Line 28: |
Line 28: |
| During the transfer, the feeder breaker from the Station Power Transformer opened but the feeder breaker from the Auxiliary | | During the transfer, the feeder breaker from the Station Power Transformer opened but the feeder breaker from the Auxiliary |
|
| |
|
| - '
| |
| Mr. J. P. O'Reilly 5-20-77 Power Transformer failed *to close. This resulted .in a loss of the lG 4kV Group Bus and a loss of No. 14 Reactor Coolant Pump. | | Mr. J. P. O'Reilly 5-20-77 Power Transformer failed *to close. This resulted .in a loss of the lG 4kV Group Bus and a loss of No. 14 Reactor Coolant Pump. |
| Plant conditions were stabilized at 25% power in three (3) loop operation. Investigation revealed that the unit isolation trip had not been reset, therefore, not allowing the feeder breaker from,the_Au,xiliary Power Transformer to close. At. | | Plant conditions were stabilized at 25% power in three (3) loop operation. Investigation revealed that the unit isolation trip had not been reset, therefore, not allowing the feeder breaker from,the_Au,xiliary Power Transformer to close. At. |
Line 42: |
Line 41: |
| L | | L |
|
| |
|
| ..*
| |
| Mr. J. P. O'Reilly 5-20~11 77-13-02 Technical Specification 6.8.1 requires written procedures to be established, implemented, .and maintained covering opera-tion of the*reactor coolant system. | | Mr. J. P. O'Reilly 5-20~11 77-13-02 Technical Specification 6.8.1 requires written procedures to be established, implemented, .and maintained covering opera-tion of the*reactor coolant system. |
| Operating Instruction*II 1.3-3, OPERATING WITH LESS THAN FOUR REACTOR COOLANT LOOPS IN* SERVICE, SECTION 5.5, "Start-ing a Reactor Coolant Pump (RCP) During Power Operation," | | Operating Instruction*II 1.3-3, OPERATING WITH LESS THAN FOUR REACTOR COOLANT LOOPS IN* SERVICE, SECTION 5.5, "Start-ing a Reactor Coolant Pump (RCP) During Power Operation," |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 LR-N24-0038, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 2024-09-25
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
... ..
Frederick W. Schneider Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/622-7000 Vice President Production May 20, 1977 Mr. James P. O'Reilly, Director
- u. s. Nuclear Regulatory Commission Off ice of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. O'Reilly:
NRC INSPECTION REPORT NO. 50~272/77-13 INSPECTION DATE APRIL 12, 1977 NO. 1 UNIT SALEM GENERATING STATION We have received and reviewed the report of your inspection conducted April 12, 1977. The report was transmitted with your letter of April 29, 1977 and received on.May 2, 1977.
Our response to the items of noncompliance is as follows:
77-13-01 "Facility Operating License No. DPR-70 Amendment No. 4 paragraph 2.C. (4), dated January 6, 1977, states in part that, nPublic Service Electric and Gas Company shall not operate the reactor at power levels above P-7 (11 per-cent) *** with less than four (4) reactor coolant loops in operation until *** approval for less than four loop operation at power levels above P-7 has been granted by the Commission by amendment of this license. 1' Contrary to the above on April 12, 1977, the plant was operated from 10:01 a.m. to 10:32 a.m. at 25 percent power with No. 14 Reactor Coolant Pump idle and the associated loop out of service ..
On April 12, 1977, at 1001 hours0.0116 days <br />0.278 hours <br />0.00166 weeks <br />3.808805e-4 months <br />, while in Mode 1 operation, an attempt was made to transfer the lG 4kV Group Bus from_ the Station Power Transformer to the Auxiliary Power Transformer.
During the transfer, the feeder breaker from the Station Power Transformer opened but the feeder breaker from the Auxiliary
Mr. J. P. O'Reilly 5-20-77 Power Transformer failed *to close. This resulted .in a loss of the lG 4kV Group Bus and a loss of No. 14 Reactor Coolant Pump.
Plant conditions were stabilized at 25% power in three (3) loop operation. Investigation revealed that the unit isolation trip had not been reset, therefore, not allowing the feeder breaker from,the_Au,xiliary Power Transformer to close. At.
approximately 1015 hour0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br />s~ the Unit Isolation Trip had been reset and the lG-4kVGroup Bus was re-energized from the Auxiliary Power Transformer. At 1032 hoµrs, the No. 14 Reactor Coolant Pump was re-started.
There are several factors which contributed to the oversight of the license amendment prohibiting less than four loop operation above 11% *power. Cold SRO licensed supervisory personnel have been standing watch to meet the technical specifi~ -
cation requirements until the control operators are RO licensed.
This has required a certain amount of overtime and irregular shift assignments and has prevented the start of the License Operator Retraining Program. As a result, training of licensed personnel during this interim period has not been as.effective*
as we had expected. In this particular situation, the licensed operators.were originally trained and granted their SRO licenses based on the Technical Specification which.does allow three loop operation*. The license amendment which restricts this mode of operation came approximately six months after the license was issued, _and al though operating personnel were* made aware of the restriction, _the training._ emphasis was obviously insufficient to overcome_ the more rigorous earlier training.
Therefore, in addition to the corrective action listed below, we will review the license and technical specification requirements and operating. inc.:j,.dents that have taken place to date to be sure they are incorporated into the retraining program which should resume in June. * *
- 1. An on-the-spot-change was made to OI II-1.3-1 which added Step -3.11 "Do not start a Reactor Coolant Pump while reactor is critical II I on April 12, _1977.
On April 12, 1977, a night order book entry was made to re-instruct Control Room personnel of the Reactor Coolant Pump restriction.
- 2. On April 15, _1977, a plastic tag was placed on the Operating Console as a warning to Operators that three loop operation ab6ve P-7, is not allowed.
L
Mr. J. P. O'Reilly 5-20~11 77-13-02 Technical Specification 6.8.1 requires written procedures to be established, implemented, .and maintained covering opera-tion of the*reactor coolant system.
Operating Instruction*II 1.3-3, OPERATING WITH LESS THAN FOUR REACTOR COOLANT LOOPS IN* SERVICE, SECTION 5.5, "Start-ing a Reactor Coolant Pump (RCP) During Power Operation,"
requires power level to be reduced to* below 10 percent prior_ to starting a*RCP in an idle loop.
Contrary to the above, No. 14 Reactor Coolant Pump was started in the idle loop at 10:32 a.m. on April 12, 1977, with the reactor at 25 percent power. An unplanned initi-ation of safety injection occurred as a result of adverse
The following corrective action has been taken:
An on-the-spot change added a precaution to QI II-1.3-3 on April 12,. 1977, which states, "Do not start a Reactor Coolant Pump with the reactor critical."
In response to your concern about the number and frequency of operator induced safeguard actuations, station management *has instituted a system*.which requires operator written responses to variances. in operating practices*. This system is expected to stimulate operator awareness of his actions and will indicate to management those.areas where additional training or procedure modification is required.* Also, .the Nuclear Review Board will be asked to review.the Licensed Operator Retraining Program after
- it has been in effect for six months, to verify its adequacy.
If you require additional information, we will be pleased to discuss it with you.
Very truly yours,