Information Notice 1985-44, Emergency Communication System Monthly Test: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:SSINS No.: 6835 IN 85-44 UNITED STATES NUCLEAR REGULATORY
{{#Wiki_filter:SSINS No.: 6835 IN 85-44 UNITED STATES


COMMISSION
NUCLEAR REGULATORY COMMISSION


OFFICE OF INSPECTION
OFFICE OF INSPECTION AND ENFORCEMENT


===AND ENFORCEMENT===
WASHINGTON, D.C. 20555 May 30, 1985 IE INFORMATION NOTICE NO. 85-44:   EMERGENCY COMMUNICATION SYSTEM MONTHLY TEST
WASHINGTON, D.C. 20555 May 30, 1985 IE INFORMATION
 
NOTICE NO. 85-44: EMERGENCY
 
COMMUNICATION
 
SYSTEM MONTHLY TEST


==Addressees==
==Addressees==
:
:
All nuclear power reactor facilities
All nuclear power reactor facilities holding an operating license and NFS


holding an operating
Erwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.
 
license and NFS Erwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.


==Purpose==
==Purpose==
: This information
:
This information notice is being issued to bring malfunctions of the communi- cation system to the attention of licensees and remind them of their responsi- bility to test required communication systems in accordance with 10 CFR 50. It


notice is being issued to bring malfunctions
is expected that recipients will review the information for applicability to


of the communi-cation system to the attention
their facilities and consider actions, if appropriate, to preclude a similar


of licensees
problem occurring at their facilities. However, suggestions contained in this


and remind them of their responsi-bility to test required communication
information notice do not constitute NRC requirements; therefore, no specific


systems in accordance
action or written response is required.


with 10 CFR 50. It is expected that recipients
Discussion:
Section 50.54(q) of Part 50 requires licensees to follow emergency plans which


will review the information
meet the requirements of Appendix E to Part 50. Section IV.E.9.d of Appendix E


for applicability
requires monthly tests of provisions for communicating with NRC from the control


to their facilities
room, the Technical Support Center, and the Emergency Operations Facility.


and consider actions, if appropriate, to preclude a similar problem occurring
Licensee emergency plans might contain additional testing requirements.


at their facilities.
Emergency preparedness exercises and specific tests by NRC Headquarters Opera- tions Officers have identified serious communication malfunctions, which were


However, suggestions
previously undetected because of inadequate monthly testing. In most of those


contained
cases, neither the Emergency Notification System (ENS) nor Health Physics


in this information
Network (HPN) telephones were found to have been tested routinely.


notice do not constitute
This Information Notice reminds licensees of their responsibility for satisfy- ing the requirement for monthly testing of the ENS and HPN telephones. The NRC


NRC requirements;
is responsible for testing ENS and HPN telephones located in the NRC Resident
therefore, no specific action or written response is required.Discussion:
Section 50.54(q) of Part 50 requires licensees


to follow emergency
Inspector's office and for testing the link between the NRC Operations Center


plans which meet the requirements
and the Regional Office Operations Center since communications with the licensee


of Appendix E to Part 50. Section IV.E.9.d of Appendix E requires monthly tests of provisions
via HPN and ENS are completed through the Headquarters Operations Center.


for communicating
This Information Notice also clarifies that violations in this area may be


with NRC from the control room, the Technical
categorized at Severity Level III, and civil penalties may be considered.


Support Center, and the Emergency
8505280195


Operations
IN 85-44 May 30, 1985 Compliance with the regulation cited above may be achieved through implementa- tion of the testing scheme shown in Attachment 1.


Facility.Licensee emergency
The primary system for emergency communications with the NRC is a combination


plans might contain additional
of the ENS and the HPN. Licensees should note that the backup means of


testing requirements.
communications for a given link is not required to be tested unless the primary


Emergency
system is not available.


preparedness
No specific action or written response is required by this information notice.


exercises
If you have any questions about this matter, please contact the Regional


and specific tests by NRC Headquarters
Administrator of the appropriate Regional Office or the technical contact


Opera-tions Officers have identified
listed below.


serious communication
war      Jordan, Director


malfunctions, which were previously
Divi      of Emergency Preparedness


undetected
an Engineering Response


because of inadequate
Office of Inspection and Enforcement


monthly testing. In most of those cases, neither the Emergency
===Technical Contact:===


Notification
===H. M. Hawkins, IE===
 
                  ---301-492-4145-----
System (ENS) nor Health Physics Network (HPN) telephones
 
were found to have been tested routinely.
 
This Information
 
Notice reminds licensees
 
of their responsibility
 
for satisfy-ing the requirement
 
for monthly testing of the ENS and HPN telephones.
 
The NRC is responsible
 
for testing ENS and HPN telephones
 
located in the NRC Resident Inspector's
 
office and for testing the link between the NRC Operations
 
Center and the Regional Office Operations
 
Center since communications
 
with the licensee via HPN and ENS are completed
 
through the Headquarters
 
Operations
 
Center.This Information
 
Notice also clarifies
 
that violations
 
in this area may be categorized
 
at Severity Level III, and civil penalties
 
may be considered.
 
8505280195 IN 85-44 May 30, 1985 Compliance
 
with the regulation
 
cited above may be achieved through implementa- tion of the testing scheme shown in Attachment
 
1.The primary system for emergency
 
communications
 
with the NRC is a combination
 
of the ENS and the HPN. Licensees
 
should note that the backup means of communications
 
for a given link is not required to be tested unless the primary system is not available.
 
No specific action or written response is required by this information
 
notice.If you have any questions
 
about this matter, please contact the Regional Administrator
 
of the appropriate
 
Regional Office or the technical
 
contact listed below.war Jordan, Director Divi of Emergency
 
===Preparedness===
an Engineering
 
Response Office of Inspection
 
and Enforcement
 
Technical
 
Contact: H. M. Hawkins, IE--- 301-492-4145-----
Attachments:
Attachments:
1. Testing of Emergency
1. Testing of Emergency Communications Links


Communications
Between Licensees and NRC


Links Between Licensees
2. List of Recently Issued IE Information Notices


and NRC 2. List of Recently Issued IE Information
I


Notices
Attachment 1 IN 85-44 May 30, 1985 TESTING OF EMERGENCY COMMUNICATIONS LINKS BETWEEN LICENSEES AND NRC


I Attachment
The matrix below indicates the primary modes of operation for the NRC communi- cations links which are to be tested monthly by the licensee.


1 IN 85-44 May 30, 1985 TESTING OF EMERGENCY COMMUNICATIONS
'A


LINKS BETWEEN LICENSEES
FROM                                          IV


AND NRC The matrix below indicates
Headquarters*
Control Room                                  ENS only


the primary modes of operation
Technical Support Center                      ENS and HPN


for cations links which are to be tested monthly by the licensee.the NRC communi-'A FROM IV Headquarters*
Emergency Operations Facility                ENS and HPN
Control Room ENS only Technical


Support Center ENS and HPN Emergency Operations
ENS = Emergency Notification System


Facility ENS and HPN ENS = Emergency
HPN = Health Physics Network


Notification
*    Communication between the Licensee and appropriate Regional NRC Office


System HPN = Health Physics Network* Communication
will always be completed through the Headquarters Operations Center.


between the Licensee and appropriate
The communications link between the Headquarters Operations Center and


Regional NRC Office will always be completed
the Regional Office is tested by NRC.


through the Headquarters
Attachment 2 IN 85-44 May 30, 1985 LIST OF RECENTLY ISSUED


Operations
IE INFORMATION NOTICES


Center.The communications
Information                                    Date of


link between the Headquarters
Notice No.      Subject                        Issue    Issued to


Operations
85-43          Radiography Events At Power    5/30/85  All power reactor


Center and the Regional Office is tested by NRC.
Reactors                                facilities holding


Attachment
an OL or CP


2 IN 85-44 May 30, 1985 LIST OF RECENTLY ISSUED IE INFORMATION
85-42          Loose Phosphor In Panasonic    5/29/85  All power reactor


NOTICES Information
800 Series Badge Thermo-                facilities holding


Date of Notice No. Subject Issue Issued to 85-43 85-42 85-41 85-40 85-39 85-38 85-37 84-55 Sup. 1 85-20 Sup. 1 Radiography
luminescent Dosimeter (TLD)            an OL or CP


Events At Power Reactors Loose Phosphor In Panasonic 800 Series Badge Thermo-luminescent
Elements


Dosimeter (TLD)Elements Scheduling
85-41            Scheduling Of Pre-Licensing  5/24/85  All power reactor


Of Pre-Licensing
Emergency Preparedness                facilities holding


Emergency
Exercises                              a CP


===Preparedness===
85-40            Deficiencies In Equipment    5/22/85  All power reactor
Exercises Deficiencies


In Equipment Qualification
Qualification Testing And              facilities holding


Testing And Certification
Certification Process                  an OL or CP


Process Auditability
85-39            Auditability of Electrical    5/22/85  All power reactor


of Electrical
Equipment-Qualification                facilities holding


Equipment-Qualification
Records At Licensees'                  an OL or CP


Records At Licensees'
Facilities
Facilities


Loose Parts Obstruct Control Rod Drive Mechanism Chemical Cleaning Of Steam Generator
85-38          Loose Parts Obstruct Control 5/21/85 All PWR facilities
 
At Milestone
 
2 Seal Table Leaks At PWRs 5/30/85 5/29/85 5/24/85 5/22/85 5/22/85 5/21/85 5/14/85 5/14/85 All power reactor facilities


holding an OL or CP All power reactor facilities
Rod Drive Mechanism                    designed by B&W


holding an OL or CP All power reactor facilities
holding an OL or CP


holding a CP All power reactor facilities
85-37          Chemical Cleaning Of Steam    5/14/85 All pressure water


holding an OL or CP All power reactor facilities
Generator At Milestone 2                reactor facilities


holding an OL or CP All PWR facilities
holding an OL or CP


designed by B&W holding an OL or CP All pressure water reactor facilities
84-55          Seal Table Leaks At PWRs      5/14/85  All power reactor


holding an OL or CP All power reactor facilities
Sup. 1                                                  facilities holding


holding an OL or CP All power reactor facilities
an OL or CP


holding an OL or CP Motor-Operated
85-20          Motor-Operated Valve Failures 5/14/85  All power reactor


Valve Failures 5/14/85 Due To Hammering
Sup. 1          Due To Hammering Effect                facilities holding


Effect OL = Operating
an OL or CP


License CP = Construction
OL = Operating License


Permit}}
CP = Construction Permit}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Latest revision as of 03:37, 24 November 2019

Emergency Communication System Monthly Test
ML031180374
Person / Time
Issue date: 05/30/1985
From: Jordan E
NRC/IE
To:
References
IN-85-044, NUDOCS 8505280195
Download: ML031180374 (4)


SSINS No.: 6835 IN 85-44 UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

WASHINGTON, D.C. 20555 May 30, 1985 IE INFORMATION NOTICE NO. 85-44: EMERGENCY COMMUNICATION SYSTEM MONTHLY TEST

Addressees

All nuclear power reactor facilities holding an operating license and NFS

Erwin, General Atomics, UNC Montville, B&W LCR Lynchburg, and B&W Lynchburg.

Purpose

This information notice is being issued to bring malfunctions of the communi- cation system to the attention of licensees and remind them of their responsi- bility to test required communication systems in accordance with 10 CFR 50. It

is expected that recipients will review the information for applicability to

their facilities and consider actions, if appropriate, to preclude a similar

problem occurring at their facilities. However, suggestions contained in this

information notice do not constitute NRC requirements; therefore, no specific

action or written response is required.

Discussion:

Section 50.54(q) of Part 50 requires licensees to follow emergency plans which

meet the requirements of Appendix E to Part 50.Section IV.E.9.d of Appendix E

requires monthly tests of provisions for communicating with NRC from the control

room, the Technical Support Center, and the Emergency Operations Facility.

Licensee emergency plans might contain additional testing requirements.

Emergency preparedness exercises and specific tests by NRC Headquarters Opera- tions Officers have identified serious communication malfunctions, which were

previously undetected because of inadequate monthly testing. In most of those

cases, neither the Emergency Notification System (ENS) nor Health Physics

Network (HPN) telephones were found to have been tested routinely.

This Information Notice reminds licensees of their responsibility for satisfy- ing the requirement for monthly testing of the ENS and HPN telephones. The NRC

is responsible for testing ENS and HPN telephones located in the NRC Resident

Inspector's office and for testing the link between the NRC Operations Center

and the Regional Office Operations Center since communications with the licensee

via HPN and ENS are completed through the Headquarters Operations Center.

This Information Notice also clarifies that violations in this area may be

categorized at Severity Level III, and civil penalties may be considered.

8505280195

IN 85-44 May 30, 1985 Compliance with the regulation cited above may be achieved through implementa- tion of the testing scheme shown in Attachment 1.

The primary system for emergency communications with the NRC is a combination

of the ENS and the HPN. Licensees should note that the backup means of

communications for a given link is not required to be tested unless the primary

system is not available.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the Regional

Administrator of the appropriate Regional Office or the technical contact

listed below.

war Jordan, Director

Divi of Emergency Preparedness

an Engineering Response

Office of Inspection and Enforcement

Technical Contact:

H. M. Hawkins, IE

---301-492-4145-----

Attachments:

1. Testing of Emergency Communications Links

Between Licensees and NRC

2. List of Recently Issued IE Information Notices

I

Attachment 1 IN 85-44 May 30, 1985 TESTING OF EMERGENCY COMMUNICATIONS LINKS BETWEEN LICENSEES AND NRC

The matrix below indicates the primary modes of operation for the NRC communi- cations links which are to be tested monthly by the licensee.

'A

FROM IV

Headquarters*

Control Room ENS only

Technical Support Center ENS and HPN

Emergency Operations Facility ENS and HPN

ENS = Emergency Notification System

HPN = Health Physics Network

  • Communication between the Licensee and appropriate Regional NRC Office

will always be completed through the Headquarters Operations Center.

The communications link between the Headquarters Operations Center and

the Regional Office is tested by NRC.

Attachment 2 IN 85-44 May 30, 1985 LIST OF RECENTLY ISSUED

IE INFORMATION NOTICES

Information Date of

Notice No. Subject Issue Issued to

85-43 Radiography Events At Power 5/30/85 All power reactor

Reactors facilities holding

an OL or CP

85-42 Loose Phosphor In Panasonic 5/29/85 All power reactor

800 Series Badge Thermo- facilities holding

luminescent Dosimeter (TLD) an OL or CP

Elements

85-41 Scheduling Of Pre-Licensing 5/24/85 All power reactor

Emergency Preparedness facilities holding

Exercises a CP

85-40 Deficiencies In Equipment 5/22/85 All power reactor

Qualification Testing And facilities holding

Certification Process an OL or CP

85-39 Auditability of Electrical 5/22/85 All power reactor

Equipment-Qualification facilities holding

Records At Licensees' an OL or CP

Facilities

85-38 Loose Parts Obstruct Control 5/21/85 All PWR facilities

Rod Drive Mechanism designed by B&W

holding an OL or CP

85-37 Chemical Cleaning Of Steam 5/14/85 All pressure water

Generator At Milestone 2 reactor facilities

holding an OL or CP

84-55 Seal Table Leaks At PWRs 5/14/85 All power reactor

Sup. 1 facilities holding

an OL or CP

85-20 Motor-Operated Valve Failures 5/14/85 All power reactor

Sup. 1 Due To Hammering Effect facilities holding

an OL or CP

OL = Operating License

CP = Construction Permit