|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:*SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT The Power To Do More.'P.O. Box 15830, Sacramento, CA 95852-1830; 1-888-742-SMUD (7683)NQA 06-035 September 6, 2006 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station LicenseNo. | | {{#Wiki_filter:*SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT The Power To Do More.' |
| DPR-54 RANCHO SECO GROUNDWATER MONITORING REPORT Attention: | | P.O. Box 15830, Sacramento, CA 95852-1830; 1-888-742-SMUD (7683) |
| JohIl-ickman Attached is a copy ofil&"groundwater monitoring report for Rancho Seco. Thisreport provides the results of the groundwater characterization for the Rancho Seco site. The groundwater monitoring program consisted of samples collected over four calendar quarters to represent the four seasons of a yearlong period. The reports concludes that licensed radioactive materials, including tritium, generated during the operation and decommissioning of Rancho Seco have not contaminated the regional aquifer under the Rancho Seco site.Members of your staff with questions requiring additional informatig or clarification may contact me at (916) 732-4843.Sincerely, Ro e tE es Supervý g Quality Engineer Attachment Cc w/ attachment: | | NQA 06-035 September 6, 2006 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station LicenseNo. DPR-54 RANCHO SECO GROUNDWATER MONITORING REPORT Attention: JohIl-ickman Attached is a copy ofil&"groundwater monitoring report for Rancho Seco. Thisreport provides the results of the groundwater characterization for the Rancho Seco site. The groundwater monitoring program consisted of samples collected over four calendar quarters to represent the four seasons of a yearlong period. The reports concludes that licensed radioactive materials, including tritium, generated during the operation and decommissioning of Rancho Seco have not contaminated the regional aquifer under the Rancho Seco site. |
| B.S. Mallett, NRC, Region V RANCHO SECO NUCLEAR PLANT | | Members of your staff with questions requiring additional informatig or clarification may contact me at (916) 732-4843. |
| * 14440 Twin Cities Road, Herald, CA 95638-9799; (209) 333-2935}} | | Sincerely, Ro e tE es Supervý g Quality Engineer Attachment Cc w/ attachment: B.S. Mallett, NRC, Region V RANCHO SECO NUCLEAR PLANT |
| | * 14440 Twin Cities Road, Herald,CA 95638-9799; (209) 333-2935}} |
Latest revision as of 12:46, 23 November 2019
|
---|
Category:Letter
MONTHYEARML19025A0822019-01-10010 January 2019 Rancho Seco Nuclear Generating Station - Report of Changes to the Rancho Seco Quality Assurance Program That Do Not Require Prior NRC Approval ML18302A1582018-11-28028 November 2018 Revised Letter for Termination of Rancho Seco Nuclear Generating Station Operating License DPR-54 and Indemnity Agreement ML18324A5902018-10-31031 October 2018 Sacramento Municipal Utility District (Smud) - Rancho Seco - Emergency Plan Manual Update IR 05000312/20180012018-09-0505 September 2018 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 05000312/2018001 and 07200011/2018001 ML18082B0762018-08-31031 August 2018 Termination of Rancho Seco Nuclear Generating Station Operating License DPR-054 ML18143B4752018-05-15015 May 2018 Biennial Report for Period Covering 05/01/2016 Through 04/30/2016 ML18081A5792018-03-0505 March 2018 Report on Decommissioning Funding Status ML18065A1852018-02-20020 February 2018 Annual Radioactive Effluent Release Report for 2017 ML17191A6322017-06-26026 June 2017 2016 Annual Financial Report for the Sacramento Municipal Utility District ML17116A1362017-05-16016 May 2017 Review of Final Status Survey Report for Rancho Seco Nuclear Generating Station Interim Onsite Storage Building ML17118A0252017-04-20020 April 2017 Final Status Survey Report Submittal - Clarifying Information ML17108A3442017-03-30030 March 2017 Records Required to Be Forwarded to the NRC Prior to Plant 10CFR50 License Termination. with Attachment 1: Annual Radioactive Effluent Release Report for the 1st Quarter of 2017 ML17108A3492017-03-30030 March 2017 Radioactive Effluent Release Report for January 1 - March 30, 2017 ML17095A9802017-03-30030 March 2017 and Independent Spent Fuel Storage Facility - Submittal of Revised Quality Manual ML17094A4072017-03-23023 March 2017 Report on Irradiated Fuel Management Funding Status ML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17094A7332017-03-22022 March 2017 Report on Decommissioning Funding Status ML17090A4102017-03-20020 March 2017 Annual Report of Property Insurance Levels ML17083A2602017-03-14014 March 2017 Annual Radioactive Effluent Release Report for 2016 ML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17026A4332017-01-17017 January 2017 Independent Spent Fuel Storage Installation Proposed License Amendment No. 4 ML16302A0702016-10-18018 October 2016 Biennial Update to Rancho Seco License Termination Plan ML16302A0712016-10-18018 October 2016 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 3 IR 05000312/20160022016-09-16016 September 2016 NRC Inspection Report 050-00312/2016-002 ML16208A1092016-07-14014 July 2016 Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 IR 05000312/20160012016-06-17017 June 2016 IR 05000312/2016001 and 07200011/2016001, May 17-18, 2016, Sacramento Municipal Utility District, Rancho Seco Independent Spent Fuel Storage Installation ML16187A1922016-06-16016 June 2016 and ISFSI - Annual Financial Report for 2015 ML16106A1092016-04-0707 April 2016 Notification of Mailing Date of the Rancho Seco Report on Decommissioning Funding Status ML16097A2362016-03-31031 March 2016 Report on Irradiated Fuel Management Funding Status ML16102A0822016-03-23023 March 2016 Annual Report of Property Insurance Levels ML16102A0972016-03-14014 March 2016 Report on Decommissioning Funding Status ML16089A2932016-03-10010 March 2016 Annual Radioactive Effluent Release Report for the Period of January 1 Through December 31, 2015 ML16014A1372016-01-0707 January 2016 ISFSI - Report of Changes to the Quality Assurance Program That Do Not Require Prior NRC Approval ML15140A4212015-05-12012 May 2015 Sacramento Municipal Utility District - 2014 Annual Financial Report ML15105A0812015-03-31031 March 2015 Voluntary Submission of Pending Licensing Actions (RIS 2014-13 Response) ML15099A5742015-03-31031 March 2015 Independent Spent Fuel.Storage Installation, 10 CFR 20.2206 Annual Report of Individual Monitoring ML15099A5832015-03-30030 March 2015 and Independent Spent Fuel Storage Installation - 2014 Annual Radiological Environmental Operating Report for the Period of January 1, 2014 Through December 31, 2014 ML15093A0582015-03-23023 March 2015 Report on Decommissioning Funding Status ML15093A0592015-03-23023 March 2015 Annual Radioactive Effluent Release Report for 2014 ML15093A0562015-03-23023 March 2015 Annual Report of Property Insurance Levels ML15036A0472015-01-0707 January 2015 Report of Changes to the Rancho Seco Quality Assurance Program That Do Not Require Prior NRC Approval ML14352A3402015-01-0505 January 2015 Change in Project Manager Ltr Rancho Seco ML14310A1972014-10-30030 October 2014 Biennial Update to Rancho Seco License Termination Plan ML14310A2962014-10-23023 October 2014 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 2 ML14308A0562014-10-22022 October 2014 Annual Notification of Foreign Ownership, Control, or Influence Status IR 05000312/20140072014-08-20020 August 2014 IR 050003122014007, on 06/23-25/2014 - 07/28-30/2014, Rancho Seco Nuclear Generating Station, NRC Inspection Report ML14219A3272014-07-24024 July 2014 Biennial Report ML14195A0272014-06-19019 June 2014 Submitting the 2013 Annual Financial Report for the Sacramento Municipal Utility District ML14142A3802014-05-0101 May 2014 Annual Notification of Foreign Ownership, Control, or Influence Status ML14154A1182014-04-30030 April 2014 Request to Register as User of Energysolutions 10-160B Package 2019-01-10
[Table view] |
Text
- SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT The Power To Do More.'
P.O. Box 15830, Sacramento, CA 95852-1830; 1-888-742-SMUD (7683)
NQA 06-035 September 6, 2006 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station LicenseNo. DPR-54 RANCHO SECO GROUNDWATER MONITORING REPORT Attention: JohIl-ickman Attached is a copy ofil&"groundwater monitoring report for Rancho Seco. Thisreport provides the results of the groundwater characterization for the Rancho Seco site. The groundwater monitoring program consisted of samples collected over four calendar quarters to represent the four seasons of a yearlong period. The reports concludes that licensed radioactive materials, including tritium, generated during the operation and decommissioning of Rancho Seco have not contaminated the regional aquifer under the Rancho Seco site.
Members of your staff with questions requiring additional informatig or clarification may contact me at (916) 732-4843.
Sincerely, Ro e tE es Supervý g Quality Engineer Attachment Cc w/ attachment: B.S. Mallett, NRC, Region V RANCHO SECO NUCLEAR PLANT
- 14440 Twin Cities Road, Herald,CA 95638-9799; (209) 333-2935