| issue date = 08/01/2014
| issue date = 08/01/2014
| title = 2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
| title = 2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:__ 0'"""'*
{{#Wiki_filter:__0'"""'*P..~rating Test Quality Checklist                                           Form ES-301*3 Operating Test Number .2.0J4~1Q1.
Test Quality Checklist Form ES-301*3 Operating Test Number
Initials
: 1. General Criteria *----------*----
: 1. General Criteria The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution).
The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance.
: b.         There is no day-to-day repetition between this and other operating tests to be administered dunng this examination.
safety function distribution).
: c.        The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see                                             / ~
: b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination.
SectlonD.1.a.)                                                                                                                     .\
Initials The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / SectlonD.1.a.)  
11--------------------------------*---------------t=.L.L+-lr-+_;__-ll
.\ c. 11--------------------------------*---------------t=.L.L+-lr-+_;__-ll
: d.         Overlap with the written examination and between different parts of the operating test is within acceptable limits.                                                                                                                 dw..
: d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level.
It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level.
Criteria a. Each JPM includes U1e foilowmg, as applicable:
                  ------------"2"'._W.;..;;..:a:..;lk:..;*-:.T=hr_!?.~9h Criteria
: a.         Each JPM includes U1e foilowmg, as applicable:
* initial conditions
* initial conditions
* initiating cues
* initiating cues
* references and tools. including associated procedures
* references and tools. including associated procedures
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
* operationally important specific performance criteria that include. o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues ') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o-restrictions on the sequence of steps. if applicable
* operationally important specific performance criteria that include.
: b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
o     detailed expected actions with exact criteria and nomenclature o     system response and other examiner cues
The associated simulator Form ES-301-4 and Author Facility R(';vle'Ner(')
                  ')     statements describing important observations to be made by the applic:ant o     criteria for successful completion of the task o     identification of critical steps and their associated performance standards lf---------'-o- restrictions on the sequence of steps. if applicable
: d. NRC Supervisor NOTE* 3. Simulator Criteria tests (scenario sets) have be*.m revieweci in accordance with is net applicable f*x NRC .. dev*;loped tests. revievver In Co!urnn chief conc:urrf;:;nce required Date dw..}}
: b.         Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
: 3. Simulator Criteria The associated simulator                 tests (scenario sets) have be*.m revieweci in accordance with Form ES-301-4 and Date Author Facility R(';vle'Ner(')
: d. NRC Supervisor NOTE*                                     is net applicable f*x NRC. dev*;loped tests.
revievver   ~nlti~ll lit~rns In Co!urnn *c~ chief exarntnf~r conc:urrf;:;nce required}}

Latest revision as of 16:41, 5 February 2020

2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
ML14316A306
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
References
Download: ML14316A306 (1)


Text

__0'"""'*P..~rating Test Quality Checklist Form ES-301*3 Operating Test Number .2.0J4~1Q1.

Initials

1. General Criteria The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance. safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination.
c. The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / ~

SectlonD.1.a.) .\

11--------------------------------*---------------t=.L.L+-lr-+_;__-ll

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. dw..

It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level.


"2"'._W.;..;;..:a:..;lk:..;*-:.T=hr_!?.~9h Criteria

a. Each JPM includes U1e foilowmg, as applicable:
  • initial conditions
  • initiating cues
  • references and tools. including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
  • operationally important specific performance criteria that include.

o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues

') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o- restrictions on the sequence of steps. if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator tests (scenario sets) have be*.m revieweci in accordance with Form ES-301-4 and Date Author Facility R(';vle'Ner(')
d. NRC Supervisor NOTE* is net applicable f*x NRC. dev*;loped tests.

revievver ~nlti~ll lit~rns In Co!urnn *c~ chief exarntnf~r conc:urrf;:;nce required