|
|
(2 intermediate revisions by the same user not shown) |
Line 5: |
Line 5: |
| | author name = Peterson H | | | author name = Peterson H |
| | author affiliation = NRC/RGN-III/DRS | | | author affiliation = NRC/RGN-III/DRS |
| | addressee name = Nazar M K | | | addressee name = Nazar M |
| | addressee affiliation = Indiana Michigan Power Co | | | addressee affiliation = Indiana Michigan Power Co |
| | docket = 05000315, 05000316 | | | docket = 05000315, 05000316 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ril 20, 2007 |
| [[Issue date::April 20, 2007]]
| |
|
| |
|
| Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
| | ==SUBJECT:== |
| | | DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2007301(DRS); |
| SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2007301(DRS); | |
| 05000316/2007301(DRS) | | 05000316/2007301(DRS) |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
| On March 26, 2007, Nuclear Regulatory Commission (NRC) examiners completed initialoperator licensing examinations at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. | | On March 26, 2007, Nuclear Regulatory Commission (NRC) examiners completed initial operator licensing examinations at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. |
|
| |
|
| The enclosed report documents the results of the examination which were discussed on March 23, 2007, with Mr. J. Jensen and other members of your staff. An exit meeting was conducted by telephone on March 28, 2007, between Mr. I. D. Fleedwood of your staff and Mr. D. McNeil, Senior Operations Engineer, to review the proposed final grading of the written examination for the license applicants. There were no post examination comments submitted for the examination by the station's staff.The NRC examiners administered an initial license examination operating test during the weekof March 19, 2007. The written examination was administered by plant training department personnel on March 26, 2007. Four Senior Reactor Operator and five Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on April 18, 2007. All nine applicants passed all sections of their respective examinations and were issued applicable operator licenses.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom, or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | The enclosed report documents the results of the examination which were discussed on March 23, 2007, with Mr. J. Jensen and other members of your staff. An exit meeting was conducted by telephone on March 28, 2007, between Mr. I. D. Fleedwood of your staff and Mr. D. McNeil, Senior Operations Engineer, to review the proposed final grading of the written examination for the license applicants. There were no post examination comments submitted for the examination by the stations staff. |
|
| |
|
| M. Nazar-2-We will gladly discuss any questions you have concerning this examination.
| | The NRC examiners administered an initial license examination operating test during the week of March 19, 2007. The written examination was administered by plant training department personnel on March 26, 2007. Four Senior Reactor Operator and five Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on April 18, 2007. All nine applicants passed all sections of their respective examinations and were issued applicable operator licenses. |
|
| |
|
| Sincerely,/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74 | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination. |
| | |
| | Sincerely, |
| | /RA/ |
| | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 |
|
| |
|
| ===Enclosures:=== | | ===Enclosures:=== |
| 1.Operator Licensing Examination Report 05000315/2007301(DRS); 05000316/2007301(DRS) | | 1. Operator Licensing Examination Report 05000315/2007301(DRS); 05000316/2007301(DRS) |
| | w/Attachment: Supplemental Information 2. Simulation Facility Report 3. Written Examinations and Answer Keys |
|
| |
|
| ===w/Attachment:===
| | REGION III== |
| Supplemental Information2.Simulation Facility Report 3.Written Examinations and Answer Keyscc w/encl 1 & 2:M. Peifer, Site Vice PresidentL. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
| | Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Report No: 05000315/2007301(DRS); 05000316/2007301(DRS) |
| Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigancc w/encl 1, 2, & 3:R. Gillespie, Training Manager, Donald C. Cook Plant M. Nazar-2-We will gladly discuss any questions you have concerning this examination.
| | Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant Location: Bridgman, MI Dates: March 19 through March 26, 2007 Examiners: D. McNeil, Chief Examiner C. Moore, Examiner C. Zoia, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1 |
|
| |
|
| Sincerely,/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74
| | =SUMMARY OF FINDINGS= |
| | ER 05000315/2007301(DRS), 05000316/2007301(DRS); 03/19/06 - 03/26/06; |
|
| |
|
| ===Enclosures:===
| | Donald C. Cook Nuclear Power Plant; Initial License Examination Report. |
| 1.Operator Licensing Examination Report 05000315/2007301(DRS); 05000316/2007301(DRS)
| |
|
| |
|
| ===w/Attachment:===
| | The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, |
| Supplemental Information2.Simulation Facility Report 3.Written Examinations and Answer Keyscc w/encl 1 & 2:M. Peifer, Site Vice PresidentL. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
| | Operator Licensing Examination Standards for Power Reactors, Revision 9. |
| Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigancc w/encl 1, 2, & 3:R. Gillespie, Training Manager, Donald C. Cook PlantDOCUMENT NAME: C:\FileNet\ML071150480.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMEDMcNeil:coHPetersonDATE04/18/0704/20/07OFFICIAL RECORD COPY M. Nazar-3-ADAMS Distribution
| |
| :TEB MMT RidsNrrDirsIrib GEG KGO GLS BJK1 CAA1 LSL (electronic IR's only)
| |
| C. Pederson, DRS (hard copy - IR's only)
| |
| DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov NLS Enclosure 1U. S. NUCLEAR REGULATORY COMMISSIONREGION IIIDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74Report No:05000315/2007301(DRS); 05000316/2007301(DRS)
| |
| Licensee:Indiana Michigan Power Company Facility:Donald C. Cook Nuclear Power Plant Location:Bridgman, MI Dates:March 19 through March 26, 2007 Examiners:D. McNeil, Chief ExaminerC. Moore, Examiner C. Zoia, ExaminerApproved by:Hironori Peterson, ChiefOperations Branch Division of Reactor Safety Enclosure 1 1
| |
|
| |
|
| =SUMMARY OF FINDINGS=
| | Examination Summary: |
| ER 05000315/2007301(DRS), 05000316/2007301(DRS); 03/19/06 - 03/26/06;Donald C. Cook Nuclear Power Plant; Initial License Examination Report.The announced initial operator licensing examination was conducted by regional NuclearRegulatory Commission examiners in accordance with the guidance of NUREG-1021,
| | * Nine applicants passed all sections of their respective examinations. Four applicants were issued senior operator licenses and five applicants were issued operator licenses. |
|
| |
|
| "Operator Licensing Examination Standards for Power Reactors," Revision 9.Examination Summary
| | (Section 4OA5.1). |
| :*Nine applicants passed all sections of their respective examinations. Four applicantswere issued senior operator licenses and five applicants were issued operator licenses.
| |
|
| |
|
| (Section 4OA5.1).
| | =REPORT DETAILS= |
|
| |
|
| 2
| | ==OTHER ACTIVITIES (OA)== |
| | {{a|4OA5}} |
| | ==4OA5 Other== |
|
| |
|
| =REPORT DETAILS= | | ===.1 Initial Licensing Examinations=== |
| 4.OTHER ACTIVITIES (OA)4OA5Other.1Initial Licensing Examinations
| |
|
| |
|
| ====a. Examination Scope==== | | ====a. Examination Scope==== |
| The Donald C. Cook Plant Training Department trainers prepared the examinationoutline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of February 26, 2007, at the Donald C. Cook Nuclear Power Plant training building with the assistance of members of the licensee training staff. The examiners also audited at least 10 percent of the license applications for accuracy. The NRC examiners conducted the operating portion of the initial license examination during the week of March 19, 2007. The Donald C. Cook Plant training department staff administered the written examination on March 26, 2007. The NRC examiners and plant training staff used the guidance established in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, to prepare, validate, revise, administer, and grade the examination. | | The Donald C. Cook Plant Training Department trainers prepared the examination outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of February 26, 2007, at the Donald C. Cook Nuclear Power Plant training building with the assistance of members of the licensee training staff. The examiners also audited at least 10 percent of the license applications for accuracy. The NRC examiners conducted the operating portion of the initial license examination during the week of March 19, 2007. The Donald C. Cook Plant training department staff administered the written examination on March 26, 2007. The NRC examiners and plant training staff used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, to prepare, validate, revise, administer, and grade the examination. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| Written ExaminationDuring the validation of the written examination several questions were modified orreplaced. Changes made to the written examination were documented on Form ES-401-9, "Written Examination Review Worksheet" which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The licensee had no post-examination comments. | | Written Examination During the validation of the written examination several questions were modified or replaced. Changes made to the written examination were documented on Form ES-401-9, Written Examination Review Worksheet which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The licensee had no post-examination comments. |
| | |
| | The NRC examiners graded the written examination on April 2, 2007, and conducted a review of each question missed by 50 percent or more of the applicants to determine the accuracy and validity of the examination questions. |
|
| |
|
| The NRC examiners graded the written examination on April 2, 2007, and conducted a review of each question missed by 50 percent or more of the applicants to determine the accuracy and validity of the examination questions.Operating TestDuring the validation of the operating test, minor modifications were made to the JobPerformance Measures (JPMs) and to the dynamic simulator scenarios. Changes made to the operating test were documented in a document titled, "Operating Test Comments," which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The NRC examiners completed grading the operating test on April 9, 2007.
| | Operating Test During the validation of the operating test, minor modifications were made to the Job Performance Measures (JPMs) and to the dynamic simulator scenarios. Changes made to the operating test were documented in a document titled, Operating Test Comments, which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The NRC examiners completed grading the operating test on April 9, 2007. |
|
| |
|
| 3Examination ResultsFour applicants at the Senior Reactor Operator (SRO) level and five applicants at theReactor Operator (RO) level were administered written and operating tests. Two of the SRO applicants were previously licensed as ROs at the Donald C. Cook Nuclear Power Plant. All nine applicants passed all portions of their examinations and were issued applicable operating licenses..2Examination Security
| | Examination Results Four applicants at the Senior Reactor Operator (SRO) level and five applicants at the Reactor Operator (RO) level were administered written and operating tests. Two of the SRO applicants were previously licensed as ROs at the Donald C. Cook Nuclear Power Plant. All nine applicants passed all portions of their examinations and were issued applicable operating licenses. |
| | |
| | ===.2 Examination Security=== |
|
| |
|
| ====a. Scope==== | | ====a. Scope==== |
| The NRC examiners reviewed and observed the licensee's implementation ofexamination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, "Integrity of Examinations and Tests." The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors" to determine acceptability of the licensee's examination security activities. | | The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors to determine acceptability of the licensees examination security activities. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified.4OA6MeetingsDebriefThe chief examiner presented the examination team's preliminary observations andfindings on March 23, 2007, to J. Jensen and other members of the Donald C. Cook Nuclear Power Plant staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.Exit MeetingThe chief examiner conducted an exit meeting on March 28, 2007, with Mr. I. Fleetwood,Donald C. Cook Plant Initial License Training Supervisor by telephone. Receipt of the written examination materials was acknowledged by the chief examiner and Mr. Fleetwood stated that the licensee had no post examination comments.ATTACHMENT: | | No findings of significance were identified. |
| | {{a|4OA6}} |
| | ==4OA6 Meetings== |
| | |
| | Debrief The chief examiner presented the examination team's preliminary observations and findings on March 23, 2007, to J. Jensen and other members of the Donald C. Cook Nuclear Power Plant staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings. |
| | |
| | Exit Meeting The chief examiner conducted an exit meeting on March 28, 2007, with Mr. I. Fleetwood, Donald C. Cook Plant Initial License Training Supervisor by telephone. Receipt of the written examination materials was acknowledged by the chief examiner and Mr. Fleetwood stated that the licensee had no post examination comments. |
| | |
| | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
Line 103: |
Line 113: |
| : [[contact::C. Moore]], Examiner | | : [[contact::C. Moore]], Examiner |
| : [[contact::C. Zoia]], Examiner | | : [[contact::C. Zoia]], Examiner |
| | |
| ==ITEMS OPENED, CLOSED, AND DISCUSSED== | | ==ITEMS OPENED, CLOSED, AND DISCUSSED== |
| Opened, Closed, and | | |
| ===Discussed===
| | ===Opened, Closed, and Discussed=== |
|
| |
|
| None | | None |
| | |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| None
| |
| ==LIST OF ACRONYMS==
| |
| USEDADAMSAgency-Wide Document Access and Management SystemDRSDivision of Reactor Safety
| |
| JPMJob Performance Measures
| |
| NRCNuclear Regulatory Commission
| |
| ROReactor Operator
| |
| SROSenior Reactor Operator
| |
|
| |
|
| 1SIMULATION FACILITY REPORTFacility Licensee:Donald C. Cook Nuclear Power PlantFacility Docket No:50-315; 50-316
| |
| Operating Tests Administered:March 19 - 23, 2007
| |
| The following documents observations made by the NRC examination team during the initialoperator license examination. These observations do not constitute audit or inspection
| |
| findings and are not, without further verification and review, indicative of non-compliance with
| |
| : [[CFR]] [[55.45(b). These observations do not affect]]
| |
| NRC certification or approval of the
| |
| simulation facility other than to provide information which may be used in future evaluations.
| |
| No licensee action is required in response to these observations.During the conduct of the simulator portion of the operating tests, the following items wereobserved:ITEMDESCRIPTION
| |
| None
| |
| : [[1WRITTE]] [[N EXAMINATIONS]]
| |
| : [[AND]] [[]]
| |
| : [[ANSWER]] [[]]
| |
| : [[KEYS]] [[(]]
| |
| : [[RO]] [[/SRO)RO/SRO Initial Examination]]
| |
| : [[ADAMS]] [[Accession #]]
| |
| : [[ML]] [[071060320.]]
| |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] Category:License-Operator Examination Report (Non-Power Reactors Only)
MONTHYEARIR 05000315/20073012007-04-20020 April 2007 Er 05000315-07-301(DRS), 05000316-07-301(DRS); 03/19/06 - 03/26/06; Donald C. Cook Nuclear Power Plant; Initial License Examination Report 2007-04-20
[Table view] |
Text
ril 20, 2007
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2007301(DRS);
05000316/2007301(DRS)
Dear Mr. Nazar:
On March 26, 2007, Nuclear Regulatory Commission (NRC) examiners completed initial operator licensing examinations at your Donald C. Cook Nuclear Power Plant, Units 1 and 2.
The enclosed report documents the results of the examination which were discussed on March 23, 2007, with Mr. J. Jensen and other members of your staff. An exit meeting was conducted by telephone on March 28, 2007, between Mr. I. D. Fleedwood of your staff and Mr. D. McNeil, Senior Operations Engineer, to review the proposed final grading of the written examination for the license applicants. There were no post examination comments submitted for the examination by the stations staff.
The NRC examiners administered an initial license examination operating test during the week of March 19, 2007. The written examination was administered by plant training department personnel on March 26, 2007. Four Senior Reactor Operator and five Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on April 18, 2007. All nine applicants passed all sections of their respective examinations and were issued applicable operator licenses.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosures:
1. Operator Licensing Examination Report 05000315/2007301(DRS); 05000316/2007301(DRS)
w/Attachment: Supplemental Information 2. Simulation Facility Report 3. Written Examinations and Answer Keys
REGION III==
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Report No: 05000315/2007301(DRS); 05000316/2007301(DRS)
Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant Location: Bridgman, MI Dates: March 19 through March 26, 2007 Examiners: D. McNeil, Chief Examiner C. Moore, Examiner C. Zoia, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000315/2007301(DRS), 05000316/2007301(DRS); 03/19/06 - 03/26/06;
Donald C. Cook Nuclear Power Plant; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 9.
Examination Summary:
- Nine applicants passed all sections of their respective examinations. Four applicants were issued senior operator licenses and five applicants were issued operator licenses.
(Section 4OA5.1).
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The Donald C. Cook Plant Training Department trainers prepared the examination outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of February 26, 2007, at the Donald C. Cook Nuclear Power Plant training building with the assistance of members of the licensee training staff. The examiners also audited at least 10 percent of the license applications for accuracy. The NRC examiners conducted the operating portion of the initial license examination during the week of March 19, 2007. The Donald C. Cook Plant training department staff administered the written examination on March 26, 2007. The NRC examiners and plant training staff used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, to prepare, validate, revise, administer, and grade the examination.
b. Findings
Written Examination During the validation of the written examination several questions were modified or replaced. Changes made to the written examination were documented on Form ES-401-9, Written Examination Review Worksheet which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The licensee had no post-examination comments.
The NRC examiners graded the written examination on April 2, 2007, and conducted a review of each question missed by 50 percent or more of the applicants to determine the accuracy and validity of the examination questions.
Operating Test During the validation of the operating test, minor modifications were made to the Job Performance Measures (JPMs) and to the dynamic simulator scenarios. Changes made to the operating test were documented in a document titled, Operating Test Comments, which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The NRC examiners completed grading the operating test on April 9, 2007.
Examination Results Four applicants at the Senior Reactor Operator (SRO) level and five applicants at the Reactor Operator (RO) level were administered written and operating tests. Two of the SRO applicants were previously licensed as ROs at the Donald C. Cook Nuclear Power Plant. All nine applicants passed all portions of their examinations and were issued applicable operating licenses.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors to determine acceptability of the licensees examination security activities.
b. Findings
No findings of significance were identified.
4OA6 Meetings
Debrief The chief examiner presented the examination team's preliminary observations and findings on March 23, 2007, to J. Jensen and other members of the Donald C. Cook Nuclear Power Plant staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
Exit Meeting The chief examiner conducted an exit meeting on March 28, 2007, with Mr. I. Fleetwood, Donald C. Cook Plant Initial License Training Supervisor by telephone. Receipt of the written examination materials was acknowledged by the chief examiner and Mr. Fleetwood stated that the licensee had no post examination comments.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Jensen, Site Vice-President
- S. Adkins, Legal
- L. Bush, Operations
- R. Crane, Regulatory Affairs
- I. Fleetwood, ILT Supervisor
- R. Harrah, Training - Operations
- J. Newmiller, Compliance
- S. Simpson, Manager, Regulatory Affairs
- L. Weber, Plant Manager
NRC
- D. McNeil, Examiner
- B. Kemker, Senior Resident Inspector, Donald C. Cook Plant
- C. Moore, Examiner
- C. Zoia, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED