no fracture toughness requirements on the shield plate, and therefore none are performed on the base metal or the heat affected zones. This weld is not subject to low temperatures, as it is inside the cask cavity. An evaluation of this weld at low temperatures is presented in Appendix 3E of the TN-32 FSAR.

Gamma Shielding NB-2190 Material in the component The gamma shielding materials were procured to ASTM or support load path and not ASME material specifications. Materials testing is performed in performing a pressure accordance with the applicable specification. Impact testing is not retaining function welded to performed on the gamma shielding materials (including welding pressure retaining material materials). An evaluation of the gamma shielding due to impact at shall meet the requirements low temperatures is presented in Appendix 3E of the TN-32 of NF-2000 FSAR.

Confinement NB-7000 Vessels are required to have No overpressure protection is provided. Function of confinement Vessel overpressure protection vessel is to contain radioactive contents under normal, off normal, and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maximum accident temperatures.

North Anna ISFSI SAR Confinement NB-8000 State requirements for TN-32 cask to be marked and identified in accordance with Vessel nameplates, stamping and 10 CFR 72 requirements. Code stamping is not required. QA data reports per NCA-8000 package to be in accordance with Transnuclear approved QA program.

A.1-19

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures Confinement NB-2000 Requires materials to be Material will be supplied by Transnuclear approved suppliers with Revision 806/14 Vessel material supplied by ASME Certified Material Test reports (CMTR) in accordance with approved material supplier; NB-2000 requirements. The cask is not code stamped. The quality Quality assurance to meet assurance requirements of NQA-1 or 10 CFR 72 Subpart G may NCA requirements be imposed in lieu of the requirements of NCA-3800.

Corner Weld NB-5231 Full penetration corner In lieu of the UT inspection, the joint will be examined by RT and between bottom welded joins require the either PT or MT methods in accordance with ASME Subsection inner plate to inner fusion zone and the parent NB requirements.

shell metal beneath the attachment surface to be UT inspected after welding Boundary of NB-1131 The design specification A code design specification was not prepared for the TN-32 cask.

Jurisdiction shall define the boundary of A TN design criteria was prepared in accordance with TNs QA a component to which program. The containment boundary is specified in Chapter 1 of another component is the TSAR.

attached.

North Anna ISFSI SAR A.1-20

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures PT/MT inspection NB-5130 Weld preparations in plates The final thickness of the shell is 1.5 inches, and therefore this Revision 806/14 of plates 2 inches and over are requirement was not imposed. However, the confinement shells required to be surface may be made from shells with original thickness greater than examined by PT or MT. 1.5 inches. We interpret the code to mean the final thickness of the pressure vessel. The weld prep on one side of the wall is performed by back gouging after the opposite side is welded. An MT examination of this back gouged surface before welding is performed. A UT examination is performed on the plate material when purchased. This examination is intended to discover indications, both laminar and nonlaminar imperfections. Therefore the UT examination of the plate prior to welding can be expected to reveal any indications or imperfections that exist in the plate.

Surface NB-4121.3 If more than 1/8 inch of The containment flanges and the lids are procured with both a UT examination after material is removed, a and MT examination. More than 1/8 inch of material may be machining surface examination is removed during processing, and no additional surface required of components examinations are performed.

which have been previously surface examined.

Aluminum basket NF-2120 Materials to be ASME The aluminum plate strength is not used for structural analysis plate and rail, Class 1 materials under normal operating loads nor the 50g accident end drop load.

North Anna ISFSI SAR neutron absorber The aluminum plate strength is only assumed to be effective for plates the short duration dynamic loading from a tipover accident and for secondary thermal stress calculations. 6061-T6 is ASME code material (Class 2 or 3). The strength of the neutron absorber plates are not considered in any analysis.

A.1-21

Table A.1-1 (CONTINUED)

TN-32 ASME CODE EXCEPTIONS Reference ASME Component Code/Section Code Requirement Exception, Justification & Compensatory Measures Basket NF-4000/NF-5000 Welding/NDE Inspections Basket welding procedures are qualified in accordance with Revision 806/14 ASME Section IX. Due to the unique nature of these welds, special inspections and tests were developed for these welds.

Components other Subsection NB The code does not apply to components other than the than the containment boundary and basket. The gamma shielding has been containment analyzed and inspected in accordance with Subsection NB as boundary and defined at the beginning of this table.

basket Basket NF-3000 Allowable Stresses The ASME Code gives stress values up to 400°F. Stress values above 400°F are taken from Aluminum Standards and Data, 1990. The allowable stresses used for the aluminum basket plate and rail are based on S, the allowable stress for a Class 2 or 3 component. This is conservative, since the analyses of the basket and rail are performed in accordance with the rules of Subsection NF. Subsection NF allowables are based on Sm which is 1/3 the ultimate strength, while S is 1/4 the ultimate strength.

Thus there is additional margin built into the analysis of the basket and rail over and above the margin required by Subsection NF for class 1 materials.

