| author name = Kim S, Miang C, Townsend C
| author name = Kim S, Miang C, Townsend C
| author affiliation = Purdue Univ
| author affiliation = Purdue Univ
| addressee name = Montgomery C K
| addressee name = Montgomery C
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000182
| docket = 05000182
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:P l URDUE u l Cindy Montgomery U.S. NRC S I T Y One White Flint North 11555 Rockville Pike Rockville, MD 20852 August 28, 2017 SCHOOL OF NUCLEAR ENGINEERING
{{#Wiki_filter:P lURDUE u         l             S I T Y                SCHOOL OF NUCLEAR ENGINEERING Cindy Montgomery U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 August 28, 2017


==SUBJECT:==
==SUBJECT:==
Submission of License Amendment Request, PUR-1, Docket 50-182-Management Chain Change  
Submission of License Amendment Request, PUR-1, Docket 50-182-Management Chain Change


==Dear Ms. Montgomery,==
==Dear Ms. Montgomery,==
This le i tter is a request to amend the PUR-1 license, Docket 50-182, to change the Organization Chart for Reactor Administration in the PUR-1 Technical Specifications.
 
When reviewing the I Safety Analysis Report as dated June 30, 2008 (ML 111890201) and the PUR-1 Technical Specifications as approved on October 31, 2016 (ML16267 AOOl), the Level 1 designee is not consistent.
This leitter is a request to amend the PUR-1 license, Docket 50-182, to change the Organization Chart for Reactor Administration in the PUR-1 Technical Specifications. When reviewing the PUR-I Safety Analysis Report as dated June 30, 2008 (ML111890201) and the PUR-1 Technical Specifications as approved on October 31, 2016 (ML16267 AOOl), the Level 1 designee is not consistent. This License Amendment seeks to rectify the issue and utilize an organizational structure to continue the safe operation of the PUR-1. Following consultation with both the Dean of Engineering and Head of the School of Nuclear Engineering, the Head has been selected as the most appropriate choice for the Level 1 designee. The Head has a greater familiarity with the operation of the facility which will result in a more productive dialogue between the Facility Director and the Head.
This License Amendment seeks to rectify the issue and utilize an organizational structure to continue the safe operation of the PUR-1. Following consultation with both the Dean of Engineering and Head of the School of Nuclear Engineering, the Head has been selected as the most appropriate choice for the Level 1 designee.
NUREG-1537, *P art 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Contact," Section 12.1.1, "Structure," states, in part, "The individual or group with legal responsibility for holding the reactor license ... should be shown at the top of the organization." In compliance with this guidance, the Level 1 designee is listed at the top of the boxed region of Figure 6.1 in the Technical Specifications. To remain as consistent as possible with historic documentation, reporting chain above the Level 1 is also included. Additionally, it is noted that those of higher authority are listed nearer the top of the char~. This is illustrated in Figure 6.1. The proposed change is consistent with the guidance in ANS/ANSI 15.l "The Development of Technical Specifications for Research Reactors" and ANS/ANSI 15.4 "Selection and Training of Persom1el for Research Reactors."
The Head has a greater familiarity with the operation of the facility which will result in a more productive dialogue between the Facility Director and the Head. NUREG-1537, *Part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors:
        ~ \,) tll> (I(      School of Nuclear Engineering
Format and Contact," Section 12.1.1, "Structure," states, in part, "The individual or group with legal responsibility for holding the reactor license ... should be shown at the top of the organization." In compliance with this guidance, the Level 1 designee is listed at the top of the boxed region of Figure 6.1 in the Technical Specifications.
,;                    ~.
To remain as consistent as possible with historic documentation, reporting chain above the Level 1 is also included.
*,.-...,'f' r. ,G\~,¢1 Nuclear Engineering Building* 400 Central Drive* West Lafayette, IN 47907-2017 (765) 494-5739 *Fax: (765) 494-9570
Additionally, it is noted that those of higher authority are listed nearer the top of the This is illustrated in Figure 6.1. The proposed change is consistent with the guidance in ANS/ANSI 15.l "The Development of Technical Specifications for Research Reactors" and ANS/ANSI 15.4 "Selection and Training of Persom1el for Research Reactors." ,; School of Nuclear Engineering  
* https://engineering.purdue.edu/NE
'::. .. Nuclear Engineering Building*
 
400 Central Drive* West Lafayette, IN 47907-2017 (765) 494-5739 *Fax: (765) 494-9570
Presidem
* https://engineering.purdue.edu/NE
                                            -------       Purdue Cni,*crsiry I
\"ice Presidemfor Research Radiation Safecy Commincr Radiation Safecy Officer !RSOJ Presidem -------Purdue Cni,*crsiry I Pro\'Ost I Dean College of Engineering
                      \"ice Presidemfor Pro\'Ost Research I
* I H.-arl Xuclea.r Engineering Level I Lahoraton*
Radiation Safecy                      Dean Commincr                        College of Engineering I
Dir.-ctor  
Radiation Safecy Officer                  H.-arl Xuclea.r Engineering
--Lcvcl2
                            !RSOJ Level I Lahoraton* Dir.-ctor
* Reactor Supel"'isor Lcvcl3
                                                                                ,  Committee On Reactor I
* I Reactor Operations Staff ---------------------
                                            --             Lcvcl2                   Operations lCORO)
___ , Committee On Reactor I Operations lCORO) Figure 6.1: Organization Chart for Reactor Administration The current head of the School of Nuclear Engineering is Dr. Seungjin Kim, the Laboratory Director is Dr. Robert Bean, and the Reactor Supervisor is Clive Townsend.
Reactor Supel"'isor Lcvcl3 Reactor Operations Staff I
The Committee On Reactor Operations will continue to be chaired by the RSO and the Head will appoint its other members, maintaining all prior voting requirements.
Figure 6.1: Organization Chart for Reactor Administration The current head of the School of Nuclear Engineering is Dr. Seungjin Kim, the Laboratory Director is Dr. Robert Bean, and the Reactor Supervisor is Clive Townsend. The Committee On Reactor Operations will continue to be chaired by the RSO and the Head will appoint its other members, maintaining all prior voting requirements. Dr. Kim received his Ph.D. in Nuclear Engineering in 1999 and has extensive research experience.
Dr. Kim received his Ph.D. in Nuclear Engineering in 1999 and has extensive research experience.
The PUR-1 Reactor Operations Staff will respond in a timely manner to any questions or requests for addiltional information the NRC staff may have. The attached Technical Specifications reflect markup changes and the final document. Note that all pages will have Amendment No. 15 listed in the footer. Amendment No. 14 is reserved for other pending licensing action.
The PUR-1 Reactor Operations Staff will respond in a timely manner to any questions or requests for addiltional information the NRC staff may have. The attached Technical Specifications reflect markup changes and the final document.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Note that all pages will have Amendment No. 15 listed in the footer. Amendment No. 14 is reserved for other pending licensing action. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on August 28, 2017.
Executed on August 28, 2017. Sincerely, Clive Townsend Reactor Supervisor School of Nuclear Engineering Purdue University . Chung Miang Dean College of Engineering Purdue University Attachments:
Sincerely,
PUR-1 Technical Specifications -Amendment No. 15 Dr. Seungjin Kim Head School of Nuclear Engineering Purdue University
~~
: 6. ADMINISTRATIVE CONTROLS 6.1 Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering.
Clive Townsend                                       . Chung Miang                            Dr. Seungjin Kim Reactor Supervisor                                 Dean                                        Head School of Nuclear Engineering                     College of Engineering                       School of Nuclear Engineering Purdue University                                  Purdue University                            Purdue University Attachments: PUR-1 Technical Specifications -Amendment No. 15
The Dean of the College of *RgHleeringThe Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Dean Head for the admiinistration and proper and safe operation of the facility.
: 6.     ADMINISTRATIVE CONTROLS 6.1     Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering. The Dean of the College of RgHleeringThe Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Dean Head for the admiinistration and proper and safe operation of the facility. Figure 6.1 shows the admi11istration chart for the PUR-1. The Committee on Reactor Operations advises the direc1tor of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.
Figure 6.1 shows the admi11istration chart for the PUR-1. The Committee on Reactor Operations advises the direc 1 t or of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.
President
Yice Presidentfor Research Radiation Safety Committee Radiation Officer (RSO) PUR-1 Technical Specifications President  
                                        -------       Purdue l:ni,*ersiry I
-------Purdue l:ni,*ersiry I Pro\'OSt: I Dean College of Engineering
Yice Presidentfor Pro\'OSt:
* I Head Xuclear Engineering Level 1 -Laboraron*
Research I
Director .i. Lcvel2 I React:or Supen1sor Lcvel8 I Reactor Operations Staff 26 ----------------------1 ' ' ' Committee On Reactor ... Operations (CORO) Amendment No. 4615 President r ------Purdue University I Vice President for Research I Provost Purdue University Dean College of Engineering Radiation Safety Committee Level 1 -----, Radiation Safety Officer Laboratory Director Level2 Reactor Supervisor Level3 I Reactor Operations J ---Primarily Administration ---Primarily Safety I I I I
Radiation Safety                      Dean Committee                        College of Engineering I
* Committee On -Reactor Operations Figure 6.1: Organization Chart for Reactor Administration
Radiation Safe~* Officer                  Head
                                                                      --- ------------ ---- ---1 (RSO)
Xuclear Engineering                              '
Level 1                                    '
Laboraron* Director Committee On Reactor
                                      .i .                           ...
Lcvel2                    Operations (CORO)
I React:or Supen1sor Lcvel8 I
Reactor Operations Staff PUR-1 Technical Specifications                          26                                        Amendment No. 4615
 
President r- - - - - -     Purdue University I                         ~
Vice President                 Provost Purdue University for Research I
                                                  ~
Dean College of Engineering Radiation                     Level 1         - -   - - - ,
Safety                                                    I Committee                                                    I I
I Radiation           Laboratory Director Committee On Reactor Safety Officer                 Level2 Operations Reactor Supervisor Level3 I Reactor Operations       J
                                    - - - Primarily Administration
                                    -   - - Primarily Safety Figure 6.1: Organization Chart for Reactor Administration
: a. Structure
: a. Structure
: 1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
: 1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
: 2. The Dean Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.
: 2. The Dean Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.
: 3. Management Levels: PUR-1 Technical Specifications 27 Amendment No. 4a15 a) Level 1: Dean of the College of Engineering Head of the School of Nuclear Engineering
: 3. Management Levels:
: Responsible for the PUR-1. b) Level 2: PUR-1 Facility Director:
PUR-1 Technical Specifications                   27                             Amendment No. 4a15
Responsible for reactor facility operation and shall report to Level 1 . c) Level 3: Reactor Supervisor:
 
Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2. d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees.
a) Level 1: Dean of the College of Engineering Head of the School of Nuclear Engineering: Responsible for the PUR-1.
These individuals shall report to Level 3. e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down. 4. Committee on Reactor Operations (CORO): The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1. b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
b) Level 2: PUR-1 Facility Director: Responsible for reactor facility operation and shall report to Level 1.
The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO. c. Staffing 1. The minimum staffing when the reactor is not secured shall be as follows: a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement.
c) Level 3: Reactor Supervisor: Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2.
During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; b) During periods of reactor maintenance the two individuals who shall be PUR-1 Technical Specifications 28 Amendment No.
d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees. These individuals shall report to Level 3.
present at the complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911. c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility);
e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down.
and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include: i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director 2. Events requiring the presence at the facility of the senior reactor operator:
: 4. Committee on Reactor Operations (CORO):
a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading of fuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%. d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the fol'lowing:
The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1.
: 1. Responsibility:
: b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO.
: 2. Selection:
: c. Staffing
The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
: 1. The minimum staffing when the reactor is not secured shall be as follows:
a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement. During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; b) During periods of reactor maintenance the two individuals who shall be PUR-1 Technical Specifications               28                         Amendment No. ~15
 
present at the f~cility complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911.
c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility); and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include:
: i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director
: 2. Events requiring the presence at the facility of the senior reactor operator:
a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading of fuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%.
: d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the fol'lowing:
: 1. Responsibility: The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
: 2. Selection: The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
: 3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
: 3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
: 4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.  
: 4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.
 
6.2     Review and Audit PUR-1 Technical Specifications                 29                       Amendment No. ~15
===6.2 Review===
: a. Committee on Reactor Operations (CORO)
and Audit PUR-1 Technical Specifications 29 Amendment No.
The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro tem. The members are appointed by the Dean of the College of Engineering Head of the School of Nuclear Engineering to serve three year terms.
: a. Committee on Reactor Operations (CORO) The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro tem. The members are appointed by the Dean of the College of Engineering Head of the School of Nuclear Engineering to serve three year terms. It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.
It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.
: b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for: 1. Meeting Frequency:
: b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for:
The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
: 1. Meeting Frequency: The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
: 2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
: 2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
: 3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
: 3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
: 4. Subcommittees:
: 4. Subcommittees: The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and
The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and 5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary.
: 5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary. It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Dean of the College of EngineeringHead of the School of Nuclear Engineering , within three months.
It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Dean of the College of EngineeringHead of the School of Nuclear Engineering , within three months. The CORO shall review and approve the minutes of the previous meetings.
The CORO shall review and approve the minutes of the previous meetings. A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.
A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.
: c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
: c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
: 1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications 30 Amendment No. 4315 experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;
: 1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications               30                           Amendment No. 4315
 
experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;
: 2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
: 2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
: 3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
: 3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
: 4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license; 5. Review of the PUR-1 radiation protection program; 6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
: 4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license;
: 5. Review of the PUR-1 radiation protection program;
: 6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
: 7. Review of operating abnormalities having safety significance;
: 7. Review of operating abnormalities having safety significance;
: 8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and 9. Review of audit reports. d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents.
: 8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and
Discussions with cognizant personnel and observation of operations should be used also as appropriate.
: 9. Review of audit reports.
In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
: d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents. Discussions with cognizant personnel and observation of operations should be used also as appropriate. In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
: 1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures:
: 1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures: at least every 12 months (interval between audits not to exceed 15 months);
at least every 12 months (interval between audits not to exceed 15 months); 2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months); 3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications 31 Amendment No.
: 2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months);
30 months); 4. The reactor facility emergency plan and implementing procedures:
: 3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications               31                         Amendment No. ~15
at least once every other calendar year (interval between audits not to exceed 30 months); and 5. The reactor facility security plan and implementing procedures:
at least once every other calendar year (interval between audits not to exceed 30 months). Deficiencies uncovered that affect reactor safety shall immediately be reported to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management).
A written report of the findings of the audit shall be submitted to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.
: e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually.
The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.


