| document type = Technical Specification, Bases Change
| document type = Technical Specification, Bases Change
| page count = 7
| page count = 7
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:Distribution:
{{#Wiki_filter:Date: 8[17[2017 Distribution:                                                    Duke Energy                            Document Transmittal #: TR-NUC-MC-006874
Duke Energy Date: 8[17[2017 Document Transmittal  
: 1. Boyer, Robert P
#: TR-NUC-MC-006874
: 2. Gardner, Troy R                           DOCUMENTTRANSMITTALFORM
: 1. Boyer, Robert P DOCUMENTTRANSMITTALFORM Purpose: Issue 2. Gardner, Troy R 3. Howell, Pamela T Released By: 4. Mc Ginnis, Vickie L Facility:
MCGUIRE NUCLEAR STATION Duke Energx 5. OPS HUMAN PERFORMANCE
-SUBJECT 13225 Hagers Road 6. OPS TRNG MGR. Technical Sgecification Changes -Amendment Nos.296[275 Document Management
: 7. QATS-MG02DM 8. RESIDENT NRC INSPECT Huntersville, NC 28078 9. SERV BLDG FILE ROOM -10. U S NUC REG WASHINGTON, DC V MNSDCRM@duke-energx.com
: 11. USNRC -12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 Document ID 1 2 3 4 5 6 7 8 9 10 11 12 LICN MC -MNS-TS-3.6.10
-001 -ISSUED. FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE LICN -MC -MNS-TS-3.7.9
-002 -ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE Remarks: 
* *
* 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS) LCO 3.6.10 Two AVS trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4. ACTIONS CONDITION REQUIRED ACTION A. One AVS train A.1 Restore AVS train to inoperable.
OPERABLE status. AVS 3.6.10 COMPLETION TIME 7 days B. One or more AVS B.1 Restore AVS train(s) heater ?days train(s) heater to OPERABLE status. inoperable.
OR 8.2 Initiate action in accordance with 7 days Specification 5.6.6. C. Required Action and C.1 Be in MODE 3. 6 hours associated Completion Time not met. AND C.2 Be in MODE 5 . 36 hours McGuire Units 1 and 2 3.6.10-1 Amendment Nos. 184/166 AVS 3.6.10 SURVEILLANCE REQUIREMENTS
* SURVEILLANCE FREQUENCY SR 3.6.10.1 Operate each AVS train 15 continuous minutes. In accordance with the Surveillance Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the In accordance with Ventilation Filter Testing Program (VFTP). the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated In accordance with actuation signal. the Surveillance Frequency Control Program SR 3.6.10.4 Verify each AVS filter cooling bypass valve can be In accordance with opened. the Surveillance Frequency Control Program
* SR 3.6.10.5 Verify each AVS train flow rate 7200 cfm and :s; 8800 In accordance with cfm. the Surveillance Frequency Control Program
* McGuire Units 1 and 2 3.6.10-2 Amendment Nos. 296/275 
*
* 3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRAVS trains shall be OPERABLE.
CRAVS 3.7.9 ------------------------------------------NOTE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control. APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION A. One CRAVS train A.1 Restore CRAVS train to inoperable for reasons OPERABLE status . other than Condition B. B. One or more CRAVS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions. boundary in MODE 1,2,3, or4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND B.3 Restore CRE boundary to OPERABLE status. C. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Be in MODE 5. COMPLETION TIME 7 days* Immediately 24 hours 90 days 6 hours 36 hours (continued)
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
E. Two CRAVS trains inoperable in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
OR One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Two CRAVS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE ALTERATIONS.
AND D.2.2. Suspend movement of irradiated fuel assemblies.
E.1 Suspend CORE ALTERATIONS.
AND E.2 Suspend movement of irradiated fuel assemblies.
F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 * * * 
* *
* G. CONDITION One or more CRAVS train(s) heater inoperable.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification


====5.6.6. CRAVS====
==Purpose:==
3.7.9 COMPLETION TIME 7 days ?days  
Issue
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 . McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for :2:: 15 continuous minutes. SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3. 7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program. CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Pro ram In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 296/275 * * *}}
: 3. Howell, Pamela T                                                                                    Released By:
Facility: MCGUIRE NUCLEAR STATION                                Duke Energx
: 4. Mc Ginnis, Vickie L
: 5. OPS HUMAN PERFORMANCE -                                              SUBJECT                            13225 Hagers Fer~ Road Technical Sgecification Changes - Amendment Nos.296[275          Document Management
: 6. OPS TRNG MGR.
: 7. QATS-                                                                                                  MG02DM
: 8. RESIDENT NRC INSPECT                                                                                    Huntersville, NC 28078
: 9. SERV BLDG FILE ROOM -                                                                                  MNSDCRM@duke-energx.com
: 10. U S NUC REG WASHINGTON, DC      V
: 11. USNRC                                                                        -
: 12. WESTINGHOUSE ELECTRIC CO LLC                                      Page 1of1 Document ID                  1      2        3        4      5   6        7        8        9        10    11      12 LICN  ~ MC - MNS-TS-3.6.10 - 001 - ISSUED.      FYIIE    FYIIE    FYIIE    FYIIE  FYIIE R&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE LICN - MC - MNS-TS-3.7.9 - 002 - ISSUED        FYIIE    FYIIE    FYIIE    FYIIE  FYIIE ~&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE Remarks:
 
AVS 3.6.10 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS)
LCO 3.6.10            Two AVS trains shall be OPERABLE.
APPLICABILITY:        MODES 1, 2, 3, and 4.
ACTIONS CONDITION                      REQUIRED ACTION              COMPLETION TIME A.      One AVS train              A.1    Restore AVS train to        7 days inoperable.                        OPERABLE status.
B.      One or more AVS            B.1    Restore AVS train(s) heater ?days train(s) heater                  to OPERABLE status.
inoperable.
OR 8.2    Initiate action in accordance with            7 days Specification 5.6.6.
C.      Required Action and        C.1      Be in MODE 3.              6 hours associated Completion Time not met.              AND C.2      Be in MODE 5 .            36 hours
* McGuire Units 1 and 2                  3.6.10-1                  Amendment Nos. 184/166
 
AVS 3.6.10 SURVEILLANCE REQUIREMENTS SR 3.6.10.1 SURVEILLANCE Operate each AVS train    for~ 15 continuous minutes.
FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the    In accordance with Ventilation Filter Testing Program (VFTP).                  the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated      In accordance with actuation signal.                                          the Surveillance Frequency Control Program SR 3.6.10.4  Verify each AVS filter cooling bypass valve can be          In accordance with opened.                                                    the Surveillance Frequency Control Program SR 3.6.10.5 Verify each AVS train flow rate cfm.
is~ 7200 cfm and :s; 8800  In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2                    3.6.10-2                    Amendment Nos. 296/275
* CRAVS 3.7.9
: 3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9                Two CRAVS trains shall be OPERABLE.
        ------------------------------------------NOTE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:          MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION                                REQUIRED ACTION                      COMPLETION TIME A. One CRAVS train                      A.1      Restore CRAVS train to              7 days*
inoperable for reasons                        OPERABLE status .
* B.
other than Condition B.
One or more CRAVS trains inoperable due to inoperable CRE B.1 Initiate action to implement mitigating actions.
Immediately boundary in MODE 1,2,3, or4.
AND                                          24 hours B.2      Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
AND                                          90 days B.3      Restore CRE boundary to OPERABLE status.
C. Required Action and                  C.1      Be in MODE 3.                      6 hours associated Completion Time of Condition A or B            AND not met in MODE 1, 2, 3, or4.                                C.2      Be in MODE 5.                      36 hours (continued)
McGuire Units 1 and 2                              3.7.9-1                      Amendment No. 282/261
 
CRAVS 3.7.9 CONDITION                  REQUIRED ACTION              COMPLETION TIME D. Required Action and      D.1    Place OPERABLE CRAVS        Immediately associated Completion          train in emergency mode.
Time of Condition A not met in MODE 5 or 6, or  OR during movement of irradiated fuel          D.2.1  Suspend CORE                Immediately assemblies, or during            ALTERATIONS.
CORE ALTERATIONS.
AND D.2.2. Suspend movement of          Immediately irradiated fuel assemblies.
E. Two CRAVS trains        E.1    Suspend CORE                Immediately inoperable in MODE 5            ALTERATIONS.
or 6, or during movement of irradiated  AND OR fuel assemblies, or during CORE ALTERATIONS.
E.2    Suspend movement of irradiated fuel assemblies.
Immediately One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Two CRAVS trains        F.1    Enter LCO 3.0.3.            Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
(continued)
McGuire Units 1 and 2                3.7.9-2                    Amendment Nos. 249/229
 