North Anna ISFSI SAR A.1-22

Revision 806/14 North Anna ISFSI SAR A.1-23 Figure A.1-1 TN-32 SURFACE DOSE RATE MEASUREMENT LOCATIONS

Revision 806/14 North Anna ISFSI SAR A.1-24 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-1 Appendix A.1, Attachment 1 Revision of Lid Bolt Analysis Supplants the Analyses in TN-32 TSAR, Revision 9A, Section 3A.3 and TN-32 FSAR, Revision 0, Section 3A.3

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-3 3A.3 Lid Bolt Analyses The lid bolt analysis presented below is performed using the weight of the TN-32A lid (including top neutron shield) since it is slightly heavier than the standard TN-32 lid assembly (with top neutron shield). The use of either aluminum or silver metallic o-ring seals is discussed in the analysis below. Both are acceptable for use in a TN-32 cask lid system. O-ring parameters from either an aluminum or silver o-ring are used interchangeably in the following analyses, depending on which of the parameters from a particular o-ring provides the more limiting result.

3A.3.1 Normal Conditions 3A.3.1.1 Bolt Preload The lid is secured to the cask body by forty-eight 1.5-in. diameter bolts. The selected bolt preload is such that the metallic confinement seals are properly compressed and the lid is seated against the flange with sufficient force to resist the maximum cavity internal pressure and any dead weight loads acting to unseat the lid. The maximum corresponding tensile reload stress in the bolts at temperature is 51,930 psi (corresponding to a maximum applied torque during cask loading of 1230 ft-lb. with lubrication) which is less than the stress allowable for the bolt material for Normal (Level A) Conditions. The minimum tensile preload stress in the bolts at temperature is 37,150 psi (corresponding to a minimum applied torque of 880 ft-lb. with lubrication) The load per bolt is:

Maximum: FB = AB x 51,930

= 1.492 x 51,930 = 77,480 lb./bolt Minimum: FB = AB x 37,150

1.492 x 39,260 = 55,430 lb./bolt Since we have 48 bolts, the maximum total seating force of all 48 bolts is 48 FB

3,719,000 lb. and the minimum total seating force is 2,661,000 lb.

The force required to seat the metallic O-rings (also referred to as seals), from Reference 1, is a line load of 1399 pounds per inch of seal circumference for aluminum seals, or 2284 pounds per inch of seal circumference for silver seals. The diameter of the outer seal is 72.65 in. and the diameter of the inner seal 71.05 in. The seal seating force is then:

Fseating = 1399 (72.65 + 71.05) = 631,570 lb. (aluminum)

Fseating = 2284 (72.65 + 71.05) =1,031,000 lb. (silver)

The maximum cask cavity internal pressure is the Design Pressure of 100 psi. The force required to react the pressure load (conservatively assuming the pressure is applied over the outer seal diameter) is:

FPressure = 100 ( - )(72.65)2 = 414,500 lbs.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-4 The TN-32 cask is always oriented vertical during loading, during transfer to the ISFSI and during storage on the pad. Dead weight of the lid and cask contents does not actually load the lid bolts. In fact the lid weight (and external pressure) helps to seat the lid. However, it is conservative to require that the bolt preload maintain lid seating in any cask orientation. The weights of the lid, fuel and basket are:

Lid Assembly Weight = 14,480 lb.

Fuel Weight = 49,060 lb.

Basket Weight = 16,900 lb.

WTotal 80,440 lb.

The total of the seal seating force (conservatively assuming silver seals are used), pressure load and dead weight loads is:

Fseating = 1,031,000 lb.

Fpressure = 414,500 lb.

WTotal = 80,440 lb.

= 1,525,940 lb.

This force is less than the preload stresses achieved for the torque value range of 880 to 1230 ft-lbs. and shows that ample lid seating force is provided under Normal Conditions.

Furthermore, the range of preload stresses is well below the limiting value of 2Sm (63,800 psi) for the bolt material at 300°F.

3A.3.1.2 Differential Thermal Expansion The 48 lid bolts preload the outer rim of the closure lid against the cask body flange. The 1.5 in. diameter bolts are installed through 1.56 in. diameter clearance holes in the 4.50 in. thick lid periphery. Preloading of the bolts against the lid is accomplished by tightening the bolts so that the shank portions of the bolts within the clearance holes are stretched elastically. The bolt loads will therefore change from the initial installed values if any thermal expansion differences should occur between the lid (through thickness direction) and the bolts.

The bolt material is SA 320 Grade L43 (1 3/4 Ni 3/4 Cr 1/4 Mo). The lid and body flange are both SA 350 Grade LF3 (3 1/2 Ni). The Section III Code Appendices specify the same coefficient of thermal expansion for these materials. The bolts are in intimate contact with the lid and flange and will therefore operate at the same temperature as these components. Therefore there will be no thermal expansion differences between the lid and bolts, and the assembly preload will be maintained under all temperatures.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-5 3A.3.1.3 Bolt Torsion The torque required to preload the bolt is:

T = K DN Fa (Reference 2)

Where Tmax = 0.127 (1.5) (77,480) = 14,760 in-lb. = 1,230 ft-lb.

Tmin = 0.127 (1.5) (55,430) =10,560 in-lb. = 880 ft-lb.

K = Nut Factor = 0.127 for N-5000 lubricant (as determined experimentally on a TN-32 cask)

AB = Bolt stress area = 1.492 in.2 DN = Bolt nominal diameter = 1.5 in.

FBmax = 51,930 psi preload stress x AB = 77,480 lb.

FBmin = 37,150 psi preload stress x AB = 55,130 lb.

The maximum residual torque in the bolt corresponds to the maximum applied torque and is:

TR = 0.5625T = 0.5625 x 14,760 = 8,303 in-lb.