===6.3 Radiation===
30 months);
 
: 4. The reactor facility emergency plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months); and
Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 10 CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities." 6.4 Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items: a. Startup, operation, and shutdown of the reactor; b. Fuel loading, unloading, and movement within the reactor; c. Control rod removal or replacement; PUR-1 Technical Specifications 32 Amendment No. 4315
: 5. The reactor facility security plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months).
: d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety; e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
Deficiencies uncovered that affect reactor safety shall immediately be reported to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management). A written report of the findings of the audit shall be submitted to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.
: e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually. The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.
6.3     Radiation Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 10 CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities."
6.4   Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items:
: a. Startup, operation, and shutdown of the reactor;
: b. Fuel loading, unloading, and movement within the reactor;
: c. Control rod removal or replacement; PUR-1 Technical Specifications               32                       Amendment No. 4315
: d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety;
: e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
: f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
: f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
: g. Implementation of required plans such as emergency or security plans; h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA); i. Use, receipt, and transfer of by-product material, if appropriate; and j. Surveillance procedures for shipping radioactive materials.  
: g. Implementation of required plans such as emergency or security plans;
 
: h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA);
===6.5 Experiment===
: i. Use, receipt, and transfer of by-product material, if appropriate; and
 
: j. Surveillance procedures for shipping radioactive materials.
Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.
6.5   Experiment Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.
: a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
: a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
: b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.  
: b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.
 
6.6   Required Actions
===6.6 Required===
: a. Action to be Taken in the Event of a Safety Limit Violation
Actions a. Action to be Taken in the Event of a Safety Limit Violation
: 1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC;
: 1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC; 2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications; and PUR-1 Technical Specifications 33 Amendment No. 4615
: 2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S.
: 3. A report shall be prepared which shall include: a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.
NRC in accordance with Section 6.7.b of these specifications; and PUR-1 Technical Specifications             33                         Amendment No. 4615
This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor. b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
: 3. A report shall be prepared which shall include:
: 1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions.
a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.
If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor.
: b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
: 1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions. If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
: 2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
: 2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
: 3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO; 4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and 5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.  
: 3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO;
: 4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and
: 5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.
6.7    Reports
: a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
: 1. A narrative summary of ( 1) reactor operating experience (including PUR-1 Technical Specifications              34                        Amendment No. 4315


===6.7 Reports===
experiments performed), (2) changes in facility design, performance characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;
: a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
: 1. A narrative summary of ( 1) reactor operating experience (including PUR-1 Technical Specifications 34 Amendment No. 4315 experiments performed), (2) changes in facility design, performance characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;
: 2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
: 2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
: 3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
: 3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
: 4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
: 4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
: 5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50; 6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge.
: 5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50;
The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent.
: 6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge. The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:
If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:
a) Liquid Waste (summarized on a monthly basis)
a) Liquid Waste (summarized on a monthly basis) i. Radioactivity discharged during the reporting period. I. Total radioactivity released (in Curies), 11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period. ii. Total volume (in gallons) of effluent water (including dilution) during periods of release. b) Airborne Waste (summarized on a monthly basis) i. Radioactivity discharged during the reporting period (in Curies) for: PUR-1 Technical Specifications 35 Amendment No. 4315 I. 11. 41 Ar and ' Particulates with half-lives greater than eight days. c) Solid Waste i. The total amount of solid waste transferred (in cubic feet), ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site). 7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and 8. A description and summary of any environmental surveys performed outside the facility.
: i. Radioactivity discharged during the reporting period.
: b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows: 1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:
I. Total radioactivity released (in Curies),
a) Violation of safety limit (see TS 6.6.a); b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:
: 11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period.
ii. Total volume (in gallons) of effluent water (including dilution) during periods of release.
b) Airborne Waste (summarized on a monthly basis)
: i. Radioactivity discharged during the reporting period (in Curies) for:
PUR-1 Technical Specifications                   35                         Amendment No. 4315
 
41 I. Ar and
: 11. Particulates with half-lives greater than eight days.
c) Solid Waste
: i. The total amount of solid waste transferred (in cubic feet),
ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site).
: 7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and
: 8. A description and summary of any environmental surveys performed outside the facility.
: b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows:
: 1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S.
Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:
a) Violation of safety limit (see TS 6.6.a);
b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:
: i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.
: i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.
ii. Operation in violation of limiting conditions for operation established in the technical specifications.
ii. Operation in violation of limiting conditions for operation established in the technical specifications.
iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications 36 Amendment No.
iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications                 36                           Amendment No. ~15
render the reactor safety system incapable of performing its intended safety function.
 
If the malfunction or condition is caused by maintenance, then no report is required.
render the reactor safety system incapable of performing its intended safety function. If the malfunction or condition is caused by maintenance, then no report is required.
Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.
Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.
iv. An unanticipated or uncontrolled change in reactivity greater than 0.006 llk/k. v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks). vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.
iv. An unanticipated or uncontrolled change in reactivity greater than 0.006 llk/k.
: 2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of: a) Permanent changes in the facility organization involving Level 1 and Level 2;and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report. 6.8 Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows: a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years 1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year), 2. Principal maintenance operations, 3. Reportable occurrences, 4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications 37 Amendment No.
: v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks).
: 5. Reactor facility radiation and contamination surveys where required by applicable regulations, 6. Experiments performed with the reactor, 7. Fuel inventories, receipts, and shipments, 8. Approved changes in operating procedures, and 9. Records of meeting and audit reports of the CORO. b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed. c. Records to be Retained for the Lifetime of the Reactor Facility 1. Gaseous and liquid radioactive effluents released to the environs, 2. Radiation exposure for all personnel monitored, 3. Drawings of the reactor facility, and 4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.
vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.
PUR-1 Technical Specifications 38 Amendment No.
: 2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of:
: 6. ADMINISTRATIVE CONTROLS 6.1 Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering.
a) Permanent changes in the facility organization involving Level 1 and Level 2;and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.
The Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Head for the administration and proper and safe operation of thei facility.
6.8   Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows:
Figure 6.1 shows the administration chart for the PUR-1. The Committee on Reactor Operations advises the director of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.  
: a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years
,------------------Yice Presidentfor Research Radiation Safety Corrunittee Radiation Safety Officer {RSO) President
: 1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year),
-------Purdue l:"niversity I Pro\*ost I Dean College of Engineering I I Head Xuclear Engineering Levell I -Laboratory Director !.-Level2 I Reactor Supenisor Level3
: 2. Principal maintenance operations,
* Reactor Operations Sta.ff .. ---------------------, ' ' '
: 3. Reportable occurrences,
' ' ' ' Corrunittee On Reactor ---Operations (CORO) Figure 6.1: Organization Chart for Reactor Administration
: 4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications               37                       Amendment No. ~15
: 5. Reactor facility radiation and contamination surveys where required by applicable regulations,
: 6. Experiments performed with the reactor,
: 7. Fuel inventories, receipts, and shipments,
: 8. Approved changes in operating procedures, and
: 9. Records of meeting and audit reports of the CORO.
: b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed.
: c. Records to be Retained for the Lifetime of the Reactor Facility
: 1. Gaseous and liquid radioactive effluents released to the environs,
: 2. Radiation exposure for all personnel monitored,
: 3. Drawings of the reactor facility, and
: 4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.
PUR-1 Technical Specifications             38                           Amendment No. ~15
: 6.       ADMINISTRATIVE CONTROLS 6.1     Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering. The Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Head for the administration and proper and safe operation of thei facility. Figure 6.1 shows the administration chart for the PUR-1. The Committee on Reactor Operations advises the director of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.
President
                          ,- - - -- -- -- -- -- - - -- - -------       Purdue l:"niversity I
Yice Presidentfor Pro\*ost Research I
Radiation Safety                                      Dean Corrunittee                                      College of Engineering I
I Head Radiation Safety Officer Xuclear Engineering
{RSO)                                                                                      ''
Levell                                     '
I Laboratory Director Corrunittee On Reactor Operations (CORO)
Level2 I
Reactor Supenisor Level3 Reactor Operations Sta.ff Figure 6.1: Organization Chart for Reactor Administration
: a. Structure
: a. Structure
: 1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
: 1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
: 2. The Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.
: 2. The Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.
PUR-1 Technical Specifications 26 Amendment No. 15
PUR-1 Technical Specifications                                           26                                           Amendment No. 15
: 3. Management Levels: a) Level 1: Head of the School of Nuclear Engineering:
: 3. Management Levels:
Responsible for the PUR-1. b) Level 2: PUR-1 Facility Director:
a) Level 1: Head of the School of Nuclear Engineering: Responsible for the PUR-1.
Responsible for reactor facility operation and shall report to Level 1. c) Level 3: Reactor Supervisor:
b) Level 2: PUR-1 Facility Director: Responsible for reactor facility operation and shall report to Level 1.
Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2. d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees.
c) Level 3: Reactor Supervisor: Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2.
These individuals shall report to Level 3. e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down. 4. Committee on Reactor Operations (CORO): The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1. b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees. These individuals shall report to Level 3.
The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO. c. Staffing 1. The minimum staffing when the reactor is not secured shall be as follows: a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement.
e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down.
During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; PUR-1 Technical Specifications 27 Amendment No. 15 b) During periods of reactor maintenance the two individuals who shall be present at the facility complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911. c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility);
: 4. Committee on Reactor Operations (CORO):
and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include: i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director 2. Events requiring the presence at the facility of the senior reactor operator:
The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1.
a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading offuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%. d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the following:
: b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
: 1. Responsibility:
The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO.
The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
: c. Staffing
: 2. Selection:
: 1. The minimum staffing when the reactor is not secured shall be as follows:
The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement. During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; PUR-1 Technical Specifications               27                           Amendment No. 15
 