CRAVS 3.7.9 CONDITION                            REQUIRED ACTION                    COMPLETION TIME G.      One or more CRAVS              G.1      Restore CRAVS train(s)            7 days train(s) heater                          heater to OPERABLE inoperable.                              status.
G.2      Initiate action in                ?days accordance with Specification 5.6.6.
    --------------~-------------~---------~~--~-~-~NOTE---------------~-----~----------------------------~-------
  * 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 .
* McGuire Units 1 and 2                           3.7.9-3                       Amendment No. 282/261
 
CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.7.9.1   Operate each CRAVS train for :2:: 15 continuous minutes. In accordance with the Surveillance Frequency Control Pro ram SR 3.7.9.2   Perform required CRAVS filter testing in accordance with  In accordance with the Ventilation Filter Testing Program (VFTP).           the VFTP SR 3. 7.9.3   Verify each CRAVS train actuates on an actual or         In accordance with simulated actuation signal.                               the Surveillance Frequency Control Program SR 3.7.9.4   Perform required CRE unfiltered air inleakage testing in In accordance with accordance with the Control Room Envelope Habitability   the Control Room Program.                                                  Envelope Habitability Program McGuire Units 1 and 2                     3.7.9-4                 Amendment No. 296/275
                                                                                            *}}

Latest revision as of 12:05, 4 February 2020

Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275
ML17237A046
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/17/2017
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17237A046 (7)


Text

Date: 8[17[2017 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-006874

1. Boyer, Robert P
2. Gardner, Troy R DOCUMENTTRANSMITTALFORM

Purpose:

Issue

3. Howell, Pamela T Released By:

Facility: MCGUIRE NUCLEAR STATION Duke Energx

4. Mc Ginnis, Vickie L
5. OPS HUMAN PERFORMANCE - SUBJECT 13225 Hagers Fer~ Road Technical Sgecification Changes - Amendment Nos.296[275 Document Management
6. OPS TRNG MGR.
7. QATS- MG02DM
8. RESIDENT NRC INSPECT Huntersville, NC 28078
9. SERV BLDG FILE ROOM - MNSDCRM@duke-energx.com
10. U S NUC REG WASHINGTON, DC V
11. USNRC -
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 Document ID 1 2 3 4 5 6 7 8 9 10 11 12 LICN ~ MC - MNS-TS-3.6.10 - 001 - ISSUED. FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE LICN - MC - MNS-TS-3.7.9 - 002 - ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE ~&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE Remarks:

AVS 3.6.10 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS)

LCO 3.6.10 Two AVS trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One AVS train A.1 Restore AVS train to 7 days inoperable. OPERABLE status.

B. One or more AVS B.1 Restore AVS train(s) heater ?days train(s) heater to OPERABLE status.

inoperable.

OR 8.2 Initiate action in accordance with 7 days Specification 5.6.6.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5 . 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • McGuire Units 1 and 2 3.6.10-1 Amendment Nos. 184/166

AVS 3.6.10 SURVEILLANCE REQUIREMENTS SR 3.6.10.1 SURVEILLANCE Operate each AVS train for~ 15 continuous minutes.

FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the In accordance with Ventilation Filter Testing Program (VFTP). the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated In accordance with actuation signal. the Surveillance Frequency Control Program SR 3.6.10.4 Verify each AVS filter cooling bypass valve can be In accordance with opened. the Surveillance Frequency Control Program SR 3.6.10.5 Verify each AVS train flow rate cfm.

is~ 7200 cfm and :s; 8800 In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2 3.6.10-2 Amendment Nos. 296/275

  • CRAVS 3.7.9
3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.


NOTE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status .

  • B.

other than Condition B.

One or more CRAVS trains inoperable due to inoperable CRE B.1 Initiate action to implement mitigating actions.

Immediately boundary in MODE 1,2,3, or4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days B.3 Restore CRE boundary to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2. Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND OR fuel assemblies, or during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued)

McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in ?days accordance with Specification 5.6.6.


~-------------~---------~~--~-~-~NOTE---------------~-----~----------------------------~-------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 .
  • McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for :2:: 15 continuous minutes. In accordance with the Surveillance Frequency Control Pro ram SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3. 7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Program SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in In accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 296/275