Line 2: Line 2:
| number = ML080390314
| number = ML080390314
| issue date = 01/31/2008
| issue date = 01/31/2008
| title = Palo Verde, Unit 3 - Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U3R13
| title = Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U3R13
| author name = Mims D C
| author name = Mims D
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:CAL NRR-07-004 mAWW Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-05807-DCM/RJR January 31, 2008 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:CAL NRR-07-004 mAWW Dwight C. Mims                                                       Mail Station 7605 Palo Verde Nuclear   Vice President                               Tel. 623-393-5403       P.O. Box 52034 Generating Station     Regulatory Affairs and Plant Improvement     Fax 623-393-6077         Phoenix, Arizona 85072-2034 102-05807-DCM/RJR January 31, 2008 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 3 Docket No. STN 50-530 Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 -U3R13 (TAC NO. MD4171)By letter dated March 15, 2007, the NRC issued to APS a Confirmatory Action Letter (CAL) for PVNGS Units 1, 2, and 3. The CAL confirmed commitments made by APS regarding Alloy 82/182 butt welds of the Palo Verde pressurizers.
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 -
U3R13 (TAC NO. MD4171)
By letter dated March 15, 2007, the NRC issued to APS a Confirmatory Action Letter (CAL) for PVNGS Units 1, 2, and 3. The CAL confirmed commitments made by APS regarding Alloy 82/182 butt welds of the Palo Verde pressurizers.
This letter is to notify the NRC that the commitment made in APS letter 102-05640, dated January 31, 2007 (ADAMS Accession No. ML070430378), regarding the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds and post-mitigation inspections were completed during U3R1 3. The results of these inspections were initially reported to the NRC Project Manager in an e-mail dated December 13, 2007, within 14 days of completion of the overlays as required by the stated action in APS letter 102-05641, dated February 08, 2007 (ADAMS Accession No. ML070470525).
This letter is to notify the NRC that the commitment made in APS letter 102-05640, dated January 31, 2007 (ADAMS Accession No. ML070430378), regarding the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds and post-mitigation inspections were completed during U3R1 3. The results of these inspections were initially reported to the NRC Project Manager in an e-mail dated December 13, 2007, within 14 days of completion of the overlays as required by the stated action in APS letter 102-05641, dated February 08, 2007 (ADAMS Accession No. ML070470525).
The information provided below satisfies our commitment in APS letter 102-05640.
The information provided below satisfies our commitment in APS letter 102-05640.
The ultrasonic examinations of the weld overlay installations in Unit 3 were completed on December 12, 2007. The seven full-structural weld overlays (FSWOL), which included the Unit 3 pressurizer spray, surge and four safety nozzle dissimilar metal welds and the surge line to hot leg nozzle dissimilar metal welds, were examined using the liquid penetrant (PT) and phased array ultrasonic examination (UT) methods as required by Relief Request 36. The PT and UT of all seven FSWOLs resulted in no rejectable indications.
The ultrasonic examinations of the weld overlay installations in Unit 3 were completed on December 12, 2007. The seven full-structural weld overlays (FSWOL), which included the Unit 3 pressurizer spray, surge and four safety nozzle dissimilar metal welds and the surge line to hot leg nozzle dissimilar metal welds, were examined using the liquid penetrant (PT) and phased array ultrasonic examination (UT) methods as required by Relief Request 36. The PT and UT of all seven FSWOLs resulted in no rejectable indications. Therefore, no repairs were needed.
Therefore, no repairs were needed.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
A member of the   STARS       (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* South Texas Project 0Wolf Creek ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 -U3R13 (TAC NO. MD4171)Page 2 As a result of the completion of the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds discussed above, APS has satisfied the commitment to mitigate these welds and is no longer performing enhanced RCS leakage monitoring in Palo Verde Unit 3.No new commitments are being made to the NRC by this letter. Should you have any questions, please contact Glenn A. Michael at (623) 393-5750.Sincerely, DCM/TNW/RJR/
* South Texas Project         0Wolf     Creek
cc: E. E. Collins Jr. NRC Region IV Regional Administrator M. T. Markley NRC NRR Project Manager G. G. Warnick NRC Senior Resident Inspector for PVNGS}}
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U3R13 (TAC NO. MD4171)
Page 2 As a result of the completion of the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds discussed above, APS has satisfied the commitment to mitigate these welds and is no longer performing enhanced RCS leakage monitoring in Palo Verde Unit 3.
No new commitments are being made to the NRC by this letter. Should you have any questions, please contact Glenn A. Michael at (623) 393-5750.
Sincerely, DCM/TNW/RJR/
cc:   E. E. Collins Jr. NRC Region IV Regional Administrator M. T. Markley       NRC NRR Project Manager G. G. Warnick       NRC Senior Resident Inspector for PVNGS}}

Latest revision as of 20:42, 14 November 2019

Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U3R13
ML080390314
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/31/2008
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-05807-DCM/RJR, TAC MD4171, NRR-07-004
Download: ML080390314 (2)


Text

CAL NRR-07-004 mAWW Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-05807-DCM/RJR January 31, 2008 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 -

U3R13 (TAC NO. MD4171)

By letter dated March 15, 2007, the NRC issued to APS a Confirmatory Action Letter (CAL) for PVNGS Units 1, 2, and 3. The CAL confirmed commitments made by APS regarding Alloy 82/182 butt welds of the Palo Verde pressurizers.

This letter is to notify the NRC that the commitment made in APS letter 102-05640, dated January 31, 2007 (ADAMS Accession No. ML070430378), regarding the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds and post-mitigation inspections were completed during U3R1 3. The results of these inspections were initially reported to the NRC Project Manager in an e-mail dated December 13, 2007, within 14 days of completion of the overlays as required by the stated action in APS letter 102-05641, dated February 08, 2007 (ADAMS Accession No. ML070470525).

The information provided below satisfies our commitment in APS letter 102-05640.

The ultrasonic examinations of the weld overlay installations in Unit 3 were completed on December 12, 2007. The seven full-structural weld overlays (FSWOL), which included the Unit 3 pressurizer spray, surge and four safety nozzle dissimilar metal welds and the surge line to hot leg nozzle dissimilar metal welds, were examined using the liquid penetrant (PT) and phased array ultrasonic examination (UT) methods as required by Relief Request 36. The PT and UT of all seven FSWOLs resulted in no rejectable indications. Therefore, no repairs were needed.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • South Texas Project 0Wolf Creek

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Completion of Full Structural Weld Overlay in Response to Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U3R13 (TAC NO. MD4171)

Page 2 As a result of the completion of the mitigation of the Palo Verde Unit 3 pressurizer Alloy 600/82/182 butt welds discussed above, APS has satisfied the commitment to mitigate these welds and is no longer performing enhanced RCS leakage monitoring in Palo Verde Unit 3.

No new commitments are being made to the NRC by this letter. Should you have any questions, please contact Glenn A. Michael at (623) 393-5750.

Sincerely, DCM/TNW/RJR/

cc: E. E. Collins Jr. NRC Region IV Regional Administrator M. T. Markley NRC NRR Project Manager G. G. Warnick NRC Senior Resident Inspector for PVNGS