b) During periods of reactor maintenance the two individuals who shall be present at the facility complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911.
c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility); and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include:
: i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director
: 2. Events requiring the presence at the facility of the senior reactor operator:
a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading offuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%.
: d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the following:
: 1. Responsibility: The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
: 2. Selection: The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
: 3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
: 3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
: 4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.
: 4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.
PUR-1 Technical Specifications 28 Amendment No. 15
PUR-1 Technical Specifications                 28                           Amendment No. 15


===6.2 Review===
6.2   Review and Audit
and Audit a. Committee on Reactor Operations (CORO) The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro fem. The members are appointed by the Head of the School of Nuclear Engineering to serve three year terms. It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.
: a. Committee on Reactor Operations (CORO)
: b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for: 1. Meeting Frequency:
The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro fem. The members are appointed by the Head of the School of Nuclear Engineering to serve three year terms. It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.
The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
: b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for:
: 1. Meeting Frequency: The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
: 2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
: 2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
: 3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
: 3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
: 4. Subcommittees:
: 4. Subcommittees: The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and
The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and 5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary.
: 5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary. It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Head of the School of Nuclear Engineering, within three months. The CORO shall review and approve the minutes of the previous meetings. A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.
It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Head of the School of Nuclear Engineering, within three months. The CORO shall review and approve the minutes of the previous meetings.
A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.
: c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
: c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
: 1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications 29 Amendment No. 15 experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;
: 1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications               29                           Amendment No. 15
 
experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;
: 2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
: 2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
: 3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
: 3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
: 4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license; 5. Review of the PUR-1 radiation protection program; 6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
: 4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license;
: 5. Review of the PUR-1 radiation protection program;
: 6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
: 7. Review of operating abnormalities having safety significance;
: 7. Review of operating abnormalities having safety significance;
: 8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and 9. Review of audit reports. d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents.
: 8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and
Discussions with cognizant personnel and observation of operations should be used also as appropriate.
: 9. Review of audit reports.
In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
: d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents. Discussions with cognizant personnel and observation of operations should be used also as appropriate. In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
: 1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures:
: 1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures: at least every 12 months (interval between audits not to exceed 15 months);
at least every 12 months (interval between audits not to exceed 15 months); 2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months); 3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications 30 Amendment No. 15 30 months); 4. The reactor facility emergency plan and implementing procedures:
: 2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months);
at least once every other calendar year (interval between audits not to exceed 30 months); and 5. The reactor facility security plan and implementing procedures:
: 3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications               30                           Amendment No. 15
at least once every other calendar year (interval between audits not to exceed 30 months). Deficiencies uncovered that affect reactor safety shall immediately be reported to the Head of the School of Nuclear Engineering (Level 1 Management).
A written report of the findings of the audit shall be submitted to the Head of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.
: e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually.
The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.
 
===6.3 Radiation===


Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 1 O CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities." 6.4 Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items: a. Startup, operation, and shutdown of the reactor; b. Fuel loading, unloading, and movement within the reactor; c. Control rod removal or replacement; PUR-1 Technical Specifications 31 Amendment No. 15
30 months);
: d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety; e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
: 4. The reactor facility emergency plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months); and
: 5. The reactor facility security plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months).
Deficiencies uncovered that affect reactor safety shall immediately be reported to the Head of the School of Nuclear Engineering (Level 1 Management). A written report of the findings of the audit shall be submitted to the Head of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.
: e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually. The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.
6.3    Radiation Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 10 CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities."
6.4     Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items:
: a. Startup, operation, and shutdown of the reactor;
: b. Fuel loading, unloading, and movement within the reactor;
: c. Control rod removal or replacement; PUR-1 Technical Specifications               31                           Amendment No. 15
: d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety;
: e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
: f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
: f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
: g. Implementation of required plans such as emergency or security plans; h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA); i. Use, receipt, and transfer of by-product material, if appropriate; and j. Surveillance procedures for shipping radioactive materials.  
: g. Implementation of required plans such as emergency or security plans;
 
: h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA);
===6.5 Experiment===
: i. Use, receipt, and transfer of by-product material, if appropriate; and
 
: j. Surveillance procedures for shipping radioactive materials.
Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.
6.5   Experiment Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.
: a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
: a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
: b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.  
: b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.
6.6    Required Actions
: a. Action to be Taken in the Event of a Safety Limit Violation
: 1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC;
: 2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S.
NRC in accordance with Section 6. 7 .b of these specifications; and
: 3. A report shall be prepared which shall include:
PUR-1 Technical Specifications              32                            Amendment No. 15


===6.6 Required===
a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.
Actions a. Action to be Taken in the Event of a Safety Limit Violation
This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor.
: 1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC; 2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S. NRC in accordance with Section 6. 7 .b of these specifications; and 3. A report shall be prepared which shall include: PUR-1 Technical Specifications 32 Amendment No. 15 a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.
: b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor. b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
: 1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions. If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
: 1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions.
If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
: 2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
: 2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
: 3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO; 4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and 5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.  
: 3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO;
: 4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and
: 5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.
6.7    Reports
: a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
: 1. A narrative summary of (1) reactor operating experience (including experiments performed), (2) changes in facility design, performance PUR-1 Technical Specifications              33                          Amendment No. 15


===6.7 Reports===
characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;
: a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
: 1. A narrative summary of (1) reactor operating experience (including experiments performed), (2) changes in facility design, performance PUR-1 Technical Specifications 33 Amendment No. 15 characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;
: 2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
: 2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
: 3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
: 3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
: 4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
: 4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
: 5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50; 6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge.
: 5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50;
The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent.
: 6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge. The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:
If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:
a) Liquid Waste (summarized on a monthly basis)
a) Liquid Waste (summarized on a monthly basis) i. Radioactivity discharged during the reporting period. I. Total radioactivity released (in Curies), 11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period. ii. Total volume (in gallons) of effluent water (including dilution) during periods of release. b) Airborne Waste (summarized on a monthly basis) i. Radioactivity discharged during the reporting period (in Curies) for: PUR-1 Technical Specifications 34 Amendment No. 15 41 Ar and ' I. 11. Particulates with half-lives greater than eight days. c) Solid Waste i. The total amount of solid waste transferred (in cubic feet), ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site). 7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and 8. A description and summary of any environmental surveys performed outside the facility.
: i. Radioactivity discharged during the reporting period.
: b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows: 1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:
I. Total radioactivity released (in Curies),
a) Violation of safety limit (see TS 6.6.a); b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:
: 11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period.
ii. Total volume (in gallons) of effluent water (including dilution) during periods of release.
b) Airborne Waste (summarized on a monthly basis)
: i. Radioactivity discharged during the reporting period (in Curies) for:
PUR-1 Technical Specifications                   34                           Amendment No. 15
 
