ML18114A036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2, 2018 Mr. Jerald G. Head Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401
 
==SUBJECT:==
ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION  SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 5.2.5, REACTOR COOLANT PRESSURE BOUNDARY LEAKAGE DETECTION
 
==Dear Mr. Head:==
 
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items to supplement the final safety evaluation report associated with the staffs review of the advanced boiling-water reactor (ABWR) design that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. This SE will document the staffs review of your application dated December 7, 2010, to renew the ABWR design certification.
The staffs SE for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support a future meeting of the ACRS Subcommittee.
The enclosed SE is being provided only to GEH for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for 10 business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that 10 day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
OFFICIAL USE ONLY - PROPRIETARY INFORMATION J. Head                                    If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at Adrian.Muniz@nrc.gov.
Sincerely,
                                          /RA/
Adrian Muniz, Acting Branch Chief Licensing Branch 3 Division of New Reactor Licensing Office of New Reactors Docket No. 52-045
 
==Enclosure:==
 
As stated cc: w/o encl. See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
Package: ML18052A118 Letter: ML18114A036        *via e-mail        NRO-002 OFFICE    NRO/DNRL/LB3:PM      NRO/DNRL/LB3:LA        NRO/DNRL/LB3:PM NAME      JShea                SGreen*                AMuniz DATE      4/23/2018            4/24/2018              5/2/2018 DC GEH - ABWR Mailing List                      (Revised 11/17/2017)
Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)
Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman)
Dale.Wuokko@toshiba.com (Dale Wuokko) david.lewis@pillsburylaw.com (David Lewis) david.robillard@pseg.com (David Robillard)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)
Joseph.Ondish@ge.com (Joseph Ondish)
Joseph_Hegner@dom.com (Joseph Hegner)
Kenichi.Sato.sz@hitachi.com (Kenichi Sato)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler)
Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)
Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)
RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)
Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)
Page1 of 1}}

Latest revision as of 03:17, 3 February 2020

Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection
ML18114A036
Person / Time
Site: 05200045
Issue date: 05/02/2018
From: Adrian Muniz
NRC/NRO/DNRL
To: Head J
GE Hitachi Nuclear Energy
Shea J
Shared Package
ML18052A118 List:
References
Download: ML18114A036 (4)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2, 2018 Mr. Jerald G. Head Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401

SUBJECT:

ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 5.2.5, REACTOR COOLANT PRESSURE BOUNDARY LEAKAGE DETECTION

Dear Mr. Head:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items to supplement the final safety evaluation report associated with the staffs review of the advanced boiling-water reactor (ABWR) design that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. This SE will document the staffs review of your application dated December 7, 2010, to renew the ABWR design certification.

The staffs SE for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support a future meeting of the ACRS Subcommittee.

The enclosed SE is being provided only to GEH for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for 10 business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that 10 day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION J. Head If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at Adrian.Muniz@nrc.gov.

Sincerely,

/RA/

Adrian Muniz, Acting Branch Chief Licensing Branch 3 Division of New Reactor Licensing Office of New Reactors Docket No.52-045

Enclosure:

As stated cc: w/o encl. See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

Package: ML18052A118 Letter: ML18114A036 *via e-mail NRO-002 OFFICE NRO/DNRL/LB3:PM NRO/DNRL/LB3:LA NRO/DNRL/LB3:PM NAME JShea SGreen* AMuniz DATE 4/23/2018 4/24/2018 5/2/2018 DC GEH - ABWR Mailing List (Revised 11/17/2017)

Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)

Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)

CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman)

Dale.Wuokko@toshiba.com (Dale Wuokko) david.lewis@pillsburylaw.com (David Lewis) david.robillard@pseg.com (David Robillard)

F.Shahrokhi@areva.com (Farshid Shahrokhi)

George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)

Joseph.Ondish@ge.com (Joseph Ondish)

Joseph_Hegner@dom.com (Joseph Hegner)

Kenichi.Sato.sz@hitachi.com (Kenichi Sato)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler)

Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)

Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)

RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)

Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)

Page1 of 1