ML18101A631: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/31/1995 | | issue date = 03/31/1995 | ||
| title = Monthly Operating Rept for Mar 1995 for Salem Unit 2.W/ 950413 Ltr | | title = Monthly Operating Rept for Mar 1995 for Salem Unit 2.W/ 950413 Ltr | ||
| author name = | | author name = Phillips R, Summers J | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:\ ' I | {{#Wiki_filter:\ e PS~G | ||
.... | ' I Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit April 13, 1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of March are being sent to you. | ||
DAILY UNIT POWER | J:O~ | ||
339-2735 Month March 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 921 2 0 18 849 3 0 19 518 4 0 20 655 5 0 21 1030 6 0 22 1018 7 0 23 664 8 0 24 453 9 153 25 447 10 706 26 456 11 778 27 496 12 938 28 446 13 936 29 446 14 865 30 446 15 928 31 446 16 962 P. 8.1-7 Rl | John C. Summers General Manager - | ||
... OPERATING DATA REPORT Docket No: Date: Completed by: Robert Phillips Telephone: | Salem Operations RH:vls Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 1<:::-rr,.~0 Ji u 1,~ li ':+/- {ff 9504180017 950331 ) | ||
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period March 1995 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capacity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical | .PDR *ADOCK 05000311 R PDR ! | ||
The power is in your hands. | |||
95-2168 REV. 6/94 | |||
.. .... ~ERAGE DAILY UNIT POWER LE~ | |||
Docket No.: 50-311 Unit Name: Salem #2 Date: 04-10-95 Completed by: Robert Phillips Telephone: 339-2735 Month March 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 921 2 0 18 849 3 0 19 518 4 0 20 655 5 0 21 1030 6 0 22 1018 7 0 23 664 8 0 24 453 9 153 25 447 10 706 26 456 11 778 27 496 12 938 28 446 13 936 29 446 14 865 30 446 15 928 31 446 16 962 P. 8.1-7 Rl | |||
HB 3 Method: 1- | ... OPERATING DATA REPORT Docket No: 50-311 Date: 04/10/95 Completed by: Robert Phillips Telephone: 339-2735 Operating Status | ||
H-Other (Explain) | : 1. Unit Name Salem No. 2 Notes | ||
: 2. Reporting Period March 1995 | |||
609-339- | : 3. Licensed Thermal Power (MWt) 3411 | ||
: 4. Nameplate Rating (Gross MWe) 1170 | |||
: 5. Design Electrical Rating (Net MWe) 1115 | |||
: 6. Maximum Dependable Capacity(Gross MWe) 1149 | |||
: 7. Maximum Dependable Capacity (Net MWe) 1106 | |||
: 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA | |||
: 9. Power Level to Which Restricted, if any (Net MWe) N/A | |||
: 10. Reasons for Restrictions, if any NA This Month Year to Date Cumulative | |||
: 11. Hours in Reporting Period 744 2160 118033 | |||
: 12. No. of Hrs. Rx. was Critical 572.4 838.4 76453.6 | |||
: 13. Reactor Reserve Shutdown Hrs. 0 0 0 | |||
: 14. Hours Generator On-Line 542.4 631. 6 73599.6 | |||
: 15. Unit Reserve Shutdown Hours 0 0 0 | |||
: 16. Gross Thermal Energy Generated (MWH) 1275559.2 1412445.6 182386229.8 Gross Elec. Energy Generated (MWH) 396480 426830 76876838 | |||
: 18. Net Elec. Energy Gen. (MWH) 369001 363224 73086768 | |||
: 19. Unit Service Factor 72.9 29.2 62.4 | |||
: 20. Unit Availability Factor 72.9 29.2 62.4 | |||
: 21. Unit Capacity Factor (using MDC Net) 44.8 15.2 56.0 | |||
. | : 22. Unit Capacity Factor (using DER Net) 44.5 15.1 55.5 | ||
: 23. Unit Forced Outage Rate 27.1 53.0 22.2 | |||
: 24. Shutdowns scheduled over next 6 months (type, date and duration of each) | |||
The | None. | ||
: 25. If shutdown at end of Report Period, Estimated Date of Startup: | |||
N A. | |||
8-1-7.R2 | |||
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO: 50-3 ll " | |||
REPORT MONTH MARCH 1995 UNIT NAME: Salem #.2' DATE: 4-10-95 COMPLETED BY: Robert Phillips TELEPHONE: 609-339-2]35 METHOD OF SHUTTING LICENSE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTIQN NO. DATE TYPE 1 (HOURS) REASON 2 REACTOR REPORT # CODE4 CODE 6 TO PREVENT RECURRENCE 2371 3-1-95 F 201.5 A 4 ------------ CB PUMPXX NUCLEAR REACTOR.COOLANT SEAL 2476 3-11-95 F 10 B 5 ------------ HH PUMP XX FEEDWATER HEATER DRAIN PUMPS 2425 3-16-95 F 19 B 5 ------------ HF PUMPXX CIRCULATING WATER PUMPS 2492 3-18-95 F 19.6 F 5 ------------ zz zzzzzz MARSH FIRE UNDER 5015 LINE 2433 3-19-95 F 34.1 B 5 ------------ HB PUMPXX NUCLEAR STEAM GEN. FEEDPUMP # 22 2439 3-23-95 F 209.8 B 5 ------------ HB PUMPXX NUCLEAR STEAM GEN. FEEDPUMPS # 21 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-continuation of CNUREG-0161) | |||
E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther - | |||
* H-Other (Explain) | |||
IOCFR50.59 EVALUATIONS DOCKET NO:,;,,: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM2 DATE: 04/10/95 COMPLETED BY:* R.HELLER TELEPHONE: 609-339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations IOCFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations. | |||
I. Design Change Packages (DCP) 2EE-0088, Pkg. I ''No. 22 Charging Safety Injection Pump Inboard Mechanical Seal Housing Replacement" Rev. 0 - This DCP entails the replacement of a leaking inboard mechanical seal assembly and seal housing on No. 22 Charging Safety Injection (C/SI) pump. The seal housing of the new replacement mechanical seal assembly, which is a later design, does not have jacket water cooling connections or a design requirement for these cooling connections. As noted in a Dresser Pacific (pump manufacturer) letter dated 8/24/84, the later design seal housings were revised to eliminate the cooling water jackets in 1976 and all pumps manufactured since have no seal housing water jackets. At this time, the proposed change to 22 C/SI pump will not change the outboard mechanical seal which still has active connections for cooling the seal housing. The operability and reliability of the C/SI pump is not affected by the installation of the replacement seal assembly. The acceptance criteria for the design basis accidents continues to be met and the margin of safety as defined in the Technical Specifications is unchanged. (SORC 95-025) 2EC-3352, Pkg. I "Waste Gas Setpoint Modification" Rev. 0 - This DCP changes the waste gas setpoints* to vendor recommended values. The overall task of this DCP is to implement the necessary setpoint and piping changes to allow stable continuous Waste Gas Compressor operation with full recirculation capability. All plant modifications for this DCP are confined to recalibration of selected Waste Gas instrumentation and rerouting of existing compressor recirculation piping. There are no additional failure modes | |||
10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM 2 DATE: 04/10/95 COMPLETED BY: R.HELLER TELEPHONE: 609-339-5162 introduced by this modification. The Waste Gas System setpoints, compressor recirculation line, compressor output capacity and WGDT storage volume, which are changed by this DCP, are not specifically addressed in the Technical Specifications. There is no reduction in the margin of safety as defined in the bases for any Technical Specification. | |||
(SORC 95-028) 2EC-3303, Pkg. 1 "Circulating Water Bearing Lubrication Screen Wash Setpoint & System Changes" Rev. 0 - Rev. 0 - The plant modifications to be accomplished under this DCP include: | |||
: 1) recalibration of header pressures and flows of the Circulating Bearing Lubrication system and the Screen Wash system, 2) Lubrication Pump and Screen Wash Pump strainer control changed from timed to continuous, 3) replacement of the lubrication water and screen wash pressure gages, and, 4) replacement of control valves with manual valves to simplify the system. The affected components do not change in regard to their function. No new failure modes will be introduced by these modifications. | |||
There is no reduction in the margin of safety as defined in the basis for any Technical; Specification. (SORC 95-032) | |||
: 2. Temporary Modifications (T-Mods) 95-022 "Boric Acid Evaporator Level Transmitter Replacement" Rev. 0 - The T-Mod will replace the level transmitter with one that does not have a sealed reference leg. The modified instrument and process sensing line will have a configuration like the 1LT3 l 5 on the Unit 1 Boric Acid Evaporator {BAE). The tubing that will now contain process fluid will be heat-traced to prevent crystallization of the boric acid, ensuring that the line does not get clogged thus rendering the instrument inoperable. The tubing for this part of the BAE is Schedule SP33C, which is non-safety related, non-nuclear, and seismic III. The operation and | |||
.1.. | |||
. 10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM 2 DATE: 04/10/95 COMPLETED BY: R. HELLER TELEPHONE: 609-339-5162 control of the BAE will not be changed because of this temporary modification. No procedure changes are required. The BAE is non-safety related equipment. Neither the BAE or any associated equipment is addressed any Technical Specifications or their bases. In addition, there is no credible way in which the PASS would be affected by this*T-Mod. Thus the margin of safety is unaffected. | |||
(SORC 95-027) | |||
: 3. Safety Evaluations (S/E) | |||
S-2-SW-MSE-0848 "Salem Unit 2 Service Water Pump Fastener Material" Rev. 0 - This S/E addresses concerns pertaining to fasteners used on four Salem Unit 2 Service Water (SW) pumps. The conditions became apparent through Problem Report No. | |||
950119152 which described the potential for Service Water pumps having stainless steel (SS) fasteners in place of the Monel fasteners originally supplied in the pumps. The fasteners have been found to be acceptable for short term use, as discussed in this evaluation. Therefore, the condition does not reduce the margin of safety as defined in the basis for any Technical Specification. Being that the design integrity of the four applicable SW pumps is maintained and the remaining two pumps have the correct fasteners, operability of the six SW pumps is not affected by this condition. (SORC 95-031) | |||
REFUELING INFORMATION DOCKET NO: | |||
* 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM2 DATE: 04/10/95 COl'vIPLETED BY: R. HELLER TELEPHONE: 609-339-5162 MONTH: MARCH 1995 | |||
: 1. Refueling information has changed from last month: YES~=NO X | |||
: 2. Scheduled date for next refueling: April 6. 1996 Scheduled date for restart following refueling: June 5. 1996 | |||
: 3. a. Will Technical Specification changes or other license amendments be required? | |||
YES~NO NOT DETERMINED TO DATE X | |||
: b. Has the reload fuel design been reviewed by the Station Operating Review Committee? | |||
YES NO X If no, when is it scheduled? April 1996 | |||
: 5. Scheduled date(s) for submitting proposed licensing action: ---~NIA.____ | |||
: 6. Important licensing considerations associated with refueling: | |||
: 7. Number of Fuel Assemblies: | : 7. Number of Fuel Assemblies: | ||
: a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity: | : a. Incore _193 _ _ | ||
Future spent fuel storage capacity: | : b. In Spent Fuel Storage _556_ _ | ||
: 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | : 8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632 | ||
8-1-7.R4 | : 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2012 8-1-7.R4 | ||
SALEM GENERATING STATION MONTHLY OPERATING | |||
==SUMMARY== | ==SUMMARY== | ||
-UNIT 2 MARCH 1995 SALEM UNIT NO. 2 The Unit began the period shutdown while No. 21 Reactor Coolant Pump seal replacement was in progress. | - UNIT 2 MARCH 1995 SALEM UNIT NO. 2 The Unit began the period shutdown while No. 21 Reactor Coolant Pump seal replacement was in progress. The repairs were completed and the Unit was synchronized to the grid on 03/09/95. On 03/10/95, the power escalation was held at 81% to perform scheduled post outage testing. In addition, Nos. 22 & 23 Heater Drain Pumps (HDP) were out of service for repairs, delaying power escalation. Repairs to No. 23 HDP were completed and power was increased to 95% on 03/12/95. No. 22 HDP was returned to service and power was increased to 95% on 03/15/95. On 03/16/95, power was reduced to 77% due to the influx of grass and problems with the circulating water pump screens. | ||
The repairs were completed and the Unit was synchronized to the grid on 03/09/95. | On 03/18/95, power was administratively limited due to a meadow fire underneath the Keeney Line. The line had been removed from service and required a load reduction due to system loading restrictions. Power was increased to 96% on 03/19/95, and held at 96% | ||
On 03/10/95, the power escalation was held at 81% to perform scheduled post outage testing. In addition, Nos. 22 & 23 Heater Drain Pumps (HDP) were out of service for repairs, delaying power escalation. | to collect state point data. On 03/19/95, power was reduced to investigate problems with No. 22 Steam Generator Feed Pump (SGFP) controls. The Unit was returned to 96% | ||
Repairs to No. 23 HDP were completed and power was increased to 95% on 03/12/95. | power on 03/21/95, however, No. 21 SGFP speed oscillations occurred and power was reduced to 50% on 03/23/95. The Unit continued to operate at 50% power throughout the remainder of the period, while the investigation into the SGFP control problems continued.}} | ||
No. 22 HDP was returned to service and power was increased to 95% on 03/15/95. | |||
On 03/16/95, power was reduced to 77% due to the influx of grass and problems with the circulating water pump screens. On 03/18/95, power was administratively limited due to a meadow fire underneath the Keeney Line. The line had been removed from service and required a load reduction due to system loading restrictions. | |||
Power was increased to 96% on 03/19/95, and held at 96% to collect state point data. On 03/19/95, power was reduced to investigate problems with No. 22 Steam Generator Feed Pump (SGFP) controls. | |||
The Unit was returned to 96% power on 03/21/95, however, No. 21 SGFP speed oscillations occurred and power was reduced to 50% on 03/23/95. | |||
The Unit continued to operate at 50% power throughout the remainder of the period, while the investigation into the SGFP control problems continued.}} |
Latest revision as of 05:45, 3 February 2020
ML18101A631 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 03/31/1995 |
From: | Phillips R, Summers J Public Service Enterprise Group |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9504180017 | |
Download: ML18101A631 (9) | |
Text
\ e PS~G
' I Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit April 13, 1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of March are being sent to you.
J:O~
John C. Summers General Manager -
Salem Operations RH:vls Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 1<:::-rr,.~0 Ji u 1,~ li ':+/- {ff 9504180017 950331 )
The power is in your hands.
95-2168 REV. 6/94
.. .... ~ERAGE DAILY UNIT POWER LE~
Docket No.: 50-311 Unit Name: Salem #2 Date: 04-10-95 Completed by: Robert Phillips Telephone: 339-2735 Month March 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 921 2 0 18 849 3 0 19 518 4 0 20 655 5 0 21 1030 6 0 22 1018 7 0 23 664 8 0 24 453 9 153 25 447 10 706 26 456 11 778 27 496 12 938 28 446 13 936 29 446 14 865 30 446 15 928 31 446 16 962 P. 8.1-7 Rl
... OPERATING DATA REPORT Docket No: 50-311 Date: 04/10/95 Completed by: Robert Phillips Telephone: 339-2735 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period March 1995
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity(Gross MWe) 1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any NA This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 2160 118033
- 12. No. of Hrs. Rx. was Critical 572.4 838.4 76453.6
- 13. Reactor Reserve Shutdown Hrs. 0 0 0
- 14. Hours Generator On-Line 542.4 631. 6 73599.6
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1275559.2 1412445.6 182386229.8 Gross Elec. Energy Generated (MWH) 396480 426830 76876838
- 18. Net Elec. Energy Gen. (MWH) 369001 363224 73086768
- 19. Unit Service Factor 72.9 29.2 62.4
- 20. Unit Availability Factor 72.9 29.2 62.4
- 21. Unit Capacity Factor (using MDC Net) 44.8 15.2 56.0
- 22. Unit Capacity Factor (using DER Net) 44.5 15.1 55.5
- 23. Unit Forced Outage Rate 27.1 53.0 22.2
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
None.
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N A.
8-1-7.R2
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO: 50-3 ll "
REPORT MONTH MARCH 1995 UNIT NAME: Salem #.2' DATE: 4-10-95 COMPLETED BY: Robert Phillips TELEPHONE: 609-339-2]35 METHOD OF SHUTTING LICENSE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTIQN NO. DATE TYPE 1 (HOURS) REASON 2 REACTOR REPORT # CODE4 CODE 6 TO PREVENT RECURRENCE 2371 3-1-95 F 201.5 A 4 ------------ CB PUMPXX NUCLEAR REACTOR.COOLANT SEAL 2476 3-11-95 F 10 B 5 ------------ HH PUMP XX FEEDWATER HEATER DRAIN PUMPS 2425 3-16-95 F 19 B 5 ------------ HF PUMPXX CIRCULATING WATER PUMPS 2492 3-18-95 F 19.6 F 5 ------------ zz zzzzzz MARSH FIRE UNDER 5015 LINE 2433 3-19-95 F 34.1 B 5 ------------ HB PUMPXX NUCLEAR STEAM GEN. FEEDPUMP # 22 2439 3-23-95 F 209.8 B 5 ------------ HB PUMPXX NUCLEAR STEAM GEN. FEEDPUMPS # 21 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-continuation of CNUREG-0161)
E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther -
- H-Other (Explain)
IOCFR50.59 EVALUATIONS DOCKET NO:,;,,: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM2 DATE: 04/10/95 COMPLETED BY:* R.HELLER TELEPHONE: 609-339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations IOCFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.
I. Design Change Packages (DCP) 2EE-0088, Pkg. I No. 22 Charging Safety Injection Pump Inboard Mechanical Seal Housing Replacement" Rev. 0 - This DCP entails the replacement of a leaking inboard mechanical seal assembly and seal housing on No. 22 Charging Safety Injection (C/SI) pump. The seal housing of the new replacement mechanical seal assembly, which is a later design, does not have jacket water cooling connections or a design requirement for these cooling connections. As noted in a Dresser Pacific (pump manufacturer) letter dated 8/24/84, the later design seal housings were revised to eliminate the cooling water jackets in 1976 and all pumps manufactured since have no seal housing water jackets. At this time, the proposed change to 22 C/SI pump will not change the outboard mechanical seal which still has active connections for cooling the seal housing. The operability and reliability of the C/SI pump is not affected by the installation of the replacement seal assembly. The acceptance criteria for the design basis accidents continues to be met and the margin of safety as defined in the Technical Specifications is unchanged. (SORC 95-025) 2EC-3352, Pkg. I "Waste Gas Setpoint Modification" Rev. 0 - This DCP changes the waste gas setpoints* to vendor recommended values. The overall task of this DCP is to implement the necessary setpoint and piping changes to allow stable continuous Waste Gas Compressor operation with full recirculation capability. All plant modifications for this DCP are confined to recalibration of selected Waste Gas instrumentation and rerouting of existing compressor recirculation piping. There are no additional failure modes
10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM 2 DATE: 04/10/95 COMPLETED BY: R.HELLER TELEPHONE: 609-339-5162 introduced by this modification. The Waste Gas System setpoints, compressor recirculation line, compressor output capacity and WGDT storage volume, which are changed by this DCP, are not specifically addressed in the Technical Specifications. There is no reduction in the margin of safety as defined in the bases for any Technical Specification.
(SORC 95-028) 2EC-3303, Pkg. 1 "Circulating Water Bearing Lubrication Screen Wash Setpoint & System Changes" Rev. 0 - Rev. 0 - The plant modifications to be accomplished under this DCP include:
- 1) recalibration of header pressures and flows of the Circulating Bearing Lubrication system and the Screen Wash system, 2) Lubrication Pump and Screen Wash Pump strainer control changed from timed to continuous, 3) replacement of the lubrication water and screen wash pressure gages, and, 4) replacement of control valves with manual valves to simplify the system. The affected components do not change in regard to their function. No new failure modes will be introduced by these modifications.
There is no reduction in the margin of safety as defined in the basis for any Technical; Specification. (SORC 95-032)
- 2. Temporary Modifications (T-Mods)95-022 "Boric Acid Evaporator Level Transmitter Replacement" Rev. 0 - The T-Mod will replace the level transmitter with one that does not have a sealed reference leg. The modified instrument and process sensing line will have a configuration like the 1LT3 l 5 on the Unit 1 Boric Acid Evaporator {BAE). The tubing that will now contain process fluid will be heat-traced to prevent crystallization of the boric acid, ensuring that the line does not get clogged thus rendering the instrument inoperable. The tubing for this part of the BAE is Schedule SP33C, which is non-safety related, non-nuclear, and seismic III. The operation and
.1..
. 10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM 2 DATE: 04/10/95 COMPLETED BY: R. HELLER TELEPHONE: 609-339-5162 control of the BAE will not be changed because of this temporary modification. No procedure changes are required. The BAE is non-safety related equipment. Neither the BAE or any associated equipment is addressed any Technical Specifications or their bases. In addition, there is no credible way in which the PASS would be affected by this*T-Mod. Thus the margin of safety is unaffected.
(SORC 95-027)
- 3. Safety Evaluations (S/E)
S-2-SW-MSE-0848 "Salem Unit 2 Service Water Pump Fastener Material" Rev. 0 - This S/E addresses concerns pertaining to fasteners used on four Salem Unit 2 Service Water (SW) pumps. The conditions became apparent through Problem Report No.
950119152 which described the potential for Service Water pumps having stainless steel (SS) fasteners in place of the Monel fasteners originally supplied in the pumps. The fasteners have been found to be acceptable for short term use, as discussed in this evaluation. Therefore, the condition does not reduce the margin of safety as defined in the basis for any Technical Specification. Being that the design integrity of the four applicable SW pumps is maintained and the remaining two pumps have the correct fasteners, operability of the six SW pumps is not affected by this condition. (SORC 95-031)
REFUELING INFORMATION DOCKET NO:
- 50-311 MONTH: MARCH 1995 UNIT NAME: SALEM2 DATE: 04/10/95 COl'vIPLETED BY: R. HELLER TELEPHONE: 609-339-5162 MONTH: MARCH 1995
- 1. Refueling information has changed from last month: YES~=NO X
- 2. Scheduled date for next refueling: April 6. 1996 Scheduled date for restart following refueling: June 5. 1996
- 3. a. Will Technical Specification changes or other license amendments be required?
YES~NO NOT DETERMINED TO DATE X
- b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X If no, when is it scheduled? April 1996
- 5. Scheduled date(s) for submitting proposed licensing action: ---~NIA.____
- 6. Important licensing considerations associated with refueling:
- 7. Number of Fuel Assemblies:
- a. Incore _193 _ _
- b. In Spent Fuel Storage _556_ _
- 8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632
- 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2012 8-1-7.R4
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT 2 MARCH 1995 SALEM UNIT NO. 2 The Unit began the period shutdown while No. 21 Reactor Coolant Pump seal replacement was in progress. The repairs were completed and the Unit was synchronized to the grid on 03/09/95. On 03/10/95, the power escalation was held at 81% to perform scheduled post outage testing. In addition, Nos. 22 & 23 Heater Drain Pumps (HDP) were out of service for repairs, delaying power escalation. Repairs to No. 23 HDP were completed and power was increased to 95% on 03/12/95. No. 22 HDP was returned to service and power was increased to 95% on 03/15/95. On 03/16/95, power was reduced to 77% due to the influx of grass and problems with the circulating water pump screens.
On 03/18/95, power was administratively limited due to a meadow fire underneath the Keeney Line. The line had been removed from service and required a load reduction due to system loading restrictions. Power was increased to 96% on 03/19/95, and held at 96%
to collect state point data. On 03/19/95, power was reduced to investigate problems with No. 22 Steam Generator Feed Pump (SGFP) controls. The Unit was returned to 96%
power on 03/21/95, however, No. 21 SGFP speed oscillations occurred and power was reduced to 50% on 03/23/95. The Unit continued to operate at 50% power throughout the remainder of the period, while the investigation into the SGFP control problems continued.