41 I. Ar and
: 11. Particulates with half-lives greater than eight days.
c) Solid Waste
: i. The total amount of solid waste transferred (in cubic feet),
ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site).
: 7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and
: 8. A description and summary of any environmental surveys performed outside the facility.
: b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows:
: 1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S.
Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:
a) Violation of safety limit (see TS 6.6.a);
b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:
: i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.
: i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.
ii. Operation in violation of limiting conditions for operation established in the technical specifications.
ii. Operation in violation of limiting conditions for operation established in the technical specifications.
iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications 35 Amendment No. 15 render the reactor safety system incapable of performing its intended safety function.
iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications                   35                             Amendment No. 15
If the malfunction or condition is caused by maintenance, then no report is required.
 
render the reactor safety system incapable of performing its intended safety function. If the malfunction or condition is caused by maintenance, then no report is required.
Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.
Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.
iv. An unanticipated or uncontrolled change in reactivity greater than 0.00611.k/k.
iv. An unanticipated or uncontrolled change in reactivity greater than 0.00611.k/k.
: v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks). vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.
: v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks).
: 2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of: a) Permanent changes in the facility organization involving Level 1 and Level 2; and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report. 6.8 Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows: a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years 1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year), 2. Principal maintenance operations, 3. Reportable occurrences, 4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications 36 Amendment No. 15
vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.
: 5. Reactor facility radiation and contamination surveys where required by applicable regulations, 6. Experiments performed with the reactor, 7. Fuel inventories, receipts, and shipments, 8. Approved changes in operating procedures, and 9. Records of meeting and audit reports of the CORO. b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed. c.. Records to be Retained for the Lifetime of the Reactor Facility 1. Gaseous and liquid radioactive effluents released to the environs, 2. Radiation exposure for all personnel monitored, 3. Drawings of the reactor facility, and 4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.
: 2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of:
PUR-1 Technical Specifications 37 Amendment No. 15}}
a) Permanent changes in the facility organization involving Level 1 and Level 2; and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.
6.8   Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows:
: a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years
: 1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year),
: 2. Principal maintenance operations,
: 3. Reportable occurrences,
: 4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications               36                         Amendment No. 15
: 5. Reactor facility radiation and contamination surveys where required by applicable regulations,
: 6. Experiments performed with the reactor,
: 7. Fuel inventories, receipts, and shipments,
: 8. Approved changes in operating procedures, and
: 9. Records of meeting and audit reports of the CORO.
: b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed.
c.. Records to be Retained for the Lifetime of the Reactor Facility
: 1. Gaseous and liquid radioactive effluents released to the environs,
: 2. Radiation exposure for all personnel monitored,
: 3. Drawings of the reactor facility, and
: 4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.
PUR-1 Technical Specifications             37                             Amendment No. 15}}

Latest revision as of 13:01, 4 February 2020

Submission of License Amendment Request, PUR-1, Docket 50-182-Management Chain Change
ML17241A031
Person / Time
Site: Purdue University
Issue date: 08/28/2017
From: Soon Kim, Miang C, Townsend C
Purdue University Research Reactor
To: Cindy Montgomery
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17241A031 (27)


Text

P lURDUE u l S I T Y SCHOOL OF NUCLEAR ENGINEERING Cindy Montgomery U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 August 28, 2017

SUBJECT:

Submission of License Amendment Request, PUR-1, Docket 50-182-Management Chain Change

Dear Ms. Montgomery,

This leitter is a request to amend the PUR-1 license, Docket 50-182, to change the Organization Chart for Reactor Administration in the PUR-1 Technical Specifications. When reviewing the PUR-I Safety Analysis Report as dated June 30, 2008 (ML111890201) and the PUR-1 Technical Specifications as approved on October 31, 2016 (ML16267 AOOl), the Level 1 designee is not consistent. This License Amendment seeks to rectify the issue and utilize an organizational structure to continue the safe operation of the PUR-1. Following consultation with both the Dean of Engineering and Head of the School of Nuclear Engineering, the Head has been selected as the most appropriate choice for the Level 1 designee. The Head has a greater familiarity with the operation of the facility which will result in a more productive dialogue between the Facility Director and the Head.

NUREG-1537, *P art 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Contact," Section 12.1.1, "Structure," states, in part, "The individual or group with legal responsibility for holding the reactor license ... should be shown at the top of the organization." In compliance with this guidance, the Level 1 designee is listed at the top of the boxed region of Figure 6.1 in the Technical Specifications. To remain as consistent as possible with historic documentation, reporting chain above the Level 1 is also included. Additionally, it is noted that those of higher authority are listed nearer the top of the char~. This is illustrated in Figure 6.1. The proposed change is consistent with the guidance in ANS/ANSI 15.l "The Development of Technical Specifications for Research Reactors" and ANS/ANSI 15.4 "Selection and Training of Persom1el for Research Reactors."

~ \,) tll> (I( School of Nuclear Engineering

,; ~.

  • ,.-...,'f' r. ,G\~,¢1 Nuclear Engineering Building* 400 Central Drive* West Lafayette, IN 47907-2017 (765) 494-5739 *Fax: (765) 494-9570

Presidem


Purdue Cni,*crsiry I

\"ice Presidemfor Pro\'Ost Research I

Radiation Safecy Dean Commincr College of Engineering I

Radiation Safecy Officer H.-arl Xuclea.r Engineering

!RSOJ Level I Lahoraton* Dir.-ctor

, Committee On Reactor I

-- Lcvcl2 Operations lCORO)

Reactor Supel"'isor Lcvcl3 Reactor Operations Staff I

Figure 6.1: Organization Chart for Reactor Administration The current head of the School of Nuclear Engineering is Dr. Seungjin Kim, the Laboratory Director is Dr. Robert Bean, and the Reactor Supervisor is Clive Townsend. The Committee On Reactor Operations will continue to be chaired by the RSO and the Head will appoint its other members, maintaining all prior voting requirements. Dr. Kim received his Ph.D. in Nuclear Engineering in 1999 and has extensive research experience.

The PUR-1 Reactor Operations Staff will respond in a timely manner to any questions or requests for addiltional information the NRC staff may have. The attached Technical Specifications reflect markup changes and the final document. Note that all pages will have Amendment No. 15 listed in the footer. Amendment No. 14 is reserved for other pending licensing action.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

Executed on August 28, 2017.

Sincerely,

~~

Clive Townsend . Chung Miang Dr. Seungjin Kim Reactor Supervisor Dean Head School of Nuclear Engineering College of Engineering School of Nuclear Engineering Purdue University Purdue University Purdue University Attachments: PUR-1 Technical Specifications -Amendment No. 15

6. ADMINISTRATIVE CONTROLS 6.1 Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering. The Dean of the College of RgHleeringThe Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Dean Head for the admiinistration and proper and safe operation of the facility. Figure 6.1 shows the admi11istration chart for the PUR-1. The Committee on Reactor Operations advises the direc1tor of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.

President


Purdue l:ni,*ersiry I

Yice Presidentfor Pro\'OSt:

Research I

Radiation Safety Dean Committee College of Engineering I

Radiation Safe~* Officer Head

--- ------------ ---- ---1 (RSO)

Xuclear Engineering '

Level 1 '

Laboraron* Director Committee On Reactor

.i . ...

