ML061460105: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML061460105
| number = ML061460105
| issue date = 04/30/2006
| issue date = 04/30/2006
| title = Rancho Seco Nuclear Generating Station License Termination Plan, Chapter 2, Site Characterization, Appendix 2-A, Miscellaneous Historical Construction Photographs
| title = License Termination Plan, Chapter 2, Site Characterization, Appendix 2-A, Miscellaneous Historical Construction Photographs
| author name =  
| author name =  
| author affiliation = Sacramento Municipal Utility District (SMUD)
| author affiliation = Sacramento Municipal Utility District (SMUD)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-93  December 27, 1968 - Clay access road and Clay East road intersection Rancho Seco License Termination Plan  Revision 0 Chapter 2, Site Characterization  April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-94  March 10, 1969 - Site Preparation, looking south at rough grading in turbine and reactor area Rancho Seco License Termination Plan  Revision 0 Chapter 2, Site Characterization  April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-95  March 10, 1969 - Site Preparation, looking north at first rough grading cut into the turbine area Rancho Seco License Termination Plan  Revision 0 Chapter 2, Site Characterization  April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-96  April 4, 1969 - Site Preparation, looking north along the east edge of the reactor containment structure
{{#Wiki_filter:Rancho Seco License Termination Plan                                               Revision 0 Chapter 2, Site Characterization                                                   April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs December 27, 1968 - Clay access road and Clay East road intersection Page 2-93


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-97  May 1, 1969 - Site Preparation, Twin Cities access road looking north
Rancho Seco License Termination Plan                                                       Revision 0 Chapter 2, Site Characterization                                                           April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 10, 1969 - Site Preparation, looking south at rough grading in turbine and reactor area Page 2-94


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-98  September 9, 1969 - forming for the fill concrete under the tendon access gallery floor slab
Rancho Seco License Termination Plan                                                         Revision 0 Chapter 2, Site Characterization                                                             April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 10, 1969 - Site Preparation, looking north at first rough grading cut into the turbine area Page 2-95


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-99  November 11, 1969 - a view of the shop and warehouse construction taken from the tower crane
Rancho Seco License Termination Plan                                                         Revision 0 Chapter 2, Site Characterization                                                             April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 4, 1969 - Site Preparation, looking north along the east edge of the reactor containment structure Page 2-96


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-100  February 9, 1970 - installing floor liner plate on reactor building floor slab
Rancho Seco License Termination Plan                                                 Revision 0 Chapter 2, Site Characterization                                                     April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 1, 1969 - Site Preparation, Twin Cities access road looking north Page 2-97


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-101  March 20, 1970 - a view looking north of the auxiliary building sub-basement slab
Rancho Seco License Termination Plan                                                       Revision 0 Chapter 2, Site Characterization                                                           April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs September 9, 1969 - forming for the fill concrete under the tendon access gallery floor slab Page 2-98


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-102  March 20, 1970 - overall view of the containment structure with cooling tower No. 1 in background
Rancho Seco License Termination Plan                                                   Revision 0 Chapter 2, Site Characterization                                                       April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs November 11, 1969 - a view of the shop and warehouse construction taken from the tower crane Page 2-99


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-103  April 23, 1970 - reinforcing steel and tendon sheathing for the first lift of the containment wall
Rancho Seco License Termination Plan                                                       Revision 0 Chapter 2, Site Characterization                                                           April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs February 9, 1970 - installing floor liner plate on reactor building floor slab Page 2-100


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-104  April 23, 1970 - overall view looking northeast
Rancho Seco License Termination Plan                                                     Revision 0 Chapter 2, Site Characterization                                                         April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - a view looking north of the auxiliary building sub-basement slab Page 2-101


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-105  April 24, 1970 - 108" diameter circulating water pipe forming and reinforcement for concrete encasements
Rancho Seco License Termination Plan                                                       Revision 0 Chapter 2, Site Characterization                                                           April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - overall view of the containment structure with cooling tower No. 1 in background Page 2-102


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-106  May 28, 1970 - looking west at the auxiliary building subbasement wall with the turbine building in the background
Rancho Seco License Termination Plan                                                           Revision 0 Chapter 2, Site Characterization                                                               April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 23, 1970 - reinforcing steel and tendon sheathing for the first lift of the containment wall Page 2-103


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-107  May 28, 1970 - view looking south at the turbine building with the reactor and auxiliary buildings on the extreme left
Rancho Seco License Termination Plan                                   Revision 0 Chapter 2, Site Characterization                                       April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 23, 1970 - overall view looking northeast Page 2-104


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-108  May 28, 1970 - view looking south at the turbine and reactor buildings
Rancho Seco License Termination Plan                                                     Revision 0 Chapter 2, Site Characterization                                                         April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 24, 1970 - 108 diameter circulating water pipe forming and reinforcement for concrete encasements Page 2-105


Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-109  July 17, 1970 - auxiliary buildin g showing reinforcing being placed Rancho Seco License Termination Plan  Revision 0 Chapter 2, Site Characterization  April 2006 Appendix 2-A, Miscellaneous Histo rical Construction Photographs Page 2-110 
Rancho Seco License Termination Plan                                                         Revision 0 Chapter 2, Site Characterization                                                           April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - looking west at the auxiliary building subbasement wall with the turbine building in the background Page 2-106


This page intentionally left blank}}
Rancho Seco License Termination Plan                                                          Revision 0 Chapter 2, Site Characterization                                                            April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - view looking south at the turbine building with the reactor and auxiliary buildings on the extreme left Page 2-107
 
Rancho Seco License Termination Plan                                                  Revision 0 Chapter 2, Site Characterization                                                      April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - view looking south at the turbine and reactor buildings Page 2-108
 
Rancho Seco License Termination Plan                                                Revision 0 Chapter 2, Site Characterization                                                    April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs July 17, 1970 - auxiliary building showing reinforcing being placed Page 2-109
 
Rancho Seco License Termination Plan                            Revision 0 Chapter 2, Site Characterization                                April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs This page intentionally left blank Page 2-110}}

Latest revision as of 19:07, 23 November 2019

License Termination Plan, Chapter 2, Site Characterization, Appendix 2-A, Miscellaneous Historical Construction Photographs
ML061460105
Person / Time
Site: Rancho Seco
Issue date: 04/30/2006
From:
Sacramento Municipal Utility District (SMUD)
To:
Document Control Desk, NRC/FSME
References
MPC&D 06-035, NQA 06-015
Download: ML061460105 (18)


Text

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs December 27, 1968 - Clay access road and Clay East road intersection Page 2-93

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 10, 1969 - Site Preparation, looking south at rough grading in turbine and reactor area Page 2-94

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 10, 1969 - Site Preparation, looking north at first rough grading cut into the turbine area Page 2-95

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 4, 1969 - Site Preparation, looking north along the east edge of the reactor containment structure Page 2-96

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 1, 1969 - Site Preparation, Twin Cities access road looking north Page 2-97

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs September 9, 1969 - forming for the fill concrete under the tendon access gallery floor slab Page 2-98

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs November 11, 1969 - a view of the shop and warehouse construction taken from the tower crane Page 2-99

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs February 9, 1970 - installing floor liner plate on reactor building floor slab Page 2-100

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - a view looking north of the auxiliary building sub-basement slab Page 2-101

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - overall view of the containment structure with cooling tower No. 1 in background Page 2-102

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 23, 1970 - reinforcing steel and tendon sheathing for the first lift of the containment wall Page 2-103

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 23, 1970 - overall view looking northeast Page 2-104

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 24, 1970 - 108 diameter circulating water pipe forming and reinforcement for concrete encasements Page 2-105

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - looking west at the auxiliary building subbasement wall with the turbine building in the background Page 2-106

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - view looking south at the turbine building with the reactor and auxiliary buildings on the extreme left Page 2-107

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - view looking south at the turbine and reactor buildings Page 2-108

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs July 17, 1970 - auxiliary building showing reinforcing being placed Page 2-109

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs This page intentionally left blank Page 2-110