ML18101B102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1995
| issue date = 10/31/1995
| title = Monthly Operating Rept for Oct 1995 for Salem Unit 2. W/951114 Ltr
| title = Monthly Operating Rept for Oct 1995 for Salem Unit 2. W/951114 Ltr
| author name = PHILLIPS R, WARREN C
| author name = Phillips R, Warren C
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:, L *
{{#Wiki_filter:,
* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 November 14, 1995 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of October are being sent to you. RH:vls Enclosures C Mr. Thomas T. Martin Sincerely yours, General Manager -Salem Operations Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 0 (. t.. r..-----------v_L._ L_ '.-_,_.}_ --9511200005 951031 PDR ADDCK 05000311 R PDR The power is in your hands. 95-2168 REV. 6/94
PS~G                      *
* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236
            ~
Nuclear Business Unit November 14, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of October are being sent to you.
Sincerely yours, General Manager -
Salem Operations RH:vls Enclosures C         Mr. Thomas T. Martin Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 0 (. r~ t.. ..~ r..-
        -~ --- -- ----- '-~- v_L._ L_ '.- _,_.}_ --
9511200005 951031 PDR ADDCK 05000311 R                             PDR The power is in your hands.
95-2168 REV. 6/94 L


DAILY UNIT POWER Docket No.: 50-311 Unit Name: Salem #2 . ' Date: 11/10/95 Completed by: Robert Phillips Telephone:
                        ~ERAGE  DAILY UNIT POWER LE~
339-2735 Month October 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 P. 8.1-7 Rl
Docket No.:   50-311 Unit Name:   Salem #2
        .                                             Date:         11/10/95 Completed' by:   Robert Phillips                     Telephone:   339-2735 Month     October     1995 Day Average Daily Power Level               Day Average Daily Power Level (MWe-NET)                                 (MWe-NET) 1             0                             17             0 2             0                             18             0 3             0                             19             0 4             0                             20             0 5             0                             21             0 6             0                             22             0 7             0                             23             0 8             0                             24             0 9             0                             25             0 10             0                             26             0 11             0                             27             0 12             0                             28             0 13             0                             29             0 14             0                             30             0 15             0                             31             0 16             0 P. 8.1-7 Rl
* OPERATING DATA REPORT
* OPERATING DATA REPORT
* Docket No: . Date: Completed by: Robert Phillips Telephone:
* Docket No: 50-311
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period October 1995 3o Licensed Thermal Power (MWt) 3411 4o Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe) 1106 50-311 11/10/95 339-2735 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give  
        .                                             Date:       11/10/95 Completed by:     Robert Phillips                     Telephone: 339-2735 Operating Status
: 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours l6o Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 200 Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate This Month 745 0 0 0 0 0 0 -4499 0 0 0 0 100 N A Year to Date 7296 2468.4 0 2261.6 0 6807220.8 2198890 2025159 31. 0 31. 0 25.1 24.9 65.1 N/A Cumulative 123169 78083.6 0 75229.5 0 187781005 78648898 74748703 61.1 61.1 54.9 54.4 24.6 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Continuation of forced outage. Planned outage starts 3 November 1995. 25. If shutdown at end of Report Period, Estimated Date of Startup: To be determined.
