| issue date = 03/29/1982
| issue date = 03/29/1982
| title = Application to Amend Licenses DPR-58 & DPR-74,changing Tech Specs to Incorporate Editorial & Organizational Changes
| title = Application to Amend Licenses DPR-58 & DPR-74,changing Tech Specs to Incorporate Editorial & Organizational Changes
| author name = HUNTER R S
| author name = Hunter R
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:REGULATORY
{{#Wiki_filter:REGULATORY   ~FORMATION DISTRlBUTION       SY  M  (RIDS)
~FORMATION DISTRlBUTION SYM(RIDS)ACCESSION NBR:8204060050'OC
ACCESSION   NBR:8204060050'OC           ~ DATE: 82/03/29    NOTARIZED:   NO            DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant~ Unit 1> Indiana                    8  05000315 50"316 Donald C ~ Cook Nuclear Power Planti Uni,t 2i Indiana BYNAME                                                                      8  05000316
~DATE:82/03/29NOTARIZED:
  'AUTH                  AUTHOR  AFFILIATION HUNTERiR ~ ST          Indiana  8  Michigan Electric Co.
NODOCKETFACIL:50-315 DonaldC.CookNuclearPowerPlant~Unit1>Indiana80500031550"316DonaldC~CookNuclearPowerPlantiUni,t2iIndiana805000316'AUTHBYNAMEAUTHORAFFILIATION HUNTERiR~STIndiana8MichiganElectricCo..RECIP~NAMERECIPIENT AFFILIATION DENTONIH~REOfficeofNuclearReactorRegula'tioni Director
  .RECIP ~ NAME          RECIPIENT AFFILIATION DENTONIH ~ RE          Office of Nuclear Reactor Regula'tioni Director


==SUBJECT:==
==SUBJECT:==
.Application
.Application )to amend Licenses DPR-58 8 DPR 74ichanging "Tech Specs to incorporate ediitorial 8 organizational changes.
)toamendLicensesDPR-588DPR74ichanging "TechSpecstoincorporate ediitorial 8organizational changes.DISTRIBUTION CODE:A001SCOPIES'RECEIVED:LTR
DISTRIBUTION CODE: A001S COPIES 'RECEIVED:LTR             . ENCL,t, TITLE: General Distribution for after Issuance of, Operating License SIZEe..~   j  5 materially NOTES:I8E:3 copies        all materials                                                "0500031'5 I8E:3 copies all                                                                05000316 RECIPIENT            COPIES      'ECIPIENT                COPIES ID CODE/NAME           LTTR ENCL        ID CODE/NANIE       LT~TR ENCL ORB  0 i BC      01      13    13 INTERNAL! ELD                          1      0    IE              06      1 NRR/DHFS DEPY08                        NRR/DL DIR REG              04 10 1
.ENCL,t,SIZEe..~j5TITLE:GeneralDistribution forafterIssuanceof,Operating LicenseNOTES:I8E:3 copiesallmaterials I8E:3copiesallmaterially "0500031'5 05000316RECIPIENT IDCODE/NAME ORB0iBC01COPIES'ECIPIENT LTTRENCLIDCODE/NANIE 1313COPIESLT~TRENCLINTERNAL!
1, 1
ELDNRR/DHFSDEPY08REG04EXTERNAL:
1 NRR/DS I/RAB RGN3 1
ACRS09NRCPDR02NTI'1011101,110101111IENRR/DLDIRNRR/DSI/RABRGN3LPDRNSIC06-030511111112211cgecu(:A3~a.e'a'37TOTALNUMBEROFCOPIESl<EQUIRED
1 1
~LTTRENCL A111ntn"f'llwiiilffI1ill<'4,1wWIfeaJ(wwwn.c.E'If,W1l,w~WI1~A'IwfPl0~g0'w''w'l'ffNjf''l,t4itww1gl,,l'wflff1n INDIANAIIMICHIGANELECTRICCOMPANYP.O.8OX1880WLINGGREENSTATIONNEWYORK,N.Y.10004March29,1982~AEP:NRC:0659 DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74TECHNICAL SPECIFICATIONS CHANGEREQUESTMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.205556'g9e+~
1 1
1 EXTERNAL: ACRS                09      10    10    LPDR            -03      2    2 NRC PDR          02      1      1    NSIC            05      1    1 NT I'                      1      1 cgecu(:         A 3 ~a.e'a
                                                                  '37 TOTAL NUMBER OF COPIES l<EQUIRED ~ LTTR                  ENCL


==DearMr.Denton:==
A 1
ThisletteranditsAttachments requestseveralchangestotheDonaldC.CookNuclearPlant,UnitNo.1andNo.2AppendixATechnical Specifications.
1 1          n t
Attachment No.1tothislettercontainsthedescription ofthechanges.Attachment No.2containstherevisedTechnical Specification pagesforUnitNo.l.andAttachment No.3containstherevisedTechnical Specification pagesforUnitNo.2.Allchangesareindicated byaverticallineontherighthandsideofthepageinAttachment Nos.2and3.TheproposedTechnical Specification changescontained hereinhavebeenreviewedandapprovedbythePlantNuclearSafetyReviewCommittee (PNSRC).ChangeNo.1hasbeenapprovedbytheAEPSCNuclearSafetyandDesignReviewCommittee (NSDRC)andChangeNos.2,3,and4willbepresented totheNSDRCattheirnextmeeting.g/OFourproposedTechnical Specification revisions arecontained inthissubmittal.
n" f'll w i
ChangeNos.2and3areconsidered tobeClassIIamendments
iil                      ill  <
($1,200.00feeeach).ClassIduplicate feesalsoapplyforthesechanges.ChangeNos.1and4areeditorial innature.Enclosed, therefore, isacheckinthaamountofg3,200.00 forNRCprocessing of~/t+~theaforementioned requests.
f  f I 1
g/gazoo82040b0050 820329PDRADOCK05000315PDR 41~'tk)I),I:}I))ItII'IttItJtloOI'II'tf'<<}~'I',tII<<I''1Wl,'J"tI*)WW',.P'tIJII.J,(')',"'W""'')I}Ij'I}}"jIl<<)WWII<<ttt}Ih1Wt,.It},I}')'TgP/ktjI,'W'i~IIt Mr.HaroldR.DentonAEP:NRC:0659 Thisdocumenthasbeenpreparedfollowing Corporate procedures whichincorporate areasonable setofcontrolstoinsureitsaccuracyandcompleteness priortosignature bytheundersigned.
                                                                                              '4,1  wW W
Verytrulyyours,R.S.HunterVicePresident
0 IfeaJ(ww wn . c. E I 1 Pl
/mdcc:JohnE.Dolan-ColumbusR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffJoeWilliams, Jr.NRCResidentInspector atCookPlant-Bridgman ATTACHMENT NO.1TOAEP:NRC:00659 DESCRIPTION OFPROPOSEDTECHNICAL SPECIFICATION CHANGESFORD.C.COOKUNITNOS~1AND2 ChaneNo.1Unit1;Page3/43-9;Table3.3-1Unit2;Page3/43-8;Table3.3-1,Thischangeiseditorial innature.ForUnitNos.1and2,itisrequested tochangethewords"Turbineimpulsechamberpressure" underDesignation P-7oftheReactorTripSystemInterlocks ofTable3.3-1("ReactorTripSystemInstrumentation"
                                  'If,  W 1  l,      w ~ ~
)tomoreaccurately describethesechannels.
A
ForUnitNo.1,itisrequested thatthesewordsbechangedto"TurbineFirstStagePressure" whichisthecontrolroomnameplate terminology usedforthesechannels.
                                                                'I  wf                        ~
ForUnitNo.2,itisrequested tochangethesewordsto"Pressure BeforetheFirstStage"whichisatechnically accuratedescription ofthesechannels.
g 0'w  ''w'l 'ff jf' N
TheUnitNo.2controlroomnameplate terminology willbechangedtocoincidewiththeproposedwording.Theabovechangeswillresultinaccurateandconsistent Technical Specification andcontrolroomnameplate terminology descriptions of-thesechannels.
                                                                                          'l                      , t 4  it w  w 1 g        l,, l' w
Thesechangeswillnotadversely affectthehealthandsafetyofthegeneralpublic.ChaneNo.2Unit1;Page6-2;Figure6.2-1Unit2;Page6-2;Figure6.2-1Figure6.2-1isthe"OffsiteOrganization forFacilityManagement andTechnical Support".
fl 1
ThisFigurehasbeenrevisedtoincorporate themostrecentoffsiteorganizational management changes.TheproposedchangeswillresultinaFigurewhichmoreaccurately describes ourcurrentorganization.
ff                                              n
Thesechangeswillnotadversely affectthehealthandsafetyofthegeneralpublic.ChaneNo.3Unit1;Page6-3;Figure6.2-2Page6-5;Section6.3Page6-6;Section6.5.1.2Unit2;Page6-3;Figure6.2-2Page6-5;Section6.3Page6-5;Section6.5.1.2Figure6.2-2ofbothUnits'echnical Specifications isthe"Facility Organization" oftheDonaldC.CookNuclearPlant.ThisFigurehasbeenamendedtoshowcurrentpositiontitlesandtheadditionofthefollowing fivesupervisory positions:
 