The minimum residual torque in the bolt corresponds to the minimum applied torque and is:

TR = 0.5625T = 0.5625 x 10,560 = 5,940 in-lb.

The shear stress in the bolt due to the residual torque from the maximum preload given by Reference 3:

TR r torsion = ---------

J where r and J are based on the bolt effective radius for the above stress area.

r = 0.689 in. effective bolt radius J = torsional moment of inertia of threaded bolt 4

r J = -------- = 0.354 inch4 2

torsion = 8,303 (0.689) /0.354 = 16,160 psi (Torsional Shear Maximum) torsion = 5,940 (0.689)/0.354 = 11,560 psi (Torsional Shear Minimum)

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-6 3A.3.1.4 Bolt Bending It is assumed that bolt bending does not occur during seating of the lid against the cask body during assembly. The bolts are rotated as they are torqued so any slight relative movements between lid and body flange during preloading will not result in a net offset between the bolt head and tapped flange holes. In addition, since the lid, flange and bolt materials have the same coefficient of thermal expansion and will operate at essentially the same temperature, differential expansion between components will not produce bolt bending.

As internal pressure is applied to the cask cavity, the lid will bulge slightly and its edge will rotate. In addition, the body cylinder radius will increase slightly due to the internal pressure resulting in outward radial movement of the tapped bolt holes in the body flange. Since no net membrane stress is developed in the lid, the lid bolt holes (at the mid surface) will remain at the original location. Rotation of the edge of the lid will, however, produce radial movement of the outer surface of the lid at the bolt head location.

The hoop stress in the cask body cylinder is:

PRi Shoop = ---------

t Where P = 100 psi Design Pressure Ri = 34.375 in. inside radius T = 9.5 in. thickness 100 x 34.375 Shoop = ------------------------------- = 361.8 psi 9.5 The radial deflection at the bolt circle is:

S hoop b.c. = Rbc x -------------

E Rbc = 38.03 in. bolt circle radius 38.03 x 361.8-b.c. = --------------------------------

6

= 0.0004914 inches outward 28 x 10 When pressure is applied to the lid, the edge rotation can be calculated assuming the lid is simply supported. From Reference 4, Table 24 Case 10:

3 3W ( 1 - v )R -

= --------------------------------

3 2Et Where = edge rotation, radians W = total applied load = 100 psi v = Poisson's ratio = 0.3 R = 36.35 in. outer seal radius

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-7 T = 4.5 in. lid thickness E = Young's modulus = 28 x l06 3

3 x 100 x ( 1 - 0.3 )x ( 36.35 )

= -------------------------------------------------------------------

6 3

- = 0.00198 radians 2 x 28 x10 x ( 4.5 )

Figure 3A.3-1 shows the net movement of the threaded hole and the Point on the lid under the bolt head.

If it is assumed that the bolt head doesn't slide on the lid surface, the head will be forced from position a to a' as the lid deflects. Point a' under the bolt head moves outward 0.00445 in.

while the threaded hole moves only 0.0004914 in. outward. The bolt head will be bent laterally by 0.00445 - 0.0004914 in. or 0.00396 in. from the threaded end.

The bending model of the bolt is shown in Figure 3A.3-2. The moment on the bolt is calculated assuming the bolt is subjected to affect bending with the head and threaded end prevented from rotating. For a cantilevered bolt free to rotate at the head, the bending moment would be reduced by one half. Therefore the assumption of fixed ends is the most conservative and results in the highest stress.

The shear force, P, and bending moment, M, for a beam subjected to offset bending with ends prevented from rotating are:

12EI-P = -------------- 3 L

6EI-M = ----------- 2 L

Where P = lateral load to deflect the bolt distance , lb.

= lateral displacement

= 0.00396 in.

E = Young's modulus, 28 x l06 psi @300°F L = bolt length in bending

= 4.625 in. (including tapped hole chamfer)

I = r4/4

= 0.177in.4 (r = 0.689 in. based on stress area of 1.492 in.2)

Therefore 6

6 x 28 x10 x 0.177 x 0.00396 MB = ------------------------------------------------------------------------

2 4.625

= 5,500 in-lb.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-8 6

12 x 28 x10 x 0.177 x 0.00396 P = ---------------------------------------------------------------------------

2 4.625

= 2,380 lb.

The bending stress in the bolt is Mr 5, 500 x 0.689 b ------- = ----------------------------------

I 0.177

= 21,430 psi The shear stress due to the lateral force is p = P/A = 2,380/1.492 = 1,595 psi 3A.3.1.5 Combined Stresses The total shear stress for the maximum preload stress (51,930 psi corresponding to a torque of 1230 ft-lbs.) is then equal to the residual torsional shear stress plus that due to force P.

total = torsion + p

= 16,160 + 1,595

= 17,755 psi The total shear stress for the minimum preload (torque of 880 ft-lbs.) equals:

total = 11,560 + 1,595 = 13,155 The average tensile stress is the bolt preload stress:

average= 51,930 psi The maximum tensile stress at two locations in the bolt is the preload stress plus the bending stress.

max = 51,930 psi + 21,430 = 73,360 psi Therefore, the average combined stress intensity is:

SIaverage = (average2 + 4 (total)2)1/2

= (51,9302 + 4 x 17,7552)1/2

= 62,910 psi (62.9 ksi) < 2Sm = 63.8 ksi The maximum combined stress intensity is:

SImax = (max2 + 4 (total)2)1/2

= (73,3602 + 4 x 17,7552)1/2

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-9

= 81,500 psi - 81.5 ksi < 3Sm = 95.7 ksi For Level A conditions, the average bolt stress is limited to 2 Sm or 2 x 31.9 = 63.8 ksi.

