ML17065A036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:j i. ------. --Rancho S.eco Final Status Survey Summary Report October 14,, 2016 IOSB DAW Bay Survey Unit F8300013 Approved By: fl'>#:e<-Date: '.c /.o L=t.(, Manager, Rancho Seco Assets FINAL STATUS SURVEY F8300013 Survey Unit: F8300013, Interim Qnsite Storage Building (IOSB) Dry Active Waste (DAW) bay Survey Unit
{{#Wiki_filter:j
: i. - ----- . -
Rancho S.eco Final Status Survey Summary Report October 14,, 2016 IOSB DAW Bay Survey Unit F8300013 Approved By: fl'>#:e<-                   Date:
Manager, Rancho Seco Assets
                                                              '.c /.o L=t.(,
 
FINAL STATUS SURVEY F8300013 Survey Unit:
F8300013, Interim Qnsite Storage Building (IOSB) Dry Active Waste (DAW) bay Survey Unit


== Description:==
== Description:==


Operating History: fhe DAW Bay was <tesigned to as a holding or storage bay for dry activated waste (DAW) packaged in shipping containers.
Operating History: fhe DAW Bay was <tesigned to as a holding or storage bay           for dry activated waste (DAW) packaged in shipping containers. There was a known ar~a of contamination in the northwest corner of the bay near the drainage trench. This area. was fully characterized Quring the scoping surveys and did not res&#xb5;lt in static measurements exceeding the DCGL.
There was a known of contamination in the northwest corner of the bay near the drainage trench. This area. was fully characterized Quring the scoping surveys and did not res&#xb5;lt in static measurements exceeding the DCGL. Site Characterization:
Site Characterization: Static measurement.~ were made of the walls, floor, and ceiling of the DAW Bay to confirm the absence or presence of plant-derived radionuclides. St~tic measurements showe.d a mean gross activity level of 3,042 dpm/ 100 cm 2 and a maxim.um value of 5,778 dpm/100 cm 2
Static were made of the walls, floor, and ceiling of the DAW Bay to confirm the absence or presence of plant-derived radionuclides.
* The statistic:S of the DAW results combines all lower walls, upper walls, floor, and ceiling data. Based, on the levels of gross activity reported, the area was determined to be a Class 3 area.
measurements showe.d a mean gross activity level of 3,042 dpm/ 100 cm 2 and a maxim.um value of 5,778 dpm/100 cm 2* The statistic:S of the DAW results combines all lower walls, upper walls, floor, and ceiling data. Based, on the levels of gross activity reported, the area was determined to be a Class 3 area. Survey Unit Design Information:
Survey Unit Design Information:
The Survey Unit Design Parameters are presented in Table 1. The survey unit and measurement locations are depicted on the. maps in Attachment
The Survey Unit Design Parameters are presented in Table 1. The survey unit and measurement locations are depicted on the. maps in Attachment 1. Static measurement locations were randomly determined and approximately 12% of the area scanned. The instrumentation used! for the survey along with the MDC values are listed in Table 2...1 .
: 1. Static measurement locations were randomly determined and approximately 12% of the area scanned. The instrumentation used! for the survey along with the MDC values are listed in Table 2 ... 1 Attachment
1                                 FSSDAWBAY                               F8300013
: 2. 1 FSSDAWBAY F8300013 FINAL STATUS SURVEY F8300013 Table 1, Survey Unit Design Parameters Evaluation Input Values Comments Survey Package: F830 IOSB Survey Unit: 001 DAW Bay Class 3 SU Area (m 2) 348 Evaluator: JR DCGLw: 43,000 Gross Activity DCGL Area Factor N/A Class 3 Design DCGLemc (dpm/1 OOcm 2): N/A Class 3 DCGLem c: NIA Class 3 LBGR: 21,500 Default = 50% DCGL Sigma: 1 , 055 Scopinq Survey Data Type I error: 0.05 Type 11 error: 0.05 Predominant Nuclide Cs-137 Sample Area (m 2) N/A Total Instrument Efficiency
 
