Information Notice 1985-44, Emergency Communication System Monthly Test: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/30/1985
| issue date = 05/30/1985
| title = Emergency Communication System Monthly Test
| title = Emergency Communication System Monthly Test
| author name = Jordan E L
| author name = Jordan E
| author affiliation = NRC/IE
| author affiliation = NRC/IE
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:SSINS No.: 6835IN 85-44UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF INSPECTION AND ENFORCEMENTWASHINGTON, D.C. 20555May 30, 1985IE INFORMATION NOTICE NO. 85-44: EMERGENCY COMMUNICATION SYSTEM MONTHLY TEST
{{#Wiki_filter:SSINS No.: 6835 IN 85-44 UNITED STATES
 
NUCLEAR REGULATORY COMMISSION
 
OFFICE OF INSPECTION AND ENFORCEMENT
 
WASHINGTON, D.C. 20555 May 30, 1985 IE INFORMATION NOTICE NO. 85-44:   EMERGENCY COMMUNICATION SYSTEM MONTHLY TEST


==Addressees==
==Addressees==
:All nuclear power reactor facilities holding an operating license and NFSErwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.
:
All nuclear power reactor facilities holding an operating license and NFS
 
Erwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.


==Purpose==
==Purpose==
:This information notice is being issued to bring malfunctions of the communi-cation system to the attention of licensees and remind them of their responsi-bility to test required communication systems in accordance with 10 CFR 50. Itis expected that recipients will review the information for applicability totheir facilities and consider actions, if appropriate, to preclude a similarproblem occurring at their facilities. However, suggestions contained in thisinformation notice do not constitute NRC requirements; therefore, no specificaction or written response is required.Discussion:Section 50.54(q) of Part 50 requires licensees to follow emergency plans whichmeet the requirements of Appendix E to Part 50. Section IV.E.9.d of Appendix Erequires monthly tests of provisions for communicating with NRC from the controlroom, the Technical Support Center, and the Emergency Operations Facility.Licensee emergency plans might contain additional testing requirements.Emergency preparedness exercises and specific tests by NRC Headquarters Opera-tions Officers have identified serious communication malfunctions, which werepreviously undetected because of inadequate monthly testing. In most of thosecases, neither the Emergency Notification System (ENS) nor Health PhysicsNetwork (HPN) telephones were found to have been tested routinely.This Information Notice reminds licensees of their responsibility for satisfy-ing the requirement for monthly testing of the ENS and HPN telephones. The NRCis responsible for testing ENS and HPN telephones located in the NRC ResidentInspector's office and for testing the link between the NRC Operations Centerand the Regional Office Operations Center since communications with the licenseevia HPN and ENS are completed through the Headquarters Operations Center.This Information Notice also clarifies that violations in this area may becategorized at Severity Level III, and civil penalties may be considered.8505280195 IN 85-44May 30, 1985 Compliance with the regulation cited above may be achieved through implementa-tion of the testing scheme shown in Attachment 1.The primary system for emergency communications with the NRC is a combinationof the ENS and the HPN. Licensees should note that the backup means ofcommunications for a given link is not required to be tested unless the primarysystem is not available.No specific action or written response is required by this information notice.If you have any questions about this matter, please contact the RegionalAdministrator of the appropriate Regional Office or the technical contactlisted below.war Jordan, DirectorDivi of Emergency Preparednessan Engineering ResponseOffice of Inspection and Enforcement
:
This information notice is being issued to bring malfunctions of the communi- cation system to the attention of licensees and remind them of their responsi- bility to test required communication systems in accordance with 10 CFR 50. It
 
is expected that recipients will review the information for applicability to
 
their facilities and consider actions, if appropriate, to preclude a similar
 
problem occurring at their facilities. However, suggestions contained in this
 
information notice do not constitute NRC requirements; therefore, no specific
 
action or written response is required.
 
Discussion:
Section 50.54(q) of Part 50 requires licensees to follow emergency plans which
 
meet the requirements of Appendix E to Part 50. Section IV.E.9.d of Appendix E
 
requires monthly tests of provisions for communicating with NRC from the control
 
room, the Technical Support Center, and the Emergency Operations Facility.
 
Licensee emergency plans might contain additional testing requirements.
 
Emergency preparedness exercises and specific tests by NRC Headquarters Opera- tions Officers have identified serious communication malfunctions, which were
 
previously undetected because of inadequate monthly testing. In most of those
 
cases, neither the Emergency Notification System (ENS) nor Health Physics
 
Network (HPN) telephones were found to have been tested routinely.
 
This Information Notice reminds licensees of their responsibility for satisfy- ing the requirement for monthly testing of the ENS and HPN telephones. The NRC
 
is responsible for testing ENS and HPN telephones located in the NRC Resident
 
Inspector's office and for testing the link between the NRC Operations Center
 
and the Regional Office Operations Center since communications with the licensee
 
via HPN and ENS are completed through the Headquarters Operations Center.
 
This Information Notice also clarifies that violations in this area may be
 
categorized at Severity Level III, and civil penalties may be considered.
 
8505280195
 
IN 85-44 May 30, 1985 Compliance with the regulation cited above may be achieved through implementa- tion of the testing scheme shown in Attachment 1.
 
The primary system for emergency communications with the NRC is a combination
 
of the ENS and the HPN. Licensees should note that the backup means of
 
communications for a given link is not required to be tested unless the primary
 
system is not available.
 
No specific action or written response is required by this information notice.
 
If you have any questions about this matter, please contact the Regional
 
Administrator of the appropriate Regional Office or the technical contact
 
listed below.
 
war     Jordan, Director
 
Divi      of Emergency Preparedness
 
an Engineering Response
 
Office of Inspection and Enforcement


===Technical Contact:===
===Technical Contact:===
H. M. Hawkins, IE--- 301-492-4145-----Attachments:1. Testing of Emergency Communications LinksBetween Licensees and NRC2. List of Recently Issued IE Information Notices


IAttachment 1IN 85-44May 30, 1985TESTING OF EMERGENCYCOMMUNICATIONS LINKS BETWEEN LICENSEES AND NRCThe matrix below indicates the primary modes of operation forcations links which are to be tested monthly by the licensee.the NRC communi-'AFROMIVHeadquarters*Control RoomENS onlyTechnical Support CenterENS and HPNEmergencyOperations FacilityENS and HPNENS = Emergency Notification SystemHPN = Health Physics Network* Communication between the Licensee and appropriate Regional NRC Officewill always be completed through the Headquarters Operations Center.The communications link between the Headquarters Operations Center andthe Regional Office is tested by NRC.
===H. M. Hawkins, IE===
                  ---301-492-4145-----
Attachments:
1. Testing of Emergency Communications Links


Attachment 2IN 85-44May 30, 1985LIST OF RECENTLY ISSUEDIE INFORMATION NOTICESInformation Date ofNotice No. Subject Issue Issued to85-4385-4285-4185-4085-3985-3885-3784-55Sup. 185-20Sup. 1Radiography Events At PowerReactorsLoose Phosphor In Panasonic800 Series Badge Thermo-luminescent Dosimeter (TLD)ElementsScheduling Of Pre-LicensingEmergency PreparednessExercisesDeficiencies In EquipmentQualification Testing AndCertification ProcessAuditability of ElectricalEquipment-QualificationRecords At Licensees'FacilitiesLoose Parts Obstruct ControlRod Drive MechanismChemical Cleaning Of SteamGenerator At Milestone 2Seal Table Leaks At PWRs5/30/855/29/855/24/855/22/855/22/855/21/855/14/855/14/85All power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdinga CPAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OL or CPAll PWR facilitiesdesigned by B&Wholding an OL or CPAll pressure waterreactor facilitiesholding an OL or CPAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OL or CPMotor-Operated Valve Failures 5/14/85Due To Hammering EffectOL = Operating LicenseCP = Construction Permit
Between Licensees and NRC


}}
2. List of Recently Issued IE Information Notices
 
I
 
Attachment 1 IN 85-44 May 30, 1985 TESTING OF EMERGENCY COMMUNICATIONS LINKS BETWEEN LICENSEES AND NRC
 
The matrix below indicates the primary modes of operation for the NRC communi- cations links which are to be tested monthly by the licensee.
 
'A
 
FROM                                          IV
 
Headquarters*
Control Room                                  ENS only
 
Technical Support Center                      ENS and HPN
 
Emergency Operations Facility                ENS and HPN
 
ENS = Emergency Notification System
 
HPN = Health Physics Network
 
*    Communication between the Licensee and appropriate Regional NRC Office
 
will always be completed through the Headquarters Operations Center.
 
The communications link between the Headquarters Operations Center and
 
the Regional Office is tested by NRC.
 
Attachment 2 IN 85-44 May 30, 1985 LIST OF RECENTLY ISSUED
 
IE INFORMATION NOTICES
 
Information                                    Date of
 
Notice No.      Subject                        Issue    Issued to
 
85-43          Radiography Events At Power    5/30/85  All power reactor
 
Reactors                                facilities holding
 
an OL or CP
 
85-42          Loose Phosphor In Panasonic    5/29/85  All power reactor
 
800 Series Badge Thermo-                facilities holding
 
luminescent Dosimeter (TLD)            an OL or CP
 
Elements
 
85-41            Scheduling Of Pre-Licensing  5/24/85  All power reactor
 
Emergency Preparedness                facilities holding
 
Exercises                              a CP
 
85-40            Deficiencies In Equipment    5/22/85  All power reactor
 
Qualification Testing And              facilities holding
 
Certification Process                  an OL or CP
 
85-39            Auditability of Electrical    5/22/85  All power reactor
 
Equipment-Qualification                facilities holding
 
Records At Licensees'                  an OL or CP
 
Facilities
 
85-38          Loose Parts Obstruct Control  5/21/85  All PWR facilities
 
Rod Drive Mechanism                    designed by B&W
 
holding an OL or CP
 
85-37          Chemical Cleaning Of Steam    5/14/85 All pressure water
 
Generator At Milestone 2                reactor facilities
 
holding an OL or CP
 
84-55          Seal Table Leaks At PWRs      5/14/85  All power reactor
 
Sup. 1                                                  facilities holding
 
an OL or CP
 
85-20          Motor-Operated Valve Failures 5/14/85  All power reactor
 
Sup. 1          Due To Hammering Effect                facilities holding
 
an OL or CP
 
OL = Operating License
 
CP = Construction Permit}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Latest revision as of 03:37, 24 November 2019

Emergency Communication System Monthly Test
ML031180374
Person / Time
Issue date: 05/30/1985
From: Jordan E
NRC/IE
To:
References
IN-85-044, NUDOCS 8505280195
Download: ML031180374 (4)


SSINS No.: 6835 IN 85-44 UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

WASHINGTON, D.C. 20555 May 30, 1985 IE INFORMATION NOTICE NO. 85-44: EMERGENCY COMMUNICATION SYSTEM MONTHLY TEST

Addressees

All nuclear power reactor facilities holding an operating license and NFS

Erwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.

Purpose

This information notice is being issued to bring malfunctions of the communi- cation system to the attention of licensees and remind them of their responsi- bility to test required communication systems in accordance with 10 CFR 50. It

is expected that recipients will review the information for applicability to

their facilities and consider actions, if appropriate, to preclude a similar

problem occurring at their facilities. However, suggestions contained in this

information notice do not constitute NRC requirements; therefore, no specific

action or written response is required.

Discussion:

Section 50.54(q) of Part 50 requires licensees to follow emergency plans which

meet the requirements of Appendix E to Part 50.Section IV.E.9.d of Appendix E

requires monthly tests of provisions for communicating with NRC from the control

room, the Technical Support Center, and the Emergency Operations Facility.

Licensee emergency plans might contain additional testing requirements.

Emergency preparedness exercises and specific tests by NRC Headquarters Opera- tions Officers have identified serious communication malfunctions, which were

previously undetected because of inadequate monthly testing. In most of those

cases, neither the Emergency Notification System (ENS) nor Health Physics

Network (HPN) telephones were found to have been tested routinely.

This Information Notice reminds licensees of their responsibility for satisfy- ing the requirement for monthly testing of the ENS and HPN telephones. The NRC

is responsible for testing ENS and HPN telephones located in the NRC Resident

Inspector's office and for testing the link between the NRC Operations Center

and the Regional Office Operations Center since communications with the licensee

via HPN and ENS are completed through the Headquarters Operations Center.

This Information Notice also clarifies that violations in this area may be

categorized at Severity Level III, and civil penalties may be considered.

8505280195

IN 85-44 May 30, 1985 Compliance with the regulation cited above may be achieved through implementa- tion of the testing scheme shown in Attachment 1.

The primary system for emergency communications with the NRC is a combination

of the ENS and the HPN. Licensees should note that the backup means of

communications for a given link is not required to be tested unless the primary

system is not available.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the Regional

Administrator of the appropriate Regional Office or the technical contact

listed below.

war Jordan, Director

Divi of Emergency Preparedness

an Engineering Response

Office of Inspection and Enforcement

Technical Contact:

H. M. Hawkins, IE

---301-492-4145-----

Attachments:

1. Testing of Emergency Communications Links

Between Licensees and NRC

2. List of Recently Issued IE Information Notices

I

Attachment 1 IN 85-44 May 30, 1985 TESTING OF EMERGENCY COMMUNICATIONS LINKS BETWEEN LICENSEES AND NRC

The matrix below indicates the primary modes of operation for the NRC communi- cations links which are to be tested monthly by the licensee.

'A

FROM IV

Headquarters*

Control Room ENS only

Technical Support Center ENS and HPN

Emergency Operations Facility ENS and HPN

ENS = Emergency Notification System

HPN = Health Physics Network

  • Communication between the Licensee and appropriate Regional NRC Office

will always be completed through the Headquarters Operations Center.

The communications link between the Headquarters Operations Center and

the Regional Office is tested by NRC.

Attachment 2 IN 85-44 May 30, 1985 LIST OF RECENTLY ISSUED

IE INFORMATION NOTICES

Information Date of

Notice No. Subject Issue Issued to

85-43 Radiography Events At Power 5/30/85 All power reactor

Reactors facilities holding

an OL or CP

85-42 Loose Phosphor In Panasonic 5/29/85 All power reactor

800 Series Badge Thermo- facilities holding

luminescent Dosimeter (TLD) an OL or CP

Elements

85-41 Scheduling Of Pre-Licensing 5/24/85 All power reactor

Emergency Preparedness facilities holding

Exercises a CP

85-40 Deficiencies In Equipment 5/22/85 All power reactor

Qualification Testing And facilities holding

Certification Process an OL or CP

85-39 Auditability of Electrical 5/22/85 All power reactor

Equipment-Qualification facilities holding

Records At Licensees' an OL or CP

Facilities

85-38 Loose Parts Obstruct Control 5/21/85 All PWR facilities

Rod Drive Mechanism designed by B&W

holding an OL or CP

85-37 Chemical Cleaning Of Steam 5/14/85 All pressure water

Generator At Milestone 2 reactor facilities

holding an OL or CP

84-55 Seal Table Leaks At PWRs 5/14/85 All power reactor

Sup. 1 facilities holding

an OL or CP

85-20 Motor-Operated Valve Failures 5/14/85 All power reactor

Sup. 1 Due To Hammering Effect facilities holding

an OL or CP

OL = Operating License

CP = Construction Permit