The maximum bolt stress is limited to 3 Sm 95.7 ksi. The analyzed stresses are within these limits as well as the yield strength of the bolt material (also 95.7 ksi).

3A.3.2 Accident Conditions The lid bolts are analyzed in this section under the loadings selected to bound those for the hypothetical bottom end drop and tipover onto the concrete storage pad.

3A.3.2.1 Bottom End Drop The bottom end drop from a height of 5 feet onto the concrete storage pad is analyzed in Section 3A.2.3.2. That section indicates that the cask deceleration may reach 42 g. This analysis conservatively examines the effects (if any) of a 50 g quasistatic loading on the lid bolts.

During a bottom end drop, the rim of the lid is forced against the flange of the cask body.

The lid is initially seated against the flange by preloading (torquing) the bolts. The bolt preload will not be affected if compressive yielding of the contact bearing area does not occur.

The contact force on the bearing area, conservatively neglecting internal pressure, is the bolt preload force less the seal compression force plus the 50 g inertial force of the lid system. The maximum preload force, from Section 3A.3.1, is 3,719,000 lb. The seal seating force is 631,570 lb.

for the aluminum seal and 1,031,000 for the silver seal. The weight of the lid system (weight of lid plus weight of top neutron shield assembly, 11560 + 2960 = 14,480 lbs., the highest weight among TN-32, TN-32A and TN-32B casks) is 14,480 lb.

Therefore, during a 50 g deceleration in the axial direction, and conservatively assuming an aluminum seal is used (i.e., an aluminum seal has a lower seating force compared to the silver seal thus resulting in a greater contact force), the contact force between lid and cask body is:

Fcontact = FBolt Preload - Fseal seating + 50 (Wlid system)

= 3,719,000 - 631,570 + 50 (14,480)

= 3,811,000 lb.

Figure 3A.3-3 illustrates the bearing interface between lid edge and body flange. The bearing area equals the area within the diameter of the lid raised section (74.0 in.) less the outside of the body chamber (70.22 in.) less the area of the seal groove.

ABearing = --- (742 - 72.952 + 70.752 - 70.222) = 180 in2 4

The bearing stress during impact is then equal to:

Sbearing = 3,811,000 / 180 = 21,170 psi (21.2 ksi)

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-10 This contact stress is below the 33.2 ksi yield strength of the lid and flange material at 300°F. The bolt preload will not be affected by the bottom drop. Therefore, this hypothetical accident case will not affect the bolt stresses.

3A.3.2.2 Tipover The tipover onto the concrete storage pad is analyzed in Appendix 3A.2.3.2 of Revision 9A of the TN-32 TSAR and Appendix 3D.2.5 of Revision 0 of the TN-32 FSAR. The tipover scenario is summarized in Figure 3A.3-4. The peak deceleration occurs at the top of the cask. The deceleration is much less at the center of gravity and essentially zero at the bottom corner pivot point. For this analysis the lateral deceleration at the lid end of the body is conservatively taken as 67g and that at the pivot point is zero.

There are two dynamic loadings acting on the lid tending to push or throw it off of the cask body (i-e. producing tensile forces in the lid bolts). There is a small axial (parallel to cask longitudinal axis) centrifugal inertia load due to the internals acting on the lid and the lid weight itself while the cask is rotating.

For the evaluation of the lid bolts it is assumed herein that the cask impacts on the corner at the lid end. There is no accident condition postulated that would cause greater load on the lid bolts. The cask orientation for the analysis is shown in Figure 3A.3-5. The axis of the cask is 30° from horizontal with the lid down. Note that this orientation is well beyond that predicted in the tipover analyses. If the lateral load, GL, is 67g, then the axial load used is 67 x tan 30° or 38.7g.

The loads acting on the cask are shown in Figure 3A.3-5. The loads acting on the lid are shown in Figure 3A.3-6. Also shown is the reaction load at the cask interface and the pivot point, O, for analysis of lid rotation. Figure 3A.3-7 shows the lid bolt loads resisting rotation of the lid about pivot point O. The increase in bolt load beyond the preload varies uniformly from pivot point, O, to the bolt farthest from O.

The moment acting on the lid about pivot point, O, due to the inertia load is calculated as follows:

MI = WI x 38.7 x RT + WL x 38.7 x RT + WL x 67 x a + PA x RT Where MI = Total moment about pivot point, in-lb WI = Weight of internals

= 16,900 + 49,060 = 65,950 lb.

WL = Weight of lid system (including shield plate and resin disk),

14,480 lb.

and PA = Internal pressure load

= 414,500 lb.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-11 RT = Distance from center of lid to pivot point

= 39.75 in.

a = Moment arm of lid inertia load, WL, in.

= 2.25 in. (very conservative since shield weight effect moves CG toward 0)

Therefore:

MI = (65,960 x 38.7 x 39.75) + (14,480 x 38.7 x 39.75)

+ (14,480 x 67 x 2.25) + (414,500 x 39.75)

= 142.4 x 106 in-lb.

