| #REDIRECT [[IR 05000389/1995005]] | | {{Adams |
| | | number = ML17228B205 |
| | | issue date = 06/27/1995 |
| | | title = Forwards Response to Violations Noted in Insp Rept 50-389/95-05.Corrective Actions:Electrical Maint Replaced Thermal Overload Heaters in 2A5 MCC W/Model 123F114C & 2AA Battery Charger Returned to Svc on 950428 |
| | | author name = Goldberg J |
| | | author affiliation = FLORIDA POWER & LIGHT CO. |
| | | addressee name = |
| | | addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| | | docket = 05000389 |
| | | license number = |
| | | contact person = |
| | | document report number = L-95-191, NUDOCS 9507060404 |
| | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE |
| | | page count = 7 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:II REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) |
| | SSION HBR:9507060404 DOC.DATE: 95/06/27 |
| | ~ NOTARIZED: NO DOCKET CIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. |
| | ~ |
| | ~ ~ ~ ~ |
| | ~ 05000389 p AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co. |
| | ~ ~ |
| | RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) |
| | 'UBJECT: Forwards response to violations noted in Insp Rept 50-389/95-05.Corrective actions:electrical maint replaced thermal overload heaters in 2A5 MCC w/Model 123F114C & 2AA 0 battery charger returned to svc on 950428. |
| | DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES: |
| | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 2 2 AEOD/DEIB 1 1 AEOD/S PD/RAB 1 1 EO 1 1 DEDRO 1 1 E CENTER 1 1 NRR/DIS P/PI PB 1 1 ~OR 0 1 1 NRR/DRCH/HHFB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 AL: LITCO BRYCE, J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS: |
| | PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! |
| | AL NUMBER OF COPIES REQUIRED: LTTR 19 - |
| | ENCL 19 |
| | |
| | ~ |
| | |
| | Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 JUN 27 1995 L-95-191 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: . St. Lucie Unit 2 Docket Nos. 50-389 Reply to Notice of Violation Ins ection Re ort 95-05 Florida Power and Light Company (FPL) has reviewed the subject inspection report and pursuant to 10 CFR 2.201"the response to the notice of violation is attached. |
| | Very truly yours, gz g J. H. Goldberg President Nuclear Division JHG/DAS/EJB Attachment cc: Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St. Lucie Plant |
| | 'it5070b0404 950627 PDR ADOCK 0500038rrr 9 PDR i |
| | an FPL Group company ++9 |
| | |
| | St. Lucie. Unit |
| | ~ 2 Docket Nos. 50-389 |
| | ~ |
| | Reply to Notice of Violation Ins ection Re ort 95-05 VIOLATION: |
| | 10 CFR 50, Appendix B, Criterion III, as implemented by Florida Power and Light (FP&L) Topical Quality Assurance Report (FPLTQAR 1-76A), Revision 38, requires, in part, design control measures which assure the suitability of application of materials and parts that are essential to the safety-related functions of the structures, systems, and components. |
| | Plant change and modification (PC/M) package 039-294, required that overload heaters with the model number 123F114C be installed in motor control center (MCC) 2A5, Compartment No. DR3, for Battery Charger 2AA. |
| | Contrary to the above, as of April 26, 1995, design control measures did not assure that 'the required overload heaters were installed in that, overload heaters with the model number 123F104C were installed in MCC 2A5, Compartment No. DR3 for Battery Charger 2AA instead of the required model number 123F114C. The installed overload heaters were less conservative than the model number required by the PC/M. |
| | |
| | ===RESPONSE=== |
| | REASON FOR VIOLATION The root cause of this event was that process controls which were in place governing the issuance and installation of safety-related components failed to ensure that design requirements were correctly implemented as specified by the PC/M. |
| | A Procurement Engineering generic evaluation performed in 1991 contained an unclear disposition of material in stock, resulting in two different overload heater models being stored under the same Material and Stock (MSS) identification number. |
| | Generic evaluations of this type were performed only during 1991 and 1992. |
| | Electrical. Maintenance personnel failed to adequately resolve a discrepancy between the parts issued from stock and those specified by the work order and PC/M. |
| | |
| | St. Lucie.Unit 2 |
| | ~ |
| | Docket Nos. 50-389 |
| | ~ |
| | 'Reply to Notice of Violation |
| | ~ |
| | Ins ection Re ort 95-05 2 ~ CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED A. Operations declared the 2AA Battery Charger out of service on April 27, 1995. |
| | B. Electrical Maintenance replaced the thermal overload heaters in the 2A5 MCC with model number 123F114C, and the 2AA Battery Charger was returned to service on April 28, 1995. |
| | C. A St. Lucie Action Report (STAR) was issued which evaluated the past operability of the 2AA Battery Charger. This evaluation concluded that the 2AA Battery Charger was capable of performing its intended function during the time the thermal overload heaters (model 123F104C) were installed. |
| | D. The Engineering Department reviewed all other procurement generic evaluations performed during 1991 and 1992 to verify the accuracy of material descriptions . No additional discrepancies were found to exist between material in stock and the item descriptions addressed by those generic evaluations. |
| | : 3. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS The Maintenance Department will revise AP-0010432, "Nuclear Plant Work Orders Administrative Procedure" to include additional verification that components installed in the performance of a PC/M match the design requirement as specified. This action will be completed by July 31, 1995. |
| | B. The Procurement Engineering generic evaluation process has been changed so that specific Material and Stock (M&S) identification numbers are no longer referenced in generic procurement evaluations. |
| | C. Engineering conducted training for Procurement Engineering personnel to emphasize the importance of providing clear instructions in evaluations regarding the disposition of instock material. |
| | |
| | S t. Lucie.Unit 2 Docket Nos. 50-389 Reply to Notice of Violation Ins ection Re ort 95-05 D. Nuclear Materials Management will develop instructions for performing part number verifications on future instock dispositions resulting from Engineering evaluations. This action will be completed by October 1, 1995. |
| | E. This event will be included into the quarterly operating events training program for maintenance disciplines. |
| | This action will be completed by December 31, 1995. |
| | F. A technical review team was formed to further examine the material control process and provide recommendations for improvement. Team recommendations to management will be provided by August 31, 1995. |
| | Full compliance was achieved on April 28, 1995 with the completion of item 2B above. |
| | |
| | C |
| | ~}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
II REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION HBR:9507060404 DOC.DATE: 95/06/27
~ NOTARIZED: NO DOCKET CIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.
~
~ ~ ~ ~
~ 05000389 p AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co.
~ ~
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
'UBJECT: Forwards response to violations noted in Insp Rept 50-389/95-05.Corrective actions:electrical maint replaced thermal overload heaters in 2A5 MCC w/Model 123F114C & 2AA 0 battery charger returned to svc on 950428.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 2 2 AEOD/DEIB 1 1 AEOD/S PD/RAB 1 1 EO 1 1 DEDRO 1 1 E CENTER 1 1 NRR/DIS P/PI PB 1 1 ~OR 0 1 1 NRR/DRCH/HHFB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 AL: LITCO BRYCE, J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
AL NUMBER OF COPIES REQUIRED: LTTR 19 -
ENCL 19
~
Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 JUN 27 1995 L-95-191 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: . St. Lucie Unit 2 Docket Nos. 50-389 Reply to Notice of Violation Ins ection Re ort 95-05 Florida Power and Light Company (FPL) has reviewed the subject inspection report and pursuant to 10 CFR 2.201"the response to the notice of violation is attached.
Very truly yours, gz g J. H. Goldberg President Nuclear Division JHG/DAS/EJB Attachment cc: Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St. Lucie Plant
'it5070b0404 950627 PDR ADOCK 0500038rrr 9 PDR i
an FPL Group company ++9
St. Lucie. Unit
~ 2 Docket Nos. 50-389
~
Reply to Notice of Violation Ins ection Re ort 95-05 VIOLATION:
10 CFR 50, Appendix B, Criterion III, as implemented by Florida Power and Light (FP&L) Topical Quality Assurance Report (FPLTQAR 1-76A), Revision 38, requires, in part, design control measures which assure the suitability of application of materials and parts that are essential to the safety-related functions of the structures, systems, and components.
Plant change and modification (PC/M) package 039-294, required that overload heaters with the model number 123F114C be installed in motor control center (MCC) 2A5, Compartment No. DR3, for Battery Charger 2AA.
Contrary to the above, as of April 26, 1995, design control measures did not assure that 'the required overload heaters were installed in that, overload heaters with the model number 123F104C were installed in MCC 2A5, Compartment No. DR3 for Battery Charger 2AA instead of the required model number 123F114C. The installed overload heaters were less conservative than the model number required by the PC/M.
RESPONSE
REASON FOR VIOLATION The root cause of this event was that process controls which were in place governing the issuance and installation of safety-related components failed to ensure that design requirements were correctly implemented as specified by the PC/M.
A Procurement Engineering generic evaluation performed in 1991 contained an unclear disposition of material in stock, resulting in two different overload heater models being stored under the same Material and Stock (MSS) identification number.
Generic evaluations of this type were performed only during 1991 and 1992.
Electrical. Maintenance personnel failed to adequately resolve a discrepancy between the parts issued from stock and those specified by the work order and PC/M.
St. Lucie.Unit 2
~
Docket Nos. 50-389
~
'Reply to Notice of Violation
~
Ins ection Re ort 95-05 2 ~ CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED A. Operations declared the 2AA Battery Charger out of service on April 27, 1995.
B. Electrical Maintenance replaced the thermal overload heaters in the 2A5 MCC with model number 123F114C, and the 2AA Battery Charger was returned to service on April 28, 1995.
C. A St. Lucie Action Report (STAR) was issued which evaluated the past operability of the 2AA Battery Charger. This evaluation concluded that the 2AA Battery Charger was capable of performing its intended function during the time the thermal overload heaters (model 123F104C) were installed.
D. The Engineering Department reviewed all other procurement generic evaluations performed during 1991 and 1992 to verify the accuracy of material descriptions . No additional discrepancies were found to exist between material in stock and the item descriptions addressed by those generic evaluations.
- 3. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS The Maintenance Department will revise AP-0010432, "Nuclear Plant Work Orders Administrative Procedure" to include additional verification that components installed in the performance of a PC/M match the design requirement as specified. This action will be completed by July 31, 1995.
B. The Procurement Engineering generic evaluation process has been changed so that specific Material and Stock (M&S) identification numbers are no longer referenced in generic procurement evaluations.
C. Engineering conducted training for Procurement Engineering personnel to emphasize the importance of providing clear instructions in evaluations regarding the disposition of instock material.
S t. Lucie.Unit 2 Docket Nos. 50-389 Reply to Notice of Violation Ins ection Re ort 95-05 D. Nuclear Materials Management will develop instructions for performing part number verifications on future instock dispositions resulting from Engineering evaluations. This action will be completed by October 1, 1995.
E. This event will be included into the quarterly operating events training program for maintenance disciplines.
This action will be completed by December 31, 1995.
F. A technical review team was formed to further examine the material control process and provide recommendations for improvement. Team recommendations to management will be provided by August 31, 1995.
Full compliance was achieved on April 28, 1995 with the completion of item 2B above.
C
~