: 1. Unit Name                         Salem No. 2     Notes
8-l-7.R2 NO. DATE 2692 10/01/95 F 1 2 F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995 DURATION TYPE 1 (HOURS) REASON 2 745 A Reason A-Equipment Failure (explain)
: 2. Reporting Period               October     1995 3o   Licensed Thermal Power (MWt)               3411 4o   Nameplate Rating (Gross MWe)               1170
B-Maintenance or Test C-Refueling D-Requlatory Restriction METHOD OF SHUTTING DOWN REACTOR 4 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
: 5. Design Electrical Rating (Net MWe)         1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe)       1106
H-Other (Explain)
: 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~~~~~=N'-'--"-A=--~~~~~~~~~~~~~~~~~~~~
LICENSE EVENT SYSTEM REPORT # CODE 4 --------SH 3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Previous Outage 5-Load Reduction 9-0ther COMPONENT CODE 5 DOCKET NO. UNIT NAME DATE COMPLETED BY TELEPHONE 50-311
: 9. Power Level to Which Restricted, if any (Net MWe)             N/A
* Salem #2 11-10-95 Robert Phi l ljfil. 609-339-2735 . ----.. CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE CKT BRK Breaker Failure 1-9 500KV 4 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report CLER) File (NUREG-0161) 5 Exhibit 1 -Same Source * 
: 10. Reasons for Restrictions, if any               N A This Month    Year to Date  Cumulative
*
: 11. Hours in Reporting Period               745          7296      123169
* lOCFR50.59 EVALUATIONS MONTH: OCTOBER 1995 DOCKET NO: UNIT NAME: 50-311 SALEM2 11/10/95 DATE: COMPLETED BY: TELEPHONE:
: 12. No. of Hrs. Rx. was Critical             0          2468.4    78083.6
R. HELLER 609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59.
: 13. Reactor Reserve Shutdown Hrs.             0              0          0
The Station Operations Review Committee has reviewed and concurs with these evaluations.  
: 14. Hours Generator On-Line                   0          2261.6    75229.5
: 1. Design Change Packages (DCP) The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations.
: 15. Unit Reserve Shutdown Hours               0              0          0 l6o Gross Thermal Energy Generated (MWH)                           0        6807220.8  187781005 Gross Elec. Energy Generated (MWH)                           0        2198890    78648898
For the next several months, during this transition phase, we anticipate few new DCPs to report. 2. Safety Evaluations (S/E) 2EC-3242 "Fuel Handling Building Ventilation Upgrades " Rev.2 -The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors.
: 18. Net Elec. Energy Gen. (MWH)         -4499          2025159    74748703
There is no reduction in the margin of safety as defined in the bases for any Technical Specification. (SORC 95-125)
: 19. Unit Service Factor                       0            31. 0      61.1 200 Unit Availability Factor                 0            31. 0      61.1
* REFUELING INFORMATION MONTH: OCTOBER 1995 MONTH: OCTOBER 1995
: 21. Unit Capacity Factor (using MDC Net)                     0            25.1        54.9
* DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 22. Unit Capacity Factor (using DER Net)                     0            24.9        54.4
50-311 SALEM2 11/10/95 R. HELLER 609-339-5162  
: 23. Unit Forced Outage Rate                 100           65.1       24.6
: 1. Refueling information has changed from last month: YES_K_NO 2. Scheduled date for next refueling:
: 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
11/02/95 Scheduled date for restart following refueling:
Continuation of forced outage. Planned outage starts 3 November 1995.
2nd quarter 1996 3. a. Will Technical Specification changes or other license amendments be required?
: 25. If shutdown at end of Report Period, Estimated Date of Startup:
NOT DETERMINED TO DATE X b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
To be determined.
YES NO X If no, when is it scheduled? (to be determined)  
8-l-7.R2
: 5. Scheduled date(s) for submitting proposed licensing action: ___
 
___ _ 6. Important licensing considerations associated with refueling:  
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995                                               DOCKET NO. 50-311
: 7. Number ofFuel Assemblies:  
* UNIT NAME Salem #2 DATE 11-10-95 COMPLETED BY Robert Phi l ljfil.
: a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity:
609-339-2735 .
Future spent fuel storage capacity:  
TELEPHONE ----..
: 9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
METHOD OF SHUTTING        LICENSE DURATION                      DOWN            EVENT            SYSTEM    COMPONENT              CAUSE AND CORRECTIVE ACTION 1
8-1-7.R4 193 556 1632 1632 March 2012 
NO.          DATE      TYPE        (HOURS)      REASON 2 REACTOR        REPORT #        CODE 4    CODE 5                    TO PREVENT RECURRENCE 2692      10/01/95  F          745          A              4              --------        SH        CKT BRK         Breaker Failure 1-9 500KV 1              2                                                        3                        4                                 5 F:  Forced      Reason                                                  Method:                  Exhibit G - Instructions           Exhibit 1 - Same S:  Scheduled  A-Equipment Failure (explain)                            1-Manual                  for Preparation of Data           Source B-Maintenance or Test                                    2-Manual Scram            Entry Sheets for Licensee C-Refueling                                              3-Automatic Scram        Event Report CLER) File D-Requlatory Restriction                                  4-Continuation of        (NUREG-0161)
*
E-Operator Training & License Examination                  Previous Outage F-Administrative                                        5-Load Reduction G-Operational Error (Explain)                            9-0ther H-Other (Explain)
* SALEM GENERATING STATION MONTHLY OPERATING  
 
10CFR50.59 EVALUATIONS DOCKET NO:            50-311 MONTH: OCTOBER 1995                                     UNIT NAME:           SALEM2 DATE:        11/10/95 COMPLETED BY:             R. HELLER TELEPHONE:            609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.
: 1. Design Change Packages (DCP)
The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations. For the next several months, during this transition phase, we anticipate few new DCPs to report.
: 2. Safety Evaluations (S/E) 2EC-3242                   "Fuel Handling Building Ventilation Upgrades " Rev.2 -
The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors. There is no reduction in the margin of safety as defined in the bases for any Technical Specification. (SORC 95-125)
 
REFUELING INFORMATION
* DOCKET NO:
* 50-311 MONTH: OCTOBER 1995                                   UNIT NAME:         SALEM2 DATE:     11/10/95 COMPLETED BY:          R. HELLER TELEPHONE:        609-339-5162 MONTH: OCTOBER 1995
: 1. Refueling information has changed from last month: YES_K_NO ~--
: 2. Scheduled date for next refueling: 11/02/95 Scheduled date for restart following refueling: 2nd quarter 1996
: 3. a. Will Technical Specification changes or other license amendments be required?
YES~NO NOT DETERMINED TO DATE               X
: b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES         NO     X If no, when is it scheduled? (to be determined)
: 5. Scheduled date(s) for submitting proposed licensing action: _ _ __.rN~/-=-A=_ _ __
: 6. Important licensing considerations associated with refueling:
: 7. Number ofFuel Assemblies:
: a. Incore                                                                 193
: b. In Spent Fuel Storage                                                   556
: 8. Present licensed spent fuel storage capacity:                             1632 Future spent fuel storage capacity:                                       1632
: 9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:               March 2012 8-1-7.R4
 
SALEM GENERATING STATION MONTHLY OPERATING  


==SUMMARY==
==SUMMARY==
  -UNIT 2 NOVEMBER 1995 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, both Units will remain shutdown pending completion of the following actions:
  - UNIT 2 NOVEMBER 1995 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, both Units will remain shutdown pending completion of the following actions:
* Appropriately address long standing equipment reliability and operability issues
* Appropriately address long standing equipment reliability and operability issues
* After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
* After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
* After the restart review, meet with the NRC and communicate the results of that review}}
* After the restart review, meet with the NRC and communicate the results of that review}}

Latest revision as of 05:38, 3 February 2020

Monthly Operating Rept for Oct 1995 for Salem Unit 2. W/951114 Ltr
ML18101B102
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/31/1995
From: Phillips R, Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511200005
Download: ML18101B102 (7)


Text

,

PS~G *

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236

~

Nuclear Business Unit November 14, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of October are being sent to you.

Sincerely yours, General Manager -

Salem Operations RH:vls Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 0 (. r~ t.. ..~ r..-

-~ --- -- ----- '-~- v_L._ L_ '.- _,_.}_ --

9511200005 951031 PDR ADDCK 05000311 R PDR The power is in your hands.

