Category:Report
MONTHYEARML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23249A2622023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature ML21179A2352021-06-25025 June 2021 PSEG Salem Generating Station - Incidental Take Report Atlantic Sturgeon 6/24/2021 ML21078A0002021-03-25025 March 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report LR-N21-0004, U.S Additional Protocol for Salem, Unit 12021-01-31031 January 2021 U.S Additional Protocol for Salem, Unit 1 LR-N21-0007, Report of Changes, Tests, and Experiments2021-01-28028 January 2021 Report of Changes, Tests, and Experiments LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report ML20274A0762020-09-25025 September 2020 PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML20121A1332020-03-0303 March 2020 Biological Opinion 2019 Annual Incidental Take Report LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20192019-11-26026 November 2019 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 LR-N19-0010, U.S. Additional Protocol for Salem Unit 1 2018 Report2019-01-31031 January 2019 U.S. Additional Protocol for Salem Unit 1 2018 Report ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-07-25025 July 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions LR-N18-0057, Pressure and Temperature Limits Report, Revision 12018-06-0808 June 2018 Pressure and Temperature Limits Report, Revision 1 ML18337A3262018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) ML18337A3252018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 ML18337A3242018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary2017-11-0909 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary LR-N17-0076, Focused Evaluation of External Flooding2017-06-30030 June 2017 Focused Evaluation of External Flooding LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2017-04-28028 April 2017 Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)2017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) LR-N17-0051, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2017-02-16016 February 2017 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N17-0049, Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.12017-02-0909 February 2017 Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.1 LR-N17-0036, License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 202017-02-0707 February 2017 License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 20 ML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve2016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal LR-N16-0112, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-29029 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal ML16256A6412016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. LR-N16-0113, NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.2016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. ML16280A5232016-08-31031 August 2016 Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review ML16256A6422016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. ML16256A6402016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.2016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. LR-N16-0113, Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment2016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment ML16256A6432016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. LR-N16-0113, ISG-06 Enclosure B Roadmap, Phase 2 Documents.2016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. LR-N16-0099, GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21.2016-05-31031 May 2016 GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21. ML16049A6092016-02-29029 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident and Staff Closure LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2016-02-26026 February 2016 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N15-0218, Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-21021 October 2015 Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report LR-N15-0207, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-0707 October 2015 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report ML16256A6442015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)2015-09-30030 September 2015 NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.2015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. ML15119A1612015-04-17017 April 2015 Report of Impingement of Atlantic Sturgeon LR-N14-0268, Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days2014-12-24024 December 2014 Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days 2023-09-06
[Table view] Category:Miscellaneous
MONTHYEARML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML21179A2352021-06-25025 June 2021 PSEG Salem Generating Station - Incidental Take Report Atlantic Sturgeon 6/24/2021 ML21078A0002021-03-25025 March 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report LR-N21-0007, Report of Changes, Tests, and Experiments2021-01-28028 January 2021 Report of Changes, Tests, and Experiments LR-N19-0010, U.S. Additional Protocol for Salem Unit 1 2018 Report2019-01-31031 January 2019 U.S. Additional Protocol for Salem Unit 1 2018 Report LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-07-25025 July 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions LR-N17-0076, Focused Evaluation of External Flooding2017-06-30030 June 2017 Focused Evaluation of External Flooding LR-N17-0051, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2017-02-16016 February 2017 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N17-0049, Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.12017-02-0909 February 2017 Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.1 LR-N17-0036, License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 202017-02-0707 February 2017 License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 20 LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal LR-N16-0112, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-29029 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal LR-N16-0113, NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.2016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. ML16256A6412016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. LR-N16-0113, Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment2016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment ML16256A6402016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment LR-N16-0113, ISG-06 Enclosure B Roadmap, Phase 2 Documents.2016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. ML16256A6432016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. LR-N16-0099, GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21.2016-05-31031 May 2016 GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21. ML16049A6092016-02-29029 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident and Staff Closure LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2016-02-26026 February 2016 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N15-0218, Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-21021 October 2015 Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report LR-N15-0207, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-0707 October 2015 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report ML15119A1612015-04-17017 April 2015 Report of Impingement of Atlantic Sturgeon LR-N14-0268, Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days2014-12-24024 December 2014 Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days LR-N14-0248, Response to March 12, 2012 Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5.2014-12-0909 December 2014 Response to March 12, 2012 Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5. LR-N14-0175, CFR 71.95 Report for Packaging and Transporting a Shipping Cask (Model TN-RAM) Without Meeting a Required Condition in Certificate of Compliance 71-92332014-08-11011 August 2014 CFR 71.95 Report for Packaging and Transporting a Shipping Cask (Model TN-RAM) Without Meeting a Required Condition in Certificate of Compliance 71-9233 ML14113A2212014-04-30030 April 2014 NRC Staff Review of the Documentation Provided by PSEG Nuclear LLC for the Salem Generating Station Units 1 and 2 Concerning Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design LR-N14-0112, CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station2014-04-25025 April 2014 CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station ML14316A4092014-03-31031 March 2014 Well AA-V Installation Report - Table 5 Well Search Summary ML14316A4082014-03-31031 March 2014 Well AA-V Installation Report - Table 4 Mean Hydraulic Grad Study Results ML14316A4072014-03-31031 March 2014 Well AA-V Installation Report - Table 2 Groundwater Sample Analytical Results Vincentown Wells ML14316A4062014-03-31031 March 2014 Well AA-V Installation Report - Table 1 Well Construction Details ML14316A4032014-03-31031 March 2014 Well AA-V Installation Report - Table 3 Well AA-V Extended Purge Salem Chemistry Screening Results ML14316A4022014-03-31031 March 2014 Well AA-V Installation Report - FIG-06 Potable Well Locations in Lower Alloways Creek Elsinboro and Greenwich Townships ML14316A4012014-03-31031 March 2014 Well AA-V Installation Report - FIG-05 Vincentown Formation Mean Hydraulic Fluctuation Study Results Map - August 2013-5 ML14316A4002014-03-31031 March 2014 Well AA-V Installation Report - FIG-02 Regional Cross SECTION-2 ML14316A3982014-03-31031 March 2014 Well AA-V Installation Report - FIG-04 Monitoring Wells Screened within the Vincentown FORMATION-4 ML14316A3972014-03-31031 March 2014 Well AA-V Installation Report - FIG-03 Facility Cross Section Through AA-V-3 ML14316A3792014-03-31031 March 2014 Well AA-V Installation Report - Appendix a - Monitoring Well Certification Form B ML14316A3692014-03-31031 March 2014 Final Well AA-V Installation Report 031214 ML14316A3342014-03-31031 March 2014 Well AA-V Installation Report - Appendix F - Well Search Results ML14316A3332014-03-31031 March 2014 Well AA-V Installation Report - Appendix E - Summary, Charts and Raw Data ML14316A3312014-03-31031 March 2014 Well AA-V Installation Report - Appendix D Specific Capacity Test for Well AA-V ML14316A3292014-03-31031 March 2014 Well AA-V Installation Report - Appendix C - AA-V Construction and Boring Logs ML14316A3282014-03-31031 March 2014 Well AA-V Installation Report - Appendix B - Cb Abandonment Report LR-N14-0035, PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima...2014-03-28028 March 2014 PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima... ML13266A2972013-11-18018 November 2013 Audit Report Regarding Flooding Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident LR-N13-0259, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)2013-11-0404 November 2013 Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) LR-N13-0083, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, ...2013-04-26026 April 2013 Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, ... 2023-12-15
[Table view] |