: 0.129 Total Area Scanned (m 2): 40.3 Scan Coverage (%) 12% Class 3 Choosing 'N/A' sets material Material Type: N/A backqround to "O" Calculated Values Comments Z1-a: 1.645 Z1-p: 1.645 Sign p: 0.99865 Calculated Relative Shift: 20.3 Relative Shift Used: 3.0 Uses 3.0 if Relative Shift >3 N-Value: 11 N-Value+20%:
FINAL STATUS SURVEY F8300013 Table 1, Survey Unit Design Parameters Evaluation Input Values                           Comments Survey Package:       F830   IOSB Survey Unit:       001 DAW Bay Class         3 SU Area (m 2 )     348 Evaluator:       JR DCGLw:     43,000   Gross Activity DCGL Area Factor       N/A Class 3 Design DCGLemc (dpm/1 OOcm 2 ) :       N/A Class 3 DCGLemc:         NIA Class 3 LBGR:   21,500   Default = 50% DCGL Sigma:     1,055 Scopinq Survey Data Type I error:     0.05 Type 11 error:     0.05 Predominant Nuclide     Cs-137 Sample Area (m 2 )       N/A Total Instrument Efficiency:   0.129 Total Area Scanned (m 2 ) :     40.3 Scan Coverage (%)         12%   Class 3 Choosing 'N/A' sets material Material Type:       N/A backqround to "O" Calculated Values                             Comments Z1-a:   1.645 Z1-p:   1.645 Sign p: 0.99865 Calculated Relative Shift:     20.3 Relative Shift Used:       3.0 Uses 3.0 if Relative Shift >3 N-Value:         11 N-Value+20%:           14 2                               FSS DAW BAY                               F8300013
14 2 FSS DAW BAY F8300013 FINAL STAT US SURVEY F8300013 Survey Results: A tota l of 15 d i r e c t meas ur e m e nt s were made in F 8 3 0 00 1 3. The r es ul ts o f th e sta t ic m eas ur e m ents a re s h ow n in Table 2. A ll of th e st a ti c m eas u re m e n ts we r e l ess th an th e DCGL. No ne o f t h e scan m e a s urem e n ts indi ca t e d a r eas of e l eva t e d ac ti v it y. S w ip e d ata did not indi cate e l evate d ac ti v it y l eve ls a b ove the M D A. Table 2 , Static Measurement Result s Number Sample# Beta Beta (cpm) (dpm/100 cm 2) 1 F8300013C0001 274 2 , 023 2 F83000 1 3C0002 261 2 , 093 3 F83000 1 3C0003 266 2 , 388 4 F8300013C0004 327 1 , 946 5 F8300013C0005 254 2 , 364 6 F83000 1 3C0006 251 2 , 535 7 F8300013C0007 194 2 , 287 8 F8300013C0008 273 2 , 062 9 F8300013C0009 180 1 , 395 10 F8300013C0010 308 1 , 969 1 1 F8300013C0011 257 1 , 504 12 F8300013C0012 305 2 , 124 13 F8300013C0013 295 1 , 992 1 4 F8 3 00013C0014 203 2 , 1 1 6 1 5 F8300013C0015 270 1 , 574 Table 3 co n ta i ns the s t at i s ti ca l s umm ary of t he s t at i c m eas ur e m e nt d a t a fo r t h e D AW B ay. 3 Table 3 , Beta Summar y Statistic s Beta S t at i c DAW (dpm/100 cm 2) Mean Median Standard Deviation M i nimum Maximum Count FSS D AW B AY 2 , 025 2 , 062 325 1 , 395 2 , 535 15 F 8 300013 FINAL STATUS SU R VEY F 8 300013 Survey Unit Data Assessment
 
: T h e survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected.
FINAL STATUS SURVEY F8300013 Survey Results:
The critical value and the resu lt s of the Sign Test are presente d in Ta b le 4. T he sample mean and median va l ues were l ess than the DCGL. The sample standard de v iation was greater than the design standard deviation but both values of sigma resulted in a relative shift greater than three (3 ), no add i tional samples were required. Tabl e 4 , D at a Assess m e nt R es ul ts Static Data Values Comments Num ber of Samples: 15 Median: 2 , 062 Mean: 2 , 0 25 Stat i c Da ta S t andard Deviat i on: 32 5 Max im um: 2 , 535 Si a n Test Results Comments Adj us ted N Valu e: 14 S+ Valu e: 15 Cr i t i cal Value: 10 Criter i a Satisfaction Comments Suff i cie n t samples collected: Pas s M axi m um value <DCGL w: Pass Me d i an v al u e <DCGL w: Pass M e an v alue <DCGL w: Pass Ma ximum va lue <DCGL emc: N IA Sign test r es ul ts: Pass Final Status Comments T he s urv e y unit p asses all co n d i tions: Pass Survey Unit Investigations and Results: No investigations were required for either direct or scan measurements and no invest i gation resu l ts are reported.
A total of 15 direct measurements were made in F83000 13. The results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. None of the scan measurements indicated areas of elevated acti vity. Swipe data did not indicate elevated acti vity levels above the MDA.
ALARA Statemen t: As state d in Chapter 4 of the L T P , as long as the residual activity within the surve y unit is less than the D CGL , the ALARA criterion has been met. Changes in Initial Survey Unit Assumptions:
Table 2, Static Measurement Results Beta              Beta Number           Sample#
T h e sur v e y unit w as designed as a Cla ss 3 survey and the sample results are con s i s tent with that classification. The variability o f the survey results was greater than the characterization data used for survey de s ign. No potential areas of elevated activity were detected. 4 FSSDAWBAY F8300013 FINAL STATUS SURVEY F8300013 as both were in excess of maximum amount and required adjustment to 3.0 No potential areas of elevated act i vity were detected. C onclusion:
(cpm)         (dpm/100 cm 2) 1 F8300013C0001                     274             2,023 2 F83000 13C0002                    261             2,093 3 F83000 13C0003                    266             2,388 4 F8300013C0004                     327             1,946 5 F8300013C0005                     254             2,364 6 F83000 13C0006                    251             2,535 7 F8300013C0007                     194             2,287 8 F8300013C0008                     273             2,062 9 F8300013C0009                     180             1,395 10 F8300013C0010                     308             1,969 11  F8300013C0011                     257             1,504 12 F8300013C0012                     305             2,124 13 F8300013C0013                     295             1,992 14  F8300013C0014                    203             2,116 15  F8300013C0015                     270             1,574 Table 3 contains the statistical summary of the static measurement data for the DAW Bay.
The FSS of this survey unit was properl y designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were l ess than the DCGL. No investigations were required.
Table 3, Beta Summary Statistics Beta Static DAW (dpm/ 100 cm 2)
The static measurement data support rejection of the null hypothesis , providing high confidence that the survey unit satisfied the release criteria and ithat the data quality objectives were met. It is concluded that survey unit F8300013 meets the release criteria of 1OCFR20.l402.
Mean                               2,025 Median                             2,062 Standard Deviation                  325 Minimum                            1,395 Maximum                            2,535 Count                                15 3                                  FSS DAW BAY                          F8300013
5 FSS DAW BAY F8300013 Attachment 1 Maps October 14, 2016 Survey Unit F8300013 SMUD Wl T IDEWATER INC UNil tt-S I SCUJ lllU I nlOlua *nt,U.H DAW BAY SMUD Approve<!
 