This moment is resisted by the effect of the preload on the lid bolts. The moment due to preload is calculated as follows:

MP = N x FB x RT Where MP = moment due to bolt preload, in-lb.

N = number of bolts, 48 FB = Preload per bolt

= AB x preload stress

= stress area bolt x preload stress

= 1.492 in.2 x 51,930 psi = 77,480 lb. with 1230 ft-lbs. torque

= 1.492 in.2 x 37,150 psi = 55,430 lb. with 880 ft-lbs. torque RT = distance from center of lid to pivot point, 39.75 in.

Therefore:

Torque = 1230 ft-lbs.:

MP = 48 x 77,480 x 39.75

= 147.8 x l06 in-lb. > 142.4 x l06 in-lb.

Torque = 880 ft-lbs.:

MP = 48 x 55,430 x 39.75

= 105.8 x l06 in-lb. < 142.4 x l06 in-lb.

Since the bolt preload moment, MP, corresponding to the maximum torque value is higher than the moment due to inertial load, MT, there will not be any additional load due to a tipover accident. However, the bolt preload moment corresponding to the minimum torque value is less than the moment due to inertial load. In this case, the inertial moment is partially resisted by the effect of the preload on the bolts. The increase in bolt load beyond the preload due to the inertia g loads created by the difference between MI and MP which is:

MT = M I - M P

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-12 MT = 142.4 x 106 - 105.8 x 106 MT = 36.6 x 106 in-lbs.

The lid bolts resist the above moment which tends to unseat the lid. The increase in lid bolt load (FBO) beyond the preload is proportional to the distance from the pivot point O. The additional resisting moment, MR, applied by the bolts about point O is obtained from the following expressions. Refer to Figure 3A.3-8 of Revision 9A of the TN-32 TSAR for terminology.

R + R cos ( n ) B BoltForce = FBO x -----------------------------------------------

2R + B Moment for a given bolt = Bolt Force x [R + Rcos (n) + B]

Therefore, the additional moment, MR, can be expressed in general terms as follows:

n = 23 2 2 2 MR = F BO ( 2R + B ) + B + 2 ( R + R cos ( n ) B )

n=1

( 2R + B )

R = 39.75 in.

B = 1.72 in.

= 7.5° Substituting yields:

MR = 1421.7 x FBO Therefore, FBO = 36.6 x 106 / 1421.7 = 25,740 lb.

The increase in tensile stress in the bolt beyond the preload is FBO / AB where:

AB = bolt area, 1.492 in.2 The increased stress is then:

FBO / AB = 25,740 / 1.492 = 17,250 psi.

The total tensile stress in Bolt 0 is 37,150 + 17,250 = 54,440 psi. Therefore, the total tensile stress for a bolt subjected to cask tipover is greater for a bolt torqued to 880 ft-lbs. than for a bolt torqued to 1230 ft-lbs. The remainder of this tipover analysis will evaluate both the 880 ft-lbs. torque and the 1230 ft-lbs. torque scenarios.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-13 When the tensile stress is combined with the bolt bending stress due to the lid edge rotation under internal pressure calculated in Section 3A.3.1, the maximum tensile plus bending stress is 54,450 psi plus 21,430 psi (bending) = 75,830 psi and the minimum is 51,930 psi + 21,430 psi = 73,360 psi. The total shear stress due to torquing and lid deformation from Section 3A.3.1.5 is 17,755 psi for the 1230 ft-lbs. case and 13,155 psi for 880 ft-lbs, The combined stress intensity is then:

The average combined stress intensity is:

SIaverage = (average2 + 4 (total)2)1/2) 1230 ft-lbs. torque: SIaverage = (51,9302 + 4 x 17,7552)1/2 SIaverage = 62,910 psi < Sy = 95,700 psi 880 ft-lbs. torque: SIaverage = (54,4002 + 4 x 13,1552)1/2 SIaverage = 60,430 psi < Sy = 95,700 psi The maximum combined stress intensity is:

SImax = (max2 + 4 (total)2)1/2 1230 ft-lbs. torque: SImax = (73,3602 + 4 x 17,7552)1/2 SImax = 81,500 psi < Su = 113,930 psi 880 ft-lbs. torque: SImax = (75,8302 + 4 x 13,1552)1/2 SImax = 80,260 psi < Su = 113,930 psi In addition to the above calculations, the lid bolts are evaluated based on the interaction formula from Appendix F of the ASME Code (Reference 5) for tension and shear:

2 2

( ft ) ( fv )


+ ------------- 1 2

( F tb ) ( F vb )

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-14 Where:

ft and fv are the applied tensile and shear stresses Ftb = allowable tensile stress, smaller of (0.7SU) or Sy (TSAR Table 3.l-3) = 0.7 x 113,930 = 79,750 psi Fvb = allowable shear stress, smaller of (0.42SU) or 0.6Sy (SAR Table 3.l-3) = 0.42 x 113,930 = 47,850 psi 1230 ft-lbs. torque: 880 ft-lbs. torque:

2 2 2 2 51 , 930 - + 17 , 755 - = 0.56 < 1 54 , 400 - + 13 , 155 - = 0.54 < 1 2 2 2 2 79, 750 47, 850 79, 750 47, 850 3A.3.3 Conclusions Based on the above evaluation, it is concluded that:

1. The maximum normal and accident condition stresses in the lid bolts are acceptable.
2. A positive (compressive) load is maintained on seals during normal and accident condition loads as bolt preload is higher than the applied loads.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-15 References

1. Resilient Metal Seals and Gaskets, Helicoflex Catalog H.001.002, Helicoflex Co., Boonton, N.J., 1983 pp.5-7.
2. NUREG/CR-6007, Stress Analysis of Closure Bolts for Shipping Casks, April 1992.
3. Hopper, A.G. and Thompson, G.V. Stress in Preloaded Bolts, Product Engineering, 1964.
4. Roark, R.J.: Formulas for Stress & Strain, 6th Edition, McGraw-Hill Book Co.
5. American Society of Mechanical Engineers; ASME Boiler and Pressure Vessel Code,Section III, Appendix F, 1992.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-16 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-17 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-18 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-19 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-20 Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-21 Table 3.4-7 Summary of Maximum Stress Intensity and Allowable Stress Limits for Lid Bolts MAXIMUM STRESS SERVICE ALLOWABLE SAFETY CALCULATED CATEGORY CONDITION STRESS (psi) FACTOR STRESS (psi)

Tensile Level A 51,930 63,800 (2Sm) 0.23 Level D 54,440 79,750 (0.7Su) 0.46 Tensile + Bending Level A 73,360 95,700 (3 Sm) 0.30 Level D 75,830 113,930 (Su) 0.50 Shear Level A 17,755 38,280 (0.4 Sy) 1.16 Level D 17,755 45,572 (0.4 Su) 1.57 Combined S.I. Level A 62,910 95,700 (3 Sm) 0.52 Level D 81,500 113,930 (Su) 0.40

Revision 806/14 North Anna ISFSI SAR A.1 Att. 1-22 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-1 Appendix A.1, Attachment 2 Revision of Tornado Missile Analysis Excerpt from TN-32 TSAR (Rev. 9A, 12/96)

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-3 2.2.1.3.2 Missile B Missile B (rigid) partially penetrates the cask wall. The loss in kinetic energy is dissipated as strain energy in the cask wall. The force Fb developed by an 8 in. diameter missile penetrating the cask body is calculated below. With a yield strength of 31,900 psi at 300°F, used for the gamma shield material:

Fb = Sy( - )(8)2 = 1.603 x 106 lbs.

From conservation of energy:

Fbx = 1- mbv2o For a given puncture force Fb:

m b v o2 x= -------------

2F b where x is the penetration distance.

The penetration distance is found to be 1.10 in. for a perpendicular impact of the missile.

When the impact angle is not 90 degrees, the missile will rotate during the impact limiting the energy available for penetration (conservatively neglected), since part of the energy will be transformed into rotational kinetic energy.

When hitting the weather protective cover, Missile B deforms the dished head before penetration begins. This will decrease the penetration distance from the above value.

If the missile were to impact the top of the cask in the vertical orientation, the missile velocity would be 88.2 mph (70% of the horizontal impact velocity of 126 mph). The kinetic energy would be:

KE = 0.5 x (276 lbs/32.2 ft/sec2) x (88.2 mph x 5280 ft/mi/3600 sec/hr)2 x 12 in/ft

= 860, 440 in lbs.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-4 Ignoring the effect of the protective cover and the top neutron shield, the lid bending stresses under a top impact are evaluated. Reference 20 is used to evaluate the stresses two boundary conditions:

1. Modeling the lid as a simply supported plate.
2. Modeling the lid as a plate with the edges fixed.

For edges simply supported, Table X, Case 2 of Reference 20 is used. The maximum stresses occur at the center, where the plate thickness is t = 10.5 in. The impact force, Fb = 1.603 x106 lbs.

The maximum stress at the center is calculated below:

Sr = St = 3W/(2 mt2) x [m + (m + 1)ln(a/ro) - (m-1)ro2/4a2]

Where ro = uniform load radius = missile radius = 4 inches m = 3.33 t = 10.5 inches a = 38.03 inches (effective radius for a simply supported lid at the bolt circle)

W = Fb = 1.603 x 106 lbs.

Therefore, Sr = St 28.5 ksi This is well below the Level D allowable stress of 63,000 psi.

For the second case, with the lid edges fixed. Table X, Case 7 of Reference 20 is used.

The maximum stress occurs at the edge, where the plate thickness, t = 4.5 inches.

Sr = 3W/(2 t2) (1 - ro2/2a2)

Where W = Fb = 1.603 x 106 lbs.

ro = uniform load radius = missile radius = 4 inches t = 4.5 inches a = 38.03 inches Sr 37.0 ksi This is also well below the allowable Level D stress of 63,000 psi.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-5 2.2.1.3.3 Missile C (steel sphere 1 diameter)

The impact of the steel sphere can result in a local dent by penetrating into the cask surface at the yield strength, Sy, for a penetration depth, d. The contact area on the cask surface is:

A = (2Rd - d2)

Where:

R is the radius of the sphere, 0.5 inches, and d is the penetration depth The kinetic energy of the steel sphere is dissipated by displacing the cask surface material:

KE = 1/2(mcvo2) = Sy o d (2Rd-d2) d Where mc = sphere mass KE = 0.5(4/3)()(0.5)3(0.28)(1/32.2)(126 x 5280/3600)2 = 933 in-lbs Sy o d (2Rd-d2) d = Sy(Rd2 - d3/3) = KE = 933 in-lbs For a yield strength of 31,900 psi, by trial and error:

d = 0.14 in.

The area, A, is therefore 0.38 sq. inches. A maximum impact force of 12.1 x 103 lb. (A x Sy) will be developed. It can be concluded that only local denting of the cask will result.

If the impact is at the top of the cask (ignoring the protective cover and the neutron shielding), Reference 20, Table X, Case 4 is used to determine the stresses. The impact force is assumed to act at the center of the lid, where p = 0, ro = 0.353 in. and a =

38.03 inches.

The maximum stress is:

Sr = St = 3W/(2 mt2) x [m + (m+1)ln(a/ro) - (m-1)ro2/4a2] 1.1 ksi Since all penetrations are covered, the steel sphere will have a negligible effect on the cask.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 2-6 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-1 Appendix A.1, Attachment 3 Modifications to the TN-32 Protective Cover Drawing SK-VP-SAR-1 Figure VP1.2-1 Figure VP2.3-1

Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-4 Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-5 Revision 806/14 North Anna ISFSI SAR A.1 Att. 3-6 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-1 Appendix A.1, Attachment 4 Supplement to the Structural Analyses in TN-32 TSAR, Revision 9A, Section 3C.3-1

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-2 Intentionally Blank

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-3 3C.3-1.1 Additional Evaluation due to gap size variations occurring from Basket Rail fabrication and Installation Tolerances This section evaluates the structural effect of the gap size variation between two basket support rails The buckling analysis of basket bottom rail performed in Section 3C.3-1 assumes a gap of 0.48 inches between the edge of two rails or 0.24 inches between the edge of the rail and centerline of the basket. However, due to fabrication and installation tolerances the gap between these two rails can vary from 0" to 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket).

  • Discussion It is observed from Section 3C.3-1 that in the rail design the most critical locations are locations 1, 2, and 3 as shown on Figure 3C.3-4. Due to the gap changes, the loading and stress at these three locations are discussed as follows:
1. The collapse load calculated in accordance with ASME B&PV Code,Section III, NB-3213.25 and Appendix F, F-1341.3 at Location 1 is 96g which is higher than the 88-g assumed for the tipover accident. The collapse load was calculated conservatively by assuming that the vertical load from the basket is directly applied at the center span of the two vertical rail support plates as shown on Figure 3C.3-2. This loading condition results in a maximum bending stress at the center of the rail horizontal plate. If the location of the rail is shifted either toward or away from the centerline of the basket due to gap size change, then the applied vertical load will move closer to the rail vertical support plates and the bending stress at the rail horizontal plate will decrease. Therefore, the gap changes will not result in increasing the stress at Location 1.
2. The stability of the vertical plates at Locations 2 and 3 is analyzed using the interaction equations 20 and 21 of Paragraph NF-3322.1 (Equations 1 and 2 in Section 3C.3-1). These equations utilize membrane and bending stresses that were determined from three dimensional ANSYS calculations.

For Location 2 and a gap of 0.24",

equation (1) becomes, 0.0954 + 0.328 = 0.423 < 1.0

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-4 equation (2) becomes, 0.440 + 0.483 = 0.923 < 1.0 and for Location 3, equation (1) becomes, 0.06 + 0.31 = 0.37 < 1.0 equation (2) becomes, 0.369 + 0.477 = 0.846 < 1.0 Since the membrane and bending stresses at Locations 2 and 3 will either increase or decrease due to the gap changes the interaction equation must be re-evaluated to insure that the structural integrity of the rail will be maintained.

  • Analysis The membrane and bending stresses presented in Section 3C.3-1 were calculated using a three dimensional ANSYS model. The purpose of this analysis is to determine the sensitivity of the stress values to a range of rail-to-rail gap dimensions, then re-evaluate the interaction equations to properly reflect the full range of stress values. A two-dimensional ANSYS model is sufficient to calculate such sensitivity.

Finite Element Model In order to calculate the member and bending stress changes due to the gap size variations, an ANSYS two-dimension beam (BEAM 3) finite element model is constructed. This finite element model includes the rail and a small portion of basket for better load transfer to the rail. Gap elements (CONTAC 12) are used between the basket and rail to accurately simulate the basket load transfer to bottom support rail.

One-inch widths of rail and basket are used for loading and beam elements section properties. The finite element model is shown on Figure 3C.3-14.

Material Properties Following data is used in this run (material properties are taken at 350°F):

Material:

Aluminum Rail E = 9.0 x106 psi (Section 3C.3-4) 304SS Basket E = 26.75 x106 psi (from Table 3.3-5)

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-5 Loading Conditions The membrane and bending stresses at locations 2 and 3 are computed by using unit loads F1, F2, F3 and a distributed load w (for 1g). The locations of these loads and displacement boundary conditions are shown in Figure 3C.3-14.

Fuel Assembly Weight, W = 1,533 lbs. (Table 3.2-1)

Rail Length, L = 159.75 in. (Drawing 1049-70-5)

F1 (at basket center line, x = 0.0) = 0.5 (No. of stacked fuel assemblies x W)/L

= 0.5 x 5 x 1533/159.75 = 23.991 lb.

F3 (at basket centerline, x = 18.61") = 23.991 lb.

F2 (at basket middle, x = 8.70 + 0.105 +.5 = 9.305") = (No. of stacked fuel assemblies x W)/L = 5 x 1533/159.75 = 47.981 lb.