FireProtection Coordinator ChiefSecuritySupervisor ShiftSecuritySupervisor Environmental Coordinator ShiftTechnical Advisor Threefootnotes havealsobeenaddedtothelegendofthecharttomoreaccurately describethereporting natureoftheQASupervisor andtoindicatetheUnitSupervisor's presentoperating license.Theindicated changeswillmaketheFacilityOrganization chartcurrent.Inaddition, Specification 6.3.2hasbeenaddedunderSpecification 6.3,"Facility StaffQualifications",
INDIANA        II  MICHIGAN ELECTRIC COMPANY P. O. 8OX 18 80 WLING GR E EN STATION NEW YORK, N. Y. 10004 March 29, 1982
ofbothUnits.Specification 6.3.2hasbeenaddedtoaccommodate ournewOperations Superintendent, whodoesnotpresently holdaSeniorReactorOperator's License(SOL).Specification 6.5.1.2,whichidentifies theChairmanandMembersofthePlantNuclearSafetyReviewCommittee (PNSRC),hasbeenamendedtoreflectpresentpositiontitles.Inaddition, theShiftSupervisor andEnvironmental Coordinator havebeenincludedasPNSRCmembers.Thesechangeswillnotadversely affectthehealthandsafetyofthegeneralpublic.ChaneNo.4Unit1;Unit2;Page6-13;Section6.7.1.dPage6-13;Section6.7.1.dSpecification 6.7.l.didentifies to.whomaSafetyLimitViolation Reportshallbesubmitted intheeventaSafetyLimitisviolated.
                                                                  ~
Thischangeiseditorial innatureandservestoreflectthepresentpositiontitleofthepreviousVicePresident,-
AEP:NRC:0659 Donald C. Cook Nuclear Plant Unit Nos.        1  and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 TECHNICAL SPECIFICATIONS CHANGE REQUEST Mr. Harold R. Denton, Director 6'g9e+~
NuclearEngineering.
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Thus,inadditiontotheCommission andtheChairmanoftheNSDRC,aSafetyViolation Reportshallalsobesubmitted totheExecutive VicePresident, Construction andNewYorkEngineering, AEPSC.Thischangewillnotadversely affectthehealthandsafetyofthegeneralpublic.
 
ATTACHMENT NO.2TOAEP:NRC:00659 REVISEDTECHNICAL SPECIFICATION PAGESFORD.C.COOKUNITNO.1}}
==Dear Mr. Denton:==
 
This  letter    and  its Attachments request several changes to the Donald C. Cook Nuclear      Plant, Unit No. 1 and No. 2 Appendix A Technical Specifications. Attachment No. 1 to this letter contains the description of the changes. Attachment No. 2 contains the revised Technical Specification pages for Unit No. l. and Attachment No. 3 contains the revised Technical Specification pages for Unit No. 2. All changes are indicated by a vertical line on the right hand side of the page in Attachment Nos. 2 and 3.
The proposed Technical Specification changes contained herein have been reviewed and approved by the Plant Nuclear Safety Review Committee (PNSRC). Change No. 1 has been approved by the AEPSC Nuclear Safety and Design Review Committee (NSDRC) and Change Nos. 2, 3, and 4 will be presented to the NSDRC at their next meeting.                                     g/
O Four proposed Technical Specification revisions are contained in this submittal.     Change Nos. 2 and 3 are considered to be Class        II amendments ($ 1,200.00 fee each).       Class  I  duplicate fees also apply for these changes. Change Nos. 1 and 4 are editorial in nature.           Enclosed, therefore, is a check in tha amount of g3,200.00 for NRC processing of               ~/t+~
the aforementioned requests.
g/ gazoo 820329 82040b0050 05000315 PDR ADOCK        PDR
 