Dy. Dal e: 10 1l(J01<* Approwl dote: Rev No.: l Page 1 F830001 -1 0 , 23 10 2 , 023 dp 100 cm2 ..... r F8300013-9 32 , 8 22 1 395 dpm/100 cm rF8300013-7 , 13 19 , 22 f 2 287 dpm/100 cm2 F8300013-11 , 9 50 18 1 504 dpm/100 cm2 F8300013-13 27 30 0 1 992 dpm/100 cm2 rF8300013-3 4 , 11 , 0 .I 2 388 dpm/100 cm2 F8300013-14. 65 47 , 22 2 116 dpm/100 cm2 (F8300013-8. 51 50 16 2 062 dpm/100 cm2 F8300013-2 72 39 , 2 093 dpm/100 cm2 F8300013-4
FINAL STATUS SURVEY F8300013 Survey Unit Data Assessment:
, 41 28 0 1 , 946 dpm/100 cm2 F8300013-10. 69 24 0 1 969 dpm/100 cm2 rF8300013-12 46 13. 0 / 2 124 dpm/100 cm2 F8300013-5
The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation was greater than the design standard deviation but both values of sigma resulted in a relative shift greater than three (3 ), no additional samples were required .
, 52 0 , 20 2 364 dpm/100 cm2 Att. 1 Maps r F8300013-15 75 2 1 574 dpm/100 cm2 F8300013-6 75 1 r 10. 2 535 dpm/100 cm2 F8300013 Attachment 2 Instrumentation October 14, 2016 Survey Unit F8300013 Meas ur e m e n t Type Beta Static Measurement Swipe Measurements Table 2-1. Surv e y Unit Instrume n tation Inst ru me n t Ty p e Ludlum Model 2350-l Ludlum Model 44-1 16 B Detector Ludlum Model 2929 Ludlum Model 44-10-1 / Minim u m Detectab l e Act i vity" Beta -510dpm/100cm 2 Alpha -25 dpm/100 cm 2 Beta -80 dpm/100 cm 2 D etecto r Efficiencies 12.9% 36.9% 42.8% Calib r at i o n Du e D a t eb 317899/331973 2 1 10/17 166716/170380 11/3/16
Table 4, Data Assessment Results Static Data Values                             Comments Number of Samples:       15 Median : 2,062 Mean : 2,025 Static Data Standard Deviation :     32 5 Maximum:   2,535 Sian Test Results                             Comments Adj usted N Value:     14 S+ Value:     15 Critical Value:   10 Criteria Satisfaction                           Comments Sufficient samples collected :   Pass Maximum value <DCGLw:         Pass Median value <DCGLw:       Pass Mean value <DCGLw:       Pass Maximum va lue <DCGLemc:         NIA Sign test results: Pass Final Status                               Comments T he survey unit passes all conditions:   Pass Survey Unit Investigations and Results:
* Minimum detectab l e activities for t h e count rate instrumentation were calculated in accordance with NUREG-1 507 , "Minim u m Detectable Concentrations with Typica l Radiation Survey Instruments for Various Contaminant s and Field Conditions" (U.S. NRC , 1 997). b Detectors are required to be calibrated once ever y 12 months. Calibration due date indicates the date by which the detector must be calibrated again. cm 2 =square centimeters cpm =counts per minute dpm =disintegrations per minute Page 1 Att. 2 Instrume n tation F8300013 Static Measurement MDA Variables Beta Survey Type 331973 Detector Number 182 Background count rate (cpm) Count Time (min) 0.129 Efficiency Area of Detector 100 (cm 2) Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count t i me are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br
No investigations were required for either direct or scan measurements and no investigation results are reported.
* t)0*5/t
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification. The variability of the survey results was greater than the characterization data used for survey design. No potential areas of elevated activity were detected.
4                                     FSSDAWBAY                             F8300013
 
FINAL STATUS SURVEY F8300013 as both were in excess of maximum amount and required adjustment to 3.0 No potential areas of elevated activity were detected .
 
==
Conclusion:==
 
The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.
The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and ithat the data quality objectives were met.
It is concluded that survey unit F8300013 meets the release criteria of 10CFR20.l402.
5                                 FSS DAW BAY                               F8300013
 
Attachment 1 Maps October 14, 2016 Survey Unit F8300013
 
r  F8300013-9 32, 8 22 1 395 dpm/100 cm rF8300013-7 , 13 19, 22 f  2 287 dpm/100 cm2 F8300013-14 . 65 47 , 22 2 116 dpm/100 cm2 F8300013-8 . 51 50 16
(   2 062 dpm/100 cm2 F8300013-11 , 9 50 18 1 504 dpm/100 cm2 r
F8300013-2 72 39, F8300013-15 75 3~ , 2 2 093 dpm/100 cm2 1 574 dpm/100 cm2 F8300013-4 , 41 28 0 F8300013-13 27 30 0 1 ,946 dpm/100 cm2 1 992 dpm/100 cm2 F8300013-10. 69 24 0 F830001 -1 0, 23 10 1 969 dpm/100 cm2 2,023 dp 100 cm2 rF8300013-12 46 13. 0 rF8300013-3 4, 11 , 0
                                                                                              .I 2 388 dpm/100 cm2
                                                                                                                                            /    2 124 dpm/100 cm2 rF8300013-6 75
: 10. 2 535 dpm/100 cm2 1
SMUD        Wl TIDEWATER UNil INC tt-S I SCUJ lllU I nlOlua *nt,U.H DAW BAY SMUD Approve<! Dy.
F8300013-5, 52 0, 20 2 364 dpm/100 cm2 Approwl dote:
Dale:    101l(J01<*
Rev No.:  l Page 1                                                                                                         Att. 1 Maps                                                                        F8300013
 
Attachment 2 Instrumentation October 14, 2016 Survey Unit F8300013
 
Table 2-1. Survey Unit Instrumentation Measurement                                    Minimum Detectable Activity"              Detecto r        Calib ration Instru ment Ty pe                                                                      Du e Da teb Type                                                                              Efficiencies Beta Static          Ludlum Model               Beta - 510dpm/100cm2                      12.9%          317899/331973
                                            /
Measurement                2350-l                                                                             2110/ 17 Ludlum Model 44- 1 16 B Detector Swipe        Ludlum Model 2929               Alpha - 25 dpm/100 cm2                  36.9%          166716/ 170380 Measurements        Ludlum Model 44-               Beta - 80 dpm/100 cm2                  42.8%             11 /3/ 16 10-1
* Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1 507 ,
  "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U .S. NRC, 1997).
b Detectors are required to be calibrated once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again.
cm 2 =square centimeters cpm =counts per minute dpm = disintegrations per minute Page 1                                       Att. 2 Instrumentation                                      F8300013
 
Static Measurement MDA Variables Beta Survey Type 331973   Detector Number 182 Background count rate (cpm)
Count Time (min) 0.129  Efficiency Area of Detector 100  (cm 2)
Constants 60  sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br
* t) 0 *5/t
* E
* E
* A/100 (NUREG 1507) Where: Static MDA Pa ge 2 Br t E A Background Countrate Count Time (min) Efficiency Area of detector (cm 2) 510 dpm/100 cm 2 A tt. 2 In s t ru mentation F8 3 00013 Att. 3 Investigation Attachment 3 Investigation September 21, 2016 Survey Unit F8300013 (none required)
* A/ 100     (NUREG 1507)
F8300013 Attachment 4 Data Assessment October 14, 2016 Survey Unit F8300013 Histogram for Beta Static Activity DAW Bay (dpm/100 cm2) ....... 1 J N lllbeldV<&te1:  
 
"....,,, 1,l!!il!\ """""" z.:: 1 so ,._.... -058 1 ........ -0.00 G'JMoon 2JJ201 G'JM .... 2Jl6>
===Background===
01..e.n:a  
Where:       Br               Countrate t               Count Time (min)
.. 0MOl'e8m 1"'5 1628 1191 1953 211& 2279 Page I Att. 4 Data Assessment F8300013 Q..Q Plot for Beta Static Activity DAW (dpm/100 cm2) 2400 1!0) 1600 1400 *1.5 -1 0 -05 00 0.5 Thoorotical Quantiles (Standar d N o rmal) Page 2 Att. 4 D ata Assess m ent 1.0 1.5 F8300013 Mean*2025 S d*325.3 Slopo*329.5
E                Efficiency Area of detector A                (cm 2)
,...,,.,...
Static MDA                          510 dpm/100 cm 2 Page 2                                  Att. 2 Instru mentation   F8300013
.2025
 
*ees1Ftlne 
Attachment 3 Investigation September 21, 2016 Survey Unit F8300013 (none required)
Att. 3 Investigation                      F8300013
 
Attachment 4 Data Assessment October 14, 2016 Survey Unit F8300013
 
Histogram for Beta Static Activity DAW Bay (dpm/100 cm2)               .......
NlllbeldV<&te1:       1J
                                                                                      "....,,,         1,l!!il!\
so
                                                                                      ,._....         z.::1
                                                                                      ........             -0581
                                                                                                            -0.00 G'JMoon         2JJ201 G'JM....         2Jl6>
l!:IN~Disbblion 01..e.n:a ..
0MOl'e8m 1"'5     1628       1191                 1953               211&       2279 Page I                         Att. 4 Data Assessment                 F8300013
 
Q..Q Plot for Beta Static Activity DAW (dpm/100 cm2)                   Act~
Mean *2025 Sd *325.3 Slopo*329.5
                                                                                              ,...,,.,....2025 Con~A*0.$7 2400
* ees1Ftlne 1!0) 1600 1400
    *1.5       -1 0     -05                       00                   0.5 1.0        1.5 Thoorotical Quantiles (Standard Normal)
Page 2                       Att. 4 Data Assessment                    F8300013


I IOSB Final Status Survey I LCl LC2 LC3 LC4-LC6 LCS j3 CPM (3 dpm Date/Time of Count Sample Comments 1 F830 001 3 c 00001 SM DAW Bay Areil 65 35 09/09/16 13:25 2 F830 001 3 c 00002 SM DAW Bay Area 62 28 '09/09/16 13:26 3 F830 001 3 c 00003 SM DAW Bay Area 66 38 09/09/16 13:28 4 F830 001 3 c 00004 SM DAW Bay Are(] 50 0 09/09/16 13:29 5 F830 001 3 c 00005 SM DAW Bay Area 49 -2 09/09/16 13:30 6 F830 001 3 c 00006 SM DAW Bay Area 52 5 09/09/16 13:32 7 F830 001 3 c 00007 SM DAW Bay Area 39 -25 09/09/16 13:33 8 F830 001 3 c 000.08 SM DAW Bay Area 43 -16 09/09/16 13:34 9 F830 001 3 c 00009 SM DAW Bay Area 52 5 09/09/16 13:36 10 F830 001 3 c 00010 SM DA w Bay. Area 55 12 09/09/16 13:37 11 F830 001 3 c 00011 SM DAW Bay Area 40 -23 09/09/16 13:38 l2 F830 001 3 c 00012 SM DAW Bay Area 65 35 09/09/16 13:40 13 F830 001 3 c 00013 SM DAW Bay Arca 51 3 09/09/16 13:41 14 F830 001 3 c 00014 SM DAW Bay Area 53 7 09/09/16 i3:4.2 15 F830 001 3 c 00015 SM DAW Bay Area 61 26 09/09/16 13:43 Comments By signature below, the required source check and background checks were satisfactorily f)erformed prior to use of the instrument identified below. ! . Ludlum 2929 Benchtop Instrument bl:1: elficir:*ntv bkp, tount 2929 S/N: 166716 rate tirne MDA 3 1 24.8 44-10-1 S/N: 1 70380 a 0.369 c:pm 1i1in dp1i1 pe*r are;.i Tech A Sign/ Date (l, /!AVLI-' I ?-7-lt J3 49.9 1 79.7 Tech B Sign/ Date I I* Cal Due Date: 11/3/2016 0-428 NIA cpm min dpm pi::i;;ire;.i Page 3 Att. 4 Data Assessment F8300013}}
Smear_Data~Calculation_:Sheet_101316 I                                                             IOSB Final Status Survey                                                                                     I LCl   LC2   LC3 LC4-   LC6     LCS                       j3 CPM       (3 dpm         Date/Time of Count                       Sample Comments 1   F830   001     3     c 00001     SM     DAW Bay Areil         65             35         09/09/16         13:25 2   F830   001     3     c 00002     SM     DAW Bay Area         62             28       '09/09/16         13:26 3   F830   001     3     c 00003     SM     DAW Bay Area         66             38       09/09/16           13:28 4   F830   001     3     c 00004     SM     DAW Bay Are(]         50             0       09/09/16           13:29 5   F830   001     3     c 00005     SM     DAW Bay Area         49             -2       09/09/16           13:30 6   F830   001     3     c 00006     SM     DAW Bay Area         52             5         09/09/16           13:32 7   F830   001     3     c 00007     SM     DAW Bay Area         39           -25       09/09/16         13:33 8   F830   001     3   c 000.08   SM     DAW Bay Area         43           -16         09/09/16         13:34 9   F830   001     3     c 00009     SM     DAW Bay Area         52             5         09/09/16         13:36 10   F830   001     3     c 00010     SM     DA w Bay. Area       55           12         09/09/16         13:37 11   F830   001     3     c 00011     SM     DAW Bay Area         40           -23         09/09/16         13:38 l2   F830   001     3     c 00012   SM       DAW Bay Area         65           35         09/09/16         13:40 13   F830   001     3     c 00013     SM     DAW Bay Arca         51             3         09/09/16         13:41 14   F830   001     3     c 00014     SM     DAW Bay Area         53             7         09/09/16         i3:4.2 15   F830   001     3     c 00015     SM     DAW Bay Area         61           26         09/09/16         13:43 Comments   By signature below, the required source check and background checks were satisfactorily f)erformed prior to use of the instrument identified below.
~! .
Ludlum 2929 Benchtop Instrument bl:1:
elficir:*ntv   bkp, tount 2929 S/N: 166716                                             rate   tirne       MDA 3       1       24.8 44-10-1 S/N: 1 70380 a         0.369 c:pm   1i1in dp1i1 pe*r are;.i Tech A Sign/ Date   (l, /!AVLI-' I ?-7-lt                                   Cal Due Date: 11/3/2016                        0-428 49.9     1       79.7 Tech B Sign/ Date I     NIA I*
J3                    cpm   min   dpm pi::i;;ire;.i Page 3                               Att. 4 Data Assessment                                   F8300013}}

Latest revision as of 18:48, 4 February 2020

Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013
ML17065A036
Person / Time
Site: Rancho Seco
Issue date: 11/10/2016
From:
Sacramento Municipal Utility District (SMUD)
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML17065A032 List:
References
DPG 17-038, F8300013
Download: ML17065A036 (16)


Text

j

i. - ----- . -

Rancho S.eco Final Status Survey Summary Report October 14,, 2016 IOSB DAW Bay Survey Unit F8300013 Approved By: fl'>#:e<- Date:

Manager, Rancho Seco Assets

'.c /.o L=t.(,

FINAL STATUS SURVEY F8300013 Survey Unit:

F8300013, Interim Qnsite Storage Building (IOSB) Dry Active Waste (DAW) bay Survey Unit

Description:

Operating History: fhe DAW Bay was <tesigned to as a holding or storage bay for dry activated waste (DAW) packaged in shipping containers. There was a known ar~a of contamination in the northwest corner of the bay near the drainage trench. This area. was fully characterized Quring the scoping surveys and did not resµlt in static measurements exceeding the DCGL.

Site Characterization: Static measurement.~ were made of the walls, floor, and ceiling of the DAW Bay to confirm the absence or presence of plant-derived radionuclides. St~tic measurements showe.d a mean gross activity level of 3,042 dpm/ 100 cm 2 and a maxim.um value of 5,778 dpm/100 cm 2

  • The statistic:S of the DAW results combines all lower walls, upper walls, floor, and ceiling data. Based, on the levels of gross activity reported, the area was determined to be a Class 3 area.

Survey Unit Design Information:

The Survey Unit Design Parameters are presented in Table 1. The survey unit and measurement locations are depicted on the. maps in Attachment 1. Static measurement locations were randomly determined and approximately 12% of the area scanned. The instrumentation used! for the survey along with the MDC values are listed in Table 2...1 .

1 FSSDAWBAY F8300013

FINAL STATUS SURVEY F8300013 Table 1, Survey Unit Design Parameters Evaluation Input Values Comments Survey Package: F830 IOSB Survey Unit: 001 DAW Bay Class 3 SU Area (m 2 ) 348 Evaluator: JR DCGLw: 43,000 Gross Activity DCGL Area Factor N/A Class 3 Design DCGLemc (dpm/1 OOcm 2 ) : N/A Class 3 DCGLemc: NIA Class 3 LBGR: 21,500 Default = 50% DCGL Sigma: 1,055 Scopinq Survey Data Type I error: 0.05 Type 11 error: 0.05 Predominant Nuclide Cs-137 Sample Area (m 2 ) N/A Total Instrument Efficiency: 0.129 Total Area Scanned (m 2 ) : 40.3 Scan Coverage (%) 12% Class 3 Choosing 'N/A' sets material Material Type: N/A backqround to "O" Calculated Values Comments Z1-a: 1.645 Z1-p: 1.645 Sign p: 0.99865 Calculated Relative Shift: 20.3 Relative Shift Used: 3.0 Uses 3.0 if Relative Shift >3 N-Value: 11 N-Value+20%: 14 2 FSS DAW BAY F8300013

