ML080710131: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML080710131
| number = ML080710131
| issue date = 03/10/2008
| issue date = 03/10/2008
| title = 2008/03/10 - Pilgrim - Letter to Secretary Original Certification of James Davis
| title = Pilgrim - Letter to Secretary Original Certification of James Davis
| author name = Uttal S
| author name = Uttal S
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC

Latest revision as of 07:50, 7 December 2019

Pilgrim - Letter to Secretary Original Certification of James Davis
ML080710131
Person / Time
Site: Pilgrim
Issue date: 03/10/2008
From: Uttal S
NRC/OGC
To:
NRC/SECY/RAS
SECY RAS
References
ASLBP 06-848-02-LR, RAS J-8
Download: ML080710131 (1)


Text

March 10, 2008 Office of the Secretary Attn: Rulemakings and Adjudications Staff U.S. Nuclear Regulatory Commission Mail Stop: O-16G4 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Secretary:

Enclosed please find the originally signed Certification of James A. Davis, a facsimile copy of which was attached to the Staff Rebuttal Testimony that was served upon all parties on March 6, 2008.

Sincerely,

/RA/

Susan L. Uttal Counsel for the NRC Staff

Enclosure:

As Stated cc without enclosure: Service List