Distributed Load, w = Fuel Assembly Weight / (L x Basket Span) = 1533 / (159.75 x 9.301) = 1.03174 lb/in Section Properties:

Rail: Section Area, A = 0.47 (depth) x 1.0 (width) = 0.47 in2 Moment of Inertia, I = 1.0 x 0.473/12 = 0.008652 in4 Basket: Steel - Aluminum Composite Section Es, Steel = 26.75 x l06 psi Ea, aluminum = 9.0 x 106 psi Ic, Composite Section = [1.0 (0.713/12 - 1.0 (0.53/12]+(l x 0.53/12) x (9.0 x 106/26.75 x 106) = 0.022914 in4 Depth, dc = (12 x 0.022914)1/3 = 0.65 in.

Ac = 0.65 x 1.0 = 0.65 in2 Contact Elements: K = 1.0 x 106 Coefficient of friction = 0

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-6 Load Case 1 The analysis is performed to calculate the membrane and bending stresses by using the existing loading condition (0.48" gap or 0.24" gap for half model).

An elastic non-linear run was made using the above loads and section properties. The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-16.

Load Case 2 The same model is run by shifting the rail to the right to simulate the maximum gap of 1.1326" or 0.5663 for the half model. In this run, all loads and section properties are same as in 0.24 in. gap case. However the finite element model was revised by transferring the 'x - coordinates' of rail nodes by 0.5663 0- 0.24 = 0.3263".

The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 1 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-17.

Load Case 3 The same model is run by shifting the rail to the left to simulate the minimum gap of 0.0" for the half model. In this run, all loads and section properties are same as in 0.24 in. gap case. However the finite element model was revised by transferring the

'x - coordinates' of rail nodes by 0- 0.24 = -0.24".

The membrane and bending stress components at location 2 and 3 are recorded in Table 3C.3-1. Also, the ratio between the values from this run and Load Case 2 are included in Table 3C.3-1. The deformed shape of model is given in Figure 3C.3-18.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-7 Evaluation The interaction equation is re-evaluated by applying the results of the sensitivity analysis to the compression and bending components of the equation. Since the result from the equation (2) bounds equation (1), therefore only result from equation (2) is re-evaluated. So, for Case 2, which reflects the maximum gap between the two rails, at location 2:

0.440(1.034) + 0.483(1.101) = 0.987 < 1.0 and at Location 3:

0.369(1.076)+ 0.477(1.084) = 0.914 < 1.0 For Case 3, which reflects the minimum gap between the rails, the interaction equation at Location 2 becomes 0.440(0.961) + 0.483(0.863) = 0.840 < 1.0 and at Location 3:

0.369(0.955)+ 0.477(0.940) = 0.801 < 1.0

  • Conclusion The results of this analysis show the following conclusions:
1. As the gap between these two rail decreases, the likelihood of buckling decreases.
2. At the maximum possible rail gap of 1.1326" (or 0.5663" between the edge of the rail and centerline of the basket), the buckling interaction equations indicate that the rail will not buckle.
3. The stresses at Location 1 are not affected by a change in the rail gap size.

Therefore, for any possible gap sizes, the structural integrity of the rail will be maintained.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-8 Table 3C.3-1

SUMMARY

OF STRESSES AND INTERACTION EQUATION EVALUATION At Location 2 At Location 3 Case Type (Node 71) (Node 81) 0.48 Space between Membrane Stress (psi) -59.182 -65.290 Rails Bending Stress (psi) 27.765 38.627 1.1326 Space between Membrane Stress (psi) -61.181 -70.267 Rails Bending Stress (psi) 30.568 41.87 Ratio Membrane Stresses -61.181/-59.182 = -70.265/-65.290 =

For 0.5663 & 0.24 1.034 1.076 cases Ratio Bending Stresses 30.568/27.765 = 41.871/38.627 =

For 0.5663 & 0.24 1.101 1.084 cases Interaction Equation 1.034(.44*) + 1.076(.369*) +

1.101(.483*) = 0.987 1.084(.477*) = 0.914 0.0 Space between Rails Membrane Stress (psi) -56.883 -62.327 Bending Stress (psi) 23.962 36.315 Ratio Membrane Stresses -56.883/-59.182 = -62.327/-65.290 =

For 0.5663 & 0.24 0.961 0.955 cases Ratio Bending Stresses 23.962/27.765 = 36.315/38.627 =

For 0.5663 & 0.24 0.863 0.940 cases Interaction Equation 0.961 (.44*) + 0.955(.369*) +

0.863(.483*) = 0.840 0.940(.477*) = 0.801

  • These coefficients are calculated in Section 3C.3-1. Since the result from the equation (2) bounds equation (1), therefore only result from equation (2) is re-evaluated.

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-9 Figure 3C.3-14 FINITE ELEMENT MODEL - BOTTOM SUPPORT RAIL

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-10 Figure 3C.3-15 FINITE ELEMENT MODEL - LOADING AND BOUNDARY CONDITIONS

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-11 Figure 3C.3-16 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.24 DISTANCE

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-12 Figure 3C.3-17 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.5663 DISTANCE

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-13 Figure 3C.3-18 FINITE ELEMENT MODEL - DEFORMED SHAPE, 0.0 DISTANCE

Revision 806/14 North Anna ISFSI SAR A.1 Att. 4-14 Intentionally Blank