FINAL STATUS SURVEY F8300013 Survey Results:

A total of 15 direct measurements were made in F83000 13. The results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. None of the scan measurements indicated areas of elevated acti vity. Swipe data did not indicate elevated acti vity levels above the MDA.

Table 2, Static Measurement Results Beta Beta Number Sample#

(cpm) (dpm/100 cm 2) 1 F8300013C0001 274 2,023 2 F83000 13C0002 261 2,093 3 F83000 13C0003 266 2,388 4 F8300013C0004 327 1,946 5 F8300013C0005 254 2,364 6 F83000 13C0006 251 2,535 7 F8300013C0007 194 2,287 8 F8300013C0008 273 2,062 9 F8300013C0009 180 1,395 10 F8300013C0010 308 1,969 11 F8300013C0011 257 1,504 12 F8300013C0012 305 2,124 13 F8300013C0013 295 1,992 14 F8300013C0014 203 2,116 15 F8300013C0015 270 1,574 Table 3 contains the statistical summary of the static measurement data for the DAW Bay.

Table 3, Beta Summary Statistics Beta Static DAW (dpm/ 100 cm 2)

Mean 2,025 Median 2,062 Standard Deviation 325 Minimum 1,395 Maximum 2,535 Count 15 3 FSS DAW BAY F8300013

FINAL STATUS SURVEY F8300013 Survey Unit Data Assessment:

The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation was greater than the design standard deviation but both values of sigma resulted in a relative shift greater than three (3 ), no additional samples were required .

Table 4, Data Assessment Results Static Data Values Comments Number of Samples: 15 Median : 2,062 Mean : 2,025 Static Data Standard Deviation : 32 5 Maximum: 2,535 Sian Test Results Comments Adj usted N Value: 14 S+ Value: 15 Critical Value: 10 Criteria Satisfaction Comments Sufficient samples collected : Pass Maximum value <DCGLw: Pass Median value <DCGLw: Pass Mean value <DCGLw: Pass Maximum va lue <DCGLemc: NIA Sign test results: Pass Final Status Comments T he survey unit passes all conditions: Pass Survey Unit Investigations and Results:

No investigations were required for either direct or scan measurements and no investigation results are reported.

ALARA Statement:

As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met.

Changes in Initial Survey Unit Assumptions:

The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification. The variability of the survey results was greater than the characterization data used for survey design. No potential areas of elevated activity were detected.

4 FSSDAWBAY F8300013

FINAL STATUS SURVEY F8300013 as both were in excess of maximum amount and required adjustment to 3.0 No potential areas of elevated activity were detected .

==

Conclusion:==

The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.

The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and ithat the data quality objectives were met.

It is concluded that survey unit F8300013 meets the release criteria of 10CFR20.l402.

5 FSS DAW BAY F8300013

Attachment 1 Maps October 14, 2016 Survey Unit F8300013

r F8300013-9 32, 8 22 1 395 dpm/100 cm rF8300013-7 , 13 19, 22 f 2 287 dpm/100 cm2 F8300013-14 . 65 47 , 22 2 116 dpm/100 cm2 F8300013-8 . 51 50 16

( 2 062 dpm/100 cm2 F8300013-11 , 9 50 18 1 504 dpm/100 cm2 r

F8300013-2 72 39, F8300013-15 75 3~ , 2 2 093 dpm/100 cm2 1 574 dpm/100 cm2 F8300013-4 , 41 28 0 F8300013-13 27 30 0 1 ,946 dpm/100 cm2 1 992 dpm/100 cm2 F8300013-10. 69 24 0 F830001 -1 0, 23 10 1 969 dpm/100 cm2 2,023 dp 100 cm2 rF8300013-12 46 13. 0 rF8300013-3 4, 11 , 0

.I 2 388 dpm/100 cm2

/ 2 124 dpm/100 cm2 rF8300013-6 75

10. 2 535 dpm/100 cm2 1

SMUD Wl TIDEWATER UNil INC tt-S I SCUJ lllU I nlOlua *nt,U.H DAW BAY SMUD Approve<! Dy.

