|
|
Line 17: |
Line 17: |
| {{#Wiki_filter:__0'"""'*P..~rating Test Quality Checklist Form ES-301*3 Operating Test Number .2.0J4~1Q1. | | {{#Wiki_filter:__0'"""'*P..~rating Test Quality Checklist Form ES-301*3 Operating Test Number .2.0J4~1Q1. |
| Initials | | Initials |
| : 1. General Criteria | | : 1. General Criteria The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution). |
| *----------*----
| |
| The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution). | |
| : b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination. | | : b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination. |
| : c. The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / ~ | | : c. The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / ~ |
Latest revision as of 16:41, 5 February 2020
Similar Documents at Cook |
---|
Category:License-Operator
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 2024-09-05
[Table view] |
Text
__0'"""'*P..~rating Test Quality Checklist Form ES-301*3 Operating Test Number .2.0J4~1Q1.
Initials
- 1. General Criteria The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution).
- b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination.
- c. The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / ~
SectlonD.1.a.) .\
11--------------------------------*---------------t=.L.L+-lr-+_;__-ll
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. dw..
It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level.
"2"'._W.;..;;..:a:..;lk:..;*-:.T=hr_!?.~9h Criteria
- a. Each JPM includes U1e foilowmg, as applicable:
- references and tools. including associated procedures
- reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
- operationally important specific performance criteria that include.
o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues
') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o- restrictions on the sequence of steps. if applicable
- b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
- 3. Simulator Criteria The associated simulator tests (scenario sets) have be*.m revieweci in accordance with Form ES-301-4 and Date Author Facility R(';vle'Ner(')
- d. NRC Supervisor NOTE* is net applicable f*x NRC. dev*;loped tests.
revievver ~nlti~ll lit~rns In Co!urnn *c~ chief exarntnf~r conc:urrf;:;nce required