4 1
                                                                                                  ~
t k
                                                                                                                  ) I I
                                                                                                              ),
:}                             I)
                                                                                                                    )
tl
      }
It I I oO I'I
                                                      'I tt          J It
                                                                              ~
                                                                                'I I'         tf
                                                ,t II                            <<
I'' 1  Wl,'     J     "t                  WW',                 I                                  <<)  W I *                .P
                                                          't
                                                                      }I j 'I} }"  j I J    I I
                    )                  .J, (')',                                             Il
                                                  'W" "''   )
WII        <<ttth } I        Wt,. It}
1
                                                                                                  , I
}
      ')'T  g      P                                              /kt    j                                                  I,'
W'i
                                                                                ~ I I t
 
Mr. Harold R. Denton                                        AEP:NRC:0659 This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, R. S. Hunter Vice President
/md cc: John E. Dolan Columbus R. W. Jurgensen W. G. Smith, Jr. Bridgman R. C. Callen G. Charnoff Joe Williams,   Jr.
NRC  Resident Inspector at Cook Plant  Bridgman
 
ATTACHMENT NO. 1 TO AEP:NRC:00659 DESCRIPTION OF PROPOSED TECHNICAL SPECIFICATION CHANGES FOR D. C. COOK UNIT NOS ~ 1 AND 2
 
Chan e No. 1 Unit 1;   Page 3/4  3-9; Table 3.3-1 Unit 2;   Page 3/4  3-8; Table 3.3-1
      , This change    is editorial in nature. For Unit Nos. 1 and 2, it is requested to change the words "Turbine impulse chamber pressure" under Designation P-7 of the Reactor Trip System Interlocks of Table 3.3-1 ("Reactor Trip System Instrumentation" ) to more accurately describe these channels.       For Unit No. 1, it is requested that these words be changed to "Turbine First Stage Pressure" which is the control room nameplate  terminology used    for  these channels. For Unit No. 2, it is requested to change these words to      "Pressure Before the First Stage" which is a technically accurate description of these channels. The Unit No. 2 control room nameplate terminology will be changed to coincide with the proposed wording. The above changes will result in accurate and consistent    Technical Specification and control room nameplate terminology descriptions of- these channels.          These changes will not adversely affect the health and safety of the general public.
Chan e No. 2 Unit 1;   Page  6-2; Figure 6.2-1 Unit 2;   Page  6-2; Figure 6.2-1 Figure    6.2-1 is the "Offsite Organization for Facility Management  and  Technical Support". This Figure has been revised to incorporate the most recent offsite organizational management changes.
The proposed changes will result in a Figure which more accurately describes our current organization.        These changes will not adversely affect the health and safety of the general public.
Chan e No. 3 Unit 1;   Page  6-3; Figure 6.2-2 Page  6-5; Section 6.3 Page  6-6; Section 6.5.1.2 Unit 2;   Page  6-3; Figure 6.2-2 Page  6-5; Section 6.3 Page  6-5; Section 6.5.1.2 Figure  6.2-2 of both    Units'echnical Specifications is the "Facility Organization" of the        Donald C. Cook Nuclear Plant.       This Figure has been amended to    show current position titles and the addition of the following five supervisory positions:
Fire Protection Coordinator Chief Security Supervisor Shift Security Supervisor Environmental Coordinator Shift Technical Advisor
 
Three footnotes have also been added to the legend of the chart to more accurately describe the reporting nature of the QA Supervisor and to indicate the Unit Supervisor's present operating license.       The indicated changes will make the Facility Organization chart current.
In addition, Specification 6.3.2 has been added under Specification 6.3, "Facility Staff Qualifications", of both Units.
Specification 6.3.2 has been added to accommodate our new Operations Superintendent, who does not presently hold a Senior Reactor Operator's License (SOL).
Specification 6.5.1.2, which identifies the Chairman and Members of the Plant Nuclear Safety Review Committee (PNSRC), has been amended to reflect present position titles. In addition, the Shift Supervisor and Environmental Coordinator have been included as PNSRC members.
These changes  will not adversely affect the health and safety of the general public.
Chan e No. 4 Unit 1;     Page 6-13; Section 6. 7. 1. d Unit 2;    Page 6-13; Section 6.7.1.d Specification 6.7.l.d identifies to .whom a Safety Limit Violation Report shall be submitted in the event a Safety Limit is violated. This change is editorial in nature and serves to reflect the present position title of the previous Vice President,- Nuclear Engineering. Thus, in addition to the Commission and the Chairman of the NSDRC, a Safety Violation Report shall also be submitted to the Executive Vice President, Construction and New York Engineering, AEPSC.
This change will not adversely affect the health and safety of the general public.
 
