ML061740560: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 19, 2006R. T. RidenoureVice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
{{#Wiki_filter:June 19, 2006 R. T. Ridenoure Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
 
P.O. Box 550 Fort Calhoun, NE 68023-0550
P.O. Box 550 Fort Calhoun, NE 68023-0550


==SUBJECT:==
==SUBJECT:==
Line 24: Line 23:
==Dear Mr. Ridenoure:==
==Dear Mr. Ridenoure:==


On June 2, 2006, you reported in Event Report 42615 that one of your NRC-licensed operatorstested positive for alcohol following a random fitness-for-duty test. This letter is a request for information pertaining to this occurrence. Within 30 days from the date of this letter, please provide answers to the questions listed in Enclosure 1 to this letter and other records and information on this operator's past fitness-for-duty, which are relevant to this occurrence. Any other information that you think is pertinent or useful regarding these occurrence would also be appreciated. We request that any personal privacy, proprietary, or safeguards information in your response be provided in a separate attachment and appropriately marked. The affidavit required by 10 CFR 2.790(b) must accompany your response, where applicable. You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1). You should ensure that (1) the operator meets the general health requirements ofANSI/ANS-3.4-1983, (2) the operator does not have a disqualifying condition under Section 5.3 of that standard, and (3) documentation describing the designated physician's conclusion thatthe operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC. If a conditional license is requested in accordance with 10 CFR 55.25, that condition should be documented on NRC Form 396 and transmitted to the NRC. If you determine that the operator no longer meets the medical qualifications described in10 CFR 55.33(a)(1) then, in accordance with 10 CFR 55.25, you should notify the NRC vialetter of the operator's incapacitation. For example, you must notify the NRC if you determine,based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983.The NRC is interested in obtaining further information regarding your review and any plannedactions to address the apparent increase in the number and frequency of occurrences of reported fitness-for-duty events at the Fort Calhoun facility. Accordingly, we request that, within90 days from the date of this letter, you respond, in writing, to the questions contained in .
On June 2, 2006, you reported in Event Report 42615 that one of your NRC-licensed operators tested positive for alcohol following a random fitness-for-duty test. This letter is a request for information pertaining to this occurrence. Within 30 days from the date of this letter, please provide answers to the questions listed in Enclosure 1 to this letter and other records and information on this operator's past fitness-for-duty, which are relevant to this occurrence. Any other information that you think is pertinent or useful regarding these occurrence would also be appreciated. We request that any personal privacy, proprietary, or safeguards information in your response be provided in a separate attachment and appropriately marked. The affidavit required by 10 CFR 2.790(b) must accompany your response, where applicable.
Omaha Public Power District-2-The NRC will evaluate the information in your replies to this letter to determine if further actionis warranted pursuant to 10 CFR Parts 50 or 55. The response to Enclosure 1, and , if applicable, will be maintained in our Privacy Act System of Records, NRC-16,"Facility Operator Licensees Records Files,"
You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1).
and will be subject to the Privacy Act. In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If you have any questions please feel free to contact Mr. Anthony T. Gody, Chief, OperationsBranch, at (817) 860-8159. Your cooperation is appreciated.Sincerely,/RA/Dwight D. Chamberlain, DirectorDivision of Reactor SafetyDocket:   50-285License: DPR-40Distribution:Joe l. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
You should ensure that (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983, (2) the operator does not have a disqualifying condition under Section 5.3 of that standard, and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC.
If a conditional license is requested in accordance with 10 CFR 55.25, that condition should be documented on NRC Form 396 and transmitted to the NRC.
If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1) then, in accordance with 10 CFR 55.25, you should notify the NRC via letter of the operator's incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983.
The NRC is interested in obtaining further information regarding your review and any planned actions to address the apparent increase in the number and frequency of occurrences of reported fitness-for-duty events at the Fort Calhoun facility. Accordingly, we request that, within 90 days from the date of this letter, you respond, in writing, to the questions contained in .
 
Omaha Public Power District                     The NRC will evaluate the information in your replies to this letter to determine if further action is warranted pursuant to 10 CFR Parts 50 or 55. The response to Enclosure 1, and , if applicable, will be maintained in our Privacy Act System of Records, NRC-16, Facility Operator Licensees Records Files, and will be subject to the Privacy Act.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions please feel free to contact Mr. Anthony T. Gody, Chief, Operations Branch, at (817) 860-8159. Your cooperation is appreciated.
Sincerely,
                                                      /RA/
Dwight D. Chamberlain, Director Division of Reactor Safety Docket: 50-285 License: DPR-40 Distribution:
Joe l. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.
Washington, DC 20005-3502
 
Omaha Public Power District            Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319


P.O. Box 550 Fort Calhoun, NE  68023-0550David J. BannisterManager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant
Omaha Public Power District                   Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (JDH1)
Resident Inspector (LMW1)
Branch Chief, DRP/E (DNG)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
SUNSI Review Completed: AT______          ADAMS: /Yes      G No Initials: __ATG____
/ Publicly Available      G Non-Publicly Available G Sensitive  / Non-Sensitive E:\Filenet\ML061740560.wpd SOE/OB                C:OB            C:RPBE        C:PSB        D:DRS GWJohnston/lmb        ATGody          DNGraves      MPShannon    DDChamberlain
/RA/                  /RA/            /RA/          /RA/          /RA/
6/13/06                6/12/06          6/13/06      6/13/06      6/19/06 OFFICIAL RECORD COPY                              T=Telephone    E=E-mail      F=Fax


P.O. Box 550 Fort Calhoun, NE  68023-0550James R. CurtissWinston & Strawn 1400 L. Street, N.W.
ENCLOSURE 1 LICENSED OPERATOR FITNESS-FOR-DUTY QUESTIONNAIRE Omaha Public Power District, is requested to provide the following information concerning the fitness-for-duty occurrences of June 2, 2006 (Event Report 42615), regarding the involved licensed operator: [Response should be properly labeled as Official Use Only - Personal Privacy Act Information.]
Washington, DC  20005-3502 Omaha Public Power District-3-ChairmanWashington County Board of Supervisors
: 1.      Name and specific responsibilities of the operator.
: 2.      A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e., random, for-cause, or followup), the results of the tests, and the dates that any tests were confirmed positive.
: 3.      A detailed chronology (time line) associated with this event, including all the information developed as a result of your review of the event (e.g., the report documenting your review of this matter, summaries of interviews, etc.). The time line should include a discussion of the specific work performed by the individual, if any, during the period of time the event occurred.
: 4.      Whether the operator consumed alcohol within the protected area. If so, please provide the specific details of the circumstances surrounding such use.
: 5.      Whether the operator was at the controls or supervising licensed activities while under the influence of alcohol. If so, please provide the specific details of the operator's performance of licensed duties while under the influence.
: 6.      Whether the operator was involved in procedural errors related to these occurrences. If so, please provide the specific details of the procedural errors and the consequences of the errors.
: 7.      Your intentions with regard to the operator's resumption of duties under the 10 CFR Parts 50 and 55 licenses, including your plans for followup testing.
: 8.      A summary of the actions that were taken by you and the licensed operator in response to the positive fitness-for-duty test for alcohol that was reported on June 2, 2006.
: 9.      Any other relevant information which will facilitate the NRC review of this matter.


P.O. Box 466 Blair, NE  68008Julia Schmitt, ManagerRadiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE  68509-5007Daniel K. McGheeBureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA  50319 Omaha Public Power District-4-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (JDH1)Resident Inspector (LMW1)Branch Chief, DRP/E (DNG)Senior Project Engineer, DRP/E (VGG)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)SUNSI Review Completed:  AT______ADAMS:  Yes G  No    Initials: __ATG____  Publicly Available G  Non-Publicly Available G  Sensitive  Non-SensitiveE:\Filenet\ML061740560.wpdSOE/OBC:OBC:RPBEC:PSBD:DRSGWJohnston/lmbATGodyDNGravesMPShannonDDChamberlain/RA//RA//RA//RA//RA/
ENCLOSURE 2 FITNESS-FOR-DUTY PROGRAM QUESTIONNAIRE Omaha Public Power District, is requested to provide the following information concerning the facility fitness-for-duty program regarding the following licensed operator fitness-for-duty related event reports: [Should your response include personal privacy act information, please properly label it as Official Use Only - Personal Privacy Act Information.]
6/13/066/12/066/13/066/13/066/19/06OFFICIAL RECORD COPY T=Telephone          E=E-mail        F=Fax ENCLOSURE 1LICENSED OPERATOR FITNESS-FOR-DUTY QUESTIONNAIREOmaha Public Power District, is requested to provide the following information concerning thefitness-for-duty occurrences of June 2, 2006 (Event Report 42615), regarding the involvedlicensed operator: [Response should be properly labeled as "Official Use Only - PersonalPrivacy Act Information."]1.Name and specific responsibilities of the operator. 2.A summary of the operator's entire fitness-for-duty testing history. Please include thedates and times the operator was tested, the reasons for the tests (i.e., random, for-cause, or followup), the results of the tests, and the dates that any tests were confirmedpositive.3.A detailed chronology (time line) associated with this event, including all the informationdeveloped as a result of your review of the event (e.g., the report documenting your review of this matter, summaries of interviews, etc.). The time line should include a discussion of the specific work performed by the individual, if any, during the period of time the event occurred. 4.Whether the operator consumed alcohol within the protected area. If so, please providethe specific details of the circumstances surrounding such use. 5.Whether the operator was at the controls or supervising licensed activities while underthe influence of alcohol. If so, please provide the specific details of the operator's performance of licensed duties while under the influence. 6.Whether the operator was involved in procedural errors related to these occurrences. Ifso, please provide the specific details of the procedural errors and the consequences of the errors. 7.Your intentions with regard to the operator's resumption of duties under the 10 CFRParts 50 and 55 licenses, including your plans for followup testing. 8.A summary of the actions that were taken by you and the licensed operator in responseto the positive fitness-for-duty test for alcohol that was reported on June 2, 2006.9.Any other relevant information which will facilitate the NRC review of this matter.
EN 41061, September 22, 2005 EN 41947, August 25, 2005 EN 42366, February 23, 2006 EN 42615, June 2, 2006
ENCLOSURE 2FITNESS-FOR-DUTY PROGRAM QUESTIONNAIREOmaha Public Power District, is requested to provide the following information concerning thefacility fitness-for-duty program regarding the following licensed operator fitness-for-duty relatedevent reports: [Should your response include personal privacy act information, pleaseproperly label it as "Official Use Only - Personal Privacy Act Information."]EN 41061, September 22, 2005EN 41947, August 25, 2005 EN 42366, February 23, 2006 EN 42615, June 2, 20061.Do these events indicate an increasing or adverse trend in your fitness-for-dutyprogram, and is this situation being addressed by your corrective action program?2.What fitness-for-duty program related common cause(s) were identified in your review, ifany?3.In you response, please describe how successful your fitness-for-duty training andbehavior observation programs have been in the past and if any improvements are planned.4.What corrective actions are being implemented as a result of your review of licensedoperator fitness-for-duty events?}}
: 1.       Do these events indicate an increasing or adverse trend in your fitness-for-duty program, and is this situation being addressed by your corrective action program?
: 2.       What fitness-for-duty program related common cause(s) were identified in your review, if any?
: 3.       In you response, please describe how successful your fitness-for-duty training and behavior observation programs have been in the past and if any improvements are planned.
: 4.       What corrective actions are being implemented as a result of your review of licensed operator fitness-for-duty events?}}

Latest revision as of 17:07, 23 November 2019

Request for Information: Licensed Operator Positive Fitness-for-Duty Test
ML061740560
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/19/2006
From: Chamberlain D
Division of Reactor Safety IV
To: Ridenoure R
Omaha Public Power District
References
Download: ML061740560 (6)


Text

June 19, 2006 R. T. Ridenoure Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

REQUEST FOR INFORMATION: LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY TEST

Dear Mr. Ridenoure:

On June 2, 2006, you reported in Event Report 42615 that one of your NRC-licensed operators tested positive for alcohol following a random fitness-for-duty test. This letter is a request for information pertaining to this occurrence. Within 30 days from the date of this letter, please provide answers to the questions listed in Enclosure 1 to this letter and other records and information on this operator's past fitness-for-duty, which are relevant to this occurrence. Any other information that you think is pertinent or useful regarding these occurrence would also be appreciated. We request that any personal privacy, proprietary, or safeguards information in your response be provided in a separate attachment and appropriately marked. The affidavit required by 10 CFR 2.790(b) must accompany your response, where applicable.

You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1).

You should ensure that (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983, (2) the operator does not have a disqualifying condition under Section 5.3 of that standard, and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC.

If a conditional license is requested in accordance with 10 CFR 55.25, that condition should be documented on NRC Form 396 and transmitted to the NRC.

If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1) then, in accordance with 10 CFR 55.25, you should notify the NRC via letter of the operator's incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983.

The NRC is interested in obtaining further information regarding your review and any planned actions to address the apparent increase in the number and frequency of occurrences of reported fitness-for-duty events at the Fort Calhoun facility. Accordingly, we request that, within 90 days from the date of this letter, you respond, in writing, to the questions contained in .

Omaha Public Power District The NRC will evaluate the information in your replies to this letter to determine if further action is warranted pursuant to 10 CFR Parts 50 or 55. The response to Enclosure 1, and , if applicable, will be maintained in our Privacy Act System of Records, NRC-16, Facility Operator Licensees Records Files, and will be subject to the Privacy Act.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions please feel free to contact Mr. Anthony T. Gody, Chief, Operations Branch, at (817) 860-8159. Your cooperation is appreciated.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety Docket: 50-285 License: DPR-40 Distribution:

Joe l. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.

Washington, DC 20005-3502

Omaha Public Power District Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319

Omaha Public Power District Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (JDH1)

Resident Inspector (LMW1)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

SUNSI Review Completed: AT______ ADAMS: /Yes G No Initials: __ATG____

/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive E:\Filenet\ML061740560.wpd SOE/OB C:OB C:RPBE C:PSB D:DRS GWJohnston/lmb ATGody DNGraves MPShannon DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/

6/13/06 6/12/06 6/13/06 6/13/06 6/19/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE 1 LICENSED OPERATOR FITNESS-FOR-DUTY QUESTIONNAIRE Omaha Public Power District, is requested to provide the following information concerning the fitness-for-duty occurrences of June 2, 2006 (Event Report 42615), regarding the involved licensed operator: [Response should be properly labeled as Official Use Only - Personal Privacy Act Information.]

1. Name and specific responsibilities of the operator.
2. A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e., random, for-cause, or followup), the results of the tests, and the dates that any tests were confirmed positive.
3. A detailed chronology (time line) associated with this event, including all the information developed as a result of your review of the event (e.g., the report documenting your review of this matter, summaries of interviews, etc.). The time line should include a discussion of the specific work performed by the individual, if any, during the period of time the event occurred.
4. Whether the operator consumed alcohol within the protected area. If so, please provide the specific details of the circumstances surrounding such use.
5. Whether the operator was at the controls or supervising licensed activities while under the influence of alcohol. If so, please provide the specific details of the operator's performance of licensed duties while under the influence.
6. Whether the operator was involved in procedural errors related to these occurrences. If so, please provide the specific details of the procedural errors and the consequences of the errors.
7. Your intentions with regard to the operator's resumption of duties under the 10 CFR Parts 50 and 55 licenses, including your plans for followup testing.
8. A summary of the actions that were taken by you and the licensed operator in response to the positive fitness-for-duty test for alcohol that was reported on June 2, 2006.
9. Any other relevant information which will facilitate the NRC review of this matter.

ENCLOSURE 2 FITNESS-FOR-DUTY PROGRAM QUESTIONNAIRE Omaha Public Power District, is requested to provide the following information concerning the facility fitness-for-duty program regarding the following licensed operator fitness-for-duty related event reports: [Should your response include personal privacy act information, please properly label it as Official Use Only - Personal Privacy Act Information.]

EN 41061, September 22, 2005 EN 41947, August 25, 2005 EN 42366, February 23, 2006 EN 42615, June 2, 2006

1. Do these events indicate an increasing or adverse trend in your fitness-for-duty program, and is this situation being addressed by your corrective action program?
2. What fitness-for-duty program related common cause(s) were identified in your review, if any?
3. In you response, please describe how successful your fitness-for-duty training and behavior observation programs have been in the past and if any improvements are planned.
4. What corrective actions are being implemented as a result of your review of licensed operator fitness-for-duty events?