Lcvel2 Operations (CORO)

I React:or Supen1sor Lcvel8 I

Reactor Operations Staff PUR-1 Technical Specifications 26 Amendment No. 4615

President r- - - - - - Purdue University I ~

Vice President Provost Purdue University for Research I

~

Dean College of Engineering Radiation Level 1 - - - - - ,

Safety I Committee I I

I Radiation Laboratory Director Committee On Reactor Safety Officer Level2 Operations Reactor Supervisor Level3 I Reactor Operations J

- - - Primarily Administration

- - - Primarily Safety Figure 6.1: Organization Chart for Reactor Administration

a. Structure
1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
2. The Dean Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.
3. Management Levels:

PUR-1 Technical Specifications 27 Amendment No. 4a15

a) Level 1: Dean of the College of Engineering Head of the School of Nuclear Engineering: Responsible for the PUR-1.

b) Level 2: PUR-1 Facility Director: Responsible for reactor facility operation and shall report to Level 1.

c) Level 3: Reactor Supervisor: Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2.

d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees. These individuals shall report to Level 3.

e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down.

4. Committee on Reactor Operations (CORO):

The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1.

b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.

The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO.

c. Staffing
1. The minimum staffing when the reactor is not secured shall be as follows:

a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement. During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; b) During periods of reactor maintenance the two individuals who shall be PUR-1 Technical Specifications 28 Amendment No. ~15

present at the f~cility complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911.

c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility); and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include:

i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director
2. Events requiring the presence at the facility of the senior reactor operator:

a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading of fuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%.

d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the fol'lowing:
1. Responsibility: The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
2. Selection: The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.

6.2 Review and Audit PUR-1 Technical Specifications 29 Amendment No. ~15

a. Committee on Reactor Operations (CORO)

The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro tem. The members are appointed by the Dean of the College of Engineering Head of the School of Nuclear Engineering to serve three year terms.

It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.

b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for:
1. Meeting Frequency: The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
4. Subcommittees: The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and
5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary. It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Dean of the College of EngineeringHead of the School of Nuclear Engineering , within three months.

The CORO shall review and approve the minutes of the previous meetings. A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.

c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications 30 Amendment No. 4315

experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;

2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license;
5. Review of the PUR-1 radiation protection program;
6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
7. Review of operating abnormalities having safety significance;
8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and
9. Review of audit reports.
d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents. Discussions with cognizant personnel and observation of operations should be used also as appropriate. In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures: at least every 12 months (interval between audits not to exceed 15 months);
2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months);
3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications 31 Amendment No. ~15

30 months);

4. The reactor facility emergency plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months); and
5. The reactor facility security plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months).

Deficiencies uncovered that affect reactor safety shall immediately be reported to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management). A written report of the findings of the audit shall be submitted to the Dean of the College of EngineeringHead of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.

e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually. The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.

6.3 Radiation Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 10 CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities."

6.4 Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items:

a. Startup, operation, and shutdown of the reactor;
b. Fuel loading, unloading, and movement within the reactor;
c. Control rod removal or replacement; PUR-1 Technical Specifications 32 Amendment No. 4315
d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety;
e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
g. Implementation of required plans such as emergency or security plans;
h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA);
i. Use, receipt, and transfer of by-product material, if appropriate; and
j. Surveillance procedures for shipping radioactive materials.

6.5 Experiment Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.

a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.

6.6 Required Actions

a. Action to be Taken in the Event of a Safety Limit Violation
1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC;
2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S.

NRC in accordance with Section 6.7.b of these specifications; and PUR-1 Technical Specifications 33 Amendment No. 4615

3. A report shall be prepared which shall include:

a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.

This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor.

b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions. If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO;
4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and
5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.

6.7 Reports

a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
1. A narrative summary of ( 1) reactor operating experience (including PUR-1 Technical Specifications 34 Amendment No. 4315

experiments performed), (2) changes in facility design, performance characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;

2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50;
6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge. The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:

a) Liquid Waste (summarized on a monthly basis)

i. Radioactivity discharged during the reporting period.

I. Total radioactivity released (in Curies),

11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period.

ii. Total volume (in gallons) of effluent water (including dilution) during periods of release.

b) Airborne Waste (summarized on a monthly basis)

i. Radioactivity discharged during the reporting period (in Curies) for:

PUR-1 Technical Specifications 35 Amendment No. 4315

41 I. Ar and

11. Particulates with half-lives greater than eight days.

c) Solid Waste

i. The total amount of solid waste transferred (in cubic feet),

ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site).

7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and
8. A description and summary of any environmental surveys performed outside the facility.
b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows:
1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S.

Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:

a) Violation of safety limit (see TS 6.6.a);

b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:

i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.

ii. Operation in violation of limiting conditions for operation established in the technical specifications.

iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications 36 Amendment No. ~15

render the reactor safety system incapable of performing its intended safety function. If the malfunction or condition is caused by maintenance, then no report is required.

Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.

iv. An unanticipated or uncontrolled change in reactivity greater than 0.006 llk/k.

v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks).

vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.

2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of:

a) Permanent changes in the facility organization involving Level 1 and Level 2;and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.

6.8 Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows:

a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years
1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year),
2. Principal maintenance operations,
3. Reportable occurrences,
4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications 37 Amendment No. ~15
5. Reactor facility radiation and contamination surveys where required by applicable regulations,
6. Experiments performed with the reactor,
7. Fuel inventories, receipts, and shipments,
8. Approved changes in operating procedures, and
9. Records of meeting and audit reports of the CORO.
b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed.
c. Records to be Retained for the Lifetime of the Reactor Facility
1. Gaseous and liquid radioactive effluents released to the environs,
2. Radiation exposure for all personnel monitored,
3. Drawings of the reactor facility, and
4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.

PUR-1 Technical Specifications 38 Amendment No. ~15

6. ADMINISTRATIVE CONTROLS 6.1 Organization The PUR-1 Facility is managed and run by members of the university's College of Engineering, specifically the School of Nuclear Engineering. The Head of the School of Nuclear Engineering shall be the final authority on all PUR-1 matters. The Laboratory Director is responsible to the Head for the administration and proper and safe operation of thei facility. Figure 6.1 shows the administration chart for the PUR-1. The Committee on Reactor Operations advises the director of the PUR-1 on all matters or policy pertaining to safety. The Radiological Safety Officer provides advice concerning personnel and radiological safety and provides technical assistance and review in the area of radiation protection.

President

,- - - -- -- -- -- -- - - -- - ------- Purdue l:"niversity I

Yice Presidentfor Pro\*ost Research I

Radiation Safety Dean Corrunittee College of Engineering I

I Head Radiation Safety Officer Xuclear Engineering

{RSO)

Levell '

I Laboratory Director Corrunittee On Reactor Operations (CORO)

Level2 I

Reactor Supenisor Level3 Reactor Operations Sta.ff Figure 6.1: Organization Chart for Reactor Administration

a. Structure
1. A line management organizational structure provides for personnel who shall administrate and operate the reactor facility.
2. The Head and the Facility Director shall have line management responsibility for adhering to the PUR-1 license and Technical Specifications and for safeguarding the public and facility personnel from undue radiation exposure.

PUR-1 Technical Specifications 26 Amendment No. 15

3. Management Levels:

a) Level 1: Head of the School of Nuclear Engineering: Responsible for the PUR-1.

b) Level 2: PUR-1 Facility Director: Responsible for reactor facility operation and shall report to Level 1.

c) Level 3: Reactor Supervisor: Responsible for the day-to-day operation of the PUR-1 including shift operation and shall report to Level 2.

d) Level 4: Reactor Operating Staff: Licensed reactor operators and senior reactor operators and trainees. These individuals shall report to Level 3.

e) The reporting structure of Figure 6.1 is such that those personnel below shall report up and those personnel listed above may communicate down.

4. Committee on Reactor Operations (CORO):

The CORO shall be responsible to the licensee for providing an independent review and audit of the safety aspects of the PUR-1.

b. Responsibility Responsibility for the safe operation of the reactor facility shall be in accordance with the line organization established in Section 6.1.a. In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.

The reactor facility shall be under the direct control of the Reactor Supervisor, a Senior Reactor Operator, or Reactor Operator (RO). The RO shall be responsible for ensuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, procedures and requirements of the Radiation Safety Officer and the CORO.

c. Staffing
1. The minimum staffing when the reactor is not secured shall be as follows:

a) At least two individuals shall be present at the facility complex and shall consist of at least a licensed reactor operator and a second person capable of calling 911. Unexpected absence for as long as 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to accommodate a personal emergency are acceptable provided immediate action is taken to obtain a replacement. During periods when the reactor is not secured, it shall be under the direct control the of the reactor operator; PUR-1 Technical Specifications 27 Amendment No. 15

b) During periods of reactor maintenance the two individuals who shall be present at the facility complex shall consist of a licensed senior reactor operator and a second individual capable of calling 911.

c) A licensed reactor operator or senior reactor operator shall be in the reactor room; d) A Senior Reactor Operator shall be readily available for emergencies or on call (the individual can be rapidly reached by phone or radio and is within 30 minutes or 15 miles of the reactor facility); and e) A list of reactor facility personnel by name and telephone number shall be readily available for use in the reactor room. The list shall include:

i. Senior Reactor Operator on Call, ii. Radiation Safety Officer iii. Other operations personnel, as deemed by the Facility Director
2. Events requiring the presence at the facility of the senior reactor operator:

a) Initial startup and approach to power, b) A Senior Reactor Operator shall direct any loading or unloading offuel or control rods within the reactor core region, c) A senior reactor operator shall direct the recovery from an unplanned shutdown, unscheduled shutdown, or unplanned power reduction of more than 5%.

d. Selection and Training of Personnel The selection and training of operations personnel shall be in accordance with the following:
1. Responsibility: The Reactor Supervisor is responsible for the selection, training, and requalification of the facility reactor operators and senior reactor operators.
2. Selection: The selection of operations personnel shall be consistent with the standards related to selection in ANSl/ANS-15.4-2007
3. Training Program: The Training Program shall be consistent with the standards related to training in ANSl/ANS-15.4-2007.
4. Requalification Program: The Requalification Program shall be consistent with the standards related to requalification in ANSl/ANS-15.4-2007.

PUR-1 Technical Specifications 28 Amendment No. 15

6.2 Review and Audit

a. Committee on Reactor Operations (CORO)

The CORO shall be comprised of at least 3 voting members knowledgeable in fields which relate to Nuclear Safety. One of these members, the Radiation Safety Officer, will serve as the Chair. If the Chair is unable to attend one or a number of committee meetings, then the Chair may designate a committee member as Chair pro fem. The members are appointed by the Head of the School of Nuclear Engineering to serve three year terms. It is expected that the members will be reappointed each term as long as they are willing to serve so that their experience and familiarity with the past history of the PUR-1 will not be lost to the committee.

b. CORO Charter and Rules The operations of the CORO shall be in accordance with a written charter, including provisions for:
1. Meeting Frequency: The CORO shall meet annually at intervals not to exceed 15 months. (Note: The facility license requires a meeting at least once per year and as frequently as circumstances warrant consistent with effective monitoring of facility activities);
2. Quorum: A quorum shall be comprised of not less than one-half of the voting membership where the operating staff does not constitute a majority;
3. Voting Rules: On matters requiring a vote, if only a quorum is present a unanimous vote of the quorum shall be required; otherwise a majority vote shall be required;
4. Subcommittees: The Chair may appoint subcommittees comprised of members of the CORO to perform certain tasks. Subcommittees or members of the CORO may be authorized to act for the committee; and
5. Meeting Minutes: The Chair shall designate one individual to act as recording secretary. It shall be the responsibility of the secretary to prepare the minutes which shall be distributed to the CORO, including the Head of the School of Nuclear Engineering, within three months. The CORO shall review and approve the minutes of the previous meetings. A complete file of the meeting minutes shall be maintained by the Chair of the CORO and by the Facility Director.
c. CORO Review Function The review responsibilities of the CORO or a designated subcommittee shall include, but are not limited to the following:
1. Review and evaluation of determinations of whether new tests or PUR-1 Technical Specifications 29 Amendment No. 15

experiments and proposed changes to equipment, systems, or procedures can be made under 10 CFR 50.59 or would require a change in Technical Specifications or license conditions;

2. Review of new procedures, major revisions of procedures, and proposed changes in reactor facility equipment or systems which have significant safety impact to reactor operations;
3. Review of new experiments or classes of experiments that could affect reactivity or result in the release of radioactivity;
4. Review of proposed changes to the Technical Specifications and U.S. NRC issued license;
5. Review of the PUR-1 radiation protection program;
6. Review of violations of Technical Specifications, U.S. NRC issued license, and violations of internal procedures or instructions having safety significance;
7. Review of operating abnormalities having safety significance;
8. Review of reportable occurrences listed in Section 6.6.a and 6.6.b of these Technical Specifications; and
9. Review of audit reports.
d. CORO Audit Function The audit function shall include selective (but comprehensive) examination of operating records, logs, and other documents. Discussions with cognizant personnel and observation of operations should be used also as appropriate. In no case shall the individual immediately responsible for an area perform an audit in that area. Audits shall include but are not limited to the following:
1. Facility operations, including radiation protection, for conformance to the Technical Specifications, applicable license conditions, and standard operating procedures: at least every 12 months (interval between audits not to exceed 15 months);
2. The results of action taken to correct those deficiencies that may occur in the reactor facility equipment systems, structures, or methods of operations that affect reactor safety: at least once every 12 months (interval between audits not to exceed 15 months);
3. The retraining and requalification program for the operating staff: at least once every other calendar year (interval between audits not to exceed PUR-1 Technical Specifications 30 Amendment No. 15

30 months);

4. The reactor facility emergency plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months); and
5. The reactor facility security plan and implementing procedures: at least once every other calendar year (interval between audits not to exceed 30 months).

Deficiencies uncovered that affect reactor safety shall immediately be reported to the Head of the School of Nuclear Engineering (Level 1 Management). A written report of the findings of the audit shall be submitted to the Head of the School of Nuclear Engineering (Level 1 Management) and the review and audit group members within 3 months after the audit has been completed.

e. Audit of ALARA Program The Chair of the CORO or designated alternate (excluding anyone whose normal job function is within the operating staff) shall conduct an audit of the reactor facility ALARA program annually. The auditor shall transmit the results of the audit to the CORO at the next scheduled meeting for its review and approval.

6.3 Radiation Safety The Radiation Safety Officer shall be responsible for implementing the radiation safety program for the PUR-1. The requirements of the radiation safety program are established in 10 CFR 20. The Program should use the guidelines of the ANSl/ANS-15.11-1993; R2004, "Radiation Protection at Research Reactor Facilities."

6.4 Procedures Written operating procedures shall be prepared, reviewed, and approved before initiating any of the activities listed in this section. The procedures shall be reviewed and approved by the Facility Director, the CORO, and shall be documented in a timely manner. Procedures shall be adequate to ensure the safe operation of the reactor but shall not preclude the use of independent judgment and action should the situation require such. Operating procedures shall be used for the following items:

a. Startup, operation, and shutdown of the reactor;
b. Fuel loading, unloading, and movement within the reactor;
c. Control rod removal or replacement; PUR-1 Technical Specifications 31 Amendment No. 15
d. Routine maintenance of the control rod, drives and reactor safety and interlock systems or other routine maintenance of major components of systems that could have an effect on reactor safety;
e. Surveillance checks, calibrations, and inspections of reactor instrumentation and controls, control rod drives, area radiation monitors, facility air monitors, the central exhaust system and other systems as required by the Technical Specifications;
f. Administrative controls for operations, maintenance, and conduct of irradiations and experiments, that could affect reactor safety or core reactivity;
g. Implementation of required plans such as emergency or security plans;
h. Radiation protection program to maintain exposures and releases as low as reasonably achievable (ALARA);
i. Use, receipt, and transfer of by-product material, if appropriate; and
j. Surveillance procedures for shipping radioactive materials.

6.5 Experiment Review and Approval Approved experiments shall be carried out in accordance with established and approved procedures.

a. All new experiments or class of experiments shall be reviewed by the CORO as required by TS 6.2.c and implementation approved in writing by the Facility Director or designated alternate.
b. Substantive changes to previously approved experiments shall be made only after review by the CORO and implementation approved in writing by the Facility Director or designated alternate.

6.6 Required Actions

a. Action to be Taken in the Event of a Safety Limit Violation
1. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the U.S. NRC;
2. An immediate notification of the occurrence shall be made to the CORO Chair and the Facility Director, and reports shall be made to the U.S.

NRC in accordance with Section 6. 7 .b of these specifications; and

3. A report shall be prepared which shall include:

PUR-1 Technical Specifications 32 Amendment No. 15

a) Applicable circumstances leading to the violation including, when known, the cause and contributing factors, b) Effect of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public, c) Corrective action to be taken to prevent recurrence.

This report shall be submitted to the CORO for review and then submitted to the U.S. NRC when authorization is sought to resume operation of the reactor.

b. Action to be Taken in the Event of a Reportable Occurrence Other Than A Safety Limit Violation
1. PUR-1 staff shall return the reactor to normal operating via the approved PUR-1 procedure or shut down conditions. If it is necessary to shut down the reactor to correct the occurrence, operations shall not be resumed unless authorized by the Facility Director or a designated alternate;
2. The Facility Director or designated alternate shall be notified and corrective action taken with respect to the operations involved;
3. The Facility Director or designated alternate shall notify the CORO Chair who shall arrange for a review by the CORO;
4. A report shall be made to the CORO which shall include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence; and
5. A report shall be made to the U.S. NRC in accordance with Section 6.7.b of these specifications.

6.7 Reports

a. Annual Operating Report An annual report covering the operation of the reactor facility during the previous calendar year shall be submitted to the NRC before March 31 of each year providing the following information:
1. A narrative summary of (1) reactor operating experience (including experiments performed), (2) changes in facility design, performance PUR-1 Technical Specifications 33 Amendment No. 15

characteristics, and operating procedures related to reactor safety and occurring during the reporting period, and (3) results of surveillance tests and inspections;

2. Tabulation of the energy output of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality;
3. The number of unscheduled shutdowns and inadvertent scrams, including, where applicable corrective action to preclude recurrence;
4. Discussion of the major maintenance operations performed during the period, including the effect, if any, on the safety of the operation of the reactor and the reasons for any corrective maintenance required;
5. A brief description, including a summary of the safety evaluations of changes in the facility or in procedures and of tests and experiments carried out pursuant to Section 50.59 of 10 CFR Part 50;
6. A summary of the nature and amount of radioactive effluents released or discharged to the environs beyond the effective control of the licensee as measured at or before the point of such release or discharge. The summary shall include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25% of the concentration allowed or recommended, a statement to this effect is sufficient:

a) Liquid Waste (summarized on a monthly basis)

i. Radioactivity discharged during the reporting period.

I. Total radioactivity released (in Curies),

11. The effluent concentration used and the isotopic composition if greater than 1 x 10-7 µCi/cc for fission and activation products, Ill. Total radioactivity (in Curies), released by nuclide during the reporting period based on representative isotopic analysis, and IV. Average concentration at point of release (in µCi/cc) during the reporting period.

ii. Total volume (in gallons) of effluent water (including dilution) during periods of release.

b) Airborne Waste (summarized on a monthly basis)

i. Radioactivity discharged during the reporting period (in Curies) for:

PUR-1 Technical Specifications 34 Amendment No. 15

41 I. Ar and

11. Particulates with half-lives greater than eight days.

c) Solid Waste

i. The total amount of solid waste transferred (in cubic feet),

ii. The total activity involved (in Curies), and iii. The dates of shipment and disposition (if shipped off site).

7. A summary of radiation exposures received by facility personnel and visitors, including dates and time where such exposures are greater than 25% of that allowed or recommended; and
8. A description and summary of any environmental surveys performed outside the facility.
b. Special Reports In addition to the requirements of applicable regulations, reports shall be made to the NRC Document Control Desk and special telephone reports of events should be made to the Operations Center as follows:
1. There shall be a report not later than the following working day by telephone and confirmed in writing by fax or similar conveyance to the NRC Headquarters Operation Center, and followed by a written report that describes the circumstances of the event and sent within 14 days to the U.S.

Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC 20555, of any of the following:

a) Violation of safety limit (see TS 6.6.a);

b) Any release of radioactivity from the site above allowed limits; and c) Any of the following:

i. Operation with actual safety system settings for required systems less conservative than the limiting safety system settings specified in the technical specifications.

ii. Operation in violation of limiting conditions for operation established in the technical specifications.

iii. A reactor safety system component malfunction that renders or could PUR-1 Technical Specifications 35 Amendment No. 15

render the reactor safety system incapable of performing its intended safety function. If the malfunction or condition is caused by maintenance, then no report is required.

Note: Where components or systems are provided in addition to those required by the technical specifications, the failure of the extra components or systems is not considered reportable provided that the minimum numbers of components or systems specified or required perform their intended reactor safety function.

iv. An unanticipated or uncontrolled change in reactivity greater than 0.00611.k/k.

v. Abnormal and significant degradation in reactor fuel or cladding, or both, coolant boundary, or confinement boundary (excluding minor leaks).

vi. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused the existence or development of an unsafe condition with regard to reactor operations.

2. A written report within 30 days to the U.S. Nuclear Regulatory Commission, Attn: Document Control Desk, Washington, DC, 20555, of:

a) Permanent changes in the facility organization involving Level 1 and Level 2; and b) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.

6.8 Records Records of facility operations in the form of logs, data sheets, or other suitable forms shall be retained for the period indicated as follows:

a. Records to be Retained for a Period of at Least Five Years or for the Life of the Component Involved if Less Than Five Years
1. Normal reactor facility operation (but not including supporting documents such as checklists, log sheets, etc. which shall be maintained for a period of at least one year),
2. Principal maintenance operations,
3. Reportable occurrences,
4. Surveillance activities required by the Technical Specifications, PUR-1 Technical Specifications 36 Amendment No. 15
5. Reactor facility radiation and contamination surveys where required by applicable regulations,
6. Experiments performed with the reactor,
7. Fuel inventories, receipts, and shipments,
8. Approved changes in operating procedures, and
9. Records of meeting and audit reports of the CORO.
b. Records to be Retained for at Least One Certification Cycle Records of retraining and requalification of licensed operations personnel shall be maintained at all times the individual is employed or until the license is renewed.

c.. Records to be Retained for the Lifetime of the Reactor Facility

1. Gaseous and liquid radioactive effluents released to the environs,
2. Radiation exposure for all personnel monitored,
3. Drawings of the reactor facility, and
4. Reviews and reports pertaining to a violation of the safety limit, the limiting safety system setting, or a limiting condition of operation.

PUR-1 Technical Specifications 37 Amendment No. 15