ATTACHMENT NO. 2 TO AEP:NRC:00659 REVISED TECHNICAL SPECIFICATION PAGES FOR D.C. COOK UNIT NO. 1}}

Latest revision as of 02:49, 4 February 2020

Application to Amend Licenses DPR-58 & DPR-74,changing Tech Specs to Incorporate Editorial & Organizational Changes
ML17319B256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/29/1982
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17319B257 List:
References
AEP:NRC:0659, AEP:NRC:659, NUDOCS 8204060050
Download: ML17319B256 (9)


Text

REGULATORY ~FORMATION DISTRlBUTION SY M (RIDS)

ACCESSION NBR:8204060050'OC ~ DATE: 82/03/29 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant~ Unit 1> Indiana 8 05000315 50"316 Donald C ~ Cook Nuclear Power Planti Uni,t 2i Indiana BYNAME 8 05000316

'AUTH AUTHOR AFFILIATION HUNTERiR ~ ST Indiana 8 Michigan Electric Co.

.RECIP ~ NAME RECIPIENT AFFILIATION DENTONIH ~ RE Office of Nuclear Reactor Regula'tioni Director

SUBJECT:

.Application )to amend Licenses DPR-58 8 DPR 74ichanging "Tech Specs to incorporate ediitorial 8 organizational changes.

DISTRIBUTION CODE: A001S COPIES 'RECEIVED:LTR . ENCL,t, TITLE: General Distribution for after Issuance of, Operating License SIZEe..~ j 5 materially NOTES:I8E:3 copies all materials "0500031'5 I8E:3 copies all 05000316 RECIPIENT COPIES 'ECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NANIE LT~TR ENCL ORB 0 i BC 01 13 13 INTERNAL! ELD 1 0 IE 06 1 NRR/DHFS DEPY08 NRR/DL DIR REG 04 10 1

1, 1

1 NRR/DS I/RAB RGN3 1

1 1

1 1

1 EXTERNAL: ACRS 09 10 10 LPDR -03 2 2 NRC PDR 02 1 1 NSIC 05 1 1 NT I' 1 1 cgecu(: A 3 ~a.e'a

'37 TOTAL NUMBER OF COPIES l<EQUIRED ~ LTTR ENCL

A 1

1 1 n t

n" f'll w i

iil ill <

f f I 1

'4,1 wW W

0 IfeaJ(ww wn . c. E I 1 Pl

'If, W 1 l, w ~ ~

A

'I wf ~

g 0'w w'l 'ff jf' N

'l , t 4 it w w 1 g l,, l' w

fl 1

ff n

INDIANA II MICHIGAN ELECTRIC COMPANY P. O. 8OX 18 80 WLING GR E EN STATION NEW YORK, N. Y. 10004 March 29, 1982

~

AEP:NRC:0659 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 TECHNICAL SPECIFICATIONS CHANGE REQUEST Mr. Harold R. Denton, Director 6'g9e+~

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

This letter and its Attachments request several changes to the Donald C. Cook Nuclear Plant, Unit No. 1 and No. 2 Appendix A Technical Specifications. Attachment No. 1 to this letter contains the description of the changes. Attachment No. 2 contains the revised Technical Specification pages for Unit No. l. and Attachment No. 3 contains the revised Technical Specification pages for Unit No. 2. All changes are indicated by a vertical line on the right hand side of the page in Attachment Nos. 2 and 3.

The proposed Technical Specification changes contained herein have been reviewed and approved by the Plant Nuclear Safety Review Committee (PNSRC). Change No. 1 has been approved by the AEPSC Nuclear Safety and Design Review Committee (NSDRC) and Change Nos. 2, 3, and 4 will be presented to the NSDRC at their next meeting. g/

O Four proposed Technical Specification revisions are contained in this submittal. Change Nos. 2 and 3 are considered to be Class II amendments ($ 1,200.00 fee each). Class I duplicate fees also apply for these changes. Change Nos. 1 and 4 are editorial in nature. Enclosed, therefore, is a check in tha amount of g3,200.00 for NRC processing of ~/t+~

the aforementioned requests.

g/ gazoo 820329 82040b0050 05000315 PDR ADOCK PDR

4 1

~

t k

) I I

),

} I)

)

tl

}

It I I oO I'I

'I tt J It

~

'I I' tf

,t II <<

I 1 Wl,' J "t WW', I <<) W I * .P

't

}I j 'I} }" j I J I I

) .J, (')', Il

'W" " )

WII <<ttth } I Wt,. It}

1

, I

}

')'T g P /kt j I,'

W'i

~ I I t

Mr. Harold R. Denton AEP:NRC:0659 This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, R. S. Hunter Vice President

/md cc: John E. Dolan Columbus R. W. Jurgensen W. G. Smith, Jr. Bridgman R. C. Callen G. Charnoff Joe Williams, Jr.

NRC Resident Inspector at Cook Plant Bridgman

ATTACHMENT NO. 1 TO AEP:NRC:00659 DESCRIPTION OF PROPOSED TECHNICAL SPECIFICATION CHANGES FOR D. C. COOK UNIT NOS ~ 1 AND 2

Chan e No. 1 Unit 1; Page 3/4 3-9; Table 3.3-1 Unit 2; Page 3/4 3-8; Table 3.3-1

, This change is editorial in nature. For Unit Nos. 1 and 2, it is requested to change the words "Turbine impulse chamber pressure" under Designation P-7 of the Reactor Trip System Interlocks of Table 3.3-1 ("Reactor Trip System Instrumentation" ) to more accurately describe these channels. For Unit No. 1, it is requested that these words be changed to "Turbine First Stage Pressure" which is the control room nameplate terminology used for these channels. For Unit No. 2, it is requested to change these words to "Pressure Before the First Stage" which is a technically accurate description of these channels. The Unit No. 2 control room nameplate terminology will be changed to coincide with the proposed wording. The above changes will result in accurate and consistent Technical Specification and control room nameplate terminology descriptions of- these channels. These changes will not adversely affect the health and safety of the general public.

Chan e No. 2 Unit 1; Page 6-2; Figure 6.2-1 Unit 2; Page 6-2; Figure 6.2-1 Figure 6.2-1 is the "Offsite Organization for Facility Management and Technical Support". This Figure has been revised to incorporate the most recent offsite organizational management changes.

The proposed changes will result in a Figure which more accurately describes our current organization. These changes will not adversely affect the health and safety of the general public.

Chan e No. 3 Unit 1; Page 6-3; Figure 6.2-2 Page 6-5; Section 6.3 Page 6-6; Section 6.5.1.2 Unit 2; Page 6-3; Figure 6.2-2 Page 6-5; Section 6.3 Page 6-5; Section 6.5.1.2 Figure 6.2-2 of both Units'echnical Specifications is the "Facility Organization" of the Donald C. Cook Nuclear Plant. This Figure has been amended to show current position titles and the addition of the following five supervisory positions:

Fire Protection Coordinator Chief Security Supervisor Shift Security Supervisor Environmental Coordinator Shift Technical Advisor

Three footnotes have also been added to the legend of the chart to more accurately describe the reporting nature of the QA Supervisor and to indicate the Unit Supervisor's present operating license. The indicated changes will make the Facility Organization chart current.

In addition, Specification 6.3.2 has been added under Specification 6.3, "Facility Staff Qualifications", of both Units.

Specification 6.3.2 has been added to accommodate our new Operations Superintendent, who does not presently hold a Senior Reactor Operator's License (SOL).

Specification 6.5.1.2, which identifies the Chairman and Members of the Plant Nuclear Safety Review Committee (PNSRC), has been amended to reflect present position titles. In addition, the Shift Supervisor and Environmental Coordinator have been included as PNSRC members.

These changes will not adversely affect the health and safety of the general public.

Chan e No. 4 Unit 1; Page 6-13; Section 6. 7. 1. d Unit 2; Page 6-13; Section 6.7.1.d Specification 6.7.l.d identifies to .whom a Safety Limit Violation Report shall be submitted in the event a Safety Limit is violated. This change is editorial in nature and serves to reflect the present position title of the previous Vice President,- Nuclear Engineering. Thus, in addition to the Commission and the Chairman of the NSDRC, a Safety Violation Report shall also be submitted to the Executive Vice President, Construction and New York Engineering, AEPSC.

This change will not adversely affect the health and safety of the general public.

ATTACHMENT NO. 2 TO AEP:NRC:00659 REVISED TECHNICAL SPECIFICATION PAGES FOR D.C. COOK UNIT NO. 1