F8300013-5, 52 0, 20 2 364 dpm/100 cm2 Approwl dote:

Dale: 101l(J01<*

Rev No.: l Page 1 Att. 1 Maps F8300013

Attachment 2 Instrumentation October 14, 2016 Survey Unit F8300013

Table 2-1. Survey Unit Instrumentation Measurement Minimum Detectable Activity" Detecto r Calib ration Instru ment Ty pe Du e Da teb Type Efficiencies Beta Static Ludlum Model Beta - 510dpm/100cm2 12.9% 317899/331973

/

Measurement 2350-l 2110/ 17 Ludlum Model 44- 1 16 B Detector Swipe Ludlum Model 2929 Alpha - 25 dpm/100 cm2 36.9% 166716/ 170380 Measurements Ludlum Model 44- Beta - 80 dpm/100 cm2 42.8% 11 /3/ 16 10-1

  • Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1 507 ,

"Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U .S. NRC, 1997).

b Detectors are required to be calibrated once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again.

cm 2 =square centimeters cpm =counts per minute dpm = disintegrations per minute Page 1 Att. 2 Instrumentation F8300013

Static Measurement MDA Variables Beta Survey Type 331973 Detector Number 182 Background count rate (cpm)

Count Time (min) 0.129 Efficiency Area of Detector 100 (cm 2)

Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br

  • t) 0 *5/t
  • E

Background

Where: Br Countrate t Count Time (min)

E Efficiency Area of detector A (cm 2)

Static MDA 510 dpm/100 cm 2 Page 2 Att. 2 Instru mentation F8300013

Attachment 3 Investigation September 21, 2016 Survey Unit F8300013 (none required)

Att. 3 Investigation F8300013

Attachment 4 Data Assessment October 14, 2016 Survey Unit F8300013

Histogram for Beta Static Activity DAW Bay (dpm/100 cm2) .......

NlllbeldV<&te1: 1J

"....,,, 1,l!!il!\

so

,._.... z.::1

........ -0581

-0.00 G'JMoon 2JJ201 G'JM.... 2Jl6>

l!:IN~Disbblion 01..e.n:a ..

0MOl'e8m 1"'5 1628 1191 1953 211& 2279 Page I Att. 4 Data Assessment F8300013

Q..Q Plot for Beta Static Activity DAW (dpm/100 cm2) Act~

Mean *2025 Sd *325.3 Slopo*329.5

,...,,.,....2025 Con~A*0.$7 2400

  • ees1Ftlne 1!0) 1600 1400
  • 1.5 -1 0 -05 00 0.5 1.0 1.5 Thoorotical Quantiles (Standard Normal)

Page 2 Att. 4 Data Assessment F8300013

Smear_Data~Calculation_:Sheet_101316 I IOSB Final Status Survey I LCl LC2 LC3 LC4- LC6 LCS j3 CPM (3 dpm Date/Time of Count Sample Comments 1 F830 001 3 c 00001 SM DAW Bay Areil 65 35 09/09/16 13:25 2 F830 001 3 c 00002 SM DAW Bay Area 62 28 '09/09/16 13:26 3 F830 001 3 c 00003 SM DAW Bay Area 66 38 09/09/16 13:28 4 F830 001 3 c 00004 SM DAW Bay Are(] 50 0 09/09/16 13:29 5 F830 001 3 c 00005 SM DAW Bay Area 49 -2 09/09/16 13:30 6 F830 001 3 c 00006 SM DAW Bay Area 52 5 09/09/16 13:32 7 F830 001 3 c 00007 SM DAW Bay Area 39 -25 09/09/16 13:33 8 F830 001 3 c 000.08 SM DAW Bay Area 43 -16 09/09/16 13:34 9 F830 001 3 c 00009 SM DAW Bay Area 52 5 09/09/16 13:36 10 F830 001 3 c 00010 SM DA w Bay. Area 55 12 09/09/16 13:37 11 F830 001 3 c 00011 SM DAW Bay Area 40 -23 09/09/16 13:38 l2 F830 001 3 c 00012 SM DAW Bay Area 65 35 09/09/16 13:40 13 F830 001 3 c 00013 SM DAW Bay Arca 51 3 09/09/16 13:41 14 F830 001 3 c 00014 SM DAW Bay Area 53 7 09/09/16 i3:4.2 15 F830 001 3 c 00015 SM DAW Bay Area 61 26 09/09/16 13:43 Comments By signature below, the required source check and background checks were satisfactorily f)erformed prior to use of the instrument identified below.

~! .

Ludlum 2929 Benchtop Instrument bl:1:

elficir:*ntv bkp, tount 2929 S/N: 166716 rate tirne MDA 3 1 24.8 44-10-1 S/N: 1 70380 a 0.369 c:pm 1i1in dp1i1 pe*r are;.i Tech A Sign/ Date (l, /!AVLI-' I ?-7-lt Cal Due Date: 11/3/2016 0-428 49.9 1 79.7 Tech B Sign/ Date I NIA I*

J3 cpm min dpm pi::i;;ire;.i Page 3 Att. 4 Data Assessment F8300013