| issue date = 08/06/2008
| issue date = 08/06/2008
| title = Preparation and Scheduling of Operator Licensing Examinations - NRC Regulatory Issue Summary (RIS) 2008-16
| title = Preparation and Scheduling of Operator Licensing Examinations - NRC Regulatory Issue Summary (RIS) 2008-16
| author name = Smith J D
| author name = Smith J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::RIS 2008-16]]


=Text=
=Text=
{{#Wiki_filter:<V..Tennessee  
{{#Wiki_filter:<V..
Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee  
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 August 6, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
37384-2000
In the Matter of                                   )                             Docket Nos. 50-327 Tennessee Valley Authority (TVA)                     )                                         50-328 SEQUOYAH NUCLEAR PLANT (SQN) - PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS - NRC REGULATORY ISSUE
August 6, 2008 U.S. Nuclear Regulatory  
 
Commission
==SUMMARY==
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
 
In the Matter of ) Docket Nos. 50-327 Tennessee  
(RIS) 2008-16 This letter is in response to the NRC RIS 2008-16 dated June 27, 2008. The enclosure provides the requested information.
Valley Authority (TVA) ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) -PREPARATION  
If you have any questions, please call me at (423) 843-7170.
AND SCHEDULING  
Sincerely, James D. Smith Manager, Site Licensing and Industry Affairs Enclosure cc (Enclosure):
OF OPERATOR LICENSING  
Mr. Luis A. Reyes Regional Administrator, Region II ATTN: W. T. Widmann U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 Printed on recycled paper
EXAMINATIONS  
 
-NRC REGULATORY  
ENCLOSURE SEQUOYAH NUCLEAR PLANT PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS
ISSUE SUMMARY (RIS) 2008-16 This letter is in response to the NRC RIS 2008-16 dated June 27, 2008. The enclosure provides the requested  
 
information.
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 08/31/2008 (8-2005)                                                           Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to-the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
If you have any questions, please call me at (423) 843-7170.Sincerely, James D. Smith Manager, Site Licensing and Industry Affairs Enclosure cc (Enclosure):
OPERATOR LICENSING                         Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA                         *and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
Mr. Luis A. Reyes Regional Administrator, Region II ATTN: W. T. Widmann U.S. Nuclear Regulatory  
FACILITY                                                                                                         NRC REGION Sequoyah Nuclear Plant                                                                                           RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                       CY 09             CY 10                           CY 10                           CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED                 1                           1                                 1                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                           0                                 0                             0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 09             CY 1o                           CY lO                           CY 11 NUMBER OF REACTOR                         3                   8                                 8                             8 OPERATORS NUMBER OF SENIOR REACTOR                       6                     9                               8                               8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                                                             0                                               0 OPERATORS - UPGRADE                         0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                       0                   0 PROPOSED DATES PRIMARY DATE                 01/26/2009       01/25/2010                     08/23/2010                     .08/22/2011 ALTERNATE DATE                 02/02/2009         02/01/2010                     08/30/2010                       08/29/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   10                                                   CY       11 PROPOSED NUMBER           MARCH         JUNE     SEPTEMBER DECEMBER           MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF                         16                                                         16 CANDIDATES NRC FORM 536 (8-2005)                                                                                               PRINTED ON RECYCLED PAPER
Commission
 
Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931
I .
Printed on recycled paper  
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131.                         EXPIRES: 08/31/2008 (8-2005)                                                         Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
ENCLOSURE SEQUOYAH NUCLEAR PLANT PREPARATION  
OPERATOR LICENSING                         Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA                         and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.         If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
AND SCHEDULING  
FACILITY                                                                                                         NRC REGION Sequoyah Nuclear Plant                                                                                           RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE
OF OPERATOR LICENSING  
        'PROPOSED NUMBER                         CY 12           CY                             CY                             CY ESTIMATED NUMBER OF LICENSEE-PREPARED                   1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                     0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 12             CY                             CY                             CY NUMBER OF REACTOR                         8 OPERATORS NUMBER OF SENIOR REACTOR                         8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                         0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                       0 PROPOSED DATES PRIMARY DATE
EXAMINATIONS
* 03/19/2012 ALTERNATE DATE                 03/26/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     12                                                 CY PROPOSED NUMBER NMARCH       JUNE       SEPTEMBER DECEMBER         MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                         16 CAN DI DATES NRC FORM 536 (8-2005)                                                                                               PRINTED ON RECYCLED PAPER}}
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 08/31/2008
(8-2005) Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden estimate to-the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.OPERATOR LICENSING  
Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information
EXAMINATION  
DATA *and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
collection.
FACILITY NRC REGION Sequoyah Nuclear Plant RII A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 10 CY 11 ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 1 1 1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 09 CY 1o CY lO CY 11 NUMBER OF REACTOR 3 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 6 9 8 8 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 0 0 OPERATORS  
-UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS  
-LIMITED 0 0 PROPOSED DATES PRIMARY DATE 01/26/2009  
01/25/2010  
08/23/2010  
.08/22/2011
ALTERNATE  
DATE 02/02/2009  
02/01/2010  
08/30/2010  
08/29/2011
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 10 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES
NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER  
I .NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131.  
EXPIRES: 08/31/2008
(8-2005) Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden estimate to the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.OPERATOR LICENSING  
Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information
EXAMINATION  
DATA and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
collection.
FACILITY NRC REGION Sequoyah Nuclear Plant RII A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE'PROPOSED  
NUMBER CY 12 CY CY CY ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 12 CY CY CY NUMBER OF REACTOR 8 OPERATORS NUMBER OF SENIOR REACTOR 8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS  
-LIMITED 0 PROPOSED DATES PRIMARY DATE 03/19/2012
ALTERNATE  
DATE 03/26/2012
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 12 CY PROPOSED NUMBER NMARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 16 CAN DI DATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER
}}

Latest revision as of 14:11, 14 November 2019

Preparation and Scheduling of Operator Licensing Examinations - NRC Regulatory Issue Summary (RIS) 2008-16
ML082210117
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/06/2008
From: James Smith
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-08-016
Download: ML082210117 (4)


Text

<V..

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 August 6, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority (TVA) ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS - NRC REGULATORY ISSUE

SUMMARY

(RIS) 2008-16 This letter is in response to the NRC RIS 2008-16 dated June 27, 2008. The enclosure provides the requested information.

If you have any questions, please call me at (423) 843-7170.

Sincerely, James D. Smith Manager, Site Licensing and Industry Affairs Enclosure cc (Enclosure):

Mr. Luis A. Reyes Regional Administrator, Region II ATTN: W. T. Widmann U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 Printed on recycled paper

ENCLOSURE SEQUOYAH NUCLEAR PLANT PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to-the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA *and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Sequoyah Nuclear Plant RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 1o CY lO CY 11 NUMBER OF REACTOR 3 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 6 9 8 8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 0 OPERATORS - UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 01/26/2009 01/25/2010 08/23/2010 .08/22/2011 ALTERNATE DATE 02/02/2009 02/01/2010 08/30/2010 08/29/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 10 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

I .

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131. EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Sequoyah Nuclear Plant RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE

'PROPOSED NUMBER CY 12 CY CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 CY CY CY NUMBER OF REACTOR 8 OPERATORS NUMBER OF SENIOR REACTOR 8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE

  • 03/19/2012 ALTERNATE DATE 03/26/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 12 CY PROPOSED NUMBER NMARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CAN DI DATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER