ML16027A027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16027A027
| number = ML16027A027
| issue date = 01/27/2016
| issue date = 01/27/2016
| title = River Bend Station - Notification of NRC Initial Operator Licensing Examination 05000458/2016301
| title = Notification of NRC Initial Operator Licensing Examination 05000458/2016301
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Olson E W
| addressee name = Olson E
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000458/2016301]]
See also: [[see also::IR 05000458/2016301]]


=Text=
=Text=
{{#Wiki_filter:January 27, 2016  
{{#Wiki_filter:UNITED STATES
                          NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E LAMAR BLVD
Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc. River Bend Station  
                                      ARLINGTON, TX 76011-4511
                                        January 27, 2016
Mr. Eric W. Olson, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR
              LICENSING EXAMINATION 05000458/2016301
Dear Mr. Olson:
In a telephone conversation on January 5, 2016, between Messrs. D. Bergstrom, Initial Exam
Lead, and K. Clayton, Chief Examiner, arrangements were made for the administration of
licensing examinations at River Bend Station during the weeks of September 12 and
September 19, 2016.
As agreed during the telephone conversation, the NRC will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. Your staff will be given the opportunity to review
the examinations during the week of, or before, August 1, 2016.
To meet the above schedule, it will be necessary for your staff to furnish the supporting
reference materials identified in Attachment 3 to ES-201 by February 1, 2016. We request that
any personal, proprietary, sensitive unclassified, or safeguards information in your response be
contained in a separate enclosure and appropriately marked. Any delay in receiving the
required reference materials, or the submittal of inadequate or incomplete materials, may cause
the examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of August 15, 2016.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff shall capture all relevant simulator data (needed for the NRC to make licensing
decisions) during the dynamic operating tests and shall retain this data until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.


5485 US Highway 61N
E. Olson                                          -2-
St. Francisville, LA  70775
To permit timely NRC review and evaluation, your staff shall submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed shall be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 500 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosures will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Thank you for your cooperation in this matter. Mr. Bergstrom has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the
NRCs examination procedures and guidelines, please contact Mr. K. Clayton at 817-200-1216
or myself at 817-200-1159.
                                                  Sincerely,
                                                  /RA/
                                                  Vincent G. Gaddy, Chief
                                                  Operations Branch
                                                  Division of Reactor Safety
Docket No. 50-458
License No. NPF-47
cc: Electronic Distribution


SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2016301
Dear Mr. Olson:


   
  ML16027A027
In a telephone conversation on January 5, 2016, between Messrs. D. Bergstrom, Initial Exam Lead, and K. Clayton, Chief Examiner, arr
  SUNSI Review          ADAMS            Publicly Available       Non-Sensitive      Keyword:
angements were made for the administration of licensing examinations at River Bend Station during the weeks of September 12 and
   By:                       Yes No       Non-Publicly Available   Sensitive         RGN-002
September 19, 2016.
  OFFICE       SOE: OB   C: DRS/OB
 
  NAME         KClayton   VGaddy
  SIGNATURE /RA/           /RA/
As agreed during the telephone conversation, the NRC will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power
  DATE         1/26/16   1/27/16
 
                                       
Plant Operators," Revision 2, Supplement 1.  Your staff will be given the opportunity to review the examinations during the week of, or before, August 1, 2016. 
Letter to Eric W. Olson from Vincent G. Gaddy, dated January 27, 2016
 
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR
              LICENSING EXAMINATION 05000458/2016301
To meet the above schedule, it will be necessary for your staff to furnish the supporting reference materials identified in Attachment 3 to ES-201 by February 1, 2016.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the
Electronic distribution by RIV:
required reference materials, or the submittal of inadequate or incomplete materials, may cause
Regional Administrator (Marc.Dapas@nrc.gov)
the examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of August 15, 2016.
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
DRP Deputy Director (Ryan.Lantz@nrc.gov)
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
DRS Director (Anton.Vegel@nrc.gov)
your staff shall capture all relevant simulator data (needed for the NRC to make licensing decisions) during the dynamic operating tests and shall retain this data until the examination results are final. 
DRS Deputy Director (Jeff.Clark@nrc.gov)
 
Senior Resident Inspector (Shiattin.Makor@nrc.gov)
Resident Inspector (Brian.Parks@nrc.gov)
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
RBS Administrative Assistant (Lisa.Day@nrc.gov)
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
E. Olson - 2 -
Senior Project Engineer (Cale.Young@nrc.gov)
  To permit timely NRC review and evaluation, your staff shall submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval
Project Engineer (Michael.Stafford@nrc.gov)
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not
Project Engineer (Lindsay.Brandt@nrc.gov)
received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has
Public Affairs Officer (Victor.Dricks@nrc.gov)
been completed shall be submitted at least 14 days before the first examination date.
Project Manager (Alan.Wang@nrc.gov)
 
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)
This letter contains information collections that are subject to the
RITS Coordinator (Marisa.Herrera@nrc.gov)
Paperwork Reduction Act of
ACES (R4Enforcement.Resource@nrc.gov)
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for
Regional Counsel (Karla.Fuller@nrc.gov)
this collection of information is estimated to average 500 hours per response, including the time
Technical Support Assistant (Loretta.Williams@nrc.gov)
for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
OEWEB Resource (OEWEB Resource@nrc.gov)
INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
OEWEB Resource (Sue.Bogle@nrc.gov)
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
 
this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. Bergstrom has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. K. Clayton at 817-200-1216
or myself at 817-200-1159.
 
Sincerely, 
  /RA/ 
Vincent G. Gaddy, Chief  Operations Branch  Division of Reactor Safety
 
Docket No. 50-458
License No. NPF-47
 
cc: Electronic Distribution
 
   ML16027A027  SUNSI Review By:   ADAMS Yes    No Publicly Available  Non-Publicly Available Non-Sensitive  Sensitive Keyword: RGN-002 OFFICE SOE: OB C: DRS/OB     NAME KClayton VGaddy     SIGNATURE /RA/ /RA/     DATE 1/26/16 1/27/16      
  Letter to Eric W. Olson from Vincent G. Gaddy, dated January 27, 2016  
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2016301  
Electronic distribution by RIV:  
Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Shiattin.Makor@nrc.gov)  
Resident Inspector (Brian.Parks@nrc.gov)  
RBS Administrative Assistant (Lisa.Day@nrc.gov)  
 
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)  
Project Engineer (Michael.Stafford@nrc.gov) Project Engineer (Lindsay.Brandt@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
 
Project Manager (Alan.Wang@nrc.gov)  
 
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) OEWEB Resource (OEWEB Resource@nrc.gov) OEWEB Resource (Sue.Bogle@nrc.gov)  
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
}}
}}

Latest revision as of 19:44, 4 December 2019

Notification of NRC Initial Operator Licensing Examination 05000458/2016301
ML16027A027
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/27/2016
From: Vincent Gaddy
Operations Branch IV
To: Olson E
Entergy Operations
References
50-458/16-301
Download: ML16027A027 (4)


See also: IR 05000458/2016301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

January 27, 2016

Mr. Eric W. Olson, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000458/2016301

Dear Mr. Olson:

In a telephone conversation on January 5, 2016, between Messrs. D. Bergstrom, Initial Exam

Lead, and K. Clayton, Chief Examiner, arrangements were made for the administration of

licensing examinations at River Bend Station during the weeks of September 12 and

September 19, 2016.

As agreed during the telephone conversation, the NRC will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 10, and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power

Plant Operators, Revision 2, Supplement 1. Your staff will be given the opportunity to review

the examinations during the week of, or before, August 1, 2016.

To meet the above schedule, it will be necessary for your staff to furnish the supporting

reference materials identified in Attachment 3 to ES-201 by February 1, 2016. We request that

any personal, proprietary, sensitive unclassified, or safeguards information in your response be

contained in a separate enclosure and appropriately marked. Any delay in receiving the

required reference materials, or the submittal of inadequate or incomplete materials, may cause

the examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of August 15, 2016.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff shall capture all relevant simulator data (needed for the NRC to make licensing

decisions) during the dynamic operating tests and shall retain this data until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

E. Olson -2-

To permit timely NRC review and evaluation, your staff shall submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed shall be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosures will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Thank you for your cooperation in this matter. Mr. Bergstrom has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the

NRCs examination procedures and guidelines, please contact Mr. K. Clayton at 817-200-1216

or myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-458

License No. NPF-47

cc: Electronic Distribution

ML16027A027

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: Yes No Non-Publicly Available Sensitive RGN-002

OFFICE SOE: OB C: DRS/OB

NAME KClayton VGaddy

SIGNATURE /RA/ /RA/

DATE 1/26/16 1/27/16

Letter to Eric W. Olson from Vincent G. Gaddy, dated January 27, 2016

SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000458/2016301

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Shiattin.Makor@nrc.gov)

Resident Inspector (Brian.Parks@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource (OEWEB Resource@nrc.gov)

OEWEB Resource (Sue.Bogle@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)