95-2168 REV. 6/94 L

~ERAGE DAILY UNIT POWER LE~

Docket No.: 50-311 Unit Name: Salem #2

. Date: 11/10/95 Completed' by: Robert Phillips Telephone: 339-2735 Month October 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 P. 8.1-7 Rl

  • OPERATING DATA REPORT
  • Docket No: 50-311

. Date: 11/10/95 Completed by: Robert Phillips Telephone: 339-2735 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period October 1995 3o Licensed Thermal Power (MWt) 3411 4o Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~~~~~=N'-'--"-A=--~~~~~~~~~~~~~~~~~~~~
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N A This Month Year to Date Cumulative
11. Hours in Reporting Period 745 7296 123169
12. No. of Hrs. Rx. was Critical 0 2468.4 78083.6
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 0 2261.6 75229.5
15. Unit Reserve Shutdown Hours 0 0 0 l6o Gross Thermal Energy Generated (MWH) 0 6807220.8 187781005 Gross Elec. Energy Generated (MWH) 0 2198890 78648898
18. Net Elec. Energy Gen. (MWH) -4499 2025159 74748703
19. Unit Service Factor 0 31. 0 61.1 200 Unit Availability Factor 0 31. 0 61.1
21. Unit Capacity Factor (using MDC Net) 0 25.1 54.9
22. Unit Capacity Factor (using DER Net) 0 24.9 54.4
23. Unit Forced Outage Rate 100 65.1 24.6
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Continuation of forced outage. Planned outage starts 3 November 1995.

25. If shutdown at end of Report Period, Estimated Date of Startup:

To be determined.

8-l-7.R2

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995 DOCKET NO. 50-311

  • UNIT NAME Salem #2 DATE 11-10-95 COMPLETED BY Robert Phi l ljfil.

609-339-2735 .

TELEPHONE ----..

METHOD OF SHUTTING LICENSE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION 1

NO. DATE TYPE (HOURS) REASON 2 REACTOR REPORT # CODE 4 CODE 5 TO PREVENT RECURRENCE 2692 10/01/95 F 745 A 4 -------- SH CKT BRK Breaker Failure 1-9 500KV 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-Continuation of (NUREG-0161)

E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-Other (Explain)

10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: OCTOBER 1995 UNIT NAME: SALEM2 DATE: 11/10/95 COMPLETED BY: R. HELLER TELEPHONE: 609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.

1. Design Change Packages (DCP)

The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations. For the next several months, during this transition phase, we anticipate few new DCPs to report.

2. Safety Evaluations (S/E) 2EC-3242 "Fuel Handling Building Ventilation Upgrades " Rev.2 -

The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors. There is no reduction in the margin of safety as defined in the bases for any Technical Specification. (SORC 95-125)

REFUELING INFORMATION

  • DOCKET NO:
  • 50-311 MONTH: OCTOBER 1995 UNIT NAME: SALEM2 DATE: 11/10/95 COMPLETED BY: R. HELLER TELEPHONE: 609-339-5162 MONTH: OCTOBER 1995
1. Refueling information has changed from last month: YES_K_NO ~--
2. Scheduled date for next refueling: 11/02/95 Scheduled date for restart following refueling: 2nd quarter 1996
3. a. Will Technical Specification changes or other license amendments be required?

YES~NO NOT DETERMINED TO DATE X

b. Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X If no, when is it scheduled? (to be determined)

5. Scheduled date(s) for submitting proposed licensing action: _ _ __.rN~/-=-A=_ _ __
6. Important licensing considerations associated with refueling:
7. Number ofFuel Assemblies:
a. Incore 193
b. In Spent Fuel Storage 556
8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632
9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2012 8-1-7.R4

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT 2 NOVEMBER 1995 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, both Units will remain shutdown pending completion of the following actions:

  • Appropriately address long standing equipment reliability and operability issues
  • After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
  • After the restart review, meet with the